a virtual power quality test lab
DESCRIPTION
A Virtual Power Quality Test Lab. Victor Wong Senior Vice President, Transmission Sarawak Energy Berhad. Real Time Power System Simulator. Powerful parallel processing hardware and custom I/O Advanced and comprehensive user interface - PowerPoint PPT PresentationTRANSCRIPT
A Virtual Power Quality Test Lab
Victor WongSenior Vice President, Transmission
Sarawak Energy Berhad
Do not distribute without expressed permission
2
Real Time Power System Simulator• Powerful parallel processing hardware and custom I/O • Advanced and comprehensive user interface• Extensive, well proven power and control system component
libraries • Large scale real time simulations• True hard real time response for closed-loop testing• Control system testing - HVDC, SVC, FACTS...• Protective relay testing - line, transformer, busbar, generator... • Smart grid applications (eg IEC 61850)• Distributed generation - wind, solar, fuel cells...
Real Time Digital Simulator(RTDS)
For more information on RTDS
http://www.rtds.comRTDS Technologies Inc, Canada
Do not distribute without expressed permission
4
RTDS Simulator SoftwareRSCAD Software SuiteRSCAD provides the ability to set up simulations, control, and modify system parameters during a simulation, data acquisition, and result analysis. The modules of the RSCAD Software Suite include: FileManager, Draft, Tline, Cable, RunTime, MultiPlot and ComponentBuilder.
Component Model Libraries
Power System Components Control System Components Protection & Automation
Do not distribute without expressed permission
5
Virtual PQ Test Lab• Leverage investment in RTDS• Set up a simulation & test environment where
physical devices can be tested• Training environment
Do not distribute without expressed permission
6
Test Set-up 1 : Harmonic Measurements
Do not distribute without expressed permission
7
Harmonics measurementThe percentage of Total Harmonic Distortion generated from RTDS test case is 41.4%.
Generated signals
Results
Do not distribute without expressed permission
8
Test Set-up 2 : Voltage sag
Step load change from 2.5MW to 100MW
Do not distribute without expressed permission
9
Voltage Sag generated
Do not distribute without expressed permission
10
Voltage Sag Captured by
Do not distribute without expressed permission
11
• RTDS as a versatile power system simulator interfacing with physical devices
• Useful training environment• Testing performance of PQ monitor/meters• Investigating proposed mitigation solutions
Conclusion
THANK YOUfor your attention