accelerated bridge construction · pdf fileny statewide conference on local bridges 2012...

74
NY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

Upload: dotram

Post on 29-Mar-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

NY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012

Accelerated Bridge Construction ABC

Bala SivakumarHNTB Corp.

New York

Page 2: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York
Page 3: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

EIGHTEENTH Statewide Conference on Local Bridges

October 23, 2012, Syracuse.

Topic Layout. Training time 4:00 hrs

Break 3:00-3:15

Session 2: ACCELERATED BRIDGE CONSTRUCTION & DESIGN

Sub-topics ABCD Tools for ABC from SHRP2 Design for ABC: Case Studies

Presenter Bala Sivakumar, HNTB

Page 4: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

Bala Sivakumar, P.EVice President, Director of Special Bridge Projects

HNTB Corp., 5 Penn PlazaNew York CityNew York, USA

BIO DATABala Sivakumar is Vice President with HNTB Corp in the New York City Office. He is the Co-Principal Investigator for the SHRP2 R04 Project for HNTB and the lead developer of the ABC Toolkit. He has over 30 years national bridge engineering experience and has served as the lead engineer on many large and complex bridge projects in various states. He has also been active in bridge engineering research in LRFD, LRFD and calibration of bridge loadings. He was the primary author of the AASHTO LRFR methodology and has assisted NYSDOT in the transition to LRFR for statewide ratings. He has a Master’s degree in Structural Engineering from Cornell University and a Bachelor’s Degree in Civil Engineering from the Indian Institute of Technology, Madras, India.

Page 5: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

ABC Training Outline2:30 hrs

1. Introduction to ABC (pg. 1) (30 min)

2. SHRP2 Project R04 - ABC Toolkit (pg. 17) (70 min)

3. ABC Pilot Projects (pg. 44) (50 min)• Prefabricated bridge system (Iowa)• Lateral slide (NY)

Page 6: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

1 1

Session 1

Introduction to ABC

Page 7: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

2

Page 8: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

3

Page 9: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

4

Page 10: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

5

Page 11: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

6

Page 12: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

7

Page 13: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

8

Page 14: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

9

Page 15: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

10

Page 16: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

11

Page 17: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

12

Page 18: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

13

Page 19: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

14

Page 20: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

15

Page 21: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

16

Page 22: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

17

Session 2

ABC Toolkit for Designers from SHRP2

• Introduction to ABC Toolkit• ABC Conceptual Plans• ABC Conceptual Erection Concepts• Using the ABC Toolkit• ABC Design Sample calculations• Recommended ABC Specifications

Page 23: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

18

Page 24: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

19

Page 25: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

20

Page 26: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

21

Page 27: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

22

Page 28: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

23

Page 29: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

24

Page 30: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

25

Page 31: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

26

Page 32: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

27

Page 33: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

28

Page 34: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

29

Page 35: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

30

Page 36: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

31

Page 37: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

32

Page 38: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

33

Page 39: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

34

Page 40: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

35

Page 41: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

36

Page 42: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

37

Page 43: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

38

Page 44: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

39

Page 45: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

40

Page 46: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

41

Page 47: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

42

Page 48: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

43

Page 49: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

44

Session 3

ABC Pilot Projects

Page 50: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

45

Page 51: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

46

Page 52: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

47

Page 53: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

48

Page 54: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

49

Page 55: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

50

Page 56: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

51

Page 57: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

52

Page 58: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

53

Page 59: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

54

Page 60: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

55

Page 61: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

56

Page 62: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

57

Page 63: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

58

Page 64: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

59

Page 65: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

60

Page 66: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

61

Page 67: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

62

Page 68: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

63

Page 69: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

64

Page 70: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

65

Page 71: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

66

Page 72: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

67

Page 73: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

68

Questions & AnswersFill in missing words:

1. ABC is bridge construction that uses design and construction methods to reduce the onsite construction time and __________

2. Time metrics for mobility impacts are measured in _____ Tiers

3. Two examples of prefabricated elements: _____________, __________

4. Two examples of prefabricated systems: ______________, ___________

5. Three bridge movement technologies: _______________, ____________, ___________

6. Incremental launching is when the structure is moved ___________________

7. One technique for rapid demolition _______________________

8. Two types of decked girders for ABC: __________________, ______________

9. Two types of abutments preferred for ABC: _______________, _____________

10. One overhead erection method: _________________

11. One camber leveling method: _____________________

12. Engineer of Record has to check erection stresses: Yes / No

Page 74: Accelerated Bridge Construction  · PDF fileNY STATEWIDE CONFERENCE ON LOCAL BRIDGES 2012 Accelerated Bridge Construction ABC Bala Sivakumar HNTB Corp. New York

69