abwr design control document tier 2 · chapter 21 figure toc volume 1-i 25a5675bb revision 7 abwr...

111
25A5675BB Revision 7 October 2019 ABWR Design Control Document Tier 2 Chapter 21 Volume 1 Copyright 1994, 2010, 2016, 2019 GE-Hitachi Nuclear Energy Americas LLC All Rights Reserved

Upload: others

Post on 25-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675BBRevision 7

October 2019

ABWR Design Control Document Tier 2

Chapter 21Volume 1

Copyright 1994, 2010, 2016, 2019 GE-Hitachi Nuclear Energy Americas LLCAll Rights Reserved

Page 2: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675BB Revision 7

Design Control Document/Tier 2ABWRChapter 21 Volume 1

List of Figures

Figure 1.2-2 Reactor Building, Arrangement Elevation, Section A-A............................................21-1

Figure 1.2-2a Reactor Building, Arrangement Elevation, Section B-B ............................................21-2

Figure 1.2-3 Upper Drywell, Arrangement Elevation, Section A-A ...............................................21-3

Figure 1.2-3a Upper Drywell, Arrangement Elevation, Section B-B................................................21-3

Figure 1.2-3b Lower Drywell, Arrangement Elevation, Section A-A...............................................21-4

Figure 1.2-3c Wetwell, Arrangement Elevation, Sections A-A & B-B ............................................21-5

Figure 1.2-4 Reactor Building, Arrangement Plan at Elevation -8200 mm ....................................21-6

Figure 1.2-5 Reactor Building, Arrangement Plan at Elevation -1700 mm ....................................21-7

Figure 1.2-6 Reactor Building, Arrangement Plan at Elevation 4800/8500 mm.............................21-8

Figure 1.2-8 Reactor Building, Arrangement Plan at Elevation 12300 mm....................................21-9

Figure 1.2-9 Reactor Building, Arrangement Plan at Elevation 18100 mm..................................21-10

Figure 1.2-10 Reactor Building, Arrangement Plan at Elevation 23500 mm..................................21-11

Figure 1.2-11 Reactor Building, Arrangement Plan at Elevation 27200 mm..................................21-12

Figure 1.2-12 Reactor Building, Arrangement Plan at Elevation 31700/38200 mm.......................21-13

Figure 1.2-13a Drywell, Arrangement Plan at Elevation 12300 mm ................................................21-14

Figure 1.2-13b Drywell, Arrangement Plan at Elevation 15600 mm ................................................21-15

Figure 1.2-13c Drywell, Arrangement Plan at Elevation 18100 mm ................................................21-16

Figure 1.2-13d Drywell Steel Structure at Elevation 18100 mm.......................................................21-17

Figure 1.2-13e Lower Drywell, Arrangement Plan at Elevation -6600 to -1850 mm.......................21-18

Figure 1.2-13f Lower Drywell, Arrangement Plan at Elevation -1850 to 1750 mm ........................21-19

Figure 1.2-13g Lower Drywell, Arrangement Plan at Elevation 1750 to 4800 mm .........................21-20

Figure 1.2-13h Lower Drywell, Arrangement Plan at Elevation 4800 to 6700 mm .........................21-21

Figure 1.2-13i Wetwell, Arrangement Plan at Elevation -8200 mm ................................................21-22

Figure 1.2-13j Wetwell, Arrangement Plan at Elevation -1700 mm ................................................21-23

Figure 1.2-13k Wetwell, Arrangement Plan at Elevation 4800 mm..................................................21-24

Figure 1.2-14 Control and Service Building, Arrangement Elevation, Section A-A ......................21-25

Chapter 21 Figure TOC Volume 1-i

Page 3: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675BB Revision 7

Design Control Document/Tier 2ABWR

List of Figures (Continued)

Figure 1.2-15 Control and Service Building, Arrangement Elevation, Section B-B.......................21-26

Figure 1.2-16 Control Building, Arrangement Plan at Elevation -8200 mm...................................21-27

Figure 1.2-17 Control and Service Building, Arrangement Plan at Elevation -2150 mm...............21-28

Figure 1.2-18 Control and Service Building, Arrangement Plan at Elevation 3500 mm ................21-29

Figure 1.2-19 Control and Service Building, Arrangement Plan at Elevation 7900 mm ................21-30

Figure 1.2-20 Control and Service Building, Arrangement Plan at Elevation 12300 mm ..............21-31

Figure 1.2-21 Control and Service Building, Arrangement Plan at Elevation 17150 mm ..............21-32

Figure 1.2-22 Control and Service Building, Arrangement Plan at Elevation 22200 mm ..............21-33

Figure 1.2-23a Radwaste Building at Elevation -1500 mm ..............................................................21-34

Figure 1.2-23b Radwaste Building at Elevation 4800 mm................................................................21-35

Figure 1.2-23c Radwaste Building at Elevation 12300 mm..............................................................21-36

Figure 1.2-23d Radwaste Building at Elevation 21000 mm..............................................................21-37

Figure 1.2-23e Radwaste Building, Section A-A ..............................................................................21-38

Figure 1.2-24 Turbine Building, General Arrangement at Elevation 5300 mm .............................21-39

Figure 1.2-25 Turbine Building, General Arrangement at Elevation 12300 mm............................21-40

Figure 1.2-26 Turbine Building, General Arrangement at Elevation 20300 mm............................21-41

Figure 1.2-27 Turbine Building, General Arrangement at Elevation 30300 mm............................21-42

Figure 1.2-28 Turbine Building, General Arrangement, Longitudinal Section A-A.......................21-43

Figure 1.2-29 Turbine Building, General Arrangement, Section B-B.............................................21-44

Figure 1.2-30 Turbine Building, General Arrangement, Section C-C.............................................21-45

Figure 1.2-31 Turbine Building, General Arrangement, Section D-D ............................................21-46

Figure 1.7-1 Piping and Instrumentation Diagram Symbols (Sheets 1–2) ....................................21-47

Figure 3H.1-23 Reactor Building Reactor Cavity Shield Blocks .......................................................21-49

Figure 3H.1-28 Configuration of RPV Pedestal .................................................................................21-50

Figure 3H.1-29 Rebar Arrangement of F/P Girder and Slab (1/2) .....................................................21-51

Figure 3H.1-30 Containment Structure Wall Reinforcement .............................................................21-52

Volume 1-ii Chapter 21 Figure TOC

Page 4: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675BB Revision 7

Design Control Document/Tier 2ABWR

List of Figures (Continued)

Figure 3H.1-31 Containment Structure Opening Reinforcement .......................................................21-53

Figure 3H.1-32 Containment Structure Opening Reinforcement .......................................................21-54

Figure 3H.1-33 Containment Structure Top Slab Reinforcement ......................................................21-55

Figure 3H.1-34 Reactor Building Foundation Reinforcement (Sheet 1)............................................21-56

Figure 3H.1-35 Reactor Building Foundation Reinforcement (Sheet 2)............................................21-57

Figure 3H.1-36 Diaphragm Floor Reinforcement ..............................................................................21-58

Figure 3H.1-37 List of Seismic Wall Sections ...................................................................................21-59

Figure 3H.2-21 Control Building Floor Plan at Elevation -8200 mm ................................................21-60

Figure 3H.2-22 Control Building Framing Plan at Elevation -2150 mm ...........................................21-61

Figure 3H.2-23 Control Building Framing Plan at Elevation 3500 mm ............................................21-62

Figure 3H.2-24 Control Building Framing Plan at Elevation 7900 mm ............................................21-63

Figure 3H.2-25 Control Building Framing Plan at Elevation 12300 and 13100 mm.........................21-64

Figure 3H.2-26 Control Building Framing Plan at Elevation 17150 and 18250 mm.........................21-65

Figure 3H.2-27 Control Building Framing Plan at Elevation 22200 and 22750 mm.........................21-66

Figure 3H.2-28 Control Building Section...........................................................................................21-67

Figure 3H.2-29 Control Building Section and Details .......................................................................21-68

Figure 3H.2-30 Control Building Details ...........................................................................................21-69

Figure 3H.3-11 Radwaste Building, Reinforced Concrete Basemat ..................................................21-70

Figure 3H.3-12 Radwaste Building, Structural Steel Framing Plan, Typical Floor ...........................21-71

Figure 3H.3-13 Radwaste Building, Structural Steel Framing Plan, Elevation 28000 mm ...............21-72

Figure 3H.3-14 Radwaste Building, Section A-A ..............................................................................21-73

Figure 3H.3-15 Radwaste Building, Exterior Walls Sections ............................................................21-74

Figure 3H.3-16 Radwaste Building, Sections and Details..................................................................21-75

Figure 4.6-8 Control Rod Drive System P&ID (Sheets 1–3) ........................................................21-76

Figure 4.6-9 Control Rod Drive System PFD................................................................................21-79

Figure 5.1-3 Nuclear Boiler System P&ID (Sheets 1–11).............................................................21-80

Chapter 21 Figure TOC Volume 1-iii

Page 5: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675BB Revision 7

Design Control Document/Tier 2ABWR

List of Figures (Continued)

Figure 5.2-8 Leak Detection and Isolation System IED (Sheets 1–10) .........................................21-91

Figure 5.4-4 Reactor Recirculation System P&ID (Sheets 1–2) .................................................21-101

Figure 5.4-5 Reactor Recirculation System PFD.........................................................................21-103

Figure 5.4-8 Reactor Core Isolation Cooling System P&ID (Sheets 1–3) ..................................21-104

Volume 1-iv Chapter 21 Figure TOC

Page 6: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-1

AB

WR

ection A-A

Figure 1.2-2 Reactor Building, Arrangement Elevation, S
Page 7: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-2

AB

WR

Section B-B

Figure 1.2-2a Reactor Building, Arrangement Elevation,
Page 8: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-3

AB

WR

ction A-A

ection B-B

Figure 1.2-3 Upper Drywell, Arrangement Elevation, Se

Figure 1.2-3a Upper Drywell, Arrangement Elevation, S

Page 9: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-4

AB

WR

ection A-A

Figure 1.2-3b Lower Drywell, Arrangement Elevation, S
Page 10: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-5

AB

WR

A-A & B-B

Figure 1.2-3c Wetwell, Arrangement Elevation, Sections
Page 11: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-6

AB

WR

ion -8200 mm

Figure 1.2-4 Reactor Building, Arrangement Plan at Elevat
Page 12: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-7

AB

WR

ion -1700 mm

Figure 1.2-5 Reactor Building, Arrangement Plan at Elevat
Page 13: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-8

AB

WR

4800/8500 mm

Figure 1.2-6 Reactor Building, Arrangement Plan at Elevation
Page 14: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-9

AB

WR

ion 12300 mm

Figure 1.2-8 Reactor Building, Arrangement Plan at Elevat
Page 15: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-10

AB

WR

ion 18100 mm

Figure 1.2-9 Reactor Building, Arrangement Plan at Elevat
Page 16: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-11

AB

WR

tion 23500 mm

Figure 1.2-10 Reactor Building, Arrangement Plan at Eleva

Page 17: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-12

AB

WR

tion 27200 mm

Figure 1.2-11 Reactor Building, Arrangement Plan at Eleva
Page 18: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-13

AB

WR

31700/38200 mm

Figure 1.2-12 Reactor Building, Arrangement Plan at Elevation

Page 19: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-14

AB

WR

12300 mm

Figure 1.2-13a Drywell, Arrangement Plan at Elevation
Page 20: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-15

AB

WR

15600 mm

Figure 1.2-13b Drywell, Arrangement Plan at Elevation
Page 21: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-16

AB

WR

18100 mm

Figure 1.2-13c Drywell, Arrangement Plan at Elevation
Page 22: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-17

AB

WR

100 mm

Figure 1.2-13d Drywell Steel Structure at Elevation 18
Page 23: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-18

AB

WR

6600 to -1850 mm

Figure 1.2-13e Lower Drywell, Arrangement Plan at Elevation -
Page 24: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-19

AB

WR

1850 to 1750 mm

Figure 1.2-13f Lower Drywell, Arrangement Plan at Elevation -
Page 25: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-20

AB

WR

1750 to 4800 mm

Figure 1.2-13g Lower Drywell, Arrangement Plan at Elevation
Page 26: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-21

AB

WR

4800 to 6700 mm

Figure 1.2-13h Lower Drywell, Arrangement Plan at Elevation
Page 27: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-22

AB

WR

-8200 mm

Figure 1.2-13i Wetwell, Arrangement Plan at Elevation
Page 28: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-23

AB

WR

-1700 mm

Figure 1.2-13j Wetwell, Arrangement Plan at Elevation
Page 29: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-24

AB

WR

4800 mm

Figure 1.2-13k Wetwell, Arrangement Plan at Elevation
Page 30: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-25

AB

WR

tion, Section A-A

Figure 1.2-14 Control and Service Building, Arrangement Eleva

Page 31: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-26

AB

WR

tion, Section B-B

Figure 1.2-15 Control and Service Building, Arrangement Eleva
Page 32: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-27

AB

WR

tion -8200 mm

Figure 1.2-16 Control Building, Arrangement Plan at Eleva
Page 33: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-28

AB

WR

Elevation -2150 mm

Figure 1.2-17 Control and Service Building, Arrangement Plan at
Page 34: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-29

AB

WR

Elevation 3500 mm

Figure 1.2-18 Control and Service Building, Arrangement Plan at
Page 35: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-30

AB

WR

Elevation 7900 mm

Figure 1.2-19 Control and Service Building, Arrangement Plan at
Page 36: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-31

AB

WR

Elevation 12300 mm

Figure 1.2-20 Control and Service Building, Arrangement Plan at
Page 37: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-32

AB

WR

Elevation 17150 mm

Figure 1.2-21 Control and Service Building, Arrangement Plan at
Page 38: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-33

AB

WR

Elevation 22200 mm

Figure 1.2-22 Control and Service Building, Arrangement Plan at

Page 39: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-34

AB

WR

0 mm

Figure 1.2-23a Radwaste Building at Elevation -150
Page 40: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-35

AB

WR

0 mm

Figure 1.2-23b Radwaste Building at Elevation 480
Page 41: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-36

AB

WR

0 mm

Figure 1.2-23c Radwaste Building at Elevation 1230
Page 42: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-37

AB

WR

0 mm

Figure 1.2-23d Radwaste Building at Elevation 2100
Page 43: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-38

AB

WR

A

Figure 1.2-23e Radwaste Building, Section A-
Page 44: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-39

AB

WR

ation 5300 mm

Figure 1.2-24 Turbine Building, General Arrangement at Elev
Page 45: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-40

AB

WR

ation 12300 mm

Figure 1.2-25 Turbine Building, General Arrangement at Elev
Page 46: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-41

AB

WR

ation 20300 mm

Figure 1.2-26 Turbine Building, General Arrangement at Elev
Page 47: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-42

AB

WR

ation 30300 mm

Figure 1.2-27 Turbine Building, General Arrangement at Elev
Page 48: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-43

AB

WR

dinal Section A-A

Figure 1.2-28 Turbine Building, General Arrangement, Longitu
Page 49: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-44

AB

WR

ection B-B

Figure 1.2-29 Turbine Building, General Arrangement, S
Page 50: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-45

AB

WR

ection C-C

Figure 1.2-30 Turbine Building, General Arrangement, S
Page 51: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-46

AB

WR

ection D-D

Figure 1.2-31 Turbine Building, General Arrangement, S
Page 52: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7

Design C

ontrol Docum

ent/Tier 2

21-47

AB

WR

(Sheet 1 of 2)

Figure 1.7-1 Piping and Instrumentation Diagram Symbols
Page 53: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7

Design C

ontrol Docum

ent/Tier 2

21-48

AB

WR

(Sheet 2 of 2)

Figure 1.7-1 Piping and Instrumentation Diagram Symbols
Page 54: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7

Design C

ontrol Docum

ent/Tier 2

21-49

AB

WR

d Blocks

Figure 3H.1-23 Reactor Building Reactor Cavity Shiel
Page 55: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-50

AB

WR

l

Figure 3H.1-28 Configuration of RPV Pedesta
Page 56: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-51

AB

WR

lab (1/2)

Figure 3H.1-29 Rebar Arrangement of F/P Girder and S
Page 57: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-52

AB

WR

ement

Figure 3H.1-30 Containment Structure Wall Reinforc
Page 58: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-53

AB

WR

rcement

Figure 3H.1-31 Containment Structure Opening Reinfo
Page 59: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-54

AB

WR

rcement

Figure 3H.1-32 Containment Structure Opening Reinfo
Page 60: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-55

AB

WR

orcement

Figure 3H.1-33 Containment Structure Top Slab Reinf
Page 61: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-56

AB

WR

nt (Sheet 1)

Figure 3H.1-34 Reactor Building Foundation Reinforceme
Page 62: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-57

AB

WR

nt (Sheet 2)

Figure 3H.1-35 Reactor Building Foundation Reinforceme
Page 63: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-58

AB

WR

t

Figure 3H.1-36 Diaphragm Floor Reinforcemen
Page 64: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-59

AB

WR

Figure 3H.1-37 List of Seismic Wall Sections

Page 65: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-60

AB

WR

-8200 mm

Figure 3H.2-21 Control Building Floor Plan at Elevation
Page 66: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-61

AB

WR

n -2150 mm

Figure 3H.2-22 Control Building Framing Plan at Elevatio
Page 67: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-62

AB

WR

n 3500 mm

Figure 3H.2-23 Control Building Framing Plan at Elevatio
Page 68: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-63

AB

WR

n 7900 mm

Figure 3H.2-24 Control Building Framing Plan at Elevatio
Page 69: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-64

AB

WR

00 and 13100 mm

Figure 3H.2-25 Control Building Framing Plan at Elevation 123
Page 70: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-65

AB

WR

50 and 18250 mm

Figure 3H.2-26 Control Building Framing Plan at Elevation 171
Page 71: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-66

AB

WR

00 and 22750 mm

Figure 3H.2-27 Control Building Framing Plan at Elevation 222
Page 72: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-67

AB

WR

Figure 3H.2-28 Control Building Section

Page 73: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-68

AB

WR

ails

Figure 3H.2-29 Control Building Section and Det
Page 74: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-69

AB

WR

Figure 3H.2-30 Control Building Details

Page 75: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-70

AB

WR

e Basemat

Figure 3H.3-11 Radwaste Building, Reinforced Concret
Page 76: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-71

AB

WR

lan, Typical Floor

Figure 3H.3-12 Radwaste Building, Structural Steel Framing P
Page 77: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-72

AB

WR

Elevation 28000 mm

Figure 3H.3-13 Radwaste Building, Structural Steel Framing Plan,
Page 78: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-73

AB

WR

A

Figure 3H.3-14 Radwaste Building, Section A-
Page 79: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-74

AB

WR

ections

Figure 3H.3-15 Radwaste Building, Exterior Walls S
Page 80: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7S

ecurity-Sensitive Inform

ationW

ithhold from P

ublic Disclosure under 10 C

FR 2.390

Design C

ontrol Docum

ent/Tier 2

21-75

AB

WR

etails

Figure 3H.3-16 Radwaste Building, Sections and D
Page 81: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7

Design C

ontrol Docum

ent/Tier 2

21-76

AB

WR

1 of 3)

Figure 4.6-8 Control Rod Drive System P&ID (Sheet
Page 82: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7

Design C

ontrol Docum

ent/Tier 2

21-77

AB

WR

2 of 3)

Figure 4.6-8 Control Rod Drive System P&ID (Sheet
Page 83: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7

Design C

ontrol Docum

ent/Tier 2

21-78

AB

WR

3 of 3)

Figure 4.6-8 Control Rod Drive System P&ID (Sheet
Page 84: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7

Design C

ontrol Docum

ent/Tier 2

21-79

AB

WR

Figure 4.6-9 Control Rod Drive System PFD

Page 85: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7

Design C

ontrol Docum

ent/Tier 2

21-80

AB

WR

of 11)

Figure 5.1-3 Nuclear Boiler System P&ID (Sheet 1
Page 86: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7

Design C

ontrol Docum

ent/Tier 2

21-81

AB

WR

of 11)

Figure 5.1-3 Nuclear Boiler System P&ID (Sheet 2

Page 87: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7

Design C

ontrol Docum

ent/Tier 2

21-82

AB

WR

of 11)

Figure 5.1-3 Nuclear Boiler System P&ID (Sheet 3
Page 88: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7

Design C

ontrol Docum

ent/Tier 2

21-83

AB

WR

of 11)

Figure 5.1-3 Nuclear Boiler System P&ID (Sheet 4
Page 89: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7

Design C

ontrol Docum

ent/Tier 2

21-84

AB

WR

of 11)

Figure 5.1-3 Nuclear Boiler System P&ID (Sheet 5
Page 90: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7

Design C

ontrol Docum

ent/Tier 2

21-85

AB

WR

of 11)

Figure 5.1-3 Nuclear Boiler System P&ID (Sheet 6

13RSS004

LT

B

13RSS

Page 91: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7

Design C

ontrol Docum

ent/Tier 2

21-86

AB

WR

of 11)

Figure 5.1-3 Nuclear Boiler System P&ID (Sheet 7
Page 92: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7

Design C

ontrol Docum

ent/Tier 2

21-87

AB

WR

of 11)

Figure 5.1-3 Nuclear Boiler System P&ID (Sheet 8
Page 93: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7

Design C

ontrol Docum

ent/Tier 2

21-88

AB

WR

of 11)

Figure 5.1-3 Nuclear Boiler System P&ID (Sheet 9
Page 94: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7

Design C

ontrol Docum

ent/Tier 2

21-89

AB

WR

of 11)

Figure 5.1-3 Nuclear Boiler System P&ID (Sheet 10
Page 95: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7

Design C

ontrol Docum

ent/Tier 2

21-90

AB

WR

of 11)

Figure 5.1-3 Nuclear Boiler System P&ID (Sheet 11
Page 96: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7

Design C

ontrol Docum

ent/Tier 2

21-91

AB

WR

eet 1 of 10)

Figure 5.2-8 Leak Detection and Isolation System IED (Sh
Page 97: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7

Design C

ontrol Docum

ent/Tier 2

21-92

AB

WR

eet 2 of 10)

Figure 5.2-8 Leak Detection and Isolation System IED (Sh
Page 98: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7

Design C

ontrol Docum

ent/Tier 2

21-93

AB

WR

eet 3 of 10)

Figure 5.2-8 Leak Detection and Isolation System IED (Sh
Page 99: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7

Design C

ontrol Docum

ent/Tier 2

21-94

AB

WR

eet 4 of 10)

Figure 5.2-8 Leak Detection and Isolation System IED (Sh
Page 100: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7

Design C

ontrol Docum

ent/Tier 2

21-95

AB

WR

eet 5 of 10)

Figure 5.2-8 Leak Detection and Isolation System IED (Sh
Page 101: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7

Design C

ontrol Docum

ent/Tier 2

21-96

AB

WR

eet 6 of 10)

Figure 5.2-8 Leak Detection and Isolation System IED (Sh
Page 102: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7

Design C

ontrol Docum

ent/Tier 2

21-97

AB

WR

eet 7 of 10)

Figure 5.2-8 Leak Detection and Isolation System IED (Sh
Page 103: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7

Design C

ontrol Docum

ent/Tier 2

21-98

AB

WR

eet 8 of 10)

Figure 5.2-8 Leak Detection and Isolation System IED (Sh
Page 104: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7

Design C

ontrol Docum

ent/Tier 2

21-99

AB

WR

eet 9 of 10)

Figure 5.2-8 Leak Detection and Isolation System IED (Sh
Page 105: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7

Design C

ontrol Docum

ent/Tier 2

21-100

AB

WR

eet 10 of 10)

Figure 5.2-8 Leak Detection and Isolation System IED (Sh
Page 106: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7

Design C

ontrol Docum

ent/Tier 2

21-101

AB

WR

et 1 of 2)

Figure 5.4-4 Reactor Recirculation System P&ID (She
Page 107: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7

Design C

ontrol Docum

ent/Tier 2

21-102

AB

WR

et 2 of 2)

Figure 5.4-4 Reactor Recirculation System P&ID (She
Page 108: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7

Design C

ontrol Docum

ent/Tier 2

21-103

AB

WR

D

Figure 5.4-5 Reactor Recirculation System PF
Page 109: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7

Design C

ontrol Docum

ent/Tier 2

21-104

AB

WR

(Sheet 1 of 3)

Figure 5.4-8 Reactor Core Isolation Cooling System P&ID
Page 110: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7

Design C

ontrol Docum

ent/Tier 2

21-105

AB

WR

(Sheet 2 of 3)

Figure 5.4-8 Reactor Core Isolation Cooling System P&ID
Page 111: ABWR Design Control Document Tier 2 · Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 ABWR Design Control Document/Tier 2 Figure 1.2-2 Reactor Building, Arrangement Elevation,

25A5675B

B R

evision 7

Design C

ontrol Docum

ent/Tier 2

21-106

AB

WR

(Sheet 3 of 3)

Figure 5.4-8 Reactor Core Isolation Cooling System P&ID