HS Commons & Music Building 5244.01 Moriarty-Edgewood School District ADDENDUM NO. 2 AD2-1 August 24, 2015 The addendum is hereby made part of the Contract Documents to the same extent as though it were originally included therein. Refer to "Bid Form" for acknowledgment of addenda. All Contractors, Subcontractors and suppliers are reminded that they shall be familiar with all addenda items (as well as all parts of the construction documents) so as to understand the extent of their work and its interrelation with other trades. To all bidders for furnishing all labor and materials necessary for the following contract: ADDENDUM 2 HS COMMONS & MUSIC BUILDING ADDITIONS AND RENOVATIONS MORIARTY-EDGEWOOD SCHOOL DISTRICT MORIARTY, NEW MEXICO ARCHITECTURAL ITEMS PROJECT MANUAL: ITEM AD2-A1 PRIOR APPROVALS The following manufacturers / products have been approved in the sections indicated, provided their product satisfies all requirements of the specifications and contract drawings. Section Manufacturer / Products ITEM AD2-A2 Section 01 50 00 – Temporary Facilities and Controls Refer to detail ADD2-D2 attached to this addendum for additional information regarding phasing the scope of work and contractor staging area. The successful proposer will be expected to work with the owner to determine the exact location and size of the staging area as well as construction fence location, configuration, size, and length. Safety of students, staff and visitors, as well as access to parking for athletic events will be considered when identifying the final configuration of construction fencing and contractor access to the work areas. Construction fencing may need to be reconfigured periodically to accommodate construction sequencing and the owner's requirements for safety and access. ITEM AD2-A3 Section 09 30 00 – Tiling 1. Line 2.01.C.6.c, no more than 20% of the floor tile area will be accent tile. Pattern will be provided during color selection process. Wall base tile will match filed tile color. 2. Line 2.01.D.6.c, no more than 20% of the wall tile area will be accent tile. Pattern will be provided during color selection process. ITEM AD2-A4 Section RFP – Request for Proposal 1. In the pre-proposal conference agenda, section B, paragraph 6, the HS breezeway is Corridor xG-05. 2. In the pre-proposal conference sign-in sheet, proposers please use the following email address to contact ESA Construction: [email protected] . DRAWINGS: ITEM AD2-A5 Sheet A101 – Floor Plan

Upload: others

Post on 17-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ADDENDUM 2 HS COMMONS & MUSIC BUILDING ADDITIONS … HS/Addendum 2.pdf · C:\Users\cvandyck\Documents\MESD_Commons-Music CD_c vandyck.rvt 8/21/2015 11:14:43 AM 5244.01 HIGH SCHOOL

HS Commons & Music Building 5244.01

Moriarty-Edgewood School District

ADDENDUM NO. 2 AD2-1 August 24, 2015

The addendum is hereby made part of the Contract Documents to the same extent as though it were originally

included therein. Refer to "Bid Form" for acknowledgment of addenda.

All Contractors, Subcontractors and suppliers are reminded that they shall be familiar with all addenda items

(as well as all parts of the construction documents) so as to understand the extent of their work and its

interrelation with other trades.

To all bidders for furnishing all labor and materials necessary for the following contract:

ADDENDUM 2

HS COMMONS & MUSIC BUILDING ADDITIONS AND RENOVATIONS

MORIARTY-EDGEWOOD SCHOOL DISTRICT

MORIARTY, NEW MEXICO

ARCHITECTURAL ITEMS

PROJECT MANUAL:

ITEM AD2-A1

PRIOR APPROVALS

The following manufacturers / products have been approved in the sections indicated, provided their product

satisfies all requirements of the specifications and contract drawings.

Section Manufacturer / Products

ITEM AD2-A2

Section 01 50 00 – Temporary Facilities and Controls

Refer to detail ADD2-D2 attached to this addendum for additional information regarding phasing the scope of work

and contractor staging area. The successful proposer will be expected to work with the owner to determine the exact

location and size of the staging area as well as construction fence location, configuration, size, and length. Safety of

students, staff and visitors, as well as access to parking for athletic events will be considered when identifying the

final configuration of construction fencing and contractor access to the work areas. Construction fencing may need

to be reconfigured periodically to accommodate construction sequencing and the owner's requirements for safety and

access.

ITEM AD2-A3

Section 09 30 00 – Tiling

1. Line 2.01.C.6.c, no more than 20% of the floor tile area will be accent tile. Pattern will be provided during

color selection process. Wall base tile will match filed tile color.

2. Line 2.01.D.6.c, no more than 20% of the wall tile area will be accent tile. Pattern will be provided during

color selection process.

ITEM AD2-A4

Section RFP – Request for Proposal

1. In the pre-proposal conference agenda, section B, paragraph 6, the HS breezeway is Corridor xG-05.

2. In the pre-proposal conference sign-in sheet, proposers please use the following email address to contact

ESA Construction: [email protected].

DRAWINGS:

ITEM AD2-A5

Sheet A101 – Floor Plan

Page 2: ADDENDUM 2 HS COMMONS & MUSIC BUILDING ADDITIONS … HS/Addendum 2.pdf · C:\Users\cvandyck\Documents\MESD_Commons-Music CD_c vandyck.rvt 8/21/2015 11:14:43 AM 5244.01 HIGH SCHOOL

HS Commons & Music Building 5244.01

Moriarty-Edgewood School District

ADDENDUM NO. 2 AD2-2 August 24, 2015

General note 3, floor prep includes leveling of existing floor slabs as required to install new ceramic tile finish over

existing floor slabs. Refer to attached Exhibit 1 for existing floor finish elevations.

ITEM AD2-A6

Sheet A102 – Floor Plans Demo & New Construction - Music Wing

1. Keyed Note 02 41 00.23, revise on this sheet only to read "Remove existing wall finish, tectum panels,

gypsum board, furring strips and insulation board. CMU wall to remain."

2. In the demolition floor plan, at rooms STO xMU-4B, BOYS xMU-4C & GIRLS xMU-4D, add keyed note

02 41 00.23. Intent is to remove all the existing interior finish from the interior CMU walls where occurs.

3. Keyed note 02 41 11.24, the existing risers are 4" concrete, steel reinforced, earth formed below.

Contractor will need to remove concrete risers and earth fill as required to install new floor slab. Refer to

structural.

4. In the demolition floor plan, at room UTILITY xMU-5, add keyed note 02 41 00.20.

ITEM AD2-A7

Sheet A103 – Music Roof Plan - New Construction

1. Install roof drain crickets at each roof drain on the new and existing building roof. Refer to detail ADD2-

D1 attached to this addendum.

2. Provide roof drain crickets at all rooftop mechanical equipment curbs and other rooftop equipment, refer to

roof plan general note 13 and mechanical.

ITEM AD2-A8

Sheet A121 – Reflected Ceiling Plan

At cooking exhaust hood (keyed note 11 40 00.EH), contractor to provide 1-hour rated enclosure for kitchen exhaust

hood ductwork from top of hood to roof deck. Refer to mechanical.

ITEM AD2-A9

Sheet A131 – Roof Plan

1. Add small roof areas west of the upper commons to the scope of work. Refer to detail ADD2-D1 attached

to this addendum.

2. Provide roof drain crickets at all rooftop mechanical equipment curbs and other rooftop equipment, refer to

roof plan general note 13 and mechanical.

ITEM AD2-A10

Sheet A201 – Exterior Elevations

Refer to detail series ADD2-D3 attached to this addendum for additional information regarding window locations.

ITEM AD2-A11

Sheet A401 – Enlarged Plans & Interior Elevations

At elevations C5, B2 and A2, ceramic wall tile will extend to the ceiling in these rooms.

ITEM AD2-A12

Sheet I102 – Interior Finish Plan - Music

At room xMU-5 UTILITY, revise ceiling material to indicate "GYP/EP", and ceiling height to read "8'-0".

ELECTRICAL ITEMS

DRAWINGS:

ITEM AD2-E1

Sheet E-001 - Electrical Symbols, Legend and General Notes

Change data outlet from data to data/comm outlet. Outlet will have a data port and a communication outlet.

ITEM AD2-E2

Page 3: ADDENDUM 2 HS COMMONS & MUSIC BUILDING ADDITIONS … HS/Addendum 2.pdf · C:\Users\cvandyck\Documents\MESD_Commons-Music CD_c vandyck.rvt 8/21/2015 11:14:43 AM 5244.01 HIGH SCHOOL

HS Commons & Music Building 5244.01

Moriarty-Edgewood School District

ADDENDUM NO. 2 AD2-3 August 24, 2015

Sheet ED-102 - Music Building Demolition Plan

1. Add existing location of data equipment. Refer to drawing SKE-2 attached.

2. Change existing telephone cabinet to be replaced with new cabinet. Refer to drawing SKE-2 attached.

ITEM AD2-E3

Sheet ES-101 - Electrical Site Plan

Add routing of new 400A feeder to new panel “K”. Refer to drawing SKE-1 attached.

ITEM AD2-E4

Sheet E-101 - Commons New Lighting Plan

Add light fixtures (fixture “A”) in common area. Refer to drawing SKE-4 attached.

ITEM AD2-E5

Sheet E-202 - Music New Power and Special Systems Plan

1. Add existing location of data equipment. Refer to drawing SKE-3 attached.

2. Change existing telephone cabinet to be replaced with new cabinet and to stay in existing location. Refer to

drawing SKE-2 attached.

3. Change location of new sub-fire alarm panel to stay in existing location. Refer to drawing SKE-2 attached.

ITEM AD2-E6

Sheet E-501 - Electrical Details

Delete music building data/comm. riser diagram detail.

END OF ADDENDUM NO. 2

Attached to this addendum are 13 sheets, some are 8 ½” x 11” sheets and some are 11” x 17” sheets. The 11”

x 17” sheets are marked as such.

Page 4: ADDENDUM 2 HS COMMONS & MUSIC BUILDING ADDITIONS … HS/Addendum 2.pdf · C:\Users\cvandyck\Documents\MESD_Commons-Music CD_c vandyck.rvt 8/21/2015 11:14:43 AM 5244.01 HIGH SCHOOL

6215.33

6215.34

6215.28

6215.126215.11

6215.226215.06

6215.13

6215.11

6215.34

EXHIBIT 1.1

COMMONSxC-1

CLRMx25

CLRMx26

Page 5: ADDENDUM 2 HS COMMONS & MUSIC BUILDING ADDITIONS … HS/Addendum 2.pdf · C:\Users\cvandyck\Documents\MESD_Commons-Music CD_c vandyck.rvt 8/21/2015 11:14:43 AM 5244.01 HIGH SCHOOL

EXHIBIT 1.2

Page 6: ADDENDUM 2 HS COMMONS & MUSIC BUILDING ADDITIONS … HS/Addendum 2.pdf · C:\Users\cvandyck\Documents\MESD_Commons-Music CD_c vandyck.rvt 8/21/2015 11:14:43 AM 5244.01 HIGH SCHOOL

02 41 11.21

MEDIA CENTER

WORKROOM

UPPER COMMONS

B

A507E5

A507

C5

A507

C5

MEDIA CENTER

WORKROOM

UPPER COMMONS

A507

C5

A507

E5

HIG

H

LO

W

A507

C5

A507C5

A507C5

A507C5

07 61 00.SC

ADD2-D1.21

?

B

07 54 00.SP

DATE:

JOB N

O.

SH

EET:

C:\Users\cvandyck\Documents\MESD_Commons-Music CD_cvandyck.rvt8/21/2015 11:14:43 AM

5244.0

108/2

4/1

5

HIG

H S

CH

OO

L C

OM

MO

NS

& M

US

IC

BLD

G -

AD

DITIO

NS

AN

D R

EN

OV

ATIO

NS

MO

RIA

RTY-ED

GEW

OO

D S

CH

OO

L D

ISTRIC

TA

DD

2-D

1

1/8" = 1'-0"1

ROOF DEMO PLAN 1/8" = 1'-0"

2NEW ROOF PLAN

REFER ALSO TO SHEET A131 FOR

KEYED NOTES AND LEGEND

Page 7: ADDENDUM 2 HS COMMONS & MUSIC BUILDING ADDITIONS … HS/Addendum 2.pdf · C:\Users\cvandyck\Documents\MESD_Commons-Music CD_c vandyck.rvt 8/21/2015 11:14:43 AM 5244.01 HIGH SCHOOL

SINGLE-PLY MEMBRANE

FLASHING, RUN UP AND OVER

PARAPET MINIMUM OF 3".

FASTEN TO WALL AT 12" OC.

2X FRT WD BLOCKING. FASTEN TO

METAL STUDS PER ANSI/SPRI ES-1

STANDARDS.

PRE-FINISHED METAL COPING WITH

CONTINUOUS CLEAT BOTH SIDES,

FASTEN @ 6" OC

SHIM TOP OF PARAPET

FOR POSITIVE DRAINAGE

EXISTING CMU WALL

SINGLE-PLY MEMBRANE

FLASHING, RUN UP AND OVER

PARAPET MINIMUM OF 3".

FASTEN TO WALL AT 12" OC.

FRT EXTERIOR GRADE

WD SHEATHING, 1/2"

FRT EXTERIOR GRADE

WD SHEATHING, 1/2"

DATE:JOB NO.

SHEET:

C:\

Use

rs\c

van

dyc

k\D

ocu

men

ts\M

ES

D_C

om

mo

ns-

Mu

sic

CD

_cva

nd

yck.

rvt

8/21

/201

5 10

: 51:

40 A

M

5244.01 08/24/15

HIGH SCHOOL COMMONS & MUSIC BLDG - ADDITIONS

AND RENOVATIONS

MORIARTY-EDGEWOOD SCHOOL DISTRICT ADD2-D1.2

3" = 1'-0"1

EXISTING PARAPET COPING

Page 8: ADDENDUM 2 HS COMMONS & MUSIC BUILDING ADDITIONS … HS/Addendum 2.pdf · C:\Users\cvandyck\Documents\MESD_Commons-Music CD_c vandyck.rvt 8/21/2015 11:14:43 AM 5244.01 HIGH SCHOOL

�����������

���� ������

����������

������������������

��������� ���������������������

��������������������������������

���������������� ������������

�����

����

����������

����� � ����������� ���

����������� �����

�������������� ����!�

�������

������������

�� ����������������� ���������� �!������������

���"�����

�#$��$��

���!�%

�����!�� ��������������������

��������

����������

���

�� ���

�� ���

���

������

������

����

������

���

��

��������

���

���

��������

���

���

������

���

���

�����

�����

�����

��������

�����

�����

������

��

����

������

��

����

������

� �

���

�����

���

����

������

��������

�����

��������

����

�������

��

�����

����

���

�����

���

���

����������

����

����������

����

�������

����

���

����

��

��

���

����

���

���

����

����

�����

�����

���

����

��

���

����

��

���

��

����

����

��

��

����

��

����

��

��

����

��

����

��

��

����

�����

���

�����

���

�����

��

�����

����

��

���

����

���

�����

��

��

���

��

����

��

�����

�����

��

�����

��

����

����

��

����

�����

����

����

��

��

���

����

��

���

���

���

����

����

�����

�����

����

���

��

����

����

��

��

��

����

�����

��

����

��

����

��

��

����

��

��

��

����

���

�����

���

��

��

�����

��

��

���

����

���

�����

��

���

��

����

��

��

�����

�����

�����

����

����

��

��

�����

������

�����

����

��

��

��

���

����

���

���

���

���

����

����

�����

��

����

���

���

��

���

��

����

����

��

��

����

�����

��

����

��

����

��

����

��

��

��

����

�����

���

��

��

��

���

����

��

���

��

����

��

��

�����

����

��

��

�����

����

��

��

����

���

���

���

����

����

�����

�����

��

����

����

��

���

��

����

����

���

��

���

����

�����

��

��

����

��

����

�����

��

����

��

��

����

�����

���

��

��

��

��

����

��

��

���

��

����

��

�����

�����

��

����

����

��

�����

����

��

��

���

����

����

���

��

��

���

���

����

����

����

��

��

��

����

����

����

���

��

��

���

����

�����

��

����

��

���

����

�����

�����

��

����

��

��

���

�����

���

��

��

����

��

��

�����

��

����

��

���

�����

�����

�����

��

����

����

��

���

�����

�����

����

��

��

��

���

����

��

���

����

���

��

��

����

����

����

��

�����

���

����

���

���

����

����

����

��

��

���

����

��

��

����

��

���

����

�����

�����

��

����

��

������

���

�����

���

����

����

��

����

��

���

��

�����

��

����

�����

��

����

�����

��

����

��

�����

�����

����

����

��

����

���

����

���

����

����

��

���

����

���

���

��

����

����

��

��

����

�����

��

����

���

��

�����

���

�����

����

��

���

��

�����

���

����

�����

����

��

��

��

����

��

���

��

�����

��

����

����

�����

��

���

����

����

�����

��

����

����

��

���

�����

����

��

����

��

���

���

����

���

����

����

��

��

���

��

����

����

����

��

��

���

����

�����

��

��

����

��

���

�����

�����

����

��

��

����

�����

���

�����

��

����

��

��

���

����

�����

��

�����

��

����

����

�����

���

�����

�����

��

����

����

��

��

��

�����

����

�����

��

���

���

���

��

���

����

����

��

����

���

��

���

�����

����

����

����

��

��

����

�����

��

����

����

��

��

���

���

�����

���

�����

����

����

��

��

��

�����

��

����

��

����

��

����

��

����

����

�����

�����

��

��

����

����

��

��

����

�����

����

�����

���

����

���

���

��

��

����

��

��

����

���

���

���

��

�����

����

����

����

��

��

����

�����

��

����

���

��

��

���

�����

�����

���

�����

����

����

��

�����

��

����

��

����

��

���

����

�����

��

��

���

����

�����

��

���

����

��

����

����

��

��

����

�����

����

���

����

���

���

���

���

���

���

���

���

��

STUDENT ACCESS ROUTE

PROPOSED LAY-DOWN AREA

����������

����

����������

����

�������

����

���

����

PHASE I - BEGINNING UPON

NOTICE TO PROCEED

PHASE II - BEGINNING

APPX. APRIL 10, 2016

PHASE III - BEGINNING

APPX. BEGINNING MAY 30, 2016

������

���

��

��������

���

���

��������

���

���

������

���

���

�����

�����

�����

��������

����

�������

��

��������

�����

�����

TEMPORARY CONSTRUCTION PARTITION.

INCLUDE EMERGENCY EGRESS DOOR

WITH PANIC HARDWARE

1

1

CONSTRUCTION AREA

ADD2-D2ORIGINAL SHEET IS 11" x 17"

AND EXIT LIGHT

MAIN

TAIN

VEH

ICU

LAR A

CCES

S F

OR

PARKIN

G D

URIN

G A

THLE

TIC E

VEN

TS

08/24/15

CONTRACTOR STAGINGAREA

Page 9: ADDENDUM 2 HS COMMONS & MUSIC BUILDING ADDITIONS … HS/Addendum 2.pdf · C:\Users\cvandyck\Documents\MESD_Commons-Music CD_c vandyck.rvt 8/21/2015 11:14:43 AM 5244.01 HIGH SCHOOL

14 3 25

7' - 4" 3' - 4" 5' - 4" 3' - 4" 5' - 4" 3' - 4" 5' - 4" 3' - 4"

8' - 0" 5' - 1"

DATE:

JOB N

O.

SH

EET:

C:\Users\cvandyck\Documents\MESD_Commons-Music CD_cvandyck.rvt8/21/2015 11:59:09 AM

5244.0

108/24/15

HIG

H S

CH

OO

L C

OM

MO

NS

& M

US

IC

BLD

G -

AD

DITIO

NS

AN

D R

EN

OV

ATIO

NS

MO

RIA

RTY-E

DG

EW

OO

D S

CH

OO

L D

I STRIC

TA

DD

2-D

3.1

1/8" = 1'-0"1

EAST EXTERIOR ELEVATION- COMMONS

mc
Cloud
Page 10: ADDENDUM 2 HS COMMONS & MUSIC BUILDING ADDITIONS … HS/Addendum 2.pdf · C:\Users\cvandyck\Documents\MESD_Commons-Music CD_c vandyck.rvt 8/21/2015 11:14:43 AM 5244.01 HIGH SCHOOL

3' - 3"

2' - 0"

5' - 2 1/2"

2' - 0"

2' - 0 1/2"

2' - 0" 6' - 8" 2' - 0"

2' - 0"2' - 0"

7' - 4"

DATE:JOB NO.

SHEET:

C:\

Users

\mc\D

ocu

men

ts\M

ES

D_C

om

mo

ns-M

usic

CD

_m

c.b

urn

s.r

vt

8/2

0/2

015 9

:06:3

9 A

M

5244.01 08/24/2015

HIGH SCHOOL COMMONS & MUSIC BLDG - ADDITIONS

AND RENOVATIONS

MORIARTY-EDGEWOOD SCHOOL DISTRICT ADD2-D3.2

1/8" = 1'-0"

NORTH EXTERIOR ELEVATION- COMMONS

1/8" = 1'-0"

SOUTH EXTERIOR ELEVATION - COMMONS

Page 11: ADDENDUM 2 HS COMMONS & MUSIC BUILDING ADDITIONS … HS/Addendum 2.pdf · C:\Users\cvandyck\Documents\MESD_Commons-Music CD_c vandyck.rvt 8/21/2015 11:14:43 AM 5244.01 HIGH SCHOOL

8' - 0" 2' - 0" 8' - 0"

ALIGN ALIGN ALIGN

8' - 0" 4' - 0" 8' - 0" 8' - 0" 4' - 0" 8' - 0"

8' - 4 1/2"8' - 0"9' - 3" 7' - 11" 2' - 0" 7' - 11"

1' - 6"1' - 4" 1' - 0"

1' - 0" 1' - 4" 1' - 8 1/2"

SHEET TITLE

DRAWING SHEET

PROJECT NO:

DRAWN BY:CHECKED BY:

THIS DRAWING IS INCOMPLETE AND NOT

TO BE USED FOR CONSTRUCTION UNLESS

IT IS STAMPED, SIGNED, AND DATED

BELOW

DATE:

C:\

Use

rs\m

c\D

ocu

men

t s\M

ES

D_

Com

mon

s-M

usi

c C

D_

mc.

bu

rns.

rvt

8/2

0/2

01

5 9

:07

:22

AM

5244.01

WINDOW LOCATIONS

HIG

H S

CH

OO

L C

OM

MO

NS &

MU

SIC

BLD

G -

AD

DIT

ION

S A

ND

REN

OVATIO

NS

08/24/2015

ADD2-D3.3

MO

RIA

RTY-E

DG

EW

OO

D S

CH

OO

L D

ISTRIC

T

1/8" = 1'-0"1

NORTH EXTERIOR ELEVATION- MUSIC

1/8" = 1'-0"2

SOUTH EXTERIOR ELEVATION- MUSIC 1/8" = 1'-0"

3EAST ELEVATION - MUSIC

ORIGINAL SHEET IS 11" X 17"

Page 12: ADDENDUM 2 HS COMMONS & MUSIC BUILDING ADDITIONS … HS/Addendum 2.pdf · C:\Users\cvandyck\Documents\MESD_Commons-Music CD_c vandyck.rvt 8/21/2015 11:14:43 AM 5244.01 HIGH SCHOOL

07 54 00.RC

07 54 00.RC

07 54 00.RC

07 54 00.RC

TYP OF 6

TYP OF 4

SHEET TITLE

DRAWING SHEET

PROJECT NO:

DRAWN BY:CHECKED BY:

THIS DRAWING IS INCOMPLETE AND NOT

TO BE USED FOR CONSTRUCTION UNLESS

IT IS STAMPED, SIGNED, AND DATED

BELOW

DATE:

C:\

Use

rs\m

c\D

ocu

men

t s\M

ES

D_

Com

mon

s-M

usi

c C

D_

mc.

bu

rns.

rvt

8/2

0/2

01

5 9

:07

:56

AM

5244.01

Roof Crickets

HIG

H S

CH

OO

L C

OM

MO

NS &

MU

SIC

BLD

G -

AD

DIT

ION

S A

ND

REN

OVATIO

NS

08/18/15

ADD2-D4

MO

RIA

RTY-E

DG

EW

OO

D S

CH

OO

L D

ISTRIC

T

3/32" = 1'-0"1

ROOF PLAN - NEW CONSTRUCTION *REFER ALSO TO SHEET A103 FOR KEYED NOTES AND LEGEND

08/24/15

ORIGINAL SHEET IS 11" x 17"

Page 13: ADDENDUM 2 HS COMMONS & MUSIC BUILDING ADDITIONS … HS/Addendum 2.pdf · C:\Users\cvandyck\Documents\MESD_Commons-Music CD_c vandyck.rvt 8/21/2015 11:14:43 AM 5244.01 HIGH SCHOOL

AA

AA

AA

AAAA

AAAAAAAAAA

AAE

AA

AAE

1 3

2

2

2

(TYP.) FE

F

AFAH

K

CH

MDP SWBD

44

FEF

1(TYP.)

5

NEW 400A FUSEDDISCONNECT

320 GOLD AVE SW STE 500, ALBUQUERQUE, NM 87102 PH-505-877-4499 WEB SITE - WWW.VERTTERRE.COM

HIGH SCHOOLCOMMONS & MUSICBLDG - ADDITIONSAND RENOVATIONSADDENDUM 2200 CENTER ST., MORIARTY, NM 87035

PROJECT NO:DRAWN BY:CHECKED BY:DATE:

100055.0004

08/21/15

REFERENCE SHEET:

SKE-1

ES-101

M. MONTANOD. SANDOVAL

1" = 20'-0"1 ELECTRICAL SITE PLAN ADDENDUM 2

KEYED NOTES 1 REMOVE AND REPLACE EXISTING LIGHT FIXTURE WITH NEW LIGHT FIXTURE.

COORDINATE IN FIELD FOR EXACT LOCATION.

2 INSTALL NEW LIGHT FIXTURE 9'-0" AFG AND CONNECT TO EXISTING EXTERIORLIGHTING CIRCUIT.

3 INSTALL NEW LIGHT FIXTURE 20'-0" AFG AND CONNECT TO EXISTING EXTERIORLIGHTING CIRCUIT.

4 INSTALL NEW LIGHT FIXTURE RECESSED IN CEILING AND CONNECT TOEXISTING EXTERIOR LIGHT CIRCUIT.

5 RUN FEEDER FOR NEW PANEL "K" THROUGH CEILING SPACE. REFER TOONE-LINE DIAGRAM SHEET E-601 FOR MORE INFORMATION.

Page 14: ADDENDUM 2 HS COMMONS & MUSIC BUILDING ADDITIONS … HS/Addendum 2.pdf · C:\Users\cvandyck\Documents\MESD_Commons-Music CD_c vandyck.rvt 8/21/2015 11:14:43 AM 5244.01 HIGH SCHOOL

M

F

J

REMOVE AND REPLACE EXISTING TELEPHONECABINET. REFER TO SHEET E-201 FOR MORE

INFORMATION.EXISTING DATAEQUIPMENT TO REMAIN.

320 GOLD AVE SW STE 500, ALBUQUERQUE, NM 87102 PH-505-877-4499 WEB SITE - WWW.VERTTERRE.COM

HIGH SCHOOLCOMMONS & MUSICBLDG - ADDITIONSAND RENOVATIONSADDENDUM 2200 CENTER ST., MORIARTY, NM 87035

PROJECT NO:DRAWN BY:CHECKED BY:DATE:

100055.0004

08/21/15

REFERENCE SHEET:

1/4" = 1'-0"1 MUSIC BUILDING DEMOLITION PLAN ADDENDUM 2

SKE-2

ED-102

M. MONTANOD. SANDOVAL

Page 15: ADDENDUM 2 HS COMMONS & MUSIC BUILDING ADDITIONS … HS/Addendum 2.pdf · C:\Users\cvandyck\Documents\MESD_Commons-Music CD_c vandyck.rvt 8/21/2015 11:14:43 AM 5244.01 HIGH SCHOOL

M

HD

HD

MB- 21 MB- 9

MB MBPMC

SUB-FACP

TELE CABINET

STOMU-5A

STOxMU-4A

UTILITYxMU-5

REPLACE EXISTING TELEPHONE CABINETWITH NEW. RECONNECT TELPHONE SERVICE

TO NEW CABINET. RECONNECT IN A CLEANAND WORKMEN LIKE MANNER.PROVIDE

MODIFICATIONS NECESSARY FOR ACOMPLETE INSTALLATION. COORDINATEINSTALLATION WITH LOCAL TELEPHONE

COMPANY.

EXISTING DATA EQUIPMENT

320 GOLD AVE SW STE 500, ALBUQUERQUE, NM 87102 PH-505-877-4499 WEB SITE - WWW.VERTTERRE.COM

HIGH SCHOOLCOMMONS & MUSICBLDG - ADDITIONSAND RENOVATIONSADDENDUM 2200 CENTER ST., MORIARTY, NM 87035

PROJECT NO:DRAWN BY:CHECKED BY:DATE:

100055.0004

08/21/15

REFERENCE SHEET:

1/8" = 1'-0"1 MUSIC BUILDING NEW POWER PLAN ADDENDUM 2

SKE-3

E-202

M. MONTANOD. SANDOVAL

Page 16: ADDENDUM 2 HS COMMONS & MUSIC BUILDING ADDITIONS … HS/Addendum 2.pdf · C:\Users\cvandyck\Documents\MESD_Commons-Music CD_c vandyck.rvt 8/21/2015 11:14:43 AM 5244.01 HIGH SCHOOL

J

B B

A AA

A A

A

AA

AA

B B

AF

AH

D

Aa

aa

a a

a

a

aa

a a

a

a

A

A

a

A

Aa

AH- 37

AH- 33

AH- 35

AH- 37

C-STORExC-2

STOxC-4

ELECxM-4

VESTxM-3

AA

A

A

AA

A

aa

a

a

a

aa

320 GOLD AVE SW STE 500, ALBUQUERQUE, NM 87102 PH-505-877-4499 WEB SITE - WWW.VERTTERRE.COM

HIGH SCHOOLCOMMONS & MUSICBLDG - ADDITIONSAND RENOVATIONSADDENDUM 2200 CENTER ST., MORIARTY, NM 87035

PROJECT NO:DRAWN BY:CHECKED BY:DATE:

100055.0004

08/21/15

REFERENCE SHEET:

1/8" = 1'-0"1 COMMONS NEW LIGHTING PLAN ADDENDUM 2

SKE-4

E-101

M. MONTANOD. SANDOVAL