acnw's integrated strategy to evaluate the staff's licensing … › docs › ml0108 ›...
TRANSCRIPT
![Page 1: ACNW'S INTEGRATED STRATEGY TO EVALUATE THE STAFF'S LICENSING … › docs › ML0108 › ML010820257.pdf · 2012-11-17 · Introduction "* Strategy involves evaluating the staff's](https://reader033.vdocument.in/reader033/viewer/2022060323/5f0dd2bc7e708231d43c434c/html5/thumbnails/1.jpg)
ACNW'S INTEGRATED STRATEGY TO
EVALUATE THE STAFF'S LICENSING CAPABILITY
AND SUFFICIENCY REVIEW
Dr. B. John Garrick
Chairman, ACNW
March 22, 2001
![Page 2: ACNW'S INTEGRATED STRATEGY TO EVALUATE THE STAFF'S LICENSING … › docs › ML0108 › ML010820257.pdf · 2012-11-17 · Introduction "* Strategy involves evaluating the staff's](https://reader033.vdocument.in/reader033/viewer/2022060323/5f0dd2bc7e708231d43c434c/html5/thumbnails/2.jpg)
Introduction
"* Strategy involves evaluating the staff's licensing review capability
"• Strategy integrates several ACNW first-tier priorities (Figure 1)
"* Strategy features a "vertical slice review" of DOE's technical basis documents for the site recommendation
2
![Page 3: ACNW'S INTEGRATED STRATEGY TO EVALUATE THE STAFF'S LICENSING … › docs › ML0108 › ML010820257.pdf · 2012-11-17 · Introduction "* Strategy involves evaluating the staff's](https://reader033.vdocument.in/reader033/viewer/2022060323/5f0dd2bc7e708231d43c434c/html5/thumbnails/3.jpg)
![Page 4: ACNW'S INTEGRATED STRATEGY TO EVALUATE THE STAFF'S LICENSING … › docs › ML0108 › ML010820257.pdf · 2012-11-17 · Introduction "* Strategy involves evaluating the staff's](https://reader033.vdocument.in/reader033/viewer/2022060323/5f0dd2bc7e708231d43c434c/html5/thumbnails/4.jpg)
Introduction (Cont'd)
Strategy Integrates (Figure 2): - Vertical Slice Review of Technical
Basis Documents - Key Technical Issue (KTI)
Resolution - Specific Technical Issues
(e.g., Alloy 22)
4
![Page 5: ACNW'S INTEGRATED STRATEGY TO EVALUATE THE STAFF'S LICENSING … › docs › ML0108 › ML010820257.pdf · 2012-11-17 · Introduction "* Strategy involves evaluating the staff's](https://reader033.vdocument.in/reader033/viewer/2022060323/5f0dd2bc7e708231d43c434c/html5/thumbnails/5.jpg)
Introduction (Cont'd)
* Strategy Integrates (Figure 2) cont'd.
- Performance Assessment (PA) tools
- Proposed 10 CFR 63 - Draft YMRP and Guidance
5
![Page 6: ACNW'S INTEGRATED STRATEGY TO EVALUATE THE STAFF'S LICENSING … › docs › ML0108 › ML010820257.pdf · 2012-11-17 · Introduction "* Strategy involves evaluating the staff's](https://reader033.vdocument.in/reader033/viewer/2022060323/5f0dd2bc7e708231d43c434c/html5/thumbnails/6.jpg)
I,Figure 2
S ite.; S uitabQ it
and
Verlical Slice
Re
![Page 7: ACNW'S INTEGRATED STRATEGY TO EVALUATE THE STAFF'S LICENSING … › docs › ML0108 › ML010820257.pdf · 2012-11-17 · Introduction "* Strategy involves evaluating the staff's](https://reader033.vdocument.in/reader033/viewer/2022060323/5f0dd2bc7e708231d43c434c/html5/thumbnails/7.jpg)
ACNW'S VERTICAL SLICE REVIEW
Dr. George M. Hornberger
ACNW
March 22, 2001
7
![Page 8: ACNW'S INTEGRATED STRATEGY TO EVALUATE THE STAFF'S LICENSING … › docs › ML0108 › ML010820257.pdf · 2012-11-17 · Introduction "* Strategy involves evaluating the staff's](https://reader033.vdocument.in/reader033/viewer/2022060323/5f0dd2bc7e708231d43c434c/html5/thumbnails/8.jpg)
Vertical Slice Review
"• ACNW's original approach to a sufficiency review (6/29/00) described an evaluation of DOE's technical basis documents
"* Current approach is not a comprehensive review of DOE's technical basis
"* Revised approach is a vertical slice review of NRC's sufficiency review
8
![Page 9: ACNW'S INTEGRATED STRATEGY TO EVALUATE THE STAFF'S LICENSING … › docs › ML0108 › ML010820257.pdf · 2012-11-17 · Introduction "* Strategy involves evaluating the staff's](https://reader033.vdocument.in/reader033/viewer/2022060323/5f0dd2bc7e708231d43c434c/html5/thumbnails/9.jpg)
Vertical Slice Objectives
"* Is NRC's sufficiency review risk informed and performance based?
"* Are the staff's sufficiency comments logical and defensible?
"* Are there gaps in the staff's tools, guidance, and capability to review a possible LA for Yucca Mountain?
9
![Page 10: ACNW'S INTEGRATED STRATEGY TO EVALUATE THE STAFF'S LICENSING … › docs › ML0108 › ML010820257.pdf · 2012-11-17 · Introduction "* Strategy involves evaluating the staff's](https://reader033.vdocument.in/reader033/viewer/2022060323/5f0dd2bc7e708231d43c434c/html5/thumbnails/10.jpg)
Vertical Slice Approach
"* Review selected KTIs to evaluate transparency, traceability, and defensibility
"* Evaluate whether the staff's approach is reasonable and RIPB
"• Become familiar with DOE's technical basis documents
10
![Page 11: ACNW'S INTEGRATED STRATEGY TO EVALUATE THE STAFF'S LICENSING … › docs › ML0108 › ML010820257.pdf · 2012-11-17 · Introduction "* Strategy involves evaluating the staff's](https://reader033.vdocument.in/reader033/viewer/2022060323/5f0dd2bc7e708231d43c434c/html5/thumbnails/11.jpg)
Vertical Slice Approach (Cont'd)
* Use YMRP guidance, IRSRs, and technical exchange agreements to guide review
• Interact with the NRC staff during review
11
![Page 12: ACNW'S INTEGRATED STRATEGY TO EVALUATE THE STAFF'S LICENSING … › docs › ML0108 › ML010820257.pdf · 2012-11-17 · Introduction "* Strategy involves evaluating the staff's](https://reader033.vdocument.in/reader033/viewer/2022060323/5f0dd2bc7e708231d43c434c/html5/thumbnails/12.jpg)
Vertical Slice Topics
* HLW chemistry review
* Saturated zone flow
• Thermal effects on flow
* Total system performance assessment
12
![Page 13: ACNW'S INTEGRATED STRATEGY TO EVALUATE THE STAFF'S LICENSING … › docs › ML0108 › ML010820257.pdf · 2012-11-17 · Introduction "* Strategy involves evaluating the staff's](https://reader033.vdocument.in/reader033/viewer/2022060323/5f0dd2bc7e708231d43c434c/html5/thumbnails/13.jpg)
Example of Vertical Slice Review
Saturated Zone KTI
* NRC subissue: ambient flow and dilution in the saturated zone flow
* NRC Status: closed-pending
13
![Page 14: ACNW'S INTEGRATED STRATEGY TO EVALUATE THE STAFF'S LICENSING … › docs › ML0108 › ML010820257.pdf · 2012-11-17 · Introduction "* Strategy involves evaluating the staff's](https://reader033.vdocument.in/reader033/viewer/2022060323/5f0dd2bc7e708231d43c434c/html5/thumbnails/14.jpg)
Example of Vertical Slice Review
Saturated Zone KTI
* ACNW Approach:
- Is the staff's basis for closedpending status transparent?
- Is NRC's approach RIPB?
14
![Page 15: ACNW'S INTEGRATED STRATEGY TO EVALUATE THE STAFF'S LICENSING … › docs › ML0108 › ML010820257.pdf · 2012-11-17 · Introduction "* Strategy involves evaluating the staff's](https://reader033.vdocument.in/reader033/viewer/2022060323/5f0dd2bc7e708231d43c434c/html5/thumbnails/15.jpg)
Example of Vertical Slice Review
Saturated Zone KTI
* DOE's current modeling approach - 3D flow and transport model
- principal axis oriented in SW-NE
direction
- anisotropic, stochastic parameters, alluvial uncertainty zone
15
![Page 16: ACNW'S INTEGRATED STRATEGY TO EVALUATE THE STAFF'S LICENSING … › docs › ML0108 › ML010820257.pdf · 2012-11-17 · Introduction "* Strategy involves evaluating the staff's](https://reader033.vdocument.in/reader033/viewer/2022060323/5f0dd2bc7e708231d43c434c/html5/thumbnails/16.jpg)
Some NRC staff concerns about SZ flow: - Anisotropy? - Flow paths in alluvium? - Alternative conceptual models?
NorthYucca Mountain
1 '~~' • . . . . . f. .
I m scale 100m scale\ 1/0 m scale
Porous Medium Large-scale, Vertical Larger effective porosity. Transverse
Longer groundwater Dispersion travel time (dilution)
Legend l - AdveC.on V Wirer Tabei
S.... . O is,11 11 i I FV3037-3
16
![Page 17: ACNW'S INTEGRATED STRATEGY TO EVALUATE THE STAFF'S LICENSING … › docs › ML0108 › ML010820257.pdf · 2012-11-17 · Introduction "* Strategy involves evaluating the staff's](https://reader033.vdocument.in/reader033/viewer/2022060323/5f0dd2bc7e708231d43c434c/html5/thumbnails/17.jpg)
Some NRC staff requests: - Detailed plan for alluvial testing - Justification for uncertainty of paths
'- E•-P•6D
, ,;NYE COUNTY, NEVADA
.... ]• ,-= EARLY WARNING DRILLING PROGRAM DRILLHOLE LOCATIONS
* Phase I Drillholes * Phase II DrIIholus * Phase II Monitoring Wells
Phase II injection Well / Phase MrllDillhtes
17
![Page 18: ACNW'S INTEGRATED STRATEGY TO EVALUATE THE STAFF'S LICENSING … › docs › ML0108 › ML010820257.pdf · 2012-11-17 · Introduction "* Strategy involves evaluating the staff's](https://reader033.vdocument.in/reader033/viewer/2022060323/5f0dd2bc7e708231d43c434c/html5/thumbnails/18.jpg)
Products
"* Status of Issue Resolution
"* Report on vertical slice reviews
"* Comments on DOE's technical basis documents
"* Report on the staff's sufficiency comments on DOE's technical basis documents
18
![Page 19: ACNW'S INTEGRATED STRATEGY TO EVALUATE THE STAFF'S LICENSING … › docs › ML0108 › ML010820257.pdf · 2012-11-17 · Introduction "* Strategy involves evaluating the staff's](https://reader033.vdocument.in/reader033/viewer/2022060323/5f0dd2bc7e708231d43c434c/html5/thumbnails/19.jpg)
KEY TECHNICAL ISSUE (KTI)
RESOLUTION
Mr. Milton Levenson
ACNW
March 22, 2001
19
![Page 20: ACNW'S INTEGRATED STRATEGY TO EVALUATE THE STAFF'S LICENSING … › docs › ML0108 › ML010820257.pdf · 2012-11-17 · Introduction "* Strategy involves evaluating the staff's](https://reader033.vdocument.in/reader033/viewer/2022060323/5f0dd2bc7e708231d43c434c/html5/thumbnails/20.jpg)
KTI Resolution
* Goal of issue resolution is to clarify what is needed for license application
* Based on technical exchange meetings, DOE submittals, and staff reviews
* Issue resolution is not compliance determination
20
![Page 21: ACNW'S INTEGRATED STRATEGY TO EVALUATE THE STAFF'S LICENSING … › docs › ML0108 › ML010820257.pdf · 2012-11-17 · Introduction "* Strategy involves evaluating the staff's](https://reader033.vdocument.in/reader033/viewer/2022060323/5f0dd2bc7e708231d43c434c/html5/thumbnails/21.jpg)
Observations
"* Issue resolution process appears to be working
"• Staff has capability to evaluate issue closure requirements
"* Progress has been made in adopting risk-informed and performance-based (RIPB) approach
21
![Page 22: ACNW'S INTEGRATED STRATEGY TO EVALUATE THE STAFF'S LICENSING … › docs › ML0108 › ML010820257.pdf · 2012-11-17 · Introduction "* Strategy involves evaluating the staff's](https://reader033.vdocument.in/reader033/viewer/2022060323/5f0dd2bc7e708231d43c434c/html5/thumbnails/22.jpg)
Concerns
"* Have all subissues been identified?
"* Has integration been achieved?
"* Has RIPB been implemented?
"* Has public participation been appropriate?
"* Will design evolution require major changes?
22
![Page 23: ACNW'S INTEGRATED STRATEGY TO EVALUATE THE STAFF'S LICENSING … › docs › ML0108 › ML010820257.pdf · 2012-11-17 · Introduction "* Strategy involves evaluating the staff's](https://reader033.vdocument.in/reader033/viewer/2022060323/5f0dd2bc7e708231d43c434c/html5/thumbnails/23.jpg)
Follow-up Questions
* Is the risk of the various KTI subissues and integrated subissues (ISIs) known or understood?
* Are the KTIs the most risksignificant issues identified by PA?
23
![Page 24: ACNW'S INTEGRATED STRATEGY TO EVALUATE THE STAFF'S LICENSING … › docs › ML0108 › ML010820257.pdf · 2012-11-17 · Introduction "* Strategy involves evaluating the staff's](https://reader033.vdocument.in/reader033/viewer/2022060323/5f0dd2bc7e708231d43c434c/html5/thumbnails/24.jpg)
ALLOY 22 CORROSION
Dr. Raymond G. Wymer
ACNW
March 22, 2001
24
![Page 25: ACNW'S INTEGRATED STRATEGY TO EVALUATE THE STAFF'S LICENSING … › docs › ML0108 › ML010820257.pdf · 2012-11-17 · Introduction "* Strategy involves evaluating the staff's](https://reader033.vdocument.in/reader033/viewer/2022060323/5f0dd2bc7e708231d43c434c/html5/thumbnails/25.jpg)
Importance of Issue
* Longevity of waste packages is a key attribute of DOE's Repository Safety Strategy
* DOE expects Alloy 22 to contain radionuclides for more than 10,000 years
25
![Page 26: ACNW'S INTEGRATED STRATEGY TO EVALUATE THE STAFF'S LICENSING … › docs › ML0108 › ML010820257.pdf · 2012-11-17 · Introduction "* Strategy involves evaluating the staff's](https://reader033.vdocument.in/reader033/viewer/2022060323/5f0dd2bc7e708231d43c434c/html5/thumbnails/26.jpg)
Previous ACNW Advice
* Bound environmental conditions affecting corrosion
* Understand corrosion mechanisms (e.g., stress corrosion cracking and pitting)
• Develop confirmatory data
26
![Page 27: ACNW'S INTEGRATED STRATEGY TO EVALUATE THE STAFF'S LICENSING … › docs › ML0108 › ML010820257.pdf · 2012-11-17 · Introduction "* Strategy involves evaluating the staff's](https://reader033.vdocument.in/reader033/viewer/2022060323/5f0dd2bc7e708231d43c434c/html5/thumbnails/27.jpg)
Observations and Conclusions
"* Experiments by Nevada consultants not representative of Yucca Mountain
"* Role of trace elements in corrosion not yet thoroughly investigated by DOE and NRC
"* NRC and CNWRA identifying conditions where trace elements could influence results
27
![Page 28: ACNW'S INTEGRATED STRATEGY TO EVALUATE THE STAFF'S LICENSING … › docs › ML0108 › ML010820257.pdf · 2012-11-17 · Introduction "* Strategy involves evaluating the staff's](https://reader033.vdocument.in/reader033/viewer/2022060323/5f0dd2bc7e708231d43c434c/html5/thumbnails/28.jpg)
Recommendations
"• Verify that absence of trace elements in previous work did not bias conclusions
"* Evaluate key corrosion conditions at Yucca Mountain
"* Understand corrosion mechanisms
28
![Page 29: ACNW'S INTEGRATED STRATEGY TO EVALUATE THE STAFF'S LICENSING … › docs › ML0108 › ML010820257.pdf · 2012-11-17 · Introduction "* Strategy involves evaluating the staff's](https://reader033.vdocument.in/reader033/viewer/2022060323/5f0dd2bc7e708231d43c434c/html5/thumbnails/29.jpg)
Follow-up Questions
* Are expectations of waste package performance limiting study of other features or processes (multiple barriers) that affect performance?
* For example, is radionuclide transport in the near-field being adequately addressed?
29
![Page 30: ACNW'S INTEGRATED STRATEGY TO EVALUATE THE STAFF'S LICENSING … › docs › ML0108 › ML010820257.pdf · 2012-11-17 · Introduction "* Strategy involves evaluating the staff's](https://reader033.vdocument.in/reader033/viewer/2022060323/5f0dd2bc7e708231d43c434c/html5/thumbnails/30.jpg)
NRC STAFF PERFORMANCE ASSESSMENT CAPABILITY
Dr. B. John Garrick ACNW
March 22, 2001
30
![Page 31: ACNW'S INTEGRATED STRATEGY TO EVALUATE THE STAFF'S LICENSING … › docs › ML0108 › ML010820257.pdf · 2012-11-17 · Introduction "* Strategy involves evaluating the staff's](https://reader033.vdocument.in/reader033/viewer/2022060323/5f0dd2bc7e708231d43c434c/html5/thumbnails/31.jpg)
Previous Recommendations
"* Strengthen capability in specific disciplines
"* Improve methods for evaluating individual barrier performance
"* Ranking importance of risk contributors
31
![Page 32: ACNW'S INTEGRATED STRATEGY TO EVALUATE THE STAFF'S LICENSING … › docs › ML0108 › ML010820257.pdf · 2012-11-17 · Introduction "* Strategy involves evaluating the staff's](https://reader033.vdocument.in/reader033/viewer/2022060323/5f0dd2bc7e708231d43c434c/html5/thumbnails/32.jpg)
Previous Recommendations
(Cont'd)
"• Peer review NRC's TPA code
"* Utilize realistic models and parameters
"• Improve transparency of the analyses
32
![Page 33: ACNW'S INTEGRATED STRATEGY TO EVALUATE THE STAFF'S LICENSING … › docs › ML0108 › ML010820257.pdf · 2012-11-17 · Introduction "* Strategy involves evaluating the staff's](https://reader033.vdocument.in/reader033/viewer/2022060323/5f0dd2bc7e708231d43c434c/html5/thumbnails/33.jpg)
TPA Peer Review
* Peer review of TPA Code conducted by independent team
* Peer members' comments currently being considered by staff
33
![Page 34: ACNW'S INTEGRATED STRATEGY TO EVALUATE THE STAFF'S LICENSING … › docs › ML0108 › ML010820257.pdf · 2012-11-17 · Introduction "* Strategy involves evaluating the staff's](https://reader033.vdocument.in/reader033/viewer/2022060323/5f0dd2bc7e708231d43c434c/html5/thumbnails/34.jpg)
Conclusions
"* Staff is addressing ACNW concerns and improving their overall PA capability
"* TPA code is evolving as an effective tool for evaluating DOE TSPA
"* Committee is satisfied with progress
34
![Page 35: ACNW'S INTEGRATED STRATEGY TO EVALUATE THE STAFF'S LICENSING … › docs › ML0108 › ML010820257.pdf · 2012-11-17 · Introduction "* Strategy involves evaluating the staff's](https://reader033.vdocument.in/reader033/viewer/2022060323/5f0dd2bc7e708231d43c434c/html5/thumbnails/35.jpg)
Follow-up Questions
* How has uncertainty been evaluated?
* Are the key issues treated with conservative bounding assumptions or assessed more realistically?
35
![Page 36: ACNW'S INTEGRATED STRATEGY TO EVALUATE THE STAFF'S LICENSING … › docs › ML0108 › ML010820257.pdf · 2012-11-17 · Introduction "* Strategy involves evaluating the staff's](https://reader033.vdocument.in/reader033/viewer/2022060323/5f0dd2bc7e708231d43c434c/html5/thumbnails/36.jpg)
Summary
"* Integrated strategy to evaluate staff's licensing capability and sufficiency review
"° Includes works in progress and past letters
"* Other aspects of the strategy include proposed 10 CFR 63 and draft YMRP
36