उत्ति क्षते्रीय ववद्यतु वमवत
Northern Regional Power Committee
िं. उक्षेवव /वाविवययक/201/क्षे.ऊ.ले./2020/ ददनााँक: 16 दद म्बि, 2020
No. NRPC/Comml/201/ REA/ 2020/ Dated: 16th December, 2020
ेवामें,
To,
िंलग्न ूची के अनु ाि
As per list enclosed
ववषय : माह माचग, 2020 के अिंवतम क्षेत्रीय ऊजाग लेखा में िंशोधन-1 ।
Subject – Amendment-1 in Final REA for the month of March, 2020.
महोदय/Sir,
This is in reference to Final REA for the month of March 2020 issued by this office
vide letter number NRPC/Comml/201/ REA/ 2020/ 10436-10474 dated 03rd November 2020.
NTPC vide their email dated 10-11-2020, intimated the discrepancy in “Energy
Requisition Details from NR Stations below 85% of Entitlement” (Table-O1) and in
Compensation calculation amount w.r.t. Dadri-II station to Andhra Pradesh. The
discrepancies have now been corrected.
The amended pages of the REA containing the above mentioned calculation are
enclosed herewith (copy available on www.nrpc.gov.in).
अनलुग्नक – यथोपरि । भवदीय
Encl.: As above. Yours faithfully,
(आि. पी. प्रधान)
(R.P. Pradhan)
अधीक्षि अवभयिंता
Superintending Engineer
Northern Regional Power CommitteeFinal REA for the Month of MARCH, 2020
Table-O1
Energy Requisition Details from NR Stations below 85% of Entitlement (All Figs in LUs)
Station Name State Name Cumulative upto Last
Month (a)
Cumulative upto this
month(b)
During the month (c) =
(b)-(a)
ANTA GPP
CHANDIGARH 618.946786 678.280536 59.333750
DELHI 2372.962224 2638.921589 265.959365
HIMACHAL PRADESH 673.224409 763.690552 90.466143
HARYANA 1291.246640 1435.919902 144.673262
J & K 2854.763891 3282.724172 427.960281
M.P. 18.432948 25.024381 6.591433
PUNJAB 2648.023289 2943.599252 295.575963
RAJASTHAN 4486.105161 4985.028506 498.923345
UTTARAKHAND 1326.839708 1465.258382 138.418674
UTTAR PRADESH 4781.824005 5381.891493 600.067488
TOTAL ANTA GPP 21072.369061 23600.338765 2527.969704
AURAIYA GPP
CHANDIGARH 886.936882 954.786313 67.849431
DELHI 4223.926192 4612.307136 388.380944
HIMACHAL PRADESH 1082.726127 1197.083200 114.357073
HARYANA 2305.782855 2517.260073 211.477218
J & K 4867.789075 5428.278595 560.489520
M.P. 62.916571 71.823326 8.906755
PUNJAB 4902.251130 5352.993333 450.742203
RAJASTHAN 3561.312862 3889.906801 328.593939
UTTARAKHAND 2281.908426 2479.899231 197.990805
UTTAR PRADESH 13893.580428 15096.026102 1202.445674
TOTAL AURAIYA GPP 38069.130548 41600.364110 3531.233562
DADRI GPP
CHANDIGARH 902.036607 945.942993 43.906386
DELHI 4513.285045 4756.493881 243.208836
HIMACHAL PRADESH 722.732839 771.795266 49.062427
HARYANA 2033.372442 2154.479306 121.106864
J & K 4385.874857 4586.996480 201.121623
PUNJAB 6605.918377 6996.754654 390.836277
PG-DADRI 13.722794 14.579436 0.856642
RAJASTHAN 3655.235152 3862.288792 207.053640
UTTARAKHAND 2238.863185 2326.289570 87.426385
UTTAR PRADESH 10661.725993 11476.921596 815.195603
TOTAL DADRI GPP 35732.767291 37892.541974 2159.774683
Amendment-1
1
Northern Regional Power CommitteeFinal REA for the Month of MARCH, 2020
Table-O1
Energy Requisition Details from NR Stations below 85% of Entitlement (All Figs in LUs)
Station Name State Name Cumulative upto Last
Month (a)
Cumulative upto this
month(b)
During the month (c) =
(b)-(a)
DADRI TPS
DELHI 25011.845772 29386.409532 4374.563760
UTTAR PRADESH 2121.521270 2607.583910 486.062640
VIRTUAL ENTITY(SCED) 3775.394700 3775.394700 0.000000
TOTAL DADRI TPS 30908.761742 35769.388142 4860.626400
DADRI-II TPS
ANDHRA PRADESH 467.296027 467.296027 0.000000
CHANDIGARH 0.000000 1.190642 1.190642
DELHI 9157.008924 10655.853881 1498.844957
M.P. 26.939548 35.667884 8.728336
PUNJAB 167.036699 178.854435 11.817736
PG-KURUKSHETRA 151.518364 169.306426 17.788062
RAJASTHAN 2595.194633 2850.888416 255.693783
UTTARAKHAND 6.796539 11.743801 4.947262
UTTAR PRADESH 3192.205634 3681.553816 489.348182
VIRTUAL ENTITY(SCED) 5423.248792 5564.843117 141.594325
TOTAL DADRI-II TPS 21187.245160 23617.198445 2429.953285
IGSTPS-JHAJJAR
CHANDIGARH 481.957805 526.809956 44.852151
DELHI 33452.949633 37456.877465 4003.927832
HARYANA 16729.173758 18249.439946 1520.266188
J & K 354.777461 609.518922 254.741461
UTTARAKHAND 793.550720 865.653428 72.102708
UTTAR PRADESH 286.097668 368.625005 82.527337
VIRTUAL ENTITY(SCED) 2817.717125 3080.291050 262.573925
TOTAL IGSTPS-JHAJJAR 54916.224170 61157.215772 6240.991602
RIHAND STPS
CHANDIGARH 3.038190 7.900722 4.862532
UTTARAKHAND 271.784542 382.657681 110.873139
TOTAL RIHAND STPS 274.822732 390.558403 115.735671
RIHAND-II STPS
UTTARAKHAND 167.006470 246.124401 79.117931
TOTAL RIHAND-II STPS 167.006470 246.124401 79.117931
Amendment-1
2
Northern Regional Power CommitteeFinal REA for the Month of MARCH, 2020
Table-O1
Energy Requisition Details from NR Stations below 85% of Entitlement (All Figs in LUs)
Station Name State Name Cumulative upto Last
Month (a)
Cumulative upto this
month(b)
During the month (c) =
(b)-(a)
RIHAND-III STPS
HIMACHAL PRADESH 0.000000 55.161414 55.161414
UTTARAKHAND 263.395583 347.595965 84.200382
TOTAL RIHAND-III STPS 263.395583 402.757379 139.361796
SINGRAULI STPS
RAJASTHAN 323.895761 587.894177 263.998416
TOTAL SINGRAULI STPS 323.895761 587.894177 263.998416
TANDA-II STPS
HARYANA 321.893745 391.503459 69.609714
RAJASTHAN 30.550932 88.037504 57.486572
UTTAR PRADESH 1268.032120 2148.389990 880.357870
TOTAL TANDA-II STPS 1620.476797 2627.930953 1007.454156
UNCHAHAR-I TPS
DELHI 203.562347 256.004861 52.442514
HARYANA 71.477256 105.808276 34.331020
PUNJAB 416.242177 523.345812 107.103635
RAJASTHAN 666.585579 773.241819 106.656240
UTTARAKHAND 347.033019 455.659439 108.626420
UTTAR PRADESH 5125.215280 6085.612173 960.396893
VIRTUAL ENTITY(SCED) 1275.645275 1310.606250 34.960975
TOTAL UNCHAHAR-I TPS 8105.760933 9510.278630 1404.517697
UNCHAHAR-II TPS
CHANDIGARH 13.743374 21.948375 8.205001
DELHI 443.725770 512.786428 69.060658
HARYANA 344.097958 369.644320 25.546362
PUNJAB 1057.154261 1193.367857 136.213596
RAJASTHAN 1972.813782 2180.244457 207.430675
UTTARAKHAND 119.637512 153.671658 34.034146
UTTAR PRADESH 3080.417745 3562.224311 481.806566
VIRTUAL ENTITY(SCED) 1468.960525 1539.045925 70.085400
TOTAL UNCHAHAR-II TPS 8500.550927 9532.933331 1032.382404
Amendment-1
3
Northern Regional Power CommitteeFinal REA for the Month of MARCH, 2020
Table-O1
Energy Requisition Details from NR Stations below 85% of Entitlement (All Figs in LUs)
Station Name State Name Cumulative upto Last
Month (a)
Cumulative upto this
month(b)
During the month (c) =
(b)-(a)
UNCHAHAR-III TPS
DELHI 262.296714 297.468865 35.172151
HARYANA 206.841611 230.349827 23.508216
PUNJAB 239.509605 265.191516 25.681911
RAJASTHAN 1186.284301 1284.626356 98.342055
UTTARAKHAND 203.930909 230.077201 26.146292
UTTAR PRADESH 1363.988791 1561.378139 197.389348
VIRTUAL ENTITY(SCED) 375.427675 394.537450 19.109775
TOTAL UNCHAHAR-III TPS 3838.279606 4263.629354 425.349748
UNCHAHAR-IV TPS
HARYANA 525.077074 578.920251 53.843177
RAJASTHAN 2806.940704 3085.250547 278.309843
UTTARAKHAND 421.695900 485.630333 63.934433
UTTAR PRADESH 4174.063628 4808.929249 634.865621
TOTAL UNCHAHAR-IV TPS 7927.777306 8958.730380 1030.953074
Amendment-1
4
Northern Regional Power CommitteeCompensation Calculation
Calculation period from 01-4-2019 to 31-3-2020 (All Figs in Rs. Lakh Payable(+)/Recievable(-))
Station State Compensation during the
month
Compensation for the
calculation period
DADRI TPS
DELHI 116.29407 2234.46509
UTTAR PRADESH 18.60914 198.27380
VIRTUAL ENTITY(SCED) -32.65471 287.07106
TOTAL DADRI TPS 102.24850 2719.80995
DADRI-II TPS
ANDHRA PRADESH -4.54630 94.93339
CHANDIGARH 0.24188 0.24188
DELHI 215.40921 2164.78686
M.P. 1.51111 7.24610
PUNJAB 0.77573 36.33512
PG-KURUKSHETRA 2.13961 34.39540
RAJASTHAN 26.69685 579.17140
UTTARAKHAND 0.93894 2.38581
UTTAR PRADESH 68.35653 747.92498
VIRTUAL ENTITY(SCED) -23.99703 1130.52407
TOTAL DADRI-II TPS 287.52653 4797.94501
IGSTPS-JHAJJAR
CHANDIGARH 4.84792 79.01081
DELHI 470.08616 5617.77225
HARYANA 162.78767 2737.04602
J & K 36.82289 91.41548
UTTARAKHAND 7.72015 129.83046
UTTAR PRADESH 11.26203 55.28628
VIRTUAL ENTITY(SCED) 28.39543 461.98121
TOTAL IGSTPS-JHAJJAR 721.92225 9172.34251
TANDA-II STPS
HARYANA 106.83927 106.83927
RAJASTHAN 24.02498 24.02498
UTTAR PRADESH 586.28454 586.28454
TOTAL TANDA-II STPS 717.14879 717.14879
Amendment-1
5
Northern Regional Power CommitteeCompensation Calculation
Calculation period from 01-4-2019 to 31-3-2020 (All Figs in Rs. Lakh Payable(+)/Recievable(-))
Station State Compensation during the
month
Compensation for the
calculation period
UNCHAHAR-I TPS
DELHI 11.27379 88.08816
HARYANA 9.43536 36.40734
PUNJAB 23.00771 180.07694
RAJASTHAN 14.52666 266.06312
UTTARAKHAND 25.83377 156.78688
UTTAR PRADESH 159.98222 2093.98522
VIRTUAL ENTITY(SCED) -30.40181 450.96369
TOTAL UNCHAHAR-I TPS 213.65770 3272.37135
UNCHAHAR-II TPS
CHANDIGARH 2.60226 6.43554
DELHI 26.59216 150.35538
HARYANA 12.40913 108.38433
PUNJAB 55.05072 349.91035
RAJASTHAN 89.02110 639.27489
UTTARAKHAND 11.68936 45.05845
UTTAR PRADESH 185.30387 1044.48863
VIRTUAL ENTITY(SCED) 41.54755 451.26747
TOTAL UNCHAHAR-II TPS 424.21615 2795.17504
UNCHAHAR-III TPS
DELHI 15.94529 105.56864
HARYANA 11.07371 81.74878
PUNJAB 12.27645 94.11374
RAJASTHAN 50.56288 455.90067
UTTARAKHAND 11.97151 81.65203
UTTAR PRADESH 88.05995 554.11703
VIRTUAL ENTITY(SCED) 11.73857 140.01728
TOTAL UNCHAHAR-III TPS 201.62836 1513.11817
UNCHAHAR-IV TPS
HARYANA 26.01793 189.79961
RAJASTHAN 135.96361 1011.50260
UTTARAKHAND 27.67932 159.21441
UTTAR PRADESH 274.64143 1576.61245
TOTAL UNCHAHAR-IV TPS 464.30229 2937.12907
Amendment-1
6
Northern Regional Power Committee Compensation Calculation
Calculation period from 01-4-2019 to 31-3-2020 ECR & Cumulative Energy Report
ECR (SE): Energy Charge Rate in rupees/kWh based on degraded SHR and AEC as per regulation considering average unit loading of generating station during the calculation period
ECR (DC): Energy Charge Rate in rupees/kWh based on degraded SHR and AEC as per regulation considering average declared capacity as average unit loading during the calculation period
ECR (A): Energy Charge Rate in rupees/kWh based on actual parameters SHR and AEC during the calculation period
ECR (N): Energy Charge Rate in rupees/kWh based on normative parameters of SHR and AEC during the calculation period
Station Cumulative
Energy(MWh)
ECR(SE)
(Rs/kWh)
ECR(DC)
(Rs/kWh)
ECR(A)
(Rs/kWh)
ECR(N)
(Rs/kWh)
Final
Compensation
(Rs Lakh)
DADRI TPS 2044969.890800 4.418 4.232 4.257 4.124 2719.80995
DADRI-II TPS 3838356.011000 4.007 3.741 3.866 3.741 4797.94501
IGSTPS-JHAJJAR 3359832.421600 4.117 3.844 4.160 3.844 9172.34251
TANDA-II STPS 1667787.879400 2.709 2.666 2.807 2.666 717.14879
UNCHAHAR-I TPS 1971308.036700 3.690 3.524 3.717 3.524 3272.37134
UNCHAHAR-II TPS 1996553.590900 3.828 3.573 3.713 3.573 2795.17503
UNCHAHAR-III TPS 1073133.446300 3.706 3.539 3.680 3.539 1513.11816
UNCHAHAR-IV TPS 2622436.656900 3.488 3.332 3.444 3.332 2937.12906
Amendment-1