acfa-7; taipei, nov 2004 h.weerts kick-off the si licon d etector design study sid organization...

9
ACFA-7; Taipei, Nov 200 H.Weerts Kick- off The Silicon Detector Design Study SiD Organization & Status H.Weerts Fermilab/Michigan State Univ. SiD kick off meeting at ACFA-7 meeting Taipei, Taiwan Nov 9-12, 2004

Upload: charles-banks

Post on 14-Jan-2016

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ACFA-7; Taipei, Nov 2004 H.Weerts Kick-off The Si licon D etector Design Study SiD Organization & Status H.Weerts Fermilab/Michigan State Univ. SiD kick

ACFA-7; Taipei, Nov 2004

H.WeertsKick-off

The Silicon Detector Design Study

SiD Organization & Status

H.WeertsFermilab/Michigan State Univ.

SiD kick off meeting at ACFA-7 meetingTaipei, TaiwanNov 9-12, 2004

Page 2: ACFA-7; Taipei, Nov 2004 H.Weerts Kick-off The Si licon D etector Design Study SiD Organization & Status H.Weerts Fermilab/Michigan State Univ. SiD kick

ACFA-7; Taipei, Nov 2004

H.WeertsKick-off SiD kick-off meeting agenda

Agenda

Intro Harry Weerts Critical Questions for SiD Jim Brau Simulation status Norman Graf Goals/Organization Harry Weerts Discussion/Interest? All

Other talks at ACFA-7 earlier today:

-The Sid Concept by John Jaros

Page 3: ACFA-7; Taipei, Nov 2004 H.Weerts Kick-off The Si licon D etector Design Study SiD Organization & Status H.Weerts Fermilab/Michigan State Univ. SiD kick

ACFA-7; Taipei, Nov 2004

H.WeertsKick-off Goals for SiD Design Study

Develop an integrated detector design well-matched to LC physics at .5 and 1 TeV, starting fromfrom the SiD Detector Concept.

Generate a realistic picture of detectors, supports,readout, and services for each subdetector technology.

Optimize overall detector physics performance for benchmark reactions, constrained by rational cost.

Define the R&D needed to prove the design concept.

Estimate detector costs in time for the Machine CDR.

Write a CDR describing the design and its expected physics performance. Refine costs estimates in time for the Machine TDR.

Page 4: ACFA-7; Taipei, Nov 2004 H.Weerts Kick-off The Si licon D etector Design Study SiD Organization & Status H.Weerts Fermilab/Michigan State Univ. SiD kick

ACFA-7; Taipei, Nov 2004

H.WeertsKick-off Goals and time line--draft

Goal:

Benchmarks physics ( agree with other designs)Conceptual design CDRCost estimate ( need guidelines & standards) Show technical feasibility of subsystemsDefine necessary R&D WWS

Fall 2004 – Summer 2005:

Design Studies agree on common assumptionsOptimize designMake design realistic ( necessary support, etc.)Establish simulation ( common with all others ?)Performance/Response to benchmark processes

August 2005, Int. Lin. Coll. Wrkshp at Snowmass

Agree on strawman designStart final series of benchmark and simulationsDefine work needed to complete by end 2005

Hadr. ShowersAlgorithms

Page 5: ACFA-7; Taipei, Nov 2004 H.Weerts Kick-off The Si licon D etector Design Study SiD Organization & Status H.Weerts Fermilab/Michigan State Univ. SiD kick

ACFA-7; Taipei, Nov 2004

H.WeertsKick-off Detector R&D efforts & Design Studies

Vxd

4-5

SiLC

TPC

Jet

CaliceEM

CaliceHAD

LC cal

CalAsia

EMOR/

SLAC

EM hybri

d

muon

SiD X X X X X X X X

LAD X X X X X X X X X X X

HUD

X ? X X X X X X

Nearly all detector R&D efforts are represented in the Design Studies (DS)

Fwd

trac

Fwd

cal

Fwd

Che

DAQ

BDIR

SiD X X X X

LAD X X ? X X

HUD

X X ? X X

At least one representative of each R&D effort in

each DS

Goal:

Page 6: ACFA-7; Taipei, Nov 2004 H.Weerts Kick-off The Si licon D etector Design Study SiD Organization & Status H.Weerts Fermilab/Michigan State Univ. SiD kick

ACFA-7; Taipei, Nov 2004

H.WeertsKick-off Draft Organization of SiDSiD D esign S tudy organ iza tion

R eg iona l C on tactsfor now A sia & E U

E xec./ S teering C om m .

V ertex---

S i-Track ing---

C a lorim eterR .F rey (E M )

J .R epond (H C A L)

M uon---

S olenoid---

F orw ard---

S im u la tion-----

P hys ics ?

B D IR

M D I

D esign S tudy Leadersh ipJ .Ja ros / H .W eerts

Obvious: center of gravity in US, and at SLAC & Fermilab, however this IS a global effort and we would like to see active participation from all regions of the world.

Wan to reflect this in organization. Suggestions welcome….

Page 7: ACFA-7; Taipei, Nov 2004 H.Weerts Kick-off The Si licon D etector Design Study SiD Organization & Status H.Weerts Fermilab/Michigan State Univ. SiD kick

ACFA-7; Taipei, Nov 2004

H.WeertsKick-off More Organization

There is a SiD website:

www-sid.slac.stanford.edu

On this Web site you will find:

Talks/presentations on SiDSiD Hypernews discussion forumSign up for interested parties

Page 8: ACFA-7; Taipei, Nov 2004 H.Weerts Kick-off The Si licon D etector Design Study SiD Organization & Status H.Weerts Fermilab/Michigan State Univ. SiD kick

ACFA-7; Taipei, Nov 2004

H.WeertsKick-off Meetings now & future

Weekly/bi-weekly ( phone/video):•Tracking meetings every week on Friday morning;

now more emphasis on SiD tracker layout and design

•Monthly solenoid meetings

•Bi weekly calorimeter meetings will start in Dec. 2004

•Start other “subsystem” meetings soonSubsystem leader meeting in Jan/Feb 2005

March 17, 2005 ( Day before LCWS2005 at SLAC):One Day SiD Meeting

March 14-16CALICE at NIU/FNAL

…….. More to be defined

August ILCWS 2005 @ SnowmassBig opportunity for SiD collaborative effort

Page 9: ACFA-7; Taipei, Nov 2004 H.Weerts Kick-off The Si licon D etector Design Study SiD Organization & Status H.Weerts Fermilab/Michigan State Univ. SiD kick

ACFA-7; Taipei, Nov 2004

H.WeertsKick-off Summary

Why are we here ?

Invite your participation in the SiD Design Study

We have a starting point for the SiD Design Study, but the end result will

depend very much on input from participants all around the globe over the

next year and beyond