S.No. Department Capacity and Make Type Qty.
1 AVP Security Office 1.5 Ton Dawlance Split A/C 1
2 Finance manager 1.5 Ton Dawlance Split A/C 1
3 Finance Staff Room 1.5 Ton Dawlance Split A/C 2
4 MIS Server Room 1.5 Ton Dawlance Split A/C 1
5 MIS Server Room 2 Ton Dawlance Split A/C 16 MIS Manager 1 Ton Dawlance Split A/C 1
7 MIS Staff Room 2 Ton Dawlance Split A/C 1
8 MIS Hardware Room 1 Ton Dawlance Split A/C 1
9 DF Manager 1.5 Ton Dawlance Split A/C 1
10 Existing Foaming Chemical Room 1.5 Ton Dawlance Split A/C 1
11 DF Testing Leak Check Room 2 Ton Dawlance Split A/C 1
12 DF Chemical Room 2 Ton Dawlance Split A/C 1
13 DF Evaporator Leak Check Room QC 2 Ton Dawlance Split A/C 1
14 Plant Engineering Office Split AC out of order Split A/C 1
15 Welding Panel Room #2 1 Ton Split AC Dawlance Split A/C 116 Paint Booth #1 1.5 Ton Split AC Dawlance Split A/C 1
17 Paint Booth #2 1.5 Ton Split AC Dawlance Split A/C 1
18 Conveyor Panel Room #1 Split AC 1 Ton Split A/C 1
19 Evaporator Leak Check Room QC A2B Split AC 1 Ton Split A/C 1
20 Sr. DM QC A2B Split AC 1.5 Ton Split A/C 1
21 Leak Check Room A2B Function Line Split AC 1.5 Ton Split A/C 1
22 PLC Room Split AC 1.5 Ton Split A/C 1
23 A2B Function Line 1 Ton Dawlance Split A/C 1
24 A2B Charging Panel 1 Ton Dawlance Split A/C 1
25 A2B Chemical Room 1 Ton Dawlance Split Split A/C 1
26 A2B Assembly Office 1.5 Ton Dawlance Split A/C 1
27 Canteen 2 Ton Dawlance Split Split A/C 2
28 Existing Charging Panel Split AC 1.5 Ton Split A/C 1
29 CNC Mchine Thermoforming Split AC 1.5 Ton Split A/C 2
30 QC Leak Check Room Existing Split AC 1 Ton Split A/C 1
31 Thermostat Testing Room Split AC 1.5 Ton Split A/C 1
32 D and DD Office Split 1 Ton Dawlance Split A/C 3
33 Masjid Split 1.5 ton Split A/C 2
-
7/30/2019 AC DATA
2/4
34 Masjid Split 2 Ton Split A/C 1
35 CDC Office 1.5 Ton Dawlance Split A/C 1
36 Auditor Club 1 Ton Dawlance Split A/C 1
37 FM PA 1 Ton Dawlance Split A/C 1
38 Director Office 1.5 Ton Dawlance Split A/C 1
39 Conference Room 2 Ton Dawlance Split A/C 140 OHBEYA Room Split 1.5 Ton Split A/C 1
41 Manager Manufacturing Split 1.5 Ton Split A/C 1
42 Training Hall Split 1.5 Ton Split A/C 3
43 Dy. Mgr. Mech. Split 1 Ton Split A/C 1
44 HR Manager Office Split 1 Ton Split A/C 1
45 HR Staff Room Split 1 Ton Split A/C 2
46 Security Office Split 1.5 Ton Split A/C 1
47 CCTV Room Split 1 Ton Split A/C 2
48 Visitor Room Split 1.5 Ton Split A/C 1
49 Admin Manager Split 1 Ton Split A/C 150 Admin Staff Room Split 1.5 Ton Split A/C 2
61
S.No. Department Capacity and Make Type Qty.
1 Dy. Mgr EPS 1.5 Ton Dawlance Window 1
2 Electronic Lab 1.5 Ton General Window 1
3 Plant Engineerg 1.5 Ton Dawlance Window 2
4 AVP Production 2 1.5 Ton National Window 1
5 HOD Production 2 1.5 Ton Goldstar Window 1
6 Welding Panel Room 1.5 Ton Dawlance Window 1
7 Existing P/S Panel Rool 1.5 Ton Dawlance Window 1
8 Existing P/S Powder Room 1.5 Ton Dawlance Window 1
9 QC Lab 4 1.5 Ton National Window 1
10 PC Planning Office 1.5 Ton Pel Window 1
11 Shelf Mfg 1.5 Ton General Window 1
12 Canteen 1.5 Ton Window Dawlance Window 1
13 Store Room 1 ton national Window 1
14 Store Office 1 ton general Window 1
15 Moulding Manager Office 1ton General Window 1
-
7/30/2019 AC DATA
3/4
16 Moulding Screen Printing 1 ton LG Window 1
17 Molding Computer room 1 ton goldstar Window 1
18 Molding SDM Office 1 ton National Window 1
19 Receiving PC office 1 Ton General Window 1
20 Rejection PC Office 1 ton National Window 1
21 Incoming QC 1 ton Goldstar Window 122 EVP /PS office 1 ton Westin House Window 1
23 Existng Leak Check Room 1.5 Ton General Window 1
24 Thermoforming Dpt. Parco AC General Window 5
25 AM Office Thermoforming Mega 1 Ton Window 1
26 PP and CD Distribution Office 1 ton Western House Window 1
27 Ex. Foaming Manager Room 1.5 ton Window 1
28 Assy Line Exisitng 1 ton Western House Window 1
29 QC Manager 1 ton National Window 1
30 QCA Testing 1.5 ton sharp Window 1
31 QCA Existing Assy. Line 1.5 ton Goldstar Window 132 Travelogue Feeding 1.5 Ton National Window 1
33 Thermostat Testing Room 1.5 Ton National Window 1
34 Plant Engineering Manager 1.5 ton PEL Window 1
35 D and DD manager 1.5 ton National Window 1
36 D and DD Drawing office 1.5 ton National Window 1
37 Manager QCA ofice 1.5 Ton Goldstar Window 1
38 Dy mgr. QA 1.5 Ton Goldstar Window 1
39 Shahid Azam ofice 1.5 Ton Goldstar Window 1
40 Calibration office 1.5 Ton Dawlance Window 2
41 FM PA 1.5 Ton National Window 1
42 FM Office 1.5 Ton National Window 1
43 P and PCD office 1.5 ton general Window 1
44 Elect office 1.5 ton general Window 1
45 D/O Office 1.5 Ton Dawlance Window 1
46 Civil Office 1.5 Ton National Window 1
47 Plant Maint Manager 1.5 Ton Dawlance Window 1
48 SAM Mech 1.5 Ton Dawlance Window 1
49 Housekeepin Ofice 1.5 Ton Dawlance Window 1
-
7/30/2019 AC DATA
4/4
50 Purchase office Whiteweston Dawlance 1.5 ton Window 1
51 HR labor office 1.5 ton PEL Window 1
52 HR dispensory Whiteweston Dawlance 1.5 ton Window 1
53 AVP Security Office Dawlance 1.5 ton Window 1
59