Name Designation Affiliation Date Signature A. W. Gunst A. Faulkner AA domain specialist System engineer SPDO AAVP 20111115 20111115 Approved for release as part of SKA AA dCoDR documents: K. Cloete Project Manager SPDO 20111115 AAMID SYSTEM REQUIREMENTS SPECIFICATION Document number ................................................................. WP2015.020.010SRS001 Revision ........................................................................................................................... D Author ............................................................................................................... See below Date ................................................................................................................. 20111114 Status ........................................................................................................................ FINAL

Upload: lythuy

Post on 28-Mar-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

  • Name Designation Affiliation Date Signature

    A.W.Gunst

    A.Faulkner

    AAdomainspecialist

    Systemengineer

    SPDO

    AAVP

    20111115

    20111115

    ApprovedforreleaseaspartofSKAAAdCoDRdocuments:

    K.Cloete ProjectManager SPDO 20111115

    AAMIDSYSTEMREQUIREMENTSSPECIFICATION

    Documentnumber.................................................................WP2015.020.010SRS001Revision...........................................................................................................................DAuthor...............................................................................................................SeebelowDate.................................................................................................................20111114Status........................................................................................................................FINAL

    brinkStamp

    BrinkAndreG

  • WP2010.020.020SRS001 Revision:D

    20111114 Page2of52

    DOCUMENTHISTORY

    Revision DateOfIssue EngineeringChangeNumber

    Comments

    A 20111003 Firstdraftreleaseforinternalreview

    B 20111021 CommentsIlseincluded

    C 20111109 Commentsincludedaftertelecondiscussion

    D 20111114 Release

    DOCUMENTSOFTWARE

    Package Version Filename

    Wordprocessor MsWord Word2007 02WP2015.020.010SRS001D_AAMidReq.docx

    ORGANISATIONDETAILS

    Name SKAApertureArrayVerificationProgrammePhysical/Postal

    AddressASTRONOudeHoogeveensedijk4P.O.Box27990AADwingelooTheNetherlands

    Fax. +31(0)521595144Website www.skatelescope.org

  • WP2010.020.020SRS001 Revision:D

    20111114 Page3of52

    LISTOFABBREVIATIONS

    AA-Mid ....... Aperture Array for mid-frequencies

    AC .............. Alternating Current

    ADC ........... Analogue to Digital Converter

    ADD ........... Architectural Design Document

    CI ............... Configuration Item

    CMS ........... Configuration Management System

    COAR ......... Consolidated Observation Action

    Register

    CoDR ......... Concept Design Review

    dB ............... Decibel

    deg ............. degree

    DRM ........... Design Reference Mission

    DC .............. Direct Current

    EM .............. Electro Magnetic

    EMC ........... Electromagnetic Compatibility

    EMI ............. Electromagnetic Interference

    FAT ............ Factory Acceptance Test

    FCA ............ Functional Configuration Audit

    FMECA ...... Failure Modes, Effects and Critically

    Analysis

    FOV ............ Field of View in squared degrees

    GHz ............ Giga Hertz

    Hz ............... Hertz

    HFE ............ Human Factors Engineering

    HPBW ........ Half Power Beam Width

    HPC ........... High Performance Computing

    IEC ............. International Electrotechnical

    Commission

    IEEE ........... Institute of Electrical and Electronics

    Engineers

    ITU ............. International Telecommunications Union

    ICD ............. Interface Control Document

    INCOSE ..... International Council on Systems

    Engineering

    ISO ............. International Standards Organisation

    Jy ............... Jansky

    K ................. Kelvin

    Kg ............... kilogram

    km .............. kilometre

    LEMP ......... Logistic Engineering Management Plan

    LO .............. Local Oscillator

    LOFAR ....... Low Frequency Array

    m ................ metre

    M&C ........... Monitoring and Control

    MHz ........... Mega Hertz

    MIL-STD .... Military Standard

    MTBF ......... Mean Time Between Failures

    MTTR ......... Mean Time To Repair

    OAR ........... Observation Action Register

    OEM ........... Original Equipment Manufacturer

    OICD .......... Operator Interface Control Document

    PAF ............ Phased Array Feed

    PCA ........... Physical Configuration Audit

    PDR ........... Preliminary Design Review

    PEMP ......... Power Engineering Management Plan

    PITF ........... Power Investigation Task Force

    PPR ........... Pre-production Review

    PrepSKA .... Preparatory phase for the SKA

    RAM ........... Reliability, Availability and

    Maintainability

    RAS ........... Radio Astronomy Service

    RFI ............. Radio Frequency Interference

    RMS ........... Root Mean Square

    RQZ ........... Radio Quiet Zones

    SAT ............ Site Acceptance Test

    SEMP ......... System Engineering Management Plan

    SI ............... Systme International d'units

    SKA ............ Square Kilometre Array

    SKADS ....... SKA Design Studies

    SPDO ......... SKA Program Development Office

    SRR ........... (Sub)System Requirements Review

    SRS ........... System Requirements Specification

    SS .............. Survey Speed

    SSEC ......... SKA Science and Engineering

    Committee

    STaN .......... Signal Transport and Networks

    TBC ............ To Be Confirmed

    TBD. ........... To Be Determined

    TBV ............ To Be Verified

    TRR ........... Test Readiness Review

    V ................ Volt

    WBS ........... Work Breakdown Structure

    WP ............. PrepSKA Work package

  • 1 IntroductionThisdocumentcovers theSystem requirements for themid frequencyApertureArray for theSKAPhase2,SKA2.ItispartofthesystemsengineeringdocumentsetforthedeltaconceptdesignreviewforSKAAAmid.

    TherequirementsourcesarefromtheSKA2DRM[5]andthetechnicalevaluationstakingplace.

    Notes:

    1. Commentsareinreditalics

    2. TBDsetcarejustinred

    3. IhavecreatedtheneedforaTechnicalRequirementsdocumentthatderivesdetailsofthesystemrequirementsforAAsgiventheparametersfromthescienceandotherrequirementsdocs....

    4. ThereneedstoanOperationsdocumenttoreference.

    5. SomeoftherequirementswillneedtobefedbackuptotheSystemSRS

    6. Thereisverylittleuseofstandardsintherequirementsthisneedstobefixed

    7. ReallythisshouldbeoperatingunderISO9001qualitystandards

    8. ThereferencesarenowusingWordsstructureforthem.

  • WP2015.020.010SRS001Revision:D

    20111114 Page5of52

    2 References

    [1] Cloete,K.,et.al.,SKASystemRequirementsSpecification,Rev.E,WP2005.030.000SRS001,20100212.

    [2] Stevenson, T. et. al., SKA Phase 1 System Requirements Specification, Rev. A, WP2005.030.000SRS002,20110214.

    [3] SKA ScienceWorking Group, The Square Kilometre ArrayDesign ReferenceMission: SKAPhase1,report,v.1.3,January2011.

    [4] Dewdney, P.E. et. al., SKA1:High Level SystemDescription,Rev.A.,WP2005.030.010TD002,20110214.

    [5] SKAScienceWorkingGroup,TheSquareKilometreArrayDesignreferenceMission:SKAmidandSKAlo,report,v.1.0.

  • WP2015.020.010SRS001Revision:D

    20111114 Page6of52

    3 FunctionalandperformancerequirementsTheserequirementscoverAAmidforSKAPhase2.TheserequirementsarespecifictoAAmidandflowdownfromthesciencecasesintheSKADRM1.0[5].

    3.1 Functionaloverview

    The top level context diagram for the AAmid Reception is shown in

    Figure1,thesearethesameforallAAsintheSKA.ThisispartofthesecondleveloftheSKAcontextdiagramaspresented in [2].From this figure it isclear that theAAmid requirementsaredirectlyinfluencedbythefollowingexternalaspects(bluearrows):

    RFSignal:thesignalofinterestreceivedbytheAA

    RFInterference:anyhumanmadedisturbingsignalwhichisalsoreceivedbytheAAandforwhichthesystemshouldbemaderobust

    Maintenance:thedesignoftheAAreceptionsystemshouldtake intoaccounttheaffect ithas onmaintenance since the total amount of electronics in the fieldwill be significant.Hencemaintenanceshouldbeminimizedandanyextrainvestmenttoachievethatmustbebalancedagainstthereductioninmaintenancecost.

    Environment: the environment of the AA poses extra requirements on primarily themechanicaldesignoftheantennaelementandreceiversystems, installationofcablesandbunkers necessary for the AA system. Examples of environmental influences are dust,

  • WP2015.020.010SRS001Revision:D

    20111114 Page7of52

    temperature (and its variation), humidity and soil composition. The soil composition hasmechanicalimplicationsandastronginfluenceontheelectricalgroundingoftheantennas.

    Recycling:sincetheSKAhasalimitedlifetimetheusageofmaterialswhichcanberecycledmaybeofrelevance.

    Weather: the AA reception systems should be designed to withstand rain, lightning,earthquakes,hail,snowetc.dependentontheweatherprofileofthesite.

    In

    Figure 1 the internal SKA interfaces are shown in black. These interfaces are required for AAreceptiontoworkproperly.Thefollowinginternalinterfacesaredefined:

    Networking:viathis interfacethedatafromtheAAreceptionsystem istransportedtothecentralsystemstobefurtherprocessed.

    Monitor&Control: via this interfacemonitor information like status reports from all thesubsystems in the AA reception system are communicated in one direction, while thecontrol of the AA reception system is done in the other direction. Control of the AAreception system isnecessary since therearemany settings:beam steering, selecting thefrequencybands,etc.

    Sync&Timing:via this interface thesynchronization, timingandeventuallyLOsignalsareretrievedfromacentralsystem.Forradioastronomicalsystemsoneofthemostimportantaspects istosynchronizeallAAreceptionsystemswitheachothersincethephaserelation

  • WP2015.020.010SRS001Revision:D

    20111114 Page8of52

    betweentheAAstations isaprimaryparameterwhichshouldberetrieved.TypicalsignalsrequiredbytheAAreceptionsystemare:clocksignaltosampletheanaloguesignalandasynchronisationsignale.g.apulsepersecondsignaltoalignallAAreceptionsystems.

    AAReceptorCooling:coolingisnecessaryprimarilybecausetheamountofsignalprocessingrequired in theAA reception systems is significant and the environmental conditions arelikelytobehot.

    AAReceptorPower:ThisinterfaceisdefinedtopoweralltheelectronicsintheAAReceptionsystem.

    Figure1ContextdiagramoftheAAReceptionsystem(level2)

  • WP2015.020.010SRS001Revision:D

    20111114 Page9of52

    Considering in more detail the AAmid Reception context diagram of

    Figure1resultsinthethirdlevelcontextdiagrampresentedinFigure2.

  • WP2015.020.010SRS001Revision:D

    20111114 Page10of52

    AA Monitor &Control

    EM WavesReception

    Beamforming&

    Filtering

    Beamforming&

    Correlation

    AA ReceptionCooling

    AA ReceptionPower

    Generation

    DigitizingAmplification

    AA Calibration

    RF Signal

    To All

    Monitor&

    Control

    Sync&

    Timing

    Networking

    RF Interference

    Level 2 interfaces not drawn has an interface to

    all functionalities

    Figure2ContextdiagramoftheAAReceptionsystematlevel3

    AsshowninFigure2theprimaryfunctionsoftheSKA1AAmidreceptionsystemare:

    1) EMwavesreception:theelectromagneticradiationisconvertedintotheelectricaldomain.

    2) Amplification: thisboosts the signal fordigitisationand reduces thenoisecontributionoflaterstages.

    3) Beamforming & Filtering: adds optionally multiple antenna elements with an analogbeamformer and filters out the frequencies outside the AAmid specification. In practicemultipleamplifierandfilteringstageswillbeimplemented.

    4) Digitizing:theanaloguesignalissampledandquantized.

    5) Beamforming&Correlation:inthebeamformingphasethesignalsofmultiplereceptorsarecombinedinordertomakebeamsonthesky.Acorrelationfunctionisrequiredtocalibrateall the individual receiver chains with each other to compensate for gain and phasevariationsbetweenthemasafunctionoftime.

    6) AACalibration:calculatesthegainandphasedifferencesbetweenreceiverchainsandusestheoutputofthecorrelationfunctionalityasaninput.

    7) AA Monitor & Control: translates high level system control information to specificcommandsfortheAAhardwareandsoftware.Themonitor informationfromthesoftwareandhardwareistransmittedtotheSKAMonitor&Controlsystem.ThissystemalsoenableslocalcontroloftheAAstationformaintenanceandtroubleshootingactivities.

    8) AAReceptionPowerGeneration:powerisgeneratedorretrievedfromacentralnode.

  • WP2015.020.010SRS001Revision:D

    20111114 Page11of52

    9) AAReceptionCooling:maintainsthetemperatureofallpartsoftheAAmidstationwithinspecificationlimits.

    3.2 AAmidspectralcharacteristics

    ThespectrumtobeobservedwithSKA1AAmidisspecified.

    3.2.1 OperatingFrequency

    Identification Requirement Applicability Parent Verification

    AAM_REQ_1110 Electromagneticfrequencyrange.

    AAmidshallbeabletomeasureelectromagneticradiationinafrequencyrangefrom:

    Essential Test

    400MHzto1450MHz LowerboundaryfromSection16.4.2and17.4in[5].ThehigherboundaryisfromSection12.4.1[5],1450MHzistakensinceneutralhydrogenisat1421MHz.

    3.2.2 InstantaneousBandwidth

    Identification Requirement Applicability Parent Verification

    AAM_REQ_1120 Instantaneousbandwidth.AAmidshallhaveaminimuminstantaneousbandwidthof:

    Essential Test

    1000MHz

    [5]Section1.4,fractionalbandwidth~1

    3.2.3 SpectralFlatness

    Identification Requirement Applicability Parent Verification/Comments

    AAM_REQ_1130 Spectralripple.Thepassbandrippleovertheband,aftercalibration:

    Essential Test

    Maximum+/1%(TBD).

    Notethatthisisnottheanaloguesystem,butafterdigitisationandprocessing.Theonlycharacteristics

    [2]SYS_REQ_1190 Theparentisnotveryspecific.

  • WP2015.020.010SRS001Revision:D

    20111114 Page12of52

    theanaloguechainrequiresistodeliverasignalwithinboundstotheADC,stabilityandbecapableofmeasurementforcalibration.

    3.2.4 SpectralPassbandSlope

    Identification Requirement Applicability Parent Verification/Comments

    AAM_REQ_1135 Spectralpassbandslope.Thepassbandslopeoverthebandshouldbe:

    Essential Test

    MaximumxdB(TBD).

    Notethatthisistheanaloguesystem,priortodigitisation.ThiscanbecalibratedoutbutdecreasestheSignaltoNoiseRatio.

    3.2.5 SpectralResolution

    The following requirementsare for theAAmidstationonly.This iswhenusing frequencydomainbeamformingandisnecessarytomeetthesizeandspacingoftheelements.Thespectralfiltermustalsotransmitthedatasuchthatthecorrelatormayfurthersubdividethedata intomuchnarrowerbands required for correlation.The final required SKA spectral resolution shouldbemadeby thecentralsystems.

    Identification Requirement Applicability Parent Verification

    AAM_REQ_1140 Spectralresolution.

    TheAAmidstationshallhaveaminimalspectralresolutionoverthefullinstantaneousbandwidth(TBV):

    Essential Test

    1MHz(TBD)

    [5]Table12.2requiresresolutionbeforecorrelationof3kHz

    3.2.6 SpectralDynamicRange

    Identification Requirement Applicability Parent Verification

    AAM_REQ_1150 Spectraldynamicrange.

    SKAshallhaveaminimumspectraldynamicrangeattheoutputofthecorrelatorof:

    Essential Test

    62dB [1] Paragraph3.3.5,changed1400to

  • WP2015.020.010SRS001Revision:D

    20111114 Page13of52

    1450MHztoenablesurveysofneutralhydrogenat1421MHz.

    3.2.7 Clipping

    Thedynamicrangeoftheelement(orTile)uptodigitisationispartlysetbytheeffectivenumberofbits, ENOB, of the digitiser. This is ameasure of the ability to copewith interference and largeastronomicalsignals;itisnotameasureofthedynamicrangeofthearrayitselfortheimagesthatgetproducedafterprocessing.

    It is not practical to expect to precisely digitise every possible interference signal, however,statisticallytheamountofobservingtimelostduetoclippingcanbedetermined.

    Identification Requirement Applicability Parent Verification

    AAM_REQ_1160 Clipping. Essential Test

    ThedynamicrangeoftheADCsshallbesuchthatnoclippingwilloccurfor95%(TBC)ofthetime.

    [2]SYS_REQ_5430

    Theparentrequirementneedssomechangessinceitspecifiesnoclipping

    AAM_REQ_1165 Clippingdatashouldbemarkedinthedatastream

    Essential [2]SYS_REQ_5430

    3.3 AAsensitivity,FOVandsurveyspeed

    3.3.1 Sensitivity

    Identification Requirement Applicability Parent Verification

    AAM_REQ_1210 Sensitivity(Aeff/Tsys).

    TheAAreceptorsystemshallhaveaminimumsensitivityforscananglesofmaximal45degrees(TBD)of:

    Essential Test

    10,000m2/KexpressedinStokesI.

    This is equivalent with the sensitivity which is required for one polarisation.

    [5]Section18,Table18.2(DRMChapters6, 7, 8, 15 and 17)

  • WP2015.020.010SRS001Revision:D

    20111114 Page14of52

    3.3.2 InstantaneousFieldofView

    Identification Requirement Applicability Parent Verification

    AAM_REQ_1220 Instantaneousfieldofview.

    TheSKAshallachieveaminimumtotalFOV(thatcanbesynthesizedfrommultiplebeams)of:

    Essential Test

    100squaredegrees

    Thefieldofviewisderivedfromthesurveyspeedandsensitivity.

    3.3.3 SurveySpeed

    Identification Requirement Applicability Parent Verification

    AAM_REQ_1230 Surveyspeed.

    AAmidshallhaveasurveyspeed(m4K2deg2):

    Essential Test

    1010m4K2deg2 [5]Section12.4.2

    3.4 SpatialCharacteristics

    3.4.1 BaselineRequirements

    Identification Requirement Applicability Parent Verification

    AAM_REQ_1310 Baseline.

    Themaximumbaselineis:

    Essential Test

    180km(TBD) [4]

    3.4.2 SkyCoverage

    Identification Requirement Applicability Parent Verification

    AAM_REQ_1320 Skycoverage. Desirable Test

    6000deg2(TBD)

    3.4.3 ScanAngle

    Thisrequirementisderivedfromtheskycoverage.

  • WP2015.020.010SRS001Revision:D

    20111114 Page15of52

    Identification Requirement Applicability Parent Verification

    AAM_REQ_1330 Scanangle.

    Thescanangleisdefinedfromzenith.ThemaximumscanangleforSKAshallbeatleast:

    Test

    45degrees(TBD) Desirable

    3.4.4 Corefillingfactor

    Identification Requirement Applicability Parent Verification

    AAM_REQ_1340 Corefillingfactor.

    Thefillingfactorofthecoreshouldbeatleast:

    Essential Analysis

    ?%

    3.4.5 StationSideLobes

    Identification Requirement Applicability Parent Verification

    AAM_REQ_1350 Stationsidelobes.

    Theintegralofallstationsidelobesshouldbesmallerthan

    Essential Analysis

    ?dBcomparedwiththemainlobe.

    3.5 SystematicErrors

    3.5.1 CoherenceLoss

    Anycoherencelossinthesystemintroducedshouldbebelowthevaluespecifiedbelow.Anexampleofacoherence losseffect is thebeamsquintwhich iscausedbyabeamformerusingphaseshift.Sinceonlyonephaseshiftsettingpersubbandorchannelcanbesetanerrorarisesattheedgesofthesubbandorchannel.Theerrorcausescoherencelossinthebeamformerandshouldstaybelowthespecifiedvalue.

    Identification Requirement Applicability Parent Verification

    AAM_REQ_1410 Coherenceloss. Essential Test

  • WP2015.020.010SRS001Revision:D

    20111114 Page16of52

    ThecoherencelossofeachsubsystemintheSKAshouldbelowerthan:

    1%(TBD) Shouldbederivedfromtheimagingrequirementifpossible.

    3.5.2 PositioningError

    Identification Requirement Applicability Parent Verification

    AAM_REQ_1420 Positionerror.

    Thepositionerroroftheallantennaelementsfromthespecifiedpositionshouldbesmallerthan:

    Essential Test

    TBD

    Notethatthiswilldependonthearrayconfigurationusede.g.randommaybeverytolerantoferrorscalibrateout.

    LOFARuses/40

    3.5.3 OrientationError

    Theorientationof the elements is consideredwithinone array.Array to arrayorientation is thesubject of the System SRS (2). It is necessary to orientate the elements for consistency ofpolarisation,however,itmaybeeasiertocalibrateoutdetailederrors.

    Identification Requirement Applicability Parent Verification

    AAM_REQ_1430 Orientationerror.

    Theorientationerroroftheantennaelementsfromthespecifiedorientationshouldbesmallerthan:

    Essential Test

    TBD

    Thiswilldependontheabilitytocalibrateindividualelements

    LOFARuses1degree

    3.6 TemporalCharacteristics

    The stability of the analogue systems directly impacts the calibration requirements and theirregularity.Theyneedtobetradedofftogether.

  • WP2015.020.010SRS001Revision:D

    20111114 Page17of52

    3.6.1 GainStability

    Identification Requirement Applicability Parent Verification

    AAM_REQ_1510 Gainstability.

    ThegainstabilityofeachSKAreceiverchainwhichisdigitizedshouldbesmallerthan:

    Essential Shouldbederivedfromacalibrationrequirementifpossible.

    Test

    StabilityperC: 0.5%(TBD)

    over24hours: 0.5%(TBD)RMS

    ataconstanttemperature

    3.6.2 PhaseStability

    Identification Requirement Applicability Parent Verification

    AAM_REQ_1520 Phasestability.

    ThephasestabilityofeachSKAreceiverchainwhichisdigitizedshouldbesmallerthan:

    Essential Shouldbederivedfromacalibrationrequirementifpossible.

    Test

    DegreeperC: 0.5deg(TBD)

    over24hours: 0.5deg(TBD)RMS

    ataconstanttemperature

    3.6.3 BeamStability

    Identification Requirement Applicability Parent Verification

    AAM_REQ_1530 Beamstability.

    TheSKAshallhaveamaximalRMSstabilityintheHPBWof:

    Essential Shouldbederivedfromacalibrationrequirementifpossible.

    Test

    over24hours: TBD%RMS

    withazenithpointingdirection

    TBD%RMS(TBD)withazenithpointingdirectionifonereceiverchainisfailinginthefullbandforSKA

  • WP2015.020.010SRS001Revision:D

    20111114 Page18of52

    3.6.4 Smoothness

    Identification Requirement Applicability Parent Verification

    AAM_REQ_1530 Smoothness.

    AnyvariationintheSKAsystemshallbesmootherthan:

    Essential Shouldbederivedfromacalibrationrequirementifpossible.

    Test

    0.01%persecond(TBD)

    0.1%/Hz(TBD)overtheinstantaneousbandwidth

    Thisneedsmuchmorethought......

    3.6.5 TrackingAccuracy

    Identification Requirement Applicability Parent Verification

    AAM_REQ_1540 Trackingaccuracy.

    Thebeampointingaccuracyshouldbesuchthat:

    Essential (2)SYS_REQ_1980 Test

    ApointsourceremainswithinTBD%oftheHPBWofthebeam.

    Presumablythisrequirementisduetothefrequencydependantnature.Evenso,itmaywellbethatafigureindegreesfortheAAmidisbetter.

    3.6.6 BeamSwitchingAgility

    Identification Requirement Applicability Parent Verification

    AAM_REQ_1550 Beamswitchingagility.

    Thebeamswitchingtimeincludesthedistributionofthecommandfromthecontrolcentre.

    Abeamshouldberepointedtoapredefinedpositionin:

    Essential TBD Test

    TBDsecs.

  • WP2015.020.010SRS001Revision:D

    20111114 Page19of52

    3.6.7 MaximalObservationPeriod

    Identification Requirement Applicability Parent Verification

    AAM_REQ_1560 MaximalObservationPeriod.

    TheAAsubsystemshallbedesignedsothatadeepfieldobserved.Therequirementismaintainnoiselimitedsensitivity.

    Essential (2)SYS_REQ_1430 Test

    Capableof1000hrintegrationtime

    3.6.8 TemporalResolution

    Identification Requirement Applicability Parent Verification

    AAM_REQ_1560 Temporalresolution.

    TheAAsubsystemshallhaveanattainabletimeresolutionofatleast:

    Essential Test

    50s [5]Paragraph16.4.4

    3.7 PolarisationCharacteristics

    3.7.1 BeamPolarizationStability

    Identification Requirement Applicability Parent Verification

    AAM_REQ_1610 Beampolarizationstability.

    Thepolarisationpropertiesofthebeamsshallbestableenoughtoenabletheircalibrationto:

    Essential (2)SYS_REQ_1710 Test

  • WP2015.020.010SRS001Revision:D

    20111114 Page20of52

    AAM_REQ_1640 Beampolarizationpurity.

    Theisolationbetweenbothpolarisationsshallbeatleast:

    Essential Test

    40dB(TBD)

    See[5]Paragraph17.4.5

    3.8 ImagingCharacteristics

    3.8.1 UVCoverage

    Ident Requirement Applicability Parent Verification

    AAM_REQ_1710 UVcoverage.SKAshallhavea:

    Essential UV coverage isnotdefinedgoodatthemoment

    Analysis

    3.8.2 ImagingDynamicRange

    STATIONDYNAMICRANGEThishastobetranslatedintoAAstationrequirements.Theimagingisasystemwide requirement dominated by the post processing the tech requirements of the AAstationisdeterminedhere.

    Ident Requirement Applicability Parent Verification

    AAM_REQ_1720 Imaging dynamic range.SKA shallbeable toprovidean imaging dynamic rangefor continuum imaging(thermal noise imaging toclassical (micro Jansky (Jy))confusionlimits)ofatleast:

    Essential Test

    74dB [5]Paragraph6.4.5

    3.9 MonitoringandControl

    MonitoringandControl isacentral system responsible foracquiringandmonitoringdataand forcontroloftheSKAsystems.TherequirementsinthissectionreflecttheconsequentrequirementsfortheAAreceptionsubsystems.

  • WP2015.020.010SRS001Revision:D

    20111114 Page21of52

    3.9.1 M&CMonitoringData

    Identification Requirement Applicability Parent Verification

    AAM_REQ_2110 M&Cmonitoringdata.

    AAsubsystemsshallprovidemonitoringdatatothemonitoringandcontrolfunction(forperformancemonitoringandclosedloopcontrolfunctions)

    Thiswillneedsubstantialexpansion.

    Essential (2)SYS_REQ_2220 Demo

    3.9.2 M&CCalibrationInformation

    Identification Requirement Applicability Parent Verification

    AAM_REQ_2120 M&Ccalibrationinformation.

    IndividualAAsubsystemcalibrationinformationshallbeavailabletothemeasurementfunction.

    Thiswillneedsubstantialexpansion.

    Essential (2)SYS_REQ_2250 Demo

    3.9.3 SubsystemM&CAction

    Identification Requirement Applicability Parent Verification

    AAM_REQ_2130 SubsystemM&Caction.

    AAsshallreportcompletionofactionstoM&C

    Essential (2)SYS_REQ_2420 Demo

    3.9.4 AutonomousControl

    Thisistoprovidemaintenanceandtroubleshootingcapabilities.Allthefunctionsavailablecentrallywillbeavailableatalocalstationinterfacee.g.powerupanddown,parametersettingandreportingandotherdiagnostictools.

    Identification Requirement Applicability Parent Verification

    AAM_REQ_2140 AutonomousControl.

    TheAAstationshallbecapableofcomingunderlocalcontrolandnotinteractingwiththeoverallSKA.

    (2)SYS_REQ_3620 Demo

  • WP2015.020.010SRS001Revision:D

    20111114 Page22of52

    3.9.5 Calibration

    ThecalibrationoftheAAsisimportanttotheiroperation.Thedetailsoftheschemeusedneedstobedefined: theycouldbecalibratedusingexternalsources;astronomicallywhilenotobservingorduringobservationsusingaseparatebeam.

    Identification Requirement Applicability Parent Verification

    AAM_REQ_1620 Calibrationupdaterate.

    ExternalCalibrationmeasurementsshallbenecessaryatarateof:

    Essential (2)SYS_REQ_1720

    Thisdependsontherequiredprecisionandtherategainandphasearechangingasafunctionoftime.

    Test

  • WP2015.020.010SRS001Revision:D

    20111114 Page23of52

    AAM_REQ_2220 Aggregatemode.

    SKAshallprovideanaggregatemodeinwhichbandwidthisexchangedforspatialcoverage.

    Essential (2)SYS_REQ_2750 Demo

    AAM_REQ_2225 Selectablenumberofbitspersample.

    Thenumberofbitspersampleusedshouldbeselectablewithintheconstraintsofaconstanttotaloutputdatarate.

    Thisneedsascientificreasonforprovidingite.g.pulsarobservations

    Desirable TBD Demo

    3.11 DataProducts

    3.11.1 Totaloutputdatarate

    The output data rate, station to correlator, defines the survey capabilities of the array. It alsodetermines therequirementsof thecorrelatorandpostprocessor.Theaggregatedatarate foralltheAAmidstationsisconstantforagivensensitivityandsurveyspeed,howevermanystationsareused.

    Identification Requirement Applicability Parent Verification

    AAM_REQ_2305 Datarate.

    TheaggregatedatarateofallAAmidstationsshouldbe:

    Essential TBD Demo

    Totaldatarate:TBD

    Thisisafunctionofsensitivityandsurveyspeed

    3.11.2 BeamProducts

    Identification Requirement Applicability Parent Verification

    AAM_REQ_2310 Beamproducts.

    AAmidshallbecapableofcommunicatingthebeamproductsasavoltagetimeseriesovertheobservedFoV.

    Essential (4)Paragraph5.4.6 Demo

    3.11.3 DataProductTypes

    Identification Requirement Applicability Parent Verification

  • WP2015.020.010SRS001Revision:D

    20111114 Page24of52

    AAM_REQ_2320 Dataproducttypes.

    TheAAshallproducerecordableintermediatedataproducts.

    forexamplepulsarvoltagetimeseriesandRFIstatistics.

    Whatisthis?ThisisnotreallyanythingnewaboutAAsthisisallderivedfromthebeams.RFIdataisnotanintermediatedataproduct.

    Perhapsclippingdata,calibrationcorrection,beamformerweights.

    Essential (2)SYS_REQ_2820 Demo

    4 Operationalrequirements4.1 General

    4.1.1 Uptime

    Ident Requirement Applicability Parent Verification

    AAM_REQ_2410 Uptime.

    AAmidshallbedesignedtobeoperatedcontinuously,otherthanforregularmaintenance.

    Thisneedsqualificationwhataboutmaintenance?

    Essential (2)SYS_REQ_3110 Demo

    4.1.2 ReconfigurationTime

    Identification Requirement Applicability Parent Verification

    AAM_REQ_2420 Reconfigurationtime.

    ReconfigurationtimeforAAmidfromoneobservationalmodetoanother:

    Essential (2)SYS_REQ_3150 Demo

  • WP2015.020.010SRS001Revision:D

    20111114 Page25of52

    AAM_REQ_2430 Startupsequence.

    ThestartupofAAmidfunctionsshallfollowapredefinedsequencetakingnotlongerthan:

    Essential (2)SYS_REQ_3170 Test

    Hotstart: 10minutes

    Thisisarestart

    Coldstart: 24hours

    Acoldstartisdefinedasrequiring.....

    4.2.2 ShutdownSequence

    Identification Requirement Applicability Parent Verification

    AAM_REQ_2430 Shutdownsequence.

    TheAAstationswilluseacontrolledshutdownprocess.

    Essential (2)SYS_REQ_3190 Test

    4.2.3 AAmidAutonomousShutdown

    Identification Requirement Applicability Parent Verification

    AAM_REQ_2440 AAautonomousshutdown.

    AnAAmidstationshallbecapableofautonomouslydetectingconditionsrequiringstationshutdowne.g.poweranomalies,overtemperature,coolingfailureetcandthenshuttingdownandreportingtheconditiontothecentralM&Csystems.

    ThisimpliesaseparatelypoweredM&Csystemthatiskeptalivewhatifthatneedspoweringdown?

    (2)SYS_REQ_3190 Test

    4.2.4 StartupandShutdownIndividualAntennaSystems

    Identification Requirement Applicability Parent Verification

    AAM_REQ_2440 StartupandshutdownindividualAAmidstations.

    ItshallbepossibletostartuporshutdownindividualAAmidstationsandcommunicatestatustotheM&Csystems.

    Essential (2)SYS_REQ_3180 Test

  • WP2015.020.010SRS001Revision:D

    20111114 Page26of52

    4.2.5 StartupandShutdownDependencies

    Identification Requirement Applicability Parent Verification

    AAM_REQ_2450 Startupandshutdowndependencies.

    Anydependenciesinthestartupandshutdownsequencesshallbeautomaticallyverified(sotheydonotdependonoperatorintervention).

    Essential (2)SYS_REQ_3220 Inspection

    4.2.6 SubsystemShutdown

    Identification Requirement Applicability Parent Verification

    AAM_REQ_2460 Startupandshutdowndependencies.

    TheshutdownofpredefinedpartsofAAmidstationsshallhaveno(TBC)impactonSKA1operationsafterappropriaterecalibrationperformedautomatically.

    Thiscannotbecompletelytruee.g.sensitivitywillbelostorgainedjustqualifywithsignificantly?

    Essential (2)SYS_REQ_3230 Test

    4.2.7 InitialCheckout

    Identification Requirement Applicability Parent Verification

    AAM_REQ_2470 Initialcheckout.

    AAmidshallbedesignedtoenableanoperationalreadinesscheck,includingredundancies,priortocommencementofanySKA1operations(initialcheckout).

    Essential (2)SYS_REQ_3240 Test

    4.2.8 OperationalReadinessCheck

    Identification Requirement Applicability Parent Verification

    AAM_REQ_2480 Operationalreadinesscheck.

    TheAAmidoperationalreadinesscheckshalltake:

    Essential (2)SYS_REQ_3250 Test

    >5minutes.

  • WP2015.020.010SRS001Revision:D

    20111114 Page27of52

    4.3 FailureManagement

    4.3.1 General

    Identification Requirement Applicability Parent Verification

    AAM_REQ_3310 Personnelsafety.

    Asfaraspossible,nosinglefailureinAAmidshallleadtopersonnelsafetyhazards.

    Thisseemsverymildsurelyitshouldcopewithsomelevelofanticipatedfurtherfailuremodes.Suggestion:takesingleoutandchangeto:asfarasreasonable,nofailures...

    (2)SYS_REQ_3310

    Identification Requirement Applicability Parent Verification

    AAM_REQ_3320 Failurepropagation.

    FailuresintheAAmidsubsystemsshallnotleadtofailuresinotherAAsubsystemsorotherSKAsystems.

    (2)SYS_REQ_3320

    Identification Requirement Applicability Parent Verification

    AAM_REQ_3330 Operatorcommandsafety.

    NosingleoperatorcommandforAAmidshallcausecatastrophic,serious,ormajorconsequences.

    (2)SYS_REQ_3330

    Identification Requirement Applicability Parent Verification

    AAM_REQ_3340 Voltagetransientconsequences.

    Novoltagetransientsor"cutoff"ofelectricalpowershallleadtocatastrophicorseriousconsequencesinAAmid.Thisincludesvoltagetransientsappliedtotheinputofthereceivers.

    (2)SYS_REQ_3340

    Identification Requirement Applicability Parent Verification

    AAM_REQ_3350 Operatorcommandabsence.

    Theabsenceofoperatorcommandsshallnotcausecatastrophicor

    (2)SYS_REQ_3350

  • WP2015.020.010SRS001Revision:D

    20111114 Page28of52

    seriousconsequences.

    Identification Requirement Applicability Parent Verification

    AAM_REQ_3360 Singlepointfailures.

    SinglepointfailuresintheAAmidshallbelistedinthedesignandoperationaldocumentation.

    (2)SYS_REQ_3360

    Identification Requirement Applicability Parent Verification

    AAM_REQ_3370 Singlepointfailurejustification.

    EachsinglepointfailurelistedfortheAAmidshallbejustified,andassessedagainstalternativedesign(s)wherethissinglepointfailurewouldnotoccur,ifpossible.

    (2)SYS_REQ_3370

    4.3.2 DetectionandReporting

    Identification Requirement Applicability Parent Verification

    AAM_REQ_3520 Statusreportavailabilitytime.

    TheavailabilityofastatusreportofthefunctioningofAAmidshallbein:

    (2)SYS_REQ_3520

    5seconds

    Thisistoogenericarequest,howmuchstatus,inwhatdetailetc?

    Identification Requirement Applicability Parent Verification

    AAM_REQ_3530 Statusreportrequest.

    Thestatusreportofasubsystemshallshowthefunctioningofthesubsystematoraftertheoperatorrequesthasbeensubmittedtothesystem.

    (2)SYS_REQ_3530

    Identification Requirement Applicability Parent Verification

    AAM_REQ_3540 Statusreportscope.

    Thestatusreportshalldisplaythestatusofasubsystem,togetherwiththesystemtimethestatuswasdetermined.

    (2)SYS_REQ_3540

  • WP2015.020.010SRS001Revision:D

    20111114 Page29of52

    4.3.3 DiagnosisandRecovery

    Identification Requirement Applicability Parent Verification

    AAM_REQ_3610 Systeminterrogationreply.

    EachAAmidstationshallhavethecapabilitytoansweranoperatorinterrogation.

    Isthiswhatismeantorisitsubsystem?

    (2)SYS_REQ_3610

    Identification Requirement Applicability Parent Verification

    AAM_REQ_3670 Autonomousrecovery.

    AAmidshallbeabletorecoverautonomouslyincaseoffailuresthatareclassifiedasminorornegligible.

    Wheretheclassificationoffailuresandwhatismeantbyrecovery?

    (2)SYS_REQ_3670

    Identification Requirement Applicability Parent Verification

    AAM_REQ_3680 Effectofdisabledunits.

    TheAAmiddesignshallensurethatdisabledunitsdonotcorrupttheobservationaldataintheremainingsystem.

    (2)SYS_REQ_3680

    4.3.4 Lifetime

    Identification Requirement Applicability Parent Verification

    AAM_REQ_3710 Continuousoperationperiod.

    AAmidshallbedesignedforacontinuousoperationalperiodsof:

    (2)SYS_REQ_3710

    6months

    Afterthistimemaintenancemaybenecessary,e.g.exchange/cleaningofairconditioningfilters.

    Identification Requirement Applicability Parent Verification

    AAM_REQ_3720 Minimumlifetime.

    TheAAsubsystemshallbedesigned

    (2)SYS_REQ_3720

  • WP2015.020.010SRS001Revision:D

    20111114 Page30of52

    foraminimumlifetime(includinginitialinstallation,testingandcommissioningperiod)of:

    TBDyears

    Identification Requirement Applicability Parent Verification

    AAM_REQ_3725 Supportequipmentlifetime.

    AAmidsupportequipmentshallbedesignedtomaintainSKA1for:

    (2)SYS_REQ_7960

    12(TBC)years.

    Identification Requirement Applicability Parent Verification

    AAM_REQ_3730 Availability.

    TheaverageavailabilityofallAAmidsubsystemsduringtheoperationalperiodshallbe:

    (2)SYS_REQ_3730

    >90%(TBC).

    Availabilityisdefinedhereasbeingavailableforscheduledobservationsinatleastoneofthesupportedoperationalmodes.

    Thisisfartooloose.Whatlevelofsubsystem?Boardthearraywouldneverbeinuse.Thestation?Thiswouldtakeintoaccountredundancyofelements

    Identification Requirement Applicability Parent Verification

    AAM_REQ_3740 Upgradeability

    AAmidshallbeupgradable.

    Thisisagainfartoovague.Anythingisupgradeabletoatrivialextent.Thisshouldbedefined...

    (2)SYS_REQ_3740

    Identification Requirement Applicability Parent Verification

    AAM_REQ_3750 Lifetimeextension.

    Largescalemaintenanceand/oranupgradeshallgivethepossibilitytoreachalifetimeof:

    (2)SYS_REQ_3750

    50years(TBC).

    Thelevelofmaintenanceneedstobe

  • WP2015.020.010SRS001Revision:D

    20111114 Page31of52

    specified,couldeextremeinthisspec.

    Identification Requirement Applicability Parent Verification

    AAM_REQ_3760 Reusability.

    ReusabilityofAAmidequipmentshallbeensuredthroughdesignandcanbebyrefurbishmentandmaintenancewherethishasbeendemonstratedasbeingcosteffective.

    (2)SYS_REQ_7940

    Identification Requirement Applicability Parent Verification

    AAM_REQ_3770 Spareparts.

    AAmidsparepartsshallhaveastoragelifeconsistentwithavailabilityanduseduringthefulloperationallifetimeoftheSKA2equipmenttowhichitapplies.

    ThisshouldbeSKAoverall

    (2)SYS_REQ_7950

    4.3.5 Reliability

    Identification Requirement Applicability Parent Verification

    AAM_REQ_7420 Fieldreturnrate.

    Thefieldreturnrateofequipment,duringinstallationandthefirstyearfullusage,shallbe:

    (2)SYS_REQ_7420

    99.4%(TBC).

    Thisisaveryconfusingspecification.Doesitmean1000years)?Orisittheoverall

  • WP2015.020.010SRS001Revision:D

    20111114 Page32of52

    stationbeingkeptuptoperformancethroughmaintenance?

    4.4 Maintenance

    Identification Requirement Applicability Parent Verification

    AAM_REQ_3840 Datalossduetopoweroutage

    ThisspecdoesnotapplytoAAmiditisasystemparameter,thereisnosignificantdatastoredlocally.

    TheAAsubsystemshallnotlosemorethan4hoursofacquiredorprocessedmeasurementdata(notyetpermanentlystored)asaresultofanoutageintheexternalpowersupply.

    (2)SYS_REQ_3840

    ThisrequirementsneedstoberewritteninordertobefeasiblefortheAAsubsystems

    Identification Requirement Applicability Parent Verification

    AAM_REQ_3850 Autonomousrestartafterpoweroutage.

    AAmidshallhavethecapabilitytorestartautonomouslyandwithoutfailures,afteranoutageinexternalpowersupply.

    HowdoesthisvaryfromAAM_REQ_3670?

    (2)SYS_REQ_3850

    Identification Requirement Applicability Parent Verification

    AAM_REQ_3860 Systemavailabilityafterrestart.

    AAmidshallbeavailablewithin5minutes(TBC)afterrestart.

    HowdoesthisvaryfromAAM_REQ_2480?

    (2)SYS_REQ_3860

    Identification Requirement Applicability Parent Verification

    AAM_REQ_3870 Software/firmwarereinstallation.

    Allsoftware/firmwareinAAmidshallbecapableofbeingreinstalled

    (2)SYS_REQ_3870

  • WP2015.020.010SRS001Revision:D

    20111114 Page33of52

    Identification Requirement Applicability Parent Verification

    AAM_REQ_3880 Software/firmwareupgrades.

    Itshallbepossibletoreplaceallsoftware/firmwareconfigurationitemsinAAmidthroughsoftwareupgrades.

    (2)SYS_REQ_3880

    Identification Requirement Applicability Parent Verification

    AAM_REQ_3890 Softwarecodeidentification.

    Softwareconfigurationitemsshallprovideunambiguousidentificationtoallowthemaintenanceofaconfigurationmanagementdatabase.

    (2)SYS_REQ_3890

    Identification Requirement Applicability Parent Verification

    AAM_REQ_3910 Softwarecodeidentificationresponsetime.

    Thesoftwareidentificationrequestsshallbeavailabletotheoperatorwithin:

    (2)SYS_REQ_3910

    10seconds(TBC)

    Whytheurgency?

    Identification Requirement Applicability Parent Verification

    AAM_REQ_3920 AAmaintenancefunctions.

    TheAAmidshallincludefunctionsthatallowmaintenanceofhardwareandsoftware.

    Thisisfartoowholly!Whatmaintenanceetc.

    (2)SYS_REQ_3920

    Identification Requirement Applicability Parent Verification

    AAM_REQ_7820 Toolsandtestequipment.

    TheAAmiddesignshallrequireandspecifyaminimumnumberofspecialtoolsandtestequipmenttoperformassembly,integrationandrepairandmaintenanceactivities.

    (2)SYS_REQ_7820

    (2)SYS_REQ_9110

  • WP2015.020.010SRS001Revision:D

    20111114 Page34of52

    Identification Requirement Applicability Parent Verification

    AAM_REQ_7830 Inaccessiblehardwaremaintenance.

    Inaccessiblehardwareorstructuresshallrequirenomaintenanceduringoperationandshouldhavebuiltintestcapabilitywhenapplicable.

    (2)SYS_REQ_7830

    Identification Requirement Applicability Parent Verification

    AAM_REQ_7840 Testandrepairinstructions.

    TestandrepairinstructionsshallbewrittenforfaultdetectionandmaintenanceoftheAAmidequipment.

    (2)SYS_REQ_7840

    Identification Requirement Applicability Parent Verification

    AAM_REQ_7850 Maintenanceteamsize.

    Itshouldbepossibletoexecuteregularmaintenancejobswithnotmorethantwo(2)peopleperjob.

    (2)SYS_REQ_7850

    4.5 DisposalPhase

    Identification Requirement Applicability Parent Verification

    AAM_REQ_4110 Environmentalrulecompliancy.

    TheAAmiddesignshallbefullycomplianttoallenvironmentalrulesapplicabletotheSKAsite.

    Thisrequirementshouldbemuchmorespecific

    (2)SYS_REQ_4110

    Identification Requirement Applicability Parent Verification

    AAM_REQ_4120 Lastingenvironmentaleffects.

    AAmidshallbedesignedtohavenolastingadverseenvironmentaleffectsonthefacilityandsite.

    Thisrequirementshouldbemuchmorespecific

    (2)SYS_REQ_4120

  • WP2015.020.010SRS001Revision:D

    20111114 Page35of52

    5 EngineeringDesignConstraintsThischapterspecifiesthedesignconstrainingrequirementsforengineering.

    5.1 MaterialsandProcesses

    Identification Requirement Applicability Parent Verification

    AAM_REQ_7110 Materials,PartsandProcesseslists.

    EachsubsystemsupplierofAAmidshallestablish,collect,reviewanddelivermaterials,partsandprocesseslistsincludingalltheMaterials,PartsandProcessesintendedforuseintheSKAbyhissuppliersandhimself.Theyshallreflectthecurrentdesignatthetimeofissue.

    Thisallreadsverymuddledshouldbepartofaqualitysystem

    (2)SYS_REQ_7110

    Identification Requirement Applicability Parent Verification

    AAM_REQ_7130 Partsavailability.

    Theestimatedavailabilityofthepartsandproductsobtainedfrommaterialsandprocessesusedshallbecompatiblewiththefinalsystemslifecycle(tests,storage,mission).

    (2)SYS_REQ_7130

    Identification Requirement Applicability Parent Verification

    AAM_REQ_7140 Productmanufacturing.

    Productsshouldbemanufacturedasmuchaspossibleinafactory.

    Identification Requirement Applicability Parent Verification

    AAM_REQ_7150 Productassembly.

    Productswhichneedstobeassembledatthesiteshouldbeconstructedassimpleaspossibletominimizetheconstructiontime.

    Identification Requirement Applicability Parent Verification

    AAM_REQ_7160 Producttesting.

    Productsshouldbetestedasmuchas

  • WP2015.020.010SRS001Revision:D

    20111114 Page36of52

    possiblyinthefactoryinsteadoftestingatsite.

    Identification Requirement Applicability Parent Verification

    AAM_REQ_7170 Productsealing.

    Productsexposeddirectlytotheenvironment(likeantennaelements)shouldbefullysealedbeforeshippingtothesite.

    5.2 Marking

    Identification Requirement Applicability Parent Verification

    AAM_REQ_7210 Partidentification.

    Eachpart,materialorproductshallbeidentifiedwithauniqueandpermanentpartortypenumber.

    Needstobemorespecifichowfardownthehierarchytheidentificationisnecessary(boardlevel,cables,connectors,...)

    (2)SYS_REQ_7210

    Identification Requirement Applicability Parent Verification

    AAM_REQ_7220 Markingmethod.

    Methodofmarkingshallbecompatiblewiththenatureoftheitemanditsuse.

    (2)SYS_REQ_7220

    Identification Requirement Applicability Parent Verification

    AAM_REQ_7230 Documentationmarking.

    Identificationnumbersshallbemarkedondocumentationand,wherepossible,onallitems.

    (2)SYS_REQ_7230

    5.3 Powerandotherutilities

    Identification Requirement Applicability Parent Verification

    AAM_REQ_7330 Limitingexcessivecurrents.

    AAmidequipmentcircuitryshallbeprotectedagainstexcessivecurrentsbyacurrentlimitingdevice,which

    (2)SYS_REQ_8160

  • WP2015.020.010SRS001Revision:D

    20111114 Page37of52

    shallnotitselfproduceexcessivecurrents.

    Whatisthis?Isthisontheinterfacesagainstlightningorotherproblemsifso,sayso.

    Identification Requirement Applicability Parent Verification

    AAM_REQ_7340 Powersurgeprotection.

    AAmidsubsystemsshallbeprotectedagainstpowertransientsandsurges.

    (2)SYS_REQ_8170

    Identification Requirement Applicability Parent Verification

    AAM_REQ_7350 Polaritymisconnectionprotection.

    AAmidequipmentcircuitryshallbeprotectedagainsttheeffectsofinadvertentwrongpolarityconnections.(TBC)

    Thisneedstobespecifiedatwhatlevelandifitreallyneedstobedone.Thiscouldusesubstantiallymorepowerduetodiodedropsetc.

    (2)SYS_REQ_8180

    5.4 Accessibilityandtestability

    Identification Requirement Applicability Parent Verification

    AAM_REQ_7880 Selftestcapability.

    TheAAmidsubsystemdesignforbothhardwareandsoftwareshallprovideselftestcapabilities.

    (2)SYS_REQ_7880

    Identification Requirement Applicability Parent Verification

    AAM_REQ_7890 Servicingpointmaking.

    AllservicingandtestpointsshallbeclearlymarkedusingTBDlabellingstandards.

    (2)SYS_REQ_7890

    5.5 Transportabilityandstorage

    Identification Requirement Applicability Parent Verification

  • WP2015.020.010SRS001Revision:D

    20111114 Page38of52

    AAM_REQ_7910 Handlingheavyequipment.

    AAmidparts,testequipmentorsupportingequipmentwithamassexceeding25kgshallbeprovidedwithprovisionsforhandlingandtransportation.

    Warnings?

    (2)SYS_REQ_7910

    Identification Requirement Applicability Parent Verification

    AAM_REQ_7920 Disassemblyfortransport.

    ItshallbepossibletodisassembleAAmidequipmentfortransportationorstorageasnecessary.

    (2)SYS_REQ_7920

    Identification Requirement Applicability Parent Verification

    AAM_REQ_7930 Longtermstorage.

    ItshallbepossibletostoreAAmidequipment(spareparts)for10yearswithoutanydegradationofitsfunctionorperformance.

    (2)SYS_REQ_7930

    Identification Requirement Applicability Parent Verification

    AAM_REQ_7935 Specialstorage.

    Ifspecialstoragefacilitiesareneededtheyshallbesuppliedaspartofthesparesprocurement.

    (2)SYS_REQ_7935

    Ident Requirement Applicability Parent Verification

    AAM_REQ_7940 Packingdensity.

    Packingdensityfortransportationshouldbedesignedasanoptimisedcost/performancerequirement.

    TBD

  • WP2015.020.010SRS001Revision:D

    20111114 Page39of52

    Ident Requirement Applicability Parent Verification

    AAM_REQ_7950 Packingmethod.

    Allproductsshouldbepackedpriortotransportationsuchthatitcanwithstand(1)rigourstransportation,(2)transportvibrationand(3)movement.

    PerhapsthisshouldbespecifiedmorequantativeinGsforexample.

    TBD

    Ident Requirement Applicability Parent Verification

    AAM_REQ_7960 Largeequipmentsize.

    Thevolumeoflargeequipmentwhichcannotbedisassembledshouldbedrivenbystandardshippingcontainerguidelines.

    TBD

    5.6 ArrayDeployment

    Ident Requirement Applicability Parent Verification

    AAM_REQ_8000 Antennaelementdeploymenttime.

    Thetimetoassembleanddeploytheantennaelementsshouldbeminimizedto?minutesperantennaelement.

    TBD

    Ident Requirement Applicability Parent Verification

    AAM_REQ_8010 Antennaelementdeployment.

    TheAAarraydesignanddeploymentshouldbeableforinstallationonasitewithalocalflatnesstoleranceof?cmover?m.

    TBD

  • WP2015.020.010SRS001Revision:D

    20111114 Page40of52

    Ident Requirement Applicability Parent Verification

    AAM_REQ_8020 Antennapositions.

    Eachindividualantennapositionshouldbemeasuredandknownwithin?mminthreedimensionsintheITRFcoordinatesystem.

    TBD

    Ident Requirement Applicability Parent Verification

    AAM_REQ_8030 Antennaorientation.

    Antennaelementsshouldbedesignedsuchthattheycanberotatedquickandsimple.

    TBD

    Ident Requirement Applicability Parent Verification

    AAM_REQ_8040 Antennafixation.

    Antennaelementsshouldbedesignedsuchthattheycanbesimpleandeffectivelyfixedtotheground.

    TBD

    Ident Requirement Applicability Parent Verification

    AAM_REQ_8050 Housingheights.

    Anyhousingneartheantennafieldshouldnotbeinthelineofsightof=xdegreesabovehorizon.Thefollowingrelationshouldhold:h

  • WP2015.020.010SRS001Revision:D

    20111114 Page41of52

    5.7 ElectronicDesignRequirements

    Ident Requirement Applicability Parent Verification

    AAM_REQ_8100 Devicejunctiontemperature.

    ThedevicejunctiontemperatureofthemaindevicesshouldbekeptbelowxdegreesCelsiustoincreaselifetime.

    ShouldfollowfromtheRAMSanalysis.Dontknowifyoushouldputthisasarequirement.

    TBD

    Ident Requirement Applicability Parent Verification

    AAM_REQ_8110 Designforupgradability.

    TheAAlowdesignshouldbemadesuchthatfutureupgradesareabletoprocessthefullbandwidthofeachantennaelement,assumingthecostimpactissmall.

    TBD

    6 ExternalInterfaceRequirementsExternalInterfacesaredefinedasinteractionsorcommunicationswiththeworldoutsideanAAmidstation.Thesearerepresentedasbluearrowsin

  • WP2015.020.010SRS001Revision:D

    20111114 Page42of52

    Figure1.

    6.1 RFSignal

    Identification Requirement Applicability Parent Verification

    AAM_REQ_8300 RFsignal.

    TheinputsignalofeachAAmidstationhasthefollowingcharacteristicsintheband70450MHz:

    Theinputforthisrequirementisthespectrummeasuredattheselectedsite.

    TBDdBm:24hoursaveragepower

    TBDdBm:Peakpower

    6.2 RFInterference

    Identification Requirement Applicability Parent Verification

    AAM_REQ_8400 Damaginginterferencelevels.

    TheAAmidsubsystemshallnotbedamagedbyRFIsignalsoflessthan:

    (2)SYS_REQ_5410

    TBDV/m

  • WP2015.020.010SRS001Revision:D

    20111114 Page43of52

    6.3 Maintenance

    Therequirementsformaintenancearelistedintheoperationalrequirementssection(Section4.4).

    6.4 ReCycling

    Currentlynorecyclingrequirementsareformulated.

    6.5 Environment

    6.5.1 General

    Identification Requirement Applicability Parent Verification

    AAM_REQ_5120 Compliancywithlocalenvironment.

    ThedesignoftheAAmidshallbeappropriate(TBD)foroperationinthenaturalenvironmentforthegeographicaldeploymentlocationoftheSKA.

    Thisrequirementshouldbemademorespecific

    (2)SYS_REQ_5120

    Identification Requirement Applicability Parent Verification

    AAM_REQ_5130 Transportationconditions.

    AAmidequipmentshallbedesignedforthethemodeoftransportbeingused(road,air,sea,etc.)betweenplaceofmanufacturingandfinalinstallationontheSKAsite(includingpackagingrequirements).

    Thisrequirementshouldbemademorespecifice.g.useproperstandardsetc

    (2)SYS_REQ_5130

    6.5.2 Siteandinfrastructurerequirements

    Identification Requirement Applicability Parent Verification

    AAM_REQ_5220 Facilitiesandequipmentintrusion.

    ThisisasystemwiderequirementandnotspecificallyAAmid:deleteit

    (2)SYS_REQ_5220

  • WP2015.020.010SRS001Revision:D

    20111114 Page44of52

    AAmidequipmentandoperatingfacilitiesshallbeadequatelyprotectedagainstintrusionbyunauthorizedpersonsorbylargerwanderinganimals.

    Thisrequirementshouldbemademorespecific

    6.5.3 Contaminationandprecipitation

    Identification Requirement Applicability Parent Verification

    AAM_REQ_5230 Precipitation.

    AAmidshallbeabletooperatewithmaximal1%(TBD)degradationoftheperformanceduringanytypeofprecipitation(TBD).

    Theoriginalrequirementistoostringent.Precipitationlikesnowwillalwayshavesomeinfluence.Needtodeterminereasonableacceptabledegradationanddefineit.

    Shouldntthisbewith6.6Weather?

    (2)SYS_REQ_5230

    Ident Requirement Applicability Parent Verification

    AAM_REQ_5240 Pollutionandcontaminationprotection.

    AAmidshallbeadequatelyprotectedagainstperformancedegradationcausedbycontaminatingparticles(dust,sandetc),pollutedairoranyprecipitation.

    Thisrequirementshouldbemademorespecific

    (2)SYS_REQ_5240

    6.5.4 ElectroMagneticCompatibility

    Identification Requirement Applicability Parent Verification

    AAM_REQ_5420 EMimmunity.

    AAmidshallnotbesusceptibletoRFIsignals,inbandoroutband,otherthanviathereceptors.(Whatdoesthismean??)

    Thisrequirementshouldbemademorespecificwithnumericalvalues

    (2)SYS_REQ_5420

  • WP2015.020.010SRS001Revision:D

    20111114 Page45of52

    otherwisethisleadtoanoverdesignbyputtingallequipmentinaFaradaycage.

    Identification Requirement Applicability Parent Verification

    AAM_REQ_5610 EMCsafetymargin.

    TheEMCsafetymargin,whichisdefinedastheratiobetweensusceptibilitythresholdandtheinterferenceatanypointwithinthesystem,shallbegreaterthanTBDdB.

    (2)SYS_REQ_5610

    Identification Requirement Applicability Parent Verification

    AAM_REQ_5620 EMCcompatibilitymarking.

    All"offtheshelf"equipmentappliedwithintheAAmidsubsystemshallpossesasaminimumthehostcountryEMCmarking,includingelectricalandelectronicsupportingandinfrastructuralequipment.

    Needstobemorespecificwhenthesiteisselected.

    (2)SYS_REQ_5620

    Identification Requirement Applicability Parent Verification

    AAM_REQ_5630 Groundingconcept.

    AhybridgroundingconceptasshowninfiguresTBDshallbeusedforEMCpurposes.GroundloopsinvolvingDC,andlowfrequencyAC,currentsshallbeavoidedinsidethesystem.Intentionalcurrentsthroughstructurearenotpermitted.(tobeelaborated)

    (2)SYS_REQ_5630

    Identification Requirement Applicability Parent Verification

    AAM_REQ_5640 EMCdesignefforts.

    Maximumeffort(tobedetailed)shallbeputintodesigningsignalinterfacestowithstandnoisyenvironmentsandtominimizethegenerationofexcessivenoise.

    Thisneedstobeproperlyfleshedout.

    (2)SYS_REQ_5640

  • WP2015.020.010SRS001Revision:D

    20111114 Page46of52

    6.5.5 SelfgeneratedRFIenvironment

    Identification Requirement Applicability Parent Verification

    AAM_REQ_2910 SelfgeneratedRFIsusceptibility.

    InterferenceduetoselfgeneratedRFIshallnotdegradetheperformanceoftheinstrumentbygreaterthan1%byanymeasure(TBC).

    Thisisawildguess....

    (2)SYS_REQ_2910

    6.5.6 Grounding

    Identification Requirement Applicability Parent Verification

    AAM_REQ_5810 Safetyground.

    Electricalsafetygroundshallbedesignedaccordingtotheregulationsimposedbythelocalgovernment.

    Thisshouldbemademorespecificassoonthesiteisselected.

    (2)SYS_REQ_5810

    6.5.7 Corrosion

    Identification Requirement Applicability Parent Verification

    AAM_REQ_5820 Corrosionprotection.

    AAmidequipmentandbuildingsshallbeprotectedagainstcorrosion.

    Specifythestandard...

    (2)SYS_REQ_5820

    Identification Requirement Applicability Parent Verification

    AAM_REQ_5830 Corrosionprotectioninairflows.

    AAmidelectronicsandconnectorsinareaswithahigherairflow(forcooling)oroutdoorenvironmentshallbeadditionallyprotectedagainstcorrosion.

    Specifythestandard...

    (2)SYS_REQ_5830

  • WP2015.020.010SRS001Revision:D

    20111114 Page47of52

    6.6 Weather

    6.6.1 ClimaticRequirements

    Identification Requirement Applicability Parent Verification

    AAM_REQ_5310 Humidity.

    AAmidequipmentshallbeabletowithstandmoistureandhumiditylevelsupto:

    (2)SYS_REQ_5310

    100%RH.

    Forhowlong?Operating?

    Identification Requirement Applicability Parent Verification

    AAM_REQ_5320 Allowableairtemperaturerange.

    AAmidequipmentshallbeabletowithstand(nonoperatingifnecessary)anoutsideairtemperaturewithintherangeof:

    (2)SYS_REQ_5320

    15C(TBC)to+60C(TBC).

    Forhowlong...?

    Identification Requirement Applicability Parent Verification

    AAM_REQ_5330 Airtemperatureoperationrange.

    AAmidequipmentshallbeabletooperatewithinspecificationiftheoutsideairtemperatureiswithintherangeof

    (2)SYS_REQ_5330

    5C(TBC)to+50C(TBC).

    Identification Requirement Applicability Parent Verification

    AAM_REQ_5340 Windvelocities.

    AAmidshallbeabletoleratewindvelocitiesupto:

    (2)SYS_REQ_5340

    Survival: 160km/hr(TBC)

    Normaloperation:40km/hr(TBC).

  • WP2015.020.010SRS001Revision:D

    20111114 Page48of52

    6.6.2 Lightning

    Identification Requirement Applicability Parent Verification

    AAM_REQ_5710 Lightningdischargesusceptibility.

    AAmidshallbeabletowithstandtheelectromagneticfieldimpactdefinedinTBDduringoperationorinanyothermodewithoutanydamageorcharacteristicsdegradationbecauseofalightningdischarge.

    Thisneedsconsiderablestudy,theremaybeelementsofthearraydestroyedandstillcarryon.

    (2)SYS_REQ_5710

    Identification Requirement Applicability Parent Verification

    AAM_REQ_5720 Lightningprotection.

    AAmiddedicatedbuildingsandequipmentlocatedonsitesshallbeprotectedtominimizetheeffectsofadirectlightningstrikeusingcertifiedmethods(e.g.asdescribedinNEN1014).

    (2)SYS_REQ_5720

    6.6.3 Seismicity

    Identification Requirement Applicability Parent Verification

    AAM_REQ_5910 Earthquakes.

    AAmidequipmentandbuildingsshallbeprotectedagainstearthquakeswithamagnitudeupto:

    (2)SYS_REQ_5910

    Richter3.8(TBC).

    7 InternalInterfaceRequirementsInternal interfacesaredefinedas interactionsorcommunicationswiththeSKAsystemoutsidetheAAmid subsystems. These are represented as black arrows in

  • WP2015.020.010SRS001Revision:D

    20111114 Page49of52

    Figure1.

    7.1 AAReceptorPower

    Ident Requirement Applicability Parent Verification

    AAM_REQ_8110 Supplypower.

    ThepowersuppliedtoAAmidshallhavethefollowingcharacteristics(TBC):

    (2)SYS_REQ_8110

    Voltage: 380V+/10%

    Phases: Three

    Frequency: 50Hz+/1Hz

    Identification Requirement Applicability Parent Verification

    AAM_REQ_7320 Powerconsumption.

    ThepowerconsumptionofallequipmentatanAAmidstationshallbe:

    (2)SYS_REQ_7320

  • WP2015.020.010SRS001Revision:D

    20111114 Page50of52

    7.2 SyncandTiming

    Identification Requirement Applicability Parent Verification

    AAM_REQ_8140 Subsystemtimestandard.

    EachAAmidstationshallmaintainaninternaltimestandardwithanaccuracyof:

    (2)SYS_REQ_8140

    TBDnanoseconds.

    Needstodiscussstandaloneanddriftrateetc.

    Identification Requirement Applicability Parent Verification

    AAM_REQ_8150 Centraltimestandard.

    AllAAmidstationsshallsynchronizetheirinternaltimestandardstothecentraltimingstandardwithanaccuracyof

    (2)SYS_REQ_8150

    TBDnanoseconds.

    Identification Requirement Applicability Parent Verification

    AAM_REQ_8160 Synchronisationsignal.

    Asynchronisationsignal(tickorpulse)isdistributedtoeachAAstationandhasthefollowingcharacteristics:

    ThiswillbederivedfromtheSignalTransportandNetworksdomain.

    Voltage: TBDV

    Thisisrubbish,itwillbeanopticalsignaloverfibre.

    Risetime: TBDps

    Itwillprobablynotbedonethisway

    TBDspulsewithawidthofTBDs

    Identification Requirement Applicability Parent Verification

    AAM_REQ_8170 Clocksignal.

    Thislookswrongsurelyitwillbealocallygeneratedsignalthatissynchronisedwiththeabove

    ThecentralclockisdistributedtoeachAAmidstationandhasthe

    ThiswillbederivedfromtheSignalTransportandNetworksdomain.

  • WP2015.020.010SRS001Revision:D

    20111114 Page51of52

    followingcharacteristics:

    VoltageofTBDV

    FrequencyofTBDMHz

    JitterofTBDns

    LongtermstabilityofTBD

    7.3 Network

    Ident Requirement Applicability Parent Verification

    AAM_REQ_8200 Data timetagging. Allaperture arrays shall timetag received and processeddata with the accuracy oftheirinternaltimestandard.

    [1]SYS_REQ_8210

    Identification Requirement Applicability Parent Verification

    AAM_REQ_8210 Datapacketizing.

    AllAAmidobservationdatashallbepacketizedaccordingtotheSKAstandardwrittenin[TBD].

    TBD

    Identification Requirement Applicability Parent Verification

    AAM_REQ_8220 Datainterface.

    ThedatainterfaceofAAmidtothecentralprocessinghasthefollowingcharacteristics:

    ThiswillfollowfromtheSignalTransportandNetworkdomain.

    TBD

    7.4 MonitorandControl

    Identification Requirement Applicability Parent Verification

    AAM_REQ_8500 M&Cprotocol.

    TheM&CprotocolusedtointerfacewiththeAAmidisTBD

    ThisisdrivenbytheM&Cdomain.

  • WP2015.020.010SRS001Revision:D

    20111114 Page52of52

    Identification Requirement Applicability Parent Verification

    AAM_REQ_8510 M&Cinterface.

    TheelectricalcharacteristicsoftheM&CprotocolfortheAAmidstationare:

    ThisisdrivenbytheM&Cdomain.

    TBD

    TBD

    7.5 AAReceptorCooling

    Identification Requirement Applicability Parent Verification

    AAM_REQ_8600 Coolingcapacity.

    TherequiredcoolingcapacityforeachAAmidstationrequires:

    TBDkW

    TBD

    TBD