![Page 1: ADDENDUM #01 - Conventional Builders Inc · 2021. 5. 17. · 309 S. GOVERNORS AVENUE, DOVER, DELAWARE 19904 302.734.7950 FAX 302.734.7965 Date: May 14, 2021 To: Mark DeVore, DTCC](https://reader036.vdocument.in/reader036/viewer/2022070223/61471b7ff4263007b1359b7a/html5/thumbnails/1.jpg)
309 S. GOVERNORS AVENUE, DOVER, DELAWARE 19904 302.734.7950 FAX 302.734.7965
Date: May 14, 2021 To: Mark DeVore, DTCC From: Ann M. Camper, BMG Copies: John Farina, DEDC Project: DTCC Terry Campus – Healthcare Center of Excellence
Dover, Delaware Project Number: BMG Project No. 2020179.00 Subject: ADDENDUM #01 NOTICE: Attention is called to the following item(s), effective as of the date above, which shall be added to, deleted from, or changed in the contract documents dated 04/01/2020, and any previously issued addenda, thereby incorporating these items into the contract. Bidders shall acknowledge receipt of this addendum on the bid form. RFIs
Item Description 1 Q1: Please verify that June 2, 2021 at 3pm is the correct bid date, not June 1, 2021 at 10am?
A1: Yes, June 2, 2021 at 3pm is the correct date bids are due.
2 Q2: Wage Rate page is dated 2020 calendar year. Is that correct for this Project? A2: The wage rates are effective March 15, 2021. An older version of wages rates were inadvertently distributed in the printed and digital sets. The correct wage rates are included in this addendum.
3 Q3: Spec section “Alternates 012300 is missing from spec book. Do we need this? A3: No, this section will be deleted from the TOC.
4 Q4: There are specifications for dimensional letter, however, there are no drawings showing letter height, location and type face? A4: See drawings 12/A701 and 16/A701.
5 Q5: Are there interior signs? A5: No. Interior room signage is by owner. See drawings 12/A701 and 16/A701 and specification section 101419 for dimensional lettering signage.
6 Q6: Cabinetry - Can the AWI certification be waived? A6: No.
ADDENDUM #01 TO CONTRACT DOCUMENTS
![Page 2: ADDENDUM #01 - Conventional Builders Inc · 2021. 5. 17. · 309 S. GOVERNORS AVENUE, DOVER, DELAWARE 19904 302.734.7950 FAX 302.734.7965 Date: May 14, 2021 To: Mark DeVore, DTCC](https://reader036.vdocument.in/reader036/viewer/2022070223/61471b7ff4263007b1359b7a/html5/thumbnails/2.jpg)
Addendum #01 May 14, 2021 DTCC – Healthcare Center of Excellence 2020179.00 Dover, Delaware Page 2
309 S. GOVERNORS AVENUE DOVER, DELAWARE 19904 302.734.7950 FAX 302.734.7965
7 Q7: Walk through’s – When or how do we/ or subcontractors arrange walking through the building? A7: Thursday, May 20, 2021 at 10am local time subcontractors can access the building. On-site contact will be Ray Parsons, DTCC.
8 Q8: How many data does each WAP get? A8: One.
9 Q9: The specs call out fiber and enclosures etc. but I am not exactly sure where on the drawings the fiber is going. Is there fiber or any backbone involved in this project? A9: No. This section shall be deleted.
10 Q10: How many data are at each demo location? I know the new work plans show multiple different amounts of data at different outlets, given the room. I am more or less looking for a rough estimate for this number. A10: Estimate two (2) existing data at each location.
11 Q11: When is the final date to submit RFI’s? A11: See specification section 001200 INVITATION TO BIDDERS, section 19: RFI’s will be “Deadline for any questions will be received by the Architect until, 7 business days prior to the bid-due date and time or the question cut-off date, whichever is earlier. Phone calls and verbal requests for interpretation will not be accepted.”. During Pre-bid meeting held on 05/11/21 it was determined the cut off date for submitting RFI’s would be May 24, 2021 at 5:00 pm local time.
12 Q12: Signage on Drawing A701 appears to not match Delaware techs graphic standard manual. Please advise. A12: Design drawings are diagrammatic for intent. As noted on 12/A701 and 16/A701, signage design shall adhere to DTCC graphic/brand standards.
13 Q13: Looking through the bid form and DIV 00 and can’t find a bid bond form. RFP mentions a 10% bid security required with the bid? please clarify
A13: See specification section 001200 INVITATION TO BIDDERS, section 3: “The form of the Bid Bond shall be AIA Document A310-2010 Bid Bond or equivalent. A certified check may be used in lieu of a Bid Bond.”
14 Q14: Support Beam for Folding Partition- Sections 4/S-101 and 5/S-101 indicate a T.O.S. elevation of 10'-0" for the W14x30 folding partition support beam. Section 3/A-401 shows the T.O.S. elevation being closer to 12'-0". We need to know the elevation of the folding partition support beam to price the correct hanger rod length for the folding partition track system. A14: Answer pending, will be addressed in next addendum.
15 Q15: In regards to the HVAC controls, on drawing M401 it mentions to tie new controls into the existing BAS but doesn’t mention what the existing BAS is. In the control specs on M000 it lists several approved vendors but again no mention of existing BAS or details related to connecting new equipment to an existing BAS. What is the design intent regarding the HVAC controls and is there an existing BAS system within the facility? A15: Answer pending, will be addressed in next addendum.
![Page 3: ADDENDUM #01 - Conventional Builders Inc · 2021. 5. 17. · 309 S. GOVERNORS AVENUE, DOVER, DELAWARE 19904 302.734.7950 FAX 302.734.7965 Date: May 14, 2021 To: Mark DeVore, DTCC](https://reader036.vdocument.in/reader036/viewer/2022070223/61471b7ff4263007b1359b7a/html5/thumbnails/3.jpg)
Addendum #01 May 14, 2021 DTCC – Healthcare Center of Excellence 2020179.00 Dover, Delaware Page 3
309 S. GOVERNORS AVENUE DOVER, DELAWARE 19904 302.734.7950 FAX 302.734.7965
16 Q16: I see on the legend for the electrical drawings that "telecommunications wiring/ jacks are to be provided by others"- is this by the Owner's vendor or is this in the GC's SOW? A16: Wiring and devices by owner’s vendor unless specifically noted otherwise.
17 Q17: Please confirm a hazardous material clean letter will be provided by owner prior to start of project. A17: Answer pending, will be addressed in next addendum.
18 Q18: Please verify if an owner contingency is to be carried in our price. If yes, please provide a value. A18: See specification section 012100, paragraph 3.3.A “Allowance No. 1: Contingency Allowance: Include a contingency allowance of $20,000 for use according to Owner’s written instructions.”
19 Q19: Please confirm drug testing is required for all workers on site. What process is required to submit this documentation to the owner? A19: See Specification section 002113 Instructions to Bidders, paragraph 4.1.11 and section 008000 paragraph 5.2.5 “The Contractor shall comply and shall ensure all Subcontractors comply with all requirements for drug testing as set forth in TITLE 19 LABOR DELAWARE ADMINISTRATIVE CODE 4000 Office of Management and Budget 4100 Division of Facilities Management 4104 Regulations for the Drug Testing of Contractor and Subcontractor Employees Working on Large Public Works Projects.” Refer to specification section 008114 for drug testing forms.
20 Q20: Please confirm all security and teledata wiring is to be handled by owner. A20: Security and data wiring by owner/owner’s vendor.
21 Q21: Please confirm all signage is to be by owner. A21: See Q5 above.
22 Q22: Please confirm all toilet accessories are by owner. A22. Toilet accessories are existing to remain or provided by owner.
23 Q23: Ref General Note 8 on A101, please confirm any utility connections or requirements for owner furnished equipment is shown in the MEP drawings. If not and portions are to be determined, please specifiy an common allowance for us to carry. A23: Answer pending, will be addressed in next addendum.
24 Q24: Can you please provide more information on the existing Fire Alarm system in the building. A24: There is an existing Radionics system maintained by Advantech.
25 Q25: Do we need to list subcontractors? A25. Yes. Bidders must complete the SUBCONTRACTOR LISTING form included in specification section 004150. Refer to specification section 002113 Instructions to Bidders, paragraph 4.3 for more information. Use caution when completing the subcontractor listing as failure to complete the form correctly can result in an irregular bid. Subcontractor list shall include the following trades:
Demolition
Mechanical
![Page 4: ADDENDUM #01 - Conventional Builders Inc · 2021. 5. 17. · 309 S. GOVERNORS AVENUE, DOVER, DELAWARE 19904 302.734.7950 FAX 302.734.7965 Date: May 14, 2021 To: Mark DeVore, DTCC](https://reader036.vdocument.in/reader036/viewer/2022070223/61471b7ff4263007b1359b7a/html5/thumbnails/4.jpg)
Addendum #01 May 14, 2021 DTCC – Healthcare Center of Excellence 2020179.00 Dover, Delaware Page 4
309 S. GOVERNORS AVENUE DOVER, DELAWARE 19904 302.734.7950 FAX 302.734.7965
Electrical
BAS Controls
Painting
Casework
26 Q26: What are the work hours? A26: The building will not be occupied during construction and operations shall take place during normal work hours of 7am to 4:30pm.
27 Q27: What is the projected start date? A27: DTCC intends to turn around award quickly and contractors will be expected to mobilize immediately. DTCC intends construction to start on or before July 1, 2021.
28 Q28: Will compressed air be needed as typically simulation labs have this. A28: No.
29 Q29: Does DTCC have any preferred subcontractors? A29: DTCC follows State of Delaware regulations and does not identify preferred contractors. Refer to Prevailing Wage Debarment List for contractors debarred from State projects.
30 Q30: What is the condition of the existing roof. A30: Roof replaced in 2012.
SPECIFICATION CHANGES
Item Description 1 Section 000110 TABLE OF CONTENTS
A. DELETE “12300 – ALTERNATES”
2 Section 001113 ADVERTISEMT FOR BIDS A. REVISE paragraph 1, second sentence to read: “Bids will be received at Office of the
President, Building 1000, Terry Campus, 100 Campus Drive, Dover DE 19904 until 3:00 p.m. local time on June 2, 2021, at which time they will be publicly opened and read aloud.” (Note: the correct bid opening date was posted to the State website, the incorrect date was included in the printed and digital version distributed)
3 Section 003000 BID FORM A. REPLACE section 003000 – Bid Form with the attached that includes a line item for
including Allowances as described in specification section 012100 Allowances.
2 Section 007346 – Wage Rates A. REPLACE section 007346 – Wage Rates with the attached. (Note: the correct wage rates
were posted to the State website, the incorrect wage rates were included in the printed and digital version distributed)
![Page 5: ADDENDUM #01 - Conventional Builders Inc · 2021. 5. 17. · 309 S. GOVERNORS AVENUE, DOVER, DELAWARE 19904 302.734.7950 FAX 302.734.7965 Date: May 14, 2021 To: Mark DeVore, DTCC](https://reader036.vdocument.in/reader036/viewer/2022070223/61471b7ff4263007b1359b7a/html5/thumbnails/5.jpg)
Addendum #01 May 14, 2021 DTCC – Healthcare Center of Excellence 2020179.00 Dover, Delaware Page 5
309 S. GOVERNORS AVENUE DOVER, DELAWARE 19904 302.734.7950 FAX 302.734.7965
DRAWING CHANGES
Item Description 1 G001 – COVER SHEET
A. Drawing list 1. REVISE sheet labeled S100 to read as S101 2. REVISE sheet labeled P001 to read as P000
2 A101 – FIRST FLOOR NEW WORK PLAN A. A101/1
1. ADD dimensions in Sterile Lab 211A for rough opening for equipment pass through.
2. ADD note “ROUGH OPENING 2'-6" WIDE X 6'-8" HEIGHT. CONTRACTOR TO COORDINATE FINAL OPENING WITH EQUIPMENT MANUF. AND REQUIRED EQUIPMENT CLEARANCES”
3 A104 – EQUIPMENT AND FURNITURE PLAN – FOR REFERENCE ONLY A. A104/1
1. REVISE location of equipment. See E101 fore revised power locations.
4 PD101 – FIRST FLOOR SANITARY PIPING DEMO PLAN A. REVISE location of existing 4” sanitary line from Mens Room 806 to exterior
5 P101 – FIRST FLOOR SANITARY PIPING NEW WORK A. REPLACE sheet in its entirety to reflect updated distribution plans for sanitary piping.
6 E101 – ELECTRICAL FIRST FLOOR POWER NEW WORK PLAN A. REVISE location of power in Clean Sterile Lab 211A and Soiled Sterile Lab 211B.
LIST OF ATTACHMENTS Item Description Date 1 Section 001113 - ADVERTISMENT FOR BIDS 2 Section 003000 – BID FORM 3 Section 007346 – WAGE RATES 4 G001 – COVER SHEET 5 A101 – FIRST FLOOR NEW WORK PLAN 6 A104 – EQUIPMENT AND FURNITURE PLAN – FOR REFERENCE ONLY 7 PD101– FIRST FLOOR SANITARY PIPING DEMO PLAN 8 P101 – FIRST FLOOR SANITARY PIPING NEW WORK 9 E101 – ELECTRICAL FIRST FLOOR POWER NEW WORK PLAN 10 Pre-bid meeting sign in sheets
END OF ADDENDUM #01 202017900-Addendum01
![Page 6: ADDENDUM #01 - Conventional Builders Inc · 2021. 5. 17. · 309 S. GOVERNORS AVENUE, DOVER, DELAWARE 19904 302.734.7950 FAX 302.734.7965 Date: May 14, 2021 To: Mark DeVore, DTCC](https://reader036.vdocument.in/reader036/viewer/2022070223/61471b7ff4263007b1359b7a/html5/thumbnails/6.jpg)
DTCC HEALTHCARE CENTER OF EXCELLENCE 2020179.00
ADVERTISEMENT FOR BIDS 001113- 1
Public notice is hereby given that sealed bids for Delaware Technical Community College Contract No. C94620ED2, Healthcare Center of Excellence (Building 200), Terry Campus in Dover, DE. Bids will be received at Office of the President, Building 1000, Terry Campus, 100 Campus Drive, Dover DE 19904 until 3:00 p.m. local time on June 2, 2021, at which time they will be publicly opened and read aloud. In accordance with State of Delaware Emergency guidelines, bids may be opened by video conference. Instructions to connect to the opening will be posted in a future Addendum. Bidder bears the risk of late delivery. Any bids received after the stated time will be returned unopened.
Project involves the interior renovation to approximately 8,480 square feet of existing classrooms and offices to create instructional space, simulation healthcare labs and faculty offices for the healthcare education programs at the Delaware Technical and Community College, Terry Campus Building 200, located in Dover, Delaware.
A Pre-Bid Meeting will be held at Building 200, at the Terry Campus, 100 Campus Drive, Dover, DE 19904, on May 11, 2021 at 11:00 a.m. local time for the purpose of establishing the listing of subcontractors and to answer questions. ATTENDANCE AT THIS MEETING IS NOT MANDATORY. Note that in accordance with the Governor’s Twenty Seventh Modification to the State of Emergency declaration, all persons seeking entry to college buildings will be screened in accordance with the requirements set forth in the declaration. After entry, social distancing requirements shall be enforced at all times. Sealed bids shall be addressed to the Delaware Technical Community College, Office of the President, Building 1000, Terry Campus, 100 Campus Drive, Dover DE 19904. The outer envelope should clearly indicate: " COLLEGE CONTRACT NO. C94620ED2, HEALTHCARE CENTER OF EXCELLENCE (BUILDING 200)- TERRY CAMPUS - SEALED BID - DO NOT OPEN." Full sets and partial sets of Bid Documents are available directly from Becker Morgan Group, Inc. 309 S. Governors Ave, Dover, Delaware 19904, at no charge. Addenda will be issued electronically and only to bidders or subcontractors who obtained full sets of the Bid Documents. Owner and Architect are not responsible for bidders and/or subcontractors not obtaining the information provided through the full set of bid documents. Construction documents will be available for review at the following locations: Becker Morgan Group, Inc. 309 S. Governors Ave, Dover, Delaware 19904; Associated Builders and Contractors Delaware, 31 Blevins Drive, Suite B, New Castle, DE 19720. Bidders will not be subject to discrimination on the basis of race, creed, color, sex, sexual orientation, gender identity or national origin in consideration of this award, and Minority Business Enterprises, Disadvantaged Business Enterprises, Women-Owned Business Enterprises and Veteran-Owned Business Enterprises will be afforded full opportunity to submit bids on this contract. Each bid must be accompanied by a bid security equivalent to ten percent of the bid amount and all additive alternates. The successful bidder must post a performance bond and payment bond in a sum equal to 100 percent of the contract price upon execution of the contract. The Owner reserves the right to reject any or all bids and to waive any informalities therein. The Owner may extend the time and place for the opening of the bids from that described in the advertisement, with not less than two calendar days notice by certified delivery, facsimile machine or other electronic means to those bidders receiving plans. END OF ADVERTISMENT FOR BIDS
![Page 7: ADDENDUM #01 - Conventional Builders Inc · 2021. 5. 17. · 309 S. GOVERNORS AVENUE, DOVER, DELAWARE 19904 302.734.7950 FAX 302.734.7965 Date: May 14, 2021 To: Mark DeVore, DTCC](https://reader036.vdocument.in/reader036/viewer/2022070223/61471b7ff4263007b1359b7a/html5/thumbnails/7.jpg)
DTCC HEALTHCARE CENTER OF EXCELLENCE 2020179.00
ADVERTISEMENT FOR BIDS 001113- 2
(PAGE INTENTIONALLY LEFT BLANK)
![Page 8: ADDENDUM #01 - Conventional Builders Inc · 2021. 5. 17. · 309 S. GOVERNORS AVENUE, DOVER, DELAWARE 19904 302.734.7950 FAX 302.734.7965 Date: May 14, 2021 To: Mark DeVore, DTCC](https://reader036.vdocument.in/reader036/viewer/2022070223/61471b7ff4263007b1359b7a/html5/thumbnails/8.jpg)
DTCC HEALTHCARE CENTER OF EXCELLENCE 2020179.00
BID FORM 003000 - 1
BID FORM TO: Mr. Michael Jackson, Vice President for Finance,
Delaware Technical Community College 100 Campus Drive Dover, DE 19904
RE: DTCC Healthcare Center of Excellence Building 200, Terry Campus Dover, Delaware 19904 The undersigned BIDDER proposes and agrees, if this Bid is accepted, to enter into an Agreement with OWNER on the form included in the Contract Documents to complete all Work as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this Bid and in accordance with the Contract Documents. BIDDER has examined the site and locality where the Work is to be performed, the legal requirements (federal, state and local laws, ordinances, rules and regulations) and the conditions affecting cost, progress or performance of the Work and has made such independent investigations as BIDDER seems necessary. I/We agree to achieve total project substantial completion of the work within calendar days (not to exceed 130 calendar days) of the notice to proceed date. A construction schedule documenting this will be required to be submitted in accordance with Section 013200 Construction Progress Documentation. Receipt of the following addenda to the drawings and specifications is hereby acknowledged:
Addendum No.______ Dated_____________ Addendum No.______ Dated_____________ Addendum No.______ Dated_____________ Addendum No.______ Dated_____________ BASE BID (Stipulated Lump Sum):
The sum of Dollars, ($ )
ALTERNATES: A. None ALLOWANCES: A. Contingency: $20,000. Refer to specification Section 012100. BIDDER hereby agrees to furnish all labor, materials, equipment and services required for the project. LIST OF SUBCONTRACTORS: Bidders must complete Section 004150 - Subcontractor Listing for this project at time of bid. Upon award of the Contract, the General Contractor must supply a completed AIA G705-2001, List of Subcontractors. UNIT PRICES:
1. None
![Page 9: ADDENDUM #01 - Conventional Builders Inc · 2021. 5. 17. · 309 S. GOVERNORS AVENUE, DOVER, DELAWARE 19904 302.734.7950 FAX 302.734.7965 Date: May 14, 2021 To: Mark DeVore, DTCC](https://reader036.vdocument.in/reader036/viewer/2022070223/61471b7ff4263007b1359b7a/html5/thumbnails/9.jpg)
DTCC HEALTHCARE CENTER OF EXCELLENCE 2020179.00
BID FORM 003000 - 2
In submitting this bid we agree: 1. This offer is binding and cannot be withdrawn until sixty (60) days from date of Bid. 2. To accept the provisions of Instructions to Bidders. 3. To enter into and execute a contract, if awarded on the basis of this Bid, and to furnish performance
and payment bonds in accordance with the Instructions to Bidders and Supplementary Conditions. 4. To accomplish the Work in accordance with the Contract Documents. 5. Owner will award based on review of lowest responsive and responsible bidder based on alternates,
submitted proposed substantial completion date and bidder’s qualification. 6. All subcontractors or suppliers furnishing over $100,000 in combined labor and material are
bondable. 7. Add/Alternate pricing to be held for one hundred twenty (120) days from date of Bid. 8. This bid is based upon minimum wage rates designated by the State of Delaware. Owner will review base bids from responsive bidders, submitted proposed substantial completion dates and bidders’ qualifications. Owner will make the award based on his best interests. We have attached the required bid security to this bid.
(1) Signature when Bidder is an individual: Respectfully submitted, _____________ _____________________________ Date Firm Name
_____________________________ Owner
(2) Signature when Bidder is a partnership: _____________________________ _____________ Firm Name Date
_____________________________ Signature of Partner
_____________________________ Signature of Partner
_____________________________ Signature of Partner
(3) Signature when Bidder is a Corporation: _____________________________ _____________ Firm Name Date By___________________________
_____________________________ Corporate Seal Title
![Page 10: ADDENDUM #01 - Conventional Builders Inc · 2021. 5. 17. · 309 S. GOVERNORS AVENUE, DOVER, DELAWARE 19904 302.734.7950 FAX 302.734.7965 Date: May 14, 2021 To: Mark DeVore, DTCC](https://reader036.vdocument.in/reader036/viewer/2022070223/61471b7ff4263007b1359b7a/html5/thumbnails/10.jpg)
DTCC HEALTHCARE CENTER OF EXCELLENCE 2020179.00
BID FORM 003000 - 3
NON-COLLUSION STATEMENT The Bidder hereby attests that neither he nor she nor anyone on his or her behalf have conspired with any other party in an attempt to bid a fixed or set price.
Signed: ______________________________ Title: ______________________________
WITNESS:
SUBSCRIBED AND SWORN to, and before me, a Notary Public,
of the State of _________________________________________
County of/City of ______________________________________
Signed:
Title:_______________________ Notary Public
This _________ day of ______________________, 2019
Delaware Contractor’s License #____________ Federal EI #________________
THIS PAGE MUST BE SIGNED AND NOTARIZED FOR YOUR BID TO BE CONSIDERED.
![Page 11: ADDENDUM #01 - Conventional Builders Inc · 2021. 5. 17. · 309 S. GOVERNORS AVENUE, DOVER, DELAWARE 19904 302.734.7950 FAX 302.734.7965 Date: May 14, 2021 To: Mark DeVore, DTCC](https://reader036.vdocument.in/reader036/viewer/2022070223/61471b7ff4263007b1359b7a/html5/thumbnails/11.jpg)
DTCC HEALTHCARE CENTER OF EXCELLENCE 2020179.00
BID FORM 003000 - 4
CERTIFICATION REGARDING PROJECT MANUAL SECTION 008000-Supplementary
General Conditions The Contractor, ___________________, certifies or affirms that they have read and accepted all clauses and conditions noted in project manual section 008000 – “Supplementary General Conditions” __________________________ Signature of Contractor's Authorized Official __________________________ Name and Title of Contractor's Authorized Official ___________________________ Date
END OF BID FORM
![Page 12: ADDENDUM #01 - Conventional Builders Inc · 2021. 5. 17. · 309 S. GOVERNORS AVENUE, DOVER, DELAWARE 19904 302.734.7950 FAX 302.734.7965 Date: May 14, 2021 To: Mark DeVore, DTCC](https://reader036.vdocument.in/reader036/viewer/2022070223/61471b7ff4263007b1359b7a/html5/thumbnails/12.jpg)
![Page 13: ADDENDUM #01 - Conventional Builders Inc · 2021. 5. 17. · 309 S. GOVERNORS AVENUE, DOVER, DELAWARE 19904 302.734.7950 FAX 302.734.7965 Date: May 14, 2021 To: Mark DeVore, DTCC](https://reader036.vdocument.in/reader036/viewer/2022070223/61471b7ff4263007b1359b7a/html5/thumbnails/13.jpg)
![Page 14: ADDENDUM #01 - Conventional Builders Inc · 2021. 5. 17. · 309 S. GOVERNORS AVENUE, DOVER, DELAWARE 19904 302.734.7950 FAX 302.734.7965 Date: May 14, 2021 To: Mark DeVore, DTCC](https://reader036.vdocument.in/reader036/viewer/2022070223/61471b7ff4263007b1359b7a/html5/thumbnails/14.jpg)
A101
1SIM
SF-1
1i
Name
101
1
A101
SIM
101
1
A101
SIM
0STRUCTURAL GRID LINES
SECTION ELEVATION
DETAILS IN PLAN, SECTION
WALL TYPE, SEE A501
ROOM NAME AND NUMBER
WINDOW TAG
DOOR TAG
EXISTING WALL TO REMAIN
EXISTING WALL TO BE REMOVED
NEW WALL
BRICK
CAST STONE
CONCRETE
CONCRETE MASONRY UNITS
SHINGLES
EARTH
PARTICLE BOARD
RIGID INSULATION
STEEL-LARGE SCALE
GLASS-LARGE SCALE
BATT INSULATION
STUD PARTITION
WOOD-FINISH
ACOUSTIC C.M.U. SMALL SCALE
ACOUSTIC C.M.U. LARGE SCALE
GLAZED C.M.U.
WOOD BLOCKING
SOLID CONCRETE MASONRY UNITS
ALL METALS-SMALL SCALE
1. CODES: ALL WORK ON THIS PROJECT SHALL BE DONE IN ACCORDANCE WITH ALL APPLICABLE BUILDING CODES, ORDINANCES, REGULATIONS, STANDARDS, AND ANY ADDITIONAL REQUIREMENT STATED IN ANY LAW, ORDINANCE, OR REGULATION PERTAINING TO CONSTRUCTION WITHIN THE LIMITS OF THE AUTHORITY HAVING JURISDICTION OVER THE PROPOSED WORK (INCLUDING BUT NOT LIMITED TO: FIRE, ACCESSIBILITY, ZONING, WATER, WASTEWATER, ENVIRONMENTAL, STRUCTURAL, ARCHITECTURAL, HEALTH, FIRE PROTECTION, PLUMBING, MECHANICAL, ELECTRICAL, AND ENERGY CONSERVATION). CONFORMITY TO ALL CODES APPLICABLE TO THIS PROJECT SHALL BE THE CONTRACTORS RESPONSIBILITY.
2. EGRESS: ALL MEANS OF EGRESS SHALL BE CONTROLLED BY THE AUTHORITY HAVING JURISDICTION, INCLUDING EXITS, EXIT ACCESS, EXIT DISCHARGE, OTHER EGRESS PATHS, OCCUPANTS LOADS, SPRINKLER PROTECTION, ETC..
3. ACCESSIBILITY: ALL BUILDING COMPONENTS, FIXTURES, ACCESSORIES, ETC. SHALL BE INSTALLED WITH MANEUVERING AND OPERATING CLEARANCES, MOUNTING HEIGHTS, ETC. IN ACCORDANCE WITH AMERICANS WITH DISABILITIES ACT STANDARDS, ICC/ANSI A117.1, AND STATE ACCESSIBILITY CODE.
4. FIELD VERIFICATION: THE CONTRACTOR SHALL VERIFY ALL SITE CONDITIONS AND PROPOSED BUILDING DIMENSIONS PRIOR TO CONSTRUCTION, ANY VARIATIONS, DISCREPANCIES, OR FIELD ALTERATIONS TO THESE DESIGN DRAWINGS SHALL BE BROUGHT TO THE ARCHITECT'S ATTENTION PRIOR TO CONSTRUCTION. IF CONTRACTOR COMMENCES CONSTRUCTION WITHOUT NOTIFYING ARCHITECT OF VARIATIONS, DISCREPENCIES, OR FIELD ALTERATIONS, THAT SHALL CONSTITUTE WAIVER TO ANY CLAIM BY CONTRACTOR FOR ADDITIONAL EXPENSES NECESSARY TO PERFORM WORK ASSOCIATED WITH THOSE CONDITIONS.
5. SUBMITTALS: CONTRACTOR SHALL SUBMIT ALL NECESSARY BUILDING COMPONENTS, SYSTEMS, EQUIPMENT, MATERIALS, FINISHES, ETC. FOR REVIEW BY ARCHITECT/OWNER PRIOR TO PROCUREMENT, FABRICATION, AND/OR INSTALLATION.
6. INSTALLATION: PROPER ASSEMBLY, INSTALLATION, AND OPERATION OF ALL MATERIALS, COMPONENTS, SYSTEMS, AND FINISHES IS THE CONTRACTOR'S RESPONSIBILITY AND SHALL BE IN ACCORDANCE WITH MANUFACTURES INSTRUCTIONS AND ALL APPLICABLE CODES.
7. INCIDENTAL WORK: ANY ITEMS NOT SPECIFICALLY SHOWN ON THE DRAWINGS, BUT WHICH ARE REASONABLY INCIDENTAL TO AND NECESSARY FOR THE SATISFACTORY COMPLETION OF THE PROJECT IN ACCORDANCE WITH APPLICABLE CODES, ORDINANCES, REGULATIONS, AND STANDARDS, ARE INCLUDED WITHIN THE INTENT OF THESE DESIGN DRAWINGS.
8. OWNER-PROVIDED WORK: LOCATION OF ALL OWNER-PROVIDED FIXTURES, EQUIPMENT, ETC. SHALL BE COORDINATED TO ENSURE PROPER ALIGNMENT FOR INSTALLATION AND OPERATION, BLOCKING, ETC.
9. SAFETY: COMPONENTS FOR CONSTRUCTION SAFETY ARE NOT INDICATED IN THESE DRAWINGS. THE CONTRACTOR IS RESPONSIBLE TO COMPLY WITH ALL RULES AND OTHER REQUIREMENTS OF THE OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA), AND APPLICABLE STATE AND LOCAL SAFETY REQUIREMENTS DURING ALL CONSTRUCTION ACTIVITIES.
10. INSPECTIONS: CONTRACTOR IS RESPONSIBLE FOR SCHEDULING ALL ON-SITE INSPECTIONS REQUIRED PRIOR TO OCCUPANCY APPROVAL.
11. DIMENSIONS: UNLESS OTHERWISE INDICATED: WALLS ARE TO FACE OF STUD FRAMING AND TO FACE OF MASONRY; WINDOWS AND DOORS ARE TO CENTERLINE OF OPENING IN STUD FRAMING AND TO FACE OF MASONRY OPENING IN MASONRY; PLUMBING FIXTURES ARE TO CENTERLINE OF FIXTURE.
12. BLOCKING: PROVIDE BLOCKING AS REQUIRED FOR INSTALLATION OF ALL PORTIONS OF THE WORK AND PER MANUFACTURER'S WRITTEN RECOMMENDATIONS, WHETHER OR NOT SPECIFICALLY INDICATED IN THESE DRAWINGS.
13. METAL PROTECTION AT TREATED WOOD: METAL CONNECTORS THAT COME IN CONTACT WITH TREATED LUMBER SHALL BE STAINLESS STEEL OR "ZMAX" CORROSION RESISTANT MATERIALS TO HELP PROTECT AGAINST ACCELERATED CORROSION. CONTRACTOR SHALL COORDINATE COMPATIBILITY OF ALL METALS USED WITH TREATMENT PRODUCT(S) MANUFACTURER(S)'S WRITTEN RECOMMENDATIONS.
14. HURRICANE TIES: CONTRCATOR SHALL PROVIDE HURRICANE TIES AND CONSTRUCTION CONNECTORS PER CODE AND AS REQUIRED BY AUTHORITY HAVING JURISDICTION.
15. WINDOWS AND DOORS: WINDOWS AND DOORS ARE INDICATED USING NOMINAL DIMENSIONS. MATERIALS AND INSTALLATION SHALL COMPLY WITH DESIGN PRESSURE (DP) RATINGS, WATER INFILTRATION RATING, IMPACT/SAFETY GLAZING, WIND REQUIREMENTS, EGRESS HARDWARE, U-FACTOR / R-VALUE, ETC.. ALL EXTERIOR UNITS SHALL HAVE CORROSION-RESISTANT HARDWARE.
16. LIFE SAFETY COMPONENTS: FINAL LOCATION OF FIRE EXTINGUISHERS, EMERGENCY LIGHTING, AND EXIT SIGNS TO BE AS DIRECTED BY LOCAL FIRE MARSHAL, AND ARE SUBJECT TO FINAL ON-SITE INSPECTION AND EVALUATION. CONTRACTOR SHALL MAKE REVISIONS AND/OR ADDITIONS IN ACCORDANCE WITH FIRE MARSHAL'S INSPECTION..
17. FIRE PROTECTION, PLUMBING, MECHANICAL, ELECTRICAL WORK: ALL FIRE PROTECTION, PLUMBING, MECHANICAL, AND ELECTRICAL WORK SHALL BE PERFROMED BY QUALIFIED, LICENSED (SUB)CONTRACTORS, AND BE IN ACCORDANCE WITH ALL APPLICABLE CODES, REGULATIONS, STANDARDS, ETC.. ALL COMPONENTS SHALL BE INSTALLED ABOVE THE FLOOD ELEVATION AS REQUIRED BY FEMA, LOCAL A.H.J., AND ALL APPLICABLE CODES
18. PIPE INSULATION: CONTRACTOR SHALL INSULATE AND PROTECT PIPES AS REQUIRED BY CODE, AND AS REQURIED TO PROTECT PIPING EXPOSED TO EXTERIOR CONDITIONS.
19. GRADING: CONTRACTOR SHALL COORDINATE SITE GRADING TO COMPLY WITH CODES AND ORDINANCES, AND TO MAINTAIN POSITIVE DRAINAGE AWAY FROM BUILDING.
DEDC, LLC
FIRE PROTECTION, PLUMBING, MECHANICAL, AND ELECTRICAL ENGINEER
315 SOUTH CHAPEL STREETNEWARK, DELAWARE 19711302-738-7172 fax: 302-738-7175
PT., PTD. PAINTEDP.R.V. POWER ROOF VENTILATORR.D. ROOF DRAINREC. RECESSEDRECPT. RECEPTIONISTREF. REFRIGERATORREQD. REQUIREDR.L. RAIN LEADERRM. ROOMR.O. ROUGH OPENINGRUB. RUBBER (WALL BASE)S.D. SOAP DISPENSERSECT. SECTIONS.G.F.T. STRUCT. GLAZED
FACING TILES.H. SHOWER HEADSHT. SHEETSIM. SIMILARS.M. SURFACE MOUNTEDS.P. STAND PIPES.S. SERVICE SINKSS STAINLESS STEELSTL. STEELSTOR. STORAGESTRUCT. STRUCTURALSUSP. SUSPENDEDSYN.FL. SYNTHETIC FLOORTB, T.B. TACKBOARDTEL. TELEPHONET.& G. TONGUE AND GROOVETHRESH. THRESHOLDT.O.B. TOP OF BEARINGT.O.M. TOP OF MASONRY PARAPETT.P. TOILET PAPER HOLDERT.S. TACK STRIP,
TEACHING STATIONT.W. TEACHING WALLTYP. TYPICALU.L. UNDERWRITERS
LABORATORIESU.O.N. UNLESS OTHERWISE NOTEDU.S.G. U.S. GYPSUM COMPANYV.A.T. VINYL ASBESTOS TILEV.C.T. VINYL COMPOSITION TILEVERT. VERTICALVEST., V. VESTIBULEV.R.G. VINYL REDUCER STRIPV.T.R. VENT THROUGH ROOFW. WOMENW/ WITHWAIN. WAINSCOTWARD. WARDROBEW.C. WATER CLOSETWD. WOODWDR. WARDROBEWL. WALLW.M. WALL-MOUNTEDW.W.W. WELDED WIRE MESH
ACT ACOUSTIC CEILINGTILE
AC. ACOUSTICAL., ALUM. ALUMINUMA.P. ACCESS PANELA.R.GWB ABUSE RESISSTANT
GWBA.F.F. ABOVE FINISHED
FLOORBD. BOARDBLDG. BUILDINGB.M. BENCH MARKBRG. BEARINGCAB. CABINETCB, C.B. CHALKBOARDC.T. CERAMIC TILEC.H. CEILING HEIGHTCJ, C.J. CONTROL JOINTC.L. CENTER LINECLG. CEILINGCLO., C. CLOSETCLR. CLEARC.M.U., CMU CONCRETE
MASONRY UNITCOL. COLUMNCONC. CONCRETECONST. CONSTRUCTIONCONT. CONTINUOUSCORR. CORRIDORCPT. CARPETC.R. COLD ROLLEDD.A. DISTURBED AREADET. DETAILD.F. DRINKING FOUNTAINDBL DOUBLEDIA. DIAMETERDIM. DIMENSIONDISP. DISPENSERDR. DOORDW DRYWALLDS DOWNSPOUTDWG. DRAWINGEA. EACHE.J., EJ EXPANSION JOINTELEC. ELECTRIC(-AL)EP EPOXY PAINTEQ. EQUALEQUIP, EQPT EQUIPMENTE.W.C. ELECTRIC WATER
COOLEREXG. EXISTINGEXP. EXPANSIONEXT. EXTERIORF.C. FIRE CODEF.C.U. FAN COIL UNITF.D. FLOOR DRAINFON. FOUNDATIONF.E. FIRE EXTINGUISHER
F.E.C. FIRE EXTINGUISHERCABINET
FIN.F.,F.F. FINISHED FLOORF.OF S. FACE OF STUDFRP FIREGLASS
REINFORCED PLASTICF.R.T. FIRE RETARDANT
TREATEDFTG. FOOTINGFURR. FURRINGF.V. FIELD VERIFYFVC FIRE VALVE CABINETGA. GAUGEG.B. GRAB BARG.W.B, GWB GYPSUM WALL BOARDGYP.BD. GYPSUM BOARDH., HT. HEIGHTH.C. HANDICAPPEDHDW. HARDWAREH.M. HOLLOW METALHR. HOURH.P. HIGH POINTI.D. INSIDE DIAMETERINSUL. INSULATIONJ., JAN. JANITORJST. JOISTJT. JOINTLAM. LAMINATELAV. LOW POINTL.P. LAVATORY SINKM. MENMACH. MACHINEMAINT. MAINTENANCEMAS. MASONRYMAT. MATERIALSMAX. MAXIMUMMB, M.B. MARKER BOARDM.C. MEDICINE CABINETMECH. MECHANICALMET., MTL. METALMFR. MANUFACTURERMIN. MINMUMM.O. MASONRY OPENINGM.S., METAL SHELVINGMTD MOUNTEDN.C., NONCOM.NON COMBUSTIBLEN.I.C. NOT IN CONTRACTNO., # NUMBERN.T.S. NOT TO SCALEO.C. ON CENTERO.D. OUTSIDE DIAMETEROFF. OFFICEO.H. OPPOSITE HANDOPNG. OPENINGPART. PARTITIONPL. PLATEPLAM,, P-LAM PLASTIC LAMINATEPLY., PWD PLYWOODPNL. PANELPS., P.S. PROJECTOR SCREEN
SCALE:
DATE:
DRAWN BY: PROJ MGR:
PROJECT NO:
PROJECT TITLE
SHEET TITLE
ISSUE BLOCK
COPYRIGHT © 2021
VICINITY MAP DRAWING LIST
ABBREVIATIONS
SYMBOLS OF MATERIALS
DRAWING KEYS
RENOVATIONS TO
DESIGN TEAM
BECKER MORGAN GROUP INC.DEDC, LLC
ARCHITECTS & STRUCTURAL ENGINEERS
MECHANICAL, PLUMBING AND ELECTRICAL ENGINEERS
Delaware309 S Governors Ave
Dover, DE 19904
302.734.7950
Maryland312 West Main St, Suite 300
Salisbury, MD 21801
410.546.9100
North Carolina3333 Jaeckle Drive, Suite 120
Wilmington, NC 28403
910.341.7600
www.beckermorgan.com
Rittenhouse Station
250 South Main Street, Suite 109
Newark, DE 19711
302.369.3700
THE PROFESSIONAL SERVICES OF THE ARCHITECT ARE UNDERTAKEN FOR AND ARE PERFORMED IN THE INTEREST OF:1)
NO CONTRACTURAL OBLIGATION IS ASSUMED BY THE ARCHITECT FOR THE BENEFIT OF ANY OTHER PERSON INVOLVED IN THE PROJECT.
DATE OF SIGNATURE: 05.05.2021DATE OF REGISTRATION EXPIRATION:01/31/2022
GENERAL NOTES
1" = 1'-0"
5/1
2/2
021
6:1
3:1
4 P
MC
:\U
se
rs\jd
eg
race\D
ocu
me
nts
\202
01
79
00_
jdeg
race
FX
JN
W.r
vt
G001
COVER SHEET
AMCJAD
05/05/2021
2020179.00
TERRY CAMPUS100 CAMPUS DRIVE, DOVER, DE
DTCCHEALTHCARECENTER OFEXCELLENCE
DTCC HEALTHCARE CENTER OFEXCELLENCE
TERRY CAMPUS100 CAMPUS DRIVE, DOVER, DE
ISSUED FOR PERMITS
05/05/2021
DELAWARE TECHNICAL COMMUNITYCOLLEGE
SHEET No. SHEET TITLE
GENERAL
G001 COVER SHEET
G101 LIFE SAFETY PLAN AND CODE STUDY
STRUCTURAL
S101 FOUNDATION PLAN
ARCHITECTURAL
AD101 FIRST FLOOR DEMOLITION PLAN
A001 CONSTRUCTION TYPES - WALL TYPES AND DETAILS
A101 FIRST FLOOR NEW WORK PLAN
A102 FIRST FLOOR REFLECTED CEILING PLAN
A103 FIRST FLOOR FINISH PLAN
A104 EQUIPMENT AND FURNITURE PLAN - FOR REFERENCE ONLY
A401 ENLARGED PLANS AND SECTIONS
A601 DETAILS, DOOR AND WINDOW TYPES AND SCHEDULE
A701 INTERIOR ELEVATIONS
MECHANICAL
M000 MECHANICAL LEAD SHEET
MD101 FIRST FLOOR DUCTWORK DEMO PLAN
M101 FIRST FLOOR NEW DUCTWORK PLAN
M401 MECHANICAL CONTROL DIAGRAMS
M501 MECHANICAL DETAILS
M601 MECHANICAL SCHEDULES
M901 MECHANICAL FIRST FLOOR ZONING PLAN
PLUMBING
P000 PLUMBING LEAD SHEET
PD101 FIRST FLOOR SANITARY PIPING DEMO PLAN
PD110 FIRST FLOOR SERVICE PIPING DEMO PLAN
P101 FIRST FLOOR SANITARY PIPING NEW WORK
P110 FIRST FLOOR SERVICE PIPING NEW WORK
P500 PLUMBING DETAILS
ELECTRICAL
E000 ELECTRICAL NOTES LEGENDS & ABBREVIATIONS
E001 ELECTRICAL SPECIFICATIONS
ED101 ELECTRICAL FIRST FLOOR LIGHTING & POWER DEMOLITION PLAN
E101 ELECTRICAL FIRST FLOOR POWER NEW WORK PLAN
E201 ELECTRICAL FIRST FLOOR LIGHTING NEW WORK PLAN
E300 ELECTRICAL PANELBOARD SCHEDULES
ISSUED:
ISSUED
FOR PERMITS
05/05/21
SITE
Mark Date Description
1 12/16/2020 ISSUED FOR AABREVIEW
2 12/18/2020 ISSUED FOR FINALOWNER REVIEW
3 04/01/21 ISSUED FOR BIDDING
4 05/05/21 ISSUED FOR PERMIT
5 05/14/21 ADDENDUM NO. 01
5
5
![Page 15: ADDENDUM #01 - Conventional Builders Inc · 2021. 5. 17. · 309 S. GOVERNORS AVENUE, DOVER, DELAWARE 19904 302.734.7950 FAX 302.734.7965 Date: May 14, 2021 To: Mark DeVore, DTCC](https://reader036.vdocument.in/reader036/viewer/2022070223/61471b7ff4263007b1359b7a/html5/thumbnails/15.jpg)
REF.
DN
DN
WD
GENERAL NOTES1. DIMENSIONS ARE TO EXTERIOR FACE OF
CONCRETE, MASONRY, OR METAL STUD UNLESS OTHERWISE NOTED.
2. SEE A400-SERIES FOR ENLARGED PLANS AND SECTIONS.
3. SEE A103 FOR FINISH SCHEDULE AND LEGEND.4. SEE A601 FOR DOOR SCHEDULE, DOOR AND FRAME
TYPES, STOREFRONT TYPES AND WINDOW TYPES. 5. COORDINATE REQUIREMENTS OF WORK WITH ALL
OTHER TRADES.6. PATCH AND REPAIR AREAS DAMAGED BY
DEMOLITION ACTIVITIES. FINISH SMOOTH TO BLEND WITH ADJACENT CONSTRUCTION OR IN PREPARATION FOR NEW FINISHES.
7. REPAIR ALL HOLES LEFT BY REMOVAL OF EQUIPMENT. FINISH SMOOTH TO BLEND WITH ADJACENT CONSTRUCTION OR IN PREPARATION FOR NEW FINISHES.
8. SEE SHEET A104 AND MEP DRAWINGS FOR EQUIPMENT AND FURNITURE PLAN. CONTRACTOR SHALL COORDINITATE EQUIPMENT, UTILITIES, CLEARANCES AND EQUIPMENT REQUIREMENTS WITH ALL OTHER TRADES, TYP. FOR ROOMS 202, 208,211A, 211B, 212, 213, 214, 218, 219. EQUIPMENT BY OWNER, SHOWN FOR REFERENCE ONLY, N.I.C.
9. CONTRACTOR SHALL COORDINATE WASHER, DRYER AND MOP SINK WITH OWNER AND ENSURE FITMENT IN LAUNDRY 230.
CLASSROOM
217
WOMEN
215
CNA LAB
208
VESTIBULE
200
PROMETRIC
202
OFFICE
229
OFFICE
228
OFFICE
226
CLOSET
227
OFFICE
225
CORRIDOR
224
COPY/ WORKROOM
223
MEN
222
STORAGE
221
CNA LAB
218CCMAA LAB
219
ELEC.
207A
CO
M.
RO
OM
206A
PHLEB. LAB
214
CLEANSTERILE LAB
211A
DIALYSIS LAB
213
DENTAL LAB
212
CORRIDOR
203
CORRIDOR
210
CORRIDOR
220
CO
RR
IDO
R
206
STORAGE
231
BREAKROOM
207
COMPUTERLAB
205
DOOR TO REMAIN, SECURE DOOR FROM INTERIOR PRIOR TO WALL INFILL, REMOVE HARDWARE AND PROVIDE BLANKING PLATES
A701
1
A701
A701
2
CLASSROOM
204
CLASSROOM
216
CLASSROOM
209
CORRIDOR
201
1A
1A
1A
1A
2A1A
1A
1A
1A
1A
1A
229/1
205/1
208/1
209/1
219/1
3
3
A401
4
A401 6
A401
1
A401
A701
1211
B
A601
1
A701
56
A701
4
OPERABLE PARTITION
231/1
3' -
0"
9' -
10
"
ALIG
N
MIN.
4' - 0"
A701
2
6' - 0" 3' - 6"
ALIG
N
1A2A
ALIGN
BOTTLE FILLING STATION (SEE PLUMB.)
(N.I.C.)
A701
8
7
24' - 7" 24' - 7"
2A
ALIGN
LAUNDRY
230
2' -
0"
4' -
4"
1A 1A
1A
1A
1A
13' - 8 1/2" +/- 2' - 0" 5' - 5"
COPIER(N.I.C.)
SHREDDER(N.I.C.)
5' -
3"
4' -
6"
(N.I.C.) (N.I.C.)
TRANSACTION WINDOW
TRANSACTION WINDOW
212/1
223/1
223/2
4' - 9" 2' - 0"
A701
10
A701
9
8
A401
8
A401
5
A401
7
A401
A601
2
1' - 6" MIN.
8' - 7"
11' - 9"
EXISTING STAIR AND LANDING TO REMAIN
EXISTING HANDRAIL TO REMAIN
EXISTING STAIR AND LANDING TO REMAIN
217/1 216/1
218/1
214/1
207/1
207A/1206A/1
204/1202/1
227/1
228/1
226/1
230/1 222/1
225/1
213/1
200/1
45.00°
EXISTING MONITOR TO REMAIN
COLUMN(SEE STRUCT.)
1A
SF-2
200/2
9' - 0"
3SIM
SIM
1' -
0"
3' -
6"
3' -
3"
24
' -
9"
A601
3
218/2
217/2
C L1
' -
4"
10
A401
A701
13
10' - 1"
8' -
10
"7
' -
8"
1A
SOLIEDSTERILE LAB
211B
SF-1
5' - 1"
9
A401
ALIG
N
2
A401
B
1
A
B
COLUMN(SEE STRUCT.)
CO
NT
RA
CT
OR
TO
V.I.F
.
19
' -
10
" +
/-
2A
2A 2A
211A/1
211B/1
14
9' - 0"
15
ALIG
N
2A2A
2A
1A
1A
11
A401
14
' -
0"
2' - 0"
ALIGN
1' -
2"
10"
2' -
0"
3' -
6"
7' - 0"
4' - 6"
ALIG
N
TO SOFFIT ABOVE2' - 0" - ALIGN
MAINTAIN REQUIRED CLEARANCES
COORDINATE REQUIRED CLEARANCE WITH OPERABLE PARTITION MANUFACTURER
2A
1A1A
3"
7"
18
' -
7"
10"
6' -
0"
4' -
6"
1A
1A
1A
1A
1A3' - 5"
1B
1' - 0" MIN.
A
A
A
A
A
A
B
B
B
B
A B
BB
BB
B
AA
A
A
SF-3
2' -
0"
5"
COUNTER4" MAX
GL
AS
S
3' -
0"
FIX
ED
SLID
ER
3' -
0"
7"
201/1
HVAC (SEE MECH.)
A701SIM
2
6' - 7"
2' -
1"
6' -
7"
2' - 1"
2' - 1"
A
3' -
4"
6' - 0"
6' - 8" H
2' - 6" W
ROUGH OPENING 2'-6" WIDE X 6'-8" HEIGHT. CONTRACTOR TO COORDINATE FINAL OPENING WITH EQUIPMENT MANUF. AND REQUIRED EQUIPMENT CLEARANCES
5
DEDC, LLC
FIRE PROTECTION, PLUMBING, MECHANICAL, AND ELECTRICAL ENGINEER
315 SOUTH CHAPEL STREETNEWARK, DELAWARE 19711302-738-7172 fax: 302-738-7175
SCALE:
DATE:
DRAWN BY: PROJ MGR:
PROJECT NO:
PROJECT TITLE
SHEET TITLE
ISSUE BLOCK
COPYRIGHT © 2021
Delaware309 S Governors Ave
Dover, DE 19904
302.734.7950
Maryland312 West Main St, Suite 300
Salisbury, MD 21801
410.546.9100
North Carolina3333 Jaeckle Drive, Suite 120
Wilmington, NC 28403
910.341.7600
www.beckermorgan.com
Rittenhouse Station
250 South Main Street, Suite 109
Newark, DE 19711
302.369.3700
THE PROFESSIONAL SERVICES OF THE ARCHITECT ARE UNDERTAKEN FOR AND ARE PERFORMED IN THE INTEREST OF:1)
NO CONTRACTURAL OBLIGATION IS ASSUMED BY THE ARCHITECT FOR THE BENEFIT OF ANY OTHER PERSON INVOLVED IN THE PROJECT.
DATE OF SIGNATURE: 05.05.2021DATE OF REGISTRATION EXPIRATION:01/31/2022
As indicated
5/1
2/2
021
6:1
3:1
2 P
MC
:\U
se
rs\jd
eg
race\D
ocu
me
nts
\202
01
79
00_
jdeg
race
FX
JN
W.r
vt
A101
FIRST FLOOR NEWWORK PLAN
AMCJAD
05/05/2021
2020179.00
TERRY CAMPUS100 CAMPUS DRIVE, DOVER, DE
DTCCHEALTHCARECENTER OFEXCELLENCE
DELAWARE TECHNICAL COMMUNITYCOLLEGE
SCALE: 1/4" = 1'-0"1 FIRST FLOOR NEW WORK PLAN
N
SCALE: 1/4" = 1'-0"
0' 2' 4' 8'
ISSUED:
ISSUED
FOR PERMITS
05/05/21
TOILET ACCESSORY SCHEDULE
KEY ACCESSORY DESCRIPTION Comments
A PAPER TOWEL DISPENSER BY OWNER
B SOAP DISPENSER BY OWNER
Mark Date Description
1 12/16/2020 ISSUED FOR AABREVIEW
2 12/18/2020 ISSUED FOR FINALOWNER REVIEW
3 04/01/21 ISSUED FOR BIDDING
4 05/05/21 ISSUED FOR PERMIT
5 05/14/21 ADDENDUM NO. 01
![Page 16: ADDENDUM #01 - Conventional Builders Inc · 2021. 5. 17. · 309 S. GOVERNORS AVENUE, DOVER, DELAWARE 19904 302.734.7950 FAX 302.734.7965 Date: May 14, 2021 To: Mark DeVore, DTCC](https://reader036.vdocument.in/reader036/viewer/2022070223/61471b7ff4263007b1359b7a/html5/thumbnails/16.jpg)
REF.
DN
DN
WD
CLASSROOM
217
WOMEN
215
CNA LAB
208
VESTIBULE
200
OFFICE
229
OFFICE
228
OFFICE
226
CLOSET
227
OFFICE
225
CORRIDOR
224
COPY/ WORKROOM
223
MEN
222
STORAGE
221
CNA LAB
218
CCMAA LAB
219
ELEC.
207A
CO
M.
RO
OM
206A
PHLEB. LAB
214
CLEANSTERILE LAB
211A
DIALYSIS LAB
213
DENTAL LAB
212
CORRIDOR
203
CORRIDOR
210
CORRIDOR
220
CO
RR
IDO
R
206
STORAGE
231
BREAKROOM
207
COMPUTERLAB
205
VENDING (BY OTHERS)
CLASSROOM
204
CLASSROOM
216
CLASSROOM
209
CORRIDOR
201
ALIG
N(N.I.C.)
LAUNDRY
230
(N.I.C.) (N.I.C.)
10
1213
13
11
11
10
10
10
1 1
1 1
1 1
1 1
MS-1 MS-1 MS-1 MS-1 MS-1
MS
-1
MS-1
3SIM
SOLIEDSTERILE LAB
211B
PROMETRIC
202
TABLE
14
5
8
STOR. 16"X 32"
WRAP. 16"X 32"
29
153 7
TABLE (BY OWNER)
6
LINEN CABINET, TYP. (BY OWNER)
COPIER(N.I.C.)
SHREDDER(N.I.C.)
11
11
16
16
1
4
3' -
2"
3' -
10
"
5
SPECIALITY EQUIPMENT LEGEND
3M ATTEST MINI AUTO READER 2
WASHER DISINFECTORS STERILIZING P10003
(STERRAD STERILIZER) STERRAD NX
INTERGRITY STERILIZER 175SG5
HEIGHT ADJUSTABALE PROCESSING SINK6
SURGICAL SCRUB SINK (SINGLE)7
FLEX ULTRASONICS8
ERGOSTAT HEIGHT ADJUSTABLE PREP & PACK TABLE9
PHLEBOTOMY CHAIR10
DIALYSIS CHAIR12
DIALYSIS MACHINE13
DENTAL CHAIR 14
PHLEBOTOMY CART11
PATIENT BED - MED SURG W/ MATRESS 1
15
4
WRAPPING RACK
16 TREATMENT TABLE
EQUIPMENT NAME#
EQUIPMENT AND FURNITURE GENERAL NOTES
1. FURNITURE BY OWNER, SHOWN FOR REFERENCE ONLY, N.I.C.
2. CONTRACTOR SHALL COORDINITATE UTILITY CONNECTIONS FOR EQUIPMENT. MAINTAIN CLEARANCE REQUIREMENTS WITH ALL OTHER TRADES, TYP. FOR ROOMS 202, 208,211A, 211B, 212, 213, 214, 218, 219. EQUIPMENT BY OWNER, SHOWN FOR REFERENCE ONLY, N.I.C.
DEDC, LLC
FIRE PROTECTION, PLUMBING, MECHANICAL, AND ELECTRICAL ENGINEER
315 SOUTH CHAPEL STREETNEWARK, DELAWARE 19711302-738-7172 fax: 302-738-7175
SCALE:
DATE:
DRAWN BY: PROJ MGR:
PROJECT NO:
PROJECT TITLE
SHEET TITLE
ISSUE BLOCK
COPYRIGHT © 2021
Delaware309 S Governors Ave
Dover, DE 19904
302.734.7950
Maryland312 West Main St, Suite 300
Salisbury, MD 21801
410.546.9100
North Carolina3333 Jaeckle Drive, Suite 120
Wilmington, NC 28403
910.341.7600
www.beckermorgan.com
Rittenhouse Station
250 South Main Street, Suite 109
Newark, DE 19711
302.369.3700
THE PROFESSIONAL SERVICES OF THE ARCHITECT ARE UNDERTAKEN FOR AND ARE PERFORMED IN THE INTEREST OF:1)
NO CONTRACTURAL OBLIGATION IS ASSUMED BY THE ARCHITECT FOR THE BENEFIT OF ANY OTHER PERSON INVOLVED IN THE PROJECT.
DATE OF SIGNATURE: 05.05.2021DATE OF REGISTRATION EXPIRATION:01/31/2022
As indicated
5/1
2/2
021
6:1
3:1
4 P
MC
:\U
se
rs\jd
eg
race\D
ocu
me
nts
\202
01
79
00_
jdeg
race
FX
JN
W.r
vt
A104
EQUIPMENT ANDFURNITURE PLAN -FOR REFERENCEONLY
AMCJAD
05/05/2021
2020179.00
TERRY CAMPUS100 CAMPUS DRIVE, DOVER, DE
DTCCHEALTHCARECENTER OFEXCELLENCE
DELAWARE TECHNICAL COMMUNITYCOLLEGE
SCALE: 1/4" = 1'-0"1FIRST FLOOR NEW WORKEQUIPMENT PLAN
N
SCALE: 1/4" = 1'-0"
0' 2' 4' 8'
ISSUED:
ISSUED
FOR PERMITS
05/05/21
Mark Date Description
1 12/16/2020 ISSUED FOR AABREVIEW
2 12/18/2020 ISSUED FOR FINALOWNER REVIEW
3 04/01/21 ISSUED FOR BIDDING
4 05/05/21 ISSUED FOR PERMIT
5 05/14/21 ADDENDUM NO. 01
![Page 17: ADDENDUM #01 - Conventional Builders Inc · 2021. 5. 17. · 309 S. GOVERNORS AVENUE, DOVER, DELAWARE 19904 302.734.7950 FAX 302.734.7965 Date: May 14, 2021 To: Mark DeVore, DTCC](https://reader036.vdocument.in/reader036/viewer/2022070223/61471b7ff4263007b1359b7a/html5/thumbnails/17.jpg)
REF.
W/D
OFFICE
803
OFFICE
802
OFFICE
801
OFFICE
804
CLASSROOM
805
CLASSROOM
808
CLASSROOM
809
CLASSROOM
810
WOMEN'S
811
CLO.
816A
CLASSROOM
822
CLASSROOM
821
CLASSROOM
816
CLASSROOM
818
BREAK ROOM
817
CO
M. R
OO
M
STUDY
820
COPY
819
CLOSET
LOBBY
RECEPTION
800
MEN'S
806
OFFICE
807
CLO.
CLOSET
DEDC, LLC
FIRE PROTECTION, PLUMBING,
MECHANICAL, AND ELECTRICAL ENGINEER
315 SOUTH CHAPEL STREET
NEWARK, DELAWARE 19711
302-738-7172 fax: 302-738-7175
SCALE:
DATE:
DRAWN BY: PROJ MGR:
PROJECT NO:
PROJECT TITLE
SHEET TITLE
ISSUE BLOCK
COPYRIGHT © 2020
Delaware309 S Governors Ave
Dover, DE 19904302.734.7950
Maryland312 West Main St, Suite 300
Salisbury, MD 21801410.546.9100
North Carolina3333 Jaeckle Drive, Suite 120
Wilmington, NC 28403910.341.7600
www.beckermorgan.com
Rittenhouse Station250 South Main Street, Suite 109
Newark, DE 19711302.369.3700
As indicated
JRFDB
05/05/2021
2020179.00
TERRY CAMPUS
100 CAMPUS DRIVE, DOVER, DE
DTCC
HEALTHCARE
CENTER OF
EXCELLENCE
N
SCALE: 1/4" = 1'-0"
0' 2' 4' 8'
Mark Date Description
1 12/09/2020 AAB SUBMISSION
2 12/18/2020 ISSUED FOR FINAL
OWNER REVIEW
3 04/01/2021 ISSUED FOR BIDDING
ISSUED:
ISSUED
FOR PERMITS
05/05/21
4 05/05/2021 ISSUED FOR PERMIT
PD101
FIRST FLOOR
SANITARY PIPING
DEMO PLAN
5 05/14/2021 ADDENDUM #1
![Page 18: ADDENDUM #01 - Conventional Builders Inc · 2021. 5. 17. · 309 S. GOVERNORS AVENUE, DOVER, DELAWARE 19904 302.734.7950 FAX 302.734.7965 Date: May 14, 2021 To: Mark DeVore, DTCC](https://reader036.vdocument.in/reader036/viewer/2022070223/61471b7ff4263007b1359b7a/html5/thumbnails/18.jpg)
WD
DN
DN
CLASSROOM
217
WOMENS
ROOM
215
CNA LAB
208
SECURED
VESTIBULE
200
PROMETRIC
202
OFFICE
229
OFFICE
228
OFFICE
226
CLOSET
227
OFFICE
225
CORRIDOR
224
COPY/ WORK
ROOM
223
MEN'S
ROOM
222
STORAGE
221
CNA LAB
218
LAB
219
CO
M. R
OO
M
206A
PHLEBOTOMY
LAB
214
DIALYSIS LAB
213
DENTAL LAB
212
CORRIDOR
203
CORRIDOR
210
CO
RR
ID
OR
220
CORRIDOR
206
BREAK
ROOM
207
COMPUTER
LAB
205
CLASSROOM
204
CLASSROOM
216
CLASSROOM
209
CORRIDOR
201
CLEAN
STERILE LAB
211A
SOILED
STERILE LAB
211B
ELEC.
207A
STORAGE
231
LAUNDRY
230
DEDC, LLC
FIRE PROTECTION, PLUMBING,
MECHANICAL, AND ELECTRICAL ENGINEER
315 SOUTH CHAPEL STREET
NEWARK, DELAWARE 19711
302-738-7172 fax: 302-738-7175
SCALE:
DATE:
DRAWN BY: PROJ MGR:
PROJECT NO:
PROJECT TITLE
SHEET TITLE
ISSUE BLOCK
COPYRIGHT © 2020
Delaware309 S Governors Ave
Dover, DE 19904302.734.7950
Maryland312 West Main St, Suite 300
Salisbury, MD 21801410.546.9100
North Carolina3333 Jaeckle Drive, Suite 120
Wilmington, NC 28403910.341.7600
www.beckermorgan.com
Rittenhouse Station250 South Main Street, Suite 109
Newark, DE 19711302.369.3700
As indicated
JRFDB
05/05/2021
2020179.00
TERRY CAMPUS
100 CAMPUS DRIVE, DOVER, DE
DTCC
HEALTHCARE
CENTER OF
EXCELLENCE
N
SCALE: 1/4" = 1'-0"
0' 2' 4' 8'
Mark Date Description
1 12/09/2020 AAB SUBMISSION
2 12/18/2020 ISSUED FOR FINAL
OWNER REVIEW
3 04/01/2021 ISSUED FOR BIDDING
ISSUED:
ISSUED
FOR PERMITS
05/05/21
4 05/05/2021 ISSUED FOR PERMIT
P101
FIRST FLOOR
SANITARY PIPING
NEW WORK
5 05/14/2021 ADDENDUM #1
![Page 19: ADDENDUM #01 - Conventional Builders Inc · 2021. 5. 17. · 309 S. GOVERNORS AVENUE, DOVER, DELAWARE 19904 302.734.7950 FAX 302.734.7965 Date: May 14, 2021 To: Mark DeVore, DTCC](https://reader036.vdocument.in/reader036/viewer/2022070223/61471b7ff4263007b1359b7a/html5/thumbnails/19.jpg)
WD
REF.
DN
DN
CLASSROOM
217
WOMENS
ROOM
215
CNA LAB
208
SECURED
VESTIBULE
200
PROMETRIC
202
OFFICE
229
OFFICE
228
OFFICE
226
CLOSET
227
OFFICE
225
CORRIDOR
224
COPY/ WORK
ROOM
223
MEN'S ROOM
222
STORAGE
221
CNA LAB
218
LAB
219
ELEC.
207A
PHLEBOTOMY
LAB
214
DIALYSIS LAB
213
DENTAL LAB
212
CORRIDOR
203
CORRIDOR
210
CORRIDOR
220
CORRIDOR
206
STORAGE
231
BREAK
ROOM
207
COMPUTER
LAB
205
CLASSROOM
204
CLASSROOM
216
CLASSROOM
209
CORRIDOR
201
CLEAN
STERILE LAB
211A
SOILED
STERILE LAB
211B
LAUNDRY
230
COM. ROOM
206A
DEDC, LLC
FIRE PROTECTION, PLUMBING,
MECHANICAL, AND ELECTRICAL ENGINEER
315 SOUTH CHAPEL STREET
NEWARK, DELAWARE 19711
302-738-7172 fax: 302-738-7175
SCALE:
DATE:
DRAWN BY: PROJ MGR:
PROJECT NO:
PROJECT TITLE
SHEET TITLE
ISSUE BLOCK
COPYRIGHT © 2020
Delaware309 S Governors Ave
Dover, DE 19904302.734.7950
Maryland312 West Main St, Suite 300
Salisbury, MD 21801410.546.9100
North Carolina3333 Jaeckle Drive, Suite 120
Wilmington, NC 28403910.341.7600
www.beckermorgan.com
Rittenhouse Station250 South Main Street, Suite 109
Newark, DE 19711302.369.3700
As indicated
JRFDB
05/05/2021
2020179.00
TERRY CAMPUS
100 CAMPUS DRIVE, DOVER, DE
DTCC
HEALTHCARE
CENTER OF
EXCELLENCE
N
SCALE: 1/4" = 1'-0"
0' 2' 4' 8'
Mark Date Description
1 12/09/2020 AAB SUBMISSION
2 12/18/2020 ISSUED FOR FINAL
OWNER REVIEW
3 04/01/2021 ISSUED FOR BIDDING
ISSUED:
ISSUED
FOR PERMITS
05/05/21
4 05/05/2021 ISSUED FOR PERMIT
ELECTRICAL
FIRST FLOOR POWER
NEW WORK PLAN
E101
5
5 05/14/2021 ADDENDUM # 1
![Page 20: ADDENDUM #01 - Conventional Builders Inc · 2021. 5. 17. · 309 S. GOVERNORS AVENUE, DOVER, DELAWARE 19904 302.734.7950 FAX 302.734.7965 Date: May 14, 2021 To: Mark DeVore, DTCC](https://reader036.vdocument.in/reader036/viewer/2022070223/61471b7ff4263007b1359b7a/html5/thumbnails/20.jpg)
![Page 21: ADDENDUM #01 - Conventional Builders Inc · 2021. 5. 17. · 309 S. GOVERNORS AVENUE, DOVER, DELAWARE 19904 302.734.7950 FAX 302.734.7965 Date: May 14, 2021 To: Mark DeVore, DTCC](https://reader036.vdocument.in/reader036/viewer/2022070223/61471b7ff4263007b1359b7a/html5/thumbnails/21.jpg)
![Page 22: ADDENDUM #01 - Conventional Builders Inc · 2021. 5. 17. · 309 S. GOVERNORS AVENUE, DOVER, DELAWARE 19904 302.734.7950 FAX 302.734.7965 Date: May 14, 2021 To: Mark DeVore, DTCC](https://reader036.vdocument.in/reader036/viewer/2022070223/61471b7ff4263007b1359b7a/html5/thumbnails/22.jpg)