िकाि government of india ministry of power त्ति...

8
18-, शहीद जीत सह माग , कटवारिया िाय, नई दली- 110016 फोन:011-26868681, 26967842 फे : 011-26865206 -मेल: [email protected] वेबाईट: www.nrpc.gov.in 18-A, S. Jeet Singh Marg, Katwaria Sarai, New Delhi-110016 Phone: 011-26868681, 26967842 Fax: 011-26865206 e- mail: [email protected] Website: www.nrpc.gov.in भाित िकाि Government of India वुत मालय Ministry of Power उि ेीय वुत वमवत Northern Regional Power Committee . उेवव/वाविवययक/201/े.ऊ.ले./2020/ दनाक: 16 दबि, 2020 No. NRPC/Comml/201/ REA/ 2020/ Dated: 16 th December, 2020 ेवाम, To, ल ूची के अनुाि As per list enclosed वषय : माह माचग , 2020 के अवतम ेीय ऊजाग लेखा म शोधन-1 Subject Amendment-1 in Final REA for the month of March, 2020. महोदय/Sir, This is in reference to Final REA for the month of March 2020 issued by this office vide letter number NRPC/Comml/201/ REA/ 2020/ 10436-10474 dated 03 rd November 2020. NTPC vide their email dated 10-11-2020, intimated the discrepancy in Energy Requisition Details from NR Stations below 85% of Entitlement (Table-O1) and in Compensation calculation amount w.r.t. Dadri-II station to Andhra Pradesh. The discrepancies have now been corrected. The amended pages of the REA containing the above mentioned calculation are enclosed herewith (copy available on www.nrpc.gov.in). अनुलक यथोपरि । भवदीय Encl.: As above. Yours faithfully, (आि. पी. धान) (R.P. Pradhan) अधीि अवभयता Superintending Engineer

Upload: others

Post on 05-Mar-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: िकाि Government of India Ministry of Power त्ति ...164.100.60.165/Comm/2019-20/REA/REA_0320_FR1.pdf · 2020. 12. 16. · 18-ए, शह द जत स िंह मार्ग,

18-ए, शहीद जीत स िंह मार्ग, कटवारिया िाय, नई ददल्ली- 110016 फोन:011-26868681, 26967842 फेक् : 011-26865206 ई-मेल: [email protected] वेब ाईट: www.nrpc.gov.in

18-A, S. Jeet Singh Marg, Katwaria Sarai, New Delhi-110016 Phone: 011-26868681, 26967842 Fax: 011-26865206 e- mail: [email protected] Website: www.nrpc.gov.in

भाित िकाि Government of India

ववद्यतु मिंत्रालय

Ministry of Power

उत्ति क्षते्रीय ववद्यतु वमवत

Northern Regional Power Committee

िं. उक्षेवव /वाविवययक/201/क्षे.ऊ.ले./2020/ ददनााँक: 16 दद म्बि, 2020

No. NRPC/Comml/201/ REA/ 2020/ Dated: 16th December, 2020

ेवामें,

To,

िंलग्न ूची के अनु ाि

As per list enclosed

ववषय : माह माचग, 2020 के अिंवतम क्षेत्रीय ऊजाग लेखा में िंशोधन-1 ।

Subject – Amendment-1 in Final REA for the month of March, 2020.

महोदय/Sir,

This is in reference to Final REA for the month of March 2020 issued by this office

vide letter number NRPC/Comml/201/ REA/ 2020/ 10436-10474 dated 03rd November 2020.

NTPC vide their email dated 10-11-2020, intimated the discrepancy in “Energy

Requisition Details from NR Stations below 85% of Entitlement” (Table-O1) and in

Compensation calculation amount w.r.t. Dadri-II station to Andhra Pradesh. The

discrepancies have now been corrected.

The amended pages of the REA containing the above mentioned calculation are

enclosed herewith (copy available on www.nrpc.gov.in).

अनलुग्नक – यथोपरि । भवदीय

Encl.: As above. Yours faithfully,

(आि. पी. प्रधान)

(R.P. Pradhan)

अधीक्षि अवभयिंता

Superintending Engineer

ravinder
Typewritten Text
11768-11806
ravinder
Typewritten Text
-sd-
ravinder
Typewritten Text
ravinder
Typewritten Text
Page 2: िकाि Government of India Ministry of Power त्ति ...164.100.60.165/Comm/2019-20/REA/REA_0320_FR1.pdf · 2020. 12. 16. · 18-ए, शह द जत स िंह मार्ग,

Northern Regional Power CommitteeFinal REA for the Month of MARCH, 2020

Table-O1

Energy Requisition Details from NR Stations below 85% of Entitlement (All Figs in LUs)

Station Name State Name Cumulative upto Last

Month (a)

Cumulative upto this

month(b)

During the month (c) =

(b)-(a)

ANTA GPP

CHANDIGARH 618.946786 678.280536 59.333750

DELHI 2372.962224 2638.921589 265.959365

HIMACHAL PRADESH 673.224409 763.690552 90.466143

HARYANA 1291.246640 1435.919902 144.673262

J & K 2854.763891 3282.724172 427.960281

M.P. 18.432948 25.024381 6.591433

PUNJAB 2648.023289 2943.599252 295.575963

RAJASTHAN 4486.105161 4985.028506 498.923345

UTTARAKHAND 1326.839708 1465.258382 138.418674

UTTAR PRADESH 4781.824005 5381.891493 600.067488

TOTAL ANTA GPP 21072.369061 23600.338765 2527.969704

AURAIYA GPP

CHANDIGARH 886.936882 954.786313 67.849431

DELHI 4223.926192 4612.307136 388.380944

HIMACHAL PRADESH 1082.726127 1197.083200 114.357073

HARYANA 2305.782855 2517.260073 211.477218

J & K 4867.789075 5428.278595 560.489520

M.P. 62.916571 71.823326 8.906755

PUNJAB 4902.251130 5352.993333 450.742203

RAJASTHAN 3561.312862 3889.906801 328.593939

UTTARAKHAND 2281.908426 2479.899231 197.990805

UTTAR PRADESH 13893.580428 15096.026102 1202.445674

TOTAL AURAIYA GPP 38069.130548 41600.364110 3531.233562

DADRI GPP

CHANDIGARH 902.036607 945.942993 43.906386

DELHI 4513.285045 4756.493881 243.208836

HIMACHAL PRADESH 722.732839 771.795266 49.062427

HARYANA 2033.372442 2154.479306 121.106864

J & K 4385.874857 4586.996480 201.121623

PUNJAB 6605.918377 6996.754654 390.836277

PG-DADRI 13.722794 14.579436 0.856642

RAJASTHAN 3655.235152 3862.288792 207.053640

UTTARAKHAND 2238.863185 2326.289570 87.426385

UTTAR PRADESH 10661.725993 11476.921596 815.195603

TOTAL DADRI GPP 35732.767291 37892.541974 2159.774683

Amendment-1

1

Page 3: िकाि Government of India Ministry of Power त्ति ...164.100.60.165/Comm/2019-20/REA/REA_0320_FR1.pdf · 2020. 12. 16. · 18-ए, शह द जत स िंह मार्ग,

Northern Regional Power CommitteeFinal REA for the Month of MARCH, 2020

Table-O1

Energy Requisition Details from NR Stations below 85% of Entitlement (All Figs in LUs)

Station Name State Name Cumulative upto Last

Month (a)

Cumulative upto this

month(b)

During the month (c) =

(b)-(a)

DADRI TPS

DELHI 25011.845772 29386.409532 4374.563760

UTTAR PRADESH 2121.521270 2607.583910 486.062640

VIRTUAL ENTITY(SCED) 3775.394700 3775.394700 0.000000

TOTAL DADRI TPS 30908.761742 35769.388142 4860.626400

DADRI-II TPS

ANDHRA PRADESH 467.296027 467.296027 0.000000

CHANDIGARH 0.000000 1.190642 1.190642

DELHI 9157.008924 10655.853881 1498.844957

M.P. 26.939548 35.667884 8.728336

PUNJAB 167.036699 178.854435 11.817736

PG-KURUKSHETRA 151.518364 169.306426 17.788062

RAJASTHAN 2595.194633 2850.888416 255.693783

UTTARAKHAND 6.796539 11.743801 4.947262

UTTAR PRADESH 3192.205634 3681.553816 489.348182

VIRTUAL ENTITY(SCED) 5423.248792 5564.843117 141.594325

TOTAL DADRI-II TPS 21187.245160 23617.198445 2429.953285

IGSTPS-JHAJJAR

CHANDIGARH 481.957805 526.809956 44.852151

DELHI 33452.949633 37456.877465 4003.927832

HARYANA 16729.173758 18249.439946 1520.266188

J & K 354.777461 609.518922 254.741461

UTTARAKHAND 793.550720 865.653428 72.102708

UTTAR PRADESH 286.097668 368.625005 82.527337

VIRTUAL ENTITY(SCED) 2817.717125 3080.291050 262.573925

TOTAL IGSTPS-JHAJJAR 54916.224170 61157.215772 6240.991602

RIHAND STPS

CHANDIGARH 3.038190 7.900722 4.862532

UTTARAKHAND 271.784542 382.657681 110.873139

TOTAL RIHAND STPS 274.822732 390.558403 115.735671

RIHAND-II STPS

UTTARAKHAND 167.006470 246.124401 79.117931

TOTAL RIHAND-II STPS 167.006470 246.124401 79.117931

Amendment-1

2

Page 4: िकाि Government of India Ministry of Power त्ति ...164.100.60.165/Comm/2019-20/REA/REA_0320_FR1.pdf · 2020. 12. 16. · 18-ए, शह द जत स िंह मार्ग,

Northern Regional Power CommitteeFinal REA for the Month of MARCH, 2020

Table-O1

Energy Requisition Details from NR Stations below 85% of Entitlement (All Figs in LUs)

Station Name State Name Cumulative upto Last

Month (a)

Cumulative upto this

month(b)

During the month (c) =

(b)-(a)

RIHAND-III STPS

HIMACHAL PRADESH 0.000000 55.161414 55.161414

UTTARAKHAND 263.395583 347.595965 84.200382

TOTAL RIHAND-III STPS 263.395583 402.757379 139.361796

SINGRAULI STPS

RAJASTHAN 323.895761 587.894177 263.998416

TOTAL SINGRAULI STPS 323.895761 587.894177 263.998416

TANDA-II STPS

HARYANA 321.893745 391.503459 69.609714

RAJASTHAN 30.550932 88.037504 57.486572

UTTAR PRADESH 1268.032120 2148.389990 880.357870

TOTAL TANDA-II STPS 1620.476797 2627.930953 1007.454156

UNCHAHAR-I TPS

DELHI 203.562347 256.004861 52.442514

HARYANA 71.477256 105.808276 34.331020

PUNJAB 416.242177 523.345812 107.103635

RAJASTHAN 666.585579 773.241819 106.656240

UTTARAKHAND 347.033019 455.659439 108.626420

UTTAR PRADESH 5125.215280 6085.612173 960.396893

VIRTUAL ENTITY(SCED) 1275.645275 1310.606250 34.960975

TOTAL UNCHAHAR-I TPS 8105.760933 9510.278630 1404.517697

UNCHAHAR-II TPS

CHANDIGARH 13.743374 21.948375 8.205001

DELHI 443.725770 512.786428 69.060658

HARYANA 344.097958 369.644320 25.546362

PUNJAB 1057.154261 1193.367857 136.213596

RAJASTHAN 1972.813782 2180.244457 207.430675

UTTARAKHAND 119.637512 153.671658 34.034146

UTTAR PRADESH 3080.417745 3562.224311 481.806566

VIRTUAL ENTITY(SCED) 1468.960525 1539.045925 70.085400

TOTAL UNCHAHAR-II TPS 8500.550927 9532.933331 1032.382404

Amendment-1

3

Page 5: िकाि Government of India Ministry of Power त्ति ...164.100.60.165/Comm/2019-20/REA/REA_0320_FR1.pdf · 2020. 12. 16. · 18-ए, शह द जत स िंह मार्ग,

Northern Regional Power CommitteeFinal REA for the Month of MARCH, 2020

Table-O1

Energy Requisition Details from NR Stations below 85% of Entitlement (All Figs in LUs)

Station Name State Name Cumulative upto Last

Month (a)

Cumulative upto this

month(b)

During the month (c) =

(b)-(a)

UNCHAHAR-III TPS

DELHI 262.296714 297.468865 35.172151

HARYANA 206.841611 230.349827 23.508216

PUNJAB 239.509605 265.191516 25.681911

RAJASTHAN 1186.284301 1284.626356 98.342055

UTTARAKHAND 203.930909 230.077201 26.146292

UTTAR PRADESH 1363.988791 1561.378139 197.389348

VIRTUAL ENTITY(SCED) 375.427675 394.537450 19.109775

TOTAL UNCHAHAR-III TPS 3838.279606 4263.629354 425.349748

UNCHAHAR-IV TPS

HARYANA 525.077074 578.920251 53.843177

RAJASTHAN 2806.940704 3085.250547 278.309843

UTTARAKHAND 421.695900 485.630333 63.934433

UTTAR PRADESH 4174.063628 4808.929249 634.865621

TOTAL UNCHAHAR-IV TPS 7927.777306 8958.730380 1030.953074

Amendment-1

4

Page 6: िकाि Government of India Ministry of Power त्ति ...164.100.60.165/Comm/2019-20/REA/REA_0320_FR1.pdf · 2020. 12. 16. · 18-ए, शह द जत स िंह मार्ग,

Northern Regional Power CommitteeCompensation Calculation

Calculation period from 01-4-2019 to 31-3-2020 (All Figs in Rs. Lakh Payable(+)/Recievable(-))

Station State Compensation during the

month

Compensation for the

calculation period

DADRI TPS

DELHI 116.29407 2234.46509

UTTAR PRADESH 18.60914 198.27380

VIRTUAL ENTITY(SCED) -32.65471 287.07106

TOTAL DADRI TPS 102.24850 2719.80995

DADRI-II TPS

ANDHRA PRADESH -4.54630 94.93339

CHANDIGARH 0.24188 0.24188

DELHI 215.40921 2164.78686

M.P. 1.51111 7.24610

PUNJAB 0.77573 36.33512

PG-KURUKSHETRA 2.13961 34.39540

RAJASTHAN 26.69685 579.17140

UTTARAKHAND 0.93894 2.38581

UTTAR PRADESH 68.35653 747.92498

VIRTUAL ENTITY(SCED) -23.99703 1130.52407

TOTAL DADRI-II TPS 287.52653 4797.94501

IGSTPS-JHAJJAR

CHANDIGARH 4.84792 79.01081

DELHI 470.08616 5617.77225

HARYANA 162.78767 2737.04602

J & K 36.82289 91.41548

UTTARAKHAND 7.72015 129.83046

UTTAR PRADESH 11.26203 55.28628

VIRTUAL ENTITY(SCED) 28.39543 461.98121

TOTAL IGSTPS-JHAJJAR 721.92225 9172.34251

TANDA-II STPS

HARYANA 106.83927 106.83927

RAJASTHAN 24.02498 24.02498

UTTAR PRADESH 586.28454 586.28454

TOTAL TANDA-II STPS 717.14879 717.14879

Amendment-1

5

Page 7: िकाि Government of India Ministry of Power त्ति ...164.100.60.165/Comm/2019-20/REA/REA_0320_FR1.pdf · 2020. 12. 16. · 18-ए, शह द जत स िंह मार्ग,

Northern Regional Power CommitteeCompensation Calculation

Calculation period from 01-4-2019 to 31-3-2020 (All Figs in Rs. Lakh Payable(+)/Recievable(-))

Station State Compensation during the

month

Compensation for the

calculation period

UNCHAHAR-I TPS

DELHI 11.27379 88.08816

HARYANA 9.43536 36.40734

PUNJAB 23.00771 180.07694

RAJASTHAN 14.52666 266.06312

UTTARAKHAND 25.83377 156.78688

UTTAR PRADESH 159.98222 2093.98522

VIRTUAL ENTITY(SCED) -30.40181 450.96369

TOTAL UNCHAHAR-I TPS 213.65770 3272.37135

UNCHAHAR-II TPS

CHANDIGARH 2.60226 6.43554

DELHI 26.59216 150.35538

HARYANA 12.40913 108.38433

PUNJAB 55.05072 349.91035

RAJASTHAN 89.02110 639.27489

UTTARAKHAND 11.68936 45.05845

UTTAR PRADESH 185.30387 1044.48863

VIRTUAL ENTITY(SCED) 41.54755 451.26747

TOTAL UNCHAHAR-II TPS 424.21615 2795.17504

UNCHAHAR-III TPS

DELHI 15.94529 105.56864

HARYANA 11.07371 81.74878

PUNJAB 12.27645 94.11374

RAJASTHAN 50.56288 455.90067

UTTARAKHAND 11.97151 81.65203

UTTAR PRADESH 88.05995 554.11703

VIRTUAL ENTITY(SCED) 11.73857 140.01728

TOTAL UNCHAHAR-III TPS 201.62836 1513.11817

UNCHAHAR-IV TPS

HARYANA 26.01793 189.79961

RAJASTHAN 135.96361 1011.50260

UTTARAKHAND 27.67932 159.21441

UTTAR PRADESH 274.64143 1576.61245

TOTAL UNCHAHAR-IV TPS 464.30229 2937.12907

Amendment-1

6

Page 8: िकाि Government of India Ministry of Power त्ति ...164.100.60.165/Comm/2019-20/REA/REA_0320_FR1.pdf · 2020. 12. 16. · 18-ए, शह द जत स िंह मार्ग,

Northern Regional Power Committee Compensation Calculation

Calculation period from 01-4-2019 to 31-3-2020 ECR & Cumulative Energy Report

ECR (SE): Energy Charge Rate in rupees/kWh based on degraded SHR and AEC as per regulation considering average unit loading of generating station during the calculation period

ECR (DC): Energy Charge Rate in rupees/kWh based on degraded SHR and AEC as per regulation considering average declared capacity as average unit loading during the calculation period

ECR (A): Energy Charge Rate in rupees/kWh based on actual parameters SHR and AEC during the calculation period

ECR (N): Energy Charge Rate in rupees/kWh based on normative parameters of SHR and AEC during the calculation period

Station Cumulative

Energy(MWh)

ECR(SE)

(Rs/kWh)

ECR(DC)

(Rs/kWh)

ECR(A)

(Rs/kWh)

ECR(N)

(Rs/kWh)

Final

Compensation

(Rs Lakh)

DADRI TPS 2044969.890800 4.418 4.232 4.257 4.124 2719.80995

DADRI-II TPS 3838356.011000 4.007 3.741 3.866 3.741 4797.94501

IGSTPS-JHAJJAR 3359832.421600 4.117 3.844 4.160 3.844 9172.34251

TANDA-II STPS 1667787.879400 2.709 2.666 2.807 2.666 717.14879

UNCHAHAR-I TPS 1971308.036700 3.690 3.524 3.717 3.524 3272.37134

UNCHAHAR-II TPS 1996553.590900 3.828 3.573 3.713 3.573 2795.17503

UNCHAHAR-III TPS 1073133.446300 3.706 3.539 3.680 3.539 1513.11816

UNCHAHAR-IV TPS 2622436.656900 3.488 3.332 3.444 3.332 2937.12906

Amendment-1

7