![Page 1: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/1.jpg)
A short History of Reactors :A short History of Reactors :The first GenerationThe first Generation
Bertrand BARRÉScientific Advisor AREVA
Pr. Emeritus INSTN
![Page 2: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/2.jpg)
Oklo, Gabon : Generation 0
Nuclear Power – B. Barré - Garching – February 2010. - p.2
![Page 3: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/3.jpg)
Generation I
Generation II
1950 1970 1990 2010 2030 2050 2070 2090
Generation III
PionnerPionnerFacilitiesFacilities
OperatingOperatingReactorsReactors
Advanced Advanced ReactorsReactors
FutureFutureNuclear SystemsNuclear Systems
Generation IV
Nuclear reactors « Generations »
Nuclear Power – B. Barré - Garching – October 2010. - p.3
![Page 4: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/4.jpg)
Fission 1938 - 19421938 : Fermi plays with neutrons & U. Hahn-Meitner say «fission !»
1939 : Joliot et al. «chain reaction»1942 : Staggs Field
Nuclear Power – B. Barré - Garching – February 2010. - p.4
![Page 5: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/5.jpg)
December 2, 1942
Prospects & Prerequisites to Renaissance – B. Barré Gassummit 2009
![Page 6: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/6.jpg)
The 50s : Nuclear Electricity
1956 : Inauguration of Calder Hall by
Elisabeth II
1951 : EBR 1 lits 4 Bulbs)
1954 : Obninsk, 5 MWe
Nuclear Power – B. Barré - Garching – February 2010. - p.6
![Page 7: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/7.jpg)
Prospects & Prerequisites to Renaissance – B. Barré Gassummit 2009
Obninsk 5 MWe NPP
Calder Hall : from Opening to Decommissioning
![Page 8: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/8.jpg)
Paleontology
Nuclear Power – B. Barré - Garching – February 2010. - p.8
![Page 9: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/9.jpg)
Many Possible Combinations
Fissile Material U235, Pu, U233
Fertile Material U238, Th232
Moderator D2O, Graphite, H2O, or none
Fuel Composition Metal, oxide, carbide, nitride, salt, solid, liquid, suspension
Fuel Geometry Cylinder, rod, pin, sphere, particle
Coolant Air, H2O, D2O, CO2, He, Na, Pb
Cycle Direct, indirect
Nuclear Power – B. Barré - Garching – February 2010. - p.9
![Page 10: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/10.jpg)
The 50s’ ebullient Creativity
(Coffee Shop, Idaho Falls, 1973)Nuclear Power – B. Barré - Garching – February 2010. - p.10
![Page 11: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/11.jpg)
Characteristics of Gen I
Incredible creativity : almost every possible combination tried
Very short design-to-operation time
Very light regulatory framework
Strong Government support
Good public acceptance
No time to correct mistakes
From prototype to prototype to prototype
Fast escalation in unit size
No standardization
Safety issues progressively raised and solved
Prospects & Prerequisites to Renaissance – B. Barré Gassummit 2009
![Page 12: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/12.jpg)
Chicago Pile #1
Graphite
Natural uranium
(metal & oxide)
Nuclear Power – B. Barré - Garching – February 2010. - p.12
![Page 13: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/13.jpg)
The Reactors « Phylum »
+ MSR ?
Fermi
w-PuGraphite Magnox AGR
HTR
HWR
w-Pu
CanduSGHWR
+Swu LWR
RBMK
Naval P.
BWR
PWR
FBR+Reprocessing
Nuclear Power – B. Barré - Garching – February 2010. - p.13
![Page 14: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/14.jpg)
Coolants ComparisonWater Sodium Gas
Operating Temperature
Poor (boiling, corrosion)
Good Excellent
Thermal Transfer Very good Excellent Mediocre (pressure, mass flow, Pvol)
Neutron capture Mediocre (only thermal)
Good Excellent
Corrosion Poor Good He : excellent CO2 : poor (HT)
Technology leaktightness
Medium Medium (no pressure)
Leaks
ISIR Excellent Poor Excellent
Safety Issues Vaporization Na-O2Na-H2O
Loss of pressure
Nuclear Power – B. Barré - Garching – February 2010. - p.14
![Page 15: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/15.jpg)
A Few Selection Factors
• Excess Ambition
•Technology Problems
• Poor performance
• Accidents (or risks)
• Bad « timing »
• U Utilization
• Independence
• Duality/synergies
• Industrial strength
• Tec breakthrough
• Waste management
Nuclear Power – B. Barré - Garching – February 2010. - p.15
![Page 16: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/16.jpg)
GWe Installed in the World, July 2010
Operating : 438 Units, 372 GWe
Under Construction:61 Units, 59 GWe
53 PWR+VVR
Source: IAEA PRIS
Reactor Types
*VVR included
16Nuclear Power – B. Barré - Garching – October 2010. - p.16
![Page 17: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/17.jpg)
First to start a Power Programme:
Soviet Union
United Kingdom
France
United States
Canada
Sweden
Exports and Licenses (Japan, Germany)
Nuclear Power – B. Barré - Saclay – October 2010. - p.17
![Page 18: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/18.jpg)
Soviet Union 1: The Beginnings
1946: F1 at Kurchatov Institute = CP1, still operational
1954: Obninsk APS1 5MWe connected, ancestor RBMK
1964:Beloyarsk 1, 100 MWe RBMK and Novovoronezh 1, 210 MWe VVR + B2, NV2
« Dual Purpose » RBMKs restricted to SU proper, while VVR exported to satellites (except Yugoslavia & Romania) + Finland, with spent fuel return
First generation (1973-79) = 12 units, 5.8 GWe, 4 VVR 440/230, 4 RBMK 1000 and 4 Cogen Bilibino
FBR units BOR 60 and BN 350 (desalination) Nuclear Power – B. Barré - Saclay – October 2010. - p.18
![Page 19: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/19.jpg)
Soviet Union : Generation 2
In Russia : 18 units, 16,5 GWe: 7 RBMK, 2 VVR 440/213, 7 VVR 1000, 1 FBR BN600
In Ukraine, Lituania : 4 RBMK 1000, 2 RBMK 1500, 2 VVR 400, 13 VVR 1000
April 26 1986: Accident at Unit 4 Chernobyl
1990: End USSR
Nuclear Power – B. Barré - Saclay – October 2010. - p.19
![Page 20: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/20.jpg)
VVR (or VVER) : Russian PWRs
Kozloduy
Intro 1 – B. Barré GA2010. - p.20
![Page 21: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/21.jpg)
VVER 1000 Primary Circuit
Intro 1 – B. Barré GA2010. - p.21
![Page 22: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/22.jpg)
RBMK Schematics
Containment Areas
Reactor Floor
Core : diameter 12 mheight 7 m
Nuclear Power – B. Barré - Garching – February 2010. - p.22
![Page 23: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/23.jpg)
Chernobyl
Nuclear Power – B. Barré - Garching – February 2010. - p.23
![Page 24: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/24.jpg)
The British Saga (1)
Tube Alloys associated to the Manhattan Project
1945 AERE Harwell, military priority GLEEP 1947-90
No D2O, no SWU GCRs
Windscale production piles 1950-51
Magnox series (Calder Hall, October 1956) : 11 sites, 26 units, 5 consortia)
U enriched Oxide/SS AGR (Windscale 1962) 6 sites, 15 units
No standardization, Magnox = reprocessing
vision : Pu from Magnox to Breeders
Nuclear Policies – WNU - B. Barré July 2010 24
![Page 25: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/25.jpg)
Lots of Magnox… too many Vendors
Prospects & Prerequisites to Renaissance – B. Barré Gassummit 2009
Berkeley Dungeness A Oldbury A
Bradwell Hinckley Point A Sizewell A
![Page 26: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/26.jpg)
Gas Cooled Reactors (Magnox & AGR)
Nuclear Power – B. Barré - Garching – February 2010. - p.26
![Page 27: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/27.jpg)
Windscale : Magnox & Proto AGR
Intro 1 – B. Barré GA2010. - p.27
![Page 28: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/28.jpg)
Prospects & Prerequisites to Renaissance – B. Barré Gassummit 2009
![Page 29: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/29.jpg)
Magnox 300 MW & AGR 600 MW
Oldbury A Dungeness B
Nuclear Power – B. Barré - Garching – February 2010. - p.29
![Page 30: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/30.jpg)
The British Saga (2)
Dragon 1964-1974, SGHWR 1968-1990 (in case)
FBR Programm at Dounreay: DFR 1959-1977, PFR 1974-1994
Dragon Project
SGHWR
Nuclear Policies – WNU - B. Barré July 2010 30
![Page 31: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/31.jpg)
French Nuclear Program : early years1945 Creation of the CEA (Commissariat à l’Énergie Atomique)
1948 Criticality of ZOE
1956 First experimental generation of nuclear electricity (G1)
1963 First EDF Nuclear Plant Chinon A1
1970 Decision to switch from UNGG to LWR at Fessenheim
1972 Westinghouse License to Framatome
1974 « Messmer » Program
1975 PWR selected, CEA replaces W as Framatome shareholder
Nuclear Power – B. Barré - Saclay – October 2010. - p.31
![Page 32: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/32.jpg)
Confirmation of Fission. Joliot Patents 1939-1940
Joliot, Halban & Kowarsky
Nuclear Power – B. Barré - Saclay – October 2010. - p.32
![Page 33: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/33.jpg)
D Day for the French Nuclear Program
December 15 1948
Criticality of «ZOÉ»
![Page 34: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/34.jpg)
![Page 35: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/35.jpg)
The Pionneers (UNGG - Magnox)
Nuclear Power – B. Barré - Garching – February 2010. - p.35
![Page 36: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/36.jpg)
UNGG Fuel Rods (SL1)
Nuclear Power – B. Barré - Garching – February 2010. - p.36
![Page 37: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/37.jpg)
Refueling Machine UNGG
Nuclear Power – B. Barré - Garching – February 2010. - p.37
![Page 38: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/38.jpg)
St Laurent A
Prospects & Prerequisites to Renaissance – B. Barré Gassummit 2009
![Page 39: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/39.jpg)
From UNGG to PWR : Le Bugey
![Page 40: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/40.jpg)
Nuclear Power in the United States
Priority to the Bomb…then to the Submarines
Nuclear Power – B. Barré - Saclay – October 2010. - p.40
![Page 41: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/41.jpg)
USA 1 : The Beginnings
1946 : Mc Mahon Act, establishes USAEC
1948 : Westinghouse involved in submarine design
1950: General Electric, ditto
1951: MTR, EBR1 at INEL (picture 20-12-51)
1953: S1W, land-based sub, ancestor PWR. Atoms for Peace Speech.
1954: Atomic Energy Act opens Nuclear to private industry and declassifies relevant data
1955-57: AEC launches Power Demonstration Program (PWR, BWR, Na-Graphite, HWR, FBR, HTGR). BORAX III lits Arco.
Nuclear Power – B. Barré - Saclay – October 2010. - p.41
![Page 42: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/42.jpg)
USA 2 : The Heydays1957: Shippingport 60 MWe PWR, 1st US NPP connected (Shut down 1982, green field 1987)
1963-1966 : First turnkey Plants W & GE (costs overruns)
1966: 20 orders in the year, « truly commercial »: B&W, CE and GA join the gang, and A/E intervene
1972-1972 : > 40 orders/year
Shippingport 1957 Dresden 1960
Nuclear Power – B. Barré - Saclay – October 2010. - p.42
![Page 43: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/43.jpg)
Shippingport1957-1982
Prospects & Prerequisites to Renaissance – B. Barré Gassummit 2009
![Page 44: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/44.jpg)
![Page 45: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/45.jpg)
PWR Fuel Assembly
Control rod cluster
Top end fitting
Guide-tubes
Spacer/mixing Grid
Fuel Pin
Bottom end fitting
Nuclear Reactors – B. Barré - Imperial College - December 2009. - p.45
![Page 46: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/46.jpg)
Boiling Water Reactors BWR
Only one cooling circuit at Psat pressure ~7 Mpa
Vapor generation close to the fuel. Same vapor goes to the turbine (direct cycle)
Moderation ration varies axially
Intro 1 – B. Barré GA2010. - p.46
![Page 47: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/47.jpg)
BWR Fuel Assembly
LWR Family – B. Barré October 2010. - p.47
![Page 48: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/48.jpg)
BWR Layout Evolution
LWR Family – B. Barré October 2010. - p.48
![Page 49: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/49.jpg)
USA 3 : 1974, Annus Horribilis1972 West Valley shut down for refurbishing, will not restart. GE abandons Morris
1973: Kippour War, 1st Oil shock, Project Independance, Watergate hearings
1974: Series of NPP cancellations – AEC split into ERDA and NRC, JAEC dissolved – Smiling Buddah
1976: G Ford stops commercial reprocessing
1977 (April 7): J Carter kills reprocessing and FBR-ERDA becomes USDOE - INFCE
1978: Nuclear Non Proliferation Act. Full Scope Safeguards – End of US enrichment monopoly
1979 (March 29) TMI2 Accident. : National Nuclear Scare
Nuclear Power – B. Barré - Saclay – October 2010. - p.49
![Page 50: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/50.jpg)
Three Mile Island
Nuclear Power – B. Barré - Saclay – October 2010. - p.50
![Page 51: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/51.jpg)
Canada
September 1945 : ZEEP, first nuclear reactor outside USA
1947 NRX
1952 AECL (Chalk River)
1962 NPD 25 MWe PHWR (AECL, GE, Ontario Hydro) first nuclear electricity
1966 Douglas Point 200 MWe CANDU
1973 : Pickering, 4 x 800 MWe CANDU (largest nuclear station) + KANUPP + Rajasthan
![Page 52: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/52.jpg)
ZEEP 1945NRX 1947
Douglas Point 68-84 Heavy Water
Nuclear Power – B. Barré - Saclay – October 2010. - p.52
![Page 53: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/53.jpg)
Bruce Site
Nuclear Power – B. Barré - Saclay – October 2010. - p.53
![Page 54: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/54.jpg)
Système CANDU
![Page 55: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/55.jpg)
![Page 56: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/56.jpg)
Today, when we think « nuclear reactors »…
![Page 57: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/57.jpg)
AGESTA : District heating in Sweden
![Page 58: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/58.jpg)
CHP in Bilibino
![Page 59: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/59.jpg)
A A
А - А
88
1
2
3
4
5
6
7
8
9
Fuel Assembly
1. Gas gap2. Shielding plug 3. Upper plenum4. Downcomer5. Tubular-type fuel element6. Graphite sleeve7. Spiral expansion joint8. Inlet orifice9. Bottom plenum
7685
Bilibino NPPs
4 units
(1974-1976)
12 MWe + 20 MWt
250/280°C
273 Fuel Assemblies
of 6 elements (tubes)
7.2 t U 3%
![Page 60: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/60.jpg)
Seawater Desalination
BN-350, Aktau (ex-Schevschenko), Kazakhstan
Fast Neutron Reactor 6 loops, sodium cooled, enriched U
Construction 1964, Operation1976 to 1999
90/52 MWe and 120 000 m3 freshwater per day
![Page 61: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/61.jpg)
Fly Nuclear Airlines !
![Page 62: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/62.jpg)
Shielded Cabin for the Pilot of NB-36H
![Page 63: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/63.jpg)
Nuclear Jet Engine
General Electric develops a direct cycle engine from a modified J-47 turbojet
1956 Land-based prototype Heat Transfer Reactor Experiment HTRE-1
HTRE-3 could feed 2 turbojets while located within the plane body (but never flew)
HTRE-1
HTRE-3
![Page 64: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/64.jpg)
The SLAM Program (Pluto)
A predecessor of the Cruise Missile, with a nuclear « ramjet »
1958 : Contract given to Vought, Convair and North American
Reactor first developped by General Electric, then Lawrence Livermore Lab
![Page 65: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/65.jpg)
1961 Pluto Tests (TORY II-A)600 MWt Reactor, no shielding
Homogeneous cylindrical core 1m22 X 0.8 m diameter
10 000 elements : Hexagonal Ceramics « macaronis », BeO, ZrO2, UO2, 10 cm long, 0.6 cm I D
![Page 66: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/66.jpg)
Nerva-Rover Program,NRX Tests, Jackass Flats
![Page 67: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/67.jpg)
NRX ElementPyC Coated UC2 Particles dispersed in graphitized Matrix
19 Coolant Channels coated with niobium carbide to prevent H2 attack
Beryllium Reflector
2000 MWt/m3
Inlet H2 Temp. : -183°C
Outlet H2 Temp. : 2500°C
~1 MW per Fuel Element
1m32
19 mm
![Page 68: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/68.jpg)
NERVA NRX-A3
![Page 69: A short History of Reactors : The first Generation · down 1982, green field 1987) 1963-1966 : First turnkey Plants W & GE (costs overruns) 1966: 20 orders in the year, « truly commercial](https://reader034.vdocument.in/reader034/viewer/2022050116/5f4ccef2c652513c76611c04/html5/thumbnails/69.jpg)
For More :
www.bertrandbarre.com