acem bim survey minco

Upload: zatul-akmal-zamil

Post on 06-Jul-2018

240 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/16/2019 ACEM BIM Survey Minco

    1/22

    Completed survey forms to be returned to ACEM ([email protected])16 August 2012 !ers"on 1.00

    Industry Wide BIM Survey

    1 Introduction to the BIM Survey

    A

    # $egree of Computer"sat"on % &' $eployment

    C BIM Awareness and Preparedness

    2 Introduction to the BIM Survey

     This survey is conducted under the purview of the Building Industry Presidents Cou

     The survey ai!s to collect data" opinions and e#pections on Building Infor!atio

    fro! industry players It is hoped that the data collected can $e used to for!ulatewide national BIM Masterplan and %&oad Map% The survey is organised into threefollows'

    Company or espondents &nformat"on to this survey The data collected in this section when collated against dasection will $e a$le to %!ap% sectors of the industry against IT %preparedness%and BIM %awareness% (section C)

     The purpose of this section is to collect data and infor!ation on the deapplication (hardware and software application) Analysis of data on a !acr

    provide infor!ation on the level of IT application in the industry and $y e#tlevel of industry %preparedness% for the i!ple!entation of Building Infor!atioand identify %gaps% in industry %readiness%

     This section assess the level of %preparedness% and %awareness% of Building IModelling (BIM)

     The survey for! is designed in a spread sheet for!at to facilitate data collation aSurvey for!s in spread sheet for!at are loc*ed +ata entry ,elds are on the l

    generally coloured and unloc*ed for data entry

    Coloured cell for dentry

    Co!!ents to assirespondent

    Placing cursor over a datacell will $ring down descriassist respondent

    In so!e data entry cell" plcursor over the cell will $ridrop down list $o# with a liselection

  • 8/16/2019 ACEM BIM Survey Minco

    2/22

    Completed survey forms to be returned to ACEM ([email protected])16 August 2012 !ers"on 1.00

    Industry Wide BIM Survey

    2 Introduction to the BIM Survey

    A di-erent selection of data.value will change the status of other related data entry

    In so!e data cells" selection of certain data will change other data cells !aapplica$le for data.entry/ e#a!ples are as follows'

    +ata cells coloured green are lare auto!atically updated fro!entered in section A (co!pany

     The values in C111 will cause tof data cells to 0$lan*.out0" !aapplica$le for data entry All %$lcells are considered $lan*.outapplica$le for data.entry

    In so!e cells the selection ofcertain data value will 0$lan*.out0 the cells $elow All %$luish.grey% cells are considered $lan*.out not applica$le for data.entry

    +ata cells coloured green are loare auto!atically updated fro!entered in section A (co!pany iSelection of 0endor0 (or 0Manufor 0Contractor0) in section A nothe group of cells in C1 for dat The cells in C1 are now light y

     The selection of di-erent datavalue in C131 will now unloc*the cell $elow for data entry

  • 8/16/2019 ACEM BIM Survey Minco

    3/22

    Completed survey forms to be returned to ACEM ([email protected])16 August 2012 !ers"on 1.00

    Industry Wide BIM Survey

    2 The Building Industry President Council (BIPC)

    4 Co!pleted Survey 5or!s

    (a) '*e &nst"tut"on of +urveyors Malays"a

    ($) ,ertubu*an Ar-"te- Malays"a

    (c)

    (d) Malays"an &nst"tute of ,lanners

    (e) &nst"tut"on of Eng"neers Malays"a

    (f),ertubu*an ,emborong #"naan Malays"a

    (g) '*e eal Estate and ous"ng $evelopers Assoc"at"on

     The Building Industry Presidential Council (BIPC) is a council of Presidents of assoctrade organisations who are *ey sta*e holders in the $uilding industry in Malaysiwas esta$lished so!eti!e in the early 2666 and !eets a$out 4 to 3 ti!es a year to

    on issues relating to the $uilding industry in Malaysia Me!$ers of BIPC co!prise thorganisations'

     The co!pleted survey for!s (in electronic for!at) should $e forwarded $ac* to thaddress'

    Assoc"at"on of Consult"ng Eng"neers Malays"asec7ace!

    '*e &nst"tut"on of+urveyors Malays"a

    ,ertubu*an Ar-"te-Malays"a

    Assoc"at"on ofConsult"ng Eng"neers

    Malays"a

    Malays"an &nst"tute of,lanners

    '*e &nst"tut"on ofEng"neers Malays"an

    '*e eal Estate andous"ng $evelopersAssoc"at"on

    ,ertubu*an ,emborong#"naan Malays"a

    mailto:[email protected]:[email protected]

  • 8/16/2019 ACEM BIM Survey Minco

    4/22

    Completed survey forms to be returned to ACEM ([email protected])16 August 2012 !ers"on 1.00

     

    cil BIPC

      Modelling

    n industryections as

    a in other(section B)

    gree of IT$asis will

    nsion" theModelling

    nfor!ation

    d analysisft and are

    ata

    st

    entrytion to

    cingng up ast of

  • 8/16/2019 ACEM BIM Survey Minco

    5/22

    Completed survey forms to be returned to ACEM ([email protected])16 August 2012 !ers"on 1.00

     

    cells

      ing it not

    c*ed anddata

    info)

    hese group*ing it notuish.grey%ot

    *ed anddatafo)

    act.urer0unloc*

    a entryellow

  • 8/16/2019 ACEM BIM Survey Minco

    6/22

    Completed survey forms to be returned to ACEM ([email protected])16 August 2012 !ers"on 1.00

     

    iations and The BIPCdeli$erate

    e following

    e following

    o!!y

    mailto:[email protected]:[email protected]

  • 8/16/2019 ACEM BIM Survey Minco

    7/22

    Completed survey forms to be returned to ACEM ([email protected]) 16 August 2012 !ers"on 1.00

    A Co!pany or &esponden

     The infor!ation collected shall $e con,dential and shall 89T $e disclo

    A 1 Co!pany 8a!e (9ptional Infor!ation)

    A 2 Person responsi$le (optional infor!ation)

    A 21 8a!e of Contact person responsi$le Ir Cheng

    A 22 Telephone 64

    A 24 e!ail

    A 4 What is the !ain discipline of your co!pany

    A 41 Main $usiness focus

    A 42 Su$ +iscipline

    A 3 &egistration Type

    A > ?ear of Incorporation

    A Co!pany Strength

    A 1 Total nu!$er of sta- 

    A 2 8u!$er of professional sta- 

    A 4 8u!$er of technical sta- 

    A Co!pany turnover (in &inggit)

    A 1 Annual Turnover (2611)

    A 2 Annual Turnover (2616)

    A Professional;icensing &egistration Agency

    A 1 ConsultantD&egistration CI+B

    A 2 ConsultantD&egistration EF&

    A 4 ConsultantD&egistration M95

    A 3 ConsultantD&egistration EF&

    A @ Manage!ent Certi,cation Agency

    A @1 IS9 Guality SI&IM

    A @2 IS9 =nviron!ental SI&IM

     The purpose of this section is to collect data and infor!ation oncollected in this section when collated against data in other section wi%preparedness% (section B) and BIM %awareness% (section C)

  • 8/16/2019 ACEM BIM Survey Minco

    8/22

    Completed survey forms to be returned to ACEM ([email protected]) 16 August 2012 !ers"on 1.00

      %s Infor!ation

      ed to any parties

    Minconsult Sdn Bhd

      ung ;i!

    @>2> @1

    hlcheng7!inconsultco!

    Consultant

    Civil < Structural =ngineer

    Sdn Bhd

    1@2

    3>6

    243

    122

    +isciplineClassType etc

    C

  • 8/16/2019 ACEM BIM Survey Minco

    9/22

    Completed survey forms to be returned to ACEM ([email protected]) 16 August 2012 !ers"on 1

    B +egree of Co!puterisation IT +eploy!ent

     The infor!ation collected shall $e con,dential and shall 89T $e disclosed to any parties

    B 1 +egree of Co!puterisation (hardware)

    B 11 IWe e!ploy an IT !anager in the co!pany  ?=SB 12 Total nu!$er of co!puters in !y Co!pany 466

    B 141 H of total co!puters and 9perating Syste! 166H   Windows

    B 142 H of total co!puters and 9perating Syste! 6H Macintosh

    B 13 My co!pany !aintain an on.site data server 89

    B 1> H of total co!puters with the 3 $it processor 6H 6H

    B 2 Internet Connection

    B 21 My oce has Internet Connection  ?=S 16MBps

    B 22 My co!pany !aintains a we$page  ?=S

    B 4 Manage!ent software !aintained $y our co!panyB 41 Accounting software  ?=S M?9B

    B 42 Manage!ent software  ?=S

    B 3 Software !aintained $y our co!pany

    B 311 +esign softwares utilised ($usiness focus) Consultant Category

    B 312 Su$ +iscipline Civil < Structural =ngineer

    B 32 +esign BIM software suite

    B 321 +esign CA+ Suite used in !y oce 8o of ;icense Structure

     The purpose of this section is to collect data and infor!ation on the degree of IT application (hardware and softwareapplication) Analysis of data on a !acro $asis will provide infor!ation on the level of IT application in the industry and $ye#tension" the level of industry %preparedness% for the i!ple!entation of Building Infor!ation Modelling and identify %gaps%in industry %readiness%

    www!inconsultco!

    http://www.minconsult.com/http://www.minconsult.com/

  • 8/16/2019 ACEM BIM Survey Minco

    10/22

    Completed survey forms to be returned to ACEM ([email protected]) 16 August 2012 !ers"on

    B +egree of Co!puterisation IT +eploy!ent

     The infor!ation collected shall $e con,dential and shall 89T $e disclosed to any parties

     The purpose of this section is to collect data and infor!ation on the degree of IT application (hardware and softwareapplication) Analysis of data on a !acro $asis will provide infor!ation on the level of IT application in the industry and $ye#tension" the level of industry %preparedness% for the i!ple!entation of Building Infor!ation Modelling and identify %gaps%in industry %readiness%

    B 322 Structure suite used in !y oce 9thers (Please specify $elow)

    B 324 Structure suite used in !y oce 9thers (Please specify $elow)

    B 323 Structure suite (if not listed a$ove) Autodes* &evit Structure

    B 32> Structure suite (if not listed a$ove)

    B 341 +esign CA+ Suite used in !y oce 8o of ;icense Interior +esign

    B 342 Interior +esign suite used in !y oce

    B 344 Interior +esign suite used in !y oce

    B 343 Interior +esign suite (if not listed a$ove)

    B 34> Interior +esign suite (if not listed a$ove)

    B 331 +esign CA+ Suite used in !y oce 8o of ;icense Civil

    B 332 Civil suite used in !y oce 9rion

    B 334 Civil suite used in !y oce STAA+

    B 333 Civil suite (if not listed a$ove) =TABS

    B 33> Civil suite (if not listed a$ove) A+APT

  • 8/16/2019 ACEM BIM Survey Minco

    11/22

    Completed survey forms to be returned to ACEM ([email protected]) 16 August 2012 !ers"on

    B +egree of Co!puterisation IT +eploy!ent

     The infor!ation collected shall $e con,dential and shall 89T $e disclosed to any parties

     The purpose of this section is to collect data and infor!ation on the degree of IT application (hardware and softwareapplication) Analysis of data on a !acro $asis will provide infor!ation on the level of IT application in the industry and $ye#tension" the level of industry %preparedness% for the i!ple!entation of Building Infor!ation Modelling and identify %gaps%in industry %readiness%

    B 3>1 +esign CA+ Suite used in !y oce 8o of ;icense M2 M4 M3 M> M ProJect Manage!ent suite (if not listed a$ove)

    B 31 9ther Software Suite utilised (please descri$e) 8o of ;icense

    B 32 software used in !y oce

    B 34 software used in !y oce

    B 33 software used in !y oce

    B 3> software used in !y oce

    B 3 software used in !y oce

    B 3 software used in !y oce

    B 3 software used in !y oce

    B 3@ software used in !y oce

  • 8/16/2019 ACEM BIM Survey Minco

    12/22

    Completed survey forms to be returned to ACEM ([email protected]) 16 August 2012 !ers"on 1.

    B +egree of Co!puterisation IT +eploy!ent

     The infor!ation collected shall $e con,dential and shall 89T $e disclosed to any parties

     The purpose of this section is to collect data and infor!ation on the degree of IT application (hardware and softwareapplication) Analysis of data on a !acro $asis will provide infor!ation on the level of IT application in the industry and $ye#tension" the level of industry %preparedness% for the i!ple!entation of Building Infor!ation Modelling and identify %gaps%in industry %readiness%

  • 8/16/2019 ACEM BIM Survey Minco

    13/22

    Completed survey forms to be returned to ACEM ([email protected])16 August 2012 !ers"on 1.00

    C BIM Awareness and Prepa

     This section assess the level of %preparedness% and %awareness% of Building In

     The infor!ation collected shall $e con,dential and shall 89T $e disclosed to

    C 1 Aspects of #&M usage "n my company

    C 11 Co!pany Business 5ocus

    C 111  The !ain $usiness focus of !y co!pany'

    C 112 Su$ sector of industry  

    C 12 4+ Production of drawings

    C 121

     ?=S

    C 122 166H

    C 124

    C 123

    C 12>

    C 12

    C 12

    C 14 9$Jects in drawings

    C 141  ?=S

    C 13 Guantities and Tender

    C 131 My co!pany have e#perience in eTender  ?=S

    C 132  ?=S

    C 134 We prepare eBG using the following software 9$Jects in

    C 133 We have e#pertise in preparing eTender  ?=S

    C 1> ProJect Scheduling

    1>1 ?=S

    1>2 We use the following software in PS

    My co!pany has the e#pertise to producedrawings in 4+ Percentage of total drawingsproduced in 4+ in !y co!pany'

    We use the following software for production of4+ drawings (H of total drawing production usingthis software) If 09thers0 are listed in either ofthe ,rst 4 row" na!e the software used in the 3thand >th row (11> to 11)

    My co!pany has the e#pertise to insert 0o$Jects0into CA+ drawings The percentage of totaldrawings where o$Jects are inserted are roughlylisted as follows

    We have e#pertise in preparing Kuantities inelectronic for!at

    My co!pany have e#perience ProJect Scheduling(PS)'

  • 8/16/2019 ACEM BIM Survey Minco

    14/22

    Completed survey forms to be returned to ACEM ([email protected])16 August 2012 !ers"on 1.00

    C BIM Awareness and Prepa

     This section assess the level of %preparedness% and %awareness% of Building In

     The infor!ation collected shall $e con,dential and shall 89T $e disclosed to

    C 1 BIM Co!pliant e;i$rary (for contractors" vendors and !anufactur11  ?=S

    12

    14

    13

    1> +escri$e if not listed a$ove

    1 +escri$e if not listed a$ove

    C 2 #&M A/areness "n my Company

    C 21 Leneral BIM I!ple!entation in !y Co!pany

    C 211 Awareness of BIM in !y co!pany is

    C 212 I!ple!entation of BIM in !y co!pany

    C 214 We plan to i!ple!ent BIM within

    (if answer to C212 is positive)

    C 22 I!pedi!ent to I!ple!enting BIM (endogenous factors)

     

    Cost

    C 221 pgrading hardware

    C 222 pdgrading Add Software

    C 224 Training sta-  2

    C 223 Changes to wor* Now" procedure < !ethod 2

    C 22> =#ogenous (e#ternal) factors (C24 $elow)

    C 24 I!pedi!ent to I!ple!enting BIM (e#ogenous factors)

     

    Cost

    C 241 ;ac* of BIM standardisation in industry

    C 242 ;ac* of BIM adoption $y *ey !ar*et players

    C 244 ;ac* of or insucient trained sta- in industry

    C 243 ;ac* of BIM co!pliant co!ponents in e;i$rary 2

    C 24> Proprietary nature of BIM software

    Products under !y co!pany are issued ine;i$rary which can $e directly inserted in CA+drawings BIM

    Co!pliance

    +escri$e $uilding co!ponents in e;i$rary (if !orethan one type select again $elow)

    In !y opinion" !aJor i!pedi!ent to i!ple!entation of BIM in!y co!pany ran*ed" in order of i!portance are as follows(Cost and +iculty ;evel)'

    In !y opinion" e#ogenous factors (factors outside the controlof !y co!pany) which i!pede BIM is due to the followingreasons (ran*ed in order of i!portance/ 1 !ost i!portant to . least i!portant)')'

  • 8/16/2019 ACEM BIM Survey Minco

    15/22

    Completed survey forms to be returned to ACEM ([email protected])16 August 2012 !ers"on 1.00

    C BIM Awareness and Prepa

     This section assess the level of %preparedness% and %awareness% of Building In

     The infor!ation collected shall $e con,dential and shall 89T $e disclosed to

    C 24 Migration of co!puter hardware for BIM

    co!pliance

  • 8/16/2019 ACEM BIM Survey Minco

    16/22

    Completed survey forms to be returned to ACEM ([email protected])16 August 2012 !ers"on 1.00

    C BIM Awareness and Prepa

     This section assess the level of %preparedness% and %awareness% of Building In

     The infor!ation collected shall $e con,dential and shall 89T $e disclosed to

    C 23 The i!ple!entation of BIM in !y Co!pany is or has $een $ene,c

    C 231 I!proved proJect design!odelling8ote

    C 232 I!proved productivity8ote

    C 234 I!proved cost eciencyincreased pro,ta$ility8ote

    C 233 I!proved proJect scheduling8ote

    C 23> BIM pro,ciency confers advantage in proJect $idding8ote

    C .0 eneral #&M 3nderstand"ng and ,erspect"ve

    C 41 I have $een hearing a$out BIM within the last 1 year

    C 42 BIM is all a$out using software

    C 44 BIM is only a$out 4+ CA+ drawings

    C 43 BIM is a$out real ti!e colla$oration a!ongst *ey players

    C 4> The industry is not clear what BIM is a$out

    C 4 BIM do not pro!ote creativity in design

    C 4 BIM is the future for the construction industry

    C 4 Most BIM se!inars or courses have not $een helpful

    C 4@

    C 416

    C 4.0 Comments 5 Enter any comments or suggest"ons on #&M "n

    C 31

    C 32

    C 34

    In !y e#perience or opinion" the $ene,ts of i!ple!entating BIM in !yco!pany can $e listed in following Indicate your level of 0Agree!ent0 or0+isagree!ent0 to the following state!ents

     This include a $etter understanding of design through visualisation" clashanalysis" energy !odelling" construction scheduling analysis etc during theproJect life cycle (concept" design" construction" operation)

     This generally !eans faster turnover ti!e for production of drawings duringthe proJect life cycle andor proJect construction period

     This generally !eans higher pro,ta$ility after ta*ing into account increasecost" lower cost for %a$ortive% wor*s" $etter cost control etc

    I!proved proJect scheduling refers in the proJect life cycle pertains to criticalpath analysis (CPA) of proJect" identifying !anpower needs" coordinationneeds" delivera$les and ti!e line etc

    So!e clients" iconic proJects or internationalprestigious develop!ent areincreasingly specifying BIM pro,ciency or co!pliance as a pre.reKuisite forproJect $idding

    Indicate your level of 0Agree!ent0 or 0+isagree!ent0 to the followingstate!ents regarding BIM in industry'

     The govern!ent should !a*e BIM co!pulsory (atleast for pu$lic wor*s)

     The govern!ent should provide ,nancial,scal incentives topro!ote BIM

  • 8/16/2019 ACEM BIM Survey Minco

    17/22

    Completed survey forms to be returned to ACEM ([email protected])16 August 2012 !ers"on 1.00

    C BIM Awareness and Prepa

     This section assess the level of %preparedness% and %awareness% of Building In

     The infor!ation collected shall $e con,dential and shall 89T $e disclosed to

    C 33

  • 8/16/2019 ACEM BIM Survey Minco

    18/22

    Completed survey forms to be returned to ACEM ([email protected])16 August 2012 !ers"on 1.00

      edness

      for!ation Modelling (BIM)

      any parties

    Consultant

    Civil < Structural =ngineer

    46H

    Autodes* &evit

    9thers (descri$e $elow)

    9thers (descri$e $elow)

      drawings listed in 12 lin*ed to Kuantities

    +o not understand eTender

    PS only within design stage

  • 8/16/2019 ACEM BIM Survey Minco

    19/22

    Completed survey forms to be returned to ACEM ([email protected])16 August 2012 !ers"on 1.00

      edness

      for!ation Modelling (BIM)

      any parties

      r only)

    +escri$e e;i$rary Co!ponent

    Aware of BIM

    Currently using BIM

    &an* in order of i!portance

    +iculty

    2

    2

    2

    4

    &an* in order of i!portance

    +iculty

    4

    2

  • 8/16/2019 ACEM BIM Survey Minco

    20/22

    Completed survey forms to be returned to ACEM ([email protected])16 August 2012 !ers"on 1.00

      edness

      for!ation Modelling (BIM)

      any parties

  • 8/16/2019 ACEM BIM Survey Minco

    21/22

    Completed survey forms to be returned to ACEM ([email protected])16 August 2012 !ers"on 1.00

      edness

      for!ation Modelling (BIM)

      any parties

    ial in the following !anner

    BIM is currently I!ple!ented

    So!ewhat Agree

    8eutral

    8eutral

    So!ewhat Agree

    Strongly Agree

    Strongly Agree

    So!ewhat Agree

    8eutral

    8eutral

    So!ewhat Agree

    So!ewhat Agree

    Strongly Agree

    8eutral

    So!ewhat Agree

    So!ewhat Agree

      &ndustry

  • 8/16/2019 ACEM BIM Survey Minco

    22/22

      edness

      for!ation Modelling (BIM)

      any parties