accelerator support and maintenance
DESCRIPTION
Accelerator Support and Maintenance. Run 14. Maintenance Tomorrow. PASS for 56MHz, install and test, CeC , eLens . Injectors: Booster and AGS 0700- 1100hrs CA Specific Jobs only. RHIC 0700 - 1400hrs Morning RA in most of ring CA in the afternoon . Sweep 4 o’clock RF at 1600hrs. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Accelerator Support and Maintenance](https://reader036.vdocument.in/reader036/viewer/2022062811/56816247550346895dd286c5/html5/thumbnails/1.jpg)
Accelerator Supportand Maintenance
Run 14
![Page 2: Accelerator Support and Maintenance](https://reader036.vdocument.in/reader036/viewer/2022062811/56816247550346895dd286c5/html5/thumbnails/2.jpg)
Maintenance Tomorrow PASS for 56MHz, install and test,
CeC, eLens. Injectors:
Booster and AGS 0700-1100hrs CA Specific Jobs only.
RHIC 0700-1400hrs Morning RA in most of ring CA in the afternoon.
Sweep 4 o’clock RF at 1600hrs
![Page 3: Accelerator Support and Maintenance](https://reader036.vdocument.in/reader036/viewer/2022062811/56816247550346895dd286c5/html5/thumbnails/3.jpg)
Schedule Booster and AGS LOTO
application starting at 4am. Access to RHIC promptly at
0700, all but kicker and RF areas.
RHIC sweeps early afternoon in tunnel.
Final tunnel sweep at 4Z1. Experimental Sweeps during
hysteresis ramp and setup.
![Page 4: Accelerator Support and Maintenance](https://reader036.vdocument.in/reader036/viewer/2022062811/56816247550346895dd286c5/html5/thumbnails/4.jpg)
![Page 5: Accelerator Support and Maintenance](https://reader036.vdocument.in/reader036/viewer/2022062811/56816247550346895dd286c5/html5/thumbnails/5.jpg)
Details, plans and discussion here at 1430hrs
![Page 6: Accelerator Support and Maintenance](https://reader036.vdocument.in/reader036/viewer/2022062811/56816247550346895dd286c5/html5/thumbnails/6.jpg)