A275 Sheffield Green RoadSheffield Park
March 2011
Insitu recycling by
Resurfacing by
![Page 2: A275 Sheffield Green Road rev 12.02.16](https://reader036.vdocument.in/reader036/viewer/2022062503/589e11f81a28ab67278b6eb1/html5/thumbnails/2.jpg)
Existing carriageway condition prior to start of works
![Page 3: A275 Sheffield Green Road rev 12.02.16](https://reader036.vdocument.in/reader036/viewer/2022062503/589e11f81a28ab67278b6eb1/html5/thumbnails/3.jpg)
A Scheme 1 mile away was found to contain Tar in the existing carriageway, the planning's were used at
Sheffield Green Road to improve the existing levels . Recycling of Tar bound planning's is one of the few
accepted methods to dispose of tar bound planning's
Spreading of the additional planning's
WRAP and the CSS acknowledge that In-situ recycling is the First choice for dealing with Tar bound materials. MST Recycling Ltd has developed a complete quality protocol uniquely specialised for handling and recycling Tar bound material.
![Page 4: A275 Sheffield Green Road rev 12.02.16](https://reader036.vdocument.in/reader036/viewer/2022062503/589e11f81a28ab67278b6eb1/html5/thumbnails/4.jpg)
First mix with a Wirtgen Cold recycler
WR 2500 SK
Cutting teeth
After 30 mins work
![Page 5: A275 Sheffield Green Road rev 12.02.16](https://reader036.vdocument.in/reader036/viewer/2022062503/589e11f81a28ab67278b6eb1/html5/thumbnails/5.jpg)
Grading of planning's and sub-base after first pass of the Wirtgen Cold recycler WR 2500 SK
![Page 6: A275 Sheffield Green Road rev 12.02.16](https://reader036.vdocument.in/reader036/viewer/2022062503/589e11f81a28ab67278b6eb1/html5/thumbnails/6.jpg)
Spreading of Lime & Cement
![Page 7: A275 Sheffield Green Road rev 12.02.16](https://reader036.vdocument.in/reader036/viewer/2022062503/589e11f81a28ab67278b6eb1/html5/thumbnails/7.jpg)
Recycling completed. A layer of Bond Coat is applied and then a Bit Grit is spread on top to protect the Bond Coat
and to also allow the area to be trafficked
![Page 8: A275 Sheffield Green Road rev 12.02.16](https://reader036.vdocument.in/reader036/viewer/2022062503/589e11f81a28ab67278b6eb1/html5/thumbnails/8.jpg)
Bituminous layer 50mm thick of 14mm Superflex 100
![Page 9: A275 Sheffield Green Road rev 12.02.16](https://reader036.vdocument.in/reader036/viewer/2022062503/589e11f81a28ab67278b6eb1/html5/thumbnails/9.jpg)
Surface course layer
![Page 10: A275 Sheffield Green Road rev 12.02.16](https://reader036.vdocument.in/reader036/viewer/2022062503/589e11f81a28ab67278b6eb1/html5/thumbnails/10.jpg)
Colbond 50 Hot Applied Bond Coat applied prior to surface course
![Page 11: A275 Sheffield Green Road rev 12.02.16](https://reader036.vdocument.in/reader036/viewer/2022062503/589e11f81a28ab67278b6eb1/html5/thumbnails/11.jpg)
Completed works Glass Road Stud