Page 1: AD14 MGS Installation (Aramco Requirts)

AD14-MGS (2001-02)

AD14-MGS (2001-02) 28-Aug-02 11:32:01 AM

MGS view from vent line.JPG AD14 Mud gas separator.JPG MGS from rig floor.JPG

MGS from rig floor 1.JPG MGS mud return.JPG MGS top .JPG

MGS vent lines .JPG MGS view from rig floor.JPG MGS view from vdoor.JPG

Page 2: AD14 MGS Installation (Aramco Requirts)

X-Sender: [email protected] X-Mailer: QUALCOMM Windows Eudora Version 5.1 Date: Sat, 10 Aug 2002 14:44:29 +0300 To: maucuer gerard <[email protected]> From: "Yong Chiang Lee" <[email protected]> Subject: Re: Fwd: Re: Fwd: Re: Fwd: Re: Mud gas separator Gerard, Please see the attached picture with my feedbacks in blue. Cheers Yong Chiang At 08:52 AM 07-08-02 +0400, you wrote:

YCL, I had sent you this one before going on vacation, and didn't get any feedback. Pls could you confirm. Thks,

Date: Wed, 26 Jun 2002 08:39:21 +0400 To: "Yong Chiang Lee" <[email protected]> From: maucuer gerard <[email protected]> Subject: Re: Fwd: Re: Fwd: Re: Mud gas separator Very good, thks a lot. However I still have a few questions. See attacht. Referring to the CAD construction dwg sent earlier, I would have thought: - N1 (8") was the inlet from the K&C manifold, (Inlet from flowline, 8") - N2 (4") was a washing (after use) line, (Inlet from choke manifold,4") - N3 (10") was the vent - confirmed by photos (Yes) - N4 (8") was the mud seal - return to shakers (Yes) - N5 (10") : cannot find it on the dwg ??? (it is the 10" pipe inside the MGS, see Sect D of Fabtech drawing)Pls, confirm. At 10:27 PM 25-06-02 +0300, you wrote:

Gerard, Pictures of AD14 MGS as requested. These pictures were taken right after rig move. In some pictures you will notice that the line going from the flowline to the MGS had not been hooked up at the time the pictures were taken. regards Yong Chiang

__________________________________________________________________________________________________ Gerard Maucuer, Engineering Mng <mailto: [email protected]> Schlumberger Drilling Services, World Trade Center, Level 31, POB 9261, Dubai, United Arab Emirates Tel: +971.4.306.7777; DD: +971.4.306.7205 - Fax: +971.4.332.5036,  Cell +971.50.459.0600 (Time: GMT+4) ______________________________________________________________________________________________________________________ I understand that U.S. trade regulations prohibit certain transfers of U.S. technology technical data or software to U.S. embargoed states. I am aware of Schlumberger's Trade Control Policy and the OFS Export Administration procedures with respect to U.S. embargoed states and confirm that this transmission does not cause a prohibited transfer of technology technical data or software

Rig Manager (AD-4 / AD-14 ) Arabian Drilling Company P.O.Box 708, Dammam 31421, Kingdom of Saudi Arabia Tel: +966-3-3301152 (ext 228) Fax: +966-3-3300624

AD14 MGS hook-up1.doc

Page 1 of 1Yong Chiang Lee, 02:44 PM 10-08-02 +0300, Re: Fwd: Re: Fwd: Re: Fwd: Re: Mud gas...

28-Aug-02Printed for maucuer gerard <[email protected]>

Page 3: AD14 MGS Installation (Aramco Requirts)

Return to shakers providing mud seal/leg (YES, 4”)

What are these connections for? (Inlet from flowline, 8”)

Assume this is connection to K&C manifold (YES)

Where & how is this vertical line ending? (2 feet off the ground, with a butterfly valve at the end, for drain, clean)

Why 2 vent lines? (Aramco requirement – 8” x 400 ft length each)

Page 4: AD14 MGS Installation (Aramco Requirts)
Page 5: AD14 MGS Installation (Aramco Requirts)