adam boskovic nirbir kaur sibia darryl trotter peter scrimizzi jennifer van den bussche main menu...

50
Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi MAIN MENU •STRUCTURAL SYSTEM •STRUCTURAL SYSTEM •STRUCTURAL SYSTEM ONSTRUCTION PROCESS •ENVELOPE SYSTEM •CONSTRUCTION PROCESS •CONSTRUCTION PROCESS •ENVELOPE SYSTEM •ENVELOPE SYSTEM •SCHEMATIC DESIGN LAYOUT •STRUCTURAL SECTIONS & SIZES www.covers-timber-structures.l.../ glulam.htm www.lbstructures.co.uk/ metspan.htm www.superiorconcreteco.com/ tiltwall.html STEEL TIMBER CONCRETE

Upload: avery-grimshaw

Post on 31-Mar-2015

218 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

Adam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

MAIN MENU

•STRUCTURAL SYSTEM

•STRUCTURAL SYSTEM•STRUCTURAL SYSTEM•CONSTRUCTION

PROCESS

•ENVELOPE SYSTEM •CONSTRUCTION PROCESS

•CONSTRUCTION PROCESS

•ENVELOPE SYSTEM•ENVELOPE SYSTEM

•SCHEMATIC DESIGN LAYOUT •STRUCTURAL SECTIONS & SIZES

www.covers-timber-structures.l.../

glulam.htm

www.lbstructures.co.uk/metspan.htm

www.superiorconcreteco.com/

tiltwall.html

STEEL

TIMBER

CONCRETE

Page 2: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

Adam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

STEEL STRUCTURAL SYSTEM

Steel construction is used for the majority of single-storey buildings, due to the ability to design relatively light, long span, durable structures in steel which are easy to erect safely and quickly. The most common type of structure and in the projects case is the simple rectangular single-storey structure, which provides a weatherproof and environmentally comfortable space for carrying out manufacturing or for storage.

PREVIOUS MAIN MENU NEXT

http://www.kleuven.ac.be/bwk/materials/Teaching/master/

www.unige.ch/cuepe/idea/_buildings/b_080/visi/page_03.htm

www.steelstructureskenya.com/

toc.htm

http://www.kuleven.ac.be/bwk/materials/Teaching/master/wg14/l0200.htm

Page 3: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

Adam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

The optimum span of steel ranges from 15-40m. This is because of a high weight to span ratio. Steel portal frames can be heavy,this can be reduced by using lattice girder systems, which use much less steel, however the cost goes up due to manufacturing. Spans can be increased with additions of universal beam webs, providing pans up to 60m making it increasingly popular with industrial warehouse construction. Compared to other materials, particularly reinforced or prestressed concrete and timber, steel has major advantages. Steel has a high tensile and compressive strength, which enables steel buildings to be of relatively light construction. Steel is therefore the most suitable material for long-span roofs as they can also be modified easily for extension or change of use due to the ease with which steel sections can be connected to existing work.

STEEL STRUCTURAL SYSTEM

PREVIOUS MAIN MENU NEXT

http://www.kleuven.ac.be/bwk/materials/Teaching/master/

http://www.kleuven.ac.be/bwk/materials/Teaching/master/

http://www.kuleven.ac.be/bwk/materials/Teaching/master/wg14/l0200.htm

Page 4: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

Adam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

The structure of a steel building, especially of an industrial building, is quickly erected and clad, providing a weatherproof envelope which enables the floor and installation of services and internal finishes to proceed at an early stage. Since the construction schedule is always tied to the earliest handover date fixed by production planning, time saved in construction is usually very valuable. In a dry closed environment steel does not rust, and protection against corrosion is needed only for the erection period. For other environments protection systems are available, which, depending on cost and suitable maintenance, prevent corrosion adequately.

STEEL STRUCTURAL SYSTEM

PREVIOUS MAIN MENU NEXT

Diagram from Jeremy Ham Lecture power point

http://www.kuleven.ac.be/bwk/materials/Teaching/master/wg14/l0200.htm

Page 5: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

Adam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

The two most popular arrangements of steel framing are the portal frame with pinned bases, if there is no crane to be supported, and the fully rigid portal frame, which is often used if there is a crane. These forms are both functional and economic. In- plane stability is derived from the provision of moment-resisting connections at the top and at the beam-to-column connections for the first situation and also at the base in the second one. Because of its economy, the most widely used building shape is the pin-based single or multi-bay pitched roof portal frame, typically of 20-40m span at 6m centres. Hot-rolled I, welded or cold-formed sections are usually used for the members.

STEEL STRUCTURAL SYSTEM

PREVIOUS MAIN MENU NEXT

http://www.kleuven.ac.be/bwk/materials/Teaching/master/

http://www.kleuven.ac.be/bwk/materials/Teaching/master/

http://www.kleuven.ac.be/bwk/materials/Teaching/master/

http://www.kleuven.ac.be/bwk/materials/Teaching/master/

http://www.kuleven.ac.be/bwk/materials/Teaching/master/wg14/l0200.htm

Page 6: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

Adam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

When hot-rolled sections are used, haunches are usually provided at the eaves and the ridge. These haunches deepen the overall section, thereby reducing bolt forces. By extending the haunched regions along the rafter the frame is also strengthened and stiffened.

STEEL STRUCTURAL SYSTEM

PREVIOUS MAIN MENU NEXT

Diagram from Jeremy Ham Lecture power point

http://www.kleuven.ac.be/bwk/materials/Teaching/master/

http://www.kuleven.ac.be/bwk/materials/Teaching/master/wg14/l0200.htm

Page 7: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

Adam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

During recent years an increasing use of welded sections has occurred. This increase is the result of progress achieved in making welding automatic and the ability to adapt the cross-section to the internal forces. The ability to vary web thickness, flange dimensions and section depth results in high material efficiency. Deep slender sections are used to maximise economy. In addition to material economies there are benefits in reduced deflections resulting from the high in-plane stiffness of the deep sections.

STEEL STRUCTURAL SYSTEM

PREVIOUS MAIN MENU NEXT

http://www.kuleven.ac.be/bwk/materials/Teaching/master/wg14/l0200.htm

Page 8: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

Adam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

The overall resistance of simple single-storey industrial buildings to horizontal loading is usually easy to achieve. One of the attractions of portal frame buildings is that in-plane stability follows from the rigidity of the frame connections. Bracing members for industrial buildings commonly use circular hollow sections, rods or angles. Bracing in one end bay may be sufficient. For longer buildings, bracing of two or more bays may be necessary. The rafter bracing itself provides restraint to the heads of the gable stanchions. The braced end bays provide anchor points to which the longitudinal rafter stabilising ties, which are usually the purlins, are attached. During erection, bracing facilitates plumbing and squaring of the building, as well as providing essential stability.

STEEL STRUCTURAL SYSTEM

PREVIOUS MAIN MENU END OF STEEL STRUCTURAL SYSTEM RETURN TO MAIN MENU

http://www.kuleven.ac.be/bwk/materials/Teaching/master/wg14/l0200.htm

Page 9: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

Adam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

Concrete panels can be used either as cladding to the building, or as part of the load bearing structure, supporting roof and wind loads,

CONCRETE TILT UP STRUCTURAL SYSTEM

MAIN MENU NEXT

Cement &concrete assoc of Australia briefing 8-1-03

Cement &concrete assoc of Australia briefing 8-1-03

Page 10: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

Adam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

The erection of the tilt up structural system incorporates the simplicity of the erection of the steel and timber portal frames. The concrete panels are lifted into position on the provided strip footings and temporarily braced.

CONCRETE TILT UP STRUCTURAL SYSTEM

However it isn’t this process of the structural system that most attention is paid to but rather the joint detailing, incorporation of steelwork and bracing aspects of the system in order for it to function as an effective structural system.

PREVIOUS MAIN MENU NEXT

www.superiorconcreteco.com/

tiltwall.html

Cement &concrete assoc of Australia briefing 8-1-03

Page 11: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

Adam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

When using concrete tilt up panels as a core structural material for warehouse construction, windows and other openings need to be considered when positioning joints within the concrete panels. Unlike a metal or timber based cladding material that is positioned on top of steel or timber portal frames with little regard for joints within these materials, concrete panels need to be of sufficient width and depth in order to contain sufficient strength as not to break around openings. Joints need to be kept to a minimum, however due to tilt up providing best results in large construction this is rarely achieved.

CONCRETE TILT UP STRUCTURAL SYSTEM

PREVIOUS MAIN MENU NEXT

Cement &concrete assoc of Australia briefing 8-1-03

Page 12: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

Adam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

CONCRETE TILT UP STRUCTURAL SYSTEM

Joints at corners of the tilt up system need special attention and in majority of cases oversail joints are required, however this method may be unacceptable, as it requires showing a panel end on the façade.

PREVIOUS MAIN MENU NEXT

Oversail edge on structures front may be unattractive

Cement &concrete assoc of Australia briefing 8-1-03

Page 13: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

Adam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

CONCRETE TILT UP STRUCTURAL SYSTEM

To allow for a uniform wall appearance and treatment mitered joints are preferred, however these joints are susceptible to damage and impose greater restrictions on tolerances. A simple edge detail known as a chamfer is therefore required at the edges of panels reducing the chances of concrete being broken away from a panel.

For joints to be a successful part of the structural system they need to be between 15-25mm, allow for slight movement between panels and be weather proof. A disadvantage of tilt up construction as opposed to steel of timber portal frame methods is thatif attention isn’t paid to the minor details of the panels damage is inevitable.

PREVIOUS MAIN MENU NEXT

Cement &concrete assoc of Australia briefing 8-1-03

Page 14: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

Adam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

CONCRETE TILT UP STRUCTURAL SYSTEM

A major advantage of the tilt up structural system is the incorporation of steelwork into the structural development. Steel rafters that are situated on the panels is known as racking, this method provides many advantages. Using panels as load-bearing elements generally reduces the overall cost of construction due to a decrease in the weight of structural steelwork required. Eliminating the columns that steel and timber portal frames contain usually provides greater savings. Also, in terms of the programming, the panels can be cast and erected prior to the delivery of steelwork, allowing time for fabrication of the steelwork.

PREVIOUS MAIN MENU NEXT

Cement &concrete assoc of Australia briefing 8-1-03

Page 15: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

Adam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

CONCRETE TILT UP STRUCTURAL SYSTEM

Unfortunately the concrete tilt up system may be prone to progressive collapse, and redundancy needs to be incorporated into the structural system that provides stability and robustness. For instance, the failure of a single bracing member due to an event such as a fire, accident or abuse, should not lead to the collapse of the building. As a result of this more bracing members as opposed to steel and timber portal frames is needed.

PREVIOUS MAIN MENU NEXT

Cement &concrete assoc of Australia briefing 8-1-03

Cement &concrete assoc of Australia briefing 8-1-03

Bay roof bracing

End walls act as shear walls to accommodate loads

Cement &concrete assoc of Australia briefing 8-1-03

Page 16: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

Adam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

CONCRETE TILT UP STRUCTURAL SYSTEM

If erection, joints, incorporation of steelwork and bracing is attended to in detail then the tilt up structural system provides many positive aspects in relation to other methods of framing such as steel and timber portal.  

•Economy. In areas where tilt-up design and construction expertise is available—particularly a trained crane and rigging crew—tilt-up has proven to be more economical than competing construction methods for similar types of buildings •Speed of Construction. From the time the floor slab is placed, the typical elapsed time from starting to form the panels until the building shell is completed is 4–5 weeks. •Fire Resistance. Concrete is an obvious first choice for fire resistance. A typical 150mm thick wall, for example, has a 90-120minute fire resistive rating. •Low Maintenance Costs. About the only thing needed is a coat of paint every 6–8 years. •Low Heating/Cooling Costs. The insulation value for tilt-up concrete often exceeds steel, masonry and wood frame construction. Tilt-up walls can be economically insulated to give higher insulation values. •Expandability. By planning for the possibility of expansion, panel connections can be designed so the panels can be detached and relocated.

PREVIOUS MAIN MENU END OF CONCRETE TILT UP STRUCTURAL SYSTEM RETURN TO MAIN MENU

Cement &concrete assoc of Australia briefing 8-1-03

Page 17: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

Adam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

TIMBER STRUCTURAL SYSTEM

The use of timber as a material in warehouse construction provides the designers with a wide range of structural systems to employ. Whilst steel and concrete construction have been introduced and well accepted, timber has maintained its many advantages as a structural system including, aesthetic appeal, availability, workability and high strength to weight ratio. Also composite construction combining concrete/timber and steel/timber can prove to be effective design solutions.

MAIN MENU NEXT

Cover of NAFI manual

NAFI manual

Page 18: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

Adam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

TIMBER STRUCTURAL SYSTEM

Although steel and concrete are relatively new forms of construction adapting a lot of the industries advanced technology, timber so to has implemented new technologies as well as products such as plywood, laminated veneer lumber and glued laminated timber that has significantly broadened the versatility of the timber structural system.

PREVIOUS MAIN MENU NEXT

NAFI manual

Plywood sections

www.covers-timber-structures.l.../

glulam.htm

NAFI manual

Page 19: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

Adam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

TIMBER STRUCTURAL SYSTEM

Definitely the simplest form of timber construction mimics that of a steel portal frame. A timber post and beam portal frame is made up of beams and post, where roof loads are traditionally transferred down post and into appropriate footings. Much like a steel portal, roofing materials are supported by purlins spanning between beams and conventional girts support wall claddings.

PREVIOUS MAIN MENU NEXT

NAFI manual

NAFI manual

Page 20: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

Adam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

TIMBER STRUCTURAL SYSTEM

The most practical and cost competitive timber portal system for rectangular or square warehouse design is portals with nailed gusset plate joints at knees and apex. Straight or tapered sections are used for the columns and rafters with the advantages of ready availability, ease of transport and simple and economical erection. The latter advantage is experienced due to the large amount of experienced timber tradesmen. Unlike steel and concrete structural systems where only a minority of skilled labour exists, timber labour is easily found.

PREVIOUS MAIN MENU NEXT

NAFI manual

NAFI manual

Page 21: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

Adam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

TIMBER STRUCTURAL SYSTEM

The timber portal frame system is disadvantages in a sense, compared to steel as timber has lower modules of elasticity therefore deflections are more significant. If these deflections are not considered then permanent damage to the structural system and overall structure will occur.

PREVIOUS MAIN MENU NEXT

Typical frame bending moment diagram

Damaged cladding

Pooling water

NAFI manual

Page 22: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

Adam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

TIMBER STRUCTURAL SYSTEM

Timber portal frames as a structural system challenge both steel and concrete construction with regards to cost, spanning potential, workmanship and ease of fabrication. However there are a number of other advantages of this structural system.  ·        Timber buildings can be adaptable in regards to their changes in use. Timber contains several of attributes that allow it to adapt with little or no risk for example a change in use from a storage warehouse to a chemical storage warehouse. Concrete and steel are susceptible to chemical attack where as timber is resistant to chemical attack. ·        Unlike other forms of construction, in particular the tilt up system, timber portals are able to tolerate relatively large movements such as one experienced due to reactive soils. While other structural systems may deform and break, timber will generally cope. ·        When the timber portal structural system is clad or attached to it is a multi story office building these assist greatly in providing high strength and rigidity in transferring lateral loads. ·        Although steel and concrete are available in standardized form and are suitable for many structures, the various properties amongst different timber species enables the selection of specific species that will suit the needs of a specific structural system.

PREVIOUS MAIN MENU NEXT

NAFI manual

Page 23: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

Adam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

TIMBER STRUCTURAL SYSTEM

MAIN MENU END OF TIMBER STRUCTURAL SYSTEM RETURN TO MAIN MENU

Through critical analysis of a number of structural systems that are appropriate for warehouse construction,the method that our group believes will effectively succeed in the construction of the warehouse project is a standard rigid portal frame, clad with architectural foam core panels developed by borrel in conjunction with BHP. The report outlines the positive aspects of such a structural system.

the shared party wall between the office and warehouse will be concrete tilt up panel as this provides adequate sound and thermal insulation as well as a sufficient fire barrier between the two sections.

Page 24: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

Structural Systems

Adam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

Two major types of wide span construction are COLUMN AND BEAM or CONCRETE PANELS

There are many different styles of column and beam construction which has evolved over the years. We based our research on the most popular of the column and beam,

the Portal Frame.

With links to:

StructureProcess

chart

With links to:

StructureProcess

Chart

MAIN MENU NEXT

Page 25: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

Structural Systems

Adam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

STEEL COMPARED TO TIMBERWe found it difficult to locate factories constructed from timber portal frames. In a country such as Australia with

plenty of natural and renewable resources, this seems a silly situation. Perhaps due to the extra depth of members which eat into valuable internal space, although this does not affect so much because of the placement of timber purlins. Maybe because steel can span further at a lower pitch due to the elasticity of timber. Maybe it

is good marketing on behalf of the steel companies. Perhaps laminating and finger jointing methods are a relatively new industry.

The main difference between timber and steel structural system is the

joint connection and the purlin connection. Steel purlins sit on top of the rood and timber purlins sit in

between. Although there are no limit to the alternatives.

Top chord supported timber truss purlins between steel UB

rafters.Timber truss girts external of column supported by cleats

PREVIOUS MAIN MENU NEXT

Page 26: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

Process - Portal FrameAdam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

Portal Frame construction can be a very flexible process in that the development can take a number of sequences depending on a number of factors, including site restrictions, time and economic

viability. The following pages will explore a few examples.

Footings are the main load bearing points of the building transferring main loads directly to the foundations below.

Site excavation and footings are always dug and poured first.

Pad footings are usually used for point loads such as column bases. Strip footings can be used in conjunction with pad footings for applications such as masonry veneer.

FOOTINGS

PREVIOUS MAIN MENU NEXT

Page 27: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

Process - Portal Frame Adam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

Steel or timber members are usually delivered to site prefabricated and ready to be assembled into the final product in a variety of orders.

Members are usually bolted together using the prefabricated plates and corresponding holes. They can be welded but this process cost time and requires added equipment and skilled labour.

BOLTED JOINTS

PREVIOUS MAIN MENU NEXT

Page 28: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

Process - Portal FrameAdam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

Slabs poured first can be beneficial for a working surface such as assembling rafters or as in the instance below, carrying out alterations after the building works have begun. Care must be taken to

not damage the concrete with loads heavier than the slab is designed for.

Columns are raised singularly and bolted to tie downs in footings. On smaller jobs, this

process can be performed safely by two

man teams

PORTAL ASSEMBLY ALTERNATIVE 1.

Bracing

Tie Down Rods

PREVIOUS MAIN MENU NEXT

Page 29: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

Process - Portal FrameAdam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

Rafters are then raised as one unit

ALTERNATIVE 1. SUMMARYCrane hire would increase in time but reduce in necessary

size capacity.Labour would also increase in

time but be reduced in intensityOverall site time seems to take

the longest in this process.

PORTAL ASSEMBLY ALTERNATE 1.

Rafters are bolted at the apex, lifted into place as one rafter and attached to the columns. This particular roof had been bolted

and erected but had been taken down and had webs welded on to create a truss to support the roof of the factory in the

background. These were late alteration to the original design which were permitted due to the bolted construction.

Portals can also be raised as one unit with both columns and rafters pre-assembled.

PREVIOUS MAIN MENU NEXT

Page 30: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

Process - Portal FrameAdam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

The entire roof can be assembled as one unit with beams and purlins and raised in blocks to be attached to the already standing columns.

If safety mesh and sarking was also installed prior to

roof lift, this would save on the labour and safety

costs of installation at a much greater height.

PORTAL ASSEMBLY ALTERNATE 2.

ALTERNATIVE 2. SUMMARY

Crane hire would increased dramatically for the duration of the roof lift, but be for a

much shorter duration. It would also require plenty

of room on site. Cover of NAFI manual

PREVIOUS MAIN MENU NEXT

Page 31: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

Process - Portal FrameAdam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

PORTAL ASSEMBLY ALTERNATE 3.

Another system which has been recently developed but not used much in our local area, is

the portal frame with a pin knee joint which is connected to the column, the rafters rigidly bolted

together and the frame raised as one.

This process works with both timber and steel portal frames. The portals can be lifted as a single

unit, or the whole roof can be assembled and blocks of entire structural portal raised in one fluid

motion.

One problem encountered with this system is that as the columns are dragged along the ground to a vertical position, hold down bolts can be bent out

of shape and slabs can be damaged.

ALTERNATIVE 3. SUMMARYSpecial engineering would be required to

calculate the extra force placed on the columns and pin knee joint. This added cost may be

outweighed by the erection speed, especially if the roof cladding is installed prior to lift. .

Diagram from Jeremy Ham Lecture power point

PREVIOUS MAIN MENU NEXT

Page 32: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

Process - Portal FrameAdam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

The slab pouring process can be poured first, middle or last, depending on design and conditions

Whether the veneer is iron, masonry or concrete, the slab can go last if the columns are not resting directly on top. This creates a solid seal between cladding and slab for weather and rodent proofing. If the roof cladding is installed early, then the slab is protected from weather and can be poured at any time, thus saving any possible weather delays.

PORTAL ASSEMBLY ALTERNATE 4.

PREVIOUS MAIN MENUEND OF PORTAL FRAME CONSTRUCTION PROCESS RETURN TO MAIN MENU

Page 33: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

Process Concrete Tilt UpAdam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

CONCRETE TILT UP BASIC ELEMENTS

This process consists basically of footings (pad or strip), a slab, and tilt panels manufactured either off or on site, raised in place with a crane to form the walls. This usually requires good site access and height clearance. The panels can be load bearing to support the roof or upper floors, or non-

load bearing and used for aesthetics or on lower panels for safety and security reasons.

Load Bearing Panels with beam

attached directly to concrete panel via

cleat cast or bolted into panel with

ferrules (pictured above)

Non-load bearing panel fastened to portal frame via ferrules

MAIN MENU NEXT

Page 34: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

Process Concrete Tilt UpAdam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

PRE FABRICATED VERSUS ON SITE FABRICATION

If the construction time required is short, then prefabricated is the

better option. However, site access would have to be fairly good to allow for placement of panels in a position close enough to panel lifting point. Quality is usually more controlled in a factory environment with greater accuracy. This is more expensive material wise but much less labour

intensive.

Panels poured on site is a slower construction process as panels need curing time in between pours to gain strength for lifting which puts huge stresses on lifting points and ties up valuable site

working space. It also requires good weather which is not always guaranteed in our climate. They can be poured separately over the whole slab (the slab must have good quality finish), or they can be stack cast. Due to the heavy loads, they may require a

thickening of the slab, or even a temporary separate slab. Bond breakers (required to stop panels

sticking to slab) may also have an effect on later applied finishes such as paint. There are also no transport restrictions so size limitations are limited

to structure.

www.innovation.org.au/transtilt.html

Lifting Lug

MAIN MENU NEXTPREVIOUS

Page 35: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

Process Concrete Tilt UpAdam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

PROCESS ADVANTAGES

Whilst waiting for later applied structural elements to stabilise the building, temporary props are used on either side of the panel.

Tilt panels do not require outside access so they can be placed almost hard up against an existing

building. This is also viable because of it’s high fire rating quality

PROCESS DISADVANTAGES

Panel edges are usually chamfered to prevent damage such as this occurring. However concrete is brittle and will be

damaged if care is not taken.

MAIN MENU NEXTPREVIOUS

Page 36: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

Process Concrete Tilt UpAdam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

PROCESS ALTERNATIVES

Similar to Portal Frames, this process can be altered allowing much flexibility in process. The panels can be placed on top of the footings and the slab poured up to the wall allowing

flexibility on a sloped site and creating a nice finish inside.

Panels placed on top of strip footings first which

allows the slab to be poured last. This creates a nice

solid finish. In this case, the footings

were poured, then the slab and then the wall panels

were erected. The panels had no influence on the

slab via connection.

MAIN MENU NEXTPREVIOUS

Page 37: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

Process Concrete Tilt UpAdam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

PROCESS ALTERNATIVESThis is a panel with footings only at the support

points. This is allowing for late addition of services which reduces possibility of damage by plant. Notice the FFL is above the level of holes which allow for grouting after the Y bars are in

place.

MAIN MENUEND OF CONCRETE TILT UP CONSTRUCTION PROCESS RETURN TO MAIN MENU

PREVIOUS

Page 38: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

PLANSAdam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

Click to view plans in further detailMAIN MENU

Page 39: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

ENVELOPE SYSTEMSAdam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

TILT UP CONCRETE PANELSTilt up panels are being use quite a lot in resent years for outer wall

cladding on factory walls and office spaces the concrete is a reliable and durable construction material it can be poured on site or off and transported to the site the extra cost of pre-cast is the time saving the decision to pour on site or off as both have for and against points this will be determined by the restrains of the contract and the working environment i.e. sloping site

area over head wires.The size of the site may also determine the height of the panels needed. When erecting on a boundary the erecting process needs to be carefully

analysed and consideration for water proofing, jointing, flashing.Crane size should also be considered.

Advantages the panels can be made to order for flexible applications can eliminate columns but extra roof bracing is required, a variety of finishes

can be added and it has a good Fire ratting.

Disadvantages are that once it is erected it is hard to change chipping can occur on the edges and extra cost for experienced labour. A more complex planing of execution and delivery for precast and large spaces needed for on site pouring and time needed for curing a minimum of 28 days. And measurements need to be exact.

MAIN MENU NEXT

Page 40: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

ENVELOPE SYSTEMSAdam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

WALLING AND ROOFING

Foam core cladding panels : foam core cladding panel are a light weight composite building material the is made up of two colour bond sheets which

are pre-painted and are glued to an inner foam core. The foam can be of made from polystyrene or polyurethane depending on the application of the product or the proposed design. The panels range in thickness of 50mm p

to 200mm and are pliable enough to be moulded or cranked to most architectural forms.

1. The structural steel base 2. Zinc/aluminium alloy coating3. A conversion layer chemically applied to enhance coating adhesion 4. A corrosion inhibitive primer is baked onto the surface 5. A durable, exterior grade  top-coat is baked on.

FireClad® and Firestop® are registered to Boral Australian Gypsum Limited.

The distinct advantage with the foam core is it insulating properties it resistance to weathering and the large rang of aesthetic colours, the disadvantage is the specialized fixing required and the cost and it is more suited to areas that need climate controlled spaces. Must be layed on a pitch greater than 5º

MAIN MENU NEXTPREVIOUS

Page 41: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

ENVELOPE SYSTEMSAdam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

FIRE CLAD

Fireclad® Exterior Wall System is a fire rated commercial walling system developed by Boral and refined in association with BlueScope Steel that adheres to the fire rating codes. The manufacturers clam that it can save

up to 25% on wall thickness comparing with tilt up construction for the same fire rating. As it is attached to girts and purlins in a similar fashion to

that of traditional sheet cladding it is quick and easy to install.The system, which complies with the Building Code of Australia, provides

external fire resistance of either 60, 90 or 120 minutes.

Easy to install where proximity to adjoining buildings prevents conventional construction

Lightweight - less load on foundations and easy to handle Ideal for refurbishments and building upgrades

Cost savings - In situations where half the external wall area of a building requires a fire rating, an independent cost

analysis by Rider Hunt quantity surveyors indicates savings of 25% can be made on core building elements when FireClad® is used compared with conventional tilt-up

construction

www.lysaght.com

MAIN MENU NEXTPREVIOUS

Page 42: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

ENVELOPE SYSTEMSAdam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

LYSAGHT CUSTOM ORB

This is a corrugated profiled sheet of colour bond sheeting suitable for both wall and roof clawing with design aspects for lite traffic.

Advantages: easy to align, lite, durable, quick and easy to install. It comes in a large range of colours if damaged easy to replace and extend. It has a relatively large spaning capacity in relation to supports. Can be made to

length of up 24m. Disadvantages: Hard to install in high wind low insulation properties, can

corrode if in contact with dissimilar metals, short life span in relation to other materials.

www.stratco.com.au

MAIN MENU NEXTPREVIOUS

Page 43: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

ENVELOPE SYSTEMSAdam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

D3-COMTEX This is a James Hardie, facade product it is constructed with 9mm fibre cement. With new innovation in these products the edges have rebates on each side to

allow for seamless jointing. This product comes with a 5 year warranty. Advantages: aesthetic finish, easy installation. Comes in large sheets of 3×6m

sheet

Top-dek is a Stratco roofing product it has a 50mm profile and come in width of 700mm sheet are rolled to length. Anything over 10m. will require special

transport and min made lengths are 1.2m must be layed at pitch greater than 1º. Made from high tensile 550 MPa steel.

Advantages: easy to handle for installation, the clipping system eliminates the need for washers and thus reduces the chance of rain penetration. Cold rolled

for extra strength Disadvantages: not suitable for steep pitches and is not able to be cranked.

TOP-DEK

www.infolink.com

MAIN MENU NEXTPREVIOUS

Page 44: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

ENVELOPE SYSTEMSAdam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

ALSYNITE ULTRA FIBRE GLASS

Made by Laserlite Australia Ltd. is a translucent roof sheeting for industrial application it come in a wide range of

colours clear and opal. It is available with fire and corrosion resistant retardants. profiles – 1800gsm/m2 to 4880gsm/m2.

Lengths as required

www.infolink.com.au

MAIN MENU NEXTPREVIOUS

Page 45: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

ENVELOPE SYSTEMSAdam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

PURLINS AND GIRTS

Lysaght SupaZed and Lasagyht SupaCee purlins are another Bluescope product there clam is that they out preform any other purlin on the market per

weight of steel. The clam comes from the design with a ribbed web and curve lip in the c and z sections this gives extra strength there fore longer spaning

capacities

www.lysaght.com

MAIN MENU NEXTPREVIOUS

Page 46: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

ENVELOPE SYSTEMSAdam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

PERMAGAL PURLIN

Permagal purlins have been producing heavy duty purlins since 1997, they are

designed to fill the void in areas subject to corrosion i.e swimming pools, as they are hot dipped galvanised section Permagal

Purlins are available in standard web heights from 100mm to 300mm.They are

also available in 1.9mm, 2.4mm and 3.0mm steel thickness. Special

arrangements can be made where thicker or non-standard thickness is require.

Available in z and c sections.

www.infolink.com

MAIN MENU NEXTPREVIOUS

Page 47: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

ENVELOPE SYSTEMSAdam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

ROOF MESH

Waratah Roof safe safety, it is designed to cover the entire roof once the purlins have been placed. The product specific purpose is to stop people from falling through when installing

the roof . Waratah roofing mesh conforms to all required standards and comes in two sizes.

Description Unit

1800 x 300 x 150 x 2mm 50 meter roll

1800 x 300 x 150 x 2mm Variable meters

www.infolink.com

MAIN MENU NEXTPREVIOUS

Page 48: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

ENVELOPE SYSTEMSAdam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

WINDOWS

Lidco: 50mm Perimeter framed / non ventilating Windows

The window system is designed for low medium commercial buildings there are able to be link

vertically and horizontally to provide a continuos run of windows. The aluminium sash is designed to cater for glazing from 4mm to 10mm, there is also a double glazing option,with a 25mm gap with a further option of an internal vertical blind

system.

www.lidco.com.au

MAIN MENU NEXTPREVIOUS

Page 49: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

ENVELOPE SYSTEMSAdam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

INSULATION

PermaStop Is made Insulation solutions it is

designed for industrial and residential application for insulation of sheet

roofing and sheet walling, it also acts as a water barrier. It comes in a range of sizes and thickness from R 1.5 to

R2.5 Also a very affective moisture barrier.

www.infolink.com

MAIN MENU NEXTPREVIOUS

Page 50: Adam Boskovic Nirbir Kaur Sibia Darryl Trotter Peter Scrimizzi Jennifer van den Bussche MAIN MENU STRUCTURAL SYSTEM CONSTRUCTION PROCESSCONSTRUCTION PROCESS

REFERENCESAdam Boskovic

Nirbir Kaur Sibia

Darryl Trotter

Peter Scrimizzi

Jennifer van den Bussche

•BCA

•NAFI MANUALS

•TIMBER MERCHANTS ASSOCIATION

•BHP BLUESCOPE

•JEREMY HAM LECTURE NOTES

•http://www.kuleven.ac.be/bwk/materials/Teaching/master/wg14/l0200.htm (STEEL RELATED WEBSITE)

MAIN MENUPREVIOUS