Abhay Kumar Singh,
Executive Director, NHPC Limited.
1
NHPC Limited.
![Page 2: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/2.jpg)
2
![Page 3: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/3.jpg)
NHPC PROFILE
3
Year of Establishment 1975
Authorized Share Capital Rs. 150000 million
Power Stations in Operation 24 (7071.2 MW)22 (5551.2 MW) - NHPC2 (1520 MW) - NHDC (JV)
Projects under Construction 6 (4934 MW)
Power Stations Commissioned on Deposit/Turnkey Basis- Completed outside India- Completed within India
5 (89.35 MW)2 (74.10 MW)3 (15.25 MW)
Projects under Clearance 13 (8211 MW)
Projects under Survey and Investigation stage 2 (1079 MW)
![Page 4: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/4.jpg)
7071.2* MW
2810 +2124 (JV)
= 4934 MW
8211 MW
1079 MW
POWER STATIONS
Hydro-22 (6971.2MW)+
Wind-1 (50 MW)+
Solar-1 (50 MW)
PROJECTS UNDER
CONSTRUCTIONHydro - 2 (2800 MW)
RE – 1 (10 MW)+
Pakal Dul (1000 MW)**Kiru (624 MW)**
Teesta VI (500 MW)***
PROJECTS UNDER CLEARANCE
Hydro – 11 (8171MW)RE – 2 (40 MW)
PROJECTSUNDER S&IHydro – 2
TOTAL = 21295.20 MW• Including JV Mode (1520 MW)
• ** CVPP ( subsidiary)
• *** LTHPL (fully owned subsidiary)
NHPC PROFILE
4
![Page 5: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/5.jpg)
❖ 24 POWER STATIONS
• HYDRO – 22
• WIND – 01
• SOLAR – 01
❖ 6 PROJECTS UNDER
CONSTRUCTION
• HYDRO – 05
• SOLAR – 01
❖ PROJECTS UNDER
CLEARANCE
• HYDRO – 11
• RE – 02
❖ 02 PROJECTS UNDER S&I
❖ 05 PROJECTS COMPLETED
DEPOSIT/TURNKEY BASIS
POWER MAP OF NHPC
5
![Page 6: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/6.jpg)
6
NHPC PROJECTS PORTFOLIO
![Page 7: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/7.jpg)
7
![Page 8: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/8.jpg)
8
![Page 9: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/9.jpg)
9
➢ NHDC Ltd. – JV with Govt. of Madhya Pradesh
➢Loktak Downstream Hydroelectric Corporation Ltd. – JV
with Govt. of Manipur
➢Bundelkhand Saur Urja Limited – JV with Uttar Pradesh
NEDA.
➢Chenab Valley Power Projects (P) Limited – JV with JKSPDC
and PTC India Limited.
➢ National High Power Test Laboratory (P) Limited – JV with
NTPC, PGCIL, CPRI and DVC
➢Lanco Teesta Hydro Power Limited – Wholly owned
subsidiary of NHPC for Teesta VI Project (500 MW) in Sikkim.
Current JV Companies
![Page 10: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/10.jpg)
10
NHPC Key Capabilities
➢ Planning, Investigation, Design & Engineering and execution of Hydroelectric Projects from concept to commissioning
➢ Operation, Maintenance, Renovation and Modernization of all types & sizes of hydro plants
➢ Execution of underground works in any type of geological conditions.
![Page 11: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/11.jpg)
11
![Page 12: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/12.jpg)
12
EXPERTISE IN RCC DAM CONSTRUCTION
![Page 13: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/13.jpg)
13
![Page 14: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/14.jpg)
14
![Page 15: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/15.jpg)
15
PROJECTS RECENTLY
COMMISIONED
![Page 16: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/16.jpg)
KISHANGANGA HE PROJECT(330MW)
330 MW Kishanganga HE Project Dedicated to Nation on 19th
May 2018 by Hon’ble Prime Minister of India 16
![Page 17: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/17.jpg)
KISHANGANGA HE PROJECT(330MW)
Hon’ble Minister of State (I/C) for Power and New & Renewable Energy
delivering welcome address on 19th May 2018 on dedication to Nation NHPC’s
330 MW Kishanganga HE Project (J&K)17
![Page 18: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/18.jpg)
KISHANGANGA HE PROJECT(330MW)
View of Power House at Bandipora (J&K)18
![Page 19: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/19.jpg)
KISHANGANGA HE PROJECT(330MW)
DAM & RESERVOIR AT GUREZ (J&K)19
![Page 20: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/20.jpg)
Mangdechhu HE Project (720 MW), Bhutan
NHPC had prepared the DPR and provided Design and Engineering
consultancy services for implementation of Mangdechhu HEP in Bhutan. 20
![Page 21: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/21.jpg)
Mangdechhu HE Project (720 MW), Bhutan
NHPC had prepared the DPR and provided Design and Engineering
consultancy services for implementation of Mangdechhu HEP in Bhutan. 21
![Page 22: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/22.jpg)
SOLAR POWER PROJECT, TAMIL NADU (50MW)
Project Commissioned in March 2018 22
![Page 23: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/23.jpg)
SOLAR POWER PROJECT, TAMIL NADU (50MW)
23Project Commissioned in March 2018
![Page 24: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/24.jpg)
24
PROJECTS UNDER CONSTRUCTION
![Page 25: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/25.jpg)
DAM D/S VIEW
PARBATI-II HE PROJECT(800MW)
25
![Page 26: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/26.jpg)
POWER HOUSE – OUTSIDE VIEW
PARBATI-II HE PROJECT(800MW)
26
![Page 27: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/27.jpg)
POWER HOUSE - INSIDE VIEW
PARBATI-II HE PROJECT(800MW)
27
![Page 28: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/28.jpg)
VIEW OF DAM
SUBANSIRI LOWER HE PROJECT(2000MW)
28
![Page 29: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/29.jpg)
HEAD RACE TUNNEL
SUBANSIRI LOWER HE PROJECT(800MW)
29
![Page 30: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/30.jpg)
POWER HOUSE
SUBANSIRI LOWER HE PROJECT(2000MW)
30
![Page 31: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/31.jpg)
SUBANSIRI LOWER HE PROJECT (2000MW)
POWER HOUSE BACK HILL SLOPES RESTORED31
![Page 32: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/32.jpg)
DOWNSTREAM PROTECTION WORK
SUBANSIRI LOWER HE PROJECT (2000MW)
32
![Page 33: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/33.jpg)
SUBANSIRI LOWER HE PROJECT (2000MW)
DOWNSTREAM PROTECTION WORK33
![Page 34: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/34.jpg)
SUBANSIRI LOWER HE PROJECT (2000MW)
DOWNSTREAM PROTECTION WORK34
![Page 35: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/35.jpg)
Projects Under Construction in
Joint Venture (CVPPPL)
35
![Page 36: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/36.jpg)
PAKAL DUL HE PROJECT(1000MW)
Foundation stone laid by Hon’ble PM Shri Narendra Modi on 19th May 201836
![Page 37: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/37.jpg)
PAKAL DUL HE PROJECT(1000MW)
Construction of Main Access Tunnel (MAT) to Power House completed37
![Page 38: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/38.jpg)
PAKAL DUL HE PROJECT(1000MW)
38Right Side slashing at PH cavern in progesss
![Page 39: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/39.jpg)
PAKAL DUL HE PROJECT(1000MW)
39
Excavation of Adit to HRT 2 in progess
![Page 40: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/40.jpg)
CONSULTANCY SERVICES
40
Major assignments in India and
neighboring countries like Bhutan,
Myanmar, Tajikistan and Ethiopia
![Page 41: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/41.jpg)
CONSULTANCYSome of the important fields of expertise of NHPC are hereunder;
➢ River Basin Studies DPR stage
➢ Detailed Survey & Investigations
➢ Design & Engineering of
a) Tunnels (DBM/TBM)
b) Large Dams of Concrete/RF/CFRD
c) Underground Power House etc.
➢ Cost Engineering
➢ Tendering for the Civil / Mechanical /Electrical works
➢ Environmental Impact Assessment & Environmental Management Plans
➢ Equipment Planning & Management
➢ Construction Planning & Management
➢ Quality Control & Assurance
➢ Testing & Commissioning
➢ Operation & Maintenance
➢ Renovation, Modernization & Uprating (RM&U) of Hydropower Stations
➢ Dam Safety
![Page 42: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/42.jpg)
42
➢ DEVIGHAT H.E. PROJECT (completed in
1984 in a record time of 3.5 years)
➢ NUWAKOT Rural Electrification covering 64
villages one year ahead of schedule
➢ NHPC Signs MOU with HIDCL Nepal for Joint
Hydro Development
➢ NHPC studying development of Garba
Tawaghat HE Project (630 MW on Kali river
near existing NHPC Project Dhauliganga)
![Page 43: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/43.jpg)
43
➢ Declaring all Hydro as Renewable Energy Source
➢Hydro Purchase obligation (HPO) as a separate entity within Non
Solar Renewable Purchase Obligation (RPO)
➢Tariff rationalization to bring down tariff by increasing project life
to 40 years
➢Budgetary Support for Flood Moderation / Storage Hydro Electric
Projects.
➢Budgetary Support to cost of enabling infrastructure i.e; roads,
bridges.
NEW INITIATES OF GOI FOR HYDRO DEVELOPMENT
![Page 44: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/44.jpg)
44
New model in Hydro Development in India
➢ Initiatives of GOI :
New Hydro policy ( RE / life etc )
Funding for Infrastructure/ flood moderation
➢ Initiates of State Govenments :
Waiver / deferral of Free Power
Exemption of state taxes
Looking Hydro Projets as Drivers of local / national Growth ( Make
in Country Initiative )
![Page 45: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/45.jpg)
45
![Page 46: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/46.jpg)
Major CSR Initiatives - Healthcare
46 46
❑ Spandan-Deployment of Mobile Medical Units in rural areas
• SPANDAN, a healthcare outreach programme,
• Deployed 20 Nos. Mobile Medical Units (MMU)/Vans in rural areas
during FY 2016-17 & FY 2017-18. District covered Dhemaji,
Lakhimpur, Sonitpur, Majuli & Biswanath
• NHPC has spent Rs. 11.86 Crores during FY 2016-17 (Rs. 6.43 Crore) &
FY 2017-18 (Rs. 5.43 Crore).
• During FY 2018-19, 10 No. MMUs deployed for Dhemaji, Lakhimpur &
Majuli
• During FY 2018-19, NHPC has spent Rs. 84.50 Lakh up to 27.07.2018.
• Beneficiaries are approx. 6 Lakh
![Page 47: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/47.jpg)
Major CSR Initiatives - Healthcare
47
▪ Augmenting Healthcare services by means of providing
Ambulances to District Hospitals of Faridabad, Sikkim &
Darjeeling
▪ Organizing Medical Camps
▪ Augmentation of healthcare infrastructure (Pathology Labs &
other Equipment)
▪ Cochlear Implant Surgery of Hearing Impaired children
![Page 48: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/48.jpg)
Major CSR Initiatives – Drinking WaterProviding Safe Drinking Water Facilities in Rural Areas - ‘Kalash’
• MoU signed for 1620 locations with local bodies/ management
committees for implementation of the scheme in rural areas of Dhemaji,
Lakhimpur, Biswanath and Majuli districts in the state of Assam.
• Work has been completed at all 1620 locations.
• Total expected beneficiary from the scheme is 10 Lakhs approx.
• Expenditure incurred till date Rs. 14.55 Crores
48
![Page 49: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/49.jpg)
Major CSR Initiatives – Drinking Water
49 49
Providing RO Based
Drinking Water &
Sanitation Complex
• 1000 LPH RO Plant with
estimated cost of Rs. 28.5 lakhs
each catering to around 300-400
families on daily basis at ten
locations.
• The facility has Sanitation
Complex & RO Plant.
• 10 No. RO Cum Sanitation
Complexes have been completed
at different places
• During 2017-18, a sum of Rs.1.60
Crore has been spent towards this
scheme.
![Page 50: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/50.jpg)
❑ Hydro Engineering College at Bilaspur, Himachal Pradesh (H.P.)
• Rs. 37.5 Crore was contributed for setting up of the Hydro EngineeringCollege at Bilaspur, Himachal Pradesh during FY 2016-17.
❑ Darjeeling Engineering College, Takdah, Darjeeling, West Bengal
NHPC has contributed 13 Crore for establishment of DarjeelingEngineering College
Main Building of Darjeeling Engineering College, Takdah is underconstruction .
Major CSR Initiatives-Education
50
![Page 51: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/51.jpg)
Major CSR Initiatives-Education• 13 nos. ITIs adopted by NHPC(J&K-7 nos,Uttarakhand-4 &
Arunachal-2).
• Rs. 2.02 Crore spent towards various up-gradation activities of ITIs
during 2014-18.
• Contributed 4.50 Cr. for infrastructural developmental works of ITI,
Chandey in Sikkim.
• Vivekanand Kendra Vidyalaya was constructed in Kolaptukar,
Subansiri Lower District, Arunachal Pradesh. Rs. 9.65 Crore has
been spent so far. Currently around 133 students are studying in the
School.
51
![Page 52: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/52.jpg)
5252
Skill Development Initiatives
• For 3500 nos. unemployed youth
completed
• MoU with CIDC (Construction
Industry Development Council) and
NSDC (National Skill Development
Corporation) with F.I. of Rs. 8.68
Crore
• Area of Coverage - Arunachal
Pradesh, Assam, Sikkim, Himachal
Pradesh, West Bengal, Jammu &
Kashmir and Manipur
• Job Roles/ Courses
Plumber, Electrician, Mason, Site
Accountant, Land Surveyor,
Trainee Associate, Sewing Machine
Operator, Assistant Beauty
Therapist, Shaft Handloom Weaver,
Major CSR Initiatives – Skill Development
52
![Page 53: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/53.jpg)
5353 53
Major CSR Initiatives – Skill Development
Name of Training Provider
No. of Candidates
Trained
No. of Candidates
Placed
NSDC 2500 1987
CIDC 1000 703
Total 3500 2690During FY 2018-19, the proposal for Vocational Training
for 3000 nos. unemployed youth through NSDC is under
process. MoU is to be signed shortly.
![Page 54: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/54.jpg)
MAJOR CSR INITIATIVES –RURAL DEVELOPMENT
• 2 Food Processing Units setup in Alchi & Khaltsi Villages in Leh
District a cost of Rs. one crore.
• Development of agriculture and apiculture in the Project
Affected Areas of Kishanganga Project.
• Poly Green Houses to 445 Nos. locals in Gurez Valley
• Electrification of Hamlets in Alchi Village
• Permanent Restoration of kuls
54
![Page 55: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/55.jpg)
• Construction of 7043 nos. toilets was undertaken in
34 Districts of 8 States against the target of 6802.
• Total F.I. was Rs. 105.70 Crore (incl. Rs. 23.17 Crore
by NHDC Limited, a JV of NHPC), during FY 2014-
15 & FY 2015-16.
55
MAJOR CSR INITIATIVES –SANITATION
![Page 56: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/56.jpg)
MAJOR CSR INITIATIVES – WOMEN EMPOWERMENT
• Trained 75 local women in Assam in furniture making using
Lantana Kamara.
• Organized 350 women into Self Help Groups, through
motivational methods at village level and develop their
capacities to sustain during FY 2016-17
56
![Page 57: Abhay Kumar Singh, Executive Director, NHPC Limited. · 2019-11-28 · NHPC PROFILE 3 Year of Establishment 1975 Authorized Share Capital Rs. 150000 million Power Stations in Operation](https://reader030.vdocument.in/reader030/viewer/2022040107/5e91c699d76b4c0b1e797799/html5/thumbnails/57.jpg)
57
Clean Power for every home …
NHPC Limited.