acfa-7; taipei, nov 2004 h.weerts kick-off the si licon d etector design study sid organization...
TRANSCRIPT
ACFA-7; Taipei, Nov 2004
H.WeertsKick-off
The Silicon Detector Design Study
SiD Organization & Status
H.WeertsFermilab/Michigan State Univ.
SiD kick off meeting at ACFA-7 meetingTaipei, TaiwanNov 9-12, 2004
ACFA-7; Taipei, Nov 2004
H.WeertsKick-off SiD kick-off meeting agenda
Agenda
Intro Harry Weerts Critical Questions for SiD Jim Brau Simulation status Norman Graf Goals/Organization Harry Weerts Discussion/Interest? All
Other talks at ACFA-7 earlier today:
-The Sid Concept by John Jaros
ACFA-7; Taipei, Nov 2004
H.WeertsKick-off Goals for SiD Design Study
Develop an integrated detector design well-matched to LC physics at .5 and 1 TeV, starting fromfrom the SiD Detector Concept.
Generate a realistic picture of detectors, supports,readout, and services for each subdetector technology.
Optimize overall detector physics performance for benchmark reactions, constrained by rational cost.
Define the R&D needed to prove the design concept.
Estimate detector costs in time for the Machine CDR.
Write a CDR describing the design and its expected physics performance. Refine costs estimates in time for the Machine TDR.
ACFA-7; Taipei, Nov 2004
H.WeertsKick-off Goals and time line--draft
Goal:
Benchmarks physics ( agree with other designs)Conceptual design CDRCost estimate ( need guidelines & standards) Show technical feasibility of subsystemsDefine necessary R&D WWS
Fall 2004 – Summer 2005:
Design Studies agree on common assumptionsOptimize designMake design realistic ( necessary support, etc.)Establish simulation ( common with all others ?)Performance/Response to benchmark processes
August 2005, Int. Lin. Coll. Wrkshp at Snowmass
Agree on strawman designStart final series of benchmark and simulationsDefine work needed to complete by end 2005
Hadr. ShowersAlgorithms
ACFA-7; Taipei, Nov 2004
H.WeertsKick-off Detector R&D efforts & Design Studies
Vxd
4-5
SiLC
TPC
Jet
CaliceEM
CaliceHAD
LC cal
CalAsia
EMOR/
SLAC
EM hybri
d
muon
SiD X X X X X X X X
LAD X X X X X X X X X X X
HUD
X ? X X X X X X
Nearly all detector R&D efforts are represented in the Design Studies (DS)
Fwd
trac
Fwd
cal
Fwd
Che
DAQ
BDIR
SiD X X X X
LAD X X ? X X
HUD
X X ? X X
At least one representative of each R&D effort in
each DS
Goal:
ACFA-7; Taipei, Nov 2004
H.WeertsKick-off Draft Organization of SiDSiD D esign S tudy organ iza tion
R eg iona l C on tactsfor now A sia & E U
E xec./ S teering C om m .
V ertex---
S i-Track ing---
C a lorim eterR .F rey (E M )
J .R epond (H C A L)
M uon---
S olenoid---
F orw ard---
S im u la tion-----
P hys ics ?
B D IR
M D I
D esign S tudy Leadersh ipJ .Ja ros / H .W eerts
Obvious: center of gravity in US, and at SLAC & Fermilab, however this IS a global effort and we would like to see active participation from all regions of the world.
Wan to reflect this in organization. Suggestions welcome….
ACFA-7; Taipei, Nov 2004
H.WeertsKick-off More Organization
There is a SiD website:
www-sid.slac.stanford.edu
On this Web site you will find:
Talks/presentations on SiDSiD Hypernews discussion forumSign up for interested parties
ACFA-7; Taipei, Nov 2004
H.WeertsKick-off Meetings now & future
Weekly/bi-weekly ( phone/video):•Tracking meetings every week on Friday morning;
now more emphasis on SiD tracker layout and design
•Monthly solenoid meetings
•Bi weekly calorimeter meetings will start in Dec. 2004
•Start other “subsystem” meetings soonSubsystem leader meeting in Jan/Feb 2005
March 17, 2005 ( Day before LCWS2005 at SLAC):One Day SiD Meeting
March 14-16CALICE at NIU/FNAL
…….. More to be defined
August ILCWS 2005 @ SnowmassBig opportunity for SiD collaborative effort
ACFA-7; Taipei, Nov 2004
H.WeertsKick-off Summary
Why are we here ?
Invite your participation in the SiD Design Study
We have a starting point for the SiD Design Study, but the end result will
depend very much on input from participants all around the globe over the
next year and beyond