addendum #2 meeting #14 october 21, 2020 committee of ... · (4% for 26-100 required parking...
TRANSCRIPT
![Page 1: Addendum #2 Meeting #14 October 21, 2020 Committee of ... · (4% for 26-100 required parking spaces) 7.70 m required 12.44 m 62.27 m 12.95 m 15.00 m total development area zoning](https://reader033.vdocument.in/reader033/viewer/2022060705/607105702c257e02040330e4/html5/thumbnails/1.jpg)
Addendum #2
Meeting #14
October 21, 2020 Committee of Adjustment
Hearing #06
Re: 5360 Mainway
A-058/20
Committee of Adjustment Start Time – 5:30 PM
![Page 2: Addendum #2 Meeting #14 October 21, 2020 Committee of ... · (4% for 26-100 required parking spaces) 7.70 m required 12.44 m 62.27 m 12.95 m 15.00 m total development area zoning](https://reader033.vdocument.in/reader033/viewer/2022060705/607105702c257e02040330e4/html5/thumbnails/2.jpg)
Addendum #2
Revised Zoning Comments Submitted October 18, 2020 See Attached Site Planning Comments Submitted October 19, 2020 Site Planning The subject property is located on the south side of Mainway, west of Burloak Drive
and east of Sutton Drive. The applicant is proposing to construct two single storey
industrial shell buildings. The following variance is required to facilitate the proposed
development and pertains to building A, located on the west portion of the site:
• To permit a front yard setback of 13 m instead of the minimum required 15 m for the proposed building.
1) Official Plan Designation: Does the proposed minor variance from the Zoning By-law maintain the general intent and purpose of the Official Plan? Yes
The subject site is designated as “General Employment” in the City’s Official Plan (OP).
This land use designation permits industrial uses that involve assembling,
manufacturing, processing, and warehousing, among others. Given the proposed use,
the site is deemed to be in accord with this aspect of the Plan and maintains the general
employment land use designation.
Part II, Section 6.5 a) states that “The density, form, bulk, height, setbacks, spacing and materials of development are to be compatible with its surrounding area.” Generally, compatibility is encouraged through site design and buffering measures, including landscaping, screening and fencing. The Official Plan also considers matters related to environmental features such as ravines, flood plains, lands associated with creeks etc. Staff notes that the subject property does contain lands that are regulated by Conservation Halton. As such, approval will be required prior to commencing any development.
Staff notes that the proposed building (A) has a 15m front yard setback when measured
from the property line; however, the front yard setback is reduced when measured from
the deemed road width. The intent of the OP is to ensure compatibility between uses,
![Page 3: Addendum #2 Meeting #14 October 21, 2020 Committee of ... · (4% for 26-100 required parking spaces) 7.70 m required 12.44 m 62.27 m 12.95 m 15.00 m total development area zoning](https://reader033.vdocument.in/reader033/viewer/2022060705/607105702c257e02040330e4/html5/thumbnails/3.jpg)
the provision of landscaping and to provide a transition between different uses. A
landscaped area, up to Mainway will be maintained which includes land (sodded area)
within the municipal right-of-way. Staff is of the opinion that the 2m reduction will not
create a significant visual impact on the property and the streetscape character will be
upheld by maintaining visual consistency with the adjacent properties and surrounding
area.
Based on the above, staff is of the opinion that the proposed variance will not impact
adjacent land uses or streetscape character, thereby maintaining the general intent and
purpose of the OP.
2) Zoning By-law Designation:
Does the proposed minor variance from the Zoning By-law maintain the general intent and purpose of the Zoning By-law? Yes
The subject property is zoned as GE1, General Employment, under the City’s Zoning
By-Law 2020, as amended.
The provisions within the General Employment zone outlines regulations related to the
physical configuration of built form on site and the relationship with surrounding land
uses. The regulations include minimum yards, building heights, separation distances,
floor area ratios, landscape areas and buffers, loading and parking, outdoor storage and
manufacturing, retail and fencing.
The general intent and purpose of the Zoning By-law is to ensure sufficient spacing and
buffering between different land uses and to the street, to provide appropriate transition
and scale while reducing impacts that adjacent land uses may have on one another. In
this case, staff is of the opinion that the proposed building with a reduced front yard
setback will not generate adverse impacts on the site or to the surrounding area. Staff
notes that the proposed landscaped area will extend beyond the property boundary and
result in the enhancement and maintenance of land (sodded area) within with public
right-of-way. Furthermore, staff is of the opinion that the sitting and design of the
building is consistent with similar developments in the immediate vicinity, thereby
maintaining the integrity of the streetscape character.
As such, staff is of the opinion that the proposed variance maintains the general intent
and purpose of the Zoning By-law
![Page 4: Addendum #2 Meeting #14 October 21, 2020 Committee of ... · (4% for 26-100 required parking spaces) 7.70 m required 12.44 m 62.27 m 12.95 m 15.00 m total development area zoning](https://reader033.vdocument.in/reader033/viewer/2022060705/607105702c257e02040330e4/html5/thumbnails/4.jpg)
3) Desirability: Is the proposed minor variance from the Zoning By-law desirable for the appropriate development or use of the land, building or structure?
Yes
Staff is of the opinion that the proposed variance results is an appropriate form of
development for the subject lands, with no adverse impacts to the surrounding land
uses and streetscape character of the area.
4) Minor in Nature:
Is the proposed minor variance from the Zoning By-law considered minor in nature? Yes
Staff is of the opinion that the requested variance is minor and will not result in any
adverse impacts to the streetscape character or neighbouring properties.
Cumulative Effects of Multiple Variances and Other Planning Matters: N/A
Recommendation:
Staff has reviewed the proposed variance in accordance with the Planning Act, the
policies of the Official Plan and the requirements of the Zoning By-law and has no
objection.
Date: October 16, 2020 Prepared By: Andreas Houlios MCIP RPP
![Page 5: Addendum #2 Meeting #14 October 21, 2020 Committee of ... · (4% for 26-100 required parking spaces) 7.70 m required 12.44 m 62.27 m 12.95 m 15.00 m total development area zoning](https://reader033.vdocument.in/reader033/viewer/2022060705/607105702c257e02040330e4/html5/thumbnails/5.jpg)
Page 1 COMMITTEE OF ADJUSTMENT
STAFF REPORTS
ZONING COMMENT The subject property is zoned GE1, General Employment, under Zoning By-Law 2020, as amended. The GE1 zone, among other things, requires the following: Part 3 – Employment Zones 6.1 LOT WIDTH, AREA, YARDS
Table 3.6.1
Regulation GE1 Zone GE2 Zone
Yard abutting a street having a deemed width of 26 m or greater
15 m 9 m
The applicant is proposing to construct two speculative industrial buildings. Required variance:
1) To permit a front yard setback of 13 m instead of the minimum required 15 m for the proposed building.
Conditions:
1) A zoning clearance certificate is required for each building 2) Conservation Halton Approval will be required
Notes:
• Proposed buildings are subject of City, Region, and School Board Development Charges. Applicant to submit the applicable forms for processing. Park Dedication Fees/City/Region/School Board Development charges will be required prior to issuance of a building permit.
Date: September 27, 2020 Prepared By: Mark Dalrymple Revised: October 16, 2020
![Page 6: Addendum #2 Meeting #14 October 21, 2020 Committee of ... · (4% for 26-100 required parking spaces) 7.70 m required 12.44 m 62.27 m 12.95 m 15.00 m total development area zoning](https://reader033.vdocument.in/reader033/viewer/2022060705/607105702c257e02040330e4/html5/thumbnails/6.jpg)
DE
SIG
NA
TE
D F
IR
E R
OU
TE
S
H
E
L
D
O
N
'
S
C
R
E
E
K
ENT-2
HD
PV
M
T
HD
PV
M
T
ENT-1
RE
FE
R T
O C
HA
RT
CO
NS
TR
UC
T
RE
FE
R T
O C
HA
RT
BU
LL
NO
SE
R=
1.5
0m
R&
R E
XIS
TIN
G C
UR
B
R&
R E
XIS
TIN
G C
UR
B
N37°23'4
1"E
[6
2.2
74]
S
H
E
L
D
O
N
'
S
C
R
E
E
K
N
8
2
°
5
5
'
5
4
"
E
[
7
8
.
5
1
8
]
R
=
8
8
.
0
0
0
N
8
7
°
3
2
'
5
7
"
W
C
=
2
9
.
1
0
6
A
=
2
9
.
2
4
1
N
7
7
°
5
2
'
0
5
"
W
[
3
7
.
6
2
0
]
N37°32'1
5"E
[1
5.6
30]
N37°23'4
0"E
[7
1.0
00]
N37°23'4
0"E
[7
6.4
50]
N4
6°5
1'2
1"W
[1
32
.0
00
]
N
7
7
°
5
9
'
1
0
"
W
[
1
9
.
3
4
0
]
F.S.
DENOTES MANHOLE
27
8
38
SURVEY LEGEND
UP
FIRE ROUTE SIGN
DENOTES WATER VALVE
DENOTES FIRE HYDRANT
DENOTES SIGN
DENOTES GUY WIRE
BW
TOC
PIN
DENOTES FINISHED SILL ELEVATION
DENOTES BOTTOM OF WALL ELEVATION
DENOTES PROPERTY IDENTIFIER NUMBER
DENOTES TOP OF CURB ELEVATION
DENOTES UTILITY POLE
DENOTES CATCHBASIN
DENOTES CONIFEROUS TREE 0.10 METRE DIAMETRE
MA
INW
AY
SU
BJE
CT
TO
AN
EA
SE
ME
NT
(SE
E S
UR
VE
Y D
W
GS
)
5.00
S
H
E
L
D
O
N
'
S
C
R
E
E
K
TOP OF BANK
EX
. C
ON
C. C
UR
BE
X. C
ON
C. C
UR
BE
X. C
ON
C. C
UR
B
15.00
9.0
0
AC
CE
SS
PR
OP
. 22.5
3m
CU
RB
CU
T
TO
TH
E
SA
TIS
FA
CT
ION
OF
TH
E M
UN
ICIP
ALIT
Y
PR
OP
. 19.9
7m
CU
RB
CU
T T
O T
HE
SA
TIS
FA
CT
ION
OF
TH
E M
UN
ICIP
ALIT
Y
FU
LL M
OV
ES
AC
CE
SS
R
7
.
5
R
7
.
5
R
9
.
0
R18.0
12.95
15°
LANDS.
5.00
12.95
10.89
12.95
1
0
.
1
1
7.50
0.20
M/E
5.5 x 4.0m
7.79
A
5350 MAINWAY
INDUSTRIAL
3,307.59 m²
(35,603 sqft)
FFE: TBD
REFUSE STORED INTERNAL TO
EACH UNIT
ROOFTOP MECHANICAL
EQUIPMENT EXCEEDING 1.2m IN
HEIGHT TO BE SCREENED
FROM PUBLIC VIEW
FDC
R
1
2
.
0
R
1
2
.
0
R
1
2
.
0
R
6
.
0
6.00 7.50 6.00 6.00 6.00 6.00 3.003.00
1
3
.
2
1
1
3
5
°
1
3
5
°
TOP OF BANK BUFFER
DE
SIG
NA
TE
D F
IR
E
RO
UT
E
DE
SIG
NA
TE
D
FIR
E R
OU
TE
DE
SIG
NA
TE
D F
IR
E
RO
UT
E
7.70
CO
NC
. W
ALK
CO
NC
. W
ALK
CO
NC
. W
ALK
CO
NC
. W
ALK
CO
NC
. W
ALK
R
2
.
0
R
1
2
.
0
7.70
SU
BJE
CT
TO
AN
EA
SE
ME
NT
(SE
E S
UR
VE
Y D
W
GS
)
5.00
SU
BJE
CT
TO
AN
EA
SE
ME
NT
(SE
E S
UR
VE
Y D
W
GS
)
T
O
P
O
F
B
A
N
K
B
U
F
F
E
R
T
O
P
O
F
B
A
N
K
B
U
F
F
E
R
T
O
P
O
F
B
A
N
K
B
U
F
F
E
R
8
15
10
15
8
FDC
31.00
2
6
.
3
8
43.50
R
2
.
0
R6.0
R
3
.
0
45.31
39.60
33.88
22.45
2.75
TY
P
2.75
TY
P
2.75
TY
P
2.75
TY
P
2.75
TY
P
2.75
TY
P
2.75
TY
P
2BR
2BR
6.00 7.50 6.00 6.00 6.00 6.00
2.00
3.00
2.00
KEY PLANCITY OF BURLINGTON N.T.S.
SUBJECT
SITE
M
A
I
N
W
A
Y
B
U
R
L
O
A
K
D
R
I
V
E
INTERIOR SIDE (WEST SIDE)
orBUILDING B
4 spaces
49.90%
ACCESSIBLE PARKING
LOADING SPACES
LOT COVERAGE
LANDSCAPED AREA
BUILDING HEIGHT (MAX)
SITE STATISTICS
orBUILDING A
32.04%
18.07%
INTERIOR SIDE (EAST SIDE)
FRONT YARD (MAINWAY)
35,602 sqft
1 STOREY
REQUIRED
3,307.59 m2
REAR YARD (SOUTH SIDE)
PROVIDED
TBD
PROVIDED
6 spaces
15.00 m
PAVED AREA
3 spaces
TOTAL GFA or
GE1 - GENERAL EMPLOYMENT
5,265.57 m2 56,678 sqft
45.00 mLOT WIDTH / FRONTAGE
7.50 m
21,076 sqft1,957.99 m2
(4% FOR 26-100 REQUIRED PARKING SPACES)
7.70 m
REQUIRED
12.44 m
62.27 m
12.95 m
15.00 m
TOTAL DEVELOPMENT AREA
ZONING
7.50 m
16,436.08 m2 or 4.06 Acres
YA
RD
S
ET
BA
CK
S
4.50 m
85 spaces
PA
RK
IN
G
48 spaces
123 spaces
WASTE RECEPTACLE
ACCESSIBLE PARKING SPACE
DIRECTION OF TRAFFIC FLOW
BICYCLE RING - 2 SPACES
LIGHT STANDARD (SEE ELEC. DWGS)
SANITARY SEWER MANHOLE (SEE CIVIL DWGS)
STORM SEWER MANHOLE (SEE CIVIL DWGS)
DOUBLE CATCH BASIN (SEE CIVIL DWGS)
CATCH BASIN (SEE CIVIL DWGS)
FIRE HYDRANT + VALVE
DRIVE-IN OVERHEAD DOOR
LOADING DOCK LOCATION
MAN DOOR LOCATION
CURB DEPRESSION / RAMP WITH TACTILE INDICATORS
STOP SIGN
ACCESSIBLE SIGN PER MUNICIPAL BY-LAW
FIRE DEPARTMENT / SIAMESE CONNECTION
CONC. FILLED STEEL BOLLARD
SITE FURNITURE - BENCH (SEE LANDS. DWGS)
ELECTRIC VEHICLE CHARGING SPACE & STATION
GAS METERS (REFER TO NOTES BELOW)
PAD MOUNTED HYDRO TRANSFORMER
SNOW STORAGE AREA
SYMBOL LEGEND
or2,969.39 m2
or8,201.12 m2
FH
BR
FR
SS
BN
LS
WR
FH
FDC
B
G
HT
N
PR
OJE
CT
NO
RT
H
TR
UE
NO
RT
H
CITY OF BURLINGTON
AS PREPARED BY THAM SURVEYING LIMITED
METRIC: DISTANCES AND/OR COORDINATES SHOWN ON THIS PLAN ARE
IN METRES AND CAN BE CONVERTED TO FEET BY DIVIDING BY 0.3048.
LEGAL DESCRIPTION
BLOCK 51 AND 52,
REGIONAL MUNICIPALITY OF HALTON
15 metres100 55
REGISTERED PLAN 43M-1997
PLAN 20M-505
30% OFFICE @ 3.0 per 100 m2
GAS METERS SHALL NOT BE LOCATED ON BUILDING FACADES THAT FACE
STREETS AND SHALL BE LOCATED DISCRETELY, AWAY FROM PEDESTRIAN
TRAVEL ROUTES AND SCREENED FROM PUBLIC VIEW.
GAS PIPES SERVICING ROOF TOP MECHANICAL EQUIPMENT SHALL NOT VE
VISIBLE TO ANY PUBLIC VIEW AND SHALL BE INSTALLED WITHIN THE WALL
CONSTRUCTION.
MUNICIPAL & GENERAL NOTES
Q
U
E
E
N
E
L
I
Z
A
B
E
T
H
W
A
Y
A
P
P
L
E
B
Y
L
A
N
E
AND BLOCK 16, 27 AND 28
1-STOREY INDUSTRIAL
1-STOREY INDUSTRIAL
5360 MAINWAY, BLOCK 16
2 spaces
BICYCLE SPACES
8 spaces7 spaces
11.43
LO
AD
IN
G
Steering Angle
16.79
Lock to Lock Time
Articulating Angle
Tractor Width
WB-20
6.200.80
Tractor Track
Trailer Track
Trailer Width
meters
2.60
2.60:
2.60
2.60
:
:
:
0.00
1.30 12.40
3.00 17.00
:
:
: 6.0
28.2
70.0
2 SPACES + 1 SPACE / 1,000 m2 GFA (OFFICE)
RE
LO
CA
TE
U/P
MIN
. 1.5
m
FR
OM
CU
RB
S
U/P
1
.
5
2
U/P TO BE MIN 1.5m
FROM CURB
RE
MO
VE
EX
. C
UR
B
R
9
.
0
70% INDUSTRIAL
3.40
B
A
2.75
2.00
7.50
A
B
2.75
2.00
3.40
B
2.75
2.00
EV
R
2
.
0
37 spaces@ 1.0 per 100 m2
B
5360 MAINWAY
INDUSTRIAL
1,957.99 m²
(21,076 sqft)
FFE: TBD
REFUSE STORED INTERNAL TO
EACH UNIT
ROOFTOP MECHANICAL
EQUIPMENT EXCEEDING 1.2m
IN HEIGHT TO BE SCREENED
FROM PUBLIC VIEW
2.45 spaces / 100 m2PARKING RATIO (TOTAL)
7
.5
0
RE
INS
TA
TE
w/ H
/D S
W
R
1
.
5
RE
INS
TA
TE
SW
w/ H
/D C
ON
C. S
W
EX
IST
ING
SID
EW
ALK
EX
IST
ING
SID
EW
ALK
EX
IST
ING
SID
EW
ALK
3.40
A
TOTAL
(NOT INCLUDING ACCESSIBLE SPACES)
107.50
72.80
GF
A
LO
AD
IN
G
7
.
5
0
TOP OF BANK
TOP OF BANK
6
.
0
0
7.50
A
C
C
E
S
S
7
.
9
7
1.50
7
.
5
0
TOP OF BANK BUFFER
6
.
7
6
6
.
0
0
SNOW STORAGE AREA
SNW
SNW
LANDS.
or 2.02%165.32 m2
SNW
SN
W
LANDS.
'YIELD'
TRAFFIC SIGN
10
1
1
10
C
B
A
· CURB RAMP MUST HAVE A MINIMUM CLEAR WIDTH OF 1500mm,
EXCLUSIVE OF ANY FLARED SIDES.
· THE RUNNING SLOPE OF THE CURB MUST,
i. BE A MAX OF 1:8, WHERE ELEVATION IS LESS THAN 75mm, AND
ii. BE A MAX OF 1:10, WHERE ELEVATION IS LESS 75mm OR
GREATER AND 200mm OR LESS.
· THE MAX SLOPE ON THE FLARED SIDE OF THE CURB RAMP MUST BE
NO MORE THAN 1:10.
· CURB RAMP MUST HAVE A TACTILE WALKING SURFACE INDICATOR THAT,
- HAVE RAISED TACTILE PROFILES COMPOSED OF TRUNCATED DOMES,,
- HAVE A HIGH TONAL CONTRAST WITH THE ADJACENT SURFACE,
- ARE LOCATED AT THE BOTTOM OF THE CURB RAMP,
- ARE SET BACK BETWEEN 150mm AND 200mm FROM THE CURB EDGE,
- EXTEND THE FULL WIDTH OF THE CURB RAMP,
- ARE A MIN OF 610mm IN DEPTH, AND
- BE SLIP-RESISTANT.
AXONOMETRIC
VIEW
1
5
0
0
M
I
N
1
5
0
0
D
±
1
1
0
0
C
B
A
61
0
1500
MIN
74
0
15
00
11
00
MIN
PLAN VIEW
TACTILE SURFACE / DETECTABLE HAZARD INDICATOR
150mm FROM EDGE OF CURB AND 610mm IN DEPTH
SLOPE SURFACE @ 1:10 (max)
LANDING / UNINTERRUPTED SPACE OF NOT LESS THAN 1100mm
FLARED SIDES WITH MAX SLOPE OF 1:10
D
THE INFORMATION PROVIDED HERE WAS ASSEMBLED FROM OBC 3.8.3.2. AND THE ONTARIO
REGULATION 413 / 12 (made under the ACCESSIBILITY FOR ONTARIANS WITH DISABILITIES ACT, 2005 -
made DEC 12, 2012) IN CONJUNCTION WITH THE GUIDELINES FOR BARRIER-FREE DESIGN OF
ONTARIO GOVERNMENT FACILITIES.
27
50
MIN
15
0
BUILDING FACE
OUTSIDE CURB
A
B
C
D
CURB DEPRESSION DETAIL
B
B
B
B
FU
LL M
OV
ES
AC
CE
SS
2 SPACES + 0.25 SPACES / 1,000 m2 GFA (INDUSTRIAL)
M/E
5.5 x 4.0m
1
.
5
0
6.95
(% OF PAVED AREA)
LANDS.
LANDS.
LANDS.
SNW
SNW
TOP OF BANK AS STAKED BY CONSERVATION
HALTON, RADY-PENTEK AND EDWARD
SURVEYING LTD. AND MELROSE INVESTMENTS
ON AUGUST 19, 2015
Lock to Lock Time
SU-9M
Width
Track
Steering Angle
1.22 6.10
meters
:
:
:
6.0
2.44
2.44
31.8:
9.14
2.00
3.00
2m
RO
AD
W
IDE
NIN
G
15.13
13.10
LOAD.
TYP.
LOAD.
TYP.
30.00
DE
EM
ED
R
OA
D W
ID
TH
1.40
2.50
1.40
2.50
1.50
PYLON SIGN
EXISTING
PYLON SIGN
4.50
13.00
2.50
1.00
1.00
1.82
HT
6m
LA
ND
SC
AP
E
BU
FF
ER
2.06
6.00
3.50
2.00
3.00
PROP. SERVICE LOCATION
REFER TO CIVIL DWGS.
No. DATEREVISION
DATE: CHECKED:
PROJECT No. DRAWING No.
DRAWN BY: SCALE:
OWNERS INFORMATION:
ISSUED DATENo.
BALDASSARRA
Architects Inc.
30 Great Gulf Drive, Unit 20 | Concord ON | L4K 0K7
T. 905.660.0722 | www.baldassarra.ca
5350/5360
Mainway
Burlington, ON
SITE PLAN
OCT. 2020 DW/LY 1:400
19-62 A-1.0
1
CLIENT REVIEW OCT. 25,
2016
2
ISSUED FOR PAC JUL. 24,
2019
3
ISSUED FOR CLIENT REVIEW OCT. 17,
2019
4
ISSUED FOR CLIENT REVIEW FEB. 21,
2020
5
ISSUED FOR SPA FEB. 27,
2020
6
ISSUED FOR CLIENT REVIEW JUNE 11,
2020
7
ISSUED FOR CLIENT REVIEW JUNE 12,
2020
8
ISSUED FOR SPA RESUBMISSION JUNE 18,
2020
9
ISSUED FOR MINOR VARIANCE
APPLICATION
SEPT. 2,
2020
1
REVISED PER CITY
COMMENTS
OCT. 14,
2020