abbot point growth gateway project - environmental impact ... · 16/07/2015 16/07/2015 drawing...
TRANSCRIPT
C.Livingstone
DRAWING NUMBER
CHECK
DRAFTING
REV
DRAWN
ENGINEER
PROJECT MGR
APPROVED
CHECK
ENGINEERING
DATUM
NOTES
REV DATE AMENDMENT
APP
DRN
CJL
ORIG SIZE
A1 ARCHIVE
MAP GRID OF AUSTRALIA BASED ON GDA 94, ZONE 55
VERTICAL
HORIZONTAL BebbCart
CLIENT
PROJECT
TITLE
A
G.Bebbington
BMT JFA-275_03-00-03A.DGN
SCALE 1 : 10000
100 0 1000
METRES
LAT BASED ON PM 66022 (RL 8.740m LAT)
T0 DREDGING
7800000 m
N
7802000 m
N7802000 m
N
7804000 m
N7804000 m
N
612000 mE612000 mE
614000 mE614000 mE
7800000 m
N
16/07/15
16/07/2015
16/07/2015
LAT
MLWS
MLWN
MSL
MHWN
MHWS
HAT
0.00m
0.67m
1.30m
1.69m
2.07m
2.70m
3.60m
(QUEENSLAND TIDE TABLES 2015)
ABBOT POINT
TIDAL PLANES
BMT JFA 275.03-00-03
(INDICATIVE)RETURN PIPELINE
SITE LAYOUT
GENERAL ARRANGEMENT
LEGEND
PROPOSED CULTURAL HERITAGE AVOIDANCE AREA
INDICATIVE RETURN PIPELINE ROUTE
INDICATIVE DELIVERY PIPELINE ROUTE
A
16/07/2015
16/07/2015
ABBOT POINT GROWTH GATEWAY
DEPARTMENT OF STATE DEVELOPMENTH.Sunarko
T.GreenISSUED FOR APPROVAL
CONTAINMENT PONDS
DREDGED MATERIAL
AERIAL PHOTOGRAPHY 20131.
2.
3.
4.LOCATION OF EXISTING FEATURES TO BE CONFIRMED ON SITE
5.CULTURAL HERITAGE AREA PROVIDED BY DSDIP 19/12/2014
ISSUED FOR APPROVAL
NOT FOR CONSTRUCTION
(LOCATION TBC)AREA (100m x 100m)
NOM. PIPE LAYDOWN
AND PIPE LAYDOWN AREA.
RETURN WATER PIPELINES, DREDGED MATERIAL CONTAINMENT PONDS
SITE OF WORKS INCLUDES TOTAL DREDGING EXTENTS, DELIVERY AND
DREDGING & DREDGED MATERIAL PLACEMENTSPECIFICATION (
DRAWINGS TO BE READ IN CONJUNCTION WITH THE TECHNICAL
Contract No. DSD-3221-15a)
SHORE CROSSINGAND RETURN PIPELINEALTERNATE DELIVERY
PUMP STATION
ALTERNATE INDICATIVE RETURN PIPELINE ROUTE
(INDICATIVE)DELIVERY PIPELINE
7798000 m
N7798000 m
N
ALTERNATE INDICATIVE DELIVERY PIPELINE ROUTE
LAYDOWN AREASITE OFFICE AND
SOIL STOCKPILE AREA
-17.0
-18.0
-17.5
-18.5
-16.5
-16.0
-15.5
-15.0
-16.0
-17.0
-18.0
-17.5
-17.5
-18.0
-18.5
-17.5
C.Livingstone
DRAWING NUMBER
CHECK
DRAFTING
REV
DRAWN
ENGINEER
PROJECT MGR
APPROVED
CHECK
ENGINEERING
DATUM
NOTES
REV DATE AMENDMENT
APP
DRN
CJL
ORIG SIZE
A1 ARCHIVE
MAP GRID OF AUSTRALIA BASED ON GDA 94, ZONE 55
VERTICAL
HORIZONTAL BebbCart
CLIENT
PROJECT
TITLE
A
T0-01
T0-11
T0-10
T0-09
T0-08
T0-07
T0-06
T0-05
T0-04
-18.5m LAT
DESIGN
-21.0m LAT
DESIGN
500
RPOINT
T0-11
T0-10
T0-09
T0-08
T0-07
T0-06
T0-05
T0-04
T0-03
T0-02
T0-01
-18.5
-18.5
-18.5
-18.5
-21.0
-21.0
-21.0
-21.0
-18.5
-18.5
-18.5
RL (m LAT)
SETOUT POINTS
615021.0
614538.0
614224.0
614154.0
614150.0
614193.0
615075.0
615123.0
615131.0
615741.0
615341.9
7804004.0
7803916.0
7804024.0
7803822.0
7803811.0
7803722.0
7803417.0
7803475.0
7803486.0
7804237.6
7804271.0
EASTING (m)NORTHING (m)
LAT BASED ON PM 66022 (RL 8.740m LAT)
A
B
C
D
E
SCALE 1 : 2500
50 0 200
METRES
BMT JFA-275_03-01-01B.DGN
23/06/15
14/07/2015
14/07/2015
7803500 mN 7803500 mN
7804000 mN 7804000 mN
614000 m
E614000 m
E
614500 m
E614500 m
E
615000 m
E615000 m
E
615500 m
E615500 m
E
1029.4m
T0-03
BMT JFA 275.03-01-01
933.2m
70.4
m
T0-02
1056.9
m
213.8
m
SETOUT
T0 DREDGING
349.3m
B
LAT
MLWS
MLWN
MSL
MHWN
MHWS
HAT
0.00m
0.67m
1.30m
1.69m
2.07m
2.70m
3.60m
DEPARTMENT OF STATE DEVELOPMENT
ABBOT POINT GROWTH GATEWAY
INITIAL ISSUE
H.Sunarko
14/07/2015
G.Bebbington
T.Green
CJLB ISSUED FOR APPROVAL
1.
2.ALL DESIGN BATTERS ARE 1:5
3.DREDGE SETOUT FROM ADANI DRG. BRM202-DW-MN-GEN-0002 REV2
4.
5.LOCATION OF EXISTING FEATURES TO BE CONFIRMED ON SITE
6.NO BOX CUTS PERMITTED FOR BATTER BETWEEN T0-05 to T0-06
(REFER DRG No. BMT JFA 275.03-03-01 FOR MORE DETAILS)
HYDROGRAPHIC CONTOURS (0.5m INTERVAL) FROM COMBINED SURVEY
01-02
01-02
01-02
01-02
01-02
ISSUED FOR APPROVAL
NOT FOR CONSTRUCTION
DREDGING & DREDGED MATERIAL PLACEMENTSPECIFICATION (Contract No. DSD-3221-15a)
DRAWINGS TO BE READ IN CONJUNCTION WITH THE TECHNICAL
14/07/15
(QUEENSLAND TIDE TABLES 2015)
ABBOT POINT
TIDAL PLANES
14/07/2015