© ABB Group March 19, 2009 | Slide 1 ABB Solar Experience and Capabilities Mauricio Mazuela, Market Manager Power Technologies

Upload: others

Post on 07-Jul-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 1

ABB Solar Experience and CapabilitiesMauricio Mazuela, Market Manager Power Technologies

Page 2: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 2

ABB Solar ExperienceReference List

Page 3: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 3

ABB Solar ExperienceReference List

CSP (17 projects)

SEGS VI, VII, VIII, IX

PSA

Andasol 1&2

eSolar Sierra

Extresol 1&2

PV (18 projects)

Totana

La Robla

Mezos

Saint Julien

Aprilia 1

Kuraymat

Hassi R’Mel

Martin 8

Manchasol 1&2

Vallesol 1&2

Sapeu

Monreale

Francofonte

Duccotto

Page 4: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 4

Concentrating Solar PowerConcentrating Solar Power

Page 5: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 5

SEGS VI, VII, VIII & IX Solar Power Plant

SEGS

Sizes: 2 x 30 MW, 2 x 80 MW

Customer: Luz Solar Partners

End user: FP&L/Terra Gen

Year of ABB commissioning:

DCS: 1988 - 1990

ABB’s supply

Steam Turbines and Generators

Steam Turbine Control System

Customer benefits

Ability to meet schedule

High degree of availability

Low cost life-cycle regarding O&M and future extensions

Page 6: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 6

PSA Solar Power Plant

PSA SPP

Size: 1 x 1.3 MW

Customer: CIEMAT

End user: All companies

Year of ABB commissioning:

DCS: 1998

ABB’s supply

Distributed Control System (DCS) for the DISS test loop (1.3 MW)

Customer benefits

Constitutes an excellent experimental system for investigating the two-phase flow and direct steam generation for electricity production.

High degree of standardization in planning and documentation

Extremely flexible system regarding O&M and future extensions

Page 7: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 7

Andasol 1&2 Solar Power Plant

Andasol 1 & 2 SPP (Spain)

Size: 1 x 50 MW each

Customer: Cobra/Sener

End user: ACS

Year of ABB commissioning:

DCS: 2008

UTE ANDASOL Property – Not to be used

without UTE ANDASOL authorization

ABB’s supply

Distributed Control System (DCS)

MV Switchgear

Motors & Drives

Unit Transformers

Customer benefits

ABB’s flexibility and experience with complex power systems

High degree of standardization in planning and documentation

Extremely flexible system regarding O&M and future extensions

Thermal Energy Storage (TES) and Heat Transfer Fluid (HTF) control

Page 8: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 8

eSolar Sierra Solar Power Plant

eSolar Sierra SPP (USA)

Size: 2 x 2.5 MW

Customer: eSolar

End user: eSolar

Year of ABB commissioning:

DCS: 2009

ABB’s supply

Distributed Control System (DCS)

Customer benefits

ABB’s high quality products guarantee plant reliability and performance

ABB is able to deliver within eSolar’s aggressive time line

ABB’s modular design is in alignment with eSolar’s strategy

ABB’s global footprint ensures standardization of projects throughout the globe

Page 9: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 9

Extresol 1 & 2 Solar Power Plant

Extresol 1 & 2 SPP (Spain)

Size: 1 x 50 MW each

Customer: Cobra/Sener

End user: ACS

Year of ABB commissioning:

DCS, SCS, LOC: 2009 - 2010

ABB’s supply

Distributed Control System (DCS)

Solar Field Communications System (SCS)

Solar Field Control System (LOC): 624 units

MV Switchgear

Motors & Drives

Unit Transformers

Customer benefits

ABB’s flexibility and experience with complex power systems

Extremely flexible system regarding O&M and future extensions

Totally integrated and compatible control scope solution

Short installation and commissioning time

Thermal Energy Storage (TES) and Heat Transfer Fluid (HTF) control

Page 10: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 10

Kuraymat Integrated Solar Combined Cycle

Kuraymat ISCC (Egypt)

Size: 1 x 160 MW

Customer: Iberdrola/Flagsol

End user: NREA

Year of ABB commissioning:

DCS: 2010

ABB’s supply

Distributed Control System (DCS): Power Block + Solar Field

MV Switchgear

Motors & Drives

Customer benefits

ABB assumes responsibility for engineering and coordination activities towards control & electrical systems

Extremely flexible system regarding O&M and future extensions

Page 11: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 11

Hassi R’Mel Integrated Solar Combined Cycle

Hassi R’Mel ISCC (Algeria)

Size: 1 x 150 MW

Customer: Abener

End user: Sonatrach

Year of ABB commissioning:

EBOP: 2010

ABB’s supply

EBOP concept, including:

Transformers

MV Switchgear

LV Switchgear

Complete Electrical System

Cabling

Customer benefits

Totally integrated and compatible full scope solution

High degree of standardization in planning and documentation

Extremely flexible system regarding O&M and future extensions

Page 12: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 12

Martin Integrated Solar Combined Cycle

Martin ISCC (USA)

Size: 1 x 75 MW (Solar Field)

Customer: FP&L

End user: FP&L

Year of ABB commissioning:

LOC: 2010

ABB’s supply

Solar Field Control System (LOC): 1.136 units

Customer benefits

ABB’s experience in solar collector positioning

Extremely short delivery schedule

High degree of standardization in planning and documentation

High degree of flexibility in engineering and LOC design

Page 13: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 13

Manchasol 1 & 2 Solar Power Plant

Manchasol 1 & 2 SPP (Spain)

Size: 1 x 50 MW each

Customer: Cobra/Initec

End user: ACS

Year of ABB commissioning:

DCS, SCS, LOC: 2010 - 2011

ABB’s supply

Distributed Control System (DCS)

Solar Field Communications System (SCS)

Solar Field Control System (LOC): 624 units

Customer benefits

High degree of standardization in planning and

documentation

Extremely flexible system regarding O&M and future

extensions

Totally integrated and compatible control scope

solution

Short installation and commissioning time

Thermal Energy Storage (TES) and Heat Transfer

Fluid (HTF) control

Page 14: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 14

Vallesol 1 & 2 Solar Power Plant

Vallesol 1 & 2 SPP (Spain)

Size: 1 x 50 MW each

Customer: Cobra/Sener

End user: Torresol Energy

Year of ABB commissioning:

DCS, SCS, LOC: 2011

ABB’s supply

Distributed Control System (DCS)

Solar Field Communications System (SCS)

Solar Field Control System (LOC): 624 units

Unit Transformers

Customer benefits

ABB’s flexibility and experience with complex power systems

High degree of standardization in planning and documentation

Extremely flexible system regarding O&M and future extensions

Totally integrated and compatible control scope solution

Short installation and commissioning time

UTE ANDASOL Property – Not to be used

without UTE ANDASOL authorization

Page 15: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 15

Photovoltaic Solar Power

Page 16: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 16

Totana PV Solar Plant

Totana PV Plant (Spain)

Size: 1 MWp, 2-axis tracker

Customer: Global Capital Finance

ABB Scope: Turnkey

Year of commissioning:

Turnkey: 2008

Customer needs

Maximize plant performance and reliability

Complete turnkey solution

Plant in operation in less than 6 months

ABB response*

ABB delivers the complete plant in consortium with a

mechanical partner

ABB applies an efficiency improvement system to maximize

the overall performance of the plant

ABB scope:

• Supply: DC cabinets, AC cabinets, unit transformers,

switchgears, equipment housing, system optimization,

control and SCADA

• Installation, ground & civil works: inverters, trackers,

PV modules, transformers, switchgears, cabinets,

housing, system optimization, control, SCADA, security

system, cabling, etc

Partner scope: PV modules (supply)

Client met deadline and qualified for Spanish feed-in tariff

Page 17: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 17

Sapeu PV Solar Plant

Sapeu PV Plant (Italy)

Size: 3.9 MWp, fix installation

Customer: GA Solar

ABB Scope: Turnkey

Year of commissioning:

Turnkey: 2010

Customer needs

First class automation and electrical systems

Maximize plant performance and reliability

ABB response*

ABB delivers the complete plant in consortium with a panel

manufacturer

ABB applies an efficiency improvement system to maximize

the overall performance of the PV solar plant

ABB scope:

• Supply: DC & AC cabinets, unit transformers,

switchgears, equipment housing, system optimization,

control, SCADA, substation

• Installation, ground & civil works: inverters, structures,

DC & AC cabinets, transformers, switchgears, cabling,

equipment housing, system optimization, control,

SCADA, substation, fencing, security system, PV

modules

Page 18: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 18

Monreale PV Solar Plant

Monreale PV Plant (Italy)

Size: 3.27 MWp, fix installation

Customer: GA Solar

ABB Scope: Turnkey

Year of commissioning:

Turnkey: 2010

Customer needs

First class automation and electrical systems

Maximize plant performance and reliability

ABB response

ABB delivers the complete plant in consortium with a panel

manufacturer

ABB applies an efficiency improvement system to maximize

the overall performance of the PV solar plant

ABB scope:

• Supply: DC & AC cabinets, unit transformers,

switchgears, equipment housing, system optimization,

control, SCADA, substation

• Installation, ground & civil works: inverters, structures,

DC & AC cabinets, transformers, switchgears, cabling,

equipment housing, system optimization, control,

SCADA, substation, fencing, security system, PV

modules

Page 19: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 19

Francofonte PV Solar Plant

Francofonte PV Plant (Italy)

Size: 2.50 MWp, fix installation

Customer: GA Solar

ABB Scope: Turnkey

Year of commissioning:

Turnkey: 2010

Customer needs

First class automation and electrical systems

Maximize plant performance and reliability

ABB response

ABB delivers the complete plant in consortium with a panel

manufacturer

ABB applies an efficiency improvement system to maximize

the overall performance of the PV solar plant

ABB scope:

• Supply: DC & AC cabinets, unit transformers,

switchgears, equipment housing, system optimization,

control, SCADA, substation

• Installation, ground & civil works: inverters, structures,

DC & AC cabinets, transformers, switchgears, cabling,

equipment housing, system optimization, control,

SCADA, substation, fencing, security system, PV

modules

Page 20: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 20

Duccotto PV Solar Plant

Duccotto PV Plant (Italy)

Size: 7 MWp, fix installation

Customer: GA Solar

ABB Scope: Turnkey

Year of commissioning:

Turnkey: 2010

Customer needs

First class automation and electrical systems

Maximize plant performance and reliability

ABB response

ABB delivers the complete plant in consortium with a panel

manufacturer

ABB applies an efficiency improvement system to maximize

the overall performance of the PV solar plant

ABB scope:

• Supply: DC & AC cabinets, unit transformers,

switchgears, equipment housing, system optimization,

control, SCADA, substation

• Installation, ground & civil works: inverters, structures,

DC & AC cabinets, transformers, switchgears, cabling,

equipment housing, system optimization, control,

SCADA, substation, fencing, security system, PV

modules

Page 21: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 21

La Sugarella PV Solar Plant

La Sugarella PV Plant (Italy)

Size: 24.2 MWp, 1-axis tracker

Customer: Medenergy

ABB Scope: Turnkey

Year of commissioning:

Turnkey: 2010

Customer needs

First class automation and electrical systems

Maximize plant performance and reliability

ABB response

ABB delivers the complete plant in consortium with a panel

manufacturer

ABB applies an efficiency improvement system to maximize

the overall performance of the PV solar plant

ABB scope:

• Supply: DC & AC cabinets, unit transformers,

switchgears, equipment housing, system optimization,

control, SCADA, substation

• Installation, ground & civil works: inverters, trackers,

DC & AC cabinets, transformers, switchgears, cabling,

equipment housing, system optimization, control,

SCADA, substation, fencing, security system, PV

modules

Page 22: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 22

Aprilia 1 PV Solar Plant

Aprilia 1 PV Plant (Italy)

Size: 9.7 MWp, fix installation

Customer: Kinexia

ABB Scope: EBOP/iICE

Year of commissioning:

EBOP/iICE: 2010

Customer needs

First class automation and electrical systems

Maximize plant performance and reliability

ABB response*

ABB delivers a complete electrical solution

ABB applies an efficiency improvement system to maximize

the overall performance of the PV solar plant

ABB scope:

• Supply: inverter centers, DC & AC cabinets,

transformers, switchgears, cabling, equipment housing,

protection equipment, MV connection line

• Installation: inverter centers, DC & AC cabinets,

transformers, switchgears, cabling, equipment housing,

protection equipment, MV connection line, PV modules

electrical connection

Page 23: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 23

Macchia Rotonda PV Solar Plant

Macchia Rotonda PV Plant (Italy)

Size: 6.6 MWp, fix installation

Customer: Manesa

ABB Scope: EBOP/iICE

Year of commissioning:

EBOP/iICE: 2010

Customer needs

First class automation and electrical systems

Maximize plant performance and reliability

ABB response

ABB delivers a complete electrical solution

ABB applies an efficiency improvement system to maximize

the overall performance of the PV solar plant

ABB scope:

• Supply: structures, inverter centers, DC & AC cabinets,

transformers, switchgears, cabling, equipment housing,

protection equipment, MV connection line

• Installation: structures, inverter centers, DC & AC

cabinets, transformers, switchgears, cabling,

equipment housing, protection equipment, MV

connection line, PV modules electrical connection

Page 24: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 24

Armiento PV Solar Plant

Armiento PV Plant (Italy)

Size: 2 MWp, fix installation

Customer: Manesa

ABB Scope: EBOP/iICE

Year of commissioning:

EBOP/iICE: 2010

Customer needs

First class automation and electrical systems

Maximize plant performance and reliability

ABB response

ABB delivers a complete electrical solution

ABB applies an efficiency improvement system to maximize

the overall performance of the PV solar plant

ABB scope:

• Supply: structures, inverter centers, DC & AC cabinets,

transformers, switchgears, cabling, equipment housing,

protection equipment, MV connection line

• Installation: structures, inverter centers, DC & AC

cabinets, transformers, switchgears, cabling,

equipment housing, protection equipment, MV

connection line, PV modules electrical connection

Page 25: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 25

Iacovangelo PV Solar Plant

Iacovangelo PV Plant (Italy)

Size: 3.5 MWp, fix installation

Customer: Manesa

ABB Scope: EBOP/iICE

Year of commissioning:

EBOP/iICE: 2010

Customer needs

First class automation and electrical systems

Maximize plant performance and reliability

ABB response

ABB delivers a complete electrical solution

ABB applies an efficiency improvement system to maximize

the overall performance of the PV solar plant

ABB scope:

• Supply: structures, inverter centers, DC & AC cabinets,

transformers, switchgears, cabling, equipment housing,

protection equipment, MV connection line

• Installation: structures, inverter centers, DC & AC

cabinets, transformers, switchgears, cabling,

equipment housing, protection equipment, MV

connection line, PV modules electrical connection

Page 26: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 26

Inicorbaf PV Solar Plant

Inicorbaf PV Plant (Italy)

Size: 3 MWp, fix installation

Customer: Manesa

ABB Scope: EBOP/iICE

Year of commissioning:

EBOP/iICE: 2010

Customer needs

First class automation and electrical systems

Maximize plant performance and reliability

ABB response

ABB delivers a complete electrical solution

ABB applies an efficiency improvement system to maximize

the overall performance of the PV solar plant

ABB scope:

• Supply: structures, inverter centers, DC & AC cabinets,

transformers, switchgears, cabling, equipment housing,

protection equipment, MV connection line

• Installation: structures, inverter centers, DC & AC

cabinets, transformers, switchgears, cabling,

equipment housing, protection equipment, MV

connection line, PV modules electrical connection

Page 27: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 27

Cardonita PV Solar Plant

Cardonita PV Plant (Italy)

Size: 3.8 MWp, fix installation

Customer: Actelios

ABB Scope: Turnkey

Year of commissioning:

Turnkey: 2010

Customer needs

First class automation and electrical systems

Maximize plant performance and reliability

ABB response

ABB delivers a complete electrical solution

ABB applies an efficiency improvement system to maximize

the overall performance of the PV solar plant

ABB scope:

• Supply: structures, inverter centers, DC & AC cabinets,

transformers, switchgears, cabling, equipment housing,

protection equipment, MV connection line, PV modules

• Installation: structures, inverter centers, DC & AC

cabinets, transformers, switchgears, cabling,

equipment housing, protection equipment, MV

connection line, PV modules electrical connection

Page 28: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 28

Spinasanta PV Solar Plant

Spinasanta PV Plant (Italy)

Size: 6 MWp, fix installation

Customer: Actelios

ABB Scope: Turnkey

Year of commissioning:

Turnkey: 2010

Customer needs

First class automation and electrical systems

Maximize plant performance and reliability

ABB response

ABB delivers a complete electrical solution

ABB applies an efficiency improvement system to maximize

the overall performance of the PV solar plant

ABB scope:

• Supply: structures, inverter centers, DC & AC cabinets,

transformers, switchgears, cabling, equipment housing,

protection equipment, MV connection line, PV modules

• Installation: structures, inverter centers, DC & AC

cabinets, transformers, switchgears, cabling,

equipment housing, protection equipment, MV

connection line, PV modules electrical connection

Page 29: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 29

Sugherotorto PV Solar Plant

Sugherotorto PV Plant (Italy)

Size: 3.2 MWp, fix installation

Customer: Actelios

ABB Scope: Turnkey

Year of commissioning:

Turnkey: 2010

Customer needs

First class automation and electrical systems

Maximize plant performance and reliability

ABB response

ABB delivers a complete electrical solution

ABB applies an efficiency improvement system to maximize

the overall performance of the PV solar plant

ABB scope:

• Supply: structures, inverter centers, DC & AC cabinets,

transformers, switchgears, cabling, equipment housing,

protection equipment, MV connection line, PV modules

• Installation: structures, inverter centers, DC & AC

cabinets, transformers, switchgears, cabling,

equipment housing, protection equipment, MV

connection line, PV modules electrical connection

Page 30: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 30

Schinosa PV Solar Plant

Schinosa PV Plant (Italy)

Size: 1 MWp, fix installation

Customer: Actelios

ABB Scope: Turnkey

Year of commissioning:

Turnkey: 2010

Customer needs

First class automation and electrical systems

Maximize plant performance and reliability

ABB response

ABB delivers a complete electrical solution

ABB applies an efficiency improvement system to maximize

the overall performance of the PV solar plant

ABB scope:

• Supply: structures, inverter centers, DC & AC cabinets,

transformers, switchgears, cabling, equipment housing,

protection equipment, MV connection line, PV modules

• Installation: structures, inverter centers, DC & AC

cabinets, transformers, switchgears, cabling,

equipment housing, protection equipment, MV

connection line, PV modules electrical connection

Page 31: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 31

Mezos PV Solar Plant

Mezos PV Plant (France)

Size: 4.3 MWp, fix installation

Customer: Neoelectra

ABB Scope: Turnkey

Year of commissioning:

Turnkey: 2010

Customer needs

PV facility on a fish farm roof

Architectural integration allows higher feed-in tariff

Optimal solution due to tight surface limitations

ABB response

ABB delivers the complete plant in consortium with a panel

manufacturer

ABB applies an efficiency improvement system to maximize

the overall performance of the PV solar plant

ABB scope:

• Supply: inverters, DC & AC cabinets, transformers,

switchgears, cabling, equipment housing, system

optimization, control, SCADA

• Installation & civil works: inverters, DC & AC cabinets,

transformers, switchgears, cabling, equipment housing,

system optimization, control, SCADA, PV modules

Partner scope: PV modules (supply)

Page 32: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 32

Saint Julien PV Solar Plant

Saint Julien PV Plant (France)

Size: 1.6 MWp, fix installation

Customer: Neoelectra

ABB Scope: Turnkey

Year of commissioning:

Turnkey: 2010

Customer needs

PV facility on a fish farm roof

Architectural integration allows higher feed-in tariff

Optimal solution due to tight surface limitations

ABB response

ABB delivers the complete plant in consortium with a panel

manufacturer

ABB applies an efficiency improvement system to maximize

the overall performance of the PV solar plant

ABB scope:

• Supply: inverters, DC & AC cabinets, transformers,

switchgears, cabling, equipment housing, system

optimization, control, SCADA

• Installation & civil works: inverters, DC & AC cabinets,

transformers, switchgears, cabling, equipment housing,

system optimization, control, SCADA, PV modules

Partner scope: PV modules (supply)

Page 33: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 33

ABB Overview

Page 34: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 34

ABB in Power Generation

Wind

Fossil

Steam &

Gas

Turbines

Diesel

Solar

Hydro

Co-gen

Bio and

Waste-to-

Energy

Page 35: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 35

ABB in Solar PowerSolar Center of Excellence

Solar Power Organizational Structure:

Centre of Excellence (CoE) has been established in ABB Spain

The task is to closely follow the world market for photovoltaic plants > 1 MW

and solar thermal plants

The CoE provides worldwide support within ABB and leads global solar

R&D efforts

North and South America support offices:

Burlington, Ontario Canada

Wickliffe, Ohio U.S.

Page 36: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 36

ABB PVTurnkey solution

Page 37: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 37

General layout

INVERTERS

NETWORK MV

FOLLOWERFOLLOWER

FOLLOWER

MODULESMOTOR

STRUCTURE

FOLLOWER

TRANSFORMER

CENTER

LV/MV

SECURITY

SEGUIDOR

CONTRO

L

Page 38: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 38

Scope

Products and works

Cell and Photovoltaical module ( Customer or consortium )

Followers ( Outside purchase )

Inverters ( ABB )

Substations ( ABB )

Protections ( ABB )

Security access control ( ABB )

Supervisory control ( ABB )

REE dispaching protocol ( ABB )

Solar energy optimisation ( ABB )

Installation , erection and commisioning

Page 39: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 39

Contractual Setup – “option 1”

Developer

PV Module

Supplier

EQUIPMENT

-Tracker

including install

-Inverters

-Cable

-Misc

SERVICES

Installation and

Civil works

Contractor

Five year

maintenance

contract

ABB Inc

Specify

Modules

Technical and

Execution

support-

Coordination

Subcontracts

EQUIPMENT

-Transformers

-MV SWGR

-Inverters

-DC Combiner box

-Control / SCADA

-Substation Equip:

CB, DS, ES, SA,

CT/PT

SERVICES

Engineering and

Project

Management

EPC Contact

Module Supply

Page 40: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 40

PV power plant advanced control

RS20-0800 RS20-0800

RS20-0400Spider 5Tx

9PLC5

Fibra óptica

Multimodo

Cable

Cat5+

Cable

interior

armari

o

9PLC4

9PLC3

9PLC2

9PLC1

9PLC4

8PLC3

8PLC2

8PLC1

7PLC4

7PLC3

7PLC2 7PLC1

6PLC5

6PLC4

6PLC3

6PLC2

6PLC1

5PLC4

5PLC3

4PLC4

4PLC3

5PLC2

5PLC1

4PLC2

4PLC1

3PLC4

3PLC3

3PLC2

3PLC1

2PLC5

2PLC4

2PLC3

1PLC4

2PLC2

2PLC1

1PLC3

1PLC2 1PLC1

Master 2 Master 1

SAI

ON-LINE

ADSL

Page 41: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 41

ABB PV power plantAdvanced optimization system

Standard series and parallel

arrays of panels

A

A

A

Master DCS

Additional panels

A

V

Standard PV

power plant

underutilizes

inverter output

during off-peak

conditions

Optimization system

Page 42: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 42

ABB solar PV optimization systemU.S. Patent 12/495908, filed June 2009

Disminución de irradiancia debido a la posición horizontal

0.00

200.00

400.00

600.00

800.00

1000.00

1200.00

7:59 10:23 12:47 15:11Hora

Irra

dia

ncia

(W

/m2)

Page 43: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 43

Switching design

Page 44: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 44

High voltage DC switching system

Page 45: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 45

Dawn

Cloudiness Dawn - Nightfall

Red color area

production increase

ABB system optimizationPerformance

Page 46: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 46

PRODUCTION OPTIMIZATION

1 / 2 Axis sun Trackers …………… + 25 % to + 35 %

Panel flash report classification …. - 3,2 % to + 0,8 %

Dawn – Nightfall .…………………. + 1,1 % to + 1,4 %

Cloudiness …………………… + 0,7 % to + 1,1 %

Wind + Hail ………………………… + 0,05 % to + 0,1 %

Damages + Maintenance ………… + 0,2 % to + 0,3 %

Transformer + electrical …….…… + 0,4 % to + 0,6 %

Adding Panels ……………………. + 30 % to + 50 % ( additional power )

Dirt. ……. Will affect all parameters before.

When solar panels efficiency decrease by year this data become more relevant.

ABB System optimization

Page 47: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 47

Technical solution – Power Transformation centers Cont’d

ABB 2MVA transformers

500KW inverters

Secondary Combiner Box

ABB LV SWGR

Aux xfmr / dist boards

Control panel

SCADA Interface logger

Weather sensors

ABB Transformer Inverter

Page 48: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 49

Site construction

Page 49: ABB Solar Experience and Capabilities - CIGRE · Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning: DCS: 2010 ABB’s supply Distributed Control System (DCS): Power

© ABB Group March 19, 2009 | Slide 50