2 Leighton Asia I Capability Statement Leighton Asia I Capability Statement 3
A trusted and experienced partner
For over 40 years Leighton Asia
has built a strong track record
as an international contractor
delivering prestigious projects in the
construction, civil and engineering
and offshore oil and gas sectors.
We deliver complex tunnel, rail and
road networks, and renewable energy
infrastructure.
Our building projects range from
schools, embassies and luxury high-
rise residential towers, to large scale
leisure complexes, a growing number
of which are built to international
green building and energy efficiency
standards.
Our operations span Hong Kong,
Macau, Singapore, Malaysia,
Indonesia, Philippines and India.
Leighton Asia is a part of CPB Contractors, the construction focussed company of the CIMIC Group, one of the world’s leading international construction and mining groups.
MININGMINERAL PROCESSING
SERVICESCONSTRUCTION CONCESSIONS ENGINEERING
OTHER INVESTMENTS
Broad, established in
1991, is a building industry
managing contractor
headquartered in Perth.
THIESS is the world’s
largest mining services
provider. The team
offers the widest range
of in-house surface and
underground mining
capabilities across Australia,
Botswana, Canada, Chile,
Indonesia and Mongolia.
Thiess’ expertise spans
most of the world’s
commodities including
metallurgical and thermal
coal, copper, diamonds,
gold, iron ore, lignite, nickel
and oil sands.
From fully-resourced,
end-to-end solutions,
to targeted services,
to supporting clients’
in-house teams, the focus
is on flexibility. The team
understands the lifecycle
of a mine and how to
manage market changes
and evolving requirements,
tailoring Thiess’ services to
optimise the mining value
chain unique to each mine.
CPB CONTRACTORS
is a leading international
construction contractor,
with operations spanning
Australia, New Zealand,
Asia, India and Papua
New Guinea.
CPB Contractors delivers
projects spanning
all key sectors of the
construction industry,
including roads, rail,
tunneling, defence,
building and resources
infrastructure.
CIMIC GROUP provides leadership, strategy, corporate
governance and financial strength to its Operating Companies:
CPB Contractors, Leighton Asia, Thiess, Sedgman, UGL,
Pacific Partnerships and EIC Activities. CIMIC Group also owns
investments in companies including BIC Contracting, Ventia and
Devine.
SEDGMAN is a market
leader in the design,
construction and operation
of mineral processing plants
and associated minesite
infrastructure. With a track
record in successful project
and operation delivery,
Sedgman is focused on
realising value for clients.
From pre-feasibility and
commissioning through to
operations, Sedgman has
completed more than 170
processing and handling
projects globally. Sedgman
has a balanced commodity
portfolio across base and
precious metals, industrial
minerals, coal and iron
ore as well as associated
minesite infrastructure.
UGL is a diversified services
company delivering critical
assets and essential services
that sustain and enhance
the environment in which
we live.
UGL’s capabilities extend
across a broad range of
services and whole of
life solutions for diverse
industries by utilising world
leading, sustainable and
innovative technologies.
UGL partners with some of
the world’s largest blue chip
companies, government
agencies, public institutions
and private enterprise.
UGL’s skilled workforce,
expertise in project
management and end-to-
end engineering, is backed
by a continuous focus
on safety, innovation and
improvement.
PACIFIC PARTNERSHIPS is CIMIC Group’s project
finance arm. It is a leading
developer of public private
partnerships and build own
operate transfer projects.
Leveraging the financial
strength and diverse
capabilities of CIMIC Group,
it offers clients seamless
value for money solutions
for the finance, design,
construction, operations
and maintenance of key
infrastructure.
CIMIC has been responsible
for the delivery of more
than 20 PPPs with a market
value of around $32 billion.
EIC ACTIVITIES is CIMIC
Group’s engineering and
technical services business.
Its engineering and risk
mitigation expertise
provides a competitive
advantage for winning
and delivering profitable
projects that also generate
value for clients.
EIC Activities leads
innovation. Partnering
with tender and project
teams across the transport,
industrial and resources
infrastructure and building
sectors, it increases self
performance and delivers
competitive solutions that
achieve significant safety,
cost, time and productivity
gains.
The CIMIC Group
Our Principles
Our Mission Safety Our People
Keeping our people safe is our
absolute priority and the most
important thing we do.
Acknowledging the challenges
inherent in the construction industry,
the management of critical risk is one
of our key strategic initiatives.
Our Class One Practices provide a
hierarchy of control that seeks to
eliminate the risks involved in the
key areas that may cause serious
injury if they are not clearly
understood and managed:
• Electrical Works
• Lifting Operations
• Working at Height
• Isolation & Hazardous Energies
• Vehicle & Mobile Plant Movement
• Temporary Works
• Fitness for Work
As a company we will not compromise
on safety.
It’s the experience, expertise and
commitment of our people that
enable us to deliver projects for
our clients and returns for our
shareholders.
In return, we support our people to
help them further develop their skills
and build rewarding and fulfilling
careers.
Our inclusive culture values and
sustains diversity. We value and
recognise effort and contribution,
providing genuine opportunities
for graduates, undergraduates,
apprentices and trainees.
Our work is guided by our Principles:
INTEGRITY
ACCOUNTABILITY
INNOVATION
DELIVERY
Our Code of Conduct supports our
Principles and outlines the standards
of behaviour we expect from our
people.
Safety is more than a Principle – it underpins everything we do.
Our people are at the heart of our Mission and Principles, our focus on safety and our performance.
Our Mission is to generate sustainable returns for our shareholders by delivering projects for our clients while providing safe, rewarding and fulfilling careers for our people.
O U R C O N S T R U C T I O N
P R O J E C T S B U I L D :
• Value for our clients• Returns for our shareholders • Careers for our people
4 Leighton Asia I Capability Statement Leighton Asia I Capability Statement 5
Delivering across geographies and sectors
Leighton Asia delivers a full suite of engineering and
construction services across South East Asia and
India. We focus on our core strengths by combining
best practice in international project delivery with our
extensive in-country local knowledge.
BUILDING: Our diverse portfolio of public and
private sector projects encompasses commercial and
residential developments, casinos and theme park
attractions, schools, hospitals, museums, industrial
facilities and more.
RAIL: Our railway system design and construction
expertise allows us to undertake all aspects of rail
and associated works, including laying ballasted,
high-speed, floating slab and special tracks, building
bridges, viaducts, tunnels, stations and maintenance
facilities, track rehabilitation, traction power design,
constructing overhead systems, signalling and
communications installation.
ROADS: Our land transportation systems cover
thousands of kilometres to connect communities
across the region. With urban populations and car
ownership on the rise in Asia, we understand the
importance of delivering road transportation systems
and facilities that enable people to travel efficiently,
safely and reliably.
TUNNELLING: From cost-effective cut-and-cover
construction to precision drilling and blasting,
and sophisticated tunnel-boring machines, our
tunnelling works are built on our extensive project
planning, design and management knowledge and
experience. Clients benefit from our comprehensive
understanding of tunnel and underground
construction, especially in dense urban environments,
and our experience with in-tunnel works like track
installations, electrical and mechanical works,
cladding, portal construction and beyond.
POWER: From combined and open cycle power
plants to clean coal technologies, Leighton Asia is
at the forefront of many major energy projects in
the region. Our capabilities cover a wide range of
energy efficient power generation options while
our reputation for reliability and safety is a key
competitive advantage in an industry that demands
exceptionally high and exacting standards.
RECLAMATION: For all our clients’ needs in site
clearing and formation, excavation, land reclamation,
paving and slope protection, we have the significant
resources and expert skills required to develop
innovative and practical site preparation and
advanced earthworks solutions.
HONG KONG
Express Rail Link West Kowloon Station North (in JV)*
Hong Kong-Zhuhai-Macao Bridge Boundary Crossing Facility Passenger Clearance Building (PCB) (in JV)*
PCB Ancillary Buildings (in JV)*
Liantang / Heung Yuen Wai Boundary Control Point*
Tseung Kwan O - Lam Tin Tunnel (in JV)*
East Kowloon Cultural Centre*
Hong Kong International Airport Terminal 1 Annex Building and Carpark 4 Expansion*
Terminal 2 Foundation and Substructure Works (in JV)*
Columbarium and Garden of Remembrance
Express Rail Link Contract 811B (in JV)
Shatin to Central Link Contract 1112 - Hung Hom Station and Stabling Sidings
Shatin to Central Link Contract 1123 - Exhibition Center Station and Western Approach Tunnel (in JV)
Central-Wan Chai Bypass Central Interchange and Route-Wide System and Commissioning
Civil works for the Black Point Power Station
Mechanical and electrical projects
Express Rail Link Contract 816D - West Kowloon Station - Fire Services, Plumbing and Drainage (in JV)
Shatin and Central Link Contract 1175 - Building Services for Kai Tak Station
Shatin and Central Link Contract 1176 - Building Services for Sung Wong Toi Station
M&E Services Systems installation for above projects with *
MACAU
Wynn Palace
PHILIPPINES
North Luzon Expressway Harbor Link Segment 10.1 & R10 Exit Ramp
Cavite Laguna Expressway (Cavite section)
INDONESIA
Tangguh Tree Harvesting and Site Preparation
VALE ESP Kiln 4
Freeport – Mill Corrosion project
VALE Larona Canal Lining
INDIA
The Camellias
IKEA Retail Outlet
Maker Maxity
Radius Ten BKC
Vipul Aarohan Residences
Esplanade One
Serendipity Residential Development
Radius One Central Avenue
M&E: We have been ranking number one in terms of
volume of government and infrastructure M&E works on
hand in Hong Kong since 2015. Our M&E team provide
complete turnkey solution including design, coordination,
manufacture, fabrication, testing and commissioning and
setting up of M&E systems. Our extensive experience covers
M&E work in projects ranging from tunnel, metro stations,
mega boundary crossing facilities to hospitals, casino, and
traffic control systems.
OIL AND GAS: We offer our clients a full range of
construction service in the sectors, both onshore and
offshore Oil and Gas services. Our offshore experience
includes Platform Installations, Topside Modifications
and Upgrade works, Subsea Pipelines (rigid and flexible),
Shore Crossings, Subsea Structure and Stabilization works.
SINGAPORE
Downtown Line Stage 3 Contract 935 (in JV)
Construction of Springleaf Station & Tunnel for Thomson-East Coast Line Contract T208 (in JV)
Deep Tunnel Sewerage System Phase 2 Contract T-09
North-South Transportation Corridor Contract N103 (in JV)
MALAYSIA
Northern Double Tracking
6 Leighton Asia I Capability Statement Leighton Asia I Capability Statement 7
PROJECT VALUE HK$9 billion (US$1.1 billion)
TYPE OF CONTRACT Construct
REVENUE approx. HK$4.6 billion (US$0.56 billion)
CLIENT HKSAR Government, Civil Engineering and Development Department
Leighton Asia is building a boundary control point on the border between
Hong Kong and China. The project involves a passenger terminal building
and nine other main ancillary buildings, including fire and police bases,
vehicle examination buildings and bridge structures, with a total floor area
of approximately 157,400sqm.
Leighton Asia, with its joint venture partner, is delivering a 2.2km dual
two lane Tseung Kwan O – Lam Tin Tunnel together with associated slip
roads, branch tunnels, viaducts and tunnel portal facilities. The works also
involve the delivery of two ventilation buildings and an administration
building, as well as implementation of all associated building and
supporting works.
Liantang / Heung Yuen Wai Boundary Control Point
Tseung Kwan O – Lam Tin Tunnel
Hong Kong
Hong Kong
PROJECT VALUE HK$7.1 billion (US$912 million)
TYPE OF CONTRACT Construct
REVENUE HK$7.1 billion (US$912 million)
CLIENT HKSAR Government, Architectural Services Department
Leighton Asia, with its joint venture partner, has delivered the
12-storey, 58,900sqm Tin Shui Wai Hospital. The hospital provides up
to 300 in-patient and day beds and various ambulatory care services.
This was the first NEC Engineering and Construction Contract (ECC)
Option A project awarded by the Architectural Services Department and
was built to Hong Kong’s green building certification standard (BEAM),
featuring a glass curtain wall installed to enhance natural illumination and
environmental friendliness.
Tin Shui Wai Hospital
PROJECT VALUE HK$2.9 billion (US$380 million)
TYPE OF CONTRACT Design and construct
REVENUE approx. HK$1.47 billion (US$190 million)
CLIENT HKSAR Government, Architectural Services Department
Hong Kong
The Central-Wan Chai Bypass and Island Eastern Corridor Link project
(CWB) traverses six densely populated commercial and residential districts
and runs for 4.7km with approximately 4km of underground tunnel to
alleviate the heavily congested commercial hub. The two contracts being
delivered by Leighton Asia for the CWB project include the Central
Interchange and Route-Wide System and Commissioning. Works include
construction of two bridges, cut-and-cover tunnels, tunnel buildings,
realigning and reconstructing existing roads, design and installation of all
tunnel services, and works associated with tunnel commissioning.
Central-Wan Chai Bypass
COMBINED PROJECT VALUE HK$4.47 billion (US$571 million)
TYPE OF CONTRACT Construct
REVENUE HK$4.47 billion (US$571 million)
CLIENT HKSAR Government, Highways Department
Hong Kong
8 Leighton Asia I Capability Statement Leighton Asia I Capability Statement 9
South Island Line (East) ProjectContract 903 and 904
The South Island Line is a medium-capacity railway covering approximately
7km from Admiralty Station to South Horizons in Ap Lei Chau. Our works
consisted of the construction of the two elevated stations in Ocean Park and
Wong Chuk Hang, which involved a viaduct appropriately 2,100m long and
the Aberdeen Channel Bridge with a main span of 115m. Leighton Asia, with
its joint venture partner, has constructed two underground stations at Lei
Tung and South Horizons which involved 1,100m of tunnels and related plant
and ventilation buildings.
PROJECT VALUE HK$4.3 billion (US$547 million)
TYPE OF CONTRACT 903 – Target Cost 904 – Lump Sum
CLIENT MTR Corporation Limited
Hong Kong
PROJECT VALUE HK$5.8 billion (US$752 million)
TYPE OF CONTRACT Target Cost
REVENUE approx. HK$2.95 billion (US$383 million)
CLIENT MTR Corporation Limited
Leighton Asia, with its joint venture partner, is delivering the largest
contract of the 12 major civil works contracts awarded for Phases I and II
of the Shatin to Central Link project. Works include the construction of
an underground station (Exhibition Center Station) and 300m of cut and
cover tunnel along Convention Avenue (Western Approach Tunnel). Works
are carried out in one of the busiest areas of Wan Chai business district.
Hong Kong
Shatin to Central Link Contract 1123 - Exhibition Center Station and Western Approach Tunnel
Leighton Asia, with its joint venture partner, is responsible for the design,
manufacture, supply, installation and testing and commissioning of the
fire services, plumbing and drainage and emergency signage system of
the entire West Kowloon Station. As part of the Guangzhou-Shenzhen-
Hong Kong Express Rail Link, the station will serve as the international
gateway to China in the heart of Kowloon.
Express Rail Link – West Kowloon Station, Fire Services, Plumbing and Drainage
PROJECT VALUE HK$663 million (US$85 million)
TYPE OF CONTRACT Design and construct
REVENUE HK$331.5million (US$42.5 million)
CLIENT MTR Corporation Limited
Hong Kong
PROJECT VALUE HK$3.2 billion (US$417 million)
TYPE OF CONTRACT Design and construct
REVENUE HK$3.2 billion (US$417 million)
CLIENT MTR Corporation Limited
Leighton Asia delivered a 7.65km long drill and blast tunnel section
between Tse Uk Tsuen and Shek Yam as a part of the 26km underground
section of the Express Rail Link in Hong Kong. Our works also covered
construction of ventilation buildings at Shing Mun and Pat Heung as well
as temporary magazines for storing explosives.
Hong Kong
Express Rail Link Contract 822
10 Leighton Asia I Capability Statement Leighton Asia I Capability Statement 11
Leighton Asia is delivering the complete turnkey solution including
design development, manufacture, supply, installation, testing and
commissioning of building services installation, which comprise the
environmental control system, electrical system, fire services system,
plumbing and drainage system, station based control system and
condition based maintenance system for the Kai Tak Station and ancillary
buildings. This is the first complete M&E package contract awarded
directly to our M&E team by MTR Corporation Limited.
Shatin to Central Link Contract 1175 -Building Services for Kai Tak Station
PROJECT VALUE HK$157 million (US$20 million)
TYPE OF CONTRACT Design and construct
REVENUE HK$157 million (US$20 million)
CLIENT MTR Corporation Limited
Hong Kong
Leighton Asia is delivering the M&E contract for Building Services for
Sung Wong Toi Station and ancillary buildings. The project involves
the design development, manufacture, supply, installation, testing and
commissioning of building services installation, which comprise the
environmental control system, electrical system, fire services system,
plumbing and drainage system, station based control system and
condition based maintenance system.
Shatin to Central Link Contract 1176 -Building Services for Sung Wong Toi Station
PROJECT VALUE HK$183 million (US$ 24 million)
TYPE OF CONTRACT Design and construct
REVENUE HK$183 million (US$ 24 million)
CLIENT MTR Corporation Limited
Hong Kong
Leighton Asia is delivering Contract T-09 of the Deep Tunnel Sewerage
System Phase 2 Project, which includes design and construction of
approximately 7.9km of used water tunnels, each with an internal
diameter of six metres, as well as shafts, hydraulic structures and other
facilities associated with the used water sewerage conveyance system.
Tunnel excavation will be carried out by tunnel boring machines.
Deep Tunnel Sewerage System Phase 2 Project Contract T-09
PROJECT VALUE SG$494.5 million (US$367 million)
TYPE OF CONTRACT Design and construct
REVENUE SG$494.5 million (US$367 million)
CLIENT Public Utilities Board
Singapore
Leighton Asia, with its joint venture partner, is delivering Contract N103 of
the North-South Transportation Corridor Project. The project involves the
delivery of 640m of twin, three-lane vehicular tunnels, the underpinning
of an existing expressway flyover, a new facility building and an entrance
ramp and exit ramp.
North-South Transportation Corridor Project
PROJECT VALUE SG$553.8 million (US$421 million)
TYPE OF CONTRACT Design and construct
REVENUE approx. SG$387.7 million (US$294.7 million)
CLIENT Land Transport Authority
Singapore
12 Leighton Asia I Capability Statement Leighton Asia I Capability Statement 13
The project is part of the 43km Rapid Transit System consisting of
31 new stations and 7 interchange stations. Leighton Asia, with its joint
venture partner, has delivered the Springleaf Station, twin bored tunnels
totalling 4.4km, substantial earthworks with a cut and cover box midway
along the alignment and cut and cover tunnels at the north end of the
station, and associated ancillary works. Tunnel excavation was carried
out by three slurry type tunnel boring machines, one of which was
recovered and re-launched.
Construction of Springleaf Station and Tunnel for Thomson-East Coast Line Contract T208
PROJECT VALUE SG$383 million (US$156 million)
TYPE OF CONTRACT Construct
REVENUE approx. SG$191.5 million (US$78 million)
CLIENT Land Transport Authority
Singapore
Leighton Asia is constructing a 28km, four-lane expressway, including
bridges, interchanges, toll plazas and ancillary facilities. The Cavite and
Laguna regions are the most industrialised and urbanised areas in the
Philippines, and on completion, the expressway will reduce travel times
from Cavite to Laguna by approximately 45 minutes.
Cavite Laguna Expressway (Cavite Section)
PROJECT VALUE PHP7 billion (US$ 138 million)
TYPE OF CONTRACT Construct
REVENUE PHP7 billion (US$ 138 million)
CLIENT MPCALA Holdings Inc.
Philippines
Leighton Asia, with its joint venture partner, has delivered the largest
Australian embassy in the world, the 40,500sqm New Australian Embassy
Compound in Jakarta. The project comprises a five-storey chancery
building, an Executive Residence, 32 staff accommodation units, and
medical and recreational facilities.
New Australian Embassy Compound
PROJECT VALUE US$230 million
TYPE OF CONTRACT Construct
REVENUE approx. US$161 million
CLIENT Commonwealth of Australia - Department of Foreign Affairs and Trade
Jakarta, Indonesia
Downtown Line Stage 3 is a key component of Singapore’s 42km long
Downtown Line and extends the existing Mass Rapid Transit railway
network. Leighton Asia, with its joint venture partner, has constructed
the four-level underground Jalan Besar Station, and twin tunnels of
approximately 775m in length, along with other ancillary facilities. The
tunnels were built by using two tunnel-boring machines.
Downtown Line Stage 3 Contract 935 - Construction and Completion of Jalan Besar Station and Associated Tunnels
PROJECT VALUE SG$171 million (US$139 million)
TYPE OF CONTRACT Construct
REVENUE approx. SG$85.5 million (US$69.5 million)
CLIENT Land Transport Authority
Singapore
14 Leighton Asia I Capability Statement Leighton Asia I Capability Statement 15
The Maker Maxity project is our first project with the Maker Group, one
of India’s prestige developers, to deliver a premium retail and hospitality
development in Bandra Kurla Complex, an area that is developing into
a major investment banking hub in Mumbai. Phase two of the project
comprises a retail mall, membership club and a roof top drive-in theatre;
Phase three is a hospitality development of two luxury hotels.
Maker Maxity
PROJECT VALUE US$169.5 million
TYPE OF CONTRACT Alliance
REVENUE US$169.5 million
CLIENT The Indian Films Combine Pvt. Ltd.
Mumbai, India
Leighton Asia has constructed the Camellias, one of the largest residential
schemes in India. The luxury residential development occupies a site
area of approximately 18-acres and includes nine tower blocks totaling
429 apartments, including 14 penthouses. The project has received an
Exemplary Performance award for Site Management by the Green Rating
for Integrated Habitat Assessment India Council.
The Camellias
PROJECT VALUE US$250 million
TYPE OF CONTRACT Construct
REVENUE US$250 million
CLIENT DLF Ltd.
Gurgaon, India
Leighton Asia has constructed the Esplanade One, a mixed-use
development comprising of a shopping mall, multiplex cinema and an
office tower. The project included the delivery of civil, structural and
architectural finishes works, MEP, façade, fit out (common areas),
external and landscaping works etc. (excluding site clearing, shoring
and excavation works).
Leighton Asia has delivered India’s first IKEA flagship store in Hyderabad.
The five-storey retail outlet, with a gross built-up area of 94,334sqm,
includes two basement levels for parking and three levels for a market
hall, warehouse, showroom, restaurant and home delivery area, as well as
a play area and day care centre for children.
Esplanade One
IKEA Retail Outlet
PROJECT VALUE US$54 million
TYPE OF CONTRACT Alliance
REVENUE US$54 million
CLIENT Safari Retreats Pvt. Ltd. (Forum Group)
PROJECT VALUE US$51 million
TYPE OF CONTRACT Construct
REVENUE US$51 million
CLIENT IKEA India Pvt. Ltd.
Bhubaneswar, India
Hyderabad, India
© Leighton Asia Ltd. | August 2018
LEIGHTONASIA.COM CPBCON.COM.AU
HEAD OFFICE
39/F, Sun Hung Kai Centre30 Harbour RoadHong KongT +852 3973 1111
SINGAPORE
73 Science Park Drive, #03-14/15 Cintech I Singapore Science Park 1, 118254SingaporeT +65 6229 5300
MALAYSIA
Suite 8.1 Level 8Menara Tokio Marine Life189 Jalan Tun Razak, 50400 Kuala Lumpur MalaysiaT +60 3 2858 1500
INDONESIA
3/F Ratu Prabu 2, JI. T.B. Simatupang KAV. 1BCilandak Timur, Jakarta, 12560IndonesiaT +62 21 3000 2323
PHILIPPINES
9/F Legaspi Suite BldgNo. 178 Salcedo Street Legaspi Village, Makati City, 1229PhilippinesT +63 2 866 6400
INDIA
6th Floor, Tower 3Equinox Business Park (Peninsula Techno Park)Off Bandra Kurla ComplexLBS Marg, Kurla (West)400070 MumbaiIndiaT +91 22 6719 0000
2nd Floor, Unit No. 205, Pioneer SquareGolf Course Extension RoadSector – 62, Gurgaon122001 HaryanaIndiaT +91 12 4495 8200
Cover: East Kowloon Cultural Centre, Lai Chi Kok Drainage Tunnel, South Island Line (East) Contract 903Below: Central-Wan Chai Bypass Central Interchange, Radius Ten BKC, North Luzon Expressway Harbor Link Segment 10.1