Page 1 of 6 ADDENDA #01 PROJECT: Mount Allison University Gairdner Renovations Project PROJECT N o : CFEI-16-01 TP02 DATE: 2017.03.24 This Addendum shall be considered part of the specifications for the construction of this work and shall be read in conjunction with such specifications. All work mentioned herein shall be in addition to and shall supersede the specifications and shall be included in the contractor’s tender. This Addendum shall be read in conjunction with drawings and Specifications Issued for RFP on March 15, 2017. This Addendum has a total of Eighteen (18) pages including attachments. 1. SPECIFICATIONS 1.1. Reference Cover Page a. Revise date to read March 15, 2017. b. Revise title ‘SPECIFICATION ISSUED FOR TENDER’ to read ‘SPECIFICATIONS: REQUEST FOR PROPOSALS’ 1.2. Reference Section 00 11 16 Request for Proposals a. Revise first sentence to read as follows: ‘Proposals will be received from Qualified General Contractors at the office of the Mount Allison University department of Financial Services, Room 310, Centennial Hall, 65 York Street, Sackville New Brunswick E4L 1E4, until 4:00:00PM, Tuesday April 11, 2017 for the following project:’ 1.3. Reference Section 00 21 13 Instructions to Proponents a. Reference page 2. Modify Closing Date to Tuesday, April 11, 2017. 1.4. Reference Specification Section 02 82 00.09 Asbestos Abatement Minimum Precautions a. Change Specification Section number from 02 82 00.09 to 02 82 00.01 1.5. Reference Specification Section 02 85 14 Miscellaneous Hazardous Materials Abatement- Gairdner Fine Arts Building, Mount Allison University a. Delete Section 02 85 14, in its entirety.

Upload: others

Post on 24-May-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ADDENDA #01 PROJECT: Mount Allison University Gairdner ...€¦ · PROJECT: Mount Allison University Gairdner Renovations Project PROJECT No: CFEI-16-01 TP02 DATE: 2017.03.24 This

Page 1 of 6

ADDENDA #01

PROJECT: Mount Allison University Gairdner Renovations Project PROJECT No: CFEI-16-01 TP02 DATE: 2017.03.24

This Addendum shall be considered part of the specifications for the construction of this work and shall be read in conjunction with such specifications. All work mentioned herein shall be in addition to and shall supersede the specifications and shall be included in the contractor’s tender. This Addendum shall be read in conjunction with drawings and Specifications Issued for RFP on March 15, 2017. This Addendum has a total of Eighteen (18) pages including attachments.

1. SPECIFICATIONS

1.1. Reference Cover Page

a. Revise date to read March 15, 2017. b. Revise title ‘SPECIFICATION ISSUED FOR TENDER’ to read ‘SPECIFICATIONS:

REQUEST FOR PROPOSALS’

1.2. Reference Section 00 11 16 Request for Proposals a. Revise first sentence to read as follows:

‘Proposals will be received from Qualified General Contractors at the office of the Mount Allison University department of Financial Services, Room 310, Centennial Hall, 65 York Street, Sackville New Brunswick E4L 1E4, until 4:00:00PM, Tuesday April 11, 2017 for the following project:’

1.3. Reference Section 00 21 13 Instructions to Proponents a. Reference page 2. Modify Closing Date to Tuesday, April 11, 2017.

1.4. Reference Specification Section 02 82 00.09 Asbestos Abatement Minimum

Precautions a. Change Specification Section number from 02 82 00.09 to 02 82 00.01

1.5. Reference Specification Section 02 85 14 Miscellaneous Hazardous Materials

Abatement- Gairdner Fine Arts Building, Mount Allison University a. Delete Section 02 85 14, in its entirety.

Page 2: ADDENDA #01 PROJECT: Mount Allison University Gairdner ...€¦ · PROJECT: Mount Allison University Gairdner Renovations Project PROJECT No: CFEI-16-01 TP02 DATE: 2017.03.24 This

Page 2 of 6

1.6. Reference Specification 09 91 10 Painting item 2.1 Manufacturers

a. Modify item 2.1.1 to read as follows: Sherwin Williams b. Modify item 2.1.2 to read as follows:

‘Other acceptable manufacturers offering functionally and aesthetically equivalent products .1 CIL .2 PPG’

1.7. Reference Specification Section 22 15 00 a. Item 2.2.1: Compressed Air Piping shall not be copper tubing. Compressed air

piping shall be an approved plastic tubing with ASTM E84 compliant 25/50 smoke/flame development.

1.8. Reference Specification Section 25 05 01 a. Clarification: All Controls work shall be supplied and installed under separate

contract by Siemens (Owner’s controls contractor), except as noted herein: b. Item 1.1.2: Controls shall include all control hardware, software, graphics,

programming, relays, conduit, wiring, devices, sensors, control valves, actuators, laboratory control system, lab air control devices (air valves/terminals and associated silencers), and integration to all facility equipment (i.e air handlers, chillers, etc) with integral on-board controllers.

c. Disregard item 1.1.5: Not in contract. Disregard section requesting separate pricing of air valves and control system. Air valves/terminals, laboratory silencers shall be installed by HVAC contractor under supervision of certified device supplier. Setup, configuration, Ashrae 110 testing, etc shall be by controls contractor supplying air terminal/valves and associated laboratory controls.

d. All systems Control Valves and Actuators to be supplied by Siemens and installed by General Contractor. General Contract shall provide all required sensor wells.

1.9. Reference Specification Section 25 30 01

a. Disregard Specification Section 25 30 01 Laboratory Controllers/Devices: Not in contract.

1.10. Reference Specification Section 25 50 00

a. Disregard Specification Section 25 50 00 BACnet Device Interfacing: Not in contract.

1.11. Reference Specification Section 25 50 05.01

a. Disregard Spec section 25 50 05.01 BACnet Integration – Variable Frequency Drives: Not in contract.

Page 3: ADDENDA #01 PROJECT: Mount Allison University Gairdner ...€¦ · PROJECT: Mount Allison University Gairdner Renovations Project PROJECT No: CFEI-16-01 TP02 DATE: 2017.03.24 This

Page 3 of 6

1.12. Reference Specification Section 25 50 82.22 a. Clarification: VRF System Interfacing- Provided for reference of VRF system

device supply (By General Contract) for compatibility/reference only. Install by Siemens for to Building Automation Interface. VRF controls/devices to be supplied by VRF supplier/manufacturer thru the General contractor. VRF controls to be installed by controls contractor (Siemens). Wiring & conduit by Siemens. General Contractor shall coordinate with Siemens and have VRF supplier (Daikin) provide commissioning of VRF systems.

2. DRAWINGS

2.1. Reference Drawing Coversheet a. Replace Drawing Coversheet Issued for RFP 2017.03.14 with attached Drawing

Cover Issued for RFP 2017.03.15.

2.2. Reference Drawing F1.02 a. Delete stair modifications per sketches SSK.02 and SSK.03, attached.

2.3. Reference Drawing S1.01

a. Added design loads to canopy as per sketch SSK.04, attached.

2.4. Reference Drawing S1.04 a. Delete two hangers and short beam folding partition and support & revise

partition support beam W8x24 as per sketch SSK.05 attached. b. At air make up unit relocate piping relocate piping openings to left side of the

unit per sketch SSK.05, attached. c. Revise note 6 to C4x5.4 and maximum span on deck to 5’-0 per sketch SSK.05,

attached.

2.5. Reference Drawing S1.05 a. Delete detail indicated on sketch SSK.06, attached.

2.6. Reference Drawing S1.06

a. Add two roof anchors per sketch SSK.07

2.7. Reference Drawing S1.08 a. Relocated canopy support HSS5x5x2.5 per sketches SSK.08 and SSK.09,

attached.

2.8. Reference Drawings S1.09 to S1.12 a. Revise stair riser detail per sketch SSK.10, attached.

Page 4: ADDENDA #01 PROJECT: Mount Allison University Gairdner ...€¦ · PROJECT: Mount Allison University Gairdner Renovations Project PROJECT No: CFEI-16-01 TP02 DATE: 2017.03.24 This

Page 4 of 6

2.9. Reference Drawings A6.03 and A6.04 Finish Schedule and Finish Floor Plans a. Reference ROOM FINISH SCHEDULE and Revise Ceiling Finishes for the following

rooms as follows: 101 Phytoplankton Ecophysiology Lab GWB2

101C Transfer Hood Alcove GWB2 107 Phytoplankton Ecology & Modelling Lab GWB2 107B Transfer Hood Alcove GWB2

b. Reference ROOM FINISH SCHEDULE and Revise Comments for the following rooms 101, 101C, 107 and 107B to ADD the following: ‘GWB2 ceilings are furred to underside of existing concrete slab. Mechanical and Electrical services are exposed. Both GWB ceiling and exposed Mechanical and Electrical services/ hangers to receive a paint finish.’

c. Reference ROOM FINISH SCHEDULE: Add GENERAL NOTE: All exposed ductwork, Mechanical and Electrical Hangers, Underside of Structure, underside of slab or GWB to receive paint finish.

2.10. Reference Drawing M3.07 a. Detail 3/M3.07 Temporary Relocation of Owen’s Gallery Chiller to be

disregarded; not in contract. Work shall be coordinated directly by Facilities Management. Final relocation IS included in contract.

2.11. Reference Drawing Series M3.XX (Heating)

a. General reference: Steam/Condensate piping extending from loading dock into existing Gairdner building basement, to be isolated, capped and removed.

2.12. Reference Drawing M3.09

a. Tunnel Services Plan: All Existing service tunnel services including water, steam and condensate to be removed and replaced with new services as indicated.

2.13. Reference Drawing M2.09

a. Detail 5/M2.09: Gravity Intake Hoods (GIH) shall be equipped with Low leakage insulated control dampers. Actuators/controls by Siemens. Delete gravity backdraft dampers.

2.14. Reference Drawing M1.00

a. Note 1: Acid Neutralizer tank shall be supplied c/w ‘PHIX’ media, not limestone.

2.15. Reference Drawing M1.05 a. Aqualab sink P-4 shall be supplied with a Salt Water Fill Tap. Provide ½” fill line

to P-4, extended from local main.

2.16. Reference Drawings E0.00 a. Add Fire Alarm System symbol ‘FR’ with description: Fire Alarm Relay.

2.17. Reference Drawings E0.01

a. Add Note #7 to Site Notes as follows: Underground conduits feeding new type AA Luminaires to follow new concrete footpaths to minimize damage existing tree roots. Extend length of conduit accordingly.

Page 5: ADDENDA #01 PROJECT: Mount Allison University Gairdner ...€¦ · PROJECT: Mount Allison University Gairdner Renovations Project PROJECT No: CFEI-16-01 TP02 DATE: 2017.03.24 This

Page 5 of 6

2.18. Reference Drawings E1.01

a. Add Specific Note #2 to Detail #1 as follows: Lighting override switches, refer to detail #2 on drawing E3.01 for lighting control for fixtures G & H.

b. Refer to Basement Floor RCP – Lighting, at Gridlines D-6 Add two (2) Override Lighting switches with reference to new Specific Note #2.

c. Refer to Basement Floor RCP – Lighting, add ceiling mounted type L lighting fixture in tunnel entrance from Mechanical/Electrical Room B18 and connect to existing tunnel circuit. Add new 3-way lighting switch on wall inside of tunnel entrance to control tunnel lighting.

d. Refer to Basement Floor RCP – Lighting, add wall mounted type L lighting fixture in beside light switch in elevator pit and circuit to B1-11, controlled by lighting switch shown in elevator pit.

e. Refer to Basement Floor RCP – Lighting, add ceiling mounted occupancy sensors to the following rooms:

1. Loading B16: Quantity 1 2. Fish Biochem & Nano Particle Lab B13: Quantity 3 3. CHN Analyzer B11 : Quantity 1 4. Faculty Office B15 : Quantity 1

f. Refer to First Floor RCP – Lighting, add ceiling mounted occupancy sensors to the following rooms:

1. Phytoplancton & Eco. Lab 107: Quantity: 3 2. Transfer Hood Alcove 107B: Quantity 1 3. Phytoplancton & Eco. Lab 101: Quantity: 3 4. Transfer Hood Alcove 101C: Quantity 1

g. Refer to Second Floor RCP – Lighting, add ceiling mounted occupancy sensors to the following rooms:

1. North Stair 2 ST1-2-2: Quantity: 1 2. Meeting Room/Kitchenette 213: Quantity 1 3. Flex Innovation Lab 211: Quantity: 2 4. Eco. And Paleo Freshwater Lab 209: Quantity: 3 5. Molecular & Bio Lab 203-2: Quantity 3 6. Molecular & Bio Lab 203-1: Quantity 3

2.19. Reference Drawings E3.03

a. Replace Drawing E3.03 Revision 0 with Drawing E3.03 Revision 1, attached.

3. CLARIFICATIONS

3.1. Reference all Structural Drawings a. Revise revision title block per sketch SSK.01, attached.

Page 6: ADDENDA #01 PROJECT: Mount Allison University Gairdner ...€¦ · PROJECT: Mount Allison University Gairdner Renovations Project PROJECT No: CFEI-16-01 TP02 DATE: 2017.03.24 This

Page 6 of 6

4. ATTACHMENTS

4.1. Drawing Coversheet, dated March 15, 2017

4.2. Structural Sketches SSK.01-SSK.10, dated March 24, 2017

4.3. Electrcial Drawing E3.03, Issued for Addendum 1, dated March 23, 2017.

END OF ADDENDA #01

Page 7: ADDENDA #01 PROJECT: Mount Allison University Gairdner ...€¦ · PROJECT: Mount Allison University Gairdner Renovations Project PROJECT No: CFEI-16-01 TP02 DATE: 2017.03.24 This

2010 NATIONAL BUILDING CODE DATA MATRIX PART 3

PROJECT DESCRIPTION: CHANGE OF USE NEW BUILDING ADDITION RENOVATION PART 3 PART 9

MAJOR OCCUPANCY:

BUILDING AREA:

GROSS AREA:

NUMBER OF STOREYS:

HEIGHT OF BUILDING:

GROUP F - DIVISION 3 : LOW- HAZARD INDUSTRIAL

EXISTING: 455 SQ. M NEW: 61 SQ. M TOTAL: 516 SQ. M

EXISTING: 1314 SQ. M NEW: 116 SQ. M TOTAL: 1430 SQ. M

2 STOREYS ABOVE GRADE: 2 BELOW GRADE: 1

10.1 m

NUMBER OF STREETS: 2 STREETS

BUILDING CLASSIFICATION: GROUP F, DIVISION 3, UP TO 2 STORYS, SPRINKLERED

SPRINKLER SYSTEM PROPOSED: ENTIRE BUILDING

STANDPIPE REQUIRED: NO

FIRE ALARM REQUIRED: YES

WATER SERVICE/ SUPPLY: SUPPLY IS ADEQUATE

HIGH BUILDING: NO

PERMITTED CONSTRUCTION: COMBUSTIBLE OR NON-COMBUSTIBLE

OCCUPANT LOAD: BASED ON DESIGN OF BUILDINGBASEMENT FLOOR LOAD: 33 PEOPLEFIRST FLOOR LOAD: 33 PEOPLESECOND FLOOR LOAD: 33 PEOPLEMECHANICAL MEZZANINE LOAD: 0 PEOPLE

BARRIER-FREE DESIGN: YES- FULL COMPLIANCE

HAZARDOUS SUBSTANCES: NO

REQUIRED FIRERESISTANCE RATINGS:

FLOORSROOFMEZZANINESFRR OF SUPPORTING MEMBERSSTAIRSELEVATOR SHAFT/ CONTROL RMJANITOR RMCUSTODIAL STORAGECOMMSLABSMECHANICAL ROOMSSEPARATION AT LINK/ LOADING

0 HR FIRE SEPARATION (NON-COMBUSTIBLE)NONEN/ANONE (NON-COMBUSTIBLE)1 HR FIRE SEPARATION1 HR FIRE SEPARATION0 HR FIRE SEPARATION0 HR FIRE SEPARATION1 HR FIRE SEPARATION0 HR FIRE SEPARATION1 HR FIRE SEPARATION2 HR FIREWALL (NOTE 3)

SPATIAL SEPARATION-CONSTRUCTION OFEXTERIOR WALLS:

WALL PERMITTED %OFUNPROTECTEDOPENINGS

AREA OFEXPOSINGBUILDINGFACE

LIMITINGDISTANCE (m)

FRR(HOURS)

TYPE OFCONSTRUCTIONREQUIRED

TYPE OF CLADDINGREQUIRED

COMB. NON-COMB. COMB. NON-COMB.NORTHSOUTHEASTWEST

PLUMBING FIXTUREREQUIREMENTS:

MALEFEMALE

% OCCUPANCY W/CREQUIRED

OCCUPANTLOAD

W/C TOTALPROVIDED

W/CPROVIDED

50%50%

5050

33

33

6 SINGLE STALL W/C,INCL. 3 BARRIER FREE

3.1.2.1 (1)

1.4.1.2 (A)

1.4.1.2 (A), 3.2.1.1 (NOTE 1)

3.2.2.5

3.2.2.10

3.2.2.84

3.2.5.8

3.2.4.1

3.2.5.7

3.2.6

3.1.17 (NOTE 2)

3.8

3.3.1.2

3.2.3.1 D

3.7.2.2 C

1.4.1.2 (A)

3.2.2.84

3.2.2.84

3.2.2.84

NOTE 1: EXCEPTIONS TO BUILDING HEIGHT REFER TO NBCC 2010 REFERNCE 3.2.1.1 (1) AND 3.2.1.1 (8) AND CLAUSES:3.2.5.14 BUILDING IS SPRINKLERED3.3.1.24 ILLUMINATED SIGNS INDICATING DIRECTION OF EGRESS PROVIDED3.2.4.19 (10) AUDIBLE SIGNAL DEVICES CONNECTED TO FIRE ALARM PROVIDED3.2.7.3 (2) EMERGENCY LIGHTING PROVIDED3.3.1.3 (7) ONLY ONE POINT OF EGRESS REQUIRED, AREA OF MECHANICAL ROOM 70 SQ. M.3.4.2.4 (3) TRAVEL DISTANCE IS NO MORE THAN 50M3.4.4.4 (9) VESTIBULE PROVIDED

NOTE 2: LAB OCCUPANCY LOADS ARE DICTATED BY UNIVERSITY PROCEDURES AND MAXIMUM OCCUPANCY AT PEAK RESEARCH TIMES. A GROSS-UP FACTOR OF 1.3 IS APPLIED TOTHE HIGHEST PREDICTED OCCUPANCY AS A PRECAUTION FOR FUTURE USE.

NOTE 3: 3.1.10.2 (2) PROVIDE 2HR FIREWALL TO SEPARATE GROUP F3 OCCUPANCY FROM GROUP A.

NBCC 2010 REFERENCE

340340215.5215.5

N/AN/A20m10m

100%NONENONENONE

NONE X XX X

X XX

X XXX

XX X

100%100%100%

X X

GAIRDNER RENOVATIONSPROJECT

PROJECT NO. CFEI-16-01 TP02

ISSUED FOR RFP 2017.03.15

MOUNT ALLISON UNIVERSITY

DSRA Architecture Inc.5495 Spring Garden Road, 4th Floor,Halifax, NS, B3J 1G2TEL. (902) 420-9990

ARCHITECT

DRAWING LIST

CIVILC1.01C1.02

CIVIL SERVICESDETAILS

J. M. Giffin Engineering21042 Lower LaPlanche Street (Highway #2),Amherst, NS, B4H 3Y5TEL. (902) 667-3300

STRUCTURAL CONSULTANT

MCW Consultants Ltd.77 Vaughan Harvey Blvd., Suite 200,Moncton, NB, E1C 0K2TEL. (506) 857-8880

MECHANICAL CONSULTANT ELECTRICAL CONSULTANT

53 YORK STREET. SACKVILLE. N.B.

MCW Consultants Ltd.77 Vaughan Harvey Blvd., Suite 200,Moncton, NB, E1C 0K2TEL. (506) 857-8880

DSRA JOB NO. 16135

BUILDING RENOVATIONS

MECHANICALM0.00M1.00M1.01M1.02M1.03M1.04M1.05M1.06M1.07M1.08M1.09M1.10M2.00M2.01M2.02M2.03M2.04M2.05M2.06M2.07M2.08M2.09M3.00M3.01M3.02M3.03M3.04M3.05M3.06M3.07M3.08M3.09M3.10M3.11M4.00M4.01M4.02M4.03M4.04M4.05M5.00M5.01M5.02M5.03

MECHANICAL SYMBOL, LEGEND, DRAWING LIST AND GENERAL NOTESUNDERGROUND FLOOR PLAN - SANITARYBASEMENT FLOOR PLAN - SANITARYFIRST FLOOR PLAN- SANITARYSECOND FLOOR PLAN- SANITARYMEZZANINE AND MECH RM B18 FLOOR PLANS- PLUMBINGBASEMENT FLOOR PLAN - WATER & GASFIRST FLOOR PLAN - WATERSECOND FLOOR PLAN - WATERDETAILS - PLUMBINGDETAILS AND SCHEDULES - PLUMBINGDETAILS - PLUMBINGBASEMENT FLOOR PLAN - VENTILATIONFIRST FLOOR PLAN - VENTILATIONSECOND FLOOR PLAN - VENTILATIONMEZZANINE FLOOR PLAN - VENTILATIONROOF PLAN - MECHANICALDETAILS - VENTILATIONDETAILS & SCHEMATICS - VENTILATIONSCHEMATIC - VENTILATIONSCHEDULES- VENTILATIONSCHEDULES- VENTILATIONBASEMENT FLOOR PLAN - HEATINGFIRST FLOOR PLAN - HEATINGSECOND FLOOR PLAN - HEATINGMEZZANINE & MECHANICAL ROOM B18 FLOOR PLANS - HEATINGDETAILS - HEATINGDETAILS AND SCHEMATICS - HEATINGSCHEMATICS - HEATINGSCHEMATICS - HEATINGSCHEDULES - HEATINGTUNNEL SERVICE PLANSCHEMATIC AND DETAILS - STEAM PIPINGTUNNEL PIPING SUPPORTBASEMENT FLOOR PLAN - FIRE PROTECTIONFIRST FLOOR PLAN - FIRE PROTECTIONSECOND FLOOR PLAN - FIRE PROTECTIONMEZZANINE AND MECH. RM B18 FLOOR PLANS- FIRE PROTECTIONDETAILS - FIRE PROTECTIONSTAIRWELL SECTIONS - FIRE PROTECTIONBUILDING SECTIONS - MECHANICAL SERVICESBUILDING SECTIONS - MECHANICAL SERVICESBUILDING SECTIONS - MECHANICAL SERVICESMECHANICAL ROOM/ MEZZANINE SECTIONS - MECHANICAL SERVICES

ARCHITECTURALA0.11A0.12A0.13A1.01A1.02A1.03A1.11A1.12A1.13A1.21A1.22A2.01A3.01A3.02A4.01A4.02A5.51A5.52A5.53A5.54A5.61A5.65A6.01A6.02A6.03A6.04A7.01A7.02A7.03A8.01A8.02A8.03A8.04A8.05

BASEMENT AND FIRST FLOOR DEMOLITION PLANSSECOND FLOOR AND MEZZANINE DEMOLITION PLANSROOF DEMOLITION PLANBASEMENT AND FIRST FLOOR PLANSSECOND FLOOR AND MEZZANINE PLANSROOF PLANBASEMENT FLOOR EQUIPMENT PLANFIRST FLOOR EQUIPMENT PLANSECOND FLOOR EQUIPMENT PLANBASEMENT AND FIRST FLOOR REFLECTED CEILING PLANSSECOND FLOOR AND MEZZANINE REFLECTED CEILING PLANSEXTERIOR BUILDING ELEVATIONSBUILDING SECTIONSBUILDING SECTIONSWALL SECTIONSWALL SECTIONSEXTERIOR SECTION DETAILSEXTERIOR SECTION DETAILSEXTERIOR SECTION DETAILSEXTERIOR SECTION DETAILSEXTERIOR PLAN DETAILSINTERIOR PLAN DETAILSWINDOW SCHEDULEDOOR AND SCREEN SCHEDULEFINISH SCHEDULE AND FINISH FLOOR PATTERNFINISH SCHEDULE AND FINISH FLOOR PATTERNSOUTH STAIR PLANS AND SECTIONSNORTH STAIR PLANS AND SECTIONSSTAIR AND CANOPY DETAILSENLARGED PLANS AND INTERIOR ELEVATIONSENLARGED PLANS AND INTERIOR ELEVATIONSENLARGED PLANS AND INTERIOR ELEVATIONSENLARGED PLANS AND INTERIOR ELEVATIONSMILLWORK SECTIONS AND DETAILS

ELECTRICALE0.00E0.01E0.02E1.01E2.01E2.02E3.01E3.02E3.03E4.01E5.01E5.02E5.03

ELECTRICAL SYMBOL LEGED, DRAWING LIST AND GENERAL NOTESSITE PLAN - ELECTRICALCAMPUS PLAN - ELECTRICALLIGHTING FLOOR PLANSPOWER AND SYSTEMS FLOOR PLANSPOWER AND SYSTEMS FLOOR PLANSLUMINAIRE AND EQUIPMENT SCHEDULESOWNER'S EQUIPMENT SCHEDULEMECHANICAL EQUIPMENT SCHEDULESINGLE LINE DIAGRAMPANEL LEGENDSPANEL LEGENDSPANEL LEGENDS

STRUCTURALF1.01F1.02F1.03F1.04S1.01S1.02S1.03S1.04S1.05S1.06S1.07S1.08S1.09S1.10S1.11S1.12S1.13

FOUNDATION PLANFOUNDATION PLAN AT LOADING DOCKSECTIONS AND DETAILSSECTIONS AND DETAILSFIRST FLOOR FRAMING PLANSECOND FLOOR FRAMING PLANMEZZANINE FLOOR & NEW ROOF FRAMING PLANROOF FRAMING PLANSECTIONS AND ELEVATIONSSECTIONS AND DETAILSSECTIONSROOF FRAMING PLAN AND SECTIONSTAIR SECTIONSTAIR SECTIONSTAIR SECTIONSTAIR SECTIONSECTION

Harbourside Engineering219 Waverley Road, Suite 200Dartmouth, NS B2X 2C3TEL. (902) 405-4696

CIVIL CONSULTANT

LANDSCAPE

L1.01L1.02L1.03L1.04L1.05L1.06L1.07L1.08L1.09L1.10

EXISTING CONDITIONS AND REMOVALSSITEWORK LAYOUT PLANSITEWORK GRADING PLANSITEWORK PLANTING PLANSITEWORK DETAILS 1SITEWORK DETAILS 2SITEWORK DETAILS 3SITEWORK DETAILS 4SITEWORK DETAILS 5SITEWORK DETAILS 6

PHASINGP0.00 PROJECT PHASING PLAN

Vollick McKee Petersmann & Associates2030 Gottingen StreetHalifax, NS, B3K 3A9TEL. (902) 422-6514

LANDSCAPE ARCHITECTURE CONSULTANT

Page 8: ADDENDA #01 PROJECT: Mount Allison University Gairdner ...€¦ · PROJECT: Mount Allison University Gairdner Renovations Project PROJECT No: CFEI-16-01 TP02 DATE: 2017.03.24 This

SSK. 01

NO. REVISION DATEISSUED FOR RFP0 MAR 15 2017

Page 9: ADDENDA #01 PROJECT: Mount Allison University Gairdner ...€¦ · PROJECT: Mount Allison University Gairdner Renovations Project PROJECT No: CFEI-16-01 TP02 DATE: 2017.03.24 This

EXISTING STAIR

PLAN

(DWG.F1.02)

SSK. 02

DELETE

Page 10: ADDENDA #01 PROJECT: Mount Allison University Gairdner ...€¦ · PROJECT: Mount Allison University Gairdner Renovations Project PROJECT No: CFEI-16-01 TP02 DATE: 2017.03.24 This

SECTION

(DWG.F1.02)

SSK. 03

DELETE

Page 11: ADDENDA #01 PROJECT: Mount Allison University Gairdner ...€¦ · PROJECT: Mount Allison University Gairdner Renovations Project PROJECT No: CFEI-16-01 TP02 DATE: 2017.03.24 This

CANOPY

DESIGN LOADS

(DWG.S1.01)

SSK. 04

Page 12: ADDENDA #01 PROJECT: Mount Allison University Gairdner ...€¦ · PROJECT: Mount Allison University Gairdner Renovations Project PROJECT No: CFEI-16-01 TP02 DATE: 2017.03.24 This

ROOF FRAMING

PLAN

(DWG.S1.04)

SSK.05

Page 13: ADDENDA #01 PROJECT: Mount Allison University Gairdner ...€¦ · PROJECT: Mount Allison University Gairdner Renovations Project PROJECT No: CFEI-16-01 TP02 DATE: 2017.03.24 This

SECTION

AT CANOPY

(DWG.S1.05)

SSK.06

DELETE DETAIL

FROM VIEWPORT

Page 14: ADDENDA #01 PROJECT: Mount Allison University Gairdner ...€¦ · PROJECT: Mount Allison University Gairdner Renovations Project PROJECT No: CFEI-16-01 TP02 DATE: 2017.03.24 This

ROOF FRAMING

PLAN

(DWG.S1.06)

SSK.07

Page 15: ADDENDA #01 PROJECT: Mount Allison University Gairdner ...€¦ · PROJECT: Mount Allison University Gairdner Renovations Project PROJECT No: CFEI-16-01 TP02 DATE: 2017.03.24 This

SECTION

AT CANOPY

(DWG.S1.08)

SSK. 08

Page 16: ADDENDA #01 PROJECT: Mount Allison University Gairdner ...€¦ · PROJECT: Mount Allison University Gairdner Renovations Project PROJECT No: CFEI-16-01 TP02 DATE: 2017.03.24 This

END PLATE

DETAILS

(DWG.S1.08)

SSK.09

Page 17: ADDENDA #01 PROJECT: Mount Allison University Gairdner ...€¦ · PROJECT: Mount Allison University Gairdner Renovations Project PROJECT No: CFEI-16-01 TP02 DATE: 2017.03.24 This

SSK. 10

Page 18: ADDENDA #01 PROJECT: Mount Allison University Gairdner ...€¦ · PROJECT: Mount Allison University Gairdner Renovations Project PROJECT No: CFEI-16-01 TP02 DATE: 2017.03.24 This

SCALE:

DRAWN BY:

CHECKED BY:

MCW JOB NO.:

STAMP

KEY PLAN N

GENERAL NOTES:

1. ALL DRAWINGS, SPECIFICATIONS, AND RELATED DOCUMENTSARE THE COPYRIGHT PROPERTY OF THE ARCHITECT AND MUSTBE RETURNED UPON REQUEST. REPRODUCTION OF DRAWINGS,SPECIFICATIONS, AND RELATED DOCUMENTS IN PART OR WHOLEIS FORBIDDEN WITHOUT THE ARCHITECT'S WRITTEN PERMISSION.

2. THE ARCHITECT SHALL NOT TAKE RESPONSIBILITY FORCHANGES OCCURRING TO ELECTRONICALLY TRANSFERREDDRAWINGS, SPECIFICATIONS, AND RELATED DOCUMENTSDURING OR AFTER THEIR TRANSMISSION.

3. CONTRACTOR MUST CHECK AND VERIFY ALL DIMENSIONS ONTHE JOB SITE. ANY DISCREPANCY OR CONTRADICTORYINFORMATION WITHIN THIS SET OF DRAWINGS AND/OR OTHERCONSULTANTS' DRAWINGS MUST BE REPORTED TO THEARCHITECT BEFORE PROCEEDING WITH WORK.

4. NO VARIATIONS OR MODIFICATIONS TO WORK SHOWN SHALLBE IMPLEMENTED WITHOUT PRIOR APPROVAL OF THEARCHITECT.

5. ALL PREVIOUS VERSIONS OF THIS DRAWING ARESUPERSEDED.

6. THIS DRAWING SHALL NOT BE USED FOR CONSTRUCTIONPURPOSES UNLESS COUNTERSIGNED AND STAMPED BELOW.

MTA PROJECT #: CFEI-16-01

SHEET SIZE: 24"x36"

23

/03

/20

17 3

:12

:42

PM

D.H.

C.D.

53 YORK STREET, SACKVILLE NB

MECHANICAL EQUIPMENTSCHEDULE

E3.03

11-16-090

MOUNT ALLISON UNIVERSITY

GAIRDNER RENOVATIONS

77 Vaughan Harvey Blvd, Suite 200, Moncton, NB, E1C 0K2E-Mail: [email protected] www.mcw.comTel: 506-857-8880 Fax: 506-859-8393

Moncton Toronto Vancouver Winnipeg Ottawa HalifaxDauphin Kelowna Trail Truro Saint John

NO. REVISION DATE

0 ISSUED FOR RFP MAR 15 2017

1 ADDENDUM #1 MAR 23 2017

MECHANICAL EQUIPMENT SCHEDULE - ELECTRICAL REQUIREMENTS

REF. DESCRIPTION LOCATIONEQUIPMENT

LOAD MCA VOLTS Ø PANELPOWERSOURCE

BREAKERSIZE FEEDER CONNECTION STARTER

DISCONNECTAT UNIT REMARKS

AC-1 AIR COOLED SPLIT CONDENSER LOADING DOCK ROOF 31750 W 39.4 A 600 V 3 M NORMAL 50A-3P 3#8 RW90 + BOND, 1" EMT DIRECT CONNECT - 60A 3R

ACC-1 WALK-IN COOLER AIR COOLED CONDENSING UNIT LOADING DOCK ROOF 2130 W 5.9 A 208 V 3 B3 NORMAL 15A-3P 3#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - 30A 3R

AHU-1 AQUALAB AIR HANDLING UNIT EXTERIOR 26100 W 31.4 A 600 V 3 EDP EM. 35A-3P 3#10 RW90 + BOND, 3/4" EMT DIRECT CONNECT - - VFD AND INTERGRAL DISCONNECT BY MECHANICAL

AIR-1A OIL FREE SCROLL AIR COMPRESSOR STORAGE - B01 8718 W 30.3 A 208 V 3 SB EM. 60A-3P 3#8 RW90 + BOND, 1" EMT DIRECT CONNECT - 60A

AIR-1B OIL FREE SCROLL AIR COMPRESSOR STORAGE - B01 8718 W 30.3 A 208 V 3 B3 NORMAL 60A-3P 3#8 RW90 + BOND, 1" EMT DIRECT CONNECT - 60A

BS-1 BRANCH SELECTOR UNIT CORRIDOR - B00 90 W 0.4 A 208 V 1 B1 NORMAL 15A-2P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - 30A

BS-2 BRANCH SELECTOR UNIT CORRIDOR - B00 90 W 0.4 A 208 V 1 B1 NORMAL 15A-2P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - 30A

BS-4 BRANCH SELECTOR UNIT CORRIDOR - 100 35 W 0.1 A 208 V 1 F2 NORMAL 15A-2P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - 30A

BS-5 BRANCH SELECTOR UNIT CORRIDOR - 100 35 W 0.1 A 208 V 1 F2 NORMAL 15A-2P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - 30A

BS-9 BRANCH SELECTOR UNIT CORRIDOR - 200 90 W 0.4 A 208 V 1 S2 NORMAL 15A-2P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - 30A

BS-10 BRANCH SELECTOR UNIT CORRIDOR - 200 35 W 0.1 A 208 V 1 S2 NORMAL 15A-2P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - 30A

BS-11 BRANCH SELECTOR UNIT CORRIDOR - 200 35 W 0.1 A 208 V 1 S2 NORMAL 15A-2P 2#12 RW90 + BOND, 1/2" EMT DIRECT CONNECT - 30A

BS-12 BRANCH SELECTOR UNIT CORRIDOR - 100 35 W 0.1 A 208 V 1 F2 NORMAL 15A-2P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - 30A

BS-13 BRANCH SELECTOR UNIT CORRIDOR - 100 90 W 0.4 A 208 V 1 F2 NORMAL 15A-2P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - 30A

BS-14 BRANCH SELECTOR UNIT CORRIDOR - 100 35 W 0.1 A 208 V 1 F2 NORMAL 15A-2P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - 30A

CH-1A AIR COOLED CHILLER LOADING DOCK ROOF 28260 W 34.0 A 600 V 3 EDP EM. 40A-3P 3#8 RW90 + BOND, 1" EMT DIRECT CONNECT - - VFD AND INTERGRAL DISCONNECT BY MECHANICAL

CH-1B AIR COOLED CHILLER (FUTURE) LOADING DOCK ROOF 28260 W 34.0 A 600 V 3

CT-1 COOLING TOWER EXTERIOR 9351 W 11.3 A 600 V 3 PA NORMAL 20A-3P 3#12 RW90 + BOND, 3/4 EMT DIRECT CONNECT - - VFD AND INTERGRAL DISCONNECT BY MECHANICAL

CU-1A CONDENSER UNIT MECH./ELEC. ROOM - B18 8400 W 22.4 A 208 V 3 DPA NORMAL 30A-3P 3#10 RW90 + BOND, 3/4" EMT DIRECT CONNECT - 30A

CU-1B CONDENSER UNIT MECH./ELEC. ROOM - B18 8400 W 22.4 A 208 V 3 DPA NORMAL 30A-3P 3#10 RW90 + BOND, 3/4" EMT DIRECT CONNECT - 30A

CU-2A CONDENSER UNIT MECH./ELEC. ROOM - B18 8400 W 22.4 A 208 V 3 DPA NORMAL 30A-3P 3#10 RW90 + BOND, 3/4" EMT DIRECT CONNECT - 30A

CU-2B CONDENSER UNIT MECH./ELEC. ROOM - B18 8400 W 22.4 A 208 V 3 DPA NORMAL 30A-3P 3#10 RW90 + BOND, 3/4" EMT DIRECT CONNECT - 30A

CU-3A CONDENSER UNIT MECH./ELEC. ROOM - B18 8400 W 22.4 A 208 V 3 DPA NORMAL 30A-3P 3#10 RW90 + BOND, 3/4" EMT DIRECT CONNECT - 30A

CU-3B CONDENSER UNIT MECH./ELEC. ROOM - B18 8400 W 22.4 A 208 V 3 DPA NORMAL 30A-3P 3#10 RW90 + BOND, 3/4" EMT DIRECT CONNECT - 30A

DHWR-1 DOMESTIC HOT WATER RECIRC. PUMP MECH./ELEC. ROOM - B18 120 W 1.0 A 120 V 1 B3 NORMAL 15A-1P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT MMS -

DHWT-1 DOMESTIC HOT WATER TANK MECH./ELEC. ROOM - B18 3800 W 22.8 A 208 V 1 B3 NORMAL 25A-2P 2#10 RW90 + BOND, 3/4" EMT DIRECT CONNECT - 30A

EF-1 EXHAUST FAN ROOF 665 W 4.0 A 208 V 1 S2 NORMAL 15A-2P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - 30A 3R

EF-2 EXHAUST FAN ROOF 665 W 4.0 A 208 V 1 S2 NORMAL 15A-2P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - 30A 3R

EF-3 EXHAUST FAN MECHANICAL ROOM EXHAUST 1580 W 7.6 A 208 V 1 B3 NORMAL 15A-2P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - 30A 3R

EF-4 EXHAUST FAN MECHANICAL ROOM EXHAUST 665 W 4.0 A 208 V 1 S2 NORMAL 15A-2P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - 30A 3R

EF-5A EXHAUST FAN EXPERIMENT RM3 - B03D 24 W 0.2 A 120 V 1 B2 NORMAL 15A-1P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT MMS -

EF-5B EXHAUST FAN EXPERIMENT RM 4 - B03C 24 W 0.2 A 120 V 1 B2 NORMAL 15A-1P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT MMS -

EF-5C EXHAUST FAN EXPERIMENT RM 1 - B03A 24 W 0.2 A 120 V 1 B2 NORMAL 15A-1P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT MMS -

EF-5D EXHAUST FAN EXPERIMENT RM 2 - B03B 24 W 0.2 A 120 V 1 B2 NORMAL 15A-1P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT MMS -

EF-6 CEILING EXHAUST FAN CHN ANALYZER ROOM B11 24 W 0.2 A 120 V 1 B3 NORMAL 15A-1P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT MMS -

ERV-1 ENERGY RECOVERY VENTILATOR STORAGE - B07 72 W 0.6 A 120 V 1 B3 NORMAL 15A-1P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT MS 30A

ESP-1 ELEVATOR SUMP PUMP BIOHAZARD ROOM - B08 1176 W 12.3 A 120 V 1 SB EM. 20A-1P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT MMS -

EV-1 WALK-IN COOLER EVAPORATOR WALK-IN COOLER - B09 300 W 2.3 A 120 V 1 B3 NORMAL 15A-1P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - 30A

FC-1 HORIZ. CLG. FAN COIL UNIT - SIZE 36 FACULTY OFFICE - 207 483 W 2.9 A 208 V 1 S1 NORMAL 15A-2P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - 30A

FC-2 HORIZ. CLG. FAN COIL UNIT - SIZE 30 FLEX INOVATION LAB - 211 466 W 2.8 A 208 V 1 S1 NORMAL 15A-2P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - 30A

FC-3 HORIZ. CLG. FAN COIL UNIT - SIZE 36 FACULTY OFFICE - 201 483 W 2.9 A 208 V 1 S2 NORMAL 15A-2P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - 30A

FC-4 HORIZ. CLG. FAN COIL UNIT - SIZE 36 FACULTY OFFICE - 205 483 W 2.9 A 208 V 1 S2 NORMAL 15A-2P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - 30A

FC-5 HORIZ. CLG. FAN COIL UNIT - SIZE 15 CORRIDOR - 200 250 W 1.5 A 208 V 1 S1 NORMAL 15A-2P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - 30A

FC-6 HORIZ. CLG. FAN COIL UNIT - SIZE 15 CORRIDOR - 200 250 W 1.5 A 208 V 1 S2 NORMAL 15A-2P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - 30A

FC-7 HORIZ. CLG. FAN COIL UNIT - SIZE 15 CORRIDOR - 200 250 W 1.5 A 208 V 1 S1 NORMAL 15A-2P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - 30A

FC-9 HORIZ. CLG. FAN COIL UNIT - SIZE 36 EQUIPMENT RM - 203B 483 W 2.9 A 208 V 1 S2 NORMAL 15A-2P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - 30A

FC-11 HORIZ. CLG. FAN COIL UNIT - SIZE 09 TECH OFFICE - B05 100 W 0.6 A 208 V 1 F1 NORMAL 15A-2P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - 30A

FC-12 HORIZ. CLG. FAN COIL UNIT - SIZE 09 FACULTY OFFICE - 105 100 W 0.6 A 208 V 1 F1 NORMAL 15A-2P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - 30A

FC-13 HORIZ. CLG. FAN COIL UNIT - SIZE 48 INCUBATOR / FREEZER ROOM - 107C 566 W 3.4 A 208 V 1 F1 NORMAL 15A-2P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - 30A

FC-14 HORIZ. CLG. FAN COIL UNIT - SIZE 24 PHYTO LAB - 107 300 W 1.8 A 208 V 1 F1 NORMAL 15A-2P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - 30A

FC-15 HORIZ. CLG. FAN COIL UNIT - SIZE 09 FACULTY OFFICE - 109 100 W 0.6 A 208 V 1 F1 NORMAL 15A-2P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - 30A

FC-16 HORIZ. CLG. FAN COIL UNIT - SIZE 12 NORTH STAIR - ST1-1 232 W 1.4 A 208 V 1 F2 NORMAL 15A-2P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - 30A

FC-17 HORIZ. CLG. FAN COIL UNIT - SIZE 12 NORTH STAIR - ST1-1 232 W 1.4 A 208 V 1 F2 NORMAL 15A-2P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - 30A

FC-18 HORIZ. CLG. FAN COIL UNIT - SIZE 24 PHYTO. ECO LAB - 101 300 W 1.8 A 208 V 1 F2 NORMAL 15A-2P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - 30A

FC-19 HORIZ. CLG. FAN COIL UNIT - SIZE 48 INCUBATOR / FREEZER ROOM - 101B 566 W 3.4 A 208 V 1 F2 NORMAL 15A-2P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - 30A

FC-20 HORIZ. CLG. FAN COIL UNIT - SIZE 09 FACULTY OFFICE - 103 100 W 0.6 A 208 V 1 F2 NORMAL 15A-2P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - 30A

FC-21 HORIZ. CLG. FAN COIL UNIT - SIZE 09 CORRIDOR - 100 100 W 0.6 A 208 V 1 F2 NORMAL 15A-2P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - 30A

FC-23 HORIZ. CLG. FAN COIL UNIT - SIZE 18 FISH LAB - B13 266 W 1.6 A 208 V 1 F1 NORMAL 15A-2P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - 30A

FC-24 HORIZ. CLG. FAN COIL UNIT - SIZE 07 CORRIDOR - 100 100 W 0.6 A 208 V 1 F1 NORMAL 15A-2P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - 30A

FC-25 CASSETTE FAN COIL UNIT - SIZE 09 NORTH STAIR - ST1-B 133 W 0.8 A 208 V 1 F1 NORMAL 15A-2P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - 30A

FC-26 HORIZ. CLG. FAN COIL UNIT - SIZE 09 PHYTO LAB - 101 100 W 0.6 A 208 V 1 F2 NORMAL 15A-2P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - 30A

FE-1 LAB FAN EXHAUST c/w ECONOMIZER ROOF 22860 W 40.0 A 600 V 3 EDP EM. 40A-3P 3#8 RW90 + BOND, 1" EMT DIRECT CONNECT - - VFD AND INTERGRAL DISCONNECT BY MECHANICAL

FH-1 FUME HOOD - EQ27c FISH BIOCHEM. & NANO. LAB - B13 1200 W 10.0 A 120 V 1 B1 NORMAL 20A-1P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - - WIRE TO SINGLE POINT CONNECTION

FH-2 FUME HOOD - EQ27a PHYTO LAB - 107 1200 W 10.0 A 120 V 1 F1 NORMAL 20A-1P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - - WIRE TO SINGLE POINT CONNECTION

FH-3 FUME HOOD - EQ27d FLEX INOVATION LAB - 211 1200 W 10.0 A 120 V 1 S1 NORMAL 20A-1P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - - WIRE TO SINGLE POINT CONNECTION

FH-4 FUME HOOD - EQ27b PHYTO LAB - 101 1200 W 10.0 A 120 V 1 F2 NORMAL 20A-1P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - - WIRE TO SINGLE POINT CONNECTION

FH-5 FUME HOOD - EQ27e MOLEC. BIO LAB - 203-1 1200 W 10.0 A 120 V 1 S2 NORMAL 20A-1P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - - WIRE TO SINGLE POINT CONNECTION

GT-1 GLYCOL FILL TANK MECH./ELEC. ROOM - B18 60 W 0.5 A 120 V 1 B3 NORMAL 15A-1P 2#12 RW90 + BOND, 1/2 EMT 15/20A DUPLEX REC. - -

GT-3 GLYCOL FILL TANK MECHANICAL ROOM - 302 60 W 0.5 A 120 V 1 S1 NORMAL 15A-1P 2#12 RW90 + BOND, 1/2 EMT 15/20A DUPLEX REC. - -

GT-4 GLYCOL FILL TANK MECHANICAL ROOM - 302 60 W 0.5 A 120 V 1 S1 NORMAL 15A-1P 2#12 RW90 + BOND, 1/2 EMT 15/20A DUPLEX REC. - -

GT-5 GLYCOL FILL TANK MECHANICAL ROOM - 302 60 W 0.5 A 120 V 1 S1 NORMAL 15A-1P 2#12 RW90 + BOND, 1/2 EMT 15/20A DUPLEX REC. - -

HUM-1 STEAM HUMIDIFIER MECHANICAL ROOM - 302 1200 W 10.0 A 120 V 1 S2 NORMAL 15A-1P 2#12 RW90 + BOND, 1/2 EMT DIRECT CONNECT - 30A

MUA-1 ROOFTOP PACKAGED MAKE-UP AIR UNIT ROOF 10390 W 10.0 A 600 V 3 EDP EM. 30A-3P 3#12 RW90 + BOND, 3/4 EMT DIRECT CONNECT - - VFD AND INTERGRAL DISCONNECT BY MECHANICAL

P-1A WSHP LOOP PUMP MECH./ELEC. ROOM - B18 6338 W 7.6 A 600 V 3 PA NORMAL 15A-3P 3#12 RW90 + BOND, 3/4" EMT DIRECT CONNECT HOA - VFD AND INTERGRAL DISCONNECT BY MECHANICAL

P-1B WSHP LOOP PUMP MECH./ELEC. ROOM - B18 6338 W 7.6 A 600 V 3 PA NORMAL 15A-3P 3#12 RW90 + BOND, 3/4" EMT DIRECT CONNECT HOA - VFD AND INTERGRAL DISCONNECT BY MECHANICAL

P-2A COOLING TOWER PUMP MECH./ELEC. ROOM - B18 6338 W 7.6 A 600 V 3 PA NORMAL 15A-3P 3#12 RW90 + BOND, 3/4" EMT DIRECT CONNECT HOA - VFD AND INTERGRAL DISCONNECT BY MECHANICAL

P-2B COOLING TOWER PUMP MECH./ELEC. ROOM - B18 6338 W 7.6 A 600 V 3 PA NORMAL 15A-3P 3#12 RW90 + BOND, 3/4" EMT DIRECT CONNECT HOA - VFD AND INTERGRAL DISCONNECT BY MECHANICAL

P-3A MUA-1 HEATING COIL PUMP MECHANICAL ROOM - 302 4052 W 4.9 A 600 V 3 EDP EM. 15A-3P 3#12 RW90 + BOND, 3/4" EMT DIRECT CONNECT HOA - VFD AND INTERGRAL DISCONNECT BY MECHANICAL

P-3B MUA-1 HEATING COIL PUMP MECHANICAL ROOM - 302 4052 W 4.9 A 600 V 3 EDP EM. 15A-3P 3#12 RW90 + BOND, 3/4" EMT DIRECT CONNECT HOA - VFD AND INTERGRAL DISCONNECT BY MECHANICAL

P-4A AQUALAB TANK HEATING PUMP MECHANICAL ROOM - 302 6338 W 7.6 A 600 V 3 EDP EM. 15A-3P 3#12 RW90 + BOND, 3/4" EMT DIRECT CONNECT HOA - VFD AND INTERGRAL DISCONNECT BY MECHANICAL

P-4B AQUALAB TANK HEATING PUMP MECHANICAL ROOM - 302 6338 W 7.6 A 600 V 3 EDP EM. 15A-3P 3#12 RW90 + BOND, 3/4" EMT DIRECT CONNECT HOA - VFD AND INTERGRAL DISCONNECT BY MECHANICAL

P-5A FE/MUA HEAT RECOVERY PUMP MECHANICAL ROOM - 302 2805 W 3.4 A 600 V 3 M NORMAL 15A-3P 3#12 RW90 + BOND, 3/4" EMT DIRECT CONNECT HOA - VFD AND INTERGRAL DISCONNECT BY MECHANICAL

P-5B FE/MUA HEAT RECOVERY PUMP MECHANICAL ROOM - 302 2805 W 3.4 A 600 V 3 M NORMAL 15A-3P 3#12 RW90 + BOND, 3/4" EMT DIRECT CONNECT HOA - VFD AND INTERGRAL DISCONNECT BY MECHANICAL

P-6A AQUALAB TANK CHILLER PUMP MECH./ELEC. ROOM - B18 6338 W 7.6 A 600 V 3 EDP EM. 15A-3P 3#12 RW90 + BOND, 3/4" EMT DIRECT CONNECT HOA - VFD AND INTERGRAL DISCONNECT BY MECHANICAL

P-6B AQUALAB TANK CHILLER PUMP MECH./ELEC. ROOM - B18 6338 W 7.6 A 600 V 3 EDP EM. 15A-3P 3#12 RW90 + BOND, 3/4" EMT DIRECT CONNECT HOA - VFD AND INTERGRAL DISCONNECT BY MECHANICAL

P-7A OWEN'S HEATING PUMP MECH./ELEC. ROOM - B18 2805 W 3.4 A 600 V 3 EDP EM. 15A-3P 3#12 RW90 + BOND, 3/4" EMT DIRECT CONNECT HOA - VFD AND INTERGRAL DISCONNECT BY MECHANICAL

P-7B OWEN'S HEATING PUMP MECH./ELEC. ROOM - B18 2805 W 3.4 A 600 V 3 EDP EM. 15A-3P 3#12 RW90 + BOND, 3/4" EMT DIRECT CONNECT HOA - VFD AND INTERGRAL DISCONNECT BY MECHANICAL

SWTP-1 SALT WATER TANK PUMP BIOHAZARD ROOM - B07 2880 W 17.3 A 208 V 1 B3 NORMAL 30A-2P 2#10 RW90 + BOND, 3/4" EMT DIRECT CONNECT HOA -

WP-1 SUBMERSIBLE WELL PUMP BIOHAZARD ROOM - B07 3816 W 13.3 A 208 V 3 DPA NORMAL 25A-3P 3#10 RW90 + BOND, 3/4" EMT DIRECT CONNECT HOA -

NOTES:

1.MS = MANUAL TYPE MOTOR STARTER

C/W OVERLOAD PROTECTIONMMS = MOTOR RATED SWITCHNCM = NON-COMBINATION MAGNETICFVNR = FULL VOLTAGE NON-REVERSINGRVNR = REDUCED VOLTAGE NON-REVERSING

HOA = COMBINATION MAGNETIC STARTER/NON-FUSEDDISCONNECT C/W HAND/OFF/AUTO SELECTOR SWITCH

CMB = COMBINATION MAGNETIC STARTER C/W FUSEDCONTROL TANSFORMER

VSD = VARIABLE SPEED DRIVE, BY DIV. 15/25NCHOA =NON-COMBINATION MAGNETIC STARTER C/W

HAND/OFF/AUTO SELECTOR SWITCH

STARTER LEGEND

Mar. 23, 2017