Acceptance Testing
![Page 2: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/2.jpg)
Acceptance Testing of Fire Protection Systems 101
• Touch on all types of Fire Sprinkler of systems• Fire Pumps and Standpipes• Requirements for Acceptance Testing per NFPA
and the State Fire Marshal• Industry Jargon and Common terminology• State Rules- Texas Insurance Code Chapter 6003
& 28 TAC SS 34.700• Information in these slides comes from NFPA
Standards 13, 14 and 20
![Page 3: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/3.jpg)
Defining Terms• “Authority Having Jurisdiction”• Listed and Approved• “Shall” vs. “Should”• Hydrostatic Testing And Cover• Add and Relocates (Remodels) vs. New
System installs• Main Drain Test
![Page 4: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/4.jpg)
• Control Valve Testing• Tagging Requirements• System Type- Wet, Dry,
Preaction and Deluge with specific differences and required tests for each
• Specific Application System- ESFR, Control Mode, Residential, Double Interlock, etc
![Page 5: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/5.jpg)
Authority Having Jurisdiction (AHJ)
3.2.2* “An organization, office or individual responsible for enforcing the requirements of a code or standard, or for approving equipment, materials, an installation, or a procedure”
![Page 6: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/6.jpg)
Examples:• Fire Chief, Fire Marshal• Labor Department• Health Department- TDADS• Building Official, Electrical
Inspector, Plumbing Inspector• Insurance Organizations and their
Representatives• Commanding Officer on Base
![Page 7: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/7.jpg)
…essentially…
Anyone with a vested interest in the system performing as intended
![Page 8: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/8.jpg)
Listed
3.2.2* “Equipment, materials, or services included in a list published by an organization that is acceptable to the authority having jurisdiction”….
![Page 9: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/9.jpg)
Approved3.2.1 “Acceptable to the authority
having jurisdiction”
All materials and methods for installation are to conform to Chapter 6 of NFPA 13- 2007 or the individual product listings and approvals. When in doubt……..
Approved Materials
![Page 10: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/10.jpg)
…Make the installing contractor prove it to your satisfaction!!!!
• If it looks incorrect, it probably is• Be wary of new products, have
contractor provide cut sheets when in doubt
• Good review with thorough walk through at hydro at end of job
![Page 11: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/11.jpg)
• Your interpretation of the codes and standards is to be met or proven incorrect- codes/ standards are in writing- not inferred
• Sometimes corners are cut by unscrupulous contractors
• Some poor installs are mistakes or “human error” - BUT….
![Page 12: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/12.jpg)
Report repeat offenders to the
State Fire Marshal’s office!!!
![Page 13: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/13.jpg)
REMEMBER…• You are the last line of defense to
ensure the end user gets what they expect and paid for!!! These are your customers, you are their expert!
• Poor installs fail annual inspections and cost the owner money later for repairs
![Page 14: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/14.jpg)
Shall3.2.4 “Indicates a mandatory
requirement.”
Should3.2.5 “Indicates a recommendation
or that which advised but not required.”
![Page 15: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/15.jpg)
System Acceptance
• Acceptance Testing of systems is contained in Chapter 24 of NFPA 13-2007 Edition
• All required tests are listed, but required extra heads and some paperwork is not.
![Page 16: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/16.jpg)
Hydrostatic Test
• Section 24.2.1- “All piping and attached appurtenances subjected to system working pressure shall be hydrostatically tested at 200 psi (13.8 bar) and shall maintain that pressure without loss for two hours”
![Page 17: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/17.jpg)
• Section 24.2.1.2- Portions of systems normally subjected to working pressures in excess of 150 psi (10.4 bar) shall be tested as described in 24.2.1.1 at a pressure of 50 psi (3.5 bar) in excess of working pressure
![Page 18: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/18.jpg)
Things to watch at Hydro• Need to know expected pump
churn pressure and expected system working pressure, are PRV’s required?
• Hydrostatic test pressure is taken at the bottom of the system, not the top (Section 24.2.1.8)
![Page 19: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/19.jpg)
• Know the limits of the materials- pressure limitations of fittings and sprinkler heads
• If there is freeze potential, an interim pneumatic air test at 40 psi can be conducted for 24 hours per 24.2.2. This does not remove or replace the requirement for a hydrostatic test.
![Page 20: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/20.jpg)
• This test is referred to as a “Hydro Test” or “Cover Inspection”
• All systems require this type of test- Sprinkler, Standpipe, Pump
• In new construction the pipe should not be covered up during the test
• A procedure for removing “test blanks” must be in place
![Page 21: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/21.jpg)
• Retrofits are typically covered up. These are existing buildings and not all areas are accessible. Use your own judgment.
• Walk systems during the two hour test, look for leaks. Small leaks are not cause for concern.
• Excessive water leakage and pressure drop are cause for failure and re-test of system
![Page 22: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/22.jpg)
Hydro Test Procedure• Contractor should have system
pumped up above 200 psi or 50 above working pressure, prior to your arrival to remove air pockets
• Note Pressure on gauge upon arrival.
• Walk system- look for leaks.
![Page 23: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/23.jpg)
• While walking system, note areas that are in need of repair or changes required in the system to installing contractor.
• At end of two hour period, note pressure (loss if any). Have Contractor drain system to zero the gauge out in your presence.
![Page 24: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/24.jpg)
Things to Keep in Mind• FDC piping is often overlooked- Needs
to be tested @ 150psi after repair/ replacement- Sec 24.2.1.10
• Temperature changes affect system pressure during hydro.
• Trapped air in the system takes time to escape, if the system has not been pumped up for some time then air will escape.
![Page 25: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/25.jpg)
Add and Relocates• 24.2.1.4- “Modifications affecting
20 or fewer sprinklers shall not require testing in excess of system working pressure”
![Page 26: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/26.jpg)
• Per Section 24.2.1.5- Modifications above 20 sprinklers, isolate the affected portion of the system and hydro
• Per Section 24.2.1.6- Modifications that cannot be isolated (i.e.. Relocated drops) shall not require tested in excess of system working pressure
![Page 27: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/27.jpg)
Main Drain Test• 24.2.3.4.1 “The main drain valve
shall be opened and remain open until system pressure stabilizes”
• 24.2.3.4.2 “The static and residual pressures shall be recorded on the contractor’s material and test certificate”
• Use the bottom gauge
![Page 28: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/28.jpg)
• Often overlooked• Required on State “white tags”• Provides baseline water supply
test information to measure water supply deterioration in subsequent NFPA 25 Inspections.
• This is required on all systems! The importance cannot be stressed enough!
![Page 29: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/29.jpg)
Size of main drainsTable 8.16.2.4.2-Drain Size_________
Riser or Main Size Size of Drain
ConnectionUp to 2 in. 3⁄4 in. or larger21⁄2 in., 3 in., 31⁄2 in. 11⁄4 in. or larger4 in. and larger 2 in. only
No test orifices on main drains!!!! Need fully open for Main Drain Test. Listed Test and drain assemblies are acceptable if capable of full flow.
![Page 30: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/30.jpg)
Operational Tests• Referred to as a “Final”• While performing this test, an
inspection should be performed. Things to look for:– Loaded or painted sprinkler heads– Adequate coverage of all spaces– Missing pieces or incorrect install– Tamper and flow switch operation– Fire Alarm System should be on “Test”
![Page 31: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/31.jpg)
Walk the space- Check head coverage
• Light Hazard– 225 Sq Ft– Max. 15’ X 15’
• Ordinary Hazard– 130 Sq Ft– Max. 15 ft X 8’-8”
![Page 32: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/32.jpg)
• Extra Hazard– 100 Sq Ft– Max. 10’ X 10’ or 12 X 8’-4”
• Storage, ESFR, Control Mode– Look up each individual section-
these change often– Request the sprinkler cut sheet from
the Contractor- these are specific application and may have some special requirements
![Page 33: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/33.jpg)
Obstructions• Depending on the type of head
and the obstruction• Refer to Chapter 8 in NFPA 13-
’07. • All types of heads are broken
down individually
![Page 34: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/34.jpg)
![Page 35: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/35.jpg)
Alarm Initiating Devices
![Page 36: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/36.jpg)
Testing Alarm Switches• Inspector’s test connection should
have at least 1 inch pipe connected to a corrosion resistant orifice equal to the size of the smallest orifice on the system.
• Open ITC all the way, alarm should sound in less than 5 minutes
![Page 37: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/37.jpg)
• If bell goes off too quick, have contractor adjust delay on alarm device to account for water hammer in city water to avoid nuisance alarms.
• Ensure cover is on WF switch after test is performed
• Call the monitoring company- verify signals are correct for the space/ bldg
![Page 38: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/38.jpg)
Valve Tamper Switches
![Page 39: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/39.jpg)
Testing Tamper Switches
8.16.1.1.2.1- “Valves on connections to water supplies, sectional control valves, and other valves in supply pipes to sprinklers and other fixed water based fire suppression systems shall be supervised by one of the following:”
![Page 40: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/40.jpg)
(1)Central station, proprietary, or remote station signaling at a constantly attended point
(2)Local signaling service that will cause the sounding of an audible signal at a constantly attended point
(3)Valves locked in the correct position(4)Valves in fenced enclosures under
the owner’s control
![Page 41: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/41.jpg)
Testing Tampers• 24.2.3.5.1 “All control valves
shall be fully closed and opened under system water pressure to ensure proper operation”
• Check the valve operation• Check Tamper operation and
signal to monitoring company
![Page 42: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/42.jpg)
24.2.4- Pressure Reducing Valves
![Page 43: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/43.jpg)
Common Misinterpretation
• PRV’s should be a Pressure Reducing Valve- NOT Restricting or Relief Valve
• True PRV’s Reduce pressure under both Flow and Static Conditions
• NFPA 14-’07 Sec. 3.3.16.4 • NFPA 13-’07 Sec. 8.16.1.2.1
![Page 44: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/44.jpg)
Where Required• Sprinkler-When working pressure
exceeds 175 psi unless all downstream components are rated for the higher pressure
• Standpipe-For Fire Hose Valves where pressure exceeds 175 psi on 2-1/2” FHV’s pressure shall be limited to 100 psi- 1-1/2” valves can be of regulating type
![Page 45: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/45.jpg)
![Page 46: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/46.jpg)
PRV Requirements-Fire Sprinkler
• 8.16.1.2.2- Pressure gauges shall be on the inlet and outlet sides of each pressure reducing valve
• 8.16.1.2.3- A relief valve of not less than ½” shall be provided on the discharge side set to operate at a pressure not exceeding 175 psi.
![Page 47: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/47.jpg)
• 8.16.1.2.4- A listed indicating valve shall be provided on the inlet side of each PRV, unless the PRV meets the listing requirements for use as an indicating valve.
• 8.16.1.2.5- Means shall be provided downstream of all PRV’s for flow tests at sprinkler demand
![Page 48: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/48.jpg)
Acceptance Testing PRV’s
• 24.2.4.1- Each pressure-reducing valve shall be tested upon completion of installation to insure proper operation under flow and no-flow conditions.
• 24.2.4.2- Testing shall verify device regulates outlet at maximum and normal conditions
![Page 49: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/49.jpg)
• 24.2.4.3- The results of the flow test of each PRV shall be recorded on the contractor’s material and test certificate
• 24.2.4.4- The results shall include the static and residual inlet pressures, static and residual outlet pressures and the flow rate
![Page 50: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/50.jpg)
• Ask for PRV Testing Logs to show work was completed
• NFPA 14- 7.2 requires 1-1/2” hose valves residual pressure limited to 100 psi and 2-1/2” hose valves static and residual pressure limited to 100 psi where pressure exceeds 175 psi
Standpipe Hose Valve PRV’s- NFPA 14-’07
11.5.4
![Page 51: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/51.jpg)
Backflow Prevention Assemblies-8.17.4.6
• A.8.17.4.6- Where backflow prevention devices are installed, they should be in an accessible location to provide service and maintenance
![Page 52: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/52.jpg)
• 8.17.4.6.1- Means shall be provided downstream of all backflow prevention valves for flow tests at system demands
• A.8.17.4.6.1 describes the describes the methods available- essentially ensuring the backflow will not restrict the system demand
![Page 53: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/53.jpg)
Backflow Prevention Assemblies
Section 23.1.8 references AWWA M14, Recommended Practice for Backflow Prevention and Cross
Connection Control and the public Health AHJ requirements
Where are they Required???
![Page 54: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/54.jpg)
Backflow Prevention Acceptance Testing-
24.2.5• 24.2.5.1- The backflow prevention
assembly shall be forward flow tested to ensure proper operation.
• 24.2.5.2- The minimum flow rate shall be the system demand, including hose stream …
![Page 55: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/55.jpg)
• A copy of the state or local test report performed by a TCEQ approved tester should be attached to the riser
• An approved inspection by the local Health AHJ should be provided prior to final.
![Page 56: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/56.jpg)
Circulating Closed Loop Systems
• These are covered in 24.3. • Requires certification of pressure
ratings for auxiliary devices and proof of pressure test in all modes of operation
• Discharge tests to be per 6.9.1- the five minute requirement
![Page 57: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/57.jpg)
Wet Pipe System
For Heated Buildings Commercial Industrial Residential Hospitals Educational RetailMost Common Sprinkler SystemEasiest to Maintain and OperateRequires the Least Amount of Testing
![Page 58: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/58.jpg)
Wet System
![Page 59: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/59.jpg)
Wet System Tests and Requirements
• Hydrostatic and Cover• Walkthrough and Final
– Operational (Alarms, Tamper, Main Drain Test)
– Confirm Code compliance– Ensure correct number of spare heads
are left on site per NFPA 13-2007 Section 6.2.9- Dry heads not required. Sprinkler Wrench is.
![Page 60: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/60.jpg)
• New systems to have White Tag and Blue ITM Tag
• All additions over 20 heads are to have a new white tag added
• Hydraulic Placard and General Information Sign
• PRV test tags on each PRV• Backflow certification and Inspection
by Plumbing Dept
Wet System Riser Reqt’s
![Page 61: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/61.jpg)
Dry Pipe System
For Non-Heated Buildings Commercial Industrial Parking Garages Building Exteriors
![Page 62: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/62.jpg)
Dry Pipe System
![Page 63: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/63.jpg)
Dry System Tests and Requirements -24.2.2
• Hydrostatic and Cover• Walkthrough and Final
– Operational (Alarms, Tamper, Main Drain Test)
– Confirm Code compliance– Ensure correct number of spare heads
are left on site per NFPA 13-2007 Section 6.2.9- Dry heads not required. Sprinkler Wrench is.
![Page 64: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/64.jpg)
• In addition to 200 psi hydrostatic test- an air leakage test is required
• 40 psi of air for 24 hours- any leakage in excess of 1-1/2 psi shall be corrected
Dry Systems Also Require
![Page 65: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/65.jpg)
• 24.2.3.2 covers operational test • Trip test of valve and any quick
opening devices- time how long it takes for water to be discharged from the inspector’s test connection.
• Verify it is per 7.2.3.6 and record it on the Contractor’s Material and Test Certificate
System Operational Test
![Page 66: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/66.jpg)
Water Delivery per NFPA 13- 2007
Table 7.2.3.6.1 Dry System Water Delivery
Hazard Number of Most Remote Sprinklers
Initially Open
Maximum Time of Water Delivery
Residential 1 15 seconds Light 1 60 seconds Ordinary I 2 50 seconds Ordinary II 2 50 seconds Extra I 4 45 seconds Extra II 4 45 seconds High piled 4 40 seconds
![Page 67: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/67.jpg)
• 7.2.6.2.2- The air supply shall have a capacity capable of restoring normal air pressure in the system within 30 minutes
• A.7.2.6.2.20- When a single compressor serves multiple systems, the 30 minute fill time is based in the largest system
Air Compressor Testing
![Page 68: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/68.jpg)
• New systems to have White Tag and Blue ITM Tag
• All additions over 20 heads are to have a new white tag added
• Hydraulic Placard and General Information Sign
• PRV test tags on each PRV• Backflow certification and Inspection
by Plumbing Dept
Dry System Riser Reqt’s
![Page 69: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/69.jpg)
Pre Action System
For Environmentally Sensitive Areas Computer Rooms Surgical Suites Tele-Data Switch Rooms Fine Art Storage Rooms
![Page 70: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/70.jpg)
Pre Action System
![Page 71: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/71.jpg)
Preaction Requirements -24.2.3.3
• Hydrostatic and Cover• Walkthrough and Final
– Operational (Alarms, Tamper, Main Drain Test)
– Confirm Code compliance– Ensure correct number of spare heads
are left on site per NFPA 13-2007 Section 6.2.9- Dry heads not required. Sprinkler Wrench is.
![Page 72: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/72.jpg)
• Test the preaction valve operation in accordance with the manufacturer’s instructions- ask for literature if there is any questions on operation
• Test manual and remote control activation- this can be electric, pneumatic or a combination
Preaction Systems Also Require
![Page 73: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/73.jpg)
• Is the piping supervised? Sec. 7.3.2.4 requires supervision to ensure system integrity.
• If supervisory air or nitrogen is used- it needs to conform to 7.2.6 for dry systems…– 30 minute refill requirement.
• Also needs to maintain a minimum supervisory pressure of 7 psi.
![Page 74: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/74.jpg)
• New systems to have White Tag and Blue ITM Tag
• All additions over 20 heads are to have a new white tag added
• Hydraulic Placard and General Information Sign
• PRV test tags on each PRV• Backflow certification and Inspection
by Plumbing Dept
Preaction Riser Reqt’s
![Page 75: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/75.jpg)
Deluge System
For Highly Flammable Areas Aircraft Hangers Solvent Processing Dynamite Plants
![Page 76: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/76.jpg)
Deluge System
![Page 77: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/77.jpg)
Deluge System Requirements -24.2.3.3
• Hydrostatic and Cover• Walkthrough and Final
– Operational (Alarms, Tamper, Main Drain Test)
– Confirm Code compliance– Ensure correct number of spare heads
are left on site per NFPA 13-2007 Section 6.2.9- Dry heads not required. Sprinkler Wrench is.
![Page 78: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/78.jpg)
• Test the deluge valve operation in accordance with the manufacturer’s instructions- ask for literature if there is any questions on operation
• Test manual and remote control activation- this can be electric, pneumatic or hydraulic
Deluge Systems Also Require
![Page 79: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/79.jpg)
• Flow Testing of the system to ensure hydraulic performance. Calibrated gauges are to be used at different points on the system
• These gauge readings are to be compared to the hydraulic calculations
• Detection devices are to be automatically supervised
![Page 80: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/80.jpg)
• New systems to have White Tag and Blue ITM Tag
• All additions over 20 heads are to have a new white tag added
• Hydraulic Placard and General Information Sign
• PRV test tags on each prv• Backflow certification and Inspection
by Plumbing Dept
Deluge Riser Reqt’s
![Page 81: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/81.jpg)
Standpipe System
For Multi-levelBuildings Per AHJ
![Page 82: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/82.jpg)
Stand Pipe System
![Page 83: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/83.jpg)
Standpipe System Tests and Requirements
• Hydrostatic and Cover• Walkthrough and Final
– Operational (Alarms, Tamper, Main Drain Test)
– Confirm Code compliance and hose thread compatibility
– Flow test through roof manifold testing approved water source- fire pump, FD pumper truck, etc.
![Page 84: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/84.jpg)
• PRV tests. Ask for test log• Main Drain flow tests- record on
material test certificate• Dry and semi automatic shall be
trip tested to deliver 250 GPM at the hydraulically most remote hose connection within 3 minutes
• Air testing applies per dry systems in NFPA 13
![Page 85: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/85.jpg)
• Open and close each valve manually- make sure hose caps are on prior to testing
• Check for proper signage
![Page 86: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/86.jpg)
Fire Pump
![Page 87: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/87.jpg)
![Page 88: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/88.jpg)
Fire Pump Tests and Requirements
• Per NFPA 20- 2007 Edition Chapter 14
• Piping to be hydrostatically tested per NFPA 13 req’s
• All piping sizes to be verified per table 5.25 (a) by rated pump flow
![Page 89: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/89.jpg)
![Page 90: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/90.jpg)
• All factory supplier representatives are to be in attendance during field acceptance tests- AHJ should be notified
• As a minimum, proof of the initial startup and field acceptance test report should be provided at Fire Marshal final
![Page 91: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/91.jpg)
• A copy of the certified pump test characteristic curve shall be available for comparison of the field acceptance test.
• Compare the curves to ensure the pump meets it’s factory specs.
![Page 92: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/92.jpg)
• Pump shall be run at minimum, rated and peak loads
• How is this determined??• Minimum is 0 GPM or churn• Rated is the rating of the pump
– i.e.. 1000 GPM pump needs to be tested at 1000 GPM
• Maximum is 150 % of pump rating- a 1000 GPM rated pump is capable of 1500 GPM flow
![Page 93: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/93.jpg)
• Per NFPA 14- 2007, Section 6.2.1- Pumps shall furnish not less than 150 percent of rated capacity at not less than 65 percent of total rated head.
• 6.2.2- The shutoff head shall not exceed 140 percent of rated head for any type of pump.
![Page 94: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/94.jpg)
Example 1- Pump is rated for 750 GPM @ 100 psi
150 percent of load-1.5 X 750 =1125
65 percent of total rated head-.65 X 100= 65 psi
Pump should provide 65 psi MINIMUM at 1125 GPM
![Page 95: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/95.jpg)
Example 2- Maximum Shutoff100 psi Fire pump
Maximum Shutoff Head-1.4 X 100 psi= 140 psi
Pump shutoff pressure should not be over 140 psi.
![Page 96: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/96.jpg)
Keep in mind that is the Fire Pump shutoff pressure- the jockey of maintenance pump will add 10 more psi to the working pressure
of the system
![Page 97: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/97.jpg)
![Page 98: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/98.jpg)
![Page 99: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/99.jpg)
![Page 100: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/100.jpg)
![Page 101: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/101.jpg)
• Test fire alarm signals in Fire Pump control panel– Pump Run– A/C Power Fail– Phase Reversal
– Normal power and alternate power
![Page 102: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/102.jpg)
State Requirements
• What does 28 TAC §§ 34.700 – The Fire Sprinkler Rules require for new systems and system modifications?
![Page 103: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/103.jpg)
• White Original Installation Tag
![Page 104: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/104.jpg)
• To be affixed to riser after new install or scheduled testing and maintenance.
• To remain on riser for the life of the system- provides baseline water flow information for subsequent inspections.
• Work for this tag to be filled out by licensed RME-G or RME-I.
![Page 105: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/105.jpg)
• Blue Inspection Testing and Maintenance Tag
![Page 106: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/106.jpg)
• To be affixed to riser after new install or scheduled testing and maintenance.
• To remain on riser for minimum of five years- only to be removed by employee of authorized firm
• Work for this tag to be filled out by licensed RME-G or RME-I.
![Page 107: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/107.jpg)
• Blue Service Tag
![Page 108: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/108.jpg)
• To be affixed to riser after every service performed
• To remain on riser for minimum of five years- only to be removed by employee of authorized firm
• Work for this tag to be filled out by Installer- license not needed
• If anything is found to be impaired, a yellow or red tag need to be affixed as well.
![Page 109: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/109.jpg)
Contractor’s Material and Test Certificates
• Ensure these are filled out in their entirety and affixed to the riser in a protective sheath. The owner will want these at a later date.
![Page 110: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/110.jpg)
![Page 111: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/111.jpg)
![Page 112: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/112.jpg)
![Page 113: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/113.jpg)
![Page 114: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/114.jpg)
Hydraulic Placard
• Used in future work on system• Often lost over the years• Should be metal and permanently
marked per NFPA 13- 07
![Page 115: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/115.jpg)
![Page 116: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/116.jpg)
Design Criteria
• NFPA Codes: 13, 13R, 13D, 14, 20, 22, 24, 25 & 101 • UBC • IBC • IFC• Local AHJ’s• Other Jurisdictions – Architect, Engineer & Owner• Insurance Underwriter
![Page 117: Acceptance Testing of Fire Protection Systems 101](https://reader031.vdocument.in/reader031/viewer/2022021815/584cf9d61a28ab85738fdc7d/html5/thumbnails/117.jpg)
Post Construction Inspections and Maintenance
• Required per NFPA 25 and all Local Jurisdictions• Texas requires Licensed Inspectors • Identify changes in
• Occupancy and use• Ceiling and finishes (i.e.. Painted and loaded heads)• Added building features(Decks, Canopies, Clouds)
• Ensure system operation • Find system deficiencies and repair them in a timely manner