activities & plans 2007
DESCRIPTION
Activities & Plans 2007. Dijana Klaric Met service of Croatia RC LACE Project Leader. RC LACE report. Environment & R&D highlights Operations and Common actions From Evaluation 2 Future. LACE vs ALADIN. Regional Cooperation environment. Members: Au-Cr-Cz-Hu- Ro -Si-Sk - PowerPoint PPT PresentationTRANSCRIPT
08-11 Oct 2007 29th EWGLAM, Dubrovnik 1
Activities & Plans 2007
Dijana Klaric Met service of Croatia
RC LACE Project Leader
08-11 Oct 2007 29th EWGLAM, Dubrovnik 2
RC LACE report
Environment &
R&D highlightsR&D highlights
Operations and Common actions
From Evaluation 2 Future
08-11 Oct 2007 29th EWGLAM, Dubrovnik 3
Regional Cooperationenvironment
Members:Au-Cr-Cz-Hu-Ro-Si-Sk
Co-operation:R&D on meso-scale NWP
Operations
Common actions
RC LACE MoU RC LACE Budget
7 NWP teamsLACE MG Project Leader,
4 Working Group Leaders,
ALADIN SC, Data Manager
ALADIN partners
HIRLAM
SRNWP
08-11 Oct 2007 29th EWGLAM, Dubrovnik 4
2006/2007 ALADIN-LACE-HIRLAM actions
ALARO training at Radostovice, March 2007 14 participants -all LACE Members (+ MF, Be, PT, Mc + Denmark)
ALADIN-HIRLAM LAM-EPS WS (November 2006, Vienna)
GLAMEPS Project at ECMWF
SRNWP WS on Numerical tech. ( December 2006, Zagreb)
ALADIN-HIRLAM coordination on SURFACE and DA issues (SURFEX WS, SRNWP WS on DA)
ALADIN-HIRLAM general WSALADIN-HIRLAM general WS at Oslo April 2007at Oslo April 2007
Surface Assimilation (CANARI) WS at Budapest, Nov 2007
08-11 Oct 2007 29th EWGLAM, Dubrovnik 5
R&D overview
LACE Scientific Plans 2006; 2007 main input for ALADIN Scientific plans
IFS environment:
Arpege(Global) -Aladin(Alaro10km) -Arome (2.5km)
4 R&D working groups: Dynamics , Physics , Data Assimilation, Predictability
40 scientists: 7 NWP teams + visitors
25-30 person x month funds /year 2007
08-11 Oct 2007 29th EWGLAM, Dubrovnik 6
Physics (10km->5km) ALARO
ALARO-0, step 1 (system) Equations and interface (loss of mass due to precipitation
is considered ); Prognostic cloud water (microphysics 5 water species); Radiation –NER formulation; Turbulence (pseudo- prognostic TKE scheme); Cloudiness issue (improved optical properties, new
saturation cloud model) ALARO-0, step 2 (multi-scale, “grey-zone”)
Sub-grib scale convection - 3MT
3MT - Microphysics and TransportMicrophysics and Transport for SGS convection for SGS convection +Multiscale +Modular =3MT
08-11 Oct 2007 29th EWGLAM, Dubrovnik 7
ALARO Diagnostics
Model consistency and performance
(ALARO: more memory, less CPU – better optimized)
DDH tool for diagnostic (IFS basic, AAA developed)
Model comparison ALARO vs ALADIN Physics
ALARO –v0: operative at CZ, A, Be,..... (new ALADIN)
08-11 Oct 2007 29th EWGLAM, Dubrovnik 8
ALARO plans 2007->
Governing equations: extension to compressible case (NH)
Pseudo-prognostic TKE-scheme: new mixing length formulation; an 'analytical' CBR interpretation within p-TKE
Radiation: modularization,better aerosol model 3MT: validation and tuning, sensitivity to mid-
troposphere humidity , test of convection diurnal cycle, triggering of convection
(Team; JF Geleyn, JM Piriou, B Catry, L Gerard, R Brozkova, N Pristov, D Banciu ,M Tudor, F Vana, J Masek, J Cedilnik......)
08-11 Oct 2007 29th EWGLAM, Dubrovnik 9
ALARO-0 Project- Overview of R&D pxm o networking part only (fresh funds)o without home R&D , phasing and coordination efforts
Year ALADIN-2 LACE M F CHMI Flat-Rate FR/LACE Total
2004 1 1.5 2 2 6.5
2005 2.5 5.5 3 3.5 14.5
2006 1.5 5 2 1.5 3.5 13.5
2007 2 6 3.5 1.5 13
Total 5 pxm
18 pxm
7 pxm
7 pxm
7 pxm
1.5
pxm
45.5 pxm
08-11 Oct 2007 29th EWGLAM, Dubrovnik 10
R&D status
Results
NH ALADIN Dynamics 3D VAR DA (10km) Multi scale physics Meso-scale EPS
Operations (06/07) ALARO 10kn physics
LAEF
Desires
NH ALADIN -VFE Coupling 4D-VAR, Surface SURFEX
GLAMEPS (+)
08-11 Oct 2007 29th EWGLAM, Dubrovnik 11
GLAMEPS_v0- test phase
HIRLAM -66? members
ECMWF targeted singular vectors (TEPS)
OT - 24h
-3 TEPS domains
- 2 HIRLAM physics
- (10 memx2 mod x3domains)
ALADIN – 22 members
Downscaling of ECMWF EPS
22km/44km ALADIN lat/lon post-proc. (INM sys) Next step: ALADIN native
singular vectors (tests)
(OT =+12h, +24h)
08-11 Oct 2007 29th EWGLAM, Dubrovnik 12
Products
www.rclace.eu
ALADIN deterministic 7 ALADIN models + Global Verification package ALADIN Multi-grams
ALADIN pEPS
LAEF products Downscaling of ECMWF EPS(16+cont, 18 km)- EPS grams- Probability charts- StampsPlanned:- Multi-physics- Blending
08-11 Oct 2007 29th EWGLAM, Dubrovnik 13
FDP MAP D-Phase
MAP D-phase Demonstration Project (June-Nov 2007)
- Probabilistic hydrological and meteorological simulations for heavy rains and flood events
- Contribution of LACE via Austrian team
- ALADIN/Austria for deterministic products (ALARO phy)
(∆x= 9.6km, 45 levels, dyn. adaptation)
- ALADIN LAEF probability products (24h precipitation)
(∆x= 18km, 37 levels, 16 mem +contr. from ECMWF EPS)
- Disseminated to
MAP D-Phase center
08-11 Oct 2007 29th EWGLAM, Dubrovnik 14
RC LACEMonitoring of Observation Network
Non-GTS SYNOP DA ALADIN /HU 3D VAR DA Impact Study Data: SYNOP, TEMP,
AIREP,AMV,Wind pr, AMSU AB SYNOP Observation distribution Neutral impact
CANARI OI for surface assim.
LACE Data manager
08-11 Oct 2007 29th EWGLAM, Dubrovnik 15
LACE Evaluation
Project Evaluation after 10 year activities (1996-2006)- To give independent advices about future development
Recommendations To overcome the duplication of the operational efforts To suppress draining of resources on maintaining and downstream
applications. To provide small NWP centers with a complete NWP system.
Stronger governance: more working hours for LACE MG
TASK Sharing via Lead Centers: Operations and research
08-11 Oct 2007 29th EWGLAM, Dubrovnik 16
LACE Future 2008 ->
Action Plan for implementation of (Working Group)
Political decision for the closer operative cooperation (toward the Projects with operative deliverables)
Leading centers => Responsible center Bottom-up => Top-down planning Projects (priority list, deliverables, Responsible center)
New Management Group: PM, 4AL, ASC, DA
LACE MoU III (2008-2012) LACE 10-years strategy