aa mid system requirements...
TRANSCRIPT
-
Name Designation Affiliation Date Signature
A.W.Gunst
A.Faulkner
AAdomainspecialist
Systemengineer
SPDO
AAVP
20111115
20111115
ApprovedforreleaseaspartofSKAAAdCoDRdocuments:
K.Cloete ProjectManager SPDO 20111115
AAMIDSYSTEMREQUIREMENTSSPECIFICATION
Documentnumber.................................................................WP2015.020.010SRS001Revision...........................................................................................................................DAuthor...............................................................................................................SeebelowDate.................................................................................................................20111114Status........................................................................................................................FINAL
brinkStamp
BrinkAndreG
-
WP2010.020.020SRS001 Revision:D
20111114 Page2of52
DOCUMENTHISTORY
Revision DateOfIssue EngineeringChangeNumber
Comments
A 20111003 Firstdraftreleaseforinternalreview
B 20111021 CommentsIlseincluded
C 20111109 Commentsincludedaftertelecondiscussion
D 20111114 Release
DOCUMENTSOFTWARE
Package Version Filename
Wordprocessor MsWord Word2007 02WP2015.020.010SRS001D_AAMidReq.docx
ORGANISATIONDETAILS
Name SKAApertureArrayVerificationProgrammePhysical/Postal
AddressASTRONOudeHoogeveensedijk4P.O.Box27990AADwingelooTheNetherlands
Fax. +31(0)521595144Website www.skatelescope.org
-
WP2010.020.020SRS001 Revision:D
20111114 Page3of52
LISTOFABBREVIATIONS
AA-Mid ....... Aperture Array for mid-frequencies
AC .............. Alternating Current
ADC ........... Analogue to Digital Converter
ADD ........... Architectural Design Document
CI ............... Configuration Item
CMS ........... Configuration Management System
COAR ......... Consolidated Observation Action
Register
CoDR ......... Concept Design Review
dB ............... Decibel
deg ............. degree
DRM ........... Design Reference Mission
DC .............. Direct Current
EM .............. Electro Magnetic
EMC ........... Electromagnetic Compatibility
EMI ............. Electromagnetic Interference
FAT ............ Factory Acceptance Test
FCA ............ Functional Configuration Audit
FMECA ...... Failure Modes, Effects and Critically
Analysis
FOV ............ Field of View in squared degrees
GHz ............ Giga Hertz
Hz ............... Hertz
HFE ............ Human Factors Engineering
HPBW ........ Half Power Beam Width
HPC ........... High Performance Computing
IEC ............. International Electrotechnical
Commission
IEEE ........... Institute of Electrical and Electronics
Engineers
ITU ............. International Telecommunications Union
ICD ............. Interface Control Document
INCOSE ..... International Council on Systems
Engineering
ISO ............. International Standards Organisation
Jy ............... Jansky
K ................. Kelvin
Kg ............... kilogram
km .............. kilometre
LEMP ......... Logistic Engineering Management Plan
LO .............. Local Oscillator
LOFAR ....... Low Frequency Array
m ................ metre
M&C ........... Monitoring and Control
MHz ........... Mega Hertz
MIL-STD .... Military Standard
MTBF ......... Mean Time Between Failures
MTTR ......... Mean Time To Repair
OAR ........... Observation Action Register
OEM ........... Original Equipment Manufacturer
OICD .......... Operator Interface Control Document
PAF ............ Phased Array Feed
PCA ........... Physical Configuration Audit
PDR ........... Preliminary Design Review
PEMP ......... Power Engineering Management Plan
PITF ........... Power Investigation Task Force
PPR ........... Pre-production Review
PrepSKA .... Preparatory phase for the SKA
RAM ........... Reliability, Availability and
Maintainability
RAS ........... Radio Astronomy Service
RFI ............. Radio Frequency Interference
RMS ........... Root Mean Square
RQZ ........... Radio Quiet Zones
SAT ............ Site Acceptance Test
SEMP ......... System Engineering Management Plan
SI ............... Systme International d'units
SKA ............ Square Kilometre Array
SKADS ....... SKA Design Studies
SPDO ......... SKA Program Development Office
SRR ........... (Sub)System Requirements Review
SRS ........... System Requirements Specification
SS .............. Survey Speed
SSEC ......... SKA Science and Engineering
Committee
STaN .......... Signal Transport and Networks
TBC ............ To Be Confirmed
TBD. ........... To Be Determined
TBV ............ To Be Verified
TRR ........... Test Readiness Review
V ................ Volt
WBS ........... Work Breakdown Structure
WP ............. PrepSKA Work package
-
1 IntroductionThisdocumentcovers theSystem requirements for themid frequencyApertureArray for theSKAPhase2,SKA2.ItispartofthesystemsengineeringdocumentsetforthedeltaconceptdesignreviewforSKAAAmid.
TherequirementsourcesarefromtheSKA2DRM[5]andthetechnicalevaluationstakingplace.
Notes:
1. Commentsareinreditalics
2. TBDsetcarejustinred
3. IhavecreatedtheneedforaTechnicalRequirementsdocumentthatderivesdetailsofthesystemrequirementsforAAsgiventheparametersfromthescienceandotherrequirementsdocs....
4. ThereneedstoanOperationsdocumenttoreference.
5. SomeoftherequirementswillneedtobefedbackuptotheSystemSRS
6. Thereisverylittleuseofstandardsintherequirementsthisneedstobefixed
7. ReallythisshouldbeoperatingunderISO9001qualitystandards
8. ThereferencesarenowusingWordsstructureforthem.
-
WP2015.020.010SRS001Revision:D
20111114 Page5of52
2 References
[1] Cloete,K.,et.al.,SKASystemRequirementsSpecification,Rev.E,WP2005.030.000SRS001,20100212.
[2] Stevenson, T. et. al., SKA Phase 1 System Requirements Specification, Rev. A, WP2005.030.000SRS002,20110214.
[3] SKA ScienceWorking Group, The Square Kilometre ArrayDesign ReferenceMission: SKAPhase1,report,v.1.3,January2011.
[4] Dewdney, P.E. et. al., SKA1:High Level SystemDescription,Rev.A.,WP2005.030.010TD002,20110214.
[5] SKAScienceWorkingGroup,TheSquareKilometreArrayDesignreferenceMission:SKAmidandSKAlo,report,v.1.0.
-
WP2015.020.010SRS001Revision:D
20111114 Page6of52
3 FunctionalandperformancerequirementsTheserequirementscoverAAmidforSKAPhase2.TheserequirementsarespecifictoAAmidandflowdownfromthesciencecasesintheSKADRM1.0[5].
3.1 Functionaloverview
The top level context diagram for the AAmid Reception is shown in
Figure1,thesearethesameforallAAsintheSKA.ThisispartofthesecondleveloftheSKAcontextdiagramaspresented in [2].From this figure it isclear that theAAmid requirementsaredirectlyinfluencedbythefollowingexternalaspects(bluearrows):
RFSignal:thesignalofinterestreceivedbytheAA
RFInterference:anyhumanmadedisturbingsignalwhichisalsoreceivedbytheAAandforwhichthesystemshouldbemaderobust
Maintenance:thedesignoftheAAreceptionsystemshouldtake intoaccounttheaffect ithas onmaintenance since the total amount of electronics in the fieldwill be significant.Hencemaintenanceshouldbeminimizedandanyextrainvestmenttoachievethatmustbebalancedagainstthereductioninmaintenancecost.
Environment: the environment of the AA poses extra requirements on primarily themechanicaldesignoftheantennaelementandreceiversystems, installationofcablesandbunkers necessary for the AA system. Examples of environmental influences are dust,
-
WP2015.020.010SRS001Revision:D
20111114 Page7of52
temperature (and its variation), humidity and soil composition. The soil composition hasmechanicalimplicationsandastronginfluenceontheelectricalgroundingoftheantennas.
Recycling:sincetheSKAhasalimitedlifetimetheusageofmaterialswhichcanberecycledmaybeofrelevance.
Weather: the AA reception systems should be designed to withstand rain, lightning,earthquakes,hail,snowetc.dependentontheweatherprofileofthesite.
In
Figure 1 the internal SKA interfaces are shown in black. These interfaces are required for AAreceptiontoworkproperly.Thefollowinginternalinterfacesaredefined:
Networking:viathis interfacethedatafromtheAAreceptionsystem istransportedtothecentralsystemstobefurtherprocessed.
Monitor&Control: via this interfacemonitor information like status reports from all thesubsystems in the AA reception system are communicated in one direction, while thecontrol of the AA reception system is done in the other direction. Control of the AAreception system isnecessary since therearemany settings:beam steering, selecting thefrequencybands,etc.
Sync&Timing:via this interface thesynchronization, timingandeventuallyLOsignalsareretrievedfromacentralsystem.Forradioastronomicalsystemsoneofthemostimportantaspects istosynchronizeallAAreceptionsystemswitheachothersincethephaserelation
-
WP2015.020.010SRS001Revision:D
20111114 Page8of52
betweentheAAstations isaprimaryparameterwhichshouldberetrieved.TypicalsignalsrequiredbytheAAreceptionsystemare:clocksignaltosampletheanaloguesignalandasynchronisationsignale.g.apulsepersecondsignaltoalignallAAreceptionsystems.
AAReceptorCooling:coolingisnecessaryprimarilybecausetheamountofsignalprocessingrequired in theAA reception systems is significant and the environmental conditions arelikelytobehot.
AAReceptorPower:ThisinterfaceisdefinedtopoweralltheelectronicsintheAAReceptionsystem.
Figure1ContextdiagramoftheAAReceptionsystem(level2)
-
WP2015.020.010SRS001Revision:D
20111114 Page9of52
Considering in more detail the AAmid Reception context diagram of
Figure1resultsinthethirdlevelcontextdiagrampresentedinFigure2.
-
WP2015.020.010SRS001Revision:D
20111114 Page10of52
AA Monitor &Control
EM WavesReception
Beamforming&
Filtering
Beamforming&
Correlation
AA ReceptionCooling
AA ReceptionPower
Generation
DigitizingAmplification
AA Calibration
RF Signal
To All
Monitor&
Control
Sync&
Timing
Networking
RF Interference
Level 2 interfaces not drawn has an interface to
all functionalities
Figure2ContextdiagramoftheAAReceptionsystematlevel3
AsshowninFigure2theprimaryfunctionsoftheSKA1AAmidreceptionsystemare:
1) EMwavesreception:theelectromagneticradiationisconvertedintotheelectricaldomain.
2) Amplification: thisboosts the signal fordigitisationand reduces thenoisecontributionoflaterstages.
3) Beamforming & Filtering: adds optionally multiple antenna elements with an analogbeamformer and filters out the frequencies outside the AAmid specification. In practicemultipleamplifierandfilteringstageswillbeimplemented.
4) Digitizing:theanaloguesignalissampledandquantized.
5) Beamforming&Correlation:inthebeamformingphasethesignalsofmultiplereceptorsarecombinedinordertomakebeamsonthesky.Acorrelationfunctionisrequiredtocalibrateall the individual receiver chains with each other to compensate for gain and phasevariationsbetweenthemasafunctionoftime.
6) AACalibration:calculatesthegainandphasedifferencesbetweenreceiverchainsandusestheoutputofthecorrelationfunctionalityasaninput.
7) AA Monitor & Control: translates high level system control information to specificcommandsfortheAAhardwareandsoftware.Themonitor informationfromthesoftwareandhardwareistransmittedtotheSKAMonitor&Controlsystem.ThissystemalsoenableslocalcontroloftheAAstationformaintenanceandtroubleshootingactivities.
8) AAReceptionPowerGeneration:powerisgeneratedorretrievedfromacentralnode.
-
WP2015.020.010SRS001Revision:D
20111114 Page11of52
9) AAReceptionCooling:maintainsthetemperatureofallpartsoftheAAmidstationwithinspecificationlimits.
3.2 AAmidspectralcharacteristics
ThespectrumtobeobservedwithSKA1AAmidisspecified.
3.2.1 OperatingFrequency
Identification Requirement Applicability Parent Verification
AAM_REQ_1110 Electromagneticfrequencyrange.
AAmidshallbeabletomeasureelectromagneticradiationinafrequencyrangefrom:
Essential Test
400MHzto1450MHz LowerboundaryfromSection16.4.2and17.4in[5].ThehigherboundaryisfromSection12.4.1[5],1450MHzistakensinceneutralhydrogenisat1421MHz.
3.2.2 InstantaneousBandwidth
Identification Requirement Applicability Parent Verification
AAM_REQ_1120 Instantaneousbandwidth.AAmidshallhaveaminimuminstantaneousbandwidthof:
Essential Test
1000MHz
[5]Section1.4,fractionalbandwidth~1
3.2.3 SpectralFlatness
Identification Requirement Applicability Parent Verification/Comments
AAM_REQ_1130 Spectralripple.Thepassbandrippleovertheband,aftercalibration:
Essential Test
Maximum+/1%(TBD).
Notethatthisisnottheanaloguesystem,butafterdigitisationandprocessing.Theonlycharacteristics
[2]SYS_REQ_1190 Theparentisnotveryspecific.
-
WP2015.020.010SRS001Revision:D
20111114 Page12of52
theanaloguechainrequiresistodeliverasignalwithinboundstotheADC,stabilityandbecapableofmeasurementforcalibration.
3.2.4 SpectralPassbandSlope
Identification Requirement Applicability Parent Verification/Comments
AAM_REQ_1135 Spectralpassbandslope.Thepassbandslopeoverthebandshouldbe:
Essential Test
MaximumxdB(TBD).
Notethatthisistheanaloguesystem,priortodigitisation.ThiscanbecalibratedoutbutdecreasestheSignaltoNoiseRatio.
3.2.5 SpectralResolution
The following requirementsare for theAAmidstationonly.This iswhenusing frequencydomainbeamformingandisnecessarytomeetthesizeandspacingoftheelements.Thespectralfiltermustalsotransmitthedatasuchthatthecorrelatormayfurthersubdividethedata intomuchnarrowerbands required for correlation.The final required SKA spectral resolution shouldbemadeby thecentralsystems.
Identification Requirement Applicability Parent Verification
AAM_REQ_1140 Spectralresolution.
TheAAmidstationshallhaveaminimalspectralresolutionoverthefullinstantaneousbandwidth(TBV):
Essential Test
1MHz(TBD)
[5]Table12.2requiresresolutionbeforecorrelationof3kHz
3.2.6 SpectralDynamicRange
Identification Requirement Applicability Parent Verification
AAM_REQ_1150 Spectraldynamicrange.
SKAshallhaveaminimumspectraldynamicrangeattheoutputofthecorrelatorof:
Essential Test
62dB [1] Paragraph3.3.5,changed1400to
-
WP2015.020.010SRS001Revision:D
20111114 Page13of52
1450MHztoenablesurveysofneutralhydrogenat1421MHz.
3.2.7 Clipping
Thedynamicrangeoftheelement(orTile)uptodigitisationispartlysetbytheeffectivenumberofbits, ENOB, of the digitiser. This is ameasure of the ability to copewith interference and largeastronomicalsignals;itisnotameasureofthedynamicrangeofthearrayitselfortheimagesthatgetproducedafterprocessing.
It is not practical to expect to precisely digitise every possible interference signal, however,statisticallytheamountofobservingtimelostduetoclippingcanbedetermined.
Identification Requirement Applicability Parent Verification
AAM_REQ_1160 Clipping. Essential Test
ThedynamicrangeoftheADCsshallbesuchthatnoclippingwilloccurfor95%(TBC)ofthetime.
[2]SYS_REQ_5430
Theparentrequirementneedssomechangessinceitspecifiesnoclipping
AAM_REQ_1165 Clippingdatashouldbemarkedinthedatastream
Essential [2]SYS_REQ_5430
3.3 AAsensitivity,FOVandsurveyspeed
3.3.1 Sensitivity
Identification Requirement Applicability Parent Verification
AAM_REQ_1210 Sensitivity(Aeff/Tsys).
TheAAreceptorsystemshallhaveaminimumsensitivityforscananglesofmaximal45degrees(TBD)of:
Essential Test
10,000m2/KexpressedinStokesI.
This is equivalent with the sensitivity which is required for one polarisation.
[5]Section18,Table18.2(DRMChapters6, 7, 8, 15 and 17)
-
WP2015.020.010SRS001Revision:D
20111114 Page14of52
3.3.2 InstantaneousFieldofView
Identification Requirement Applicability Parent Verification
AAM_REQ_1220 Instantaneousfieldofview.
TheSKAshallachieveaminimumtotalFOV(thatcanbesynthesizedfrommultiplebeams)of:
Essential Test
100squaredegrees
Thefieldofviewisderivedfromthesurveyspeedandsensitivity.
3.3.3 SurveySpeed
Identification Requirement Applicability Parent Verification
AAM_REQ_1230 Surveyspeed.
AAmidshallhaveasurveyspeed(m4K2deg2):
Essential Test
1010m4K2deg2 [5]Section12.4.2
3.4 SpatialCharacteristics
3.4.1 BaselineRequirements
Identification Requirement Applicability Parent Verification
AAM_REQ_1310 Baseline.
Themaximumbaselineis:
Essential Test
180km(TBD) [4]
3.4.2 SkyCoverage
Identification Requirement Applicability Parent Verification
AAM_REQ_1320 Skycoverage. Desirable Test
6000deg2(TBD)
3.4.3 ScanAngle
Thisrequirementisderivedfromtheskycoverage.
-
WP2015.020.010SRS001Revision:D
20111114 Page15of52
Identification Requirement Applicability Parent Verification
AAM_REQ_1330 Scanangle.
Thescanangleisdefinedfromzenith.ThemaximumscanangleforSKAshallbeatleast:
Test
45degrees(TBD) Desirable
3.4.4 Corefillingfactor
Identification Requirement Applicability Parent Verification
AAM_REQ_1340 Corefillingfactor.
Thefillingfactorofthecoreshouldbeatleast:
Essential Analysis
?%
3.4.5 StationSideLobes
Identification Requirement Applicability Parent Verification
AAM_REQ_1350 Stationsidelobes.
Theintegralofallstationsidelobesshouldbesmallerthan
Essential Analysis
?dBcomparedwiththemainlobe.
3.5 SystematicErrors
3.5.1 CoherenceLoss
Anycoherencelossinthesystemintroducedshouldbebelowthevaluespecifiedbelow.Anexampleofacoherence losseffect is thebeamsquintwhich iscausedbyabeamformerusingphaseshift.Sinceonlyonephaseshiftsettingpersubbandorchannelcanbesetanerrorarisesattheedgesofthesubbandorchannel.Theerrorcausescoherencelossinthebeamformerandshouldstaybelowthespecifiedvalue.
Identification Requirement Applicability Parent Verification
AAM_REQ_1410 Coherenceloss. Essential Test
-
WP2015.020.010SRS001Revision:D
20111114 Page16of52
ThecoherencelossofeachsubsystemintheSKAshouldbelowerthan:
1%(TBD) Shouldbederivedfromtheimagingrequirementifpossible.
3.5.2 PositioningError
Identification Requirement Applicability Parent Verification
AAM_REQ_1420 Positionerror.
Thepositionerroroftheallantennaelementsfromthespecifiedpositionshouldbesmallerthan:
Essential Test
TBD
Notethatthiswilldependonthearrayconfigurationusede.g.randommaybeverytolerantoferrorscalibrateout.
LOFARuses/40
3.5.3 OrientationError
Theorientationof the elements is consideredwithinone array.Array to arrayorientation is thesubject of the System SRS (2). It is necessary to orientate the elements for consistency ofpolarisation,however,itmaybeeasiertocalibrateoutdetailederrors.
Identification Requirement Applicability Parent Verification
AAM_REQ_1430 Orientationerror.
Theorientationerroroftheantennaelementsfromthespecifiedorientationshouldbesmallerthan:
Essential Test
TBD
Thiswilldependontheabilitytocalibrateindividualelements
LOFARuses1degree
3.6 TemporalCharacteristics
The stability of the analogue systems directly impacts the calibration requirements and theirregularity.Theyneedtobetradedofftogether.
-
WP2015.020.010SRS001Revision:D
20111114 Page17of52
3.6.1 GainStability
Identification Requirement Applicability Parent Verification
AAM_REQ_1510 Gainstability.
ThegainstabilityofeachSKAreceiverchainwhichisdigitizedshouldbesmallerthan:
Essential Shouldbederivedfromacalibrationrequirementifpossible.
Test
StabilityperC: 0.5%(TBD)
over24hours: 0.5%(TBD)RMS
ataconstanttemperature
3.6.2 PhaseStability
Identification Requirement Applicability Parent Verification
AAM_REQ_1520 Phasestability.
ThephasestabilityofeachSKAreceiverchainwhichisdigitizedshouldbesmallerthan:
Essential Shouldbederivedfromacalibrationrequirementifpossible.
Test
DegreeperC: 0.5deg(TBD)
over24hours: 0.5deg(TBD)RMS
ataconstanttemperature
3.6.3 BeamStability
Identification Requirement Applicability Parent Verification
AAM_REQ_1530 Beamstability.
TheSKAshallhaveamaximalRMSstabilityintheHPBWof:
Essential Shouldbederivedfromacalibrationrequirementifpossible.
Test
over24hours: TBD%RMS
withazenithpointingdirection
TBD%RMS(TBD)withazenithpointingdirectionifonereceiverchainisfailinginthefullbandforSKA
-
WP2015.020.010SRS001Revision:D
20111114 Page18of52
3.6.4 Smoothness
Identification Requirement Applicability Parent Verification
AAM_REQ_1530 Smoothness.
AnyvariationintheSKAsystemshallbesmootherthan:
Essential Shouldbederivedfromacalibrationrequirementifpossible.
Test
0.01%persecond(TBD)
0.1%/Hz(TBD)overtheinstantaneousbandwidth
Thisneedsmuchmorethought......
3.6.5 TrackingAccuracy
Identification Requirement Applicability Parent Verification
AAM_REQ_1540 Trackingaccuracy.
Thebeampointingaccuracyshouldbesuchthat:
Essential (2)SYS_REQ_1980 Test
ApointsourceremainswithinTBD%oftheHPBWofthebeam.
Presumablythisrequirementisduetothefrequencydependantnature.Evenso,itmaywellbethatafigureindegreesfortheAAmidisbetter.
3.6.6 BeamSwitchingAgility
Identification Requirement Applicability Parent Verification
AAM_REQ_1550 Beamswitchingagility.
Thebeamswitchingtimeincludesthedistributionofthecommandfromthecontrolcentre.
Abeamshouldberepointedtoapredefinedpositionin:
Essential TBD Test
TBDsecs.
-
WP2015.020.010SRS001Revision:D
20111114 Page19of52
3.6.7 MaximalObservationPeriod
Identification Requirement Applicability Parent Verification
AAM_REQ_1560 MaximalObservationPeriod.
TheAAsubsystemshallbedesignedsothatadeepfieldobserved.Therequirementismaintainnoiselimitedsensitivity.
Essential (2)SYS_REQ_1430 Test
Capableof1000hrintegrationtime
3.6.8 TemporalResolution
Identification Requirement Applicability Parent Verification
AAM_REQ_1560 Temporalresolution.
TheAAsubsystemshallhaveanattainabletimeresolutionofatleast:
Essential Test
50s [5]Paragraph16.4.4
3.7 PolarisationCharacteristics
3.7.1 BeamPolarizationStability
Identification Requirement Applicability Parent Verification
AAM_REQ_1610 Beampolarizationstability.
Thepolarisationpropertiesofthebeamsshallbestableenoughtoenabletheircalibrationto:
Essential (2)SYS_REQ_1710 Test
-
WP2015.020.010SRS001Revision:D
20111114 Page20of52
AAM_REQ_1640 Beampolarizationpurity.
Theisolationbetweenbothpolarisationsshallbeatleast:
Essential Test
40dB(TBD)
See[5]Paragraph17.4.5
3.8 ImagingCharacteristics
3.8.1 UVCoverage
Ident Requirement Applicability Parent Verification
AAM_REQ_1710 UVcoverage.SKAshallhavea:
Essential UV coverage isnotdefinedgoodatthemoment
Analysis
3.8.2 ImagingDynamicRange
STATIONDYNAMICRANGEThishastobetranslatedintoAAstationrequirements.Theimagingisasystemwide requirement dominated by the post processing the tech requirements of the AAstationisdeterminedhere.
Ident Requirement Applicability Parent Verification
AAM_REQ_1720 Imaging dynamic range.SKA shallbeable toprovidean imaging dynamic rangefor continuum imaging(thermal noise imaging toclassical (micro Jansky (Jy))confusionlimits)ofatleast:
Essential Test
74dB [5]Paragraph6.4.5
3.9 MonitoringandControl
MonitoringandControl isacentral system responsible foracquiringandmonitoringdataand forcontroloftheSKAsystems.TherequirementsinthissectionreflecttheconsequentrequirementsfortheAAreceptionsubsystems.
-
WP2015.020.010SRS001Revision:D
20111114 Page21of52
3.9.1 M&CMonitoringData
Identification Requirement Applicability Parent Verification
AAM_REQ_2110 M&Cmonitoringdata.
AAsubsystemsshallprovidemonitoringdatatothemonitoringandcontrolfunction(forperformancemonitoringandclosedloopcontrolfunctions)
Thiswillneedsubstantialexpansion.
Essential (2)SYS_REQ_2220 Demo
3.9.2 M&CCalibrationInformation
Identification Requirement Applicability Parent Verification
AAM_REQ_2120 M&Ccalibrationinformation.
IndividualAAsubsystemcalibrationinformationshallbeavailabletothemeasurementfunction.
Thiswillneedsubstantialexpansion.
Essential (2)SYS_REQ_2250 Demo
3.9.3 SubsystemM&CAction
Identification Requirement Applicability Parent Verification
AAM_REQ_2130 SubsystemM&Caction.
AAsshallreportcompletionofactionstoM&C
Essential (2)SYS_REQ_2420 Demo
3.9.4 AutonomousControl
Thisistoprovidemaintenanceandtroubleshootingcapabilities.Allthefunctionsavailablecentrallywillbeavailableatalocalstationinterfacee.g.powerupanddown,parametersettingandreportingandotherdiagnostictools.
Identification Requirement Applicability Parent Verification
AAM_REQ_2140 AutonomousControl.
TheAAstationshallbecapableofcomingunderlocalcontrolandnotinteractingwiththeoverallSKA.
(2)SYS_REQ_3620 Demo
-
WP2015.020.010SRS001Revision:D
20111114 Page22of52
3.9.5 Calibration
ThecalibrationoftheAAsisimportanttotheiroperation.Thedetailsoftheschemeusedneedstobedefined: theycouldbecalibratedusingexternalsources;astronomicallywhilenotobservingorduringobservationsusingaseparatebeam.
Identification Requirement Applicability Parent Verification
AAM_REQ_1620 Calibrationupdaterate.
ExternalCalibrationmeasurementsshallbenecessaryatarateof:
Essential (2)SYS_REQ_1720
Thisdependsontherequiredprecisionandtherategainandphasearechangingasafunctionoftime.
Test
-
WP2015.020.010SRS001Revision:D
20111114 Page23of52
AAM_REQ_2220 Aggregatemode.
SKAshallprovideanaggregatemodeinwhichbandwidthisexchangedforspatialcoverage.
Essential (2)SYS_REQ_2750 Demo
AAM_REQ_2225 Selectablenumberofbitspersample.
Thenumberofbitspersampleusedshouldbeselectablewithintheconstraintsofaconstanttotaloutputdatarate.
Thisneedsascientificreasonforprovidingite.g.pulsarobservations
Desirable TBD Demo
3.11 DataProducts
3.11.1 Totaloutputdatarate
The output data rate, station to correlator, defines the survey capabilities of the array. It alsodetermines therequirementsof thecorrelatorandpostprocessor.Theaggregatedatarate foralltheAAmidstationsisconstantforagivensensitivityandsurveyspeed,howevermanystationsareused.
Identification Requirement Applicability Parent Verification
AAM_REQ_2305 Datarate.
TheaggregatedatarateofallAAmidstationsshouldbe:
Essential TBD Demo
Totaldatarate:TBD
Thisisafunctionofsensitivityandsurveyspeed
3.11.2 BeamProducts
Identification Requirement Applicability Parent Verification
AAM_REQ_2310 Beamproducts.
AAmidshallbecapableofcommunicatingthebeamproductsasavoltagetimeseriesovertheobservedFoV.
Essential (4)Paragraph5.4.6 Demo
3.11.3 DataProductTypes
Identification Requirement Applicability Parent Verification
-
WP2015.020.010SRS001Revision:D
20111114 Page24of52
AAM_REQ_2320 Dataproducttypes.
TheAAshallproducerecordableintermediatedataproducts.
forexamplepulsarvoltagetimeseriesandRFIstatistics.
Whatisthis?ThisisnotreallyanythingnewaboutAAsthisisallderivedfromthebeams.RFIdataisnotanintermediatedataproduct.
Perhapsclippingdata,calibrationcorrection,beamformerweights.
Essential (2)SYS_REQ_2820 Demo
4 Operationalrequirements4.1 General
4.1.1 Uptime
Ident Requirement Applicability Parent Verification
AAM_REQ_2410 Uptime.
AAmidshallbedesignedtobeoperatedcontinuously,otherthanforregularmaintenance.
Thisneedsqualificationwhataboutmaintenance?
Essential (2)SYS_REQ_3110 Demo
4.1.2 ReconfigurationTime
Identification Requirement Applicability Parent Verification
AAM_REQ_2420 Reconfigurationtime.
ReconfigurationtimeforAAmidfromoneobservationalmodetoanother:
Essential (2)SYS_REQ_3150 Demo
-
WP2015.020.010SRS001Revision:D
20111114 Page25of52
AAM_REQ_2430 Startupsequence.
ThestartupofAAmidfunctionsshallfollowapredefinedsequencetakingnotlongerthan:
Essential (2)SYS_REQ_3170 Test
Hotstart: 10minutes
Thisisarestart
Coldstart: 24hours
Acoldstartisdefinedasrequiring.....
4.2.2 ShutdownSequence
Identification Requirement Applicability Parent Verification
AAM_REQ_2430 Shutdownsequence.
TheAAstationswilluseacontrolledshutdownprocess.
Essential (2)SYS_REQ_3190 Test
4.2.3 AAmidAutonomousShutdown
Identification Requirement Applicability Parent Verification
AAM_REQ_2440 AAautonomousshutdown.
AnAAmidstationshallbecapableofautonomouslydetectingconditionsrequiringstationshutdowne.g.poweranomalies,overtemperature,coolingfailureetcandthenshuttingdownandreportingtheconditiontothecentralM&Csystems.
ThisimpliesaseparatelypoweredM&Csystemthatiskeptalivewhatifthatneedspoweringdown?
(2)SYS_REQ_3190 Test
4.2.4 StartupandShutdownIndividualAntennaSystems
Identification Requirement Applicability Parent Verification
AAM_REQ_2440 StartupandshutdownindividualAAmidstations.
ItshallbepossibletostartuporshutdownindividualAAmidstationsandcommunicatestatustotheM&Csystems.
Essential (2)SYS_REQ_3180 Test
-
WP2015.020.010SRS001Revision:D
20111114 Page26of52
4.2.5 StartupandShutdownDependencies
Identification Requirement Applicability Parent Verification
AAM_REQ_2450 Startupandshutdowndependencies.
Anydependenciesinthestartupandshutdownsequencesshallbeautomaticallyverified(sotheydonotdependonoperatorintervention).
Essential (2)SYS_REQ_3220 Inspection
4.2.6 SubsystemShutdown
Identification Requirement Applicability Parent Verification
AAM_REQ_2460 Startupandshutdowndependencies.
TheshutdownofpredefinedpartsofAAmidstationsshallhaveno(TBC)impactonSKA1operationsafterappropriaterecalibrationperformedautomatically.
Thiscannotbecompletelytruee.g.sensitivitywillbelostorgainedjustqualifywithsignificantly?
Essential (2)SYS_REQ_3230 Test
4.2.7 InitialCheckout
Identification Requirement Applicability Parent Verification
AAM_REQ_2470 Initialcheckout.
AAmidshallbedesignedtoenableanoperationalreadinesscheck,includingredundancies,priortocommencementofanySKA1operations(initialcheckout).
Essential (2)SYS_REQ_3240 Test
4.2.8 OperationalReadinessCheck
Identification Requirement Applicability Parent Verification
AAM_REQ_2480 Operationalreadinesscheck.
TheAAmidoperationalreadinesscheckshalltake:
Essential (2)SYS_REQ_3250 Test
>5minutes.
-
WP2015.020.010SRS001Revision:D
20111114 Page27of52
4.3 FailureManagement
4.3.1 General
Identification Requirement Applicability Parent Verification
AAM_REQ_3310 Personnelsafety.
Asfaraspossible,nosinglefailureinAAmidshallleadtopersonnelsafetyhazards.
Thisseemsverymildsurelyitshouldcopewithsomelevelofanticipatedfurtherfailuremodes.Suggestion:takesingleoutandchangeto:asfarasreasonable,nofailures...
(2)SYS_REQ_3310
Identification Requirement Applicability Parent Verification
AAM_REQ_3320 Failurepropagation.
FailuresintheAAmidsubsystemsshallnotleadtofailuresinotherAAsubsystemsorotherSKAsystems.
(2)SYS_REQ_3320
Identification Requirement Applicability Parent Verification
AAM_REQ_3330 Operatorcommandsafety.
NosingleoperatorcommandforAAmidshallcausecatastrophic,serious,ormajorconsequences.
(2)SYS_REQ_3330
Identification Requirement Applicability Parent Verification
AAM_REQ_3340 Voltagetransientconsequences.
Novoltagetransientsor"cutoff"ofelectricalpowershallleadtocatastrophicorseriousconsequencesinAAmid.Thisincludesvoltagetransientsappliedtotheinputofthereceivers.
(2)SYS_REQ_3340
Identification Requirement Applicability Parent Verification
AAM_REQ_3350 Operatorcommandabsence.
Theabsenceofoperatorcommandsshallnotcausecatastrophicor
(2)SYS_REQ_3350
-
WP2015.020.010SRS001Revision:D
20111114 Page28of52
seriousconsequences.
Identification Requirement Applicability Parent Verification
AAM_REQ_3360 Singlepointfailures.
SinglepointfailuresintheAAmidshallbelistedinthedesignandoperationaldocumentation.
(2)SYS_REQ_3360
Identification Requirement Applicability Parent Verification
AAM_REQ_3370 Singlepointfailurejustification.
EachsinglepointfailurelistedfortheAAmidshallbejustified,andassessedagainstalternativedesign(s)wherethissinglepointfailurewouldnotoccur,ifpossible.
(2)SYS_REQ_3370
4.3.2 DetectionandReporting
Identification Requirement Applicability Parent Verification
AAM_REQ_3520 Statusreportavailabilitytime.
TheavailabilityofastatusreportofthefunctioningofAAmidshallbein:
(2)SYS_REQ_3520
5seconds
Thisistoogenericarequest,howmuchstatus,inwhatdetailetc?
Identification Requirement Applicability Parent Verification
AAM_REQ_3530 Statusreportrequest.
Thestatusreportofasubsystemshallshowthefunctioningofthesubsystematoraftertheoperatorrequesthasbeensubmittedtothesystem.
(2)SYS_REQ_3530
Identification Requirement Applicability Parent Verification
AAM_REQ_3540 Statusreportscope.
Thestatusreportshalldisplaythestatusofasubsystem,togetherwiththesystemtimethestatuswasdetermined.
(2)SYS_REQ_3540
-
WP2015.020.010SRS001Revision:D
20111114 Page29of52
4.3.3 DiagnosisandRecovery
Identification Requirement Applicability Parent Verification
AAM_REQ_3610 Systeminterrogationreply.
EachAAmidstationshallhavethecapabilitytoansweranoperatorinterrogation.
Isthiswhatismeantorisitsubsystem?
(2)SYS_REQ_3610
Identification Requirement Applicability Parent Verification
AAM_REQ_3670 Autonomousrecovery.
AAmidshallbeabletorecoverautonomouslyincaseoffailuresthatareclassifiedasminorornegligible.
Wheretheclassificationoffailuresandwhatismeantbyrecovery?
(2)SYS_REQ_3670
Identification Requirement Applicability Parent Verification
AAM_REQ_3680 Effectofdisabledunits.
TheAAmiddesignshallensurethatdisabledunitsdonotcorrupttheobservationaldataintheremainingsystem.
(2)SYS_REQ_3680
4.3.4 Lifetime
Identification Requirement Applicability Parent Verification
AAM_REQ_3710 Continuousoperationperiod.
AAmidshallbedesignedforacontinuousoperationalperiodsof:
(2)SYS_REQ_3710
6months
Afterthistimemaintenancemaybenecessary,e.g.exchange/cleaningofairconditioningfilters.
Identification Requirement Applicability Parent Verification
AAM_REQ_3720 Minimumlifetime.
TheAAsubsystemshallbedesigned
(2)SYS_REQ_3720
-
WP2015.020.010SRS001Revision:D
20111114 Page30of52
foraminimumlifetime(includinginitialinstallation,testingandcommissioningperiod)of:
TBDyears
Identification Requirement Applicability Parent Verification
AAM_REQ_3725 Supportequipmentlifetime.
AAmidsupportequipmentshallbedesignedtomaintainSKA1for:
(2)SYS_REQ_7960
12(TBC)years.
Identification Requirement Applicability Parent Verification
AAM_REQ_3730 Availability.
TheaverageavailabilityofallAAmidsubsystemsduringtheoperationalperiodshallbe:
(2)SYS_REQ_3730
>90%(TBC).
Availabilityisdefinedhereasbeingavailableforscheduledobservationsinatleastoneofthesupportedoperationalmodes.
Thisisfartooloose.Whatlevelofsubsystem?Boardthearraywouldneverbeinuse.Thestation?Thiswouldtakeintoaccountredundancyofelements
Identification Requirement Applicability Parent Verification
AAM_REQ_3740 Upgradeability
AAmidshallbeupgradable.
Thisisagainfartoovague.Anythingisupgradeabletoatrivialextent.Thisshouldbedefined...
(2)SYS_REQ_3740
Identification Requirement Applicability Parent Verification
AAM_REQ_3750 Lifetimeextension.
Largescalemaintenanceand/oranupgradeshallgivethepossibilitytoreachalifetimeof:
(2)SYS_REQ_3750
50years(TBC).
Thelevelofmaintenanceneedstobe
-
WP2015.020.010SRS001Revision:D
20111114 Page31of52
specified,couldeextremeinthisspec.
Identification Requirement Applicability Parent Verification
AAM_REQ_3760 Reusability.
ReusabilityofAAmidequipmentshallbeensuredthroughdesignandcanbebyrefurbishmentandmaintenancewherethishasbeendemonstratedasbeingcosteffective.
(2)SYS_REQ_7940
Identification Requirement Applicability Parent Verification
AAM_REQ_3770 Spareparts.
AAmidsparepartsshallhaveastoragelifeconsistentwithavailabilityanduseduringthefulloperationallifetimeoftheSKA2equipmenttowhichitapplies.
ThisshouldbeSKAoverall
(2)SYS_REQ_7950
4.3.5 Reliability
Identification Requirement Applicability Parent Verification
AAM_REQ_7420 Fieldreturnrate.
Thefieldreturnrateofequipment,duringinstallationandthefirstyearfullusage,shallbe:
(2)SYS_REQ_7420
99.4%(TBC).
Thisisaveryconfusingspecification.Doesitmean1000years)?Orisittheoverall
-
WP2015.020.010SRS001Revision:D
20111114 Page32of52
stationbeingkeptuptoperformancethroughmaintenance?
4.4 Maintenance
Identification Requirement Applicability Parent Verification
AAM_REQ_3840 Datalossduetopoweroutage
ThisspecdoesnotapplytoAAmiditisasystemparameter,thereisnosignificantdatastoredlocally.
TheAAsubsystemshallnotlosemorethan4hoursofacquiredorprocessedmeasurementdata(notyetpermanentlystored)asaresultofanoutageintheexternalpowersupply.
(2)SYS_REQ_3840
ThisrequirementsneedstoberewritteninordertobefeasiblefortheAAsubsystems
Identification Requirement Applicability Parent Verification
AAM_REQ_3850 Autonomousrestartafterpoweroutage.
AAmidshallhavethecapabilitytorestartautonomouslyandwithoutfailures,afteranoutageinexternalpowersupply.
HowdoesthisvaryfromAAM_REQ_3670?
(2)SYS_REQ_3850
Identification Requirement Applicability Parent Verification
AAM_REQ_3860 Systemavailabilityafterrestart.
AAmidshallbeavailablewithin5minutes(TBC)afterrestart.
HowdoesthisvaryfromAAM_REQ_2480?
(2)SYS_REQ_3860
Identification Requirement Applicability Parent Verification
AAM_REQ_3870 Software/firmwarereinstallation.
Allsoftware/firmwareinAAmidshallbecapableofbeingreinstalled
(2)SYS_REQ_3870
-
WP2015.020.010SRS001Revision:D
20111114 Page33of52
Identification Requirement Applicability Parent Verification
AAM_REQ_3880 Software/firmwareupgrades.
Itshallbepossibletoreplaceallsoftware/firmwareconfigurationitemsinAAmidthroughsoftwareupgrades.
(2)SYS_REQ_3880
Identification Requirement Applicability Parent Verification
AAM_REQ_3890 Softwarecodeidentification.
Softwareconfigurationitemsshallprovideunambiguousidentificationtoallowthemaintenanceofaconfigurationmanagementdatabase.
(2)SYS_REQ_3890
Identification Requirement Applicability Parent Verification
AAM_REQ_3910 Softwarecodeidentificationresponsetime.
Thesoftwareidentificationrequestsshallbeavailabletotheoperatorwithin:
(2)SYS_REQ_3910
10seconds(TBC)
Whytheurgency?
Identification Requirement Applicability Parent Verification
AAM_REQ_3920 AAmaintenancefunctions.
TheAAmidshallincludefunctionsthatallowmaintenanceofhardwareandsoftware.
Thisisfartoowholly!Whatmaintenanceetc.
(2)SYS_REQ_3920
Identification Requirement Applicability Parent Verification
AAM_REQ_7820 Toolsandtestequipment.
TheAAmiddesignshallrequireandspecifyaminimumnumberofspecialtoolsandtestequipmenttoperformassembly,integrationandrepairandmaintenanceactivities.
(2)SYS_REQ_7820
(2)SYS_REQ_9110
-
WP2015.020.010SRS001Revision:D
20111114 Page34of52
Identification Requirement Applicability Parent Verification
AAM_REQ_7830 Inaccessiblehardwaremaintenance.
Inaccessiblehardwareorstructuresshallrequirenomaintenanceduringoperationandshouldhavebuiltintestcapabilitywhenapplicable.
(2)SYS_REQ_7830
Identification Requirement Applicability Parent Verification
AAM_REQ_7840 Testandrepairinstructions.
TestandrepairinstructionsshallbewrittenforfaultdetectionandmaintenanceoftheAAmidequipment.
(2)SYS_REQ_7840
Identification Requirement Applicability Parent Verification
AAM_REQ_7850 Maintenanceteamsize.
Itshouldbepossibletoexecuteregularmaintenancejobswithnotmorethantwo(2)peopleperjob.
(2)SYS_REQ_7850
4.5 DisposalPhase
Identification Requirement Applicability Parent Verification
AAM_REQ_4110 Environmentalrulecompliancy.
TheAAmiddesignshallbefullycomplianttoallenvironmentalrulesapplicabletotheSKAsite.
Thisrequirementshouldbemuchmorespecific
(2)SYS_REQ_4110
Identification Requirement Applicability Parent Verification
AAM_REQ_4120 Lastingenvironmentaleffects.
AAmidshallbedesignedtohavenolastingadverseenvironmentaleffectsonthefacilityandsite.
Thisrequirementshouldbemuchmorespecific
(2)SYS_REQ_4120
-
WP2015.020.010SRS001Revision:D
20111114 Page35of52
5 EngineeringDesignConstraintsThischapterspecifiesthedesignconstrainingrequirementsforengineering.
5.1 MaterialsandProcesses
Identification Requirement Applicability Parent Verification
AAM_REQ_7110 Materials,PartsandProcesseslists.
EachsubsystemsupplierofAAmidshallestablish,collect,reviewanddelivermaterials,partsandprocesseslistsincludingalltheMaterials,PartsandProcessesintendedforuseintheSKAbyhissuppliersandhimself.Theyshallreflectthecurrentdesignatthetimeofissue.
Thisallreadsverymuddledshouldbepartofaqualitysystem
(2)SYS_REQ_7110
Identification Requirement Applicability Parent Verification
AAM_REQ_7130 Partsavailability.
Theestimatedavailabilityofthepartsandproductsobtainedfrommaterialsandprocessesusedshallbecompatiblewiththefinalsystemslifecycle(tests,storage,mission).
(2)SYS_REQ_7130
Identification Requirement Applicability Parent Verification
AAM_REQ_7140 Productmanufacturing.
Productsshouldbemanufacturedasmuchaspossibleinafactory.
Identification Requirement Applicability Parent Verification
AAM_REQ_7150 Productassembly.
Productswhichneedstobeassembledatthesiteshouldbeconstructedassimpleaspossibletominimizetheconstructiontime.
Identification Requirement Applicability Parent Verification
AAM_REQ_7160 Producttesting.
Productsshouldbetestedasmuchas
-
WP2015.020.010SRS001Revision:D
20111114 Page36of52
possiblyinthefactoryinsteadoftestingatsite.
Identification Requirement Applicability Parent Verification
AAM_REQ_7170 Productsealing.
Productsexposeddirectlytotheenvironment(likeantennaelements)shouldbefullysealedbeforeshippingtothesite.
5.2 Marking
Identification Requirement Applicability Parent Verification
AAM_REQ_7210 Partidentification.
Eachpart,materialorproductshallbeidentifiedwithauniqueandpermanentpartortypenumber.
Needstobemorespecifichowfardownthehierarchytheidentificationisnecessary(boardlevel,cables,connectors,...)
(2)SYS_REQ_7210
Identification Requirement Applicability Parent Verification
AAM_REQ_7220 Markingmethod.
Methodofmarkingshallbecompatiblewiththenatureoftheitemanditsuse.
(2)SYS_REQ_7220
Identification Requirement Applicability Parent Verification
AAM_REQ_7230 Documentationmarking.
Identificationnumbersshallbemarkedondocumentationand,wherepossible,onallitems.
(2)SYS_REQ_7230
5.3 Powerandotherutilities
Identification Requirement Applicability Parent Verification
AAM_REQ_7330 Limitingexcessivecurrents.
AAmidequipmentcircuitryshallbeprotectedagainstexcessivecurrentsbyacurrentlimitingdevice,which
(2)SYS_REQ_8160
-
WP2015.020.010SRS001Revision:D
20111114 Page37of52
shallnotitselfproduceexcessivecurrents.
Whatisthis?Isthisontheinterfacesagainstlightningorotherproblemsifso,sayso.
Identification Requirement Applicability Parent Verification
AAM_REQ_7340 Powersurgeprotection.
AAmidsubsystemsshallbeprotectedagainstpowertransientsandsurges.
(2)SYS_REQ_8170
Identification Requirement Applicability Parent Verification
AAM_REQ_7350 Polaritymisconnectionprotection.
AAmidequipmentcircuitryshallbeprotectedagainsttheeffectsofinadvertentwrongpolarityconnections.(TBC)
Thisneedstobespecifiedatwhatlevelandifitreallyneedstobedone.Thiscouldusesubstantiallymorepowerduetodiodedropsetc.
(2)SYS_REQ_8180
5.4 Accessibilityandtestability
Identification Requirement Applicability Parent Verification
AAM_REQ_7880 Selftestcapability.
TheAAmidsubsystemdesignforbothhardwareandsoftwareshallprovideselftestcapabilities.
(2)SYS_REQ_7880
Identification Requirement Applicability Parent Verification
AAM_REQ_7890 Servicingpointmaking.
AllservicingandtestpointsshallbeclearlymarkedusingTBDlabellingstandards.
(2)SYS_REQ_7890
5.5 Transportabilityandstorage
Identification Requirement Applicability Parent Verification
-
WP2015.020.010SRS001Revision:D
20111114 Page38of52
AAM_REQ_7910 Handlingheavyequipment.
AAmidparts,testequipmentorsupportingequipmentwithamassexceeding25kgshallbeprovidedwithprovisionsforhandlingandtransportation.
Warnings?
(2)SYS_REQ_7910
Identification Requirement Applicability Parent Verification
AAM_REQ_7920 Disassemblyfortransport.
ItshallbepossibletodisassembleAAmidequipmentfortransportationorstorageasnecessary.
(2)SYS_REQ_7920
Identification Requirement Applicability Parent Verification
AAM_REQ_7930 Longtermstorage.
ItshallbepossibletostoreAAmidequipment(spareparts)for10yearswithoutanydegradationofitsfunctionorperformance.
(2)SYS_REQ_7930
Identification Requirement Applicability Parent Verification
AAM_REQ_7935 Specialstorage.
Ifspecialstoragefacilitiesareneededtheyshallbesuppliedaspartofthesparesprocurement.
(2)SYS_REQ_7935
Ident Requirement Applicability Parent Verification
AAM_REQ_7940 Packingdensity.
Packingdensityfortransportationshouldbedesignedasanoptimisedcost/performancerequirement.
TBD
-
WP2015.020.010SRS001Revision:D
20111114 Page39of52
Ident Requirement Applicability Parent Verification
AAM_REQ_7950 Packingmethod.
Allproductsshouldbepackedpriortotransportationsuchthatitcanwithstand(1)rigourstransportation,(2)transportvibrationand(3)movement.
PerhapsthisshouldbespecifiedmorequantativeinGsforexample.
TBD
Ident Requirement Applicability Parent Verification
AAM_REQ_7960 Largeequipmentsize.
Thevolumeoflargeequipmentwhichcannotbedisassembledshouldbedrivenbystandardshippingcontainerguidelines.
TBD
5.6 ArrayDeployment
Ident Requirement Applicability Parent Verification
AAM_REQ_8000 Antennaelementdeploymenttime.
Thetimetoassembleanddeploytheantennaelementsshouldbeminimizedto?minutesperantennaelement.
TBD
Ident Requirement Applicability Parent Verification
AAM_REQ_8010 Antennaelementdeployment.
TheAAarraydesignanddeploymentshouldbeableforinstallationonasitewithalocalflatnesstoleranceof?cmover?m.
TBD
-
WP2015.020.010SRS001Revision:D
20111114 Page40of52
Ident Requirement Applicability Parent Verification
AAM_REQ_8020 Antennapositions.
Eachindividualantennapositionshouldbemeasuredandknownwithin?mminthreedimensionsintheITRFcoordinatesystem.
TBD
Ident Requirement Applicability Parent Verification
AAM_REQ_8030 Antennaorientation.
Antennaelementsshouldbedesignedsuchthattheycanberotatedquickandsimple.
TBD
Ident Requirement Applicability Parent Verification
AAM_REQ_8040 Antennafixation.
Antennaelementsshouldbedesignedsuchthattheycanbesimpleandeffectivelyfixedtotheground.
TBD
Ident Requirement Applicability Parent Verification
AAM_REQ_8050 Housingheights.
Anyhousingneartheantennafieldshouldnotbeinthelineofsightof=xdegreesabovehorizon.Thefollowingrelationshouldhold:h
-
WP2015.020.010SRS001Revision:D
20111114 Page41of52
5.7 ElectronicDesignRequirements
Ident Requirement Applicability Parent Verification
AAM_REQ_8100 Devicejunctiontemperature.
ThedevicejunctiontemperatureofthemaindevicesshouldbekeptbelowxdegreesCelsiustoincreaselifetime.
ShouldfollowfromtheRAMSanalysis.Dontknowifyoushouldputthisasarequirement.
TBD
Ident Requirement Applicability Parent Verification
AAM_REQ_8110 Designforupgradability.
TheAAlowdesignshouldbemadesuchthatfutureupgradesareabletoprocessthefullbandwidthofeachantennaelement,assumingthecostimpactissmall.
TBD
6 ExternalInterfaceRequirementsExternalInterfacesaredefinedasinteractionsorcommunicationswiththeworldoutsideanAAmidstation.Thesearerepresentedasbluearrowsin
-
WP2015.020.010SRS001Revision:D
20111114 Page42of52
Figure1.
6.1 RFSignal
Identification Requirement Applicability Parent Verification
AAM_REQ_8300 RFsignal.
TheinputsignalofeachAAmidstationhasthefollowingcharacteristicsintheband70450MHz:
Theinputforthisrequirementisthespectrummeasuredattheselectedsite.
TBDdBm:24hoursaveragepower
TBDdBm:Peakpower
6.2 RFInterference
Identification Requirement Applicability Parent Verification
AAM_REQ_8400 Damaginginterferencelevels.
TheAAmidsubsystemshallnotbedamagedbyRFIsignalsoflessthan:
(2)SYS_REQ_5410
TBDV/m
-
WP2015.020.010SRS001Revision:D
20111114 Page43of52
6.3 Maintenance
Therequirementsformaintenancearelistedintheoperationalrequirementssection(Section4.4).
6.4 ReCycling
Currentlynorecyclingrequirementsareformulated.
6.5 Environment
6.5.1 General
Identification Requirement Applicability Parent Verification
AAM_REQ_5120 Compliancywithlocalenvironment.
ThedesignoftheAAmidshallbeappropriate(TBD)foroperationinthenaturalenvironmentforthegeographicaldeploymentlocationoftheSKA.
Thisrequirementshouldbemademorespecific
(2)SYS_REQ_5120
Identification Requirement Applicability Parent Verification
AAM_REQ_5130 Transportationconditions.
AAmidequipmentshallbedesignedforthethemodeoftransportbeingused(road,air,sea,etc.)betweenplaceofmanufacturingandfinalinstallationontheSKAsite(includingpackagingrequirements).
Thisrequirementshouldbemademorespecifice.g.useproperstandardsetc
(2)SYS_REQ_5130
6.5.2 Siteandinfrastructurerequirements
Identification Requirement Applicability Parent Verification
AAM_REQ_5220 Facilitiesandequipmentintrusion.
ThisisasystemwiderequirementandnotspecificallyAAmid:deleteit
(2)SYS_REQ_5220
-
WP2015.020.010SRS001Revision:D
20111114 Page44of52
AAmidequipmentandoperatingfacilitiesshallbeadequatelyprotectedagainstintrusionbyunauthorizedpersonsorbylargerwanderinganimals.
Thisrequirementshouldbemademorespecific
6.5.3 Contaminationandprecipitation
Identification Requirement Applicability Parent Verification
AAM_REQ_5230 Precipitation.
AAmidshallbeabletooperatewithmaximal1%(TBD)degradationoftheperformanceduringanytypeofprecipitation(TBD).
Theoriginalrequirementistoostringent.Precipitationlikesnowwillalwayshavesomeinfluence.Needtodeterminereasonableacceptabledegradationanddefineit.
Shouldntthisbewith6.6Weather?
(2)SYS_REQ_5230
Ident Requirement Applicability Parent Verification
AAM_REQ_5240 Pollutionandcontaminationprotection.
AAmidshallbeadequatelyprotectedagainstperformancedegradationcausedbycontaminatingparticles(dust,sandetc),pollutedairoranyprecipitation.
Thisrequirementshouldbemademorespecific
(2)SYS_REQ_5240
6.5.4 ElectroMagneticCompatibility
Identification Requirement Applicability Parent Verification
AAM_REQ_5420 EMimmunity.
AAmidshallnotbesusceptibletoRFIsignals,inbandoroutband,otherthanviathereceptors.(Whatdoesthismean??)
Thisrequirementshouldbemademorespecificwithnumericalvalues
(2)SYS_REQ_5420
-
WP2015.020.010SRS001Revision:D
20111114 Page45of52
otherwisethisleadtoanoverdesignbyputtingallequipmentinaFaradaycage.
Identification Requirement Applicability Parent Verification
AAM_REQ_5610 EMCsafetymargin.
TheEMCsafetymargin,whichisdefinedastheratiobetweensusceptibilitythresholdandtheinterferenceatanypointwithinthesystem,shallbegreaterthanTBDdB.
(2)SYS_REQ_5610
Identification Requirement Applicability Parent Verification
AAM_REQ_5620 EMCcompatibilitymarking.
All"offtheshelf"equipmentappliedwithintheAAmidsubsystemshallpossesasaminimumthehostcountryEMCmarking,includingelectricalandelectronicsupportingandinfrastructuralequipment.
Needstobemorespecificwhenthesiteisselected.
(2)SYS_REQ_5620
Identification Requirement Applicability Parent Verification
AAM_REQ_5630 Groundingconcept.
AhybridgroundingconceptasshowninfiguresTBDshallbeusedforEMCpurposes.GroundloopsinvolvingDC,andlowfrequencyAC,currentsshallbeavoidedinsidethesystem.Intentionalcurrentsthroughstructurearenotpermitted.(tobeelaborated)
(2)SYS_REQ_5630
Identification Requirement Applicability Parent Verification
AAM_REQ_5640 EMCdesignefforts.
Maximumeffort(tobedetailed)shallbeputintodesigningsignalinterfacestowithstandnoisyenvironmentsandtominimizethegenerationofexcessivenoise.
Thisneedstobeproperlyfleshedout.
(2)SYS_REQ_5640
-
WP2015.020.010SRS001Revision:D
20111114 Page46of52
6.5.5 SelfgeneratedRFIenvironment
Identification Requirement Applicability Parent Verification
AAM_REQ_2910 SelfgeneratedRFIsusceptibility.
InterferenceduetoselfgeneratedRFIshallnotdegradetheperformanceoftheinstrumentbygreaterthan1%byanymeasure(TBC).
Thisisawildguess....
(2)SYS_REQ_2910
6.5.6 Grounding
Identification Requirement Applicability Parent Verification
AAM_REQ_5810 Safetyground.
Electricalsafetygroundshallbedesignedaccordingtotheregulationsimposedbythelocalgovernment.
Thisshouldbemademorespecificassoonthesiteisselected.
(2)SYS_REQ_5810
6.5.7 Corrosion
Identification Requirement Applicability Parent Verification
AAM_REQ_5820 Corrosionprotection.
AAmidequipmentandbuildingsshallbeprotectedagainstcorrosion.
Specifythestandard...
(2)SYS_REQ_5820
Identification Requirement Applicability Parent Verification
AAM_REQ_5830 Corrosionprotectioninairflows.
AAmidelectronicsandconnectorsinareaswithahigherairflow(forcooling)oroutdoorenvironmentshallbeadditionallyprotectedagainstcorrosion.
Specifythestandard...
(2)SYS_REQ_5830
-
WP2015.020.010SRS001Revision:D
20111114 Page47of52
6.6 Weather
6.6.1 ClimaticRequirements
Identification Requirement Applicability Parent Verification
AAM_REQ_5310 Humidity.
AAmidequipmentshallbeabletowithstandmoistureandhumiditylevelsupto:
(2)SYS_REQ_5310
100%RH.
Forhowlong?Operating?
Identification Requirement Applicability Parent Verification
AAM_REQ_5320 Allowableairtemperaturerange.
AAmidequipmentshallbeabletowithstand(nonoperatingifnecessary)anoutsideairtemperaturewithintherangeof:
(2)SYS_REQ_5320
15C(TBC)to+60C(TBC).
Forhowlong...?
Identification Requirement Applicability Parent Verification
AAM_REQ_5330 Airtemperatureoperationrange.
AAmidequipmentshallbeabletooperatewithinspecificationiftheoutsideairtemperatureiswithintherangeof
(2)SYS_REQ_5330
5C(TBC)to+50C(TBC).
Identification Requirement Applicability Parent Verification
AAM_REQ_5340 Windvelocities.
AAmidshallbeabletoleratewindvelocitiesupto:
(2)SYS_REQ_5340
Survival: 160km/hr(TBC)
Normaloperation:40km/hr(TBC).
-
WP2015.020.010SRS001Revision:D
20111114 Page48of52
6.6.2 Lightning
Identification Requirement Applicability Parent Verification
AAM_REQ_5710 Lightningdischargesusceptibility.
AAmidshallbeabletowithstandtheelectromagneticfieldimpactdefinedinTBDduringoperationorinanyothermodewithoutanydamageorcharacteristicsdegradationbecauseofalightningdischarge.
Thisneedsconsiderablestudy,theremaybeelementsofthearraydestroyedandstillcarryon.
(2)SYS_REQ_5710
Identification Requirement Applicability Parent Verification
AAM_REQ_5720 Lightningprotection.
AAmiddedicatedbuildingsandequipmentlocatedonsitesshallbeprotectedtominimizetheeffectsofadirectlightningstrikeusingcertifiedmethods(e.g.asdescribedinNEN1014).
(2)SYS_REQ_5720
6.6.3 Seismicity
Identification Requirement Applicability Parent Verification
AAM_REQ_5910 Earthquakes.
AAmidequipmentandbuildingsshallbeprotectedagainstearthquakeswithamagnitudeupto:
(2)SYS_REQ_5910
Richter3.8(TBC).
7 InternalInterfaceRequirementsInternal interfacesaredefinedas interactionsorcommunicationswiththeSKAsystemoutsidetheAAmid subsystems. These are represented as black arrows in
-
WP2015.020.010SRS001Revision:D
20111114 Page49of52
Figure1.
7.1 AAReceptorPower
Ident Requirement Applicability Parent Verification
AAM_REQ_8110 Supplypower.
ThepowersuppliedtoAAmidshallhavethefollowingcharacteristics(TBC):
(2)SYS_REQ_8110
Voltage: 380V+/10%
Phases: Three
Frequency: 50Hz+/1Hz
Identification Requirement Applicability Parent Verification
AAM_REQ_7320 Powerconsumption.
ThepowerconsumptionofallequipmentatanAAmidstationshallbe:
(2)SYS_REQ_7320
-
WP2015.020.010SRS001Revision:D
20111114 Page50of52
7.2 SyncandTiming
Identification Requirement Applicability Parent Verification
AAM_REQ_8140 Subsystemtimestandard.
EachAAmidstationshallmaintainaninternaltimestandardwithanaccuracyof:
(2)SYS_REQ_8140
TBDnanoseconds.
Needstodiscussstandaloneanddriftrateetc.
Identification Requirement Applicability Parent Verification
AAM_REQ_8150 Centraltimestandard.
AllAAmidstationsshallsynchronizetheirinternaltimestandardstothecentraltimingstandardwithanaccuracyof
(2)SYS_REQ_8150
TBDnanoseconds.
Identification Requirement Applicability Parent Verification
AAM_REQ_8160 Synchronisationsignal.
Asynchronisationsignal(tickorpulse)isdistributedtoeachAAstationandhasthefollowingcharacteristics:
ThiswillbederivedfromtheSignalTransportandNetworksdomain.
Voltage: TBDV
Thisisrubbish,itwillbeanopticalsignaloverfibre.
Risetime: TBDps
Itwillprobablynotbedonethisway
TBDspulsewithawidthofTBDs
Identification Requirement Applicability Parent Verification
AAM_REQ_8170 Clocksignal.
Thislookswrongsurelyitwillbealocallygeneratedsignalthatissynchronisedwiththeabove
ThecentralclockisdistributedtoeachAAmidstationandhasthe
ThiswillbederivedfromtheSignalTransportandNetworksdomain.
-
WP2015.020.010SRS001Revision:D
20111114 Page51of52
followingcharacteristics:
VoltageofTBDV
FrequencyofTBDMHz
JitterofTBDns
LongtermstabilityofTBD
7.3 Network
Ident Requirement Applicability Parent Verification
AAM_REQ_8200 Data timetagging. Allaperture arrays shall timetag received and processeddata with the accuracy oftheirinternaltimestandard.
[1]SYS_REQ_8210
Identification Requirement Applicability Parent Verification
AAM_REQ_8210 Datapacketizing.
AllAAmidobservationdatashallbepacketizedaccordingtotheSKAstandardwrittenin[TBD].
TBD
Identification Requirement Applicability Parent Verification
AAM_REQ_8220 Datainterface.
ThedatainterfaceofAAmidtothecentralprocessinghasthefollowingcharacteristics:
ThiswillfollowfromtheSignalTransportandNetworkdomain.
TBD
7.4 MonitorandControl
Identification Requirement Applicability Parent Verification
AAM_REQ_8500 M&Cprotocol.
TheM&CprotocolusedtointerfacewiththeAAmidisTBD
ThisisdrivenbytheM&Cdomain.
-
WP2015.020.010SRS001Revision:D
20111114 Page52of52
Identification Requirement Applicability Parent Verification
AAM_REQ_8510 M&Cinterface.
TheelectricalcharacteristicsoftheM&CprotocolfortheAAmidstationare:
ThisisdrivenbytheM&Cdomain.
TBD
TBD
7.5 AAReceptorCooling
Identification Requirement Applicability Parent Verification
AAM_REQ_8600 Coolingcapacity.
TherequiredcoolingcapacityforeachAAmidstationrequires:
TBDkW
TBD
TBD