a successful ms4 mindset: resource versus requirement...alternative mindset example today’s...
TRANSCRIPT
![Page 1: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/1.jpg)
INAFSM 2019 Annual Conference
A Successful MS4 Mindset: Resource Versus Requirement
![Page 2: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/2.jpg)
Community Resource: Connecting Youth with Engaging ExperiencesRequirement Based: Checking Off Regulatory Boxes
CURRENT MINDSET? ALTERNATIVE MINDSET EXAMPLE
Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples of how to achieve a ‘community resource’ mindset for your local program.
![Page 3: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/3.jpg)
What we mean by viewing the MS4 Program as a Community Resourcein the words of elected officials:
![Page 4: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/4.jpg)
Views of Elected Officials on the MS4 Program
Benefits:➢ Partnerships➢ Community Support➢ Economic Development➢ Quality of Life
Recommendations:➢ Cost Share➢ Educate Community➢ Partnerships➢ Just the Right Thing to Do
![Page 5: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/5.jpg)
Two Primary Challenges:1. How do we keep pollution out of our stormwater conveyances?2. How do we keep our stormwater conveyances clean?
![Page 6: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/6.jpg)
A Coordinated Stormwater Management Program:
The MS4 Program!
Two Primary Challenges:1. How do we keep pollution out of our stormwater conveyances?2. How do we keep our stormwater conveyances clean?
![Page 7: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/7.jpg)
EPA Guidance on MS4 Program Implementation6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
![Page 8: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/8.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
Distributing educational materials and performing outreach to inform thepublic about the impacts polluted stormwater runoff discharges can haveon water quality.
![Page 9: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/9.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
Distributing educational materials and performing outreach to inform thepublic about the impacts polluted stormwater runoff discharges can haveon water quality.
MS4 Program Challenge:With so many topics, how can one effectively prioritize overall educational outreach activities?
![Page 10: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/10.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
Distributing educational materials and performing outreach to inform thepublic about the impacts polluted stormwater runoff discharges can haveon water quality.
Develop and implement an overall, local, resource focused Strategic Plan
MS4 Program Challenge:With so many topics, how can one effectively prioritize overall educational outreach activities?
![Page 11: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/11.jpg)
Overall Strategic Plan
![Page 12: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/12.jpg)
Overall Strategic Plan
CURRENT MINDSET? ALTERNATIVE MINDSET
Requirement Based Resource Based
“We copy other communitiesflyers and brochures.”
“We develop brochures and activities based on our community’s needs.”
![Page 13: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/13.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
Distributing educational materials and performing outreach to inform thepublic about the impacts polluted stormwater runoff discharges can haveon water quality.
MS4 Program Challenge:How can our program utilize existing tools to tell the story of our local watershed?
![Page 14: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/14.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
Distributing educational materials and performing outreach to inform thepublic about the impacts polluted stormwater runoff discharges can haveon water quality.
Modify information fromthe internet using a
Place-Based Education Philosophy
MS4 Program Challenge:How can our program utilize existing tools to tell the story of our local watershed?
![Page 15: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/15.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
“Perch Game” Developed by Ohio State University as a Sea Grant Project
![Page 16: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/16.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
“Perch Game” Developed by Ohio State University as a Sea Grant Project
![Page 17: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/17.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
“Perch Game” Developed by Ohio State University as a Sea Grant Project
![Page 18: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/18.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
“Perch Game” Developed by Ohio State University as a Sea Grant Project
![Page 19: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/19.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
“Perch Game” Developed by Ohio State University as a Sea Grant Project
CURRENT MINDSET? ALTERNATIVE MINDSET
Requirement Based Resource Based
“We distribute flyers andbrochures we find on the internet.”
“We use information from the internet as a guide to implement Place-Based Education
based on our local watershed.”
![Page 20: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/20.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
Distributing educational materials and performing outreach to inform thepublic about the impacts polluted stormwater runoff discharges can haveon water quality.
MS4 Program Challenge:How can our program offer quality informational products to a wider audience?
![Page 21: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/21.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
Distributing educational materials and performing outreach to inform thepublic about the impacts polluted stormwater runoff discharges can haveon water quality.
Partner with other area MS4s to Produce High Quality Posters
MS4 Program Challenge:How can our program offer quality informational products to a wider audience?
![Page 22: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/22.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
![Page 23: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/23.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
Rain Garden
Outfall
Street Drainage
Receding Storm
Kayakers
Stormwater Pond
Trees
![Page 24: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/24.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
Rain Garden
Outfall
Street Drainage
Receding Storm
Kayakers
Stormwater Pond
Trees
![Page 25: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/25.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
Rain Garden
Outfall
Street Drainage
Receding Storm
Kayakers
Stormwater Pond
Trees
CURRENT MINDSET? ALTERNATIVE MINDSET
Requirement Based Resource Based
“We copy other communitiesflyers and brochures.”
“We partnered with others to createhigh quality art posters to displayin our city and sell to residents.”
![Page 26: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/26.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
Distributing educational materials and performing outreach to inform thepublic about the impacts polluted stormwater runoff discharges can haveon water quality.
MS4 Program Challenge:How can we reach students outside of the classroom?
![Page 27: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/27.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
Distributing educational materials and performing outreach to inform thepublic about the impacts polluted stormwater runoff discharges can haveon water quality.
Partner with Afterschool Programs and Summer Camps
MS4 Program Challenge:How can we reach students outside of the classroom?
![Page 28: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/28.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
![Page 29: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/29.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
![Page 30: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/30.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
CURRENT MINDSET? ALTERNATIVE MINDSET
Requirement Based Resource Based
“We lecture students in a classroom.” “We partner with Out-of-School Time providers to run a watershed-based
Summer Camp .”
![Page 31: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/31.jpg)
Is there an Afterschool Program Near You? Check with the Indiana Afterschool Network
![Page 32: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/32.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
MS4 Program Challenge:How do we get our messages out while maximizing limited resources?
Distributing educational materials and performing outreach to inform thepublic about the impacts polluted stormwater runoff discharges can haveon water quality.
![Page 33: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/33.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
Leverage the “Buying Power” of Multiple MS4s
MS4 Program Challenge:How do we get our messages out while maximizing limited resources?
Distributing educational materials and performing outreach to inform thepublic about the impacts polluted stormwater runoff discharges can haveon water quality.
![Page 34: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/34.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
INAFSM Video Series
![Page 35: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/35.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
INAFSM Video Series
CURRENT MINDSET? ALTERNATIVE MINDSET
Requirement Based Resource Based
“We have limited resourcesso we link to EPA documents.”
“We work with multiple partners to make limited resources go farther.”
![Page 36: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/36.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
Providing opportunities for the public to participate in programdevelopment and implementation, including effectively publicizing publichearings.
![Page 37: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/37.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
Providing opportunities for the public to participate in programdevelopment and implementation, including effectively publicizing publichearings.
MS4 Program Challenge:How can we increase K-12 student participation in our outreach activities?
![Page 38: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/38.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
Providing opportunities for the public to participate in programdevelopment and implementation, including effectively publicizing publichearings.
Use Creative, Local Resource Programming
MS4 Program Challenge:How can we increase K-12 student participation in our outreach activities?
![Page 39: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/39.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
Use Creative, Local Resource Programming
“Wonders on the Wabash” tcpwq.org
![Page 40: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/40.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
Use Creative, Local Resource Programming
“Wonders on the Wabash” tcpwq.org
CURRENT MINDSET? ALTERNATIVE MINDSET
Requirement Based Resource Based
“We have public comment and input at our Stormwater Board Meetings.”
“We organized a rafting tripto showcase the Wabash River.”
![Page 41: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/41.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
MS4 Program Challenge:How can we increase K-12 student participation in our outreach activities?
Providing opportunities for the public to participate in programdevelopment and implementation, including effectively publicizing publichearings.
![Page 42: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/42.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
Teach Students about Rain Gardens and Have StudentsBuild a Rain Garden
MS4 Program Challenge:How can we increase K-12 student participation in our outreach activities?
Providing opportunities for the public to participate in programdevelopment and implementation, including effectively publicizing publichearings.
![Page 43: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/43.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
![Page 44: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/44.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
![Page 45: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/45.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
CURRENT MINDSET? ALTERNATIVE MINDSET
Requirement Based Resource Based
“We lecture kids about rain gardens.” “We teach kids how to build rain gardens.”
![Page 46: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/46.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
Developing and implementing a plan to identify and eliminate illicitdischarges to the separate storm sewer system, including developing asystem map and informing the community about the hazards associatedwith illegal discharges and improper disposal of waste.
![Page 47: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/47.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
MS4 Program Challenge:We collect dry weather inspection and monitoring data but we don’t really do anything with it?
Developing and implementing a plan to identify and eliminate illicitdischarges to the separate storm sewer system, including developing asystem map and informing the community about the hazards associatedwith illegal discharges and improper disposal of waste.
![Page 48: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/48.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
Developing and implementing a plan to identify and eliminate illicitdischarges to the separate storm sewer system, including developing asystem map and informing the community about the hazards associatedwith illegal discharges and improper disposal of waste.
Develop and Implement a Checklist to Help Identify Data Uses
MS4 Program Challenge:We collect dry weather inspection and monitoring data but we don’t really do anything with it?
![Page 49: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/49.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
IDDE Data Uses Checklist
![Page 50: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/50.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
IDDE Data Uses Checklist
CURRENT MINDSET? ALTERNATIVE MINDSET
Requirement Based Resource Based
“We collect dry weather screeningand monitoring data.”
“We utilize our data (a resource)to effectively manage our program.”
![Page 51: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/51.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
MS4 Program Challenge:We collect monitoring data but aren’t sure we are using the correct parameters?
Developing and implementing a plan to identify and eliminate illicitdischarges to the separate storm sewer system, including developing asystem map and informing the community about the hazards associatedwith illegal discharges and improper disposal of waste.
![Page 52: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/52.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
Developing and implementing a plan to identify and eliminate illicitdischarges to the separate storm sewer system, including developing asystem map and informing the community about the hazards associatedwith illegal discharges and improper disposal of waste.
Select Parameters based on Land Uses and other Readily Available Data
MS4 Program Challenge:We collect monitoring data but aren’t sure we are using the correct parameters?
![Page 53: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/53.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
IDDE Land Use Data Parameters:Nutrients, E. coli, Metals, Oil & Grease, etc.
![Page 54: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/54.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
IDDE Land Use Data Parameters:Nutrients, E. coli, Metals, Oil & Grease, etc.
CURRENT MINDSET? ALTERNATIVE MINDSET
Requirement Based Resource Based
“We collect dry weather monitoring data.” “We collect dry weather monitoring for specific parameters tied to upgradientland uses and other data resources.”
![Page 55: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/55.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
Development of an ordinance and establishment of a constructionprogram that controls polluted runoff from construction activities thatdisturb one or more acres of land in the MS4 area.
![Page 56: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/56.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
Development of an ordinance and establishment of a constructionprogram that controls polluted runoff from construction activities thatdisturb one or more acres of land in the MS4 area.
MS4 Program Challenge:“We do have a local ordinance, but developers and designers seem confused about the depth and breath of local requirements regarding land disturbing activity.”
![Page 57: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/57.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
Development of an ordinance and establishment of a constructionprogram that controls polluted runoff from construction activities thatdisturb one or more acres of land in the MS4 area.
Prepare and Distribute a Fact Sheeton the local Permitting Process for
Land Disturbing Activities
MS4 Program Challenge:“We do have a local ordinance, but developers and designers seem confused about the depth and breath of local requirements regarding land disturbing activity.”
![Page 58: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/58.jpg)
![Page 59: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/59.jpg)
CURRENT MINDSET? ALTERNATIVE MINDSET
Requirement Based Community Resource Based
“Permitting requirements for land disturbing activities are stipulated in our local
ordinances.”
“We facilitate the stormwater quantity and quality permitting process by explaining the
submittal requirements based on size of land disturbing activity .”
![Page 60: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/60.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
Development of an ordinance and establishment of a constructionprogram that controls polluted runoff from construction activities thatdisturb one or more acres of land in the MS4 area.
MS4 Program Challenge:When approached by an MS4 Inspector about site deficiencies,the Contractor responds: “I did not know I had to do that?”
![Page 61: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/61.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
Development of an ordinance and establishment of a constructionprogram that controls polluted runoff from construction activities thatdisturb one or more acres of land in the MS4 area.
Implement a Pre-ConstructionMeeting Agenda that CoversImportant Local MS4 Topics
MS4 Program Challenge:When approached by an MS4 Inspector about site deficiencies, the Contractor responds: “I did not know I had to do that?”
![Page 62: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/62.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
MS4 Pre-Construction Meeting Agenda
![Page 63: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/63.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
MS4 Pre-Construction Meeting Agenda
CURRENT MINDSET? ALTERNATIVE MINDSET
Requirement Based Community Resource Based
“Our local requirementsare available on our website.”
“We educate Contractors on how toprotect local waterways by conducting a
Pre-Construction Meeting to identifyspecific measures and practicesthat must be implemented and
maintained at construction sites.
![Page 64: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/64.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
Development of an ordinance and establishment of a constructionprogram that controls polluted runoff from construction activities thatdisturb one or more acres of land in the MS4 area.
MS4 Program Challenge:“It’s hard to know when construction projects are complete because we rarely receive a copy of the project site Notice of Termination (NOT).
![Page 65: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/65.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
Development of an ordinance and establishment of a constructionprogram that controls polluted runoff from construction activities thatdisturb one or more acres of land in the MS4 area.
Make Release of Bond & Occupancy Permit Contingent upon a successful MS4 Notice of Termination Inspection
MS4 Program Challenge:“It’s hard to know when construction projects are complete because we rarely receive a copy of the project site Notice of Termination (NOT).
![Page 66: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/66.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
MS4 Notice of Termination Inspection
![Page 67: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/67.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
MS4 Notice of Termination Inspection
![Page 68: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/68.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
MS4 Notice of Termination Inspection
CURRENT MINDSET? ALTERNATIVE MINDSET
Requirement Based Community Resource Based
“The Contractor is responsible for submitting the Notice of Termination to the state.”
“We protect local waterways by partnering with our Building Department to ensure that
all permit required stormwater-related measures and practices have been installed
correctly and are free of sediment.
![Page 69: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/69.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
Development of an ordinance and establishment of a post-constructionprogram that addresses runoff from new development andredevelopment areas.
![Page 70: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/70.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
Development of an ordinance and establishment of a post-constructionprogram that addresses runoff from new development andredevelopment areas.
MS4 Program Challenge:With limited MS4 resources, we have difficulty in tracking and monitoring Post-Construction BMPs installed by private developers.
![Page 71: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/71.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
Development of an ordinance and establishment of a post-constructionprogram that addresses runoff from new development andredevelopment areas.
Create a Base Map of Post-Construction BMPs and add New
BMPs as NOTs are Approved
MS4 Program Challenge:With limited MS4 resources, we have difficulty in tracking and monitoring Post-Construction BMPs installed by private developers.
![Page 72: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/72.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
![Page 73: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/73.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
ALTERNATIVE MINDSET
Community Resource Based
“We protect local waterways by prioritizing Post-Construction BMP monitoring at sites closest to our most sensitive waterways.”
CURRENT MINDSET?
Requirement Based
“Our ordinance requires property owners to maintain Post-Construction BMPs
in perpetuity.”
![Page 74: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/74.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
Development of an ordinance and establishment of a post-constructionprogram that addresses runoff from new development andredevelopment areas.
MS4 Program Challenge:With limited staff, resources and time, it can be difficult to monitor if property owners are in compliance with Post-Construction BMP inspections and maintenance.
![Page 75: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/75.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
Development of an ordinance and establishment of a post-constructionprogram that addresses runoff from new development andredevelopment areas.
Implement Tracking Binder(Paper or Electronic) of Post-
Construction BMP Commitments
MS4 Program Challenge:With limited staff, resources and time, it can be difficult to monitor if property owners are in compliance with Post-Construction BMP inspections and maintenance.
![Page 76: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/76.jpg)
Pages from Required Owner-Supplied O&M Manual
![Page 77: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/77.jpg)
Pages from Required Owner-Supplied O&M Manual
Regulatory Audit Assessment Item: Post-Construction BMP Control measuresimplemented on privately-owned projects are the responsibility of the siteowner to maintain and monitor. But, the MS4 entity that regulates theprivately-owned sites is responsible to have a Post-Construction site run-offinspection program with procedures for implementation, including amechanism to enforce failure to maintain a privately-owned Post-Construction measure.”
![Page 78: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/78.jpg)
Pages from Required Owner-Supplied O&M Manual
Regulatory Audit Assessment Item: Post-Construction BMP Control measuresimplemented on privately-owned projects are the responsibility of the siteowner to maintain and monitor. But, the MS4 entity that regulates theprivately-owned sites is responsible to have a Post-Construction site run-offinspection program with procedures for implementation, including amechanism to enforce failure to maintain a privately-owned Post-Construction measure.”
CURRENT MINDSET? ALTERNATIVE MINDSET
Requirement Based Community Resource Based
“Owners of Post-Construction BMPsare responsible to monitorand maintain their BMPs.”
“We protect local waterways by verifying that property owners inspect and maintain
their Post-Construction BMPs.”
![Page 79: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/79.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
Development and implementation of a program to prevent or reducepolluted runoff from municipal operations within the MS4 area.
![Page 80: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/80.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
Development and implementation of a program to prevent or reducepolluted runoff from municipal operations within the MS4 area.
MS4 Program Challenge:Other departments may underestimate the value of Municipal Facility Stormwater Pollution Prevention Plan (SWPPPs).
![Page 81: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/81.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
Development and implementation of a program to prevent or reducepolluted runoff from municipal operations within the MS4 area.
Provide Fact Sheets that Connect Routine Municipal Activities
to Water Quality Impacts
MS4 Program Challenge:Other departments may underestimate the value of Municipal Facility Stormwater Pollution Prevention Plan (SWPPPs).
![Page 82: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/82.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
![Page 83: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/83.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
![Page 84: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/84.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
![Page 85: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/85.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
![Page 86: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/86.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
MS4 Staff
Marina
Fire Dept.
Police Dept.
Parks
& Recre-ation
Public Works
City Utilities
➢ Training Sessions➢ Routine Inspections➢ Annual Report Data
Providing Services can Foster Relationships with City Staff
![Page 87: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/87.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
MS4 Staff
Marina
Fire Dept.
Police Dept.
Parks
& Recre-ation
Public Works
City Utilities
➢ Training Sessions➢ Routine Inspections➢ Annual Report Data
Providing Services can Foster Relationships with City Staff
ALTERNATIVE MINDSET
Community Resource Based
“We provide training and monitoring services as a community resource
to other City Departments.”
CURRENT MINDSET?
Requirement Based
“Copies of SWPPPs are locatedin each municipal facility.”
![Page 88: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/88.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
Development and implementation of a program to prevent or reducepolluted runoff from municipal operations within the MS4 area.
MS4 Program Challenge:Other departments may underestimate the value of inspecting and maintaining municipal stormwater conveyance systems.
![Page 89: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/89.jpg)
6 MINIMUM CONTROL MEASURES (MCMs):
MCM 1: Public Education and Outreach
MCM 2: Public Participation and Involvement
MCM 3: Illicit Discharge Detection and Elimination
MCM 4: Construction Site Runoff Control
MCM 5: Post-Construction Runoff Control
MCM 6: Pollution Prevention & Good Housekeeping
Development and implementation of a program to prevent or reducepolluted runoff from municipal operations within the MS4 area.
Provide Outfall Screening Observations to Public Works toHelp Identify Maintenance Needs
MS4 Program Challenge:Other departments may underestimate the value of inspecting and maintaining municipal stormwater conveyance systems.
![Page 90: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/90.jpg)
MS4 Inspections Can Identify: Scouring Conditions, Sedimentation or Overflows
![Page 91: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/91.jpg)
MS4 Inspections Can Identify: Scouring Conditions, Sedimentation or Overflows
![Page 92: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/92.jpg)
MS4 Inspections Can Identify: Scouring Conditions, Sedimentation or Overflows
![Page 93: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/93.jpg)
Information Can Be Shared Both Ways
![Page 94: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/94.jpg)
Identify Inflow & Infiltration (I&I) Issues, Scouring Conditions, Plugged Inlets
CURRENT MINDSET? ALTERNATIVE MINDSET
Requirement Based Community Resource Based
“We perform our IDDE outfall inspections to check for sources of
pollution in stormwater.”
“We assist Public Works staffas an extra set of eyes
to identify utility systemmaintenance issues.”
![Page 95: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/95.jpg)
A Coordinated Stormwater Management Program:
The MS4 Program!
Two Primary Challenges:1. How do we keep pollution out of our stormwater conveyances?2. How do we keep our stormwater conveyances clean?
![Page 96: A Successful MS4 Mindset: Resource Versus Requirement...alternative mindset example Today’s presentation will review the six MS4 program Minimum Control Measures and provide examples](https://reader035.vdocument.in/reader035/viewer/2022062603/5f10ac2d7e708231d44a4205/html5/thumbnails/96.jpg)
A Successful MS4 Mindset: Resource Versus Requirement