ac data

Upload: kamal-hassan

Post on 14-Apr-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/30/2019 AC DATA

    1/4

    S.No. Department Capacity and Make Type Qty.

    1 AVP Security Office 1.5 Ton Dawlance Split A/C 1

    2 Finance manager 1.5 Ton Dawlance Split A/C 1

    3 Finance Staff Room 1.5 Ton Dawlance Split A/C 2

    4 MIS Server Room 1.5 Ton Dawlance Split A/C 1

    5 MIS Server Room 2 Ton Dawlance Split A/C 16 MIS Manager 1 Ton Dawlance Split A/C 1

    7 MIS Staff Room 2 Ton Dawlance Split A/C 1

    8 MIS Hardware Room 1 Ton Dawlance Split A/C 1

    9 DF Manager 1.5 Ton Dawlance Split A/C 1

    10 Existing Foaming Chemical Room 1.5 Ton Dawlance Split A/C 1

    11 DF Testing Leak Check Room 2 Ton Dawlance Split A/C 1

    12 DF Chemical Room 2 Ton Dawlance Split A/C 1

    13 DF Evaporator Leak Check Room QC 2 Ton Dawlance Split A/C 1

    14 Plant Engineering Office Split AC out of order Split A/C 1

    15 Welding Panel Room #2 1 Ton Split AC Dawlance Split A/C 116 Paint Booth #1 1.5 Ton Split AC Dawlance Split A/C 1

    17 Paint Booth #2 1.5 Ton Split AC Dawlance Split A/C 1

    18 Conveyor Panel Room #1 Split AC 1 Ton Split A/C 1

    19 Evaporator Leak Check Room QC A2B Split AC 1 Ton Split A/C 1

    20 Sr. DM QC A2B Split AC 1.5 Ton Split A/C 1

    21 Leak Check Room A2B Function Line Split AC 1.5 Ton Split A/C 1

    22 PLC Room Split AC 1.5 Ton Split A/C 1

    23 A2B Function Line 1 Ton Dawlance Split A/C 1

    24 A2B Charging Panel 1 Ton Dawlance Split A/C 1

    25 A2B Chemical Room 1 Ton Dawlance Split Split A/C 1

    26 A2B Assembly Office 1.5 Ton Dawlance Split A/C 1

    27 Canteen 2 Ton Dawlance Split Split A/C 2

    28 Existing Charging Panel Split AC 1.5 Ton Split A/C 1

    29 CNC Mchine Thermoforming Split AC 1.5 Ton Split A/C 2

    30 QC Leak Check Room Existing Split AC 1 Ton Split A/C 1

    31 Thermostat Testing Room Split AC 1.5 Ton Split A/C 1

    32 D and DD Office Split 1 Ton Dawlance Split A/C 3

    33 Masjid Split 1.5 ton Split A/C 2

  • 7/30/2019 AC DATA

    2/4

    34 Masjid Split 2 Ton Split A/C 1

    35 CDC Office 1.5 Ton Dawlance Split A/C 1

    36 Auditor Club 1 Ton Dawlance Split A/C 1

    37 FM PA 1 Ton Dawlance Split A/C 1

    38 Director Office 1.5 Ton Dawlance Split A/C 1

    39 Conference Room 2 Ton Dawlance Split A/C 140 OHBEYA Room Split 1.5 Ton Split A/C 1

    41 Manager Manufacturing Split 1.5 Ton Split A/C 1

    42 Training Hall Split 1.5 Ton Split A/C 3

    43 Dy. Mgr. Mech. Split 1 Ton Split A/C 1

    44 HR Manager Office Split 1 Ton Split A/C 1

    45 HR Staff Room Split 1 Ton Split A/C 2

    46 Security Office Split 1.5 Ton Split A/C 1

    47 CCTV Room Split 1 Ton Split A/C 2

    48 Visitor Room Split 1.5 Ton Split A/C 1

    49 Admin Manager Split 1 Ton Split A/C 150 Admin Staff Room Split 1.5 Ton Split A/C 2

    61

    S.No. Department Capacity and Make Type Qty.

    1 Dy. Mgr EPS 1.5 Ton Dawlance Window 1

    2 Electronic Lab 1.5 Ton General Window 1

    3 Plant Engineerg 1.5 Ton Dawlance Window 2

    4 AVP Production 2 1.5 Ton National Window 1

    5 HOD Production 2 1.5 Ton Goldstar Window 1

    6 Welding Panel Room 1.5 Ton Dawlance Window 1

    7 Existing P/S Panel Rool 1.5 Ton Dawlance Window 1

    8 Existing P/S Powder Room 1.5 Ton Dawlance Window 1

    9 QC Lab 4 1.5 Ton National Window 1

    10 PC Planning Office 1.5 Ton Pel Window 1

    11 Shelf Mfg 1.5 Ton General Window 1

    12 Canteen 1.5 Ton Window Dawlance Window 1

    13 Store Room 1 ton national Window 1

    14 Store Office 1 ton general Window 1

    15 Moulding Manager Office 1ton General Window 1

  • 7/30/2019 AC DATA

    3/4

    16 Moulding Screen Printing 1 ton LG Window 1

    17 Molding Computer room 1 ton goldstar Window 1

    18 Molding SDM Office 1 ton National Window 1

    19 Receiving PC office 1 Ton General Window 1

    20 Rejection PC Office 1 ton National Window 1

    21 Incoming QC 1 ton Goldstar Window 122 EVP /PS office 1 ton Westin House Window 1

    23 Existng Leak Check Room 1.5 Ton General Window 1

    24 Thermoforming Dpt. Parco AC General Window 5

    25 AM Office Thermoforming Mega 1 Ton Window 1

    26 PP and CD Distribution Office 1 ton Western House Window 1

    27 Ex. Foaming Manager Room 1.5 ton Window 1

    28 Assy Line Exisitng 1 ton Western House Window 1

    29 QC Manager 1 ton National Window 1

    30 QCA Testing 1.5 ton sharp Window 1

    31 QCA Existing Assy. Line 1.5 ton Goldstar Window 132 Travelogue Feeding 1.5 Ton National Window 1

    33 Thermostat Testing Room 1.5 Ton National Window 1

    34 Plant Engineering Manager 1.5 ton PEL Window 1

    35 D and DD manager 1.5 ton National Window 1

    36 D and DD Drawing office 1.5 ton National Window 1

    37 Manager QCA ofice 1.5 Ton Goldstar Window 1

    38 Dy mgr. QA 1.5 Ton Goldstar Window 1

    39 Shahid Azam ofice 1.5 Ton Goldstar Window 1

    40 Calibration office 1.5 Ton Dawlance Window 2

    41 FM PA 1.5 Ton National Window 1

    42 FM Office 1.5 Ton National Window 1

    43 P and PCD office 1.5 ton general Window 1

    44 Elect office 1.5 ton general Window 1

    45 D/O Office 1.5 Ton Dawlance Window 1

    46 Civil Office 1.5 Ton National Window 1

    47 Plant Maint Manager 1.5 Ton Dawlance Window 1

    48 SAM Mech 1.5 Ton Dawlance Window 1

    49 Housekeepin Ofice 1.5 Ton Dawlance Window 1

  • 7/30/2019 AC DATA

    4/4

    50 Purchase office Whiteweston Dawlance 1.5 ton Window 1

    51 HR labor office 1.5 ton PEL Window 1

    52 HR dispensory Whiteweston Dawlance 1.5 ton Window 1

    53 AVP Security Office Dawlance 1.5 ton Window 1

    59