ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for

Upload: maria-adams

Post on 20-Jan-2016

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for

ACARP ROADWAY DEVELOPMENT WORKSHOPSMARCH 2008

Presentation for

Page 2: ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for
Page 3: ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for

PRODUCTIVITYPRODUCTIVITY To improve development productivity To improve development productivity To reduce manual handling To reduce manual handling To improve section support process requirementsTo improve section support process requirements To eliminate potential Longwall outage due to lack of continuity or To eliminate potential Longwall outage due to lack of continuity or

shortened blocksshortened blocks

SAFETYSAFETY To reduce injuries via manual handlingTo reduce injuries via manual handling To reduce injuries through section congestionTo reduce injuries through section congestion To improve general section standards and subsequent improvement in To improve general section standards and subsequent improvement in

morale. morale. To improve ventilation due to dedicated vent lines.To improve ventilation due to dedicated vent lines.

OVERALL COST BENEFITSOVERALL COST BENEFITS Improved productivity at face and support processImproved productivity at face and support process Overall better allocation of panel manning ie road cleaning etc.Overall better allocation of panel manning ie road cleaning etc. Safety-related savingsSafety-related savings Reduction in materials repair/replacementReduction in materials repair/replacement

Page 4: ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for

THE DEVELOPMENT MONORAIL SYSTEM CONSISTS OF:THE DEVELOPMENT MONORAIL SYSTEM CONSISTS OF: Inbye Services SystemInbye Services System Secondary Ventilation SystemSecondary Ventilation System Outbye Services Management SystemOutbye Services Management System

Page 5: ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for
Page 6: ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for

TASKSTASKS THAT ARE ELIMINATEDTHAT ARE ELIMINATED& ADDITIONAL BENEFITS& ADDITIONAL BENEFITS

Vent Tube HandlingVent Tube Handling Cable handlingCable handling MONORAIL VIDEO MONORAIL VIDEO Ancillary & operational equipment suspended on Ancillary & operational equipment suspended on

monorailmonorail Driveage sequence animationDriveage sequence animation Roof bolts installed with miner mounted rigs and Roof bolts installed with miner mounted rigs and

remain installed for Longwall retreat.remain installed for Longwall retreat. Rails can remain installed greatly reducing L/W Rails can remain installed greatly reducing L/W

Monorail relocation times.Monorail relocation times. Improved Ventilation due to single line.Improved Ventilation due to single line. Reduced requirement for LHD machines in panel.Reduced requirement for LHD machines in panel.

Page 7: ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for
Page 8: ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for

TASKSTASKS THAT ARE ELIMINATEDTHAT ARE ELIMINATED& ADDITIONAL BENEFITS& ADDITIONAL BENEFITS

Vent Tube HandlingVent Tube Handling Cable handlingCable handling Monorail videoMonorail video ANCILLARY & OPERATIONAL EQUIPMENT SUSPENANCILLARY & OPERATIONAL EQUIPMENT SUSPEN

DED ON MONORAILDED ON MONORAIL Driveage sequence animationDriveage sequence animation Roof bolts installed with miner mounted rigs and Roof bolts installed with miner mounted rigs and

remain installed for Longwall retreat.remain installed for Longwall retreat. Rails can remain installed greatly reducing L/W Rails can remain installed greatly reducing L/W

Monorail relocation times.Monorail relocation times. Improved Ventilation due to single line.Improved Ventilation due to single line. Reduced requirement for LHD machines in panel.Reduced requirement for LHD machines in panel.

Page 9: ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for
Page 10: ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for
Page 11: ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for
Page 12: ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for

TASKSTASKS THAT ARE ELIMINATEDTHAT ARE ELIMINATED& ADDITIONAL BENEFITS& ADDITIONAL BENEFITS

Vent Tube HandlingVent Tube Handling Cable handlingCable handling Monorail videoMonorail video Ancillary & operational equipment suspended on Ancillary & operational equipment suspended on

monorailmonorail DRIVEAGE SEQUENCE ANIMATIONDRIVEAGE SEQUENCE ANIMATION Roof bolts installed with miner mounted rigs and Roof bolts installed with miner mounted rigs and

remain installed for Longwall retreat.remain installed for Longwall retreat. Rails can remain installed greatly reducing L/W Rails can remain installed greatly reducing L/W

Monorail relocation times.Monorail relocation times. Improved Ventilation due to single line.Improved Ventilation due to single line. Reduced requirement for LHD machines in panel.Reduced requirement for LHD machines in panel.

Page 13: ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for
Page 14: ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for
Page 15: ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for
Page 16: ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for
Page 17: ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for
Page 18: ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for
Page 19: ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for
Page 20: ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for

TASKSTASKS THAT ARE ELIMINATEDTHAT ARE ELIMINATED& ADDITIONAL BENEFITS& ADDITIONAL BENEFITS

Vent tube handlingVent tube handling Cable handlingCable handling Monorail videoMonorail video Ancillary & operational equipment suspended on Ancillary & operational equipment suspended on

monorailmonorail Driveage sequence animationDriveage sequence animation Roof bolts installed with miner mounted rigs and Roof bolts installed with miner mounted rigs and

remain installed for Longwall retreat.remain installed for Longwall retreat. Rails can remain installed greatly reducing L/W Rails can remain installed greatly reducing L/W

Monorail relocation times.Monorail relocation times. Improved Ventilation due to single line.Improved Ventilation due to single line. Reduced requirement for LHD machines in panel.Reduced requirement for LHD machines in panel.

Page 21: ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for

NewstanNewstanCase StudyCase Study

System first introduced to Newstan in MG22, 2005System first introduced to Newstan in MG22, 2005

Page 22: ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for

PERFORMANCE CRITERIA COAL CUTTING CYCLE PERFORMANCE CRITERIA COAL CUTTING CYCLE PER 100M PILLAR DEVELOPEDPER 100M PILLAR DEVELOPED

PROPOSEPROPOSED D

BENEFITBENEFIT

DELIVERED DELIVERED BENEFITBENEFIT

WITHIN 3 MONTHS OF WITHIN 3 MONTHS OF INITIAL INSTALLATIONINITIAL INSTALLATION

- reduction in flitting times – increase in - reduction in flitting times – increase in cutting cutting

5.4 hrs5.4 hrs 7.4 hrs7.4 hrs

- no handling of vent tubes – increase in hours- no handling of vent tubes – increase in hours

(based on 0.25 hours saving per 6 metre (based on 0.25 hours saving per 6 metre advance)advance)

10.6 hrs10.6 hrs 10.6 hrs10.6 hrs

number of increased cutting number of increased cutting hourshours

16 hrs16 hrs 18 hrs18 hrs

- number of increased cutting shifts based on - number of increased cutting shifts based on 8 hours cutting per shift8 hours cutting per shift

1.91.9 2.22.2

- number of increased metres based on 12 - number of increased metres based on 12 metres per shiftmetres per shift

2323 2727

- extrapolation for 12 months based on 48 - extrapolation for 12 months based on 48 weeks per yearweeks per year

11221122 12841284

- potential increase in longwall block (based - potential increase in longwall block (based on 2.3 metres development advance per on 2.3 metres development advance per every 1 metre of longwall coal)every 1 metre of longwall coal)

488488 558558

Page 23: ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for

Panel Advance Improvements Proposed Benefit

No removal, storage and of vent tubes – increase in cutting

17 hours/100m cycle

No retrieval and reinstallation of reticulation cables – increase in cutting

No retrieval and reinstallation of fan, car and miner cables – increase in cutting

Fan and Box relocation 100m = 30min no LHD required – increase in cutting

Ability to perform powered maintenance during panel advance – increase in cutting

Number of increased cutting hours

Number of increased cutting meters based on 1.5MPOH

25.50m

Extrapolation for 12 months based on 48 weeks per year

1224m additional coal drivage

Operational gains + Panel advance gains amount to -

2520m additional coal drivage per year.

Page 24: ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for

EQUIPMENT DAMAGED IN LAST EQUIPMENT DAMAGED IN LAST PANEL FOLLOWING UPGRADEPANEL FOLLOWING UPGRADE

1 x 5m length of flexible duct1 x 5m length of flexible duct 1 x Miner cable, caught on Eimco1 x Miner cable, caught on Eimco 1 x Miner Transition1 x Miner Transition

Page 25: ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for

Prior to implementation of monorail system, Prior to implementation of monorail system, figures show that there were in excess of 10 figures show that there were in excess of 10 medically treated and LTI injuries throughout medically treated and LTI injuries throughout panel duration of MG22.panel duration of MG22.

Statistics have shown that during the Statistics have shown that during the development of MG23 there was a total of 3 development of MG23 there was a total of 3 minor injuries (non medically treated).minor injuries (non medically treated).

Page 26: ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for

0%

20%

40%

60%

80%

100%

120%

140%

160%

180%

Improvement Percentage

Single MinerUnit

Tandem MinerUnit

Single Minerwith Monorail

(Current)

Target forSingle Minerwith monorail

(Future)

Target Areas

Improved Productivity

Target of 1000 Metres per month – Single Miner C/W Monorail.

Single Miner unit c/w monorail equalled Tandem Mining unit production within 3 Months.

Page 27: ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for

Future for theFuture for theDevelopment Monorail Development Monorail

Kestrel Coal, 2 complete systems Kestrel Coal, 2 complete systems currently being manufactured c/w currently being manufactured c/w 8.5km of rail.8.5km of rail.

Currently have Newstan system at Currently have Newstan system at Macquarie workshop being modified Macquarie workshop being modified for Mandalong installation.for Mandalong installation.

Oaky North CoalOaky North Coal final stages of final stages of engineering sign off.engineering sign off.

Page 28: ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for

ACARP ROADWAY DEVELOPMENT WORKSHOPSMARCH 2008

Australian Mining Prospect Awards – Highly Commended Award 2006Hunter Manufacturing Award – Innovation in Technology 2006