acem bim survey minco
TRANSCRIPT
-
8/16/2019 ACEM BIM Survey Minco
1/22
Completed survey forms to be returned to ACEM ([email protected])16 August 2012 !ers"on 1.00
Industry Wide BIM Survey
1 Introduction to the BIM Survey
A
# $egree of Computer"sat"on % &' $eployment
C BIM Awareness and Preparedness
2 Introduction to the BIM Survey
This survey is conducted under the purview of the Building Industry Presidents Cou
The survey ai!s to collect data" opinions and e#pections on Building Infor!atio
fro! industry players It is hoped that the data collected can $e used to for!ulatewide national BIM Masterplan and %&oad Map% The survey is organised into threefollows'
Company or espondents &nformat"on to this survey The data collected in this section when collated against dasection will $e a$le to %!ap% sectors of the industry against IT %preparedness%and BIM %awareness% (section C)
The purpose of this section is to collect data and infor!ation on the deapplication (hardware and software application) Analysis of data on a !acr
provide infor!ation on the level of IT application in the industry and $y e#tlevel of industry %preparedness% for the i!ple!entation of Building Infor!atioand identify %gaps% in industry %readiness%
This section assess the level of %preparedness% and %awareness% of Building IModelling (BIM)
The survey for! is designed in a spread sheet for!at to facilitate data collation aSurvey for!s in spread sheet for!at are loc*ed +ata entry ,elds are on the l
generally coloured and unloc*ed for data entry
Coloured cell for dentry
Co!!ents to assirespondent
Placing cursor over a datacell will $ring down descriassist respondent
In so!e data entry cell" plcursor over the cell will $ridrop down list $o# with a liselection
-
8/16/2019 ACEM BIM Survey Minco
2/22
Completed survey forms to be returned to ACEM ([email protected])16 August 2012 !ers"on 1.00
Industry Wide BIM Survey
2 Introduction to the BIM Survey
A di-erent selection of data.value will change the status of other related data entry
In so!e data cells" selection of certain data will change other data cells !aapplica$le for data.entry/ e#a!ples are as follows'
+ata cells coloured green are lare auto!atically updated fro!entered in section A (co!pany
The values in C111 will cause tof data cells to 0$lan*.out0" !aapplica$le for data entry All %$lcells are considered $lan*.outapplica$le for data.entry
In so!e cells the selection ofcertain data value will 0$lan*.out0 the cells $elow All %$luish.grey% cells are considered $lan*.out not applica$le for data.entry
+ata cells coloured green are loare auto!atically updated fro!entered in section A (co!pany iSelection of 0endor0 (or 0Manufor 0Contractor0) in section A nothe group of cells in C1 for dat The cells in C1 are now light y
The selection of di-erent datavalue in C131 will now unloc*the cell $elow for data entry
-
8/16/2019 ACEM BIM Survey Minco
3/22
Completed survey forms to be returned to ACEM ([email protected])16 August 2012 !ers"on 1.00
Industry Wide BIM Survey
2 The Building Industry President Council (BIPC)
4 Co!pleted Survey 5or!s
(a) '*e &nst"tut"on of +urveyors Malays"a
($) ,ertubu*an Ar-"te- Malays"a
(c)
(d) Malays"an &nst"tute of ,lanners
(e) &nst"tut"on of Eng"neers Malays"a
(f),ertubu*an ,emborong #"naan Malays"a
(g) '*e eal Estate and ous"ng $evelopers Assoc"at"on
The Building Industry Presidential Council (BIPC) is a council of Presidents of assoctrade organisations who are *ey sta*e holders in the $uilding industry in Malaysiwas esta$lished so!eti!e in the early 2666 and !eets a$out 4 to 3 ti!es a year to
on issues relating to the $uilding industry in Malaysia Me!$ers of BIPC co!prise thorganisations'
The co!pleted survey for!s (in electronic for!at) should $e forwarded $ac* to thaddress'
Assoc"at"on of Consult"ng Eng"neers Malays"asec7ace!
'*e &nst"tut"on of+urveyors Malays"a
,ertubu*an Ar-"te-Malays"a
Assoc"at"on ofConsult"ng Eng"neers
Malays"a
Malays"an &nst"tute of,lanners
'*e &nst"tut"on ofEng"neers Malays"an
'*e eal Estate andous"ng $evelopersAssoc"at"on
,ertubu*an ,emborong#"naan Malays"a
-
8/16/2019 ACEM BIM Survey Minco
4/22
Completed survey forms to be returned to ACEM ([email protected])16 August 2012 !ers"on 1.00
cil BIPC
Modelling
n industryections as
a in other(section B)
gree of IT$asis will
nsion" theModelling
nfor!ation
d analysisft and are
ata
st
entrytion to
cingng up ast of
-
8/16/2019 ACEM BIM Survey Minco
5/22
Completed survey forms to be returned to ACEM ([email protected])16 August 2012 !ers"on 1.00
cells
ing it not
c*ed anddata
info)
hese group*ing it notuish.grey%ot
*ed anddatafo)
act.urer0unloc*
a entryellow
-
8/16/2019 ACEM BIM Survey Minco
6/22
Completed survey forms to be returned to ACEM ([email protected])16 August 2012 !ers"on 1.00
iations and The BIPCdeli$erate
e following
e following
o!!y
-
8/16/2019 ACEM BIM Survey Minco
7/22
Completed survey forms to be returned to ACEM ([email protected]) 16 August 2012 !ers"on 1.00
A Co!pany or &esponden
The infor!ation collected shall $e con,dential and shall 89T $e disclo
A 1 Co!pany 8a!e (9ptional Infor!ation)
A 2 Person responsi$le (optional infor!ation)
A 21 8a!e of Contact person responsi$le Ir Cheng
A 22 Telephone 64
A 24 e!ail
A 4 What is the !ain discipline of your co!pany
A 41 Main $usiness focus
A 42 Su$ +iscipline
A 3 &egistration Type
A > ?ear of Incorporation
A Co!pany Strength
A 1 Total nu!$er of sta-
A 2 8u!$er of professional sta-
A 4 8u!$er of technical sta-
A Co!pany turnover (in &inggit)
A 1 Annual Turnover (2611)
A 2 Annual Turnover (2616)
A Professional;icensing &egistration Agency
A 1 ConsultantD&egistration CI+B
A 2 ConsultantD&egistration EF&
A 4 ConsultantD&egistration M95
A 3 ConsultantD&egistration EF&
A @ Manage!ent Certi,cation Agency
A @1 IS9 Guality SI&IM
A @2 IS9 =nviron!ental SI&IM
The purpose of this section is to collect data and infor!ation oncollected in this section when collated against data in other section wi%preparedness% (section B) and BIM %awareness% (section C)
-
8/16/2019 ACEM BIM Survey Minco
8/22
Completed survey forms to be returned to ACEM ([email protected]) 16 August 2012 !ers"on 1.00
%s Infor!ation
ed to any parties
Minconsult Sdn Bhd
ung ;i!
@>2> @1
hlcheng7!inconsultco!
Consultant
Civil < Structural =ngineer
Sdn Bhd
1@2
3>6
243
122
+isciplineClassType etc
C
-
8/16/2019 ACEM BIM Survey Minco
9/22
Completed survey forms to be returned to ACEM ([email protected]) 16 August 2012 !ers"on 1
B +egree of Co!puterisation IT +eploy!ent
The infor!ation collected shall $e con,dential and shall 89T $e disclosed to any parties
B 1 +egree of Co!puterisation (hardware)
B 11 IWe e!ploy an IT !anager in the co!pany ?=SB 12 Total nu!$er of co!puters in !y Co!pany 466
B 141 H of total co!puters and 9perating Syste! 166H Windows
B 142 H of total co!puters and 9perating Syste! 6H Macintosh
B 13 My co!pany !aintain an on.site data server 89
B 1> H of total co!puters with the 3 $it processor 6H 6H
B 2 Internet Connection
B 21 My oce has Internet Connection ?=S 16MBps
B 22 My co!pany !aintains a we$page ?=S
B 4 Manage!ent software !aintained $y our co!panyB 41 Accounting software ?=S M?9B
B 42 Manage!ent software ?=S
B 3 Software !aintained $y our co!pany
B 311 +esign softwares utilised ($usiness focus) Consultant Category
B 312 Su$ +iscipline Civil < Structural =ngineer
B 32 +esign BIM software suite
B 321 +esign CA+ Suite used in !y oce 8o of ;icense Structure
The purpose of this section is to collect data and infor!ation on the degree of IT application (hardware and softwareapplication) Analysis of data on a !acro $asis will provide infor!ation on the level of IT application in the industry and $ye#tension" the level of industry %preparedness% for the i!ple!entation of Building Infor!ation Modelling and identify %gaps%in industry %readiness%
www!inconsultco!
http://www.minconsult.com/http://www.minconsult.com/
-
8/16/2019 ACEM BIM Survey Minco
10/22
Completed survey forms to be returned to ACEM ([email protected]) 16 August 2012 !ers"on
B +egree of Co!puterisation IT +eploy!ent
The infor!ation collected shall $e con,dential and shall 89T $e disclosed to any parties
The purpose of this section is to collect data and infor!ation on the degree of IT application (hardware and softwareapplication) Analysis of data on a !acro $asis will provide infor!ation on the level of IT application in the industry and $ye#tension" the level of industry %preparedness% for the i!ple!entation of Building Infor!ation Modelling and identify %gaps%in industry %readiness%
B 322 Structure suite used in !y oce 9thers (Please specify $elow)
B 324 Structure suite used in !y oce 9thers (Please specify $elow)
B 323 Structure suite (if not listed a$ove) Autodes* &evit Structure
B 32> Structure suite (if not listed a$ove)
B 341 +esign CA+ Suite used in !y oce 8o of ;icense Interior +esign
B 342 Interior +esign suite used in !y oce
B 344 Interior +esign suite used in !y oce
B 343 Interior +esign suite (if not listed a$ove)
B 34> Interior +esign suite (if not listed a$ove)
B 331 +esign CA+ Suite used in !y oce 8o of ;icense Civil
B 332 Civil suite used in !y oce 9rion
B 334 Civil suite used in !y oce STAA+
B 333 Civil suite (if not listed a$ove) =TABS
B 33> Civil suite (if not listed a$ove) A+APT
-
8/16/2019 ACEM BIM Survey Minco
11/22
Completed survey forms to be returned to ACEM ([email protected]) 16 August 2012 !ers"on
B +egree of Co!puterisation IT +eploy!ent
The infor!ation collected shall $e con,dential and shall 89T $e disclosed to any parties
The purpose of this section is to collect data and infor!ation on the degree of IT application (hardware and softwareapplication) Analysis of data on a !acro $asis will provide infor!ation on the level of IT application in the industry and $ye#tension" the level of industry %preparedness% for the i!ple!entation of Building Infor!ation Modelling and identify %gaps%in industry %readiness%
B 3>1 +esign CA+ Suite used in !y oce 8o of ;icense M2 M4 M3 M> M ProJect Manage!ent suite (if not listed a$ove)
B 31 9ther Software Suite utilised (please descri$e) 8o of ;icense
B 32 software used in !y oce
B 34 software used in !y oce
B 33 software used in !y oce
B 3> software used in !y oce
B 3 software used in !y oce
B 3 software used in !y oce
B 3 software used in !y oce
B 3@ software used in !y oce
-
8/16/2019 ACEM BIM Survey Minco
12/22
Completed survey forms to be returned to ACEM ([email protected]) 16 August 2012 !ers"on 1.
B +egree of Co!puterisation IT +eploy!ent
The infor!ation collected shall $e con,dential and shall 89T $e disclosed to any parties
The purpose of this section is to collect data and infor!ation on the degree of IT application (hardware and softwareapplication) Analysis of data on a !acro $asis will provide infor!ation on the level of IT application in the industry and $ye#tension" the level of industry %preparedness% for the i!ple!entation of Building Infor!ation Modelling and identify %gaps%in industry %readiness%
-
8/16/2019 ACEM BIM Survey Minco
13/22
Completed survey forms to be returned to ACEM ([email protected])16 August 2012 !ers"on 1.00
C BIM Awareness and Prepa
This section assess the level of %preparedness% and %awareness% of Building In
The infor!ation collected shall $e con,dential and shall 89T $e disclosed to
C 1 Aspects of #&M usage "n my company
C 11 Co!pany Business 5ocus
C 111 The !ain $usiness focus of !y co!pany'
C 112 Su$ sector of industry
C 12 4+ Production of drawings
C 121
?=S
C 122 166H
C 124
C 123
C 12>
C 12
C 12
C 14 9$Jects in drawings
C 141 ?=S
C 13 Guantities and Tender
C 131 My co!pany have e#perience in eTender ?=S
C 132 ?=S
C 134 We prepare eBG using the following software 9$Jects in
C 133 We have e#pertise in preparing eTender ?=S
C 1> ProJect Scheduling
1>1 ?=S
1>2 We use the following software in PS
My co!pany has the e#pertise to producedrawings in 4+ Percentage of total drawingsproduced in 4+ in !y co!pany'
We use the following software for production of4+ drawings (H of total drawing production usingthis software) If 09thers0 are listed in either ofthe ,rst 4 row" na!e the software used in the 3thand >th row (11> to 11)
My co!pany has the e#pertise to insert 0o$Jects0into CA+ drawings The percentage of totaldrawings where o$Jects are inserted are roughlylisted as follows
We have e#pertise in preparing Kuantities inelectronic for!at
My co!pany have e#perience ProJect Scheduling(PS)'
-
8/16/2019 ACEM BIM Survey Minco
14/22
Completed survey forms to be returned to ACEM ([email protected])16 August 2012 !ers"on 1.00
C BIM Awareness and Prepa
This section assess the level of %preparedness% and %awareness% of Building In
The infor!ation collected shall $e con,dential and shall 89T $e disclosed to
C 1 BIM Co!pliant e;i$rary (for contractors" vendors and !anufactur11 ?=S
12
14
13
1> +escri$e if not listed a$ove
1 +escri$e if not listed a$ove
C 2 #&M A/areness "n my Company
C 21 Leneral BIM I!ple!entation in !y Co!pany
C 211 Awareness of BIM in !y co!pany is
C 212 I!ple!entation of BIM in !y co!pany
C 214 We plan to i!ple!ent BIM within
(if answer to C212 is positive)
C 22 I!pedi!ent to I!ple!enting BIM (endogenous factors)
Cost
C 221 pgrading hardware
C 222 pdgrading Add Software
C 224 Training sta- 2
C 223 Changes to wor* Now" procedure < !ethod 2
C 22> =#ogenous (e#ternal) factors (C24 $elow)
C 24 I!pedi!ent to I!ple!enting BIM (e#ogenous factors)
Cost
C 241 ;ac* of BIM standardisation in industry
C 242 ;ac* of BIM adoption $y *ey !ar*et players
C 244 ;ac* of or insucient trained sta- in industry
C 243 ;ac* of BIM co!pliant co!ponents in e;i$rary 2
C 24> Proprietary nature of BIM software
Products under !y co!pany are issued ine;i$rary which can $e directly inserted in CA+drawings BIM
Co!pliance
+escri$e $uilding co!ponents in e;i$rary (if !orethan one type select again $elow)
In !y opinion" !aJor i!pedi!ent to i!ple!entation of BIM in!y co!pany ran*ed" in order of i!portance are as follows(Cost and +iculty ;evel)'
In !y opinion" e#ogenous factors (factors outside the controlof !y co!pany) which i!pede BIM is due to the followingreasons (ran*ed in order of i!portance/ 1 !ost i!portant to . least i!portant)')'
-
8/16/2019 ACEM BIM Survey Minco
15/22
Completed survey forms to be returned to ACEM ([email protected])16 August 2012 !ers"on 1.00
C BIM Awareness and Prepa
This section assess the level of %preparedness% and %awareness% of Building In
The infor!ation collected shall $e con,dential and shall 89T $e disclosed to
C 24 Migration of co!puter hardware for BIM
co!pliance
-
8/16/2019 ACEM BIM Survey Minco
16/22
Completed survey forms to be returned to ACEM ([email protected])16 August 2012 !ers"on 1.00
C BIM Awareness and Prepa
This section assess the level of %preparedness% and %awareness% of Building In
The infor!ation collected shall $e con,dential and shall 89T $e disclosed to
C 23 The i!ple!entation of BIM in !y Co!pany is or has $een $ene,c
C 231 I!proved proJect design!odelling8ote
C 232 I!proved productivity8ote
C 234 I!proved cost eciencyincreased pro,ta$ility8ote
C 233 I!proved proJect scheduling8ote
C 23> BIM pro,ciency confers advantage in proJect $idding8ote
C .0 eneral #&M 3nderstand"ng and ,erspect"ve
C 41 I have $een hearing a$out BIM within the last 1 year
C 42 BIM is all a$out using software
C 44 BIM is only a$out 4+ CA+ drawings
C 43 BIM is a$out real ti!e colla$oration a!ongst *ey players
C 4> The industry is not clear what BIM is a$out
C 4 BIM do not pro!ote creativity in design
C 4 BIM is the future for the construction industry
C 4 Most BIM se!inars or courses have not $een helpful
C 4@
C 416
C 4.0 Comments 5 Enter any comments or suggest"ons on #&M "n
C 31
C 32
C 34
In !y e#perience or opinion" the $ene,ts of i!ple!entating BIM in !yco!pany can $e listed in following Indicate your level of 0Agree!ent0 or0+isagree!ent0 to the following state!ents
This include a $etter understanding of design through visualisation" clashanalysis" energy !odelling" construction scheduling analysis etc during theproJect life cycle (concept" design" construction" operation)
This generally !eans faster turnover ti!e for production of drawings duringthe proJect life cycle andor proJect construction period
This generally !eans higher pro,ta$ility after ta*ing into account increasecost" lower cost for %a$ortive% wor*s" $etter cost control etc
I!proved proJect scheduling refers in the proJect life cycle pertains to criticalpath analysis (CPA) of proJect" identifying !anpower needs" coordinationneeds" delivera$les and ti!e line etc
So!e clients" iconic proJects or internationalprestigious develop!ent areincreasingly specifying BIM pro,ciency or co!pliance as a pre.reKuisite forproJect $idding
Indicate your level of 0Agree!ent0 or 0+isagree!ent0 to the followingstate!ents regarding BIM in industry'
The govern!ent should !a*e BIM co!pulsory (atleast for pu$lic wor*s)
The govern!ent should provide ,nancial,scal incentives topro!ote BIM
-
8/16/2019 ACEM BIM Survey Minco
17/22
Completed survey forms to be returned to ACEM ([email protected])16 August 2012 !ers"on 1.00
C BIM Awareness and Prepa
This section assess the level of %preparedness% and %awareness% of Building In
The infor!ation collected shall $e con,dential and shall 89T $e disclosed to
C 33
-
8/16/2019 ACEM BIM Survey Minco
18/22
Completed survey forms to be returned to ACEM ([email protected])16 August 2012 !ers"on 1.00
edness
for!ation Modelling (BIM)
any parties
Consultant
Civil < Structural =ngineer
46H
Autodes* &evit
9thers (descri$e $elow)
9thers (descri$e $elow)
drawings listed in 12 lin*ed to Kuantities
+o not understand eTender
PS only within design stage
-
8/16/2019 ACEM BIM Survey Minco
19/22
Completed survey forms to be returned to ACEM ([email protected])16 August 2012 !ers"on 1.00
edness
for!ation Modelling (BIM)
any parties
r only)
+escri$e e;i$rary Co!ponent
Aware of BIM
Currently using BIM
&an* in order of i!portance
+iculty
2
2
2
4
&an* in order of i!portance
+iculty
4
2
-
8/16/2019 ACEM BIM Survey Minco
20/22
Completed survey forms to be returned to ACEM ([email protected])16 August 2012 !ers"on 1.00
edness
for!ation Modelling (BIM)
any parties
-
8/16/2019 ACEM BIM Survey Minco
21/22
Completed survey forms to be returned to ACEM ([email protected])16 August 2012 !ers"on 1.00
edness
for!ation Modelling (BIM)
any parties
ial in the following !anner
BIM is currently I!ple!ented
So!ewhat Agree
8eutral
8eutral
So!ewhat Agree
Strongly Agree
Strongly Agree
So!ewhat Agree
8eutral
8eutral
So!ewhat Agree
So!ewhat Agree
Strongly Agree
8eutral
So!ewhat Agree
So!ewhat Agree
&ndustry
-
8/16/2019 ACEM BIM Survey Minco
22/22
edness
for!ation Modelling (BIM)
any parties