Page 1: Actionable information 1

Improving Packaging Line Performance –Using the correct Data and Drill Down Analysis

Actionable Information I

www.optimumfx.com

Page 2: Actionable information 1

Data…Data…Data == Good Information

Excessive data – Lack of information The right data – with drill down analysis

X

Actionable Information

Page 3: Actionable information 1

Actionable Information

1. What’s the right data to focus on the right areas?

2. How can this be categorised in a useful way? And Why?

3.How can we focus our efforts ?

?

Page 4: Actionable information 1

The right data – Overall?• Production lines are designed around a CRITICAL MACHINE which is the

slowest & typically most expensive item on the line - normally a filler / blow-fill

• Line performance is measured based on the performance of this machine i.e. if it is running, the line is running, if it is slow, the line is slow

• All other equipment should have the ability to run faster – than its neighbour (towards the Critical Machine)

• Plotting these speed values creates what is known as a V-curve (normally more like a tick )

• Lines have in-built accumulation to prevent machine stoppages immediately impacting the upstream machines

Page 5: Actionable information 1

Actionable Information

1. What’s the right data to focus on the right areas?

Causal (loss to critical machine

?

Page 6: Actionable information 1

Right data - Faults vs Machine stops vs Causal loss

Line Stoppage

Machine Stoppage

Fault Detail

Page 7: Actionable information 1

Right Stoppage Data?

Line Stoppage = Critical Machine Stoppage

WHY Stopped?

Due to another machine

True Causal Loss

Due to its own fault

Page 8: Actionable information 1

Right data - Changeover/Set-up?60,000

30,000

008:00 09:00 10:00 11:00 12:00

Time (hh:mm)

Spee

d un

its p

er h

our

07:00

Time 08:00 09:00 10:00 11:00 12:00

OEE 80% 0% 30% 60% 80%

Changeover Metric Description Value

Planned / Budget / Allowed Time Changeover time allocated in the production plan 90 mins

Target Time Best time possible 75 mins

Actual Time Time taken for last product in to first product out 85 mins

1st Hour OEE Measure of effectiveness of the changeover 50%

Changeover/ set-up time

NB – All values are example data to illustrate the metrics and the diagram is not to scale

Page 9: Actionable information 1

Right data - MTTR & MTBFIdentify MTTR (Mean Time To Repair) and MTBF (Mean Time Between Failure) Targets based on the Accumulation space between the Machines

MTTR of M2 < Accumulation SpaceWhere, Accumulation Space = Dynamic conveyor capacity (containers)

Speed of feeding machine (M1)

MTBF of M2 > Recovery time to nominal stateWhere, Recovery time = Accumulation Space

Speed differential (M2-M1)

M2M1

M1 M2Nominal State

Accumulation Full

Page 10: Actionable information 1

Actionable Information

1. What’s the right data to focus on the right areas?

Causal (loss to critical machine

Actual time

Machine stoppages

PDT/NOP

2. How can this be categorised in a useful way? And Why?

?