acc423: management accounting ii module4 (week10) covering: regression analysis eoq analysis linear...

25
ACC423: Management Accounting II Module4 (Week10) Covering: 1. Regression Analysis 2. EOQ Analysis 3. Linear Programming By: E. P. Enyi, Ph.D, MBA, ACA, FAAFM, RFS, MFP, FIIA Head, Dept of Accounting, Covenant University, Ota, Nigeria

Upload: thyra

Post on 24-Feb-2016

41 views

Category:

Documents


2 download

DESCRIPTION

ACC423: Management Accounting II Module4 (Week10) Covering: Regression Analysis EOQ Analysis Linear Programming. By:E. P. Enyi, Ph.D, MBA, ACA, FAAFM, RFS, MFP, FIIA Head, Dept of Accounting, Covenant University, Ota, Nigeria. Regression Analysis. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: ACC423: Management Accounting II Module4 (Week10) Covering: Regression Analysis EOQ Analysis Linear Programming

ACC423: Management Accounting IIModule4 (Week10)

Covering:

1. Regression Analysis2. EOQ Analysis

3. Linear Programming

By: E. P. Enyi, Ph.D, MBA, ACA, FAAFM, RFS, MFP, FIIA

Head, Dept of Accounting, Covenant University, Ota, Nigeria

Page 2: ACC423: Management Accounting II Module4 (Week10) Covering: Regression Analysis EOQ Analysis Linear Programming

Regression Analysis• Regression analysis is also called CURVE FITTING• It is a statistical technique used for short or medium term activity

forecasts like next season’s projected sales, activity costs etc.• It is also used in management accounting to establish the

relationship between two or more variables and to separate cumulated costs into fixed and variable elements.

• There are primarily two main methods of finding the line of best fit; which is the linear relationship between the variables under consideration.

• It is a SIMPLE regression analysis when it involves only two variables but it becomes a MULTIPLE regression analysis when three or more variables are involved.

• To find the line of best fit, it is necessary to calculate a line which minimizes the total of the squared deviations of the actual observations from the calculated. This is known as the LEAST SQUARES.

Page 3: ACC423: Management Accounting II Module4 (Week10) Covering: Regression Analysis EOQ Analysis Linear Programming

• The LEAST SQUARES method of linear regression is given as y = a + bx

Where, a and b are constants and where a represents the fixed element and b represents the slope of the curve; y in this case is the dependent variable e.g. total sales while x is the independent variable e.g. selling price per unit.

The following graph illustrates this:

Page 4: ACC423: Management Accounting II Module4 (Week10) Covering: Regression Analysis EOQ Analysis Linear Programming

Before you can find the value of y and x, you must first find the value of a and b by solving the following two equations simultaneously:

∑y = an + b∑x (1)∑xy = a∑x + b∑x2 (2)

where n = number of observations or pairs of past data being used for the analysis.

Example:TMC Ltd has collected data for the past seven years on the sales of its

prime product named HODAC which is presented as follows:No of Colors 1 2 3 4 5 6 7Sales(‘000) 14 17 15 23 18 22 27The management wish to know whether there is any relationship

between the number of colors included in the product and the total sales volume and what would be the sales volume if 9 colors were used.

Page 5: ACC423: Management Accounting II Module4 (Week10) Covering: Regression Analysis EOQ Analysis Linear Programming

Solution:As a matter of fact, you can solve this problem using the visual fit

method but the solution will be less accurate than the more scientific method of least squares. The outline of the least square solution is as follows:

Colors(x) Sales(y) xy x2

1 14 14 1 2 17 34 4 3 15 45 9 4 23 92 16 5 18 90 25 6 22 132 36 7 27 189 49

Totals 28 136 596 140

Page 6: ACC423: Management Accounting II Module4 (Week10) Covering: Regression Analysis EOQ Analysis Linear Programming

Here,n = 7; ∑x = 28; ∑y = 136; ∑xy = 596; ∑x2 = 140Such that:

136 = 7a + 28b …….(1)596 = 28a + 140b …….(2)

Solving the equations simultaneously, we have:a = 12b = 1.86

Therefore, the regression line or linear relationship between the number of colors in HODAC and the sales volume achieved is given by the equation:y = 12 + 1.86x

i.e. sales volume (‘000) = 12 + 1.86(No of colors used)

If 9 colors are used, then the expected sales volume will be:y = 12 + (1.86 * 9) = 28.74 or 28,740 units of HODAC

Page 7: ACC423: Management Accounting II Module4 (Week10) Covering: Regression Analysis EOQ Analysis Linear Programming

For Class Work:The following data were extracted from the production logbook of

Azundu Chemicals Ltd:Batch Units ((x) ‘000) Total Costs ((y) N’000)a. 9 116b. 16 211c. 14 152d. 38 410e. 21 256f. 25 298g. 20 220h. 15 180i. 15 185j. 11 129

Required: Separate the total costs into its fixed and variable elements. If the company is to manufacture 30 units, how much will it costs? How many units will a cost of N500,000 produce?

Page 8: ACC423: Management Accounting II Module4 (Week10) Covering: Regression Analysis EOQ Analysis Linear Programming

EOQ is a stock control tool. It is used in conjunction with other stock control tools such as Re-Order Level, Minimum Stock Level, Maximum Stock Level etc.

EOQ is defined as the optimal number of items to be placed in a single stock replenishment order in order to achieve the least total over-all stock holding costs per annum.

EOQ can be determined in two ways:-- By constructing a graph- By the use of a formula.

ASSUMPTION UNDERLYING THE USE OF EOQ1. That there is a known constant stock holding cost;2. That there is a known constant stock ordering cost;3. That the rates of demand are known;4. That the price per unit is known and constant;5. That replenishment is made instantaneously, i.e. batch is delivered whole

Economic Order Quantity (EOQ)

Page 9: ACC423: Management Accounting II Module4 (Week10) Covering: Regression Analysis EOQ Analysis Linear Programming

GRAPHICAL APPROACHTo calculate EOQ graphically, the following ingredients are necessary:- Total costs per annum (i.e. ordering cost plus carrying costs)- Number of orders required per annum (i.e. Annual DD / Order Qty)- Average stock (i.e. Order Qty / 2)

Example:A company uses 50000 bottles per annum which costs N10 each to

purchase. The ordering and handling costs are N150 per order and carrying costs are 15% of the purchase cost per annum.

Required: Determine the Economic Order Quantity that will minimize the total stock holding cost for the coming year; assuming all other parameters remain as projected.

Solution:Graphical solution is implemented by trying a combination of assumed

order quantities, e.g. 1000, 2000 etc. It is the quantity of each assumed order batch size that will determine the number of orders per annum.

Page 10: ACC423: Management Accounting II Module4 (Week10) Covering: Regression Analysis EOQ Analysis Linear Programming

A Table of Assumed Order Levels:(a) (b) (c) (d) (e) (f)

OrderAverage Annual Average Stock TotalQty No of Ordering Stock Holding Cost

Orders Costs Cost p.a.---------- ---------- -------------------------------------------Assumed Dd/(a) (b)*150 (a)/2 (d)*1.50 (c)+(e)---------- ---------- ---------------------------------------------1000 50 7,500 500 750 82502000 25 3,750 1,000 1,500 52503000 16.67 2,500 1,500 2,250 47504000 12.5 1,875 2,000 3,000 48755000 10 1,500 2,500 3,750 52506000 8.5 1,250 3,000 4,500 5,750-------------------------------------------------------------------------------------------------------From the above table the graph can be prepared:

Page 11: ACC423: Management Accounting II Module4 (Week10) Covering: Regression Analysis EOQ Analysis Linear Programming

0100020003000400050006000700080009000 Orde Qty

No of Orders

Annual OrderCostAverage Stock

Stk HoldgCost paTotalCosts

From the above graph, the EOQ is approximately 3,160 units as indicated by the downward arrow.

Page 12: ACC423: Management Accounting II Module4 (Week10) Covering: Regression Analysis EOQ Analysis Linear Programming

EOQ BY FORMULAThe scientific formula for EOQ determination is given as:

EOQ = √(2*Co*D)/CcWhere,

Co = Cost of order per batchCc = Carrying cost per item per annum D = Annual Demand

Solution:EOQ = √(2*150*50000)/1.5 = √10000000 = 3,162 units

There are other measurements of EOQ which are of interest to the management accountant. These include:

1. EOQ With Gradual Replenishment – where there is internal arrangement for stock usage replenishment; and

2. EOQ Where STOCK-OUTS Occur – where stocks can be completely allowed to be used up before replenishment (this will involve additional stock-out costs)

Page 13: ACC423: Management Accounting II Module4 (Week10) Covering: Regression Analysis EOQ Analysis Linear Programming

EOQ with Gradual Replenishment = √(2*Co*D)/(Cc(1-(D/R)))Where,

1-(D/R) = rate of stock usage R = rate of production per annum

Example:Assume the company decides to make its own bottles with a machine

that can produce up to 250,000 units per annum, with other data remaining the same, the EOQ with gradual replenishment will be:EOQ = √(2*150*50000)/(1.5(1-(50000/250000))) = √12500000 = 3,536 units per order

EOQ where STOCK-OUTS Occur = [√(2*Co*D)/Cc] * [√(Cc+Cs)/Cs]Where, Cs = Cost of stock-out per item per annum.

CLASS WORK: Assuming that a courier service charges N0.75 to make a quick delivery per item in addition to an admin cost of N0.25 per item for every stock-out orders, what is the new EOQ?

Page 14: ACC423: Management Accounting II Module4 (Week10) Covering: Regression Analysis EOQ Analysis Linear Programming

Linear Programming TechniquesLP is a mathematical technique concerned with the scientific allocation

of scarce resources to attain optimum value in decision making. For LP to be effectively deployed:

a. The problem must be capable of numerical translation;b. All factors involved in the problem must have linear relationship;c. The problem must provide alternative causes of action;d. There must be one or more restrictions on the factors involved.

USING THE LP SOLUTION TECHNIQUEThere are two stages involved in using the LP technique. The first is to

formulate the model and the second is to solve the problem using the model formulated. It is important that the model formulation is accurately done otherwise it will be a case of garbage in and garbage out.

To formulate the model, you first determine the objective function, then you determine the main body of the LP problem.

Page 15: ACC423: Management Accounting II Module4 (Week10) Covering: Regression Analysis EOQ Analysis Linear Programming

Methods:There are two main methods of solving a LP problem:1. By graph – this is only possible when the resources are limited to two.

The graphical method cannot solve complex situations. Even so, the solution provided will not be as accurate as the more scientific simplex method.

2. By Simplex Algorithm – this is a more scientific method and can handle complex situations such as those involving more than two resource combinations.

Maximization – is used when it is necessary to work out the solution (mix) that gives the maximum benefit e.g. optimal profit.

Minimization – is used when it is necessary to work out the solution (mix) that produces the least cost.

Example:A firm makes two products fork and knife. Fork has a contribution of N3 per

unit and knife N4 per unit. The firm wishes to establish weekly production plan which maximizes its total contribution. The production data are as follows:

Page 16: ACC423: Management Accounting II Module4 (Week10) Covering: Regression Analysis EOQ Analysis Linear Programming

PER UNITMachining (Hrs) Labour (Hrs) Material (kgs)

Fork 4 4 1Knife 2 6 1

Total AvailablePer Week 100 180 40Because of a trade agreement, sales of Fork are limited to a weekly

maximum of 20 units and to honor an agreement with an old customer, at least 10 units of Knife must be sold per week.

Step 1: Formulate the LP model; this is given thus:Maximize 3f + 4k

SUBJECT TO:A 4f + 2k ≤ 100 (Machining Hr Constraint)B 4f + 6k ≤ 180 (Labour Hr Constraint)C f + k ≤ 40 (Materials Constraint)D f ≤ 20 (Fork sales Constraint)E k ≥ 10 (Knife sales Constraint)

Page 17: ACC423: Management Accounting II Module4 (Week10) Covering: Regression Analysis EOQ Analysis Linear Programming

f, k ≥ 0where, f = number of units of fork

k = number of units of knife As this is a problem with only two unknowns (f and k) it can be solved

graphically.Step 2: Draw the axis of the graph ensuring that you calibrate as appropriate:

f

0 k

Page 18: ACC423: Management Accounting II Module4 (Week10) Covering: Regression Analysis EOQ Analysis Linear Programming

Step 3: Remove the inequalities from the equations and solve for each constraint as follows:Constraint Equation

A 4f + 2k = 100B 4f + 6k = 180C f + k = 40D f = 20E k = 10

In A, where f=0, then k=100/2=50; where k=0, f=100/4=25In B, where f=0, then k=180/6=30; where k=0, f=180/4=45In C, where f=0, then k=40; where k=0, f=40In D, f=20In E, k=10

These are then plotted in the given graph below to produce the following image:

Page 19: ACC423: Management Accounting II Module4 (Week10) Covering: Regression Analysis EOQ Analysis Linear Programming

0

10

20

30

40

50

60

0 20 40 60 80

ForkKnife

LP Model Graph Showing the FEASIBLE REGION

Fork

Knife

Page 20: ACC423: Management Accounting II Module4 (Week10) Covering: Regression Analysis EOQ Analysis Linear Programming

THE FEASIBLE REGIONThe feasible region is the portion of the graph which falls within the

boundary of possible solutions. It is the only area of the graph which satisfied all the conditions imposed by the various constraints. It is usually shaded to distinguish it from other non-feasible area. It is from this region that a set of possible solutions are outlined. In this graph, there are 4 possible outcomes from which we choose the one with the optimal contribution as follows:Point Fork(N3) Knife(N4) Total I 20 * 3 10 * 4 100 II 15 * 3 20 * 4 125 (Choice) III 0 * 3 30 * 4 120 IV 0 * 3 10 * 4 40

From the above analysis, we can see that the combination which produced the highest benefit is point II, i.e. the one obtained at the rightmost upward projection of the feasible area on the graph. This is translated to mean that a production combination of 15 forks and 20 knives per week should be pursued by the firm as this is the mix that will give maximum contribution.

Page 21: ACC423: Management Accounting II Module4 (Week10) Covering: Regression Analysis EOQ Analysis Linear Programming

MINIMIZATIONProvided that there are two unknowns (i.e. two products), we can also

use the graphical method to solve minimization problem, but, with the following differences:

a. In minimization problem the limitations are of the greater than or equal to type (≥) rather than the less than or equal to type (≤);

b. The feasible region is found above all or most of the limitations rather than below them;

c. The normal objective is to minimize cost so that the objective function line represent cost rather than profit or contribution and because the objective is to minimize cost, the optimum point will be found from the cost line furthest to the left which still touches the feasible region (the opposite of the maximization method).

Example:A firm is to market a new fertilizer which is to be a mixture of two

ingredients A and B. The properties of the two ingredients are given in the table below:

Page 22: ACC423: Management Accounting II Module4 (Week10) Covering: Regression Analysis EOQ Analysis Linear Programming

INGREDIENT ANALYSISBONE NITR- PHOS COSTMEAL OGEN LIME PHATE /KG

Ingredient A 20% 30% 40% 10% N12Ingredient B 40% 10% 45% 5% N8It has been decided that:a. The fertilizer will be sold in bags containing a minimum of 100kgb. It must contain at least 15% nitrogen, 8% phosphate and 25% bone meal.The firm wishes to meet the above requirements at the minimum cost possible

SOLUTIONSet the objective function as follows:

MINIMIZE 12a + 8bSubject to:

A a + b ≥ 100 (Weight Constraint)B 0.3a + 0.1b ≥ 15 (Nitrogen Constraint)C 0.1a + 0.05b ≥ 8 (Phosphate Constraint)D 0.2a + 0.4b ≥ 25 (Bone Meal Constraint)

a ≥ 0 and b ≥ 0

Page 23: ACC423: Management Accounting II Module4 (Week10) Covering: Regression Analysis EOQ Analysis Linear Programming

Where,

a = kgs of ingredient A

b = kgs of ingredient B

Remove the inequalities and solve thus:

In A, if b=0 then a=100; if a=0 then b=100

In B, if b=0 then a=15/0.3=50; if a=0 then b=15/0.1=150

In C, if b=0 then a=8/0.1=80; if a=0 then b=8/0.05=160

In D, if b=0 then a=25/0.2=125; if a=0 then b=25/0.4=62.5

The above computations are then graphed as follows:

Page 24: ACC423: Management Accounting II Module4 (Week10) Covering: Regression Analysis EOQ Analysis Linear Programming

020406080

100120140160180

0 50 100 150 200

Ing AIng B

Feasible Region

Ingredient B

Ingredient A

Page 25: ACC423: Management Accounting II Module4 (Week10) Covering: Regression Analysis EOQ Analysis Linear Programming

Reading from the graph:

Point Ing A (N12) Ing B (N8) Total (N)

I 125 * 12 0 * 8 1500

II 75 * 12 30 * 8 1140

III 60 * 12 40 * 8 1040 (Lowest = Optimal)

IV 0 * 12 160 * 8 1280

The above implies that the best combination of ingredients that would minimize total cost (i.e. result in the least cost) is 60 kg of A and 40 kg of B.

SIMPLEX ALGORITHM METHOD

This is a step-by-step arithmetic technique whereby one moves progressively from a zero position to the maximum possible contribution. It utilizes the solution method of matrix algebra. The steps involved in the simplex algorithm method are numerous and the underlying logic is complex and cannot be adequately covered within the time scheduled for this lecture. The student is advised to study this topic independently.