M&P FORM 01 DATE: 25 FEB 11 ABP 2-2075 Airbus Operations Ltd PROCESS SPECIFICATION AUTHORISED (SIGNED) R PEDWELL © Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED PAGE 1 OF 47 ABP 2-2075 ISSUE 6 TITLE: MANUAL FASTENING WITH SHORT THREAD POINT DRIVE BOLTS NOTES: (A) Reference in this specification to any other document shall be to the latest issue of that document unless specifically stated otherwise. (B) For definitions and procedures relating to the use of ABP specifications refer to AMCD 01 and ABP 0-0001. (C) This specification does not necessarily detail all the precautions necessary to meet the requirements of health and safety. It is the responsibility of the user of this specification to consult and establish appropriate Health and Safety precautions and the method should be operated only by trained personnel. KEY WORDS: Fastening Manual Fastening Bolts Point Drive Bolts DocMaster: Uncontrolled copy when printed

Upload: wydowaerdt

Post on 26-Nov-2015

1.038 views

Category:

Documents


69 download

TRANSCRIPT

Page 1: ABP 2-2075

M&P FORM 01

DATE: 25 FEB 11 ABP 2-2075

Airbus Operations Ltd PROCESS SPECIFICATION

AUTHORISED (SIGNED) R PEDWELL

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

PAGE 1 OF 47

ABP 2-2075

ISSUE 6

TITLE:

MANUAL FASTENING WITH SHORT THREAD POINT DRIVE BOLTS

NOTES:

(A) Reference in this specification to any other document shall be to the latest issue of that document unless specifically stated otherwise.

(B) For definitions and procedures relating to the use of ABP specifications refer to AMCD 01 and ABP 0-0001.

(C) This specification does not necessarily detail all the precautions necessary to meet the requirements of health and safety.

It is the responsibility of the user of this specification to consult and establish appropriate Health and Safety precautions and the method should be operated only by trained personnel.

KEY WORDS:

Fastening Manual Fastening Bolts Point Drive Bolts

DocMaster: Uncontrolled copy when printed

Page 2: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 2

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

CONTENTS

1 INTRODUCTION

2 EQUIPMENT AND PLANT

3 PROCEDURE

3.1 INSTALLATION

3.2 REMOVAL AND RE-INSTALLATION

4 INSPECTION

APPENDIX A APPROVED MATERIALS

APPENDIX B BOLT AND NUT IDENTIFICATION

APPENDIX C TORQUE TIGHTENING VALUES

APPENDIX D CHECKING OF BOLT PROTRUSION

APPENDIX E SPECIAL INSTALLATION REQUIREMENTS - PULL-IN BOLTS

APPENDIX F SPECIAL INSTALLATION REQUIREMENTS - FRANGIBLE NUTS

APPENDIX G QUALIFIED FASTENER COMBINATIONS FOR ELECTRIC NUT

RUNNERS

APPENDIX H SPECIAL INSTALLATION REQUIREMENTS - FOR L5755XXXX

HIGH INTERFERENCE FIT PULL-IN STUDS

DocMaster: Uncontrolled copy when printed

Page 3: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 3

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

INVOKED DOCUMENTS

ABP 0-1011 Control of Technique Sheets Approved Before Manufacture

ABP 1-4327 Coating of Bolts and Fasteners with Lubricant Prior to Fastening

ABP 4-5141 Application of Sealant for Integral Fuel Tanks

ABP 4-5142 Application of Sealant for General Aircraft Structure

ABR 9-0140 General Purpose Cleaning Solvent

ABP 2-2336 Common Requirements for Bolts, Studs, Nuts and other Fastening Parts

SCOPE

This Specification defines the requirements for the manual installation, and removal, of short thread point drive lead-in radius bolts, assembled with self-locking nuts, when fitted into interference or clearance fit holes.

1. INTRODUCTION

1.1 Use of this process specification for the installation of bolts of the short-thread, point drive or pull-in, lead-in radius type is restricted solely to the fasteners, and the self-locking nuts, which are specified herein:

This specification is applicable to metals, CFRP, metal/CFRP assemblies and thermoplastic* composite.

Note: * This specification shall be limited to bolts installed into AIMS 05-08-001-01 glass reinforced thermoplastic material.

a) Bolts

ASNA2026BV - 100º countersunk point-drive, intermediate head, IVD aluminium coated titanium alloy.

ASNA2026HK - 100º countersunk point drive, intermediate head, resin based aluminium coated titanium alloy.

ASNA2026T - 100° countersunk point-drive, sulphuric-acid anodised, titanium alloy

ASNA2026 - 100º countersunk point-drive, intermediate head, cadmium plated, non corrosion resisting steel.

ASNA2027BV - Protruding head point-drive, IVD aluminium coated titanium alloy.

ASNA2027HK - Protruding head point-drive, resin based aluminium coated titanium alloy.

DocMaster: Uncontrolled copy when printed

Page 4: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 4

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

ASNA2027T - Protruding head point-drive, sulphuric-acid anodised, titanium alloy.

ASNA2027 - Protruding head point-drive, cadmium plated, non corrosion resisting steel.

ABS0559VBV - Protruding head point-drive, IVD aluminium coated titanium alloy.

ABS0559VHK - Protruding head point-drive, resin based aluminium coated titanium alloy.

ABS0560VBV - 100º countersunk point-drive, intermediate head, IVD aluminium coated titanium alloy.

ABS0560VHK - 100º countersunk point-drive, intermediate head, resin based aluminium coated titanium alloy.

ABS0807K - 100º countersunk pull-in, intermediate head, resin based aluminium coated titanium alloy.

ABS0809VHK - 100° countersunk pull-in, intermediate head, resin based aluminium coated titanium alloy

ABS0809 - 100° countersunk pull-in, cadmium plated non corrosion resistant alloy steel.

ABS0810VHK - Protruding head pull-in, resin based aluminium coated titanium alloy

ABS0810 - Protruding head pull-in, cadmium plated non corrosion resistant alloy steel.

ABS0811VHK - 100° countersunk pull-in, resin based aluminium coated titanium alloy (annealed)

ABS0812VHK - Protruding head pull-in, resin based aluminium coated titanium alloy (annealed)

ABS0876L - Protruding head pull-in, resin based aluminium coated Inconel 718

ABS0907K - Protruding head pull-in, resin based aluminium coated titanium alloy.

EN6114T - 100º countersunk point-drive, intermediate head, sulphuric-acid anodised titanium alloy.

EN6114V - 100º countersunk point-drive, intermediate head, IVD coated titanium alloy.

EN6114K - 100º countersunk point-drive, intermediate head, resin based aluminium coated titanium alloy.

DocMaster: Uncontrolled copy when printed

Page 5: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 5

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

EN6114L - 100º countersunk point-drive, intermediate head, resin based aluminium coated Inconel 718.

EN6114M - 100º countersunk point-drive, intermediate head, IVD coated Inconel 718.

EN6114 - 100º countersunk point-drive, intermediate head, cadmium plated non-corrosion resisting steel.

EN6115T - Protruding head point-drive, sulphuric-acid anodised titanium alloy.

EN6115V - Protruding head point-drive, IVD coated titanium alloy.

EN6115K - Protruding head point-drive, resin based aluminium coated titanium alloy.

EN6115L - Protruding head point-drive, resin based aluminium coated Inconel 718.

EN6115M - Protruding head point-drive, IVD coated Inconel 718.

EN6115 - Protruding head point-drive, cadmium plated non-corrosion resisting steel.

Nominal Diameters: 0.1900; 0.2500; 0.3125; 0.3750; 0.4375; 0.5000; 0.5625; 0.6250; 0.7500; 0.8750; 1.0000, 1.1250, 1.2500 and 1.3750 inches.

Diameter codes in 1/16" increments: 3, 4, 5, 6, 7, 8, 9, 10, 12, 14, 16, 18, 20 and 22.

b) Nuts ABS0117 - Self locking, hexagon, aluminium alloy, counterbored.

ABS0118 - Self locking, hexagon, aluminium alloy, counterbored, self sealing. (Inactive for new design and procurement after 27/07/00)

ABS0813 - Self locking, hexagon, aluminium alloy, counterbored, self sealing. (Replaces ABS0118 after 27/07/2000)

NSA5474 - Self locking, hexagon, non corrosion resisting steel, counterbored.

NSA5472 - Self locking, hexagon, non corrosion resisting steel, counterbored with captive washer.

NSA5472 ≥ (-9) - Self locking, 12 point, non corrosion resisting steel, counterbored with captive washer.

ASNA2529 - Self locking, hexagon, aluminium alloy, counterbored.

DocMaster: Uncontrolled copy when printed

Page 6: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 6

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

ASNA2532 Self locking, with a spherical joint and a self alignment washer

ASNA2531 Self locking, hexagon, non corrosion resisting steel, counterbored.

ASNA2536 - Hexagonal, self locking, bi hex, shear type.

ASNA2538 - Hexagonal, self locking, ball, bi hex, shear type.

1.2 These bolts are marketed under the registered trade-name “Hi-lite”. The installation of point drive bolts marketed under the trade name of “Hi-lok” is the subject of ABP 2-2074. There are significant differences between these two types of fastener.

1.3 References to NSA, ASNA and ABS fasteners and parts defined in this specification are for drawing / design documentation call up purposes only. Actual part identification may be in accordance with the “Hi-Lite” or Manufacturers proprietary system as indicated in tables 1 and 3, Appendix B. Reference should be made to the appropriate part specification for further information.

1.4 When the drawing specifies provision of a Technique Sheet, as for example for a critical joint, the technique and sequence at assembly shall be agreed between the Airbus UK Design Authority and the Manufacturing function. The Technique Sheet shall be signed by the Airbus UK Design Authority at Issue 1, and all subsequent issues in accordance with ABP 0-1010 unless the drawing states otherwise.

DocMaster: Uncontrolled copy when printed

Page 7: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 7

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

1.5 Nuts may be seated on surfaces, which are not normal to the hole, but are within the following total angular tolerances:

Standard Diameter Dash No Total Angular tolerance

ABS0117, ABS0118, ABS0813, ASNA2529 (4, 5) 1½ º

ABS0117, ABS0118, ABS0813, ASNA2529 (6) 1 º

ABS0813, ASNA2529 (7, 8) 1 º ASNA2529 (9, 10) 1 º NSA5474 (3, 4, 5, 6) ½ º NSA5472 (hexagon) (3, 4, 5, 6, 7, 8) ½ º NSA5472 (12 point) (9, 10, 12, 14, 16, 18, 20, 22) ½ º ASNA2531 (3, 4, 5, 6, 7, 8, 9, 10, 12, 14, 16) ½ º

ASNA2532 (3, 4, 5, 6, 7, 8, 9, 10, 12, 14, 16) 3º *

ASNA 2536 (3,4,5,6,7,8,9,10)

½ º

ASNA 2538 3º

* Note: For joints with slope on collar/nut side higher than 3º, up to the limit in the standard, the impact on the joint performance requires assessment by design.

Spot facing to achieve these requirements is permitted only when called for on the drawing.

1.6 ASNA2026 (-, BV, HK), ASNA2027 (-, BV, HK), ABS0559 (VBV, VHK) and ABS0560 (VBV, VHK) are supplied without lubrication.

ABS0807K, ABS0809 (-,VHK), ABS0810 (-, VHK), ABS0811VHK, ABS0812VHK, ABS0907K, ASNA2026T, ASNA2027T, EN6114 (-, T, V, K, L) and EN6115 (-, T, V, K, L) are supplied with lubrication.

1.7 With bolts and nuts specified in Para 1.1 it should not be necessary in any application for a washer to be fitted. However, the infrequent use of a washer, when essential, is covered by Para 3.1.9.

1.8 Aluminium alloy nuts shall be used once only.

DocMaster: Uncontrolled copy when printed

Page 8: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 8

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

2. EQUIPMENT AND PLANT

All equipment and plant shall be approved by the Airbus UK Quality Assurance Authority and operated and maintained to manufacturer’s instructions. The issuing of any supplementary instructions necessary to ensure that the requirements of this specification are met, is the responsibility of the Airbus UK Quality Assurance Authority.

For suppliers, see Appendix A Approved Equipment and Materials

3. PROCEDURE

3.1 Installation

Note 1: Joints/fasteners shall be assembled with sealant to the requirements of ABP 4-5141 for integral fuel tanks/ABP 4-5142 for other applications, unless otherwise specified on the drawing.

3.1.1 Drill and ream, drill ream, countersink or radius and deburr holes in accordance with the Standards stated on the drawing. Where a spot-face has been machined in conformance with the drawing, reinstate the protective treatment in accordance with the master protective scheme specification, unless the drawing specifies otherwise, before final installation of the fastener.

3.1.2 Submit part/component to Inspection function for checking of hole for conformance with the relevant standard (i.e. diameter, countersink or radius, deburring and finish) and spot-face where relevant.

3.1.3 Obtain the bolts as called for on the drawing and check they are the correct grip length before trial installation of two fasteners as detailed in Para 3.1.4 to 3.1.10 inclusive.

3.1.4 Ensure that bores and areas adjacent to holes are free from any contamination, by using clean "Kimwipe" wipers or a clean cloth or wiper moistened with ABR9-0140.

3.1.5 a) Clearance fit applications: -

Prior to inserting the bolt into the hole ensure that sufficient sealant/jointing compound (ref. Para 3.1 Note 1) is applied to the shank and underhead region of the bolt to fill any gaps between the bolt and the hole.

b) Interference fit applications: -

DocMaster: Uncontrolled copy when printed

Page 9: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 9

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

i) conform to any special installation and/or tightening sequences specified on the drawing. The process is not generally applicable when one or both of the components are thin and/or bonded.

ii) ensure that the joint has slave bolts/final fasteners securely clamping the joint on either side of the fastener to be installed.

iii) Prior to driving or pulling the bolts into the holes sealant / jointing compound should be applied to the underhead region of the bolt (ref. Note 1 above Para 3.1.1). In addition where bolts are supplied without lubricant (ref: paragraph 1.6) the shanks should be lubricated in accordance with the requirements of ABP 1-4327.

Boelube 70305 paste in addition to bolt lubrication described in ABP 1-4327 is permitted for use subject to the following limitations:

a) To be used on cadmium plated alloy steel bolts of ½” diameter and above.

b) To be used on bolts with T/D ratio of 2.5 and above –

(T= joint thickness and D =bolt diameter).

c) Lubrication shall be applied to bore and bolt shank only. Any contamination to

surrounding areas and to the bolt thread shall be carefully removed using Airbus

approved cleaning agents and procedures

d) Boelube paste shall only be used where the drawing requires cadmium plated

bolts to be inserted under interference fit conditions through aluminium

containing assemblies.

iv) Where the drawing, fastener type or joint configuration (i.e. stack thickness ≥ 3D) calls for the use of ‘pull-in’ installation procedures reference should be made to the additional requirements specified in Appendix E. In all other cases the bolt should be carefully driven into place using a suitable riveting gun or dolly, taking care to ensure that neither the bolt nor the surface of the part is damaged.

3.1.6 Ensure that the head of the bolt is correctly seated in accordance with ABP2-2336.

3.1.7 Remove all sealant/jointing compound from the bolt threads by wiping with a clean ‘Kimwipe’ tissue moistened with ABR 9-0140 or other approved solvent. See Appendix A.

3.1.8 Check that the bolt protrusion through the joint is within gauging limits as detailed in Appendix D. (Compliance with these gauging instructions will determine whether a bolt with the lead in radius intruded slightly into the holes, shall be accepted). The removal of fastener threads to achieve protrusion tolerances is strictly prohibited.

DocMaster: Uncontrolled copy when printed

Page 10: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 10

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

Bolts of different grip length to those specified by the drawing may be fitted subject to the requirements of Para. 4.2.

3.1.9 Note: with the combinations defined in Para 1.1 there will not normally be any need for washers to be fitted under the nuts unless so specified by the drawing. Indiscriminate use of washers is prohibited but, on isolated occasions when use is essential, allowance shall be made for the thickness of the washer in the grip length to be employed, i.e. the acceptance gauging will be from the front face of the washer. Ensure that any sealing instructions - ABP 4-5141 / ABP 4-5142 as invoked by the drawing - are observed. Assemble the nut called for on the drawing onto the bolt finger tight.

3.1.9.1 A400M requirements. – The following requirements are for installation of fasteners within the Fuel Tank Boundary.

a) Installation of steel washer under a nut (ASNA2531 or ASNA2532).

Sealant shall be applied to the face of the washer that will be in contact with the component. Sealant contamination of the bolt threads and nuts shall be kept to a minimum. No sealant shall be applied to the nuts or where applicable the self-aligning washer. Nuts shall be installed by:

1). Manual process.

2). Using a pneumatic/electronic nut runner up to the contact point of the nut and washer and hand tighten to the torque stated in Appendix C.

3). Using electronic nut runner up to the requirements of Appendix C and Appendix G.

b) Installation of a self aligning nut (ASNA2532) without a steel washer.

Sealant shall be applied to underside of the self-aligning washer. Sealant contamination of the bolt threads and nuts shall be kept to a minimum. No sealant shall be applied to the nuts or where applicable the self-aligning washer. Nuts shall be installed by:

1). Manual process.

2). Using a pneumatic/electronic nut runner up to the contact point of the nut and washer and hand tighten to the torque stated in Appendix C.

3). Using electronic nut runner up to the requirements of Appendix C and Appendix G.

DocMaster: Uncontrolled copy when printed

Page 11: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 11

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

3.1.10 Obtain the approved hand or power tool ensuring that it is set to the correct torque level and where designated, speed limitation for the bolt/nut combination (ref. Appendix C). Where necessary, and provided the fastener geometry allows, restrain the bolt from moving by engaging the hexagon key in the recess and torque tighten the nut. After installation, slightly rotate the power tool in a clockwise direction to ease its removal from the bolt and nut. The bolt thread protrusion beyond the nut shall conform with the requirements of Appendix D. The flushness of countersunk head bolts shall conform to requirements given in the Standard stated on the drawing and in accordance with ABP2-2336.

3.1.11 Remove all exuded sealant/jointing compound using a suitable non-metallic (e.g. Tufnol) tool in accordance with ABP 4-5141 or ABP 4-5142.

3.1.12 At the discretion of the Manufacturing function, either submit the two fastener trial installation to Inspection function for verification of correct grip length/assembly requirements, ref. Para 4.2 before completing the assembly or alternatively Manufacturing function may, at its own responsibility, complete the assembly in accordance with the requirements of Para 3.1.4 to 3.1.11.

3.1.13 Submit completed assembly to Inspection function.

3.1.14 Fasteners rejected by the Inspection function shall be removed in accordance with Para 3.2.

3.1.15 All fasteners shall be re-torque tightened to account for possible joint relaxation as per ABP2-2336. Nuts shall not be slackened off as part of the torque checking procedure.

3.2 Removal and Re-installation Note: Removed interference fit fasteners shall not be re-installed.

3.2.1 Using the correct size hexagon key to prevent rotation of the bolt, unscrew and remove the nut using a spanner or the special ratchet fitted with a socket spanner or a power tool switched to reverse. Note: a hexagon key may not be needed for interference fit bolts.

3.2.2 Remove the bolt from the assembly. For an interference fit bolt use a suitable riveting gun and dolly to move the bolt sufficiently to enable an extractor to be fitted under the bolt head. Withdraw the bolt completely by using the extractor.

3.2.3 Submit the assembly to the Inspection function.

3.2.4 i) when hole and adjacent material have been confirmed as satisfactory, install new bolt(s) and nut(s) in accordance with Para 3.1.

ii) if the Inspection function considers that unsatisfactory features exist, refer to the Airbus UK Design Authority.

DocMaster: Uncontrolled copy when printed

Page 12: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 12

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

4. INSPECTION

The Inspection function shall verify that: -

4.1 Hole geometries conform to drawing call-up requirements or for high interference fasteners the requirements specified in Appendix E

4.2 When requested by Manufacturing function (see Para 3.1.12), the correct length bolt has been used, by checking and approving the trial fastener installation prior to completing the assembly. (See Paras 4.3 & 4.4 below, and procedure specified in Appendix D).

Note: Where, due to the accumulation of tolerances, the grip length of the bolt called for on the drawing is not correct, Inspection function may allow a substitution without reference back to the Airbus UK Design Authority subject to the following limitations: -

a) That the variation is not more than one grip size.

b) That the requirement of Para 3.1.9 is satisfied.

c) Where this replacement occurs repeatedly on a joint, the Airbus UK Design Authority shall be advised in order that drawing amendment can be considered.

d) No variation of bolt length is permitted for interchangeable parts without Airbus UK Design Authority approval.

4.3 Bolt protrusion is within the gauging dimensions as detailed in Appendix D. This will ensure that a minimum of one thread pitch protrudes beyond the nut and that the fully formed threads of the bolt engage the nut locking element.

DocMaster: Uncontrolled copy when printed

Page 13: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 13

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

4.4 Flushness checks on countersunk head bolts have been made at the Inspection function's discretion.

Measurement of Protrusion Measurement of Intrusion

4.5 Bolts, nuts and adjacent structures (including protective treatment) are free from damage.

4.5.1 Head damage or deformation limitations

The fasteners shall be free from visible cracks or damage.

Acceptable Criteria for Head dishing

Accept Reject Reject

Centre of Fastener

Distinct Ring or Abrupt Change in Contour.

Smooth Dish

In accordance with table

DocMaster: Uncontrolled copy when printed

Page 14: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 14

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

Limits of head deformation

Installation with head seated in aluminium or

composite parts

Installation with head seated in hard material parts (steel, titanium,

Inconel etc.)

Shear or medium head P (mm)

Shear or medium head P (mm)

Fastener material

Titanium 0,10 0,07

Alloy steel 0,07 0,05

Inconel 0 0

4.6 Holes and adjacent structure (including protective treatment) are free from damage after any fastener removal, and hole sizes are dimensionally correct before replacement fasteners are fitted.

4.7 Repairs to the protective finish conform with drawing and invoked specification requirements.

4.8 Bolt protrusion tolerances in Appendix D are not applicable for Oversize bolts.

DocMaster: Uncontrolled copy when printed

Page 15: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 15

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

APPENDIX A

Approved Materials

1 EQUIPMENT FOR SETTING SHOULD BE OBTAINED FROM: -

Any approved supplier

2 MATERIALS

2.1 Cleaners

Refer to ABR 9-0140 Supplier: Any approved supplier (typical)

2.2 Lubricants

Boelube 70305 paste Supplier: Any approved supplier (typical)

3 Tooling

Electric Nut Runners Supplier: Desoutter Ltd. (typical)

DocMaster: Uncontrolled copy when printed

Page 16: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 16

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

APPENDIX B

Bolt and Nut Identification

1. Drawings call up bolts/nuts by the appropriate Material/In-house Standard. Bolts/nuts may be identified with manufacturers part numbers, ref. tables 1 and 2.

Table 1: Bolt Identification

NOMINAL DIAMETER

DASH No (1/16"Increments)

HEAD TYPE PROPRIETARY PART No Airbus PART No MATERIAL & FINISH

(-3) - (-10)

100° Countersunk Intermediate

HST755 (CF) VL755 (CF) AL755 (CF)

ASNA2026VBV 6Al4V Titanium alloy. IVD aluminium coated. Non-lubricated. Thread end dyed black

Protruding

HST756 (CF) VL756 (CF) AL12 (CF)

AL756 (CF)

ASNA2027VBV

100° Countersunk Intermediate

HST755 (KN) VL755 (KN) AL755 (KN)

ASNA2026VHK 6Al4V Titanium alloy. Resin based aluminium coated. Non-lubricated. Thread end not dyed.

Protruding

HST756 (KN) VL756 (KN) AL12 (KN) AL756 (KN)

ASNA2027VHK

100º Countersunk Intermediate

HST755 (-) VL 755 (-)

ASNA2026T 6Al4V Titanium alloy. Sulphuric-acid anodised. Lubricated.

Protruding HST756 (-) VL756 (-)

ASNA2027T Thread end not dyed.

(-12) – (-16)

100° Countersunk Intermediate

HST955 (CF) ABS0560VBV 6Al4V Titanium alloy. IVD aluminium coated. Non-lubricated. Thread end dyed black. Protruding HST956 (CF) ABS0559VBV

100° Countersunk Intermediate

HST955 (KN) ABS0560VHK 6Al4V Titanium alloy Resin based Aluminium coated. Non-lubricated. Thread end not dyed. Protruding HST956 (KN) ABS0559VHK

(-3) – (-16) 100°

Countersunk Intermediate

HST803 (CG) ASNA2026- Non-corrosion resisting steel. Cadmium plated. Lubricated. Thread end dyed green. (-3) - (-18) Protruding HST720 (CG)

VL720 (CG) ASNA2027-

DocMaster: Uncontrolled copy when printed

Page 17: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 17

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

APPENDIX B - Continued

2. BOLT HEAD IDENTIFICATION Bolt identification in the case of ASNA and ABS coded parts will be in accordance with the manufacturers proprietary system as defined in table 2. Bolt head identification for EN6114 and EN6115 parts will be in accordance with EN6114 / EN6115 standards

Table 2. Proprietary ID code for ASNA and ABS bolts

Standard Diameter Code

Proprietary (Basic) Part Number

Diameter Code

ABS0807K (-3 to -8) HSL755 (-6 to -16) ABS0907K (-3 to -8) HSL756 (-6 to -16) ABS0809 ABS0809VHK

(-9 to -16) (-9 to -10)

HPL755

(-18 to -32) (-18 to -20)

ABS0810 ABS0810VHK

(-9 to -16) (-9 to -10)

HPL756

(-18 to -32) (-18 to -20)

ABS0811VHK (-12 to -16) HPL955 (-24 to -32) ABS0812VHK (-12 to -16) HPL956 (-24 to -32) ABS0876L (-10 to -14) HPL738 (-20 to -28) ASNA2026BV ASNA2026HK

(-3 to -10) HST755 VL755 AL755

(-6 to -20)

ASNA2026T (-3 to –6) HST755 VL755

(-6 to -12)

ASNA2027BV ASNA2027HK

(-3 to -10) HST756 VL756 AL12 AL756

(-6 to -20) (-6 to -20) (-6 to -12) (-14 to -20)

ASNA2027T (-3 to –6) HST756 VL756

(-6 to -12)

ABS0559VBV ABS0559VHK

(-12 to -16) HST956

(-24 to -32)

ABS0560VBV ABS0560VHK

(-12 to -16) HST955 (-24 to -32)

ASNA2026 (-3 to -16) HST803 (-6 to -32) ASNA2027 (-3 to -18) HST720

VL720 (-6 to -36)

Part ID Code (Proprietary or EN6114/EN6115 as appropriate)

Diameter code

Manufacturers identification (see below)

Grip length code is not marked and care should be taken to ensure that the correct grip length bolt is used.

DocMaster: Uncontrolled copy when printed

Page 18: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 18

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

APPENDIX B - Continued

3 TYPICAL CALL-UP

ASNA2026 BV 5 – 14 EN6114 V 5 – 14 ABS0560 VBV 5 – 14 ABS0807 K 5 – 14 ABS0907 K 5 – 14

ABS0876 L 12 – 14

Grip Length Code in 1/16" increments

Diameter Code in 1/16" increments (Note: corresponding HST identification quotes

diameter code in 1/32" i.e. –24 in the example chosen)

Material, finish and lubrication BV, VBV: titanium alloy, I.V.D. coated, non-

lubricated V: titanium alloy, I.V.D. coated, cetyl

alcohol lubricated L: Inconel 718, resin-based Al coated, cetyl-

alcohol lubricated K: titanium alloy, resin-based Al coated,

cetyl-alcohol lubricated

Basic part number – Short thread, point drive, lead-in radius bolt of defined head type

DocMaster: Uncontrolled copy when printed

Page 19: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 19

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

Table 3: Nut Identification Nominal Diameter

Dash No (1/16" increments)

Nut Type Airbus Part No

Materials & Finish

(-4) – (-6)

Self locking Hexagon Counterbored

ABS0117 Aluminium alloy Anodised 'black' Lubricated

Self locking Hexagon Counterbored Self sealing

ABS0118 (Inactive for new Design)

Aluminium alloy Anodised 'black' Lubricated Seal – P.T.F.E.

(-4) – (-8)

Self locking Hexagon Counterbored Self sealing

ABS0813

Aluminium alloy Anodised 'orange' Lubricated Seal – P.T.F.E.

(-3) – (-10) Self locking Hexagon Counterbored

ASNA2529 Aluminium alloy Anodised blue Lubricated

(-3) – (-6) Self locking Hexagon Counterbored

NSA5474 Non-corrosion resisting steel Cadmium plated Lubricated

(-7) – (-8)

Self locking Hexagon Counterbored Captive washer

NSA5472

Non-corrosion resisting steel. Cadmium plated Lubricated

(-9) – (-22)

Self locking 12 Point Counterbored Captive washer

NSA5472

Non-corrosion resisting steel. Cadmium plated Lubricated

(-3) – (-16) Self locking Hexagon Counterbored

ASNA2531 Non-corrosion resisting steel Cadmium plated Lubricated

(-3) – (-10)

Self aligning Hexhead Selflocking Bi Hex Shear type

ASNA2538

CRES – Cadmium plate Passivated

(-3) – (-10)

Self locking Hex head Bi Hex Shear type

ASNA2536

CRES – Cadmium plate Passivated

(-3) – (-16) Self locking Hex head Self aligning

ASNA2532 Non-corrosion resisting steel Cadmium plated Lubricated

DocMaster: Uncontrolled copy when printed

Page 20: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 20

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

APPENDIX B - Continued

TYPICAL CALL-UP

NSA 5474 - 3 - K7 ABS 0813 - 5 C

Lubricant CodeSize Code (corresponds to diameter of bolt in 1/16 in.)

Basic Part Number

DocMaster: Uncontrolled copy when printed

Page 21: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 21

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

APPENDIX C

Tightening speed limitations for A400M Overheating of fasteners/nuts shall be avoided. When using approved Electric Nut Runners for qualified fastener combinations stated in Appendix G, the torque tightening speeds shall be limited to the values as specified in the Rotational speed limitations table.

Rotational speed limitations Screw Nut Rotational speed (RPM)/ code diameter (1/16 inch) Material Material 3 4 5 6 7 8 9 10 12 14 16Titanium Steel

275 275 250 180 140 100 80 60 40 20

10 Titanium Aluminium 200 160 120 90 70 50 30 15 Steel/Inconel Steel/Inconel 250 180 140 100 80 60 40 20

Torque Tightening Values Nm (lbf.in)

Bolt Part Number

ABS0807K ABS0907K

ASNA2026BV ASNA2026HK ASNA2026T

ASNA2027BV ASNA2027HK ASNA2027T

EN6114V/K/T EN6115V/K/T

ABS0807K ABS0907K

ASNA2026BV ASNA2026HK ASNA2026T

ASNA2027BV ASNA2027HK ASNA2027T

EN6114V/K/T EN6115V/K/T

ABS0807K ABS0907K

ABS0809VHK ABS0810VHK ASNA2026BV ASNA2026HK ASNA2026T

ASNA2027BV ASNA2027HK ASNA2027T

EN6114V/K/T EN6115V/K/T

Nut Part Number

ABS0117 ABS0118 ABS0813 ASNA2529

Dia

met

er D

ash

No

-3 2.7 – 3.1 (23 – 27)

-3A 3.2 – 3.9 (28 – 34)

-4 6.2 – 7.3 (55 – 65)

6.2 – 7.3 (55 – 65)

6.2 – 7.3 (55 – 65)

-5 10.7 – 12.4 (95 – 110)

10.7 – 12.4 (95 – 110)

10.7 – 12.4 (95 – 110)

-6 18.1 – 20.3 (160 – 180)

18.1 – 20.3 (160 – 180)

18.1 – 20.3 (160 – 180)

-7 27.7 – 32.2 (245 – 275)

27.7 – 32.2 (245 – 275)

-8 40.1 – 46.3 (355 – 410)

40.1 – 46.3 (355 – 410)

-9 51.4 – 59.9 (455 – 530)

-10 68.4 – 79.1 (605 – 700)

DocMaster: Uncontrolled copy when printed

Page 22: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 22

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

APPENDIX C – Cont Torque Tightening Values Nm (lbf.in)

Bolt Part Number

ABS0807K ABS0907K

ABS0809VHK ABS0810VHK ASNA2026BV ASNA2026HK ASNA2026T

ASNA2027BV ASNA2027HK ASNA2027T

EN6114V/K/T EN6115V/K/T

ABS0559VBV ABS0559VHK ABS0560VBV ABS0560VHK ABS0811VHK ABS0812VHK

ABS0559T ABS0560T

ABS0807K ABS0907K ASNA2026

ASNA2026BV ASNA2026HK ASNA2026T ASNA2027

ASNA2027BV ASNA2027HK ASNA2027T

EN6114V/K/T EN6115V/K/T

ASNA2026 ASNA2027

EN6114 EN6115

ABS0809 ABS0810

EN6114L EN6115L EN6114M EN6115M ABS0876L

EN6114-/V/K/T EN6115-/V/K/T

EN6114L/M EN6115L/M

ABS0809 ABS0810

ABS0807K ABS0907K

ABS0809VHK ABS0559VBV ABS0811VHK

ABS0812VHK ABS0810VHK ABS0559VHK ABS0560VBV

ABS0560VHK

Nut Part Number NSA5472

NSA5472 ASNA2531 ASNA2532

NSA5474 ASNA2531 ASNA2532

NSA5472 ASNA2531

NSA5472 ASNA2531

ASNA2536 ASNA2538

Dia

met

er D

ash

No -3

2.7-31 1) (24 – 27) 3.4-4.0 (30-35)

3.4-4.0 (30-35) 3.4-4.0

(30-35)

-3A 4.8 – 6.0 (42 – 52)

4.8 – 6.0 (42 – 52) 4.8 – 6.0

(42 – 52)

-4 6.8-7.9 (60-70)

6.8-7.9 (60-70) 6.8-7.9

(60-70)

-5 13 – 14.1 (115 – 125)

13 – 14.1 (115 – 125) 13 – 14.1

(115 – 125) 1) Note : Torque values 2.7 – 3.1 Nm (24 – 27 lbf.in) is applicable to EN6114T3 and EN6115T3 Bolts with ASNA2531-3 and ASNA2532-3 Nuts, assembled in combination with NAS1149C Steel Washers that have been wet installed and positioned under the nuts.

(continued)

DocMaster: Uncontrolled copy when printed

Page 23: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 23

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

Torque Tightening Values Nm (lbf.in) (Concluded)

Bolt Part Number

ABS0807K ABS0907K

ABS0809VHK ABS0810VHK ASNA2026BV ASNA2026HK ASNA2026T

ASNA2027BV ASNA2027HK ASNA2027T

EN6114V/K/T EN6115V/K/T

ABS0559VBV ABS0559VHK ABS0560VBV ABS0560VHK ABS0811VHK ABS0812VHK

ABS0559T ABS0560T

ABS0807K ABS0907K ASNA2026

ASNA2026BV ASNA2026HK ASNA2026T ASNA2027

ASNA2027BV ASNA2027HK ASNA2027T

EN6114V/K/T EN6115V/K/T

ASNA2026 ASNA2027

EN6114 EN6115

ABS0809 ABS0810

EN6114L EN6115L EN6114M EN6115M ABS0876L

EN6114-/V/K/T EN6115-/V/K/T

EN6114L/M EN6115L/M

ABS0809 ABS0810

ABS0807K ABS0907K

ABS0809VHK ABS0559VBV ABS0811VHK

ABS0812VHK ABS0810VHK ABS0559VHK ABS0560VBV

ABS0560VHK

Nut Part Number NSA5472

NSA5472 ASNA2531 ASNA2532

NSA5474 ASNA2531 ASNA2532

NSA5472 ASNA2531

NSA5472 ASNA2531

ASNA2536 ASNA2538

-6 22 – 26 (195 – 230)

22 – 26 (195 – 230) 22 – 26

(195 – 230)

-7 33 – 38 (290 – 335) 33 – 38

(290 – 335) 33 – 38

(290 – 335) 33 – 38 (290 – 335)

-8 48 – 55 (425 – 490) 48 – 55

(425 – 490) 48 – 55

(425 – 490) 48 – 55 (425 – 490)

-9 68 – 78 (600 – 690) 68 – 78

(600 – 690) 68 – 78

(600 – 690) 68 – 78 (600 – 690)

-10 86 – 101 (760 – 890) 86 – 101

(760 – 890) 86 – 101

(760 – 890) 86 – 101

(760 – 890) 86 – 101

(760 – 890)

-12 140 – 160 (1240 – 1420)

140 – 160 (1240 – 1420)

140 – 160 (1240 – 1420) (1240 – 1420)

-14 202 – 223 (1790 – 1970) 202 – 223

(1790 – 1970) (1790 – 1970)

-16 270 – 299 (2390 – 2650) 270 – 299

(2390 – 2650)

-18 346 – 382 (3060 – 3380)

-20 429 – 470 (3800 – 4160)

-22 516 – 563 (4570 – 4980)

DocMaster: Uncontrolled copy when printed

Page 24: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 24

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

APPENDIX D Checking of Bolt Protrusion

1 PROTRUSION For the bolt/nut combination to be adjudged to have set correctly, the protrusion of the bolt from the face of the joint shall be within the range tabulated below: -

Note: Not applicable for Oversize bolts

Table 3 - Bolt protrusion tolerances

Bolt Part Number

ASNA2026-, HK, BV, T ASNA2027-, HK, BV, T ABS0559VHK, VBV ABS0560VHK, VBV ABS0807K, ABS0907K ABS0809-, VHK ABS0810-, VHK ABS0811VHK ABS0812VHK EN6114-, K, V, L, T EN6115-, K, V, L, T

ABS0876L

Nut Part Number

ABS0117 ABS0118 ABS0813 ASNA2529 ASNA2531 ASNA2532 NSA5472 NSA5474 ASNA2536 ASNA2538

NSA5472

Diameter Code

Protrusion Protrusion

Maximum Minimum Maximum Minimum

mm inch mm inch mm inch mm inch -3 9.40 0.370 7.62 0.300 -4 10.16 0.400 8.38 0.330 -5 11.68 0.460 9.91 0.390 -6 12.70 0.500 10.92 0.430 -7 14.35 0.565 12.57 0.495 -8 15.37 0.605 13.59 0.535 -9 17.27 0.680 15.49 0.610 -10 18.29 0.720 16.51 0.650 25.78 1.015 24.00 0.945 -12 24.76 0.975 22.99 0.905 30.61 1.205 28.84 1.135 -14 27.43 1.080 25.65 1.010 35.43 1.395 33.65 1.325 -16 31.50 1.240 29.70 1.170 -18 35.18 1.385 33.40 1.315 -20 38.57 1.519 36.79 1.449 -22 41.67 1.641 39.89 1.571

The dimensions given in the table can be verified by :- a) a) direct measurement by conventional means b) by use of Protrusion Gauges

DocMaster: Uncontrolled copy when printed

Page 25: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 25

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

APPENDIX D - Continued

FIG. 1 (Typical for all Gauges)

2 GAUGE PROCEDURE

(1) Centre gauge over bolt at “Touch No-Go” end. (Fig. 2)

(2) If bolt touches top of “Touch No-Go” gauge - reject.

(3) If bolt does not touch, reverse gauge to “Touch-Go” end and check.

(4) If bolt touches top of “Touch-Go” gauge (Fig. 3) - accept

(5) If bolt does not touch top of “Touch-Go” gauge with legs on structures - reject.

Note 1: It could be possible on a specific joint thickness when a bolt is on maximum limits that the bolt will be rejectable to the requirements of Para 2 (2) and substituting with a bolt of the next shorter grip which is on minimum limits that it will be rejectable to the requirements of Para 2 (5).

In this situation the shorter bolt is acceptable provided the gap between the Touch-Go part of the gauge and the end of the bolt does not exceed 0.010 inch.

No similar relaxation i.e. the legs of the Touch-No Go gauge not contacting the structure, is allowable for bolts rejectable to Para 2 (2) because of the possibility of bolt thread bonding in the nut counterbore and consequent loss of clamping.

DocMaster: Uncontrolled copy when printed

Page 26: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 26

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

Note 2: If an installation is rejected based on the requirements of paragraph 2, sub-section (5). The nut shall be removed and the fastener shall be visually checked for full grip length. If the thread run-out/lead-in radius at the transition between the plain shank and thread is completely through the joint, the installation is acceptable providing it is compliant with the requirements of paragraph 2, sub-section (2).

DocMaster: Uncontrolled copy when printed

Page 27: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 27

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

APPENDIX E:

Special Installation Requirements - Pull-in Bolts

1. Pre-installation hole geometry:

Unless otherwise specified on the drawing pre-installation hole geometries shall conform to the dimensional requirements stipulated below:

Countersunk Head: - ABS0807K, ABS0809VHK, ABS0809-, ABS0811VHK - Airbus-UK Engineering Standard No SL5174

Protruding Head: - ABS0907K, ABS0810VHK, ABS0810-, ABS0812VHK - Airbus-UK Engineering Standard No SL4478

High Interference: - ABS0876L - Dimensions as per figure 1 and table 1. All other details as per

drawing requirements or in accordance with SL4478.

Figure 1. Hole Diameter and Radius Requirements for ABS0876L High Interference Pull-in Fasteners

Table 1. Hole Diameter and Radius Requirements for ABS0876L High Interference Pull-in Fasteners

Diameter Code Units

Hole Radius ‘R’ Hole Diameter ‘D’

Min Max Min Max

-10 mm 1.02 1.27 15.694 15.737

Inches 0.040 0.050 0.6179 0.6196

-12 mm 1.14 1.40 18.852 18.904

Inches 0.045 0.055 0.7422 0.7443

-14 Mm 1.27 1.52 22.011 22.063

inches 0.050 0.060 0.8666 0.8686

‘D’

‘R’

1 Surface finish of 1,6μm

DIRECTION OF PULL-IN

1

DocMaster: Uncontrolled copy when printed

Page 28: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 28

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

APPENDIX E CONT’D

2. TOOLING REQUIREMENTS:

2.1 These special installation instructions refer to the direct pull-in installation of break-stem (ABS0807K and ABS0907K) type fasteners as detailed in Figure 2 and the pull-in installation of point-drive (ABS0809, ABS0810, ABS0811VHK, ABS0812VHK and ABS0876L) fasteners using thread-in mandrel attachments as detailed in Figure 3.

2.2 It is the responsibility of the manufacturing or production engineering function to ensure that installation tools and pull-in loads appropriate to the fastener type and size are selected. Recommended tooling and maximum pull-in loads are defined in table 2. To prevent damage to the structure always select a pull-in gun that is set to the minimum calibration load.

2.3 The use of pull-in gun nose-cap extensions or collars to prevent damage or witness marking on the structure is acceptable providing the tooling does not foul or cause damage to the fastener during the installation process.

3. PULL-IN INSTALLATION

3.1 Installation methods shall be such as to avoid damage to the surrounding structure or assembly. Cases where protective treatments have been removed shall be re-treated in accordance with drawing specifications or the requirements of ABP 0-1013.

3.2 Where the fastener design calls for the use of a mandrel, it is at the discretion of the manufacturing or production engineering function whether the mandrel is installed prior to or after the fastener is offered and aligned with the hole. Care should be taken to ensure that the mandrel and fastener pull-in thread are clean and free from damage prior to installation (Note: mandrels can be re-used). The mandrel should be fully threaded (Left-Hand Thread) into the fastener ensuring that threads are fully engaged.

3.3 Where the drawing calls for high interference fit installations holes and hole entrance shall be lubricated with Boelube 70305 paste before fastener installation, taking care to ensure that the hole is clean and free from swarf and excess sealant before lubricant is applied. Prior to bolt installation all traces of Boelube 70305 shall be removed from the structure at the surface where the bolt head seats.

3.4 Once the fastener has been offered and aligned with the hole (and where appropriate the mandrel installed) the pull-gun grips should be engaged with the mandrel or pull stem (see Figure 2), ensuring that the fastener, tooling and hole remain axially aligned. The pull-gun unit should then be operated to pull the fastener into position.

DocMaster: Uncontrolled copy when printed

Page 29: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 29

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

APPENDIX E CONT’D

3.5 If the fastener grip length exceeds the mandrel working length several pull-in operations may be required. A nose-cap extension or collar may be required to prevent fouling between the fastener and pull-in tooling. If the pull-in gun calibration load is insufficient to ensure full fastener installation the gun can be replaced with a gun having a higher calibration setting.

3.6 Pull-in fasteners shall not be used in carbon/CFRP interference holes.

4. MANDREL / STEM REMOVAL AND NUT INSTALLATION

4.1. Following bolt installation the pull-in gun shall be detached from the bolt stem or mandrel taking care to ensure that no damage occurs to the structure or bolt or to the associated pull-in tooling (gun, mandrel and nose piece extensions). Checks should then be made to ensure that the bolt head is properly seated in accordance with the requirements of ABP2-2336.

4.2. Once a satisfactory installation has been confirmed the mandrel should be removed ensuring that no damage occurs to the fastener or thread. For break-stem fasteners (ABS0807K and ABS0907K) the stem is removed from the main body of the fastener by a sharp bending or levering action designed to cause fracture in the necked region immediately below the thread, and applied using the gun / nose piece extension or other appropriate tooling (Figure 2). During this operation care should be taken to ensure that no damage occurs to the fastener, thread or surrounding structure.

4.3. Prior to nut installation remove excess sealant / lubricant from the threads with a clean cloth and check that the fastener protrusion meets the requirements defined in Appendix D table 3.

4.4. Install the nut using the procedures defined in this specification conforming to the torque tightening requirements detailed in Appendix C and ensuring that drawing invoked sealing instructions (e.g. ABP 4-5141 / ABP 4-5142) are observed.

5. DOCUMENTATION 5.1. The manufacturing or production engineering function shall generate supporting

manufacturing documentation to define:-

a. Detailed tooling set-up b. Part handling fixture requirements c. Detailed operator instructions with the correct installation and inspection sequences to

comply with the requirements of this specification.

DocMaster: Uncontrolled copy when printed

Page 30: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 30

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

APPENDIX E CONT’D

Figure 2. Pull-in installation and stem removal procedure for ABS 0807 / 0907 break-stem fasteners.

Figure 3. Pull-in installation procedure for point drive bolts using mandrel attachment.

Using the pull-gun fordiameters 4.8-6.4 mm

Fracture byBending

Using the extensionpiece for diameters greater than 7.9mm

Stage 1Stage 1 Stage 2Stage 2 Stage 3Stage 3 Stage 4Stage 4

Stage 5Stage 5

Using the pull-gun fordiameters 4.8-6.4 mm

Fracture byBending

Using the extensionpiece for diameters greater than 7.9mm

Stage 1Stage 1 Stage 2Stage 2 Stage 3Stage 3 Stage 4Stage 4Stage 1Stage 1 Stage 2Stage 2 Stage 3Stage 3 Stage 4Stage 4

Stage 5Stage 5Stage 5Stage 5

Mandrel Insertion (Left Hand Thread)

Nose-cap Extension or Collar (Optional)

Pull-in Gun / ToolingMandrel Insertion

(Left Hand Thread)

Nose-cap Extension or Collar (Optional)

Pull-in Gun / Tooling

DocMaster: Uncontrolled copy when printed

Page 31: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 31

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

APPENDIX E CONT’D

Table 2. Recommended Tooling and Pull-in Loads Bolt

Diameter Code

Bolt Part Number Pull-in

Gun Part Number

Pull-in Gun Calibration

Load

Nose-Piece Part Numbers

Mandrel Part Number

-3 ABS0807VHK ABS0907VHK

TBC PH580

TBC 9KN NRPH 580-480 -

-4 ABS0807VHK ABS0907VHK

TBC PH580

TBC 13KN NRPH 580-635 -

-5 ABS0807VHK ABS0907VHK

TBC PH580

TBC 22.7KN NRPH 580-794 -

-6 ABS0807VHK ABS0907VHK

TBC PH912

TBC TBC NRPH 912-952 -

-7 ABS0807VHK ABS0907VHK

TBC PH912

TBC 44 KN NRPHO 912-111 -

-8 ABS0807VHK ABS0907VHK

TBC PH912

TBC 54.5 KN NRPHO 912-127 -

-9 ABS0809 (-,VHK) ABS0810 (-,VHK)

TBC TBC

TBC TBC TBC TBC

-10 ABS0809 (-,VHK) ABS0810 (-,VHK)

ABS0876L

TBC TBC

PH912

TBC TBC

50kN (Max) NRPHO 912-159 HPM342 -

12SP- 3

-12

ABS0809 ABS0810

ABS0811VHK ABS0812VHK

ABS0876L

TBC TBC TBC TBC

PH925S

TBC TBC TBC TBC

100 kN (Max)

NRPHO 925S HPM342 -14SP- 4

-14

ABS0809 ABS0810

ABS0811VHK ABS0812VHK

ABS0876L

TBC TBC TBC TBC

PH925S

TBC TBC TBC TBC

130 kN (Max)

NRPHO 925S HPM342 -16SP- 4

-16

ABS0809 ABS0810

ABS0811VHK ABS0812VHK

TBC TBC TBC TBC

TBC TBC TBC TBC

NRPHO 925S HPM342 -18SP -5

DocMaster: Uncontrolled copy when printed

Page 32: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 32

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

APPENDIX F

Special Installation Requirements –Frangible Nuts/Collar 1. INSTALLATION PROCESS FOR DOUBLE HEXAGONAL NUTS

Step 1: Install nut with an approved socket by engaging the lower and upper hexagonal feature (double engagement) on the nut (figure 4) and applying relevant torque as indicated in appendix C. Step 2: If required, re-torque to the relevant torque value as indicated in appendix C due to

possible sealant relaxation. Step 3: Break off the upper hexagonal feature on the nut before the end of sealant assembly

time using suitable wrench. Torqued off area of the nut shall be protected in accordance with the requirement of the drawing.

Figure 4. Installation procedure for Frangible nuts (e.g. ASNA 2536/ASNA 2538)

Nut Installation

Step 1 Step 2 Step 3

Upper hexagonal nut Break off Re-torque Nut

DocMaster: Uncontrolled copy when printed

Page 33: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 33

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

APPENDIX G Qualified fastener combinations for Electric Nut Runners A400M Size -3 -4 -5 -6 -7 -8 -9 -10 -12 -14 -16 Bolt Nut EN6114T ASNA2531 X X X X X X ASNA2532 X X X X X X EN6115T ASNA2531 X X X X X X ASNA2532 X X X X X X

DocMaster: Uncontrolled copy when printed

Page 34: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 34

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

APPENDIX H

Special Installation Requirements - For L5755xxxx High Interference Fit Pull-In Studs

Note: L5755xxxx High Interference Fit Pull-In Studs shall be assembled with NAS5057 Nuts with the exception of –19, where NSA5373 Nuts shall be assembled.

1). Pre-installation hole geometry:

Unless otherwise specified the holes for L5755xxxx pull-in studs shall conform to the dimensions shown in figure 1 and tables 1 to 3. Additional hole details shall be in accordance with drawing requirements SL4477 and SL4478.

DocMaster: Uncontrolled copy when printed

Page 35: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 35

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

Table 1 – Hole Radius and Diameter Requirements for High Interference Fit L5755xxxx Studs

PULL-IN STUD

NUMBER

NOM. STUD DIA

CODE

UNITS

HOLE RADIUS

‘R’

HOLE DIAMETER

‘D’ MIN MAX MIN MAX

L57553245 -10 mm 1,02 1,27 16,091 16,133

inches 0.040 0.050 0.6335 0.6352

L57553244 -12 mm 1,14 1,40 19,248 19,301

inches 0.045 0.055 0.7578 0.7599 L57553243 L57556355 -14

mm 1,27 1,52 22,407 22,460 inches 0.050 0.060 0.8822 0.8843

L57553200 L57556356 -16

mm 1,52 1,78 25,566 25,619 inches 0.060 0.070 1.0065 1.0086

L57553199 L57556357 -18

mm 1,78 2,03 28,721 28,777 inches 0.070 0.080 1.1307 1.1329

L57556611 -19 mm 1,90 2,16 30,302 30,359

inches 0.075 0.085 1.193 1.1952

L57556612 -20 mm 1,90 2,16 31,881 31,94

inches 0.075 0.085 1.2552 1.2575

DocMaster: Uncontrolled copy when printed

Page 36: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 36

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

Table 2 – Hole Radius and Diameter Requirements for L5755xxxx High Interference Fit Studs – 1st Oversize.

PULL-IN STUD

NUMBER

NOM. STUD DIA

CODE

UNITS

HOLE RADIUS

‘R’

HOLE DIAMETER

‘D’ MIN MAX MIN MAX

L57553245 -1st Oversize -10

mm 1,02 1,27 16,487 16,530 inches 0.040 0.050 0.6491 0.6508

L57553244 -1st Oversize -12

mm 1,14 1,40 19,644 19,697 inches 0.045 0.055 0.7734 0.7755

L57553243 L57556355 -

1st Oversize -14

mm 1,27 1,52 22,803 22,856

inches 0.050 0.060 0.8978 0.8998

L57553200 L57556356 -

1st Oversize -16

mm 1,52 1,78 25,962 25,856

inches 0.060 0.070 1.0221 1.0242

L57553199 L57556357 -

1st Oversize -18

mm 1,78 2,03 29,118 29,176

inches 0.070 0.080 1.1464 1.1487

L57556611 -1st Oversize -19

mm 1,90 2,16 30,699 30,756 inches 0.075 0.085 1.2086 1.2109

L57556612 -1st Oversize -20

mm 1,90 2,16 32,278 32,337 inches 0.075 0.085 1.2708 1.2731

DocMaster: Uncontrolled copy when printed

Page 37: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 37

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

Table 3 – Hole Radius and Diameter Requirements for L5755xxxx High Interference Fit Studs – 2nd Oversize.

PULL-IN STUD

NUMBER

NOM. STUD DIA

CODE

UNITS

HOLE RADIUS

‘R’

HOLE DIAMETER

‘D’ MIN MAX MIN MAX

L57553245 -2nd Oversize -10

mm 1,02 1,27 16,885 16,923 inches 0.040 0.050 0.6648 0.6663

L57553244 -2nd Oversize -12

mm 1,14 1,40 20,037 20,095 inches 0.045 0.055 0.7889 0.7911

L57553243 L57556355

-2nd Oversize -14

mm 1,27 1,52 23,199 23,252

inches 0.050 0.060 0.9133 0.9154

L57553200 L57556356

-2nd Oversize -16

mm 1,52 1,78 26,358 26,411

inches 0.060 0.070 1.0377 1.0398

L57553199 L57556357

-2nd Oversize -18

mm 1,78 2,03 29,514 29,570

inches 0.070 0.080 1.1620 1.1642

L57556611 -2nd Oversize -19

mm 1,90 2,16 31,096 31,153 inches 0.075 0.085 1.2243 1.2265

L57556612 -2nd Oversize -20

mm 1,90 2,16 32,675 32,734 inches 0.075 0.085 1.2864 1.2887

DocMaster: Uncontrolled copy when printed

Page 38: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 38

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

2). Installed L5755xxxx pull-in fasteners shall conform to the protrusion requirements identified in figure 2 and table 4.

DocMaster: Uncontrolled copy when printed

Page 39: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 39

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

Table 4 – L5755xxxx Thread Protrusion Requirements

Bolt Part Number L5755xxxx

Nut Part Number NSA5057 (See Note*)

Stud Drawing Number

PROTRUSION

Dia. Plain Stud End Protrusion

(Dimension ‘M’)

Pull-In Stud End Protrusion

(Dimension ‘N’) Max Min

Stud protrusion shall be visually checked to

ensure that thread is not intruding into hole and that fastener shank is

not protruding excessively beyond

hole to cause nut fouling (shanking).

mm inch mm inch L57553245 -10 26.47 1.042 25.30 0.996 L57553244 -12 31.53 1.241 30.30 1.193 L57553243 L57556355 -14 36.59 1.441 35.30 1.390

L57553200 L57556356 -16 41.44 1.632 40.30 1.587

L57553199 L57556357 -18 44.50 1.750 43.30 1.705

L57556611 -19 48.18 1.897 46.30 1.823 L57556612 -20 48.84 1.923 47.30 1.862

Note: If washers are used, then protrusion measurements shall be taken from washer-nut face (10B to 20B studs excluding 19B studs). For 19B diameter stud, use NSA5373 nut. Washers shall be used to ensure nut does not foul stud thread runout. Protrusion measurements shall be taken from surface of the component including washer(s) see figure 4.

DocMaster: Uncontrolled copy when printed

Page 40: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 40

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

3). L5755xxxx studs and NSA5057 nuts shall be torque tightened to the requirements shown in table 5, for 19B studs use NSA5373 nuts and assemble with Never-Seez (Nickel Special) grease compound see appendix 1 of ABP 2-2336. It is necessary to torque tighten both nuts per stud assembly.

Table 5 – L5755xxxx Torque Tightening Requirements

Stud Part Number L5755xxxx Nut Part Number NSA5057 NSA5373 (1)

Stud Drawing Number

Stud Nom. Dia.

Code

Torque Tightening Value Torque Tightening Value

Nm Lbf.in Nm Lbf.in

L57553245 -10 119-130 1050-1150 N/A N/A

L57553244 -12 185-200 1640-1770 N/A N/A L57553243 L57556355 -14 250-277 2210-2450 N/A N/A

L57553200 L57556356 -16 328-362 2900-3200 N/A N/A

L57553199 L57556357 -18 421-467 3730-4130 N/A N/A

L57556611 -19 N/A N/A L57556612 -20 518-577 4610-5135 N/A N/A

Note: Both nuts on each stud assembly shall be torque tightened to the requirements shown above

(1). Nuts shall be assembled with Never-Seez (Nickel Special) Grease compound 4). The following process limitations shall be adopted:

- A maximum of 2 washers for each stud end is permissible as specified on drawing. - Unless otherwise specified on the drawing, the total thickness of washers for each stud end shall not exceed 1.6mm - Fastener assemblies shall be sealed as required by drawing. - The shrink fitting of fasteners contained within this specification are not permitted.

- Installation methods shall be such to avoid damage to the surrounding structure of the assembly. Cases where protective treatments have been removed shall be retreated in accordance with the requirements of ABP 0-1013.

DocMaster: Uncontrolled copy when printed

Page 41: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 41

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

- The use of pull-in gun nose-cap extensions or collars to prevent witness marking on the structure is acceptable providing the tooling does not foul or cause damage to the fastener

during the installation process. Collars shall not protrude within hole circumference as shown in figure 3.

- Oversize repairs shall be carried out under cover of non-conformance documentation as defined by the Airbus UK Limited Quality Authority.

- The removal of fastener threads to achieve protrusion tolerances is strictly prohibited.

- The pull-in gun load calibration setting shall not exceed the maximum allowable setting for each fastener type as defined in table 6.

- Following installation and nut torque tightening, the nut shall not foul the fastener shank, and there shall be at least 1 complete thread protruding beyond nut face.

- Studs shall not be re-installed once completely removed.

DocMaster: Uncontrolled copy when printed

Page 42: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 42

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

Table 6 – Tooling numbers and maximum allowable gun calibration settings

Bolt/Stud Part Number

Bolt/Stud Nom Dia.

Code

Pull-In Gun Part Number

Max. Gun Pull-In Load

Nose Piece Part Number

Mandrel Part

Number

L57553245 -10 PH912 50 KN NRPHO 912-159 HPM342-12SP-4

L57553244 -12 PH925S 100KN NRPHO 925S HPM342-14SP-4

L57553243 L57556355 -14 PH925S 130KN NRPHO 925S HPM342-

16SP-4 L57553200 L57556356 -16 PH925S 155KN NRPHO 925S HPM342-

18SP-5 L57553199 L57556357 -18 PH925S 155KN NRPHO 925S HPM342-

18SP-5

L57556611 -19 PH925S 155KN NRPHO 925S HPM342-18SP-5

L5756612 -20 PH925S 155KN NRPHO 925S HPM342-18SP-5

5). The following pull-in stud installation procedure shall be adopted by Manufacturing in addition to drawing requirements: Pre-Installation Checks

- The correct fastener grip length defined on drawing shall be checked and selected for a given stack thickness using a verification gauge approved by manufacturing.

- Washers shall be selected to maintain correct grip length as specified on drawing.

- Holes shall be checked to ensure that they meet the requirements specified on drawing and within this specification.

- Holes and hole entrance shall be completely lubricated with Boelube 70305 paste before fastener installation. Ensure that each hole is clean and free of swarf and excess sealant before lubricant is applied.

- Prior to bolt installation, all traces of Boelube 70305 paste shall be removed from structure at the surface where nut seats.

DocMaster: Uncontrolled copy when printed

Page 43: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 43

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

Stud Alignment and Mandrel Installation

- A suitable tooling nut (non-crimped) shall be threaded onto plain stud end prior to stud installation. The nut shall be positioned to ensure that maximum protrusion (see table 4 and figure 4) is achieved at the plain stud end following stud pull-in.

DocMaster: Uncontrolled copy when printed

Page 44: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 44

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

- Ensure correct mandrel has been selected for fastener (table 6) and check fastener pull in thread and pull-in mandrel are clean and undamaged before use (mandrels may be re-used).

- Mandrels may be threaded into pull-in thread before or after the fastener has been offered and aligned with the hole.

- Thread mandrel (Left-Hand Thread) fully into fastener ensuring that threads are correctly engaged (see figure 4).

Stud Pull-In Installation - Select correct pull-in tooling for fastener (as shown in table 6).

- To prevent damage to the structure always select a pull-in gun that is set to the minimum calibration load. If the pull-in gun calibration load is insufficient to pull-in fastener, then a gun with a higher calibration load shall be selected.

- Ensure tooling is connected to approved power pack system.

- Locate puller-gun grips over mandrel grooved and ensure fastener and tooling is axially aligned with the hole.

DocMaster: Uncontrolled copy when printed

Page 45: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 45

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

- Puller gun units shall be operated to pull the fastener into the hole (figure 5); several pull-in operations my be required if the fastener grip length exceeds the mandrel working length. A nose-ca extension or collar may be required to fervent fouling between fastener and pull-in tooling. - If puller gun calibration load is insufficient to pull-in fastener, then gun can be replaced with a gun set to a higher calibration load. - Following installation, ensure that stud nut is fully seated and conforms to the requirements shown in figure 2 and table 4.

Tooling and Mandrel Removal - Remove pull-in gun from mandrel ensuring that damage to mandrel or gun does not occur

(figure 6).

- Remove mandrel from fastener without causing damage to the fastener (figure 6).

- Inspect structure for visible signs of damage or witness marks caused by pull-in tooling.

DocMaster: Uncontrolled copy when printed

Page 46: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 46

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

Nut Installation - Remove excess sealant/lubricant from threads with a clean cloth.

- Check fastener protrusion using verification gauges/visual checks and install washers to drawing requirements.

- Thread nut onto stud and torque tighten to the requirements specified in table 5.

- To control the protrusion of studs, it is permissible to adjust the position of the fastener within the hole by loosening one nut end and torque tightening the opposing nut (providing applied torque does not exceed limits of table 5).

- Check installation of fastener and nut meet the seating and protrusion requirements defined within this specification.

6). Nuts shall be over-sealed to the requirements specified on drawing.

- For the over-sealing of nuts on the pull-in end of studs only; over-sealing shall be undertaken in accordance with ABP 4-5141 with the exception that sealant dimensions are allowed to

conform to the requirements shown in figure7

DocMaster: Uncontrolled copy when printed

Page 47: ABP 2-2075

M&P FORM 01

ABP 2-2075 PAGE 47

© Airbus Operations Ltd 1993 - 2011 ALL RIGHTS RESERVED

ISSUE 6

7). Production Engineering shall generate supporting manufacturing documentation to define the following:

- Detailed tooling set-up.

- Part handling fixture requirements.

- Detailed operator instructions with the correct installation and inspection sequences to comply with the requirements of this PSD.

DocMaster: Uncontrolled copy when printed