abdullah nadar tubitak-bilten ankara/turkey

46
A Specific application of SCADA (Supervisory Control And Data Acquisition): Feeder Automation System for Medium Voltage Distribution Networks of Istanbul Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

Upload: greg

Post on 12-Jan-2016

52 views

Category:

Documents


0 download

DESCRIPTION

A Specific application of SCADA (Supervisory Control And Data Acquisition): Feeder Automation System for Medium Voltage Distribution Networks of Istanbul. Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY. TUBITAK-BILTEN. TUBITAK : The Scientific and Technical Research Council of Turkey. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

A Specific application of SCADA (Supervisory Control And Data Acquisition):

Feeder Automation System for Medium Voltage Distribution Networks of Istanbul

                                                               

Abdullah NadarTUBITAK-BILTENAnkara/TURKEY

Page 2: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

TUBITAK-BILTEN

TUBITAK : The Scientific and Technical Research Council of Turkey

BILTEN : Information Technologies and Electronics Research Institute

Page 3: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

It was founded in 1985 works on numerous national projects funded by industry and the public sector as well as many international joint research projects in the fields of information technologies and electronics.

The organization consists of 12 different research groups and 210 personnel. 120 personnel are highly qualified full-time engineers.

TUBITAK-BILTEN

Page 4: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

TUBITAK-BILTEN12 Project Groups

• Applied Software Development Group• Communication Systems Group• Electronic System Design Group• Information Society Policies, E-Commerce and Inf.Security Group• Intelligent Energy Conversation Group• Internet and Multimedia Technologies Group• Organization, Information and Project Monitoring Group• Power Electronics Group• Hardware Development & Power System Group• Satellite Technologies Group• Signal Processing and Remote Sensing Group• VLSI Design Group

Page 5: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

• SCADA (Supervisory Control and Data Acquisition) Main Projects:

• MV Electricity Distribution Master Plan of Istanbul City• Fider Otomation Project for Istanbul Electricity Distribution

• Power Systems Capability:• To perform the analysis of electricity generation,

transmission and distribution systems. • To use PSS/E “Power System Simulator for Engineers”,

ATP “Alternative Transient Program”, EMTP “Electro Magnetic Transient Program”

TUBITAK-BILTEN Hardware Development and Power Systems Group

Page 6: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

TUBITAK-BILTEN Hardware Development and Power Systems Group

• Some Projects of Power Systems• Sub-Synchronous Resonance (SSR)

Analysis for Adapazari-Gebze NGCC (1999) and Iskenderun Power Plants (2001)

• Feasibility and Evaluation Study of Electricity Interconnection of Turkey with Balkan Pool and UCTE (2000) and Primer Frequency Control Performance Tests and Network Frequency Analysis (2003)

• High Power Transmision Lines Over Voltage Swiching Analysis for Turkey-Georgia (2004)

• Performance Tests and Network Frequency analysis of Power Plants (2004)

Page 7: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

The specific application of SCADA for European side of Istanbul Mid-Voltage (MV)

Distribution Network

Feeder Automation System

Page 8: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

Why did we need “Feeder Automation System”?

The utility decide to only 34.5 kV MV distribution instead of the two Mid-Voltage levels, 34.5 kV and 10.5 kV, which are used in Istanbul’s distribution network to be purified due to the losses of two times transformation, difficulties in operation, and increase in costs.

Page 9: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

Why did we need “Feeder Automation System”?

•The 34.5 kV MV distribution able to serve three times more power for the same crossectional area of 10.5 kV underground cable.• Easily operated ring system• But, there was a disadvantages as; Three times more subscribers are effected if a fault occurs.

Page 10: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

Why did we need “Feeder Automation System”?

Solution:

“Feeder Automation System”

Page 11: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

System Components can be classified into three groups:

1.      Data Collection

2.      Remote Control

3. Fault Identification and De-energization

Feeder Automation

Page 12: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

Data Collection

• Collects Data and DigitizesCollects Data and Digitizes

• Transmits Data via Fiber Optic Cables Transmits Data via Fiber Optic Cables

• Regional Control Center Gets the DataRegional Control Center Gets the Data

Page 13: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

RTU TypesRTU Types

• DTTU: (Distribution Transformer Terminal Unit) used in Distribution Stations.

• LETU: (Line End Terminal Unit) used in Switching Stations.

• STU: (Substation Terminal Unit) Substation’s remote terminal units.

• CCTU: (Control Centre Terminal Unit) used in Control Centre.

Page 14: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

Network ArchitectureNetwork Architecture

Work Station Control Center

CCTUCCTULoop

STU STU

STU Loop STU Loop

LETU

LETULETU LETU

LETU

LETU

DTTU DTTU

DTTU

DTTUDTTU

DTTU

DTTU

Page 15: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

Data Collection

• Distribution TransformerDistribution Transformer• LV Fuse On/Off PositionLV Fuse On/Off Position• Loadbreak Switch On/Off PositionLoadbreak Switch On/Off Position• Buckholz RelayBuckholz Relay• Thermometer RelayThermometer Relay• Thermic RelayThermic Relay

Page 16: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

A Sample Distribution Transformer Centre

Page 17: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

Remote Control

Page 18: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

Remote Control

• Distribution Transformers

• Loadbreak Switches

• 154/34.5 kV Substations

• Circuit Breakers

Page 19: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

Communication Network Structure

Page 20: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

Automatic Fault Detection and Isolation

• Fault on feeder or distribution transformer• Is detected,• Exact position is found,• Position of fault is isolated

automatically by open and close actions• Position of fault and isolation actions

are sent to control centre in order to be followed by operators.

Page 21: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

• Due to wish of operator the non-energised feeders are energised again; • Completely automatic• semi-automatic(some part by system,

the other by operator• completely by the operator (manually)

Automatic Fault Detection and Isolation

Page 22: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

LETUDTTU

DTTU DTTU

DTTU

DTTU

DTTUDTTUDTTU

LETU

DTTU

154/34.5 kV

154/34.5 kV

Fiber Optic Cable

Automatic Fault Detection and Isolation

Page 23: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

CB

154/34.5 kV

154/34.5 kV

CB

34.5/0.4 kV

Automatic Fault Detection and Isolation

Page 24: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

CB

154/34.5 kV

154/34.5 kV

CB

34.5/0.4 kV

Automatic Fault Detection and Isolation

Page 25: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

CB

154/34.5 kV

154/34.5 kV

CB

34.5/0.4 kV

Automatic Fault Detection and Isolation

Page 26: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

CB

154/34.5 kV

154/34.5 kV

CB

34.5/0.4 kV

Automatic Fault Detection and Isolation

Page 27: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

CB

154/34.5 kV

154/34.5 kV

CB

34.5/0.4 kV

Automatic Fault Detection and Isolation

Page 28: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

Alternative Communication Types For DAS

• Some examples of communication methods for a distribution automation system;• Power line carrier(PLC)• Telephone lines• GSM lines • Communication by radio frequency• Fiber optic cables

• Since Fiber optic cable and power cable installation made together, the fiber optic was chosen for the communication system.

Page 29: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

Other Choosing Reasons

• Do not suffer from the electromagnetic env.s.

• Supplies wide bandwidth.

• Do not suffer from lightning.

• No need for licence.

• No cross talk problem.

• Minimised dimensions

• No danger of fire when short circuited.

Page 30: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

Regional Control Centre Requirements

• Remote Control using select-before-operate,

• Remote Control using direct-operate,

• Automatic fault isolation within at most 1 minute time interval,

Page 31: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

• Monitoring of fault locations in the Control Centre,

• Monitoring of any change-of-status events by the Control Centre.

Regional Control Centre Requirements

Page 32: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

Regional Control Centre Responsibilities

• Records the events with time occurrence,• Interacts with other computer networks,• Runs programs as Energy Management

System (EMS) and Distribution Management System (DMS).

Page 33: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

Regional Control Centre

Page 34: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

Regional Control Centre Operator

• Control Centres are controlled by the experienced operators,• Should know the Distribution System as

a whole,• Should know the Control Centre

Software,• Regional Control Centre is a Man Machine

Interface between the operators and the Distribution System.

Page 35: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

Regional Control Centre Summary

• Regional Control Centre is a place in which all data is :• collected;• recorded;• edited;• analysed;• and displayed• by control of operators.

Page 36: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

Regional Control Centre MMI

• Feeder DiagramsFeeder Diagrams

Page 37: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

• Inside of a substationInside of a substation

Regional Control Centre MMI

Page 38: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

Regional Control Centre MMI

Page 39: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

The Application

• By considering that this system is an feeder automation system, it is the first and only.

• The time taken to find the place of a fault is not more than 40 sec.

• The system is in usage at Istanbul Levent, Yeni Bosna and Sagmalcilar Regional distribution networks.

• Now system running on about 400 trasformer centers totally at Istanbul.

Page 40: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

The Application

Page 41: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

93603B00

91193B01

96443AAA

93733B02

91543A9D

380907D5

HÜRRIYETTEPESI

93633B04

90183C12

150 mm

CENDERE

Levent-BKM FIDER OTOMASYON SEMASITÜD SIS

91223C08

96453C09

96513C0A

91283C07

90303C0C

91533C0D

96333C0E

91173C0F

90023C10

93443C11

A3E83

90833AA2

90843AA1

91733A9E

91713A9F

93203B07

90053B06

91913AA0

91333B05

TARIH

83F212

83ED2

2

9334

K

9336

K

150 mm83E8

1

2

K

3

2

90063C13

91523C14

93393C16

96383C17

93483C18

94373AA4

93273C00

91853AA3

C0C8A0FA3

LEVENT

E0C8

1 80CD2

2150 mm

K

9201K

MG

95223C01

96353AA5

95263C02

91303AA6

PKMG

P

P

90773AA9

90273AA8

90433C03

90733C04

93583B03

390407DA

345407DE

351207DD

346407DC

G

399807DB

371807D8

389707D9

383307D7

387307D6

33120902 3990

07F2381607EA

ALIBEYKÖY

93873C06

93823C05

90103A98

91443A99

93333B09

96653A9A

91483A9B

90243A9C

92063B08

34.5 kV Kablo

Fiber Optik Kablo04/ 05 / 2004 Enerjisiz Bina Tipi Yeni Merk.Mevcut Kösk Tipi Merkezler

Mevcut Merkezler

317807E8

PK

382907E9

379507E6

385707E7

359707E5

318607E4

93983B0A

ARNAVUTKÖY

Otomasyona Alinmayacak Merkezler

150 mm

357407F5

392207F4

384507F3

358680E1

1

83F7

150 mm

1

2

2

363707E3

2

ETILER

A0C8

332207ED

32810801

306607EB

390607EC

G

G

32380903

390507EE

2150 mm

342107EF

80D22

348907D3

379307D4

G

384207D2

31770900

330107D0

356907D1

32890800 150 mm

80C82

2

3

33570802

363907F1

32840803

392907F0

383007DF

351307E0

340407E1

3263

32040901

K

G

2150 mm

3939

80D711

2

G

393907E2

150 mm

150 mm1

80DC

80E61 12

2

1

2

2

2

9353

Enerjili Bina Tipi Yeni Merk.

9178

93763C0B

95633C15

83F82

1

2

83F3

1

2

1

1

1

1

9335

150 mm 2

95813C19

3748

The Application – Levent RCC

Page 42: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

69636F3

1800936F4

51036F136F0

28436F2681

BAGCILAR GIS

8BEA 8BEF

AC1C 8BE58BBD

YENIBOSNA SALT

8BC88BC0

ABB8

8BE0

CBB8

8BC3 8BC4

36E931002

31037

314643713

314843714

31140

3100936CA 36C9 36C8

31838 3155136C53101631477

36C7 36C631010 31017

380131016-A 31015

36C4310943802

3102136C3

31046 3103236CC

3100636CD

3100536CE

3101236CF

13336D0

126370E

3717852

36DF125838

3716584

36E1 36E0451

36DE851

381A053

36DD207677

36E2428

36E3

850

13636EF

1859736EE

76436ED

6347993709

1856436EC

185901854636EB

18601370A

1850436EA

18589370B18701

8BEC18008

370418594

36BA18543

36B918539

36B818574

36B718534

370C18567

36B618578

36B518507

36B418531

36B318530

36B2073

36B1674 061

18553

18624

36BB

186173712

36CB3100731570

3710

31507370F

1859536BC

18619 1854036BD

1857036BE

1852336BF

31055 3156536C0

313293711

3141536C1

3184236C2

31022

31023

31039

31024

36B0837

12436D1

55236D2

36D3014

36DC618

61536DA

23836DB

52636D4525

3800006

36D5005

619381B

680381C

639381D8BCB

8BB3

8BDB

AC4E

8BD9 8BCC

8BD6

KÜÇÜKKÖY

ABEA

8BB8

497

610370D

36D936D8711068

36D7

EBB8

BAHÇELIEVLER GIS

8100 D.M.

050

F 23 F 22 F 21

36F518011

370818030

36F618023

36F71801518016

36F818018

36F918043

36FA1803318060

36FB18020

36FC18556

370718525

36FD18586

36FE18563

36FF18512

370018557

370118513

370218545

370518604

370618568

(iST.EVLERi)

36E831001 31479

36E7417

380B485

36E6813

36E5013

3715021

36E4548

380C548-A 549

PPP

MG MGG

MGMG

MGG

GMG

MG

MGMG

MG

MG

MG

MG36D6027

Fiber Optik Kablo

34.5 kV KabloHavai HatMevcut Merkezler

Enerjili Bina Tipi Yeni Merkezler (2)Enerjisiz Yeni Merkezler (1)

Kösk Tipi MerkezlerOtomasyona Alinan Bina Tipi Yeni Merkezler (1)TARIH 22 / 08 / 2003Yenibosna-BKM FIDER OTOMASYON SEMASITÜD SIS Otomasyona Alinan Kösk Tipi Yeni Merkezler (1)

2

1 2

3

2

1

1

1

1

2 2

3

1

1

1 11

2

2 2 2

23

1

1

1

1

1

1

1

1

2

2

2 2

2

2 2

3

1

2

F 22

F 23

F 21

DIREK

8BD18BD012

41 3

18623

2

2

1

1

2

3

2

150 mm 2

150 mm 2 150 mm 2 240 mm 2

150 mm2

150 mm2

240 mm 2 240 mm 2

240 mm 2

240 mm 2

240 mm 2150 mm2

150 mm 2

240 mm2

240 mm2

150 mm2

150 mm2

150 mm2

150 mm2

240 mm2

240 mm 2

712

3910

390F

3911

3914

3913 3912

39153916

3908

3909

390A

390B390C390D

390E

3900

39043902 39033901

3907507

39055093906

AAK

MG

MG RMUMG

K

K

KMGMG

RMU

MG

AA

808

031

805

KEMER SALT18100 I.M.

18034

18218

18280 180171821718254 18065 18019

18063 18796

Otomasyona Alinan Bina Tipi Yeni Merkezler (2)Otomasyona Alinan Kösk Tipi Yeni Merkezler (2)

Enerjili Yeni Kösk Tipi Merkezler (2)

P

P

P P P P P

DAVUTPASA18066

150 mm 2150 mm 2

391B 391C 391D 391E 391F 3920 3921391A

3919

3918 3917

8BED 8BEB

The Application – Y.Bosna RCC

Page 43: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

8DB6 8DB182250FB4

82260FB3

82800FB2

80290FB1

80450FB0

84150FAF

87710FAE

87400FAD

80350FA0

80360FC0

80780FA1

87870FA2

87620FA4

87910FA5

88160FA6

88950FA7

84230FA8

82860FA9

87810FAA

88940FAB

88070FAC

2 1 12

SAGMALCILAR

G

G

GG

Fiber Optik Kablo

34.5 kV KabloTARIH

Sagmalcilar-BKM FIDER OTOMASYON SEMASITÜD SIS

ADAC

1

3

CDAC2

3 1

EDAC

2

8DBB1

18DAC

2

2

82330FC1

MALTEPE

240 mm2

240 mm2

2240 mm

240 mm2

80810FD4

88260FD5

87460FD6

84200FD0

84240FD1

87540FD2

87530FD3

K

K

17 / 11 / 2003 Mevcut Bina Tipi Merkezler

Mevcut Kösk Tipi Merkezler

The Application – Sagmalcilar RCC

Page 44: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

Results

• To control the consumption of the electric energy and to handle effective usage of the energy.

• Quick and easy fault detection, isolation and energising again.

• Automatic or operator controlled isolation.• Remote control ability with open/close

function for the operator at control center.

Page 45: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

Conclusions

• When completed, this system is going to provide to the utility the following benefits:

• Improved customer service and system reliability through reduction in duration of power-off,

• Reduced manual sectionalizing expenses in system switching operations,

• Improved utilization of available substation transformer and distribution line capacity,

• Improved circuit, deciding for better planning, design and operations.

Page 46: Abdullah Nadar TUBITAK-BILTEN Ankara/TURKEY

Thanks for your attention ...Thanks for your attention ...