Better Costing for Better Decisions
Wali Memon
![Page 2: Activity Based Costing](https://reader033.vdocument.in/reader033/viewer/2022050919/54795422b4af9fcc458b4610/html5/thumbnails/2.jpg)
��Not easily and conveniently traceable to cost objects
� Cost element is shared among cost objects
� Physically impossible to trace
� Not cost effective to trace
2
Indirect Costs
Wali Memon
![Page 3: Activity Based Costing](https://reader033.vdocument.in/reader033/viewer/2022050919/54795422b4af9fcc458b4610/html5/thumbnails/3.jpg)
��Need for allocation
� Estimate product or activity cost
� What does it really cost?
� Increase awareness of indirect costs
� Activities are not free
� Plan more cost efficient operations
� Now that we know what it costs, what should we do?
3
Indirect Costs
Wali Memon
![Page 4: Activity Based Costing](https://reader033.vdocument.in/reader033/viewer/2022050919/54795422b4af9fcc458b4610/html5/thumbnails/4.jpg)
�� Typical allocation methods
� Ability to bear
� Fairness or equity
� Benefits received
� Cause and effect
4
Allocation of Indirect Costs
Wali Memon
![Page 5: Activity Based Costing](https://reader033.vdocument.in/reader033/viewer/2022050919/54795422b4af9fcc458b4610/html5/thumbnails/5.jpg)
�� Indirect costs allocated to cost object based on the cost object’s consumption of some measure of activity, usually labor hours
5
Traditional Allocation Method
$10,000,000 total indirect cost400,000 total labor hours
= $25 per hour rate
A product consuming 6 labor hours would be charged $150 of indirect costs
Wali Memon
![Page 6: Activity Based Costing](https://reader033.vdocument.in/reader033/viewer/2022050919/54795422b4af9fcc458b4610/html5/thumbnails/6.jpg)
��Assumes all overhead is volume-related
� Factory-wide or departmental rates
� All related to single activity measure
�Departmental focus, not process focus
� Focus on costs incurred, not cause of costs
6
Criticisms of Traditional Overhead Allocation
Wali Memon
![Page 7: Activity Based Costing](https://reader033.vdocument.in/reader033/viewer/2022050919/54795422b4af9fcc458b4610/html5/thumbnails/7.jpg)
�� Purpose
� Allocation of indirect costs based on causal activities
� Attempts to identify “direct” link between cost and cost object
� Results in better allocation
� Does not provide “true” cost
7
Activity-Based Costing
Wali Memon
![Page 8: Activity Based Costing](https://reader033.vdocument.in/reader033/viewer/2022050919/54795422b4af9fcc458b4610/html5/thumbnails/8.jpg)
�� Traditional allocation method
�Activity-based allocation method
8
Activity-Based Costing
Costs Products
Costs ProductsActivities
First stage Second stage
Wali Memon
![Page 9: Activity Based Costing](https://reader033.vdocument.in/reader033/viewer/2022050919/54795422b4af9fcc458b4610/html5/thumbnails/9.jpg)
�� Identifies activities required to produce the product or service
�Determines the cost of the activities
�Allocates costs to the cost object based on the object’s consumption of activities
9
Overview of ABC
Wali Memon
![Page 10: Activity Based Costing](https://reader033.vdocument.in/reader033/viewer/2022050919/54795422b4af9fcc458b4610/html5/thumbnails/10.jpg)
��Not all costs are volume-related
� Unit level
� Batch level
� Product level
� Facility level
10
Levels of Cost Incurrence
Wali Memon
![Page 11: Activity Based Costing](https://reader033.vdocument.in/reader033/viewer/2022050919/54795422b4af9fcc458b4610/html5/thumbnails/11.jpg)
�
�Assign costs to activity pools
� First stage allocation
� Identify the costs incurred to perform various activities
�Determine the measure of activity best related to each cost pool
� Cost drivers
11
Operation of an ABC System
Wali Memon
![Page 12: Activity Based Costing](https://reader033.vdocument.in/reader033/viewer/2022050919/54795422b4af9fcc458b4610/html5/thumbnails/12.jpg)
��Determine rate per unit of activity
�Assign costs to products/services based on consumption of activities
� Second stage allocation
� Indirect costs are converted to direct costs
12
Operation of an ABC System
Wali Memon
![Page 13: Activity Based Costing](https://reader033.vdocument.in/reader033/viewer/2022050919/54795422b4af9fcc458b4610/html5/thumbnails/13.jpg)
�� Step 1 – Plan the system
� What are the goals?
� Inventory valuation
� Process improvement
� Foster active involvement
� Assemble cross-functional team
� Functional specialists
13
Implementing ABC
Wali Memon
![Page 14: Activity Based Costing](https://reader033.vdocument.in/reader033/viewer/2022050919/54795422b4af9fcc458b4610/html5/thumbnails/14.jpg)
�� Step 2 – Define, analyze activities and resources
� Decompose organization into elemental activities� Who does what, and why?
� Interview employees
�Determine resources
�Determine inputs and outputs
14
Implementing ABC
Wali Memon
![Page 15: Activity Based Costing](https://reader033.vdocument.in/reader033/viewer/2022050919/54795422b4af9fcc458b4610/html5/thumbnails/15.jpg)
�� Gather statistics on activities
� Inputs and outputs
� Transaction, duration, intensity
� For possible use as second-stage cost drivers
15
Implementing ABC
Wali Memon
![Page 16: Activity Based Costing](https://reader033.vdocument.in/reader033/viewer/2022050919/54795422b4af9fcc458b4610/html5/thumbnails/16.jpg)
�
� Step 3 – Establish activity cost pools and determine first stage allocation
� First stage allocations assign costs to cost pools
� Requires costs to be re-categorized according to why they are incurred, not by type
� Drivers may be employee time, square footage, etc.
16
Implementing ABC
Wali Memon
![Page 17: Activity Based Costing](https://reader033.vdocument.in/reader033/viewer/2022050919/54795422b4af9fcc458b4610/html5/thumbnails/17.jpg)
�� Step 4 – Determine second stage drivers and assign costs to cost objects
� Outputs of activity analysis may be second stage drivers
� Distance moved, times handled, machine hours, units, etc.
� Amount assigned to the cost object is the amount of activity consumed times the rate per unit of the activity
17
Implementing ABC
Wali Memon
![Page 18: Activity Based Costing](https://reader033.vdocument.in/reader033/viewer/2022050919/54795422b4af9fcc458b4610/html5/thumbnails/18.jpg)
��High amounts of overhead cost
�Multiple products
�Complex products
�Complex production system
� Significant variation in volume between high and low volume products
18
When is ABC Most Useful?
Wali Memon
![Page 19: Activity Based Costing](https://reader033.vdocument.in/reader033/viewer/2022050919/54795422b4af9fcc458b4610/html5/thumbnails/19.jpg)
��Different products place different demands on resources
� Problems with current cost allocations due to changes in products or processes
� Better cost information is needed
19
When is ABC Most Useful?
Wali Memon
![Page 20: Activity Based Costing](https://reader033.vdocument.in/reader033/viewer/2022050919/54795422b4af9fcc458b4610/html5/thumbnails/20.jpg)
��Natural extension of ABC
� Why are activities performed?� Are they necessary?
� Are they consistent with organizational goals?
� How are they performed?� Are they performed efficiently?
� Can they be redesigned or eliminated?
20
Activity-Based Management
Wali Memon
![Page 21: Activity Based Costing](https://reader033.vdocument.in/reader033/viewer/2022050919/54795422b4af9fcc458b4610/html5/thumbnails/21.jpg)
�� Focus on problems, opportunities
� Prioritize opportunities for improvement
� Most critical
� Greatest potential for cost savings
21
ABM for Process Improvement
Wali Memon
![Page 22: Activity Based Costing](https://reader033.vdocument.in/reader033/viewer/2022050919/54795422b4af9fcc458b4610/html5/thumbnails/22.jpg)
��Determine and explain causes for problems and opportunities
� Cannot improve the system without first understanding it
� Select specific improvement projects
22
ABM for Process Improvement
Wali Memon
![Page 23: Activity Based Costing](https://reader033.vdocument.in/reader033/viewer/2022050919/54795422b4af9fcc458b4610/html5/thumbnails/23.jpg)
��Use ABC/ABM data to test potential impact of changes
�Make changes
� Iterate
� Process of continual improvement
23
ABM for Process Improvement
Wali Memon
![Page 24: Activity Based Costing](https://reader033.vdocument.in/reader033/viewer/2022050919/54795422b4af9fcc458b4610/html5/thumbnails/24.jpg)
�
� Shifts focus from managing costs to managing activities
�Aids in recognizing, measuring and controlling complexity
� Promotes understanding of why costs are incurred
� Provides better cost allocation information
24
Implications of ABC/ABM
Wali Memon
![Page 25: Activity Based Costing](https://reader033.vdocument.in/reader033/viewer/2022050919/54795422b4af9fcc458b4610/html5/thumbnails/25.jpg)
�
�Useful for planning future operations
� Fosters continuous improvement
� Likely to meet with substantial resistance
� Analysis of why and how activities are performed
25
Implications of ABC/ABM
Wali Memon