EQUIP Semi Annual Report July to December 2012 P a g e I

Acknowledgement

On behalf of the Ministry of Education of the Islamic Republic of Afghanistan, I would like to

express sincere gratitude to the governments of Canada, Germany, Norway, the United States,

Australia, The Netherlands, Sweden, and Spain, for their generous financial contribution to

support implementation of the Education Quality Improvement Program (EQUIP-II).

Our heartfelt thanks also go to the World Bank and ARTF, for their consistent technical and

financial assistance to EQUIP. The International Development Association of the World Bank has

also been a strong financial supporter of the EQUIP Program, and provided the initial 30 Million

USD for EQUIP II.

The Ministry of Education of the Islamic Republic of Afghanistan believes that without the

assistance of EQUIP donors it would not have been able to take such significant strides towards

its goal of providing quality equitable services for all, focusing on ensuring culturally acceptable

and quality education for girl and boy students, at par with current international standards, and

acknowledges their contributions to help EQUIP achieve program development objectives.

The Ministry of Education of the Islamic Republic of Afghanistan is also grateful to the Ministry of

Finance of the Islamic Republic of Afghanistan, the Provincial Education Directorates and District

Education Directorates for their assistance in the implementation of the Program.

In conclusion, we would like to acknowledge the support of local communities, who have been

vital to the success of the program. Their active participation and contribution have made this

program unique and successful.

EQUIP Semi Annual Report July to December 2012 P a g e II

Foreword

The second half of year 2012 marks the end of the four-year cycle of EQUIP II, and beginning of a

two-year extension of EQUIP II. The additional financing extension phase does not merely signify

an extension in length of the program from four to six years; it also marks advancement in the

scope of the program. In the second half of the year 2012, EQUIP focused primarily on assessing

and auditing past achievements in school infrastructure development quality, as well as social

mobilization reforms. The reporting period also involved intensive preparation for the additional

financing (September 2012 to August 2014) and on planning the launch of new initiatives and pilot

projects. Each new initiative has its own unique importance. A few examples; a) launching of the

assessment of student learning outcomes will be a historic first step toward ascertaining the

association between investing in education and the end result; b) establishing school maintenance

systems will be a new approach that is expected to increase the value of investment in

construction of education facilities; c) the incentives for girls to complete their education is also the

first initiative of its kind in Afghanistan, and is expected to reduce school drop outs, especially

among girl students.

Advancement in the scope and focus of EQUIP II also includes the revision in the design of the

teacher professional development initiative, also called the DT3, to focus more on strengthening

district-based institutions, thus ensuring a sustainable permanent professional development

system. Also, to support pre-service teacher training, EQUIP quality enhancement grants to

teacher training colleges will improve teaching and learning facilities.

The coming six months will be devoted to completing missing components in school construction

and completing the survey of school maintenance requirements; making final preparations for

strengthening the capacity of provincial education institutions, piloting the cash incentives for

retention of girl students in schools, and intensifying public awareness and education campaigns

to garner support for education. The Learning Assessment team will pilot the assessment test,

and schools will demonstrate improvement in quality due to enhanced community participation.

We are confident that EQUIP and MOE are headed toward greater achievements in 2013.

Dr. Seddiq Weera

EQUIP Director

EQUIP Semi Annual Report July to December 2012 P a g e III

Table of Contents

Executive Summary .................................................................................................................... IX

Social Mobilization ...................................................................................................................... 1

Introduction .................................................................................................................................... 2

Quality Enhancement Grant ....................................................................................................... 2

Monitoring and Support Missions .............................................................................................. 4

Social Awareness and Mobilization ........................................................................................... 4

School Management Shura (SMS) .............................................................................................. 4

School Improvement Plan (SIP) ................................................................................................. 4

Social Mobilization Trainings..................................................................................................... 5

School Shura Training Supervision Missions: .......................................................................... 11

Recruitment of District Social Mobilizers ................................................................................ 18

Implementation Challenges for Social Mobilization .............................................................. 20

Success Stories .......................................................................................................................... 21

Teacher Education ..................................................................................................................... 22

Introduction .................................................................................................................................. 23

District Teacher Training Teams (DT3) ................................................................................... 23

Institutional grants to improve learning environment of TTCs ................................................ 24

Gender mainstreaming .............................................................................................................. 24

Regional allowances ................................................................................................................. 24

Progress in EQUIP II activities ................................................................................................. 25

Progress in DT3 .......................................................................................................................... 25

INSET ....................................................................................................................................... 26

Capacity building of TED staff to deliver and monitor INSET trainings ................................. 29

School Management Training ................................................................................................... 29

High School Teaching Assistance ............................................................................................ 31

Accelerated Learning Program for Teachers (ALPT) .............................................................. 32

In-service teacher and school manager support systems .......................................................... 33

Verification of IPs' DT3 data .................................................................................................... 37

Institutional Grants to TTCs ...................................................................................................... 38

Gender Mainstreaming .............................................................................................................. 38

Gender Grants to TTCs ............................................................................................................. 38

Girls' Scholarship Program (GSP) ............................................................................................ 42

Payment of bonus salaries to female TTC graduates ................................................................ 43

EQUIP Semi Annual Report July to December 2012 P a g e IV

Regional Allowances for Teachers Working in Disadvantaged and Insecure Areas ...... 44

Capacity Building for TED's senior management .................................................................... 44

Issues and Challenges .............................................................................................................. 44

Upcoming Initiatives ................................................................................................................... 45

Education Management Information System ........................................................................... 46

Introduction .................................................................................................................................. 47

EMIS System Development ...................................................................................................... 47

EMIS Modules .......................................................................................................................... 47

Deployment of EMIS Server in ANDC .................................................................................... 48

Infrastructure and Equipment ................................................................................................... 48

Mobile Application in Urozgan ................................................................................................ 48

TA Contributions ......................................................................................................................... 49

Other Activities ............................................................................................................................ 51

EQUIP PIM ............................................................................................................................... 51

New Recruitments ..................................................................................................................... 51

Additional support to EQUIP.................................................................................................... 51

Infrastructure Services ............................................................................................................. 52

Introduction .................................................................................................................................. 53

Achievements versus Plans ..................................................................................................... 53

Projects with Incomplete Components ..................................................................................... 55

Missing Components of Projects .............................................................................................. 55

Key challenges ........................................................................................................................... 57

Recommendations ..................................................................................................................... 57

Future Plans ................................................................................................................................ 58

GENDER ..................................................................................................................................... 59

Introduction:................................................................................................................................. 60

Main Achievements:................................................................................................................... 60

Analysis of Gender Data related to Student Enrollment and Teachers .................................... 60

Development of Gender Resource Manual and Training Manual for EQUIP Staff ................. 60

Other Activities:........................................................................................................................... 61

Field Visits to Kabul City Schools............................................................................................ 61

Second Gender Oversight Committee Meeting ........................................................................ 62

Field Visits to Provinces ........................................................................................................... 62

Gender Training ........................................................................................................................ 62

EQUIP Semi Annual Report July to December 2012 P a g e V

Future Planning .......................................................................................................................... 63

Development of Brochures ....................................................................................................... 64

Environment and Social Safeguard .......................................................................................... 65

Introduction:................................................................................................................................. 66

ESS Activities:............................................................................................................................. 69

Training ..................................................................................................................................... 70

Other ESS Activities ................................................................................................................. 72

Problems and Recommendations: .......................................................................................... 73

ANNEX 1 (Financial Status) ....................................................................................................... 74

ANNEX 2 (Data Analysis by Gender Unit) ................................................................................ 75

EQUIP Semi Annual Report July to December 2012 P a g e VI

List of Abbreviations and Acronyms

ADA Afghan Development Association

AGEI Afghanistan Girls Education Initiative

AL Accelerated Learning

ALPT Accelerated Learning Program Training

ANDS Afghanistan National Development Strategy

ARTF Afghanistan Reconstruction Trust Fund

AuSAID Australian Agency for International Development

BESST Building Education Support to Teachers Training Program

CC Community Contacts

CIDA Canadian International Development Agency

DANIDA Danish International Development Assistance

DED District Education Directorate

DSM District Social Mobilizer

DSTTC District based Satellite Teacher Training College

DT3 District Teacher Training Teams

EMIS Education Management Information System

EQUIP Education Quality Improvement Program

ESMF Environmental Social Management Framework

ESS Environmental Social Safeguard

ESSAF Environmental Social Screening Assessment Framework

FP Focal Point

GIS Geographical Information System

GIZ German Development Agency

GMTF Gender Mainstreaming Task Force

GoA Government of Afghanistan

GSP

HAS High School Teaching Assistance

EQUIP Semi Annual Report July to December 2012 P a g e VII

HR Human Resources

ICT Information Communication Technology

IDA International Development Association

INSET In-service education for teachers

IP Implementing Partners

ISD Infrastructure Services Department

ISSA In-School Support Activities

ITSA In-School Teacher Support Activities

JACK Just for Afghan Capacity and Knowledge

JICA Japan International Cooperation Agency

MDG Millennium Development Goal

M&E Monitoring and Evaluation

MOE Ministry of Education

MoF Ministry of Finance

MoWA Ministry of Women Affairs

M&R Monitoring and Reporting

NCB National Competitive Bidding

NGO Non-governmental Organization

NPITT National Program for In-service Teacher Training

PED Provincial Education Directorate

PIM Project Implementation Manual

PLC Principal Learning Circle

PMO Provincial Monitoring Officer

PTL Provincial Team leader

PTTM Principle Training Team Member

SCI Save the Children International

SIP School Improvement Plan

SMS School Management Shura

SMU Social Mobilization Unit

EQUIP Semi Annual Report July to December 2012 P a g e VIII

SMT School Management Training

ST Senior Trainer

TDC Teacher Development Center

TED Teacher Education General Directorate

TLC Teacher Learning Circle

TO Teacher Observation

TTC Teacher Training College

UNESCO United Nations Educational, Scientific and Culture Organization

UNICEF

WB World Bank

EQUIP Semi Annual Report July to December 2012 P a g e IX

Executive Summary

The World Bank supported Education Quality Improvement Program (EQUIP) of the Ministry of Education of Afghanistan, which began operations in 2004, completed its second four-year phase (EQUIP II) in August 2012. Instead of beginning a new phase of the program, the second phase was extended up to August 2014, and an extension grant of over 250 million USD was approved by ARTF and World Bank to cover the period ending in August 2014.

The following report provides a summary of activities and achievements in the second half of 2012 during which period, EQUIP II entered its extension phase. As can be expected, much of the six-month period was spent in planning and preparing for the extension phase, and taking stock of the current status of various components of the program, in order to identify needs for correction or modification of the original plan.

Nevertheless, the second half of 2012 was not without noteworthy achievements and milestones, which are described in detail in the ensuing pages. The most significant achievements include the identification of specific targets for the extension phase, training and capacity building of social

enhancement grants (QEG), audit of DT3 implementation, and audit of school infrastructures by the Infrastructure Services Department (ISD) for verifying missing components and incomplete components. The Education Management Information System (EMIS) unit developed four EMIS modules, and extended the EMIS system coverage to the provinces. (MOE) Planning Department also successfully transferred the EMIS server to the Afghanistan National Data Centre (ANDC) so that EMIS is now accessible on the internet at www.emis.af.

The EQUIP Coordination Unit focused on taking stock and identifying problems and gaps that needed to be filled, during the extension phase. Major bottlenecks in finance and procurement procedures were identified, and ways proposed for resolving them. At the end of August the coordination unit invested effort and time in finalizing the procurement plans and financial projections for the extension phase, and in recruiting staff, in particular provincial and district level social mobilization staff. EQUIP Finance and Procurement Coordinators were recruited to improve efficiency of finance and procurement activities within the unit, supporting ISD, as well as for coordinating more effectively between programs and support units at the ministry level.

Toward the end of the year the EQUIP Coordination Unit launched an important initiative a country-wide independent audit of QEG management , and the benefit to the schools. Initially, a pilot testing phase was completed in Kabul using a small sample of schools, and a training of 91 auditors undertaken. The trained auditors were then deployed in different provinces of the country to collect data regarding the amount and use of QEG by individual schools. The compiled data will provide information that will advise the method and award of QEGs in the extension phase.

The Social Mobilization Unit (SMU) established 539 new School Management Shuras (SMSs),

during the reporting months. As a result, the SMU successfully disbursed 27,297,500 AFS to 232 schools in Quality Enhancement Grants of which, 22,398,000 AFS were liquidated by the end of December, 2012.

EQUIP Semi Annual Report July to December 2012 P a g e X

Beside the above activities, the SMU undertook staff training and community capacity building activities, and trained 220 EQUIP officers, supervisors and DSM from 34 provinces and the

Environmental and Social Safeguard priorities were incorporated into the social mobilization training workshops, and the ESS framework was also woven into construction projects. As many as 1224 schools in 14 provinces installed complaint boxes so that students and teachers could express their concerns and complaints regarding the facilities and conditions of the school without fear of reprisal, and the school could receive useful and constructive feedback to help it correct problems and create a supportive and safe learning environment for girl and boy students. Staff from the ESS unit of ISD, SMU, and gender units, visited schools in the outskirts of Kabul, and identified problems related to security (boundary walls), latrines, and similar issues, and communicated them to relevant authorities or other organizations, to enlist their help in resolving the problems.

The Teacher Education General Directorate (TED)'s EQUIP-supported projects initiated in 2008, enabled it to develop sustainable professional systems and structures to support teachers in 23 provinces of Afghanistan, and to deliver in-service teacher education to a total of 100,333 teachers (29,030 female and 71,303 male) in these provinces. Sustainable professional development systems include 6,778 Teacher Learning Circles (TLCs) and 1,448 Principal Learning Circles (PLCs), engaging the faculty of Teacher Training Colleges (TTCs) in delivering in-service teacher education and introducing a culture of on-site support to teachers.

Tfemale teachers in the MOE workforce in the provinces, TED supported an increase in female enrollment levels in pre-service Teacher Training Colleges (TTCs), and to help TTCs provide an effective learning environment for all students. As many as 6234 girls enrolled in TTCs are receiving scholarships to train to be qualified school teachers, and 448 TTC faculty members are receiving regional allowances to encourage them to work in difficult geographic areas, insecure areas, or in provinces with a smaller pool of qualified TTC instructors.

The Infrastructure Services Department of the Ministry of Education performed surveys for data validation of incomplete components in Community Contracted (CC) school construction projects, and for collecting data about CC and NCB (National Competitive Bidding) missing components, and about maintenance of completed and partially completed (CC) projects. The department also focused on recruiting and training its staff. A survey of 288 schools was conducted to ascertain maintenance requirements. Over 130 engineering designs were developed for the provincially chosen priority project, a component of the sub-national governance support (Pilot Provincial Programming),

The EMIS Unit recruit technical assistants and purchase equipment and consultancy services needed to enable expansion of EMIS to provinces and districts. It developed four different modules responding to various data needs, and for effective management of information for the Operation, Infrastructure, School Management, and Council Management departments and units of the Ministry. The EMIS also pilot tested the use of mobile applications to collect education data in Uruzgan province. The highlight of achievements of the EMIS was its relocation to the Afghanistan National Data Center (ANDC), from where update data is accessible to all clients and users.

EQUIP Semi Annual Report July to December 2012 P a g e XI

The Gender Unit at the EQUIP coordination office visited schools in Kabul city and province, and worked closely with the newly hired district social mobilizers (female) to sensitize them about the most important gender issues to focus on. They also visited schools in Herat, Balkh, Baghlan, Parwan, Kapisa, Panjshir, and Kunduz, and initiated an analysis of primary gender data related to student enrollment and teachers in 34 provinces and the capital, to identify gaps and inform policy and decision making for more equitable inclusion of both sexes. The preliminary findings were presented to the EQUIP team and used to identify the best and worst provinces with regard to gender equity in the education sector in Afghanistan.

The Gender Unit also drafted a gender resource and gender training manual to be used in training provincial and district level social mobilization and construction staff, as well as community leaders.

As we enter 2013, EQUIP is fully prepared to begin implementing its plans for the extension phase of EQUIP II.

EQUIP Semi Annual Report July to December 2012 P a g e 1

Social Mobilization

EQUIP Semi Annual Report July to December 2012 P a g e 2

Introduction

EQUIP II strives towards realizing the enhancing quality of education, through improving facilities and infrastructure, training teachers and school administrators, increasing the number of qualified female teachers available, and increasing the number of girls and boys enrolled in schools. for achieving all this is by mobilizing communities so that they are directly involved in all activities and processes for ensuring provision of quality education to school-aged children. EQUIP supports the formation of School Management Shuras (SMS) in each school; these

huras are responsible for identifying educational and facility needs of the school, and cooperating with the district and provincial education authorities for addressing these needs, using s. SMSs participate in all aspects of quality improvement, including construction and rehabilitation/ development of school infrastructure, equipping of schools with educational apparatus and equipment, as well as ensuring training and recruitment of teaching staff. In many cases the SMS itself undertakes to organize and oversee school construction activities, and even contributes to the school development from their personal assets.

Quality Enhancement Grant

Quality Enhancement Grants (QEG) are allocated to improve and promote a conducive learning environment in schools throughout the country. This grant is used in schools for quality improvement activities planned through a consultative process, by the SMS, with

The QEG enable schools to enrich their educational resources and facilities so that students can benefit from a better quality learning environment, where they have access to experiential and practical learning.

During the second half of the year 2012, 30,002,000 AFS were allocated as Quality Enhancement Grants for a total of 252 schools in eight provinces, to procure the material they had identified a need for. Of the allocated amount, 29,862,000 AFS were transferred to the provinces and of this transferred amount, a total of 27,297,500 AFS were disbursed to 232 schools. Of the total cash disbursed, 22,398,000 AFS were liquidated by the end of December, 2012 and the residual 2,704,500 AFS have been carried forward for the year 2013. Figure 1.1: Laboratory Equipment Purchased with QEG

EQUIP Semi Annual Report July to December 2012 P a g e 3

The following table provides details of the Quality Enhancement Grants awarded to schools in each province, including the amount allocated, transferred, disbursed and liquidated.

S.N

o

Pro

vinc

es

Tota

l Pla

nned

S

choo

ls

Tota

l Allo

tmen

t in

AFS

Tota

l Tra

nsfe

rred

in A

FS

Tota

l Dis

burs

ed

in A

FS

Tota

l Liq

uida

ted

in A

FS

Tota

l Bal

ance

in

AFS

1 Farah 17 1,800,000 1,800,000 1,800,000 1,800,000 0

2 Wardak 57 5,052,000 5,052,000 4,887,500 2,773,000 164,500

3 Paktika 18 2,400,000 2,400,000 0 0 2,400,000

4 Herat 25 3,075,000 3,075,000 3,075,000 2,700,000 0

5 Khost 53 5,675,000 5,675,000 5,675,000 5,675,000 0

6 Nangarhar 29 6,425,000 6,425,000 6,425,000 6,150,000 0

7 Kunar 33 3,300,000 3,300,000 3,300,000 1,800,000 0

8 Kunduz 20 2,275,000 2,135,000 2,135,000 1,500,000 140,000

Total 252 30,002,000 29,862,000 27,297,500 22,398,000 2,704,500

-

10,000,000

20,000,000

30,000,000

40,000,000

30,002,000

29,862,000 27,297,500

22,398,000

2,704,500

Financial Summary of Quality Enhancement Grant (July-December, 2012)

Total Allotment in AFS Total Amount Transferred in AFS Total Amount Disbursed in AFS Total Amount Liquidated in AFS Total Amount Carryforward in AFS

Figure 1.2: Quality Enhancement Grant details

Figure 1.3: Graphical Representation of Summary of Above Information

EQUIP Semi Annual Report July to December 2012 P a g e 4

Monitoring and Support Missions

During the reporting period, the social mobilization unit undertook extensive monitoring and support missions.

In July 2012, SMU teams visited Logar, Panjshir, and Parwan Provinces, to monitor the liquidation of the Quality Enhancement and Infrastructure Development Grants, and speed up the disbursement and liquidation processes.

They also had meetings with the PEDs and Governors of the provinces and explained the objective of their mission.

An SMU team also undertook a monitoring visit to Nangarhar Province , where they met the PED, Mustofiat, and the EQUIP Teams, and explained the policy and procedure for accessing, disbursing, and liquidating the Quality Enhancement Grant to be newly transferred to the province.

Social Awareness and Mobilization

The purpose of social awareness and mobilization is to motivate and strengthen

based on local priorities. Members of the School Management Shuras (SMS) are trained to communicate with people and to encourage them to send their children to school, and to support education at village levels.

School Management Shura (SMS)

The school management Shura (SMS) provides management and supervision support to schools, to ensure community ownership, and to create an enabling environment for children so that they can have equal access to quality education in schools irrespective of gender, ethnic and other differences.

In the last six months of the year 2012 the SMU successfully established 539 School Management Shuras (SMSs) out of the total 1,046 planned.

School Improvement Plan (SIP)

School Management Shuras also prepare School Improvement Plans or SIP, which are used to address the most urgent needs of the schools. Needs are identified and prioritized by the shura. Funds are then made available from the school grants, and are used to fill the

Figure 1.4: School Management Shura

EQUIP Semi Annual Report July to December 2012 P a g e 5

needs based on the SIP. In the last six months, 550 SIP were developed out of the total 1057 planned SIP.

SMU plans to facilitate the formation of the remaining shuras and SIP during the extension phase of EQUIP II.

The chart below presents a summary of the disparity between the expected and the actual number of SMSs established and SIPs developed during the second half of 2012.

Social Mobilization Trainings

The SMU developed a social mobilization training manual for training SM Supervisors, District Social Mobilizers, and hura , which includes modules on gender, and environment and social safeguard issues. This manual is being used as the standard training guide for conducting social mobilization trainings at the central, provincial, and district levels.

Based on the SMU training plan, the central SMU organized refresher trainings in all provinces of the country. Trainings were conducted in Kabul as well as in provinces, and also zone wise. A total of 198 people participated in the social mobilization training workshops including EQUIP Officers, old and newly recruited Social Mobilization Supervisors, and District Social Mobilizers and Civil Engineers.

The following topics were covered during these trainings:

-

200

400

600

800

1,000

1,200

1,046

539

1,057

550

Summary of SMSs & SIPs (July-December, 2012)

Total Planned SMSs Total Established SMSs Total Planned SIPs Total Developed SIPs

Figure 1.5: Summary of SMSs and SIPs

EQUIP Semi Annual Report July to December 2012 P a g e 6

Social Mobilization and its Objective District Social Mobilizers and their Responsibilities Shura its Structure and Responsibilities School Improvement Plan and its Implementation Village Volunteers Responsibilities of District Social Mobilizers in Construction Gender Environmental and Social Safeguard Monitoring and Evaluation

A summary of these trainings is presented in the following table with details of participants and the total breakdown of expenditure for each zonal training. Summary of Zone Wise Trainings

S.N

o

Zona

l Wis

e Tr

aini

ngs

Pro

vinc

es C

over

ed

Dur

ing

the

Trai

ning

Des

igna

tion

of

Trai

nees

Par

ticip

ated

in

the

Trai

ning

Tota

l No

of T

rain

ees

Trai

ned

Tota

l Exp

endi

ture

in

AFS

1

1st Z

onal

Tra

inin

g

1-Maidan Wardak

2-Ghazni

3-Kandahar

4-Khost

5-Paktia

6-Logar

7-Paktika

8-Kapisa

9-Kabul City

10-Urozgan

11-Daikundi

12-Kabul

1-EQUIP Officers

2-SM Supervisors

70 800,000 AFS

EQUIP Semi Annual Report July to December 2012 P a g e 7

S.N

o

Zona

l Wis

e Tr

aini

ngs

Pro

vinc

es C

over

ed

Dur

ing

the

Trai

ning

Des

igna

tion

of

Trai

nees

Par

ticip

ated

in

the

Trai

ning

Tota

l No

of T

rain

ees

Trai

ned

Tota

l Exp

endi

ture

in

AFS

Province

13-Bamyan

14-Panjshir

15-Baghlan

16-Parwan

17-Zabul

18-Helmand

2

2nd Z

onal

Tra

inin

g

19-Ningarhar

20-Kunar

21-Laghman

22-Nooristan

1-EQUIP Officers

2-SM Supervisors

3-District Social Mobilizers

65 457,744 AFS

3

3rd Z

onal

Tra

inin

g

23-Badakhshan

24-Takhar

25-Kundoz

26-Sar-e-Pul

27-Samangan

28-Jovzjan

29-Faryab

30-Balkh

1-EQUIP Officers

2-SM Supervisors

38 666,612 AFS

EQUIP Semi Annual Report July to December 2012 P a g e 8

S.N

o

Zona

l Wis

e Tr

aini

ngs

Pro

vinc

es C

over

ed

Dur

ing

the

Trai

ning

Des

igna

tion

of

Trai

nees

Par

ticip

ated

in

the

Trai

ning

Tota

l No

of T

rain

ees

Trai

ned

Tota

l Exp

endi

ture

in

AFS

4

4th Z

onal

Tra

inin

g

31-Hirat

32-Badghis

33-Nimroz

34-Farah

35-Ghor

1-EQUIP Officers

2-SM Supervisors

3-District Social Mobilizers

25 455,385 AFS

Total 198 2,379,741 AFS

Shura Trainings

Shura training is conducted to strengthen the huras and build their capacities for developing rational and effective school improvement plans (SIPs). The training covers the ten most important tasks of a school management shura (SMS).

The ten tasks are as follow:

Identify needs of school, prepare school improvement plans, and ensure rational and transparent utilization of the Quality Enhancement Grant

Reduce student dropout rates and increase enrollment Reduce teachers and students absenteeism Ensure text books availability at school level Ensure optimum benefit from the instructional time Reduce violence in schools Promote sports and physical activities at school Promote greenery and cleanliness at school Establish Peace Committees at school level Provide equal facilities for female and male students

The total allotment for this training is 59,976,000 AFS. By the end of 2012, 2,353 of the 3,360 planned shuras from 34 provinces and Kabul City had received training. hura training is still in progress in most of the provinces, and it is expected that all shuras will have received training by the end of January 2013. A detailed report of shura trainings per province is presented in the following table.

Figure 1.6: Summary of Zone Wise Trainings

EQUIP Semi Annual Report July to December 2012 P a g e 9

S.N

o

Pro

vinc

es

Tota

l Pla

nned

Shu

ras

Tota

l Allo

tmen

t in

AFs

Tota

l Shu

ras

Trai

ned

Shu

ras

Not

Tra

ined

Yet

Tota

l Exp

endi

ture

Up

to d

ate

in A

FS

Tota

l Bal

ance

Am

ount

in

AFS

1 Badakhshan 161 2,873,850 81 80 1,385,100 1,488,750 2 Takhar 148 2,641,800 84 64 1,436,400 1,205,400 3 Kunduz 111 1,981,350 51 60 910,350 1,071,000 4 Baghlan 114 2,034,900 80 34 1,428,000 606,900 5 Panjshir 40 714,000 32 8 549,200 164,800 6 Paktika 85 1,517,250 0 85 0 1,517,250

7 Helmand 84 1,499,400 71 13 1,182,000 317,400 8 Zabul 54 963,900 54 0 963,900 0 9 Bamyan 82 1,463,700 82 0 1,463,700 0

10 Nimroz 33 589,050 33 0 565,250 23,800 11 Faryab 117 2,088,450 70 47 1,249,500 838,950

12 Kandahar 107 1,909,950 0 107 0 1,909,950 13 Uruzgan 51 910,350 31 20 553,350 357,000 14 Kunar 101 1,802,850 101 0 1,802,850 0

15 Laghman 66 1,178,100 66 0 1,178,100 0

16 Nangarhar 173 3,088,050 173 0 3,088,050 0 17 Parwan 117 2,088,450 36 81 588,750 1,499,700 18 Ghur 176 3,141,600 136 40 2,427,600 714,000 19 Daikundi 81 1,445,850 65 16 285,600 1,160,250 20 Herat 204 3,641,400 134 70 2,391,900 1,249,500 21 Balkh 128 2,284,800 128 0 0 2,284,800 22 Sar-e-Pul 91 1,624,350 91 0 1,624,350 0

23 Kabul Province 90 1,606,500 90 0 1,606,500 0 24 Ghazni 146 2,606,100 20 126 357,000 2,249,100

25 MaidanWardak 94 1,677,900 94 0 1,677,900 0 26 Logar 62 1,106,700 0 62 0 1,106,700 27 Farah 83 1,481,550 83 0 1,481,550 0

EQUIP Semi Annual Report July to December 2012 P a g e 10

S.N

o

Pro

vinc

es

Tota

l Pla

nned

Shu

ras

Tota

l Allo

tmen

t in

AFs

Tota

l Shu

ras

Trai

ned

Shu

ras

Not

Tra

ined

Yet

Tota

l Exp

endi

ture

Up

to d

ate

in A

FS

Tota

l Bal

ance

Am

ount

in

AFS

28 Badghis 103 1,838,550 70 33 1,249,500 589,050

29 Nooristan 58 1,035,300 0 58 0 1,035,300

30 Kabul City 55 981,750 55 0 981,750 0 31 Jawzjan 80 1,428,000 80 0 1,428,000 0 32 Kapisa 55 981,750 30 25 535,500 446,250 33 Khost 71 1,267,350 71 0 1,267,350 0 34 Paktia 73 1,303,050 73 0 1,303,050 0

35 Samangan 66 1,178,100 30 36 535,500 642,600 Total 3,360 59,976,000 2,353 1,007 41,692,300 18,283,700

Topics covered during shura trainings included the following,

EQUIP Goal, Objectives, and Strategy Social Mobilization Provincial EQUIP Team District Social Mobilizers and their responsibilities Village Volunteers School Management Shura -- its Structure and Responsibilities School Improvement Plan and its Implementation Responsibilities of District Social Mobilizers in Construction Environmental and Social Safeguard Gender

A pretest was taken from participants at the beginning of the training and the scores compared with the post test scores, to determine effectiveness of the training.

Figure 1.7:

EQUIP Semi Annual Report July to December 2012 P a g e 11

School Shura Training Supervision Missions:

The objective of these missions was to supervise shura trainings in the provinces, to identify weaknesses if any, and give recommendations for rectifying any problems.

Nangarhar Mission

The mission first met with the PED of the province briefing him about the objective of the mission.

The training was supervised by the central office staff on the mission. The supervision team performed spot checks on the training, provided technical support, and identified a few minor weaknesses. At the end of the day, the mission held a short debriefing meeting with staff and recommended solutions for correcting the weaknesses. The same process was repeated by the mission team on the following two days of the training.

It was noticed on the last day of the training, that the weaknesses identified on the 1st and 2nd days of the training were mostly eliminated.

Summary of Shura Trainings (Nangarhar)

S. N

o

Type

of T

rain

ing

Nam

e of

the

Dis

trict

Tota

l No

of S

choo

l S

hura

s P

er D

istri

ct

Tota

l No

of S

hura

Pa

rtici

pant

s/D

istri

ct

Tota

l Am

ount

Allo

cate

d in

AFS

1 Shura Training Jalalabad City 18 270

3,088,050

2 Shura Training Bihsood 18 270

3 Shura Training Surkhrod 15 225

4 Shura Training Hisarak 6 90

5 Shura Training Rodaat 9 135

6 Shura Training Kot 6 90

Figure 1.8: Training of School Shura

EQUIP Semi Annual Report July to December 2012 P a g e 12

S. N

o

Type

of T

rain

ing

Nam

e of

the

Dis

trict

Tota

l No

of S

choo

l S

hura

s P

er D

istri

ct

Tota

l No

of S

hura

Pa

rtici

pant

s/D

istri

ct

Tota

l Am

ount

Allo

cate

d in

AFS

7 Shura Training Bati-Kot 6 90

8 Shura Training Acheen 9 135

9 Shura Training Nazyan 3 45

10 Shura Training GhaniKhil 6 90

11 Shura Training Dor Baba 3 45

12 Shura Training LalPora 3 45

13 Shura Training MohmandDara 6 90

14 Shura Training DehBala 5 75

15 Shura Training Shirzad 5 75

16 Shura Training Khogiani 6 90

17 Shura Training PachirAgam 6 90

18 Shura Training Chaparhar 9 135

19 Shura Training Kama 11 165

20 Shura Training Goshta 3 45

21 Shura Training Dara-e-Noor 6 90

22 Shura Training Khaiwa 14 210

Total 173 2,595 3,088,050

Figure 1.9: Summary of Shura Trainings (Nangarhar)

EQUIP Semi Annual Report July to December 2012 P a g e 13

Kunar Mission

The supervision mission first met with the PED of the province briefing him about the objective of the mission. Overall, 101shura trainings were planned throughout the province, at a total cost of 1,802,850 AFS.

The mission undertook spot checks during the training and noted down the weaknesses which were later communicated to the SM Supervisors by in a short debriefing meeting.

Summary of Shura Trainings (Kunar)

S.N

o

Type

of T

rain

ing

Nam

e of

the

Dis

trict

Tota

l Num

ber o

f Sch

ool

Shu

ras

Per

Dis

trict

Tota

l Num

ber o

f Shu

ra

Parti

cipa

nts/

Dis

trict

Tota

l Am

ount

Allo

cate

in

AFS

1 Shura Training Kunar Center 10 150

1,802,850 2 Shura Training Narang 10 150

3 Shura Training Sawkay 12 180

Figure 1 ning in Kunar

Figure 1.11: Training of School Shura

EQUIP Semi Annual Report July to December 2012 P a g e 14

4 Shura Training Norgal 7 105

5 Shura Training KhasKunar 11 165

6 Shura Training Asmar 11 165

7 Shura Training Sarkano 9 135

8 Shura Training Marawara 8 120

9 Shura Training WataPor 10 150

10 Shura Training Shaigal 13 195

11 Shura Training Narai 0 0

12 Shura Training Dan Gam 0 0

13 Shura Training Ghazi Abad 0 0

14 Shura Training Chapa Dara 0 0

15 Shura Training PaichDara 0 0

Total 101 1,515 1,802,850

Laghman Mission

The mission first met with the PED of the province, to brief him about the objectives of the mission.

The supervision mission visited Haidar Khan Boys High School where the shura training was ongoing, and monitored the training to see whether it training was conducted according to standard procedure, and also to identify weaknesses if any. Two shuras were invited for the training and two SM Supervisors/DSMs conducted the training. All 30 expected participants were present. The mission undertook spot checks during the training and found the trainers to be following the standard procedures in a proper manner.

Figure 1.12: Summary of Shura Trainings (Kunar)

Figure 1.13: Training of School Shura

EQUIP Semi Annual Report July to December 2012 P a g e 15

Summary of Shura Trainings (Laghman) S.

No

Type

of T

rain

ing

Nam

e of

the

Dis

trict

Tota

l No

of S

choo

l S

hura

s P

er D

istri

ct

Tota

l No

of S

hura

Pa

rtici

pant

s/D

istri

ct

Tota

l Am

ount

Al

loca

ted

in A

FS

1 Shura Training Laghman

Center 17 255

1,178,100 2 Shura Training Alingar 15 225

3 Shura Training Ali Shang 14 210

4 Shura Training Dawlat Shah 6 90

5 Shura Training Qarghayee 14 210

Total 66 990 1,178,100

Figure 1.14: Summary of Shura Trainings (Laghman)

EQUIP Semi Annual Report July to December 2012 P a g e 16

Panjshir Mission

A supervision mission visited Panjshir and first met with the PED of the province to brief him about the mission objectives, before going to district # 01 of the province, where training for shuras of four schools was in progress. The mission observed that shura members were absent from the training due to the death of a local dignitary, and most members were participating in the funeral. The training team was advised to postpone the training to ensure maximum participation.

Kapisa Mission

A supervision mission also visited Kapisa to observe training of three school shuras at the Mir Masjidi High School The mission found that the training was going well according to set procedures, and that participation by shura members was good

Parwan Mission

A mission visited the Experimental School in the center of the province where a training of six shuras was ongoing. The mission did a direct supervision of the training and found that most shura members were absent on the first day of training because the TED had also arranged a 12-day seminar for the teachers starting on the same day. The mission instructed the provincial team to postpone the training till the TED seminar was over, as it was causing high rate of absenteeism in the shura trainings. The mission also found that the Mustofiat was not ready to give training money in advance based on the letter issued to it from the MOF. The mission then held a meeting with the Mustofiat and finally it agreed that the money would be paid as advance for conducting the trainings.

Kabul City Mission

In general, participation of women ias compared with the provinces.

A supervision mission attended the training of shuras from two schools in Bakhtyar High School of Kabul City. Of the 30 participants, 10 were female.

Social Mobilization Achievements in Laghman:

1- Engineer Shir Mohammad Boys High School in Laghman has launched ESS activities by planting flowering plants in the school compound.

2- ESS Committees have been established in five schools.

3- The DSMs met with families whose children were frequently absent from schools or were not attending schools at all. They met parents of the children of Basram Boys/Girls High School, Dharmal Girls High School and Chalmatiyu Girls High School in the Center of Laghman province. In Qarghayee, they met parents of the children of Gul Pacha Ulfat Boys High School, Shamshir Abad Middle School, Char Bagh Girls High School and Sultan Wais Baba Girls High School.

EQUIP Semi Annual Report July to December 2012 P a g e 17

The mission also attended the first day of training at Amir Hamza High School for shuras of two schools. As in the previous mission, 11 of 30 shura members who participated in the training, were female.

Similarly during its supervision of the training at Sayed Nasiri Boys High School the mission found that 15 of the 30 trainees were female.

During its next supervision visit in Kabul city to the shura training at Sultan Razia Girls High School, the mission found that 21 of the 45 shura members were female.

In the shura training at Naheed Shaheed High School 10 of the 29 participants were female.

Kabul Province Mission

Training supervision was also undertaken in Kabul province, and a mission visited Sorobi District of Kabul Province, where training for nine shuras was being conducted in two separate groups.

In the first group there were five shuras , and 59 of the total 75 members attended. In the second group there were four shuras , and 53 of the total 60 planned trainees participated.

Ghazni Mission

A supervision mission visited Ghazni province and supervised the shura training in Thamkai Boys High School and in Bibi Dilaram Middle School in Qarabagh district.

The mission identified the following issues after having discussions with the huras :

1. Inadequate school buildings specially for girls 2. Insufficient Quality Enhancement Grant 3. Shortage of books for students of grades 7 through 12 4. Lack of professional teachers for science subjects 5. Insecurity in the region.

EQUIP Semi Annual Report July to December 2012 P a g e 18

Ghur Mission

A mission visited the Sopak village in Ghur province where a shura training was being held in Abdul Ghafoor Shaheed Boys High School for four shuras , 10 of the 60 participants were female. The mission observed the training and found no weaknesses. The training was going very systematically and participants were satisfied with the training.

The mission also met the provincial staff to discuss their problems if any, and to recommend solutions, and held a meeting with the PED to brief him about the

.

Bamyan Mission

Another mission went to Yakawlang Distritc of Bamyan Province to supervise the ongoing hura trainings. Overall, 84 hura s had to be trained in this province. They supervised the training at Shah Qalandar Girls High School where three shuras were undergoing training. The mission found the training to be satisfactory, and 42 of the 45 planned members participated; 23 of them were new shura members.

Recruitment of District Social Mobilizers

District Social Mobilizers (DSMs) work at district level to support EQUIP activities and strengthen School Management Shuras (SMSs). The DSMs link communities directly with the benefits of the EQUIP project, and encourage people to use the benefits of the project while putting in their own efforts. Currently one DSM may be in charge of up to 20 schools.

A summary of the District Social Mobilizers recruitment status is presented in the following table.

Figure 1.15: Training of School Shura

EQUIP Semi Annual Report July to December 2012 P a g e 19

Summary of DSM Recruitment Status S.

No.

Pro

vinc

es

Tota

l DSM

s to

be

Rec

ruite

d

Vac

ancy

An

noun

cem

ent

Sta

tus

Writ

ten

Test

Sta

tus

Con

tract

s St

atus

Offi

ce J

oini

ng S

tatu

s

1 Laghman 14

2 Kunar 24

3 Nangarhar 42

4 Kabul City 30

5 Kabul Province 21

6 Kandahar 12

7 MaidanWardak 22

8 Faryab 23

9 Sar-e-Pul 17

10 Jawzjan 15

11 Balkh 34

12 Takhar 33 × ×

13 Kunduz 26 × ×

14 Baghlan 25 × ×

15 Samangan 16 × ×

16 Badakhshan 40 × ×

17 Ghazni 29 × ×

18 Khost 12 × ×

19 Bamyan 17 × ×

20 Ghur 37 × ×

21 Uruzgan 11 × ×

EQUIP Semi Annual Report July to December 2012 P a g e 20

S.N

o.

Pro

vinc

es

Tota

l DSM

s to

be

Rec

ruite

d

Vac

ancy

An

noun

cem

ent

Sta

tus

Writ

ten

Test

Sta

tus

Con

tract

s St

atus

Offi

ce J

oini

ng S

tatu

s

22 Logar 13 × ×

23 Paktia 13 × ×

24 Daikundi 17 × × ×

25 Farah 15 × × ×

26 Helmand 7 × × ×

27 Kapisa 11 × × ×

28 Badghis 22 × × ×

29 Nimroz 6 × × ×

30 Nooristan 10 × × ×

31 Panjshir 7 × × ×

32 Parwan 22 × × ×

33 Zabul 3 × × ×

34 Paktika 17 × × ×

35 Herat 40 × × ×

Total 703

Implementation Challenges for Social Mobilization

Insecurity in some provinces and districts

Figure 1.16: Summary of DSM Recruitment Status

EQUIP Semi Annual Report July to December 2012 P a g e 21

Success Stories

School Management emerge as forces of positive change, and in many cases, have provided tangible support to the cause of education. A few examples are reflected in the following paragraphs.

1- During recent shura training workshops in Khost, the EQUIP provincial team invited the shuras from remote areas where they had little knowledge about EQUIP and its functions. As a result of the training, a change was observed in these shuras and the communities they represented. Jawas Khan from the community in Soroto formally donated 20 jeribs of land to Khost MoE in writing. It was decided that out of the 20 jeribs, 2 jeribs would

the remaining 18 jeribs would be allocated for constructing a boys school, a green area, and making a sports ground. 2- Khost province shares a border with neighboring Pakistan. As a result it is often faced with obstacles from cross-border militants and their activities. EQUIP has remained committed to serving the children of the province and providing facilities to promote quality education. With the help of Khost PED, eight schools that were closed earlier due to insecurity were reopened.

Summary of Achievements

1- The disbursement and liquidation of Quality Enhancement Grants for 252 schools is ongoing.

2- Written Tests were conducted for

DSMs in 23 provinces; in 10 provinces newly recruited DSMs were issued contracts.

3- 539 School Management Shuras

(SMSs) were established. 4- 550 School Improvement Plans

(SIPs) were developed. 5- Zone Wise training was

successfully implemented for all EQUIP Personnel

6- Shura training was successfully

implemented in 13 provinces

Figure 1.17: Re-opened School

EQUIP Semi Annual Report July to December 2012 P a g e 22

Teacher Education

EQUIP Semi Annual Report July to December 2012 P a g e 23

Introduction

The TED of the Ministry of Education (MoE), Government of Afghanistan (GoA) is responsible for setting up infrastructure for pre- and in-service teacher education, and for planning, delivering, and monitoring teacher education throughout the country. Key responsibilities of the TED include:

establishing and sustaining a pre- and in-service professional development infrastructure, consisting of provincial TTCs, district Teacher Development Centers (TDCs) and satellite training centers

staffing and equipping these institutions adequately to deliver quality education introducing sustainable teacher professional development systems and structures to

improve the professional capacity of teachers and school managers developing a responsive teacher education curriculum for pre- and in-service teacher

professional development developing pre-service textbooks and in-service manuals and teacher guides delivering periodic professional development programs for teachers and education

managers Monitoring the quality of these professional development programs

The World Bank funded EQUIP II program, initiated in 2008, supports the TED to strengthen and sustain pre- and in-service teacher professional development. It contributes to the GoA's National Program for In-service Teacher Training (NPITT). Key components of EQUIP II are briefly introduced on the following pages.

District Teacher Training Teams (DT3)

The objective of the DT3 program is to help TED to develop and implement a sustainable in-service teacher professional development infrastructure, and to implement the NPITT. To deliver in-service teacher education to teachers across Afghanistan, EQUIP II supported the DT3 program in 23 provinces across the country1. These 23 provinces are divided into three groups, with a different lead implementing partners (IP) responsible for delivering the program in each group of provinces.

1 In the remaining 11 provinces in the country, in-service teacher education was delivered through the USAID funded BESST (Building Education Support Systems for Teachers) program from 2007 to 2011.

Figure 2.1: Teacher Training

EQUIP Semi Annual Report July to December 2012 P a g e 24

The DT3 teacher professional development program was implemented through the following activities:

i. In-service education for teachers (INSET): INSET was delivered to teachers in three phases: INSET I, II and III. Details of each phase will be provided in the following section.

ii. Capacity building for school managers: School Management Training (SMT) training was delivered in three phases: SMT I, II and III.

iii. High School Teaching Assistance (HAS): on-site professional support to high school teachers.

iv. Accelerated Learning Program for Teachers (ALPT): bridge courses to improve the qualifications of inadequately qualified teachers

v. In-service teacher and school manager support systems: TLCs and PLCs, and classroom observations by teacher trainers

Institutional grants to improve learning environment of TTCs

Annual institutional grants were provided to TTCs to enable them to provide a learning environment conducive to quality instruction. These grants could be used by individual institutions, for instance, to set up labs, purchase furniture, expand campuses, etc.

Gender mainstreaming

The objective of this component is to increase female participation in the public education sector. Efforts towards achieving the objective included increasing female staffing and female enrolment levels in TTCs. This component consists of the following sub-components:

i. Gender grants to TTCs in recognition of high female enrolment levels; the grants were to be used by TTCs to provide facilities (such as day care centers, adequate female toilets) that would help them maintain high female enrolment levels.

ii. A Girls Scholarship Program (GSP), through which the TED distributed scholarships to women enrolled in TTCs in 25 provinces with low female enrolment levels. The selection of scholarship recipients was based on their attendance and their academic performance.

iii. Payment of two-month bonus salaries to female TTC graduates who immediately joined schools and performed well during their first year as TTC graduates and active teachers.

Regional allowances

Regional allowances were distributed among faculty who worked in TTCs that are difficult to staff because they are located in unsafe or difficult to access areas because of the terrain. These allowances were given as incentives to encourage educators to work in areas where it is usually difficult to find and retain qualified human resource. They were distributed to TTC faculty as a bonus in addition to their salaries.

EQUIP Semi Annual Report July to December 2012 P a g e 25

Progress in EQUIP II activities

This section of the report is divided into sub-sections that report:

progress in the DT3 component progress in distribution of quality enhancement grants progress in gender mainstreaming activities progress in distribution of regional allowances to TTC faculty

Progress in DT3

As reported earlier, TED delivered DT3 with the help of three lead Implementing Partners (IPs) and their sub-contractors. The table below provides a breakdown of provinces by lead IP and its sub-contractors.

Area Provinces Lead IP Sub-contractor

North & Northeast

Badakhshan, Baghlan, Takhar, Kunduz, Samangan, Kunar, Nuristan, Faryab

Just for Afghan Capacity and Knowledge (JACK)

JACK didn't have any sub-contractors

Central Bamyan, Logar, Paktiya, Paktika, Kabul, Parwan, Kapisa, Laghman

Afghan Development Association (ADA)

WADAN, CoAR, AWEC

West & Southern

Badghis, Ghur, Farah, Uruzgan, Zabul, Helmand, Nimroz

Save the Children International (SCI)

HTAC, CIC, HAFO, Co-AR, STAR

Each partner implements the program in its target districts, with all three partners contributing towards the TED's targets for the entire DT3 program.

The first phase of the DT3 program came to a close on 31 July 2012; the six month extension planned from August 2012 onwards was postponed due to administrative and contractual delays. Activities planned from August onwards will now be implemented from January 2013.

Figure 2.2: Breakdown of provinces by IP

Figure 2.3: Teacher Training (INSET II)

EQUIP Semi Annual Report July to December 2012 P a g e 26

Since this report is the final report of the first phase of the DT3 program, it attempts to capture progress from the start of the program. Activities implemented in the final month of the first phase, July 2012, are also reported. In July the TED and its implementing partners focused mainly on wrapping up DT3 activities and on embedding teacher support systems into district professional development systems so that they could be sustained beyond the life of the project.

INSET

Delivery of INSET trainings

INSET trainings were delivered in three phases: INSET I, II, and III. INSET I focuses on basic pedagogy for all school teachers, whether they teach at the primary, middle, or secondary level. INSET II is a combination of content knowledge and pedagogy; participating teachers are divided into four groups: teachers from Grades 1-3, teachers from Grades 4 - 6, humanities teachers from Grades 7 12, and Math and Science (including Physics, Chemistry and Biology) teachers from Grades 7 - 12. INSET III focuses on literacy and numeracy for teachers teaching Grades 1 - 3 and content knowledge for teachers teaching all other grades. In the future, when INSET IV and V are developed, their focus will be on content-oriented material for teachers. This is because there are considerable numbers of teachers with a grade 12 education, especially in rural areas. The training was delivered using the cascade model, with TED's staff providing training to trainers recruited by the IPs, who, in turned provided training to teachers. The cascade is illustrated below: Figure 2.4: Teacher Training (INSET II)

EQUIP Semi Annual Report July to December 2012 P a g e 27

By the end of June 2012, IPs had already delivered INSET I trainings to a total of 99, 210 teachers (69,852 male and 29,538 female). Out of these teachers, a total of 86,771 teachers (60,315 male and 26,456 female) participated in INSET II, and out of these teachers, 17,585 received training in INSET III.

In July 2012, an additional 1,123 teachers completed INSET I, bringing the total number of teachers trained to 100,333 (71,303 male and 29,030 female). INSET delivery was discontinued after July and will now be resumed in the extension phase, after January 2013. The graphs below provide a breakdown of progress against targets in each of the three INSET phases:

Teachers

Teacher Training Members

Team Leaders

Senior Trainers

Lead Trainers/ TED's Provincial Monitoring Officers

0

20000

40000

60000

80000

100000

26,456

100,000 86,771

Total

Female 0

20000 40000 60000 80000

100000

120000

29,030

100,000 100,333

Total

Female

Figure 2.5: Cascade model for INSET trainings

Figure 2.6: Achievement against target for INSET I Figure 2.7: Achievement against target for INSET II

MaleMale

EQUIP Semi Annual Report July to December 2012 P a g e 28

The graph on the following page provides a gender breakdown of achievements by IP for INSET I and II. Gender disaggregated data for INSET III is currently being compiled.

0

5,000

10,000

15,000

20,000

25,000

30,000

Target Achievement

Target

Achievement

17,585

0

10000

20000

30000

40000

50000

60000

70000

80000

Male Female Male Female Male Female Male Female Male Female

SC JACK ADA TED Total Total

INSET I

INSET II

Figure 2.9: INSET I and II - Gender breakdown by IP

Figure 2.8: Achievement against target for INSET III

EQUIP Semi Annual Report July to December 2012 P a g e 29

Capacity building of TED staff to deliver and monitor INSET trainings

Between July and December 2012, the TED organized capacity building sessions to help improve the ability of TED staff to deliver and monitor INSET trainings. The first capacity building session was delivered in July 2012 for newly recruited Provincial Monitoring Officers (PMOs); it provided them an orientation to INSET I. A total of 21 (19 male and 2 female) PMOs participated in this training. The second capacity building session was also targeted at PMOs - who also serve as Lead Trainers for INSET. This training, delivered by eleven Kabul based PMOs (8 male and 3 female) focused on delivery of INSET III. A total of 46 participants (43 male and three female) traveled to Kabul from all provinces of Afghanistan to participate in the 13 day training, in September. On the final day of training, PMOs participated in a workshop to strengthen their monitoring and report writing skills.

School Management Training

As reported earlier, SMT was delivered in three phases: SMT I, II and III. SMT I is a course in basic management of school resources (including human and financial resources), and SMT II and III provide more advanced levels of capacity building. While these courses become progressively more advanced, it is not necessary for participants to complete one phase before enrolling subsequent phases since each SMT course recaptures key lessons from the basic course. SMT I and II were delivered by TED's IPs, and SMT III was delivered directly by TTC faculty. The figure below illustrates the cascade model used to deliver SMT I and II to school managers.

School Managers

Principal Training Team Members

Principal Training Leaders

Lead Trainers/ TED's Provincial Monitoring Officers

Figure 2.10: Cascade model for SMT trainings

EQUIP Semi Annual Report July to December 2012 P a g e 30

Until June 2012, a total of 7,059 school managers (6664 male and 395 female) had participated in SMT I , 7,056 school managers (6601 male and 455 female) had participated in SMT II, and 15,628 school managers (9979 male and 5,649 female) had participated in SMT III. No training was delivered after June 2012. The graphs below provide a comparison of progress against targets in each of the three SMT phases:

0

5000

10000

15000

20000

25000

Target Achievement

Total

Female

5,649

21,277 20,000

0 1000 2000 3000 4000 5000 6000 7000 8000

395

7,000 7,059

Total

Female

0

1000

2000

3000

4000

5000

6000

7000

8000

Target Achievement

455

7,000 7,056

Total

Female

Figure 2.11: Achievement against target for SMT I Figure 2.12: Achievement against target for SMT II

Figure 2.13: Achievement against target for SMT III

Male

MaleMale

EQUIP Semi Annual Report July to December 2012 P a g e 31

The table and graph below provide a gender breakdown of SMT I, II and III participants by IP.

High School Teaching Assistance

High schools across Afghanistan frequently face shortages of qualified teachers, especially in science subjects and even more so, after the introduction of the new school curriculum. To support high school teachers to deliver quality instruction to their students, DT3 teacher trainers provided teaching assistance to a total of 9,600 high schools in all 23 provinces. The assistance consisted of mentoring and teaching support, support to teachers to prepare instructional material, delivery of model lessons, consultation with teachers to help them prepare lesson plans, helping teachers find solutions to their lesson problems and instruction on how to use lab equipment and conduct experiments. Beneficiary teachers claimed to find this component of DT3 extremely useful and stated they had benefited from improved capacity and could independently teach their classes in the future.

0

2000

4000

6000

8000

10000

12000

14000

16000

Male Female Male Female Male Female Male Female Male Female

SC JACK ADA TED Total Total

SMT I

SMT II

SMT III

Training SCI JACK ADA Total Grand Total

M F M F M F M F

SMT I 1107 53 2,648 77 2,909 265 6,664 395 7,059

SMT II 1061 95 2674 78 2866 282 6,601 455 7,056

SMT III 0 0 0 0 0 0 15,628 5,649 21,277

Figure 2.14: Gender breakdown of SMT achievements by IP

Figure 2.15: SMT I, II and III: Gender breakdown by IP

EQUIP Semi Annual Report July to December 2012 P a g e 32

The chart below provides a breakdown of hours of teaching assistance per province. It shows that the greatest amount of teaching support was provided in Takhar, Baghlan, Faryab, and Badakhshan.

Though DT3 teams discontinued their high school teaching assistance in most provinces before July 2012, 70 schools received 294 hours of teaching assistance in July.

Accelerated Learning Program for Teachers (ALPT)

To make up for the acute shortage of teachers in Afghanistan's public school system, Provincial Education Departments (PEDs) hired under-qualified teachers who were expected to improve their qualifications after being recruited. To make this possible, DT3 introduced an ALPT program meant to improve the qualifications of teachers in target provinces. The beginning of the program is on hold until PEDs determine the level of education of under qualified teachers (most of them didn't have any certificates or documentation to prove their last completed grade level). The TED and MoE are planning to make a policy decision on how to handle prospective ALPT participants. Progress in this component was therefore limited to registration of prospective ALPT participants and the division of these participants into two groups: those who claimed to be graduates of Grades 7 through 9, and those who claimed to be graduates of Grades 10 through 12. An assessment of the professional development needs of these participants was conducted for possible future trainings.

9,416

13,664 11,193

975

5,126 11,877

11,935

94,798

42,340 141,334

411 25,272

51,968

3,244

10,962

4,061

1,240

5,462

Kabul Kapisa Laghman Parwan Paktika Bamayan

Logar Paktiya Samangan Baghlan Badakhshan Takhar

Kunar Nuristan Kunduz Faryab Uruzgan Bagdghiz

Nimroz Farah Helmand Zabul Ghor

Figure 2.16: Breakdown of high school teaching assistance per province

EQUIP Semi Annual Report July to December 2012 P a g e 33

From the start of the project till June 2012, a total of 9,929 teachers were registered for ALPT across 23 provinces including 8,146 men and 1,153 women. No teachers were registered after June. The table below provides a breakdown of teachers registered by each IP. The largest numbers of teachers were registered in Faryab and Farah provinces. The table and graph below present a gender breakdown of ALPT registration by each IP.

Name of Implementing Partner Male Female Total

SCI 1755 230 1985

JACK 4145 449 4594

ADA 2246 474 2720

Total 8146 1153 9299

In-service teacher and school manager support systems

DT3's in-service support systems included formation of, and support to, TLCs and PLCs and classroom observations by teacher trainers. Progress in each of these sub-components is described below:

0 1000 2000 3000 4000 5000 6000 7000 8000 9000

10000

SCI JACK ADA Total

Male

Female

Total

Figure 2.17: Gender breakdown of ALPT registration by IP

Figure 2.18: Gender breakdown of ALPT registration by IP

Figure 2.19: Teacher Training (INSET II)

EQUIP Semi Annual Report July to December 2012 P a g e 34

Teacher Learning Circles (TLC)

TLCs were set up as teacher support networks in target schools in all 23 provinces. They provided a platform for teachers to regularly meet colleagues from other schools to discuss problems and challenges, share success and best practices, and learn from each other. Since 2008, DT3 has helped form 6,778 TLCs in all 23 provinces. Each TLC had between 5 - 12 members and met at least once a month. An average meeting lasted about one hour. Teachers were supported to organize their meetings independently and to consultatively decide on the agenda for each meeting.

Key topics discussed in TLCs included:

content and teaching methods in humanities and science subjects teaching practice, including lesson planning and development and use of

instructional material participatory teaching methods including group work, role play, games, experiments

and strategies to encourage critical thinking among students assessment classroom management

More experienced teachers also helped newer teachers by giving them career counseling, professional advice, demonstration lessons, and by helping them resolve issues that they faced in class. Feedback received during TLC meetings shows that teachers found the meetings to be very useful, and that they helped teachers build a strong sense of camaraderie. Minutes of TLC meetings were recorded to track topics discussed and the assess value of the meetings.

The following chart illustrates the breakdown of TLCs per province. Ghur, Bamyan and Takhar have the most TLCs. Paktika does not have any because of delays due to mismanagement by the IP for the province. TED has terminated its contract with the IP in question.

Figure 2.20: Teacher Training

EQUIP Semi Annual Report July to December 2012 P a g e 35

Forming and strengthening TLCs is one way in which DT3 intends to sustain professional development infrastructure in its target provinces. By meeting frequently, teachers can help each other grow professionally, to find ways to address problems before they start to have an impact on student learning, and to become members of a well connected fraternity of professionals.

Principal Learning Circles (PLC)

Like TLCs, PLCs were formed to help school managers meet colleagues from neighboring schools to discuss their schools' performance, seek each others' guidance to resolve challenges in management and administration, and to learn from each others' success and best practices. To make these circles relevant and useful for participants, managers from primary schools were grouped together, managers from middle schools were grouped together and managers from high schools were grouped together.

283 54

324

267

452

124 138 185 179

794

86 108

111 101

732 627

932

683

215 57

295 430

Kabul Kapisa Laghman Parwan Paktika Bamyan

Logar Paktia Badghis Farah Ghor Helmand

Nimroz Uruzgan Zabul Badakhshan Baghlan Faryab

Kunduz Kunar Nuristan Samangan Takhar

Figure 2.21: Breakdown of TLCs per province

Figure 2.22: TLC Meeting

EQUIP Semi Annual Report July to December 2012 P a g e 36

DT3 helped form a total of 1,448 PLCs. These PLCs met at least once a month and consisted of five to twelve members each. An average meeting lasted between one and two hours. A breakdown of PLCs formed in each province is provided below:

As with TLCs, no PLCs were formed in Paktika. Ghur and Samangan have the most PLCs. PLC meetings focused on fund raising, managing and monitoring teachers, planning and assessment, administration and record keeping, effectively handling school resources, work with shuras , community participation, issues with MoE, and security. The topics most discussed were teacher management and security.

While TLCs were viewed as a valuable innovation, PLCs were even more innovative because though some teachers had prior experiences of discussing their problems with colleagues from other schools (either during trainings or casual meetings), very few school managers had participated in such structured activities. They discovered the benefit of being able to exchange ideas and knowledge with their peers and to collectively address challenges that affected their schools and students.

108 33 21

95

90

37

196

105 43 39

221

7

16 7 6 44 15 36

112

129 40 48

Badakhshan Baghlan Faryab Kunduz Kunar Nuristan

Samangan Takhar Baddghis Farah Ghor Helmand

Nimroz Uruzgan Zabul Kabul Kapisa Laghman

Parwan Paktika Bamyan Logar Paktia

Figure 2.23: Breakdown of PLCs per province

EQUIP Semi Annual Report July to December 2012 P a g e 37

Classroom observation

Following teachers' participation in INSETs, DT3 staff visited them in their schools to observe improvement in their classroom instruction and management. Follow up visits focused on teachers' ability to engage their students in active learning, manage their classrooms, improve the classroom environment, develop and follow lesson plans, use innovative patterns and techniques to ask questions in their classrooms, and to develop and use teaching and learning aids, and gauge student learning. Over the life of the program, DT3 trainers made almost 90,000 visits for classroom observation in target schools. Out of these, 215 visits were made in July 2012. During these visits, DT3 trainers identified areas for improvement in the teaching styles of individual teachers and coached them in those areas. For most teachers, this was their first experience at receiving on-site support to improve their teaching. They learnt that classroom level support doesn't necessarily have to be invasive and that it not only gives them the opportunity to seek real time guidance from their trainers, but it also provides trainers the opportunity to better understand the context in which teachers teach and give personalized guidance according to the specific challenges the teachers face.

Verification of IPs' DT3 data

TED carried out a sample verification of the data reported by DT3 IPs before releasing funds for the last 10% installment-- verification visits were conducted using tools developed by the TED. To conduct the evaluation, PMOs first participated in an orientation session on sample selection, the use of verification tools and preparation of reports. They then travelled to target provinces for verification visits. Verification data has been collected; it is currently being recorded and analyzed and will be reported in the next bi-annual report.

Figure 2.24: INSET

EQUIP Semi Annual Report July to December 2012 P a g e 38

Institutional Grants to TTCs

Every year, TTCs receive an institutional grant of USD 10,000 to improve their learning environment. The funds can be used to purchase furniture or lab equipment and other learning resources, to improve TTC dormitories, to set up libraries and computer labs, or put to any other use that help TTCs attract and retain students and provide them with a comfortable learning environment.

When proposals for grants expenditure are received from the TTCs, they are reviewed by TED and changes are made according to pre-determined criteria for the grants. Grant proposals are approved by the General Director of TED before funds can be released.

Once funds are transferred to TTCs, a Grant Management Committee in each province (which includes representatives of the PED, the Provincial Council, representatives of teachers and TTC students, the Governor's office, the provincial Revenue Department, the Human Rights Office etc) monitors the transparent, participatory, and efficient use of the funds, and oversees procurement and construction processes. The committee is required to follow ToRs that govern its establishment.

To date, all TTCs have received two tranches of this grant, totaling USD 20,000 per TTC for two years. The directors of recipient TTCs are required to report monthly progress on facilities added through the grants, and PMOs regularly monitor the effective and transparent use of grant funds.

Gender Mainstreaming

As reported earlier, EQUIP II introduced two key initiatives to mainstream participation of women in the education sector. Through these initiatives, TED was able to enroll 27, 241 students in TTCs. Last year, female graduates were at an all time high of 28, 255. Progress in each gender mainstreaming initiative is narrated below.

Gender Grants to TTCs

Gender grants were distributed among TTCs as an incentive to increase female enrolment levels in the colleges. They have a dual motive: to reward TTCs that have succeeded in enabling high female enrolment levels and to support TTCs to sustain and further increase female enrolment levels by providing a gender-friendly learning environment.

Figure 2.25: Picture: In Nimroz province, the TTC Director purchased a multi-media projector, printers and other IT equipment with their grant.

EQUIP Semi Annual Report July to December 2012 P a g e 39

To determine the size of the grants, TTCs are divided into three categories:

Category 1: TTCs with an enrolment of over 500 female students; these TTCs get USD 8,000 a year

Category 2: TTCs with an enrolment of 200 - 500 students; these TTCs get USD 6,000 a year

Category 3: TTCs with an enrolment of 10 - 200 students; these TTCs get USD 4,000 a year

TTCs with over 500 female students received the largest grant amount, while those with over 10 female students received the smallest amount. TTCs that have not yet received any gender grants since 2010 include Badghis, Kandahar, Khost, Ghanikhail, Paktika, Paktiya and Uruzgan. The following table provides a list of grant distribution by TTC:

S. N

o Name of TTC

Gender Grant 2010 Gender Grant 2011

Tota

l

Bon

us R

ecei

ved

In U

SD

Cat

egor

y 1

Cat

egor

y 2

Cat

egor

y 3

Cat

egor

y 1

Cat

egor

y 2

Cat

egor

y 3

USD

8,0

00

USD

6,0

00

USD

4,0

00

USD

8,0

00

USD

6,0

00

USD

4,0

00

>500

500-

200

10<2

00

>500

500-

200

10<2

00

1 Sayed Jamaludin 8000 0 0 8000 0 0 16,000

2 Qarabagh 0 0 4000 0 0 0 4,000

3 Faizabod 8000 0 0 0 6000 0 14,000

4 Darwaz 0 0 4000 0 0 0 4,000

5 Shighnon 0 0 4000 0 6000 0 10,000

6 Baghlan 0 6000 0 0 6000 0 12,000

7 Balkh 8000 0 0 8000 0 0 16,000

8 Bamyan 0 0 4000 0 6000 0 10,000

9 Jaghori Ghazni 0 0 4000 0 0 4000 8,000

EQUIP Semi Annual Report July to December 2012 P a g e 40

S. N

o Name of TTC

Gender Grant 2010 Gender Grant 2011

Tota

l

Bon

us R

ecei

ved

In U

SD

Cat

egor

y 1

Cat

egor

y 2

Cat

egor

y 3

Cat

egor

y 1

Cat

egor

y 2

Cat

egor

y 3

USD

8,0

00

USD

6,0

00

USD

4,0

00

USD

8,0

00

USD

6,0

00

USD

4,0

00

>500

500-

200

10<2

00

>500

500-

200

10<2

00

10 Herat 8000 0 0 8000 0 0 16,000

11 Jawzjan 8000 0 0 8000 0 0 16,000

12 Kapisa 8000 0 0 8000 0 0 8,000

13 Kunduz 0 6000 0 8000 0 0 14,000

14 Nangarhar 0 0 4000 0 6000 0 10,000

15 Parwan 0 6000 0 0 6000 0 12,000

16 Sarandon 0 0 4000 0 6000 0 10,000

17 Sar-e-Pull 0 0 4000 0 0 4000 8,000

18 Takhar 8000 0 0 8000 0 0 16,000

19 Daikundi 0 0 0 0 0 4000 4,000

20 Faryab center 0 0 4000 0 0 4000 8,000

21 Andkhoi 0 0 4000 0 0 4000 8,000

22 Ghazni Center 0 0 4000 0 0 4000 8,000

23 Sheendand Herat 0 0 4000 0 0 4000 8,000

24 Kunar 0 0 4000 0 0 4000 8,000

25 Laghman 0 0 4000 0 0 4000 8,000

26 Panjshir 0 0 4000 0 0 4000 8,000

EQUIP Semi Annual Report July to December 2012 P a g e 41

S. N

o Name of TTC

Gender Grant 2010 Gender Grant 2011

Tota

l

Bon

us R

ecei

ved

In U

SD

Cat

egor

y 1

Cat

egor

y 2

Cat

egor

y 3

Cat

egor

y 1

Cat

egor

y 2

Cat

egor

y 3

USD

8,0

00

USD

6,0

00

USD

4,0

00

USD

8,0

00

USD

6,0

00

USD

4,0

00

>500

500-

200

10<2

00

>500

500-

200

10<2

00

27 Ghoorband 0 0 4000 0 0 4000 8,000

28 Badghis 0 0 0 0 0 0 -

29 Farah 0 0 4000 0 0 4000 8,000

30 Ghur 0 0 0 0 0 4000 4,000

31 Helmand 0 0 4000 0 0 4000 8,000

32 Kandahar 0 0 0 0 0 0 -

33 Khost 0 0 0 0 0 0 -

34 Logar 0 0 4000 0 0 4000 8,000

35 Ghanikhail 0 0 0 0 0 0

36 Nimroz 0 0 0 0 0 4000 4,000

37 Nooristan 0 0 0 0 0 4000 4,000

38 Paktika 0 0 0 0 0 0 -

39 Paktiya 0 0 0 0 0 0 -

40 Uruzgan 0 0 0 0 0 0 -

41 Wardak 0 0 4000 0 0 4000 8,000

42 Zabul 0 0 0 0 0 0 -

Figure 2.26: Distribution of Gender Grants in 2010 and 2011

EQUIP Semi Annual Report July to December 2012 P a g e 42

TTCs used gender grants to set up day care centers, provide functional toilets for females, provide room and board accommodation to females, etc. As the table above shows, a few TTCs moved up categories in just one year, a major reason for this was the Girls' Scholarship Program, which enabled girls to enroll and remain in college.

Girls' Scholarship Program (GSP)

Through the GSP, the TED distributed scholarships to women enrolled in TTCs in 25 provinces with low female enrolment levels. The scholarships were intended to help improve and sustain female enrolment levels and to provide deserving female students with financial support to continue their education. The selection of scholarship recipients was based upon their attendance and their academic performance. From the start of the program till now, a total of 6,234 female students have received scholarships. Of these, 2,958 girls received scholarships in 2012.

TED surpassed its target of 5,000 students as a result of effective implementation and high demand for scholarships. Girls in four target provinces did not receive any scholarships this year because they didn't fulfill selection criteria. These include Paktika, Uruzgan, Wardak and Zabul. A breakdown of scholarships distributed in 2012 is provided below:

0

100

200

300

400

500

600

700

Badg

his

Bam

yan

Daik

undi

Fara

h

Fary

ab

Gha

zni

Ghor

Hilm

and

Kand

har

Kost

Konr

Kond

uz

Lagh

man

Loga

r

Nem

roz

Nor

stan

Pakt

ia

Pakt

ika

Pajsh

er

Parw

an

Sam

anga

n

Sarip

ul

Urz

gan

War

dak

Zabu

l

Figure 2.27: A student in Bamyan collects her scholarship

Figure 2.28: Distribution of girls' scholarships by province 2012

Figure 2.27: A student in Bamyan collects her scholarship

EQUIP Semi Annual Report July to December 2012 P a g e 43

Payment of bonus salaries to female TTC graduates

To encourage female TTC graduates to take up teaching jobs immediately after graduation, they are provided an incentive of two-month bonus salaries at the end of their first year. But if these teachers do not perform well in their first year, they lose their eligibility for the bonus. To track teachers who join schools immediately and perform well, the TED liaises closely with PED staff responsible for monitoring the performance of these teachers. Till now, a total of 390 teachers have received bonuses of USD 120 at USD 60 per month. The following table provides a breakdown of teachers per province:

S N

o

Pro

vinc

e

Num

ber o

f Te

ache

rs

Bon

uses

Bonu

s pe

r St

uden

t in

USD

Tota

l Am

ount

in

USD

Bon

us/S

tude

nt in

AF

s

Tota

l Am

ount

in

AFs

1 Bamyan 22 2 $120.00 $2,640.00 3000 132000

2 Daikundi 3 2 $120.00 $360.00 3000 18000

3 Farah 6 2 $120.00 $720.00 3000 36000

4 Faryab 49 2 $120.00 $5,880.00 3000 294000

5 Ghazni 19 2 $120.00 $2,280.00 3000 114000

6 Helmand 37 2 $120.00 $4,440.00 3000 222000

7 Kandahar 11 2 $120.00 $1,320.00 3000 66000

8 Kunar 5 2 $120.00 $600.00 3000 30000

9 Kunduz 89 2 $120.00 $10,680.00 3000 534000

10 Laghman 11 2 $120.00 $1,320.00 3000 66000

11 Logar 36 2 $120.00 $4,320.00 3000 216000

12 Panjshir 20 2 $120.00 $2,400.00 3000 120000

13 Parwan 22 2 $120.00 $2,640.00 3000 132000

14 Samangan 25 2 $120.00 $3,000.00 3000 150000

15 Sar-e-Pul 35 2 $120.00 $4,200.00 3000 210000

Total 390 $46,800.00 2340000

Figure 2.29: Distribution of bonuses by province

EQUIP Semi Annual Report July to December 2012 P a g e 44

Regional Allowances for Teachers Working in Disadvantaged and Insecure Areas

Every year, teachers who work in disadvantaged and unsafe areas are given an allowance in addition to their salary to cover for extra transportation costs and/or to compensate them for continuing to teach in difficult conditions. A total of 448 teachers working in difficult areas in 18 provinces receive this allowance with their monthly salary. These teachers receive an allowance of AF 10,000 (roughly USD 200) per month. Allowances to teachers were continued in 2012.

Capacity Building for TED's senior management

Fifteen members of the TED's senior management, including directors, travelled to Istanbul, Turkey to participate in a ten-day capacity building workshop in management and business administration. The training was organized through EQUIP.

Issues and Challenges

1. Delay in extension of DT3 contracts: TED's contracts with its DT3 IPs ended on July 31st and an extension was expected from August onwards. Unfortunately, budget and time constraints and the resultant need to repeatedly modify amendments to IP contracts delayed the extension. The TED is currently in the process of finalizing contracts with IPs and expects the extension phase to start in the first quarter of 2013. The suspension of activities between since September 2012 broke the momentum that had been created in teacher and school manager trainings, PLC and TLC activities and school level support to teachers. IPs also lost a lot of staff during the last few months and will have to hire and train new staff during the extension phase.

2. Security situation in Paktika, Paktia, Kunar, Nooristan, Helmand and other provinces: Insecurity in some provinces delayed TED's verification of DT3 data submitted. As reported earlier, TED's PMOs conducted a verification of data submitted by IPs in all target provinces. This verification exercise was delayed because of the security situation in some provinces. The report is now being prepared and will be completed by February 2013.

EQUIP Semi Annual Report July to December 2012 P a g e 45

Upcoming Initiatives

In the coming months, the TED will introduce the following initiatives to further strengthen pre- and in-service teacher education:

A Masters Program for all TTC lecturers by the American University of Afghanistan A Bridge Program to fill learning gaps among students who fall short of academic

criteria for admission to TTCs A Teacher Placement and Career Services Office in every TTC A third party evaluation of DT3 Institutionalization of a formal, sustainable professional development infrastructure

EQUIP Semi Annual Report July to December 2012 P a g e 46

Education Management Information System

EQUIP Semi Annual Report July to December 2012 P a g e 47

Introduction

Education enables the Ministry to meet its information needs for decision-making, accountability, and organizational learning. EMIS aims to provide information for strategic planning and to produce regular and specialized reports, and to this effect, has developed data management modules and enhanced human capacity.

The World Bank (WB) currently supports 1) recruitment of technical assistants for the planning department and 2) funds purchase of equipment and consultancy services required for the expansion of EMIS to provinces and districts. The following three sections cover the contributions made to EMIS by the technical assistants, the progress made in expansion of EMIS, and other activities directly or indirectly linked to WB assistance.

EMIS System Development

EMIS Modules

The EMIS section developed different modules to manage information and provide for various data needs in different departments and units of the Ministry of Education. The following are the most significant achievements over the past six months.

Operation Plan Module

This module was improved according to the 1391 report structure, and includes monthly, quarterly, and annual reporting at district, province, and central levels. The Monitoring and reporting team and the system developers reviewed and revised operational plan indicators.

Infrastructure Module for ISD

Infrastructure module for ISD was reviewed by the EMIS team, and the first level work flow (communication and information flow diagram) for collecting data from each related section, was developed and the department's procedures and policy analyzed. The estimation, handover, and monitoring sections of the module are under work, and 80% of module development has been accomplished. A comprehensive action plan for the remaining development activities has been agreed on with the Infrastructure Services Department, and the module will be completed by end of April 2013.

School Management Module

The five-year-old School Management Module has been in place and the data collected through the module has been extensively used for planning and other purposes. Over the past six months, the system was improved according to needs of various programs. The

EQUIP Semi Annual Report July to December 2012 P a g e 48

system that is placed at the Afghanistan National Data Centre can now be used to generate 60 types of reports.

Council Management System

The Council Management System was transposed from MS Access to a web-enabled application, and a report section added. It was installed and is operational in departments under the Chief of Staff Office. The system will provide information on education related activities and communication of each council member (provincial councils, lower and upper houses of parliament).

EMIS Pilot Test for General and Islamic Education Departments

EMIS pilot tested data collection from the general education department by feeding dummy data: local networking was configured, local server was configured, and client computers were able to access data from local server. The certification module was also developed and installed for General Education, and will facilitate the issuance and management of certificates for high school graduates.

The same module was developed and installed for the Islamic Education Program, and tilize

the modules.

Deployment of EMIS Server in ANDC

A contract was signed with the Ministry of Communication Information Technology (MOCIT) for transfer of the EMIS server to the Afghanistan National Data Centre (ANDC) and EMIS was transferred to Afghanistan Central Data Centre. EMIS is now on the internet at www.emis.af., and clients can access comprehensive information on schools, students and teachers online.

Infrastructure and Equipment

Procurement of equipment was completed, and equipment was installed in Kabul City departments, and has reached 21 provinces. Local Area Networks were set up and EMIS systems configured in central offices of Provincial Education Departments. Central and provincial office was trained to use the EMIS system, including data entry and data retrieval.

Mobile Application in Uruzgan

Afghanistan Reliable Technology Services (ARTS) was awarded a contract to facilitate the mobile phone data collection pilot in Uruzgan. Initial steps were taken in this direction, and ARTS has designed a mobile phone data collection system including mobile application, web application and SMS.

Negotiations were held with the Ministry of Communication and Information Technology regarding specific technical issues, and ARTS was introduced to MOCIT to handle the technical and financial aspects of the project. A server was been assigned to the project and stationed at MOCIT.

EQUIP Semi Annual Report July to December 2012 P a g e 49

EMIS developed required questionnaires based on basic data needs, and prepared training material and action plans, which were shared with ARTS. It was decided that an orientation workshop be provided to the central departments by ARTS in order to finalize the pilot phase in Uruzgan Province. The procurement of smart phones is in progress; once they arrive the pilot phase will start.

TA Contributions

Systems development is one of the functional units of Educational Management Information System (EMIS); it has the following responsibilities:

Consult with each department to integrate their paper based systems into the EMIS, thus allowing for more efficient transfer, storage, and retrieval of data. This system will be extended into a full-fledged online reporting system, and will eventually reach the school level.

Develop security and backup systems to ensure that data is safe, and to avoid loss of information.

Ensure all essential databases in the Ministry (e.g. EMIS, AFMIS, HRMIS and school establishment) can be linked in order to streamline the collection and processing of information and to minimize duplication among systems.

EMIS directorate has recruited five technical staff supported by the World Bank project

following introductions and Gantt Charts summarize past six months

1.

ID Responsible: Mohammad Ismail KhattabPosition: System Analyst

Start Finish DurationJul 2012

7/1 7/8 7/15

1 26w12/28/20127/2/2012Leading, monitoring and evaluating theactivities of EMIS team of (3 departments)

2 25.8w12/27/20127/2/2012Attending meetings, presentations and

EMIS clients and stakeholders.

3 8w8/24/20127/2/2012Assessing the performance of currentEMIS system for further improving thesystem

5 25.8w12/27/20127/2/2012Revising and checking the developmentdocuments of the EMIS team

25.8w12/27/20127/2/2012Acting as a chair member in EMIStechnical and OCEMIS meetingsconducted during the last 6 months.

Aug 2012 Sep 20127/22 7/29 8/5 8/12 8/19 8/26 9/2 9/9 9/16

Oct 2012 Nov 2012 Dec 20129/23 9/30 10/7 10/14 10/21 10/28 11/4 11/11 11/18 11/25 12/2 12/9 12/16

4

Figure 3.1:

EQUIP Semi Annual Report July to December 2012 P a g e 50

2. Mirwais Ahmadzai is a system analyst with the MoE since 17th of October 2012.

3. Noor Ahmad Firozi is working as system developer with MoE since last July 2012.

4. Zahir Jan is database developer and programmer; he has been within the EMIS directorate for the last three years within EMIS directorate.

ID Responsible person: Mirwais AhmadzaiPosition: System Analyst Start Finish Duration

Oct 2012

10/21 10/28 11/4 11/11 11/18 11/25

1 10.6w12/28/201210/17/20121. Current EMIS system assessment in order to identify problems,strengths and weaknesses.

2 1.2w10/24/201210/17/20121.1.

3 3w11/15/201210/26/20121.2. Designing standard reporting formats for school managementsystem

4 1w11/22/201211/16/20121.3. Development of standard coding system for schools

5 3w12/13/201211/23/20121.4. Requirement collection and analysis for HRMIS system

Nov 2012 Dec 2012

12/2 12/9 12/16

6 2w12/26/201212/13/20121.5. Requirement collection and analysis for Asset Managementsystem (AMS)

ID Responsible person: Noor Ahmad FiroziPosition: System Developer Start Finish Duration

Jul 2012

7/1 7/8 7/15 7/22 7/29 8/5 8/12

1 25.83w12/29/20127/2/20121. Development the ISD Module2. Preparing Agenda and meeting minutes for OCEMIS committee.

2 2.5w7/18/20127/2/20121.1. Studying the developed ISD Module

3 5w8/22/20127/19/20121.2. Analyzing and preparing the document for ISD Module

4 18.33w12/29/20128/23/20121.3. Development of standard coding system for schools

Aug 2012 Sep 2012

8/19 8/26 9/2 9/9

Oct 2012 Nov 2012 Dec 2012

9/16 9/23 9/30 10/7 10/14 10/21 10/28 11/4 11/11 11/18 11/25 12/2 12/9 12/16 12/23

ID Responsible person: Zahir JanPosition: Database developer and programmer Start Finish Duration

Jul 2012

7/1 7/8 7/15 7/22 7/29 8/5 8/12

1 2w7/14/20127/1/20121. Development of Fuel management system

2 3w8/4/20127/15/20122. Development of inventory management system.

3 2w8/18/20128/5/20123. Checked and update the operational plan management system data

4 4w9/15/20128/19/20124. configuration of servers for EMIS deployment.

Aug 2012 Sep 2012

8/19 8/26 9/2 9/9

Oct 2012 Nov 2012 Dec 2012

9/16 9/23 9/30 10/7 10/14 10/21 10/28 11/4 11/11 11/18 11/25 12/2 12/9 12/16 12/23

5

6

1w9/22/20129/16/20125. EMIS system installation in Paktia PED offfice3w10/13/20129/23/20126. Provincial based and detailed report dev for Operational plan syst.

7 11w12/29/201210/14/20127. Starting work on ISD management system with Firozi

Figure 3.2: Work progress report of Mirwais Ahmadzai

Figure 3.3: Work progress report of Noor Ahmad Firozi

Figure 3.4: Work progress report of Zahir Jan

EQUIP Semi Annual Report July to December 2012 P a g e 51

5. Toryaly Hellali is a database programmer with EMIS

Other Activities

EQUIP PIM

A review of Volume III of Program Implementation Manual for EQUIP II was finalized through a consultative process wherein, the EMIS Monitoring and Reporting Unit, and Evaluation Unit of the Department of Planning and Evaluation played key roles. The volume sets a framework and provides a guide for EQUIP Monitoring and Evaluation activities.

New Recruitments

With World Bank support, a system analyst, a data analyst, and a programmer were recruited. They will be stationed at the System Development section to provide support for improvement and expansion of the developed modules, as well as for development of other needed modules.

Additional support to EQUIP

Additional information was provided by EMIS information analysts to furnish necessary data to EQUIP units including EQUIP Gender Unit. EMIS also cooperated with the EQUIP team in the development of concepts and strategies for student learning assessment.

ID Responsible person: Torialy HellaliPosition: Database programmer Start Finish Duration

Jul 2012

7/1 7/8 7/15 7/22 7/29 8/5 8/12

1 9w9/1/20127/1/20121. Development of compliancemanagement system

2 4w9/29/20129/2/20122. Development of appointmentmanagement system for the minister office.

3 3w10/20/20129/30/20123. Configuration of servers for EMISdeployment.

4 26w12/29/20127/1/20124. Server maintenance and technicalsupport to the data entry clerks.

Aug 2012 Sep 2012

8/19 8/26 9/2 9/9

Oct 2012 Nov 2012 Dec 2012

9/16 9/23 9/30 10/7 10/14 10/21 10/28 11/4 11/11 11/18 11/25 12/2 12/9 12/16 12/23

5 10w12/30/201210/22/20125. Development of HRMIS system

6 4.67w12/29/201211/27/20126. EMIS system installation in provincialoffices

Figure 3.5: Work progress report of Torialy Hellali

EQUIP Semi Annual Report July to December 2012 P a g e 52

Infrastructure Services

EQUIP Semi Annual Report July to December 2012 P a g e 53

Introduction

The Infrastructure Services Department (ISD) of the Ministry of Education has been responsible for implementing the construction component of the Education Quality

EQUIP-I and EQUIP-II were 1652 including community contracted (CC) projects and projects awarded through national competitive bidding (NCB). In EQUIP-I, ISD undertook 775 projects -- 589 of which were CC and 186 NCB projects. During the second phase (EQUIP-II) 877 additional projects (758CC and 119 NCB) were undertaken. This report focuses primarily on CC (1347) projects that were supported and monitored directly by the ISD team.

For the reporting period (July to December 2012) the followings were the main activities:

Survey for data validation of CC incomplete components Survey for data collection of CC and NCB missing components Data collection for maintenance of completed and partially completed (CC) projects Revision/analysis/validation and consolidation of data gathered from the field Staffing/recruitment and training of staff Monitoring & Evaluation of projects

Additional tasks included: contribution to the monitoring reports prepared by IRD, and preparation of material and data for MOE and World Bank mission.

Achievements versus Plans

Of the total 1659 (CC and NCB) planned projects from the start of the program, construction of 1652 projects was planned with EQUIP budget (7 CC projects were dropped from Takhar province). Of these 305 were NCB and the remaining 1347 were CC projects.

Figure 4.1: Constructed school in remote area

EQUIP Semi Annual Report July to December 2012 P a g e 54

Based on field reports in September 2012, the status of the 1,347 CC projects was as follows:

193 projects were completed 73 of the remaining projects will be completed under the current budget, bringing the

total number of fully completed projects to (193+73) 266 projects. These 266 projects need no additional budget.

662 partially completed projects need additional budget for completion. are under construction (ongoing). These projects also need additional budget

towards their completion. 25 projects are not yet started. At this stage, further budgeting needs for these

projects is unknown.

The total number of projects that require extra budget for completion is 1056, including partially completed and ongoing projects.

The table below provides further details and project wise information.

Status and locations of (1,347) CC projects and budget requirements and the entity to pay the amount

S. N

o

Sta

tus

Sec

ure

Loca

tions

Inse

cure

Loc

atio

ns

Tota

l

Bud

get a

mou

nt n

eede

d fo

r com

plet

ion

($)

Wor

ld B

ank

to P

ay

MoE

to P

ay

1 Fully completed 144 49 193 0 0 0

2 To be completed 46 27 73 0 0 0

3 Not yet started 4 21 25 0 0 0

4 Ongoing 200 194 394 7,130,263 7,130,263 0

5 Partially completed 447 215 662 10,770,350 7,696,963 3,073,387

Total 841 506 1347 17,900,613 14,827,226 3,073,387

Figure 4.2: Status CC projects and budget requirements

EQUIP Semi Annual Report July to December 2012 P a g e 55

Projects with Incomplete Components

A total 41 ISD engineers were assigned for a field survey, mainly to collect data on incomplete components and maintenance of CC projects under EQUIP. Relevant PED and EQUIP engineers will support the team during the survey. The assigned staffs were trained in conducting the survey before being sent to the field.

The survey is in progress to collect data on incomplete components (which include latrines, water-wells, furniture and galvanized iron sheets) and will help in validation of data reported earlier, to resolve any mismatch and accordingly, to

projects, despite the increase in budget, will not be fully completed within the time frame and budget, due to increase in cost of construction commodities. The projects that will not be completed within the budget will be added to the next procurement plan for completion.

A master file is being developed for tracking projects with the help of codes, for monitoring implementation of 113 CC projects.

The remaining 204 projects will be covered under the government discretionary budget, and some will be covered by DANIDA support. Additional funding from government of India and UNICEF Emergency WASH will also be utilized to install incomplete components as necessary. A detailed breakdown of projects categorized by their donors will be available after completion of current survey.

Missing Components of Projects

Missing components of projects (which were not in the original contracts) include boundary walls, power supply, and garbage collection bins/points; 146 CC projects also require other components like desks and chairs, water wells, latrines and galvanized iron (GI) Sheets.

The boundary walls of eight different types and unit costs have been estimated for all (girls, boys and mixed) schools. Design and cost estimation for all missing components were completed for the surveyed schools. For details see the table below:

Figure 4.3: Constructed School

EQUIP Semi Annual Report July to December 2012 P a g e 56

Summary Components

S/No Incomplete Item Estimated Cost (in million $) Number of Projects

1 Desks and Chairs 0.78 121

2 Latrines 0.84 82

3 Water Well / Reservoir

0.21 86

4 G.I sheets 1.25 90

5 Others 0.01 1

6 Boundary wall 21.5 848

7 Garbage Collection Point

0.264 1,322

8 Electricity 0.44 282

Total 25.294 2,832

0

200

400

600

800

1000

1200

1400

Desks and chairs

Latrines Water well /

reservoir

G.I sheets Others Boundary wall

Garbage Collection

Point

Electricity

0.78 0.84 0.21 1.25 0.01 21.5 0.264 0.44

121

82

86

90 1

848

1322

282

Estimated Cost in (million $) Number of Projects

Figure 4.4:

Figure 4.5: Estimated cost of projects

EQUIP Semi Annual Report July to December 2012 P a g e 57

Key challenges

Beside security, lack of transportation facilities and expense funds for field visits is a major constraint for ISD to plan, implement, and monitor projects.

The travel allowances fixed for provinces by the central government law are not adequate to cover actual expenses.

ISD is short of office space and facilities to accommodate EQUIP staff working with ISD; additional computers, printer, photocopier machine and cameras are needed to enable them to better perform their responsibilities.

The staff needs training in design, estimation, monitoring and evaluation, report writing, safety and environment safe guard.

Recommendations

It is recommended that:

Relevant authorities take necessary action to resolve the issues listed above. Staff training be organized for building their capacity.

EQUIP Semi Annual Report July to December 2012 P a g e 58

Future Plans

ISD will develop and maintain a database in Excel (until Infrastructure Module in EMIS database is ready and launched) for data maintenance and reporting purposes.

ISD will conduct training for its provincial and central based engineers to brief them about the requirements of the new SPP encountering O&M, maintenance strategy, quality assurance, registration of assets including schools and other educational buildings, and monitoring and evaluation.

Figure 4.6: School that requires maintenance

EQUIP Semi Annual Report July to December 2012 P a g e 59

GENDER

EQUIP Semi Annual Report July to December 2012 P a g e 60

Introduction:

Gender mainstreaming in the education sector and promoting gender parity in access to quality education for all, are at the heart of the Education Quality Improvement program (EQUIP).

In view of the importance of this need, EQUIP has set up a separate gender unit that initiates discussions and information sharing regarding priority concerns related to gender issues in this sector. The aim is to identify problems and advocate for and recommend solutions to them, to ensure equitable distribution of education opportunities and resources to all school-aged Afghans, irrespective of gender.

Main Achievements:

Analysis of Gender Data related to Student Enrollment and Teachers

In October 2012, the Gender Unit at the EQUIP coordination office undertook a primary data (Taken from EMIS/MoE) analysis to generate a general understanding of the realities on the ground, and to use this analysis for advocacy purposes in 2013. This analysis was planned to be done at three levels:

1) Provincial level

2) District level

3)

The analysis on the provincial level was completed, and the findings presented in draft form, to the EQUIP Coordination Office team, ISD, Gender Unit MODirectorate.

Once further cleaned and checked, the findings will be shared with key stakeholders for their understanding of the status of gender parity and equity in education, for establishing causal relations between different factors, and for identifying gaps. Findings will be published in a brochure and used for gender advocacy purposes.

Development of Gender Resource Manual and Training Manual for EQUIP Staff

One important achievement during the reporting period was the development of a gender training manual and gender resource manual. The training manual has nine modules and covers the following main topics:

Definition of Gender (Sex versus Gender) Gender Data, Gender Analysis and Awareness Violence Against Women (Kinds of Violence) Patriarchy Discrimination and Gender Violence

EQUIP Semi Annual Report July to December 2012 P a g e 61

Convention on the Elimination of All Forms of Discrimination ship in Islamic History Human Rights / Universal Declaration of Human Rights

The modules are designed to use an interactive methodology involving group discussion, opinion sharing and case studies, and will be covered over a period of three full days. A test-run of the training modules will be undertaken in a training for EQUIP coordination office staff, and further adjustments and fine tuning done before it is adopted for training of provincial teams. Copies of the draft training manual and resource manual are annexed.

Other Activities:

Field Visits to Kabul City Schools

The Gender team visited 216 schools in Kabul City and created a database using information collected from these schools. They worked closely with newly hired DSMs (all female) to help them understand their duties and responsibilities, particularly related to gender interventions, wherever they were needed.

Figure 5.1: Orya Khail School in Kabul

EQUIP Semi Annual Report July to December 2012 P a g e 62

Second Gender Oversight Committee Meeting

The second Gender Oversight Committee (GOC) meeting was convened in August 2013, to identify, prioritize, and address challenges, as well as to facilitate gender mainstreaming across all levels and components of EQUIP/MOE. Participants were from different units of EQUIP, the entire gender unit team EQUIP, Ministry of Education, and World Bank. It was agreed that all EQUIP component/Unit heads would develop a gender action plan and

provide their comments before the end of the month. It was also decided to hold GOC meeting every two months because the busy schedules of the Deputy Ministers and senior EQUIP management, made it impossible for them to attend monthly meetings.

Field Visits to Provinces

The Gender Unit team members undertook field visits to Herat, Kabul Province, Balkh, Baghlan, Parwan, Kapisa, Panjshir, and Kunduz provinces, which coincided with written selection tests for recruitment of new provincial teams, interviews, and training of the new hires. The gender team visited schools and TTCs to assess the status from a gender perspective.

Gender Training

Gender training sessions were included in the training workshops organized for provincial EQUIP staff as well as for and Environment and Social Safeguard topics.

drafted in December. The draft gender manual developed for the training will be test-run in an in-house training of 8-10 participants including staff from the gender unit, communication unit, and social mobilization unit. The training will have twofold objectives: 1) to train representatives of three key EQUIP units, in key gender concepts and basic gender analysis; 2) to pilot-test and adjust and adapt the training manual using recommendations and feedback from the training for appropriateness and cultural sensitivity.

The final approved gender training module will be used to train all newly recruited men and This will be

continued till the time an international firm comes on board and carries out social mobilization reform, including development of a social mobilization strategy and training.

EQUIP Semi Annual Report July to December 2012 P a g e 63

Future Planning

Pilot test training manual in an in-house training of 10-12 EQUIP coordination unit staff.

Keep track of new hiring, especially in SMU, in the provinces to ensure gender parity

accessible to students, the gender team undertook specific problem shooting initiatives to affect concrete positive changes in the circumstances of various schools in Paghman district of Kabul province. Some examples are briefly explained below:

The family of two high-achieving seventh grade girl students (sisters) from Doodah Mast High School in Qargha, who had dropped out of school, was persuaded to allow their daughters to resume schooling and complete their education; the two sisters are back in school.

Around 1000 square meters of school grounds in Deh Araban High School (mixed school) in Qargha district, was leveled with the help of an excavator

Directorate, to prepare it for tree plantation in the coming spring.

Engineer Nargis also promised to provide the same facility for all schools in Kabul that needed to level their grounds for plantation in the spring in the month of Hoot.

The Ministry of Agriculture promised to provide as many tree saplings as requested for planting inside and outside school and mosques grounds in the spring.

ISD agreed to send out a call for bids (NCB) for construction of boundary walls for Lycee Abdul Jan Shaheed in Khaldari village in Paghman. The school had lost 200 of its girl students when families panicked after a recent suicide attack in the vicinity of the school. The ISD will announce the call for bids in the coming spring.

Figure 5.2: Leveling of Road in front of Deh Araban School in Kabul

EQUIP Semi Annual Report July to December 2012 P a g e 64

to advocate for gender equity in distribution and use of education resources

Pilot direct interventions in 5 schools in Parwan province for capacity building of provincial teams and School Shuras

Initiate research on girl student drop outs, and lack of female teacher absorbance within the system

Develop data collection tools for gender monitoring purposes Develop effective advocacy plan for general public awareness regarding girls

education, in three provinces through the MPs and Provincial Council members

Development of Brochures

The Gender Unit proposes to print sixty thousand brochures under four titles, for TTCs all over Afghanistan as part of a gender awareness campaign. The subject is --

The four titles are

1) - from the perspective of Islam.

2) cation for community/society Islamic perspective.

3) Islamic perspective

4) Girls Education in Islam - The Best Service to Humanity.

The Teacher Education Directorate (TED) has agreed to distribute the brochures in the TTCs; the EQUIP communication unit will assist in designing the brochures, and a PHD professor of Islamic Studies is helping in writing the content. They will be ready for printing in mid-January 2013; distribution will be completed by End of February 2013. One title will be published and distributed in each quarter of 2013.

EQUIP Semi Annual Report July to December 2012 P a g e 65

Environment and Social Safeguard

EQUIP Semi Annual Report July to December 2012 P a g e 66

Introduction:

The EQUIP Environment and Social Safeguard Unit contributes to improving quality of education in Afghanistan by supporting implementation of the Environmental and Social Screening Framework (ESSAF).

Currently, environmental and social safeguard management in Afghanistan suffers from critical capacity constraints, particularly in schools and in other education institutions. Since June 2011, the Environment and Social Safeguard Unit of EQUIP has been active in carrying out environmental and social safeguard activities in collusion with the social mobilization and infrastructure development teams of EQUIP. The ESS Senior Officer visited schools, and monitored the status of environmental and social safeguard issues.

Figure 6.1: Drinking Water Facility Sayed Muhammad Qoonad High School Herat city

EQ

UIP

Sem

i Ann

ual R

epor

t Jul

y to

Dec

embe

r 201

2

Pa

ge

67

Yes

NoYe

sNo

Yes

NoYe

sNo

Yes

NoYe

sNo

Yes

NoYe

sNo

Yes

NoYe

sNo

Yes

NoYe

sNo

1Ba

lkh

419

206

211

144

277

7035

011

530

317

624

322

019

924

517

410

531

484

333

281

128

296

121

7228

62

Bam

iyan

315

131

183

9422

122

292

2429

047

267

4127

315

216

212

319

112

219

221

010

426

550

9320

83

Ghaz

ni56

825

231

275

492

2153

425

542

5850

912

144

622

632

117

339

417

239

530

825

938

118

416

552

4Fa

ryab

473

174

310

9638

575

406

9638

514

933

315

532

819

029

113

934

213

734

425

422

740

971

9547

35

War

dak

389

127

262

5433

516

373

3235

565

325

5932

912

626

232

360

2935

718

620

230

969

4238

96

Pakt

iya

305

142

162

3625

828

270

2927

242

261

136

173

112

163

1029

48

289

141

155

258

6340

240

7La

ghm

an28

194

181

3424

118

257

3823

610

017

568

208

129

146

3424

132

243

160

115

211

6453

518

Kapi

sa23

014

082

105

118

7215

313

886

130

8411

791

156

6710

711

710

212

516

350

183

3610

711

69

Kabu

l- Ci

ty24

420

434

150

8813

510

318

156

181

5722

315

208

3020

533

186

5220

335

172

6654

184

10Jo

ozja

n33

899

235

9723

639

296

7625

910

223

295

240

134

202

104

231

106

229

162

174

240

9735

293

11Gh

oor

749

249

500

230

519

6368

450

697

4370

556

693

134

618

774

27

741

184

566

358

391

5169

412

Kand

ooz

393

196

198

188

202

9729

212

926

317

921

310

129

118

820

394

295

8630

420

918

630

785

3036

613

Panj

shir

150

4610

430

120

414

512

138

1413

617

133

8762

7674

7674

9753

115

3589

6114

Pakt

ika

175

2614

82

172

017

414

160

516

920

155

2015

115

158

1715

649

125

4213

00

174

5029

2086

2922

1335

3664

660

4329

959

4042

1291

3709

1429

3574

2107

2852

1224

3786

1164

3834

2607

2379

3546

1462

777

4087

100

4158

2773

1386

1980

2674

2871

4257

2475

2376

5247

7129

1581

ESS

Stat

us o

f Sch

ools

in F

ourte

en P

rovi

nces

7019

3143

2116

521

3040

2829

2649

5950

1049

9849

8650

0848

6450

0849

9949

8950

0150

0050

03

Does

the

scho

ol h

ave

a bu

ildin

g?

Does

the

scho

ol la

nd

have

lega

l do

cum

ents

?

Is th

e sig

nboa

rd

inst

alle

d on

the

wal

l of

the

com

plet

ed

Rem

arks

Tota

lPe

rcen

tage

Does

the

scho

ol

have

pl

ants

and

flo

wer

s?

Does

the

scho

ol h

ave

tree

s?

Does

the

scho

ol h

ave

suro

undi

ng

wal

ls?

Does

the

scho

ol h

ave

usab

le

latr

ines

?

Does

the

scho

ol h

ave

com

plai

nt

box?

Is th

ere

any

asse

ssm

ent

and

anal

asis

mec

hani

sm

for t

he

com

plai

nts?

NoPr

ovin

ceTo

tal N

o.of

Sc

hool

s

Does

the

scho

ol h

ave

drin

king

w

ater

so

urce

s?

Does

the

scho

ol h

ave

irrig

atio

n w

ater

?

Does

the

scho

ol

have

gr

eene

ry?

Figu

re 6

.2: E

SS

sta

tus

of s

choo

ls in

four

teen

pro

vinc

es

EQ

UIP

Sem

i Ann

ual R

epor

t Jul

y to

Dec

embe

r 201

2

Pa

ge

68

ES

S St

atus

of S

choo

ls in

Fou

rtee

n Pr

ovin

ces

Figu

re 6

.3: E

SS

sta

tus

of s

choo

ls in

four

teen

pro

vinc

es

0

500

1,00

0

1,50

0

2,00

0

2,50

0

3,00

0

3,50

0

4,00

0

4,50

0

5,00

0

5,50

0

12

34

56

78

910

1112

1314

1516

1718

1920

2122

2324

25

1-To

tal N

o. o

f sch

ools

2-Th

e sc

hool

s whi

ch h

ave

drin

king

wat

er

3-Th

e sc

hool

s whi

ch h

ave

no d

rinki

ng w

ater

4-Th

e sc

hool

s whi

ch h

ave

wat

er fo

r irr

igat

ion

5-Th

e sc

hool

s whi

ch h

ave

no

wat

er fo

r irr

igat

ion

6-Th

e sc

hool

s whi

ch h

ave

gree

nery

yard

s

7-Th

e Sc

hool

s whi

ch h

ave

no g

reen

ery y

ards

8-Th

e sc

hool

s hav

ing

plan

ts a

nd fl

ower

s

9-Th

e sc

hool

s with

out

any

plan

ts a

nd fl

ower

s

10-T

he sc

hool

s hav

ing

tree

s

11-T

he sc

hool

s hav

ing

no tr

ees

12-T

he sc

hool

s whi

ch h

ave

surr

ound

ing

wal

ls

13-T

he sc

hool

s whi

ch h

ave

no su

rrou

ndin

g w

alls

14-T

he sc

hool

s whi

ch h

ave

usab

le la

trin

es

15-T

he sc

hool

s whi

ch h

ave

no u

sabl

e La

trin

es

16-T

he sc

hool

s whi

ch h

ave

com

plai

nts

boxe

s

17-T

he sc

hool

s whi

ch h

ave

no c

ompl

aint

s bo

xes

18-T

he sc

hool

s hav

ing

mec

hani

sm fo

r the

ass

essm

ent

and

anal

asis

of th

e co

mpl

aint

s

19-T

he sc

hool

s whi

ch h

ave

no m

echa

nism

for

the

asse

ssm

ent

and

anal

asis

of th

e co

mpl

aint

s

20-T

he sc

hool

s whi

ch h

ave

build

ings

21-T

he sc

hool

s whi

ch h

ave

no b

uild

ings

22-T

he sc

hool

s of w

hich

land

s ha

ve le

gal d

ocum

ents

23-T

he sc

hool

s of w

hich

land

s ha

ve n

o le

gal d

ocum

ents

24-T

he co

mpl

eted

scho

ols w

ith s

ignb

oard

s

25-T

he co

mpl

eted

scho

ols w

ithou

t sig

nboa

rds

EQUIP Semi Annual Report July to December 2012 P a g e 69

School Land Acquisition Review and Analysis in 12 Provinces S.

No

Pro

vinc

e

Gov

ernm

enta

l

Don

ated

by

the

Com

mun

ity /

Per

son

Pur

chas

ed

by

the

Gov

ernm

ent

Pur

chas

ed b

y th

e C

omm

unity

Tota

l Sch

ools

1 Badghis 0 34 0 1 35

2 Bamyam 1 24 0 10 35

3 Jozjan 3 26 1 5 35

4 kundoz 6 22 0 9 37

5 Kunnar 3 30 0 0 33

6 Balkh 12 0 4 26 42

7 Paktiya 3 31 0 0 34

8 Takhar 4 12 0 14 30

9 Ghazni 8 23 0 1 32

10 Panjshir 0 19 0 0 19

11 Farah 2 30 0 0 32

12 Baghlan 19 0 3 11 33 Total 61 251 8 77 397

0 50

100 150 200 250 300 350 400 450

1 2 3 4 5

Graphical Representation of School Lands Acquisition Review in 12 Provinces

1 Governmental

2 Donated by Community/Person

3 Purchased by Gov

4 Purchased by Community

5 Total school

1 2 3 4 5

Figure 6.4: School Land Acquisition Review Table

Figure 6.5: School Land Acquisition Review Graph

EQUIP Semi Annual Report July to December 2012 P a g e 70

ESS Activities:

Training

Sixteen Training workshops were conducted for a total 560 participants including social mobilizers, engineers, and EQUIP officers in Kabul city and in the provinces. In order to

measure the effectiveness of the training workshops, pre and post tests were conducted at the beginning and end of each workshop. The difference in pre and post test scores reflected how much knowledge was gained by the participants at the end of the workshops.

In addition, training workshops were organized for 1979 SMSs in 28 provinces, and as many as 28,919

participated.

Objectives of the Training Workshops

The objectives of the training workshops were:

To give an overview and main picture of Environmental and Social Safeguard personnel and SMSs.

To make the EQUIP teams and SMSs familiar and acquainted with environmental and social safeguard activities.

To motivate and mobilize them for launching and enhancing the Environmental and Social Safeguard activities as a vital part of

Figure 6.6: SMS training workshop in Mazar-e-Sharif

EQUIP Semi Annual Report July to December 2012 P a g e 71

Two Training Workshops for Western Zone

Two training workshops were held in Herat city in August and November 2012 respectively, for 50 participants from Herat, Badghis, Ghur, Farah, Helmand and Nimroz. Participants included EQUIP teams of the six provinces in the Western Zone. The training had separate sessions on Environmental and Social Safeguard activities, social mobilization, and gender.

Each of the two workshops had 25 participants, with each EQUIP team represented by one equip officer, two social mobilization supervisors and two engineers in each workshop.

The contents of the Environmental and Social Screening Assessment Framework were discussed with the help of slides, and were explained in detail.

S. No. Province Number of Shuras Number of Participants

1 Badghis 96 1440

2 Balkh 128 1920

3 Badakhshan 81 1215

4 Baghlan 80 1200

5 Bamyan 81 1160

6 Daikundi 16 240

7 Farah 100 1230

8 Ghazni 20 300

9 Heart 145 2175

10 Jawzjan 90 1200

11 Kabul City 55 804

12

13 Kabul Province 90 1350

14 Kunduz 51 665

Figure 6.7: SMS in a training session in Paktiya province

EQUIP Semi Annual Report July to December 2012 P a g e 72

15 Kunar 96 1365

16 Host 71 1065

17 Kapisa 30 450

18 Laghman 66 990

19 Nimroz 33 475

20 Paktiya 73 1095

21 Nangarhar 173 2595

22 Panjshir 35 525

23 Samangan 15 150

24 Sar-e-Pul 91 1365

25 Takhar 84 1260

26 Uruzgan 31 465

27 Wardak 94 1410

28 Zabul 54 810

Other ESS Activities

Practical steps taken to ensure social safeguard and positive school environments included mobilizing the SMSs, EQUIP teams and school administrations to:

Installation of complaint boxes and set up grievance response mechanisms. A format for registering complaints was sent to all provinces. As a result many schools have installed complaint boxes, and have adopted mechanisms for addressing complaints.

Implementation of Environmental and Social Screening and Assessment Framework in all school construction projects.

Installation of signboards on school buildings after completion of construction. Inclusion of the ESSAF guidelines in the TORs for contractors and SMSs (the sixth

attachment of ESSAF) for construction of CC school buildings. Requiring cleanliness, sanitation, greenery and all ESS related activities both inside

and outside the school.

Figure 6.8: Number of School Management Shuras (SMSs) received ESS training in 28 provinces

EQUIP Semi Annual Report July to December 2012 P a g e 73

Findings at Schools Visited in Herat:

1. Social and Environmental Social

Safeguard activities of the schools

visited as sample were satisfactory.

2. The students were well-organized

and had neat uniforms.

Problems and Recommendations:

In the insecure areas, it is difficult to implement ESSAF in the schools.

Inadequate coordination and cooperation among EQUIP teams and PEDs and DEDs, and other stakeholders in the education sector, is another major weakness, which needs to be improved.

Effective coordination and cooperation between the EQUIP teams, PEDs, DEDs, and other major stakeholders in the education sector, will enable better implementation of Environmental and Social Screening Assessment Framework in all schools

The Social Mobilization Unit in conjunction with the ESS team will need to focus more on raising awareness of PEDs, DEDs and SMSs, about the importance of ESSAF, so that ESSAF is implemented easily in all schools . All stakeholders, PEDs, DEDs and SMSs must be mobilized to take active steps for implementing ESS activities in schools, and PEDs, DEDs, and SMSs, must receive proper training in this regard.

We also believe that any positive steps taken by a stakeholder, Shura, PED, or DED to fulfill Environmental and Social Safeguard goals, should be recognized and rewarded by the MOE.

The EQUIP teams needs to be supported and all necessary facilities provided to enable them to undertake ESS activities.

The PEDs and DEDs should be formally directed and advised through a letter, to focus on ESSAF implementation, and to cooperate and coordinate their plans with EQUIP teams.

Effective ESS operations require a separate allocated budget.

It is absolutely necessary to have maintenance operations in the schools; otherwise, ESSAF implementation will not be of any use. Thus a separate budget is also required for maintenance, as well as enough space and area of land for the school and education activities.

Figure 6.9: Meeting with SMS in Herat City

EQ

UIP

Sem

i Ann

ual R

epor

t Jul

y to

Dec

embe

r 201

2

Pa

ge

74

AN

NEX

1 (F

inan

cial

Sta

tus)

Re

port

ing

Date

:De

cem

ber 3

1, 2

012

Curr

ency

:M

illio

n U

SD

Orig

inal

Bud

get

Real

loca

tion

1387

1388

1389

1390

1391

Gen

eral

Edu

catio

nSc

hool

Qua

lity

Enha

ncem

ent

Scho

ol Q

ualit

y En

hanc

emen

t Gra

nt24

.50

$

24

.50

$

24.5

0$

-$

7.43

$

6.

42$

10.0

0$

0.

58$

24.4

3$

0.

07$

99.7

%68

,278

Com

mun

ity In

fras

truc

ture

Con

trac

ts (C

C)36

.80

$

37

.18

$

37.4

3$

2.14

$

11.5

0$

10

.30

$

9.

22$

2.68

$

35

.85

$

1.59

$

95

.8%

Infr

astr

uctu

re D

evel

opm

ent (

NCB

)10

.30

$

20

.56

$

18.3

5$

-$

5.24

$

4.

60$

2.61

$

1.

55$

13.9

9$

4.

36$

76.3

%

Soci

al A

war

enes

s & M

obili

zatio

n5.

20$

2.

71$

4.67

$

-$

0.51

$

0.

42$

0.03

$

1.

98$

2.94

$

1.

73$

62.9

%

76.8

0$

84.9

5$

84

.95

$

2.

14$

24

.68

$

21.7

4$

21.8

6$

6.

79$

77.2

1$

7.

74$

90.9

%

Teac

her E

duca

tion

Teac

her T

rain

ing

Teac

her T

rain

ing

48.4

0$

49.1

2$

47

.85

$

-

$

4.

18$

15.5

5$

18.5

9$

12

.12

$

50.4

3$

(2

.59)

$

105.

4%

Prin

cipl

es T

rain

ing

2.00

$

7.26

$

7.

26$

-

$

-

$

-

$

6.61

$

-

$

6.61

$

0.

65$

91.1

%

Fem

ale

Scho

lars

hips

in T

TC23

.20

$

17

.21

$

18.4

9$

-$

1.51

$

0.

76$

1.45

$

4.

83$

8.56

$

9.

94$

46.3

%

73.6

0$

73.6

0$

73

.60

$

-

$

5.

69$

16.3

1$

26.6

5$

16

.95

$

65.6

0$

8.

00$

89.1

%

Educ

atio

n M

gtPr

ojec

t Man

agem

ent &

Coo

rdin

atio

n

Proj

ect M

anag

emen

t & C

oord

inat

ion

10.1

0$

29.4

5$

29

.45

$

0.

17$

8.

13$

8.20

$

7.

27$

5.44

$

29

.20

$

0.24

$

99

.2%

Mon

itorin

g3.

20$

-

$

-

$

-$

-$

-$

-

$

-

$

-$

-$

0.0%

Eval

uatio

n1.

00$

-

$

-

$

-$

-$

-$

-

$

-

$

-$

-$

0.0%

14.3

0$

29.4

5$

29

.45

$

0.

17$

8.

13$

8.20

$

7.

27$

5.44

$

29

.20

$

0.24

$

99

.2%

Una

lloca

ted

Budg

et23

.30

$

-

$

-

$

-$

-$

-$

-

$

-

$

-$

-$

0.0%

188.

00$

18

8.00

$

18

8.00

$

2.31

$

38.5

0$

46

.25

$

55

.77

$

29.1

8$

17

2.02

$

15

.98

$

91.5

%

Not

e: S

ome

chan

ges a

re e

xpec

ted

in th

e 13

91 e

xecu

tion

figur

es a

fter

refu

nd re

port

s fro

m th

e pr

ovin

ces a

nd fi

naliz

atio

n of

the

Qat

ia re

port

Sub

tota

l

Sub

tota

l

Gra

nd to

tal

Actu

al E

xpen

ditu

reTo

tal

Expe

nditu

reBa

lanc

e Bu

dget

% S

pent

Rem

arks

Sub

tota

l

AFM

IS S

ub-

Com

pone

ntPr

ojec

t Com

pone

nt, S

ub-c

ompo

nent

s, a

ctiv

ities

Prog

ram

Bud

get

Rev

ised

Bu

dget

EQU

IP II

Bud

get &

Exe

cutio

n St

atus

(Ove

rall

Prog

ram

Bud

get)

EQUIP Semi Annual Report July to December 2012 P a g e 75

ANNEX 2 (Data Analysis by Gender Unit)

-

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

29,649

36,848 34,187

20,413

38,810

8,294 8,294

19,457

37,698

4

EQUIP Semi Annual Report July to December 2012 P a g e 76

-

50,000

100,000

150,000

200,000

250,000

51,770

247,204

64,424

109,037

35,689 32,973

103,552

66,886

96,044

36,621 32,412

EQUIP Semi Annual Report July to December 2012 P a g e 77

-

50,000

100,000

150,000

200,000

250,000

300,000

350,000

400,000

450,000

14,915

64,952

203,052

113,079

28,128

125,791

80,937 69,020 55,459

420,304

323,224

138,966

EQUIP Semi Annual Report July to December 2012 P a g e 78

.

67

0

200

400

600

800

1000

1200

1400

16 125 155 145

67 186

257

49 133

1350 1356

343 257

786

515 439 448

0.51

7%

16%

13% 4% 5%

6% 6%

9% 12%

14%

13%

15% 20%

5%

EQUIP Semi Annual Report July to December 2012 P a g e 79

0

1000

2000

3000

4000

5000

6000

7000

641 192

1833 1377

535

1663 2064

1815

859

3001

1512 978 841

1716

6732

5519

691

21%

29%

53%

33% 21%

23%

27%

28% 29%

29%

32% 46%

33%

48%

54% 23%

32%

EQUIP Semi Annual Report July to December 2012 P a g e 80

-

50,000

100,000

150,000

200,000

250,000

300,000

350,000

400,000

450,000

Axis

Titl

e

Axis Title

-

100,000

200,000

300,000

400,000

500,000

600,000

EQUIP Semi Annual Report July to December 2012 P a g e 81

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

1512 439 786

257 343

1377 145

1350 239 155

3001 2064

1833 1663

535

5519

1716 1815

257

6732

841 691

448 515 49 67 186

641

16 133 859

125 192 978

16957

0

2000

4000

6000

8000

10000

12000

3308

2339

4952

3874

2302

4568

2655

10108

3379 3239

6382

5109

6377

4336

1464

4912

2024

4648

1696

7309

1751

595

1846

2968

519 1219

3561

2543 3095

1007

2165

3762

762

1996

5715

EQUIP Semi Annual Report July to December 2012 P a g e 82

-

100

200

300

400

500

600

700

800

900

328

211

449

374

252

580

280

743

266

457

662 608

448 428

265

528

328

476 478

873

322

146

324

398

216 275

762

337 351

243

369

280

129

341

544

EQUIP Semi Annual Report July to December 2012 P a g e 83