Activated sludge settling problem resolved. Al Parrella Western Lake Superior Sanitary District. Typical SVI values. 65-70 range (annual average). SVI values December-February (2012-2013). SVI values December-February (2012-2013). Trouble above this line. Problems in plant. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Activated sludge settling problem resolved

Activated sludge settling problem resolved

Al ParrellaWestern Lake Superior Sanitary

District

Page 2: Activated sludge settling problem resolved

Sludge storage

Anaerobic digesters

Flare

Duluth influentKnowlton sta. Influent (industrial flow)

Oxygen production

Liq. O2 storage

Unox reactors

Biofilter

Secondary settling tanks

Flocculation tanks

Multimedia filters

Chlorine contact tanks

Dechlorination

Effluent

Sludge thickeners

Boilers (LP steam)

Dewatering centrifuges Grit removal

Screening

Page 3: Activated sludge settling problem resolved

Typical SVI values

• 65-70 range (annual average)

Page 4: Activated sludge settling problem resolved

SVI values December-February (2012-2013)

Page 5: Activated sludge settling problem resolved

SVI values December-February (2012-2013)

Trouble above this line

Page 6: Activated sludge settling problem resolved

Problems in plant

• High sludge blanket levels• Thin sludge• Appearance of settleometer• Other indicators to follow:

Page 7: Activated sludge settling problem resolved

Return sludge solids concentration

Page 8: Activated sludge settling problem resolved

Thickened sludge solids concentration (sludge sent to digestion)

Page 9: Activated sludge settling problem resolved

Operating parameters, centrifugesMonth/parameter % capture Polymer dosage,

lb./ton active% cake solids

December 2012 85 56 24

January 2013 98 46 25

February 2013 98 49 26

Page 10: Activated sludge settling problem resolved

Operating parameters, centrifugesMonth/parameter % capture Polymer dosage,

lb./ton active% cake solids

December 2012 85 56 24

January 2013 98 46 25

February 2013 98 49 26

Problem

Page 11: Activated sludge settling problem resolved

What started it all?

• Problem with dewatering centrifuge polymer system

• Common to both centrifuges– Corrected early January

Page 12: Activated sludge settling problem resolved

SVI values December-February (2012-2013)

Mechanical problem repaired here

Page 13: Activated sludge settling problem resolved

SVI values December-February (2012-2013)

Mechanical problem repaired here

Activated sludge process adjustment made here

Page 14: Activated sludge settling problem resolved

Initial response to problem

• As plant became upset with recycled digested sludge, response was to increase the aeration units in service

• This may have been proper to address the amount recycled septic sludge entering the aeration system but caused a classic “low nutrient” problem when the recycle flow stopped

Page 15: Activated sludge settling problem resolved

My point:

• Even though mechanical problem was resolved in early January we still had deteriorating activated sludge problem because we had too many aeration units in service!

Page 16: Activated sludge settling problem resolved

Adjustment made to number of Unox reactors in service

Page 17: Activated sludge settling problem resolved
Page 18: Activated sludge settling problem resolved
Page 19: Activated sludge settling problem resolved
Page 20: Activated sludge settling problem resolved
Page 21: Activated sludge settling problem resolved

Result of taking reactor off line

• BOD was driven deeper into the basins• F/M increased (by roughly 25%)• Sludge regained its darker-brown color• SVI came within range and settling improved

in the nick of time (before the spring floods)

Page 22: Activated sludge settling problem resolved

Through it all

• Only effluent limit that we struggled with was phosphorus– But we met all limits