academic improvement plans arkansas department of education rules governing the arkansas...

45
Academic Improvement Plans Arkansas Department of Education Rules Governing the Arkansas Comprehensive Testing, Assessment & Accountability Program & the Academic Distress Program September 1, 2005

Upload: osvaldo-cobey

Post on 14-Dec-2015

223 views

Category:

Documents


3 download

TRANSCRIPT

Academic Improvement

Plans

Arkansas Department of Education

Rules Governing the Arkansas Comprehensive Testing, Assessment & Accountability Program &

the Academic Distress Program

September 1, 2005

Academic Improvement Plans

Meeting the individual needs of

every student.

AIP’s Everyone’s Responsibility

The team with the best athletes doesn't usually win. It's the team with the athletes who play best together."

--Lisa Fernandez,softball legend  

Act 35 of the 2nd Extraordinary Session of 2003

Each student shall participate in the statewide program of educational assessment…and shall participate in an academic improvement plan when required as a result of the assessments. The Department of Education shall determine satisfactory proficiency levels and shall promulgate rules and regulations of the student’s academic improvement plan.

Quotes from CommissionerDr. Ken James, ADE

July 19, 2005

Accountability – Act 35 “No longer talk” “The party is over” “Now beginning to kick into action” “The game has changed” “The U.S. is watching Arkansas”

“Pass Rate”

The pass rate for the Benchmark Exams and the developmental appropriate assessments for K-2 shall be proficiency. However, the pass rate for end-of-course and high school literacy shall be those scores established and independently approved by the State Board of Education. (See 6.03 for proficiency table in the Rules Governing the ACTAAP and the Academic Distress Program.)

AIP…the definition

A plan Detailing supplemental or intervention and

remedial instruction, or both In deficient academic areas For any student who is not proficient on the

state-mandated criterion-referenced assessments and state-mandated developmental appropriate assessments for K-2

AIP’s …Who? Beginning in the 05-06 SY…

Any student failing to achieve at the proficient level on the State mandated CRT

Any student in grades K-2 failing to achieve at the proficient level on the State mandated NRT

IEP meets requirements if it addresses deficient areas

What else in 05-06?

Any K-2 student who exhibits a substantial reading deficiency shall be provided intensive reading instruction

School personnel shall develop and IRI (Intensive Reading Improvement Plan) for any student identified with substantial reading difficulty

IEP meets requirements if it addresses reading deficiencies

Substantial Reading Difficulty

2005-2006 the State Board of Education shall establish performance levels for

K-2 that define substantial reading difficulty

Substantial Reading Difficulty

K – students rated as delayed in both oral communication and written language on the Uniform Reading Scale (USR)

1st & 2nd – students who score in the below basic category on the State Reading Assessment in the previous school year

05-06 Data Source for AIP Not

Proficient

K-2 Substantial Reading Difficulty

K* Fall 05 Uniform Readiness Screening (Reading)

AIP Delayed on URS

1 K- ITBS AIP Below Basic on ITBS

2 1st – ITBS AIP Below Basic on ITBS

3** 2nd - ITBS AIP

4 3rd - Benchmark AIP

5 4th - Benchmark AIP

**NRT Data for CRT Based AIP*K Math ?

05-06 Data Source for AIP Not

Proficient

Additional Requirements

6 5th-Benchmark AIP

7 6th-Benchmark AIP

8 7th-Benchmark AIP

EOC Algebra

EOC Algebra Exam AIP Participation in remediation program

EOC Geo.

EOC Geo. Exam AIP Participation in remediation program

H.S.

LiteracyH.S. Literacy Exam AIP Participation in

remediation program

K-2 Substantial Reading Difficulty

K - Delayed on URS

1st - Below Basic on ITBS Reading

2nd - Below Basic on ITBS Reading

http://dibels.uoregon.edu

IRI

IRI

IRI

DIBELS

K who are delayed must be evaluated with DIBELS within 30 days of receiving URS results.

1st & 2nd who are below basic must be evaluated with DIBELS within 30 days of the beginning of school.

AIP & IRI

AIP in math and/or literacy for any student not meeting the proficient level

Results of EOC assessments shall become part of each student’s transcript or permanent record

An IRI can serve as the literacy AIP for students in K-2

IRI = LITERACY AIP

Consequences

Students in grades three through eight, identified for an AIP who do not participate in the remediation program shall be retained (7.03.2)

The local district shall determine the extent of the required participation in remediation as set forth in the student AIP

Consequences

Remedial instruction provided during high school years (7-12) may not be in lieu of English, mathematics, science or social studies, or other core subjects required for graduation

Beginning in the 2005-2006 school year, students not proficient on the EOC tests or on the high school Literacy test, shall participate in a remediation program to receive credit for the corresponding course.

Consequences

Any student who does not score at the proficient level on the CRT assessments shall continue to be provided with remedial or supplemental instruction until the expectations are met or the student is not subject to compulsory school attendance

Consequences

Any student that has an AIP and fails to remediate, but scores at the proficient level on the CRT assessments, shall not be retained

Requirement

School districts shall notify parents of Remediation requirements Retention consequences for failure to

participate in required remediation(7.03.1) 2005-2006 school year

This information shall be included in the student handbook (7.03.1)

Prepare to build the plan…

1. What does an AIP and an IRI look like?

2. Who develops the AIP and/or IRI?

3. What information must be put on the plan?

1. What does and AIP look like?

What does your student need? ADE AIP form from NORMES

http://normes.uark.edu/ The local school may adjust the format

as deemed necessary.

2. Who develops the AIP?

Developed cooperatively by: Appropriate teachers and/or Other school personnel knowledgeable

about the student’s performance or responsible for the remediation

In consultation (jointly) with the student’s parents

Parents

How do we reach them?

How do we involve them?

What is their responsibility?

3. What information must be put on the “flexible” AIP?

Multiple remediation methods and strategies Should include an intensive instructional program

different from previous year’s classroom instructional program

Formative assessment strategies With periodic revisions

Standards-based supplemental/remedial strategies aligned with child’s deficiencies

Implementation timeline

1. What does an IRI look like?

What does your student need? ADE IRI form currently being developed

that will be posted on NORMES http://normes.uark.edu/

2. Who develops the IRI?

School personnel shall develop an intensive reading plan

The IRI shall be developed cooperatively by appropriate teachers and/or other school personnel knowledgeable about the student’s performance or responsible for remediation

IRI – Parents or Guardians of Students with Substantial Reading Difficulty Shall be notified in writing

Child has been identified with substantial reading difficulty

Description of current services being provided

Description of the proposed supplemental instructional services and supports that will be provided

3. What information must be put on the IRI?

Must include intensive reading instruction utilizing a scientifically-based reading program

The intensive instruction shall systematically, explicitly, and coherently provide instruction in the 5 essential elements of reading

5 Essential Elements of Reading

Comprehension Decoding and Word Recognition

(Phonics) Fluency Phonemic Awareness Vocabulary

IRI Components continued… Implementation timeline Valid and reliable progress monitoring

assessments Measure student growth toward benchmarks

Strategies aligned with scientifically-based reading research

Monitored monthly

Deficient Performance Areas

How do we determine deficient areas?

Current Data

Benchmark Raw Scores Rank order math roster Rank order literacy roster

ITBS K-2 Performance levels should be set soon

Caution: Commissioner’s Memo ACC-05-072

Future Data

Benchmark student report K – screening results In addition to the requirements of Act 35

Brainstorm

Benchmark Examination Student Report

Interventions…

What interventions does your school have in place already? (Act 35)

Supplement Supplant

Brainstorm

Intervention Pyramid

Possible Ways to Increase Student Accountability Walk students through the student report Conference with students as the plan is

built Include students in the AIP P/T conference Assess students regularly High expectations; hold students

accountable for results Conference with students on a regular

basis Add new interventions as needed

Implementation Plan for IRI

September 23 (Train the Trainer) Video Conference: Initial introduction of

IRI on-line system for Identifying qualifying children Documenting plan for intervention Collecting initial evaluation data Monitoring progress of children toward goals Parent notification Monitoring for key personnel Reporting for school, district, co-op, & state

Implementation Plan for IRI

September 23 (Train the Trainer) DIBELS training at Arch-Ford (afternoon)

Implementation Plan for IRI

October 6 and 7 Intervention Training

Follow-up after building training Topics:

Analyzing DIBELS results Identifying intervention strategies Writing effective interventions

Note: Oct. 6 is designated for those new to DIBELS. Oct. 7 will be training for those who have received summer DIBELS training or those who have used and feel proficient in the administration of DIBELS.

Implementation Plan for IRI

October 19 Smart Teleconference: “Effective

Interventions” Support piece to Summer Conference &

Whatever It Takes Act 35

Final words…..

Practice the power of networking with other

educators.

Based on most current edits & revisions as of August 26, 2005

Cathy Ramsey, Principal

Reagan Elementary School

Rogers, Arkansas

[email protected]

Candie Watts, School Improvement Specialist

Arch Ford Education Cooperative

[email protected]