Digital substations Fully For Smart Grids ABB Georg Schett ABB Power Grids Division for Cepsi October 2016

Upload: vomien

Post on 12-Feb-2017

262 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: ABB digital substation

Digital substations Fully For Smart Grids

ABB Georg Schett ABB Power Grids Division for Cepsi October 2016

Page 2: ABB digital substation

The mega trends “Big shifts” in Energy and Automation

Page 3: ABB digital substation

Digital Substation IEC 61850 Bus substitutes copper signaling wires

November 5, 2016

The standard IEC 61850-9-2 Process bus is introduced by digital substations

Conventional Modern Digital

Local Control Cubicle (LCC)

MMI + control board

event recording

protection

GIS

bay cubicle (IEDs can be integrated in LCC)

GIS

HMI

Gateway

GIS

sensors and actuators

HMI

Station bus Station bus

process bus

Gateway

Hardwired control and protection bay cubicle (IEDs can be integrated in LCC)

Page 4: ABB digital substation

Digital Substation Shift from a conventional to a digital substation

Primary components stand alone

Conventional Substation example AIS

Small foot-print: Integration

Digital Substation example AIS

Station local or remote HMI with asset management

• Lower OPEX for

operators

• Health and safety

• Less and smaller

control cubicles

• Linear NCIT / no

saturation

• Less cabling

• Less material

• Shorter cycle times

• Smaller foot-print

• Future proof thanks

to IEC 61850 CT & VT

Customer values

Page 5: ABB digital substation

Digital Substation GIS and AIS Sensors (NCIT) replace bulky CTs and VTs

Merging Unit

IEC 61850-9-2 LE

FOCS sensor head and electronics

IEC 61850-9-2 LE

Combined Current & Voltage sensor

Page 6: ABB digital substation

Digital Substation Innovative solutions for a smaller foot-print

November 5, 2016

© ABB

empty space empty space

Page 7: ABB digital substation

Digital Substation Reduction of the foot-print example

Page 8: ABB digital substation

Digital Substation Solutions for Transmission and Distribution

Digital Substations for transmission

Digital Substations for primary distribution

Example: PASS 245 kV Example: GIS 145 kV

Example: SafeRing 24 kV Example: UniGear Digital 24 kV

Digital Substation for regional distribution

Digital Substations for secondary distribution

Page 9: ABB digital substation

The ABB offering in Digital Substation From Monitoring to Asset Management

November 5, 2016

Actual status

Dataanalysis

Fleet

management

Monitoring

Equipment provides data for

maintenance optimization

Asset management

Risk analysis takes condition

and importance of individual

asset into account

Benefits:

• Reduces OPEX

• From time based to condition

and risk based maintenance

strategies

• Preventive maintenance

reduces unplanned outage and

shortens down time

Page 10: ABB digital substation

Digital Substation Enable higher reliability and productivity in fleet service

Data capture

Product information

Plant/Substation information

Data

Data

X X X X X X

X X X

X

Signals from sensors

Off line maintenance, field

testing and product data

Product level analysis and

storage of data

Product specific fingerprint

Diagnosis and visual risk status

information of equipment at plant

level

X Other

equipment

Expert systems Fleet health: Guide for optimized selective fleet maintenance

planning based on risks versus importance of assets

Page 11: ABB digital substation

Example: transformer Smart Transformer for Digital Substations

November 5, 2016

© ABB

Tap changer • Oil or Vacuum • Mechanical or

electronic drives

Intelligent electronics • CoreSense™ for gas and moisture • Partial discharge measurement

(electric or acoustic)

Accessories • Oil level • Temperature • Breather • Buchholz Relay

CoreTec™ • Intelligent control • Monitoring and

diagnostics • Communication (DNP3

and IEC 61850)

HMI • WEB • Asset Center • SCADA

Page 12: ABB digital substation

The ABB offering in Digital Substation Switchgear equipment monitoring system MSM

IEC 61850

station bus

GIS

PASS AIS

User Interfaces • WEB • Asset center • SCADA

Condition Monitoring system

for AIS and GIS

• Gas Density

• Breaker contact ware

• Nozzle ablations

• Travel curve analysis

• Trip coils

• Operating times and frequencies

• Logging, historian

• Data analysis: trending, forecasting

• Data visualization: local display and

embedded webserver with complete

substation overview

• Data storage and communication

(IEC 61850, DNP 3)

Page 13: ABB digital substation

Digital Substation Key benefits

The digital process

bus Substitutes 80% of the

copper signaling wires

Integrated non conventional

instrument transformers More accurate measurement, real

time, supports grid stability

Foot-print reduction Integration of functions

previously separate

(disconnectors, earthing

switches

short cycle times Automatic testing

Less wiring on site

Automatic monitoring Monitor the status of the equipment in

the cloud, condition based maintenance,

risk centered maintenance on the fleet

level, advanced data driven service for

utility customers

1

2

3 4

5

6

Standard communication

IEC61850 Interoperability between IEDs from

different suppliers

Long term protection of investment