E:\d\rajesh\LPG Pipeline\Gandhar-Vijaipur\Laying-Gandhar\New Retender\Addendum - I\Addendum-I.docc Ref. No.: 05/51/23KF(GNDR)/GAIL/001(v) A Date: 21.04.2008 ADDENDUM-I Sub.: Tender Document for Laying & Construction of Under Ground Steel Pipeline, terminal & Associated Facilities for LPG from GAIL’s LPG Plant to IOCL Bottling Plant at Gandhar Ref. No.: Tender No. 05/51/23KF(GNDR)/GAIL/001(v) A dated 08.04.2008 With reference to above, please note the following changes in the tender document :- I. DATE & PLACE OF TECHNO : 29.04.2008 at 1600 Hrs. COMMERCIAL OPENING GAIL (India) Limited UG Floor, 16, Bhikaiji Cama Place; R.K.Puram New Delhi II Clause No. 42.0 of Part B : The Total Amount of Cenvat Credit Of Vol. I of IV (ITB) being provided shall be indicated in the [Cenvat Credit] format enclosed herewith as Ann. – I. The same shall be considered during evaluation of price bids of successful bidders. An unpriced format of the same shall also be submitted with “Quoted” written against the same. III Clause no. 100.0 of Part – C : Line no. 2 shall also include Service Tax Of Vol. I of IV (GCC) [Statutory Variation] IV Part – F [Schedule of Rate] : SOR Item no. 3 i.e. Summary of Price & Vol. I of IV SOR Item No. 4 i.e. Proforma for Extended Stay Compensation have been incorporated in Revised Schedule of Rates attached in the SRM Module of e-tenderin platform of GAIL. Bidders may fill in the rates in the revised SOR only and also submit an unpriced copy alongwith offer with “Quote” in the space provided in the SOR.

Upload: doanmien

Post on 11-Mar-2018

214 views

Category:

Documents


1 download

TRANSCRIPT

E:\d\rajesh\LPG Pipeline\Gandhar-Vijaipur\Laying-Gandhar\New Retender\Addendum - I\Addendum-I.docc

Ref. No.: 05/51/23KF(GNDR)/GAIL/001(v) A Date: 21.04.2008

ADDENDUM-I

Sub.: Tender Document for Laying & Construction of Under Ground Steel Pipeline,

terminal & Associated Facilities for LPG from GAIL’s LPG Plant to IOCL Bottling Plant at Gandhar

Ref. No.: Tender No. 05/51/23KF(GNDR)/GAIL/001(v) A dated 08.04.2008 With reference to above, please note the following changes in the tender document :- I. DATE & PLACE OF TECHNO : 29.04.2008 at 1600 Hrs. COMMERCIAL OPENING GAIL (India) Limited UG Floor, 16, Bhikaiji Cama Place;

R.K.Puram New Delhi

II Clause No. 42.0 of Part B : The Total Amount of Cenvat Credit Of Vol. I of IV (ITB) being provided shall be indicated in the

[Cenvat Credit] format enclosed herewith as Ann. – I. The same shall be considered during evaluation of price bids of successful bidders. An unpriced format of the same shall also be submitted with “Quoted” written against the same.

III Clause no. 100.0 of Part – C : Line no. 2 shall also include Service Tax Of Vol. I of IV (GCC) [Statutory Variation] IV Part – F [Schedule of Rate] : SOR Item no. 3 i.e. Summary of Price &

Vol. I of IV SOR Item No. 4 i.e. Proforma for Extended Stay Compensation have been incorporated in Revised Schedule of Rates attached in the SRM Module of e-tenderin platform of GAIL. Bidders may fill in the rates in the revised SOR only and also submit an unpriced copy alongwith offer with “Quote” in the space provided in the SOR.

E:\d\rajesh\LPG Pipeline\Gandhar-Vijaipur\Laying-Gandhar\New Retender\Addendum - I\Addendum-I.docc

All other terms and conditions including bid due date of the tender document shall remain unaltered. This Addendum – I and shall form integral part of tender document. Please submit alongwith your offer this ADDENDUM-I to the tender document duly signed and stamped as a token of your acceptance of the terms and conditions stated hereinabove. Please acknowledge the receipt of this Addendum per return fax. Thanking you,

Yours faithfully, For & On Behalf Of

GAIL (India) Limited Encl. As above

(A.K. Sharma) DGM I/c ( Contracts)

SCHEDULE OF RATESFOR

6" DIA. 1.4 KM LPG PIPELINE PROJECT OF GAIL, GANDHARPage 1 of 9

2 TERMINAL WORKS Figure in Rupees

I PIPING & MECHANICAL WORKS Sl. Description of Item Unit Size Rating/ Qty. Amount

No. Thk./ Sch. Figures Words1 PLANT PIPING ABOVE GROUND

Complete work of fabrication, erection, painting, testing of piping systemincluding free issue materials (i.e. valves and other accessories etc.) andmaking ready for further Commissioning / Start-up carbon steel piping of allsizes and ratings including supply of all consumables, equipment, manpowerand other resources and execution of, but not limited to, the following works inaccordance with relevant specifications indicated in clause 5.5 of SCC & scopeof work indicated in SCC, drawings and instructions of Engineer-in-charge andas per all provisions of the CONTRACT DOCUMENT.

- Handling including lifting, transportation from COMPANY's Stores toCONTRACTOR's workshop for fabrication or / and to work site for fieldfabrication and erection for all piping items supplied by COMPANY.

- Fabrication including cutting, edge preparation, inclusive of grinding the edgesof pipes, fittings, flanges etc. to match with the matching edges ofuneven/different thickness wherever required welding, attachment of all pipefittings like elbows, tees, reducers. Supply of nipples, couplings etc. as requiredfor completion of job.

- Making branch connections with Weldolets, providing stub-in connections,reinforcement pads etc, as required. Vent and drain point connection etc withsockolets, etc.

- Erection including lifting, placing on pipe sleepers and supports, overhead onracks, skids and at all elevations including installation and carrying outconnected activities for all types of valves including supply and fixing ofgaskets, fastners wherever required, levelling, aligning, joining of flanges,spectacle blind flanges, blind flanges, connecting with equipment, nozzles,strainers, tie-in with existing piping/facilities, etc. tapping for inline instrumentslike pressure gauges, thermowells, sample connection, etc.

- Preparation of Bill of Material based on piping GADs.

- Preparation of isometric and fabrication drawings.- Preparation of sketches for modifications to avoid fouling with any other existing

pipes and other requirements to suit site conditions and submission of the samefor Owner's review.

- Carrying out Non-destructive testing as required

Unit Rate inclusive of all applicable taxes & duties

D:\Vijyant\LPG\Tender\Re-TenderGandhar\sor\SOR- LPG - GNDR_RETENDER- Aril Revised.xls\Piping & MechSOR.No. 05/21/23KF(GNDR)/Piping &Mech/SOR-02, Rev-1

SCHEDULE OF RATESFOR

6" DIA. 1.4 KM LPG PIPELINE PROJECT OF GAIL, GANDHARPage 2 of 9

2 TERMINAL WORKS Figure in Rupees

I PIPING & MECHANICAL WORKS Sl. Description of Item Unit Size Rating/ Qty. Amount

No. Thk./ Sch. Figures Words

Unit Rate inclusive of all applicable taxes & duties

- Surface preparation before application of primer by means of sand blastingincluding supply of approved quality of sand, manpower, machineries, tools &tackles to achieve required roughness as per specification and as perinstruction of Engineer-in-charge

- Painting of entire system (including above-ground all pipes, fittings, flanges andaccessories) as per specification MEC/S/05/62/07A suitable for highly corrosiveenvironment including supply of approved paints and primers, preparation ofsurface and application of primer and paints, indentification lettering/numbering,colour coding, etc. as specified including rub down & touch up of shop primer orscrapping of shop primer wherever required by COMPANY and providingscafolding for all heights etc.

- Cleaning and flushing by water/ compressed air, testing of the systemsincluding hydrostatic, pneumatic and any other type of testing as specified,draining, drying by compressed air/ other methods approved by COMPANY.

- Pre-commissioning & making operational all piping system and equipments.

- Commissioning, Contractor scope shall provide all necessary assistance interm of supply of man-power, equipment, tools and tackles required amount ofnitrogen for purging of entire terminal piping system including equipments etc.to the company during commissioning activities.

- Completion of all such work in all respects as per scope of work and as perdrawings specifications and instructions of the COMPANY and keeping thesystem ready in all respects for further commissioning and start up.

- Shut-down & hook-up work at different location as shown in schematic routediagram drawing enclosed in Tender Document.

Carbon Steel Pipes (API 5L Grade B/ A106 Gr. B Seamless) MTR. 6" NB, BE S40 40 0.00

MTR. 2" NB, BE S80 12 0.00

MTR. 1.5" S80 1 0.00

MTR. 1" S80 1 0.00

MTR. 3/4" S80 6 0.00

D:\Vijyant\LPG\Tender\Re-TenderGandhar\sor\SOR- LPG - GNDR_RETENDER- Aril Revised.xls\Piping & MechSOR.No. 05/21/23KF(GNDR)/Piping &Mech/SOR-02, Rev-1

SCHEDULE OF RATESFOR

6" DIA. 1.4 KM LPG PIPELINE PROJECT OF GAIL, GANDHARPage 3 of 9

2 TERMINAL WORKS Figure in Rupees

I PIPING & MECHANICAL WORKS Sl. Description of Item Unit Size Rating/ Qty. Amount

No. Thk./ Sch. Figures Words

Unit Rate inclusive of all applicable taxes & duties

Carbon Steel Pipes (ASTM A333 Grade 6 Seamless) MTR. 4" NB, BE S40 40 0.00

MTR. 2" NB, BE S40 1 0.00

MTR. 1" NB, BE S80 28 0.00

MTR. 0.75" S80 1 0.00

Note: a) All butt welded fittings end shall match with connecting pipe thickness.b) All Couplings, Nipples, fastener & gasket etc. as required shall be suppliedby Contractor as per PMS but no separate payment shall be made as it iscovered under erection rate.c) This excludes supply of assorted pipes, flange, fitting (i.e. elbows, reducers,tees, weldolet, sockolet etc.) of all sizes, ratings & thickness. However, thierpayment for erection covered under above erection item rate.

2.0 SUPPLY OF ASSORTED PIPE, FITTINGS AND FLANGESComplete work of supply of pipes, flanges and fittings including all taxes, duties,transportation and inspection charges but not limited to, the following items inaccordance with relevant specifications indicated in scope of work indicated inSCC, drawings, specification and instructions of Engineer-in-charge and as perall provisions of the CONTRACT DOCUMENT.

- Handling including lifting, transportation from Contractor Stores toCONTRACTOR's workshop for fabrication and/ or to work site for fieldfabrication and erection for all piping items supplied by Contractor.

2.1 Carbon Steel Pipesa) Carbon Steel Pipes (API 5L Grade B/ A106 Gr. B Seamless)

MTR. 2" NB, BE S80 12 0.00

MTR. 1.5" S80 1 0.00

MTR. 1" S80 1 0.00

MTR. 3/4" S80 6 0.00

D:\Vijyant\LPG\Tender\Re-TenderGandhar\sor\SOR- LPG - GNDR_RETENDER- Aril Revised.xls\Piping & MechSOR.No. 05/21/23KF(GNDR)/Piping &Mech/SOR-02, Rev-1

SCHEDULE OF RATESFOR

6" DIA. 1.4 KM LPG PIPELINE PROJECT OF GAIL, GANDHARPage 4 of 9

2 TERMINAL WORKS Figure in Rupees

I PIPING & MECHANICAL WORKS Sl. Description of Item Unit Size Rating/ Qty. Amount

No. Thk./ Sch. Figures Words

Unit Rate inclusive of all applicable taxes & duties

b) Carbon Steel Pipes (ASTM A333 Grade 6 Seamless) MTR. 4" NB, BE S40 40 0.00

MTR. 2" NB, BE S40 1 0.00

MTR. 1" NB, BE S80 28 0.00

MTR. 0.75" S80 1 0.00

2.2 Flangesa) Weld Neck (B-16.5, A105, RF, 125 AARH) Nos. 6" 300# 25 0.00

Nos. 2" 300# 16 0.00

b) Weld Neck (B-16.5, A350 Gr LF2, RF, 125 AARH) Nos. 4" 300# 3 0.00

Nos. 2" 300# 1 0.00

c) SWRF (B-16.5, A105, RF 125AARH) Nos. 1.5" 300# 2 0.00

Nos. 1" 300# 1 0.00

Nos. 0.75" RF 300# 2 0.00

d) SWRF (B-16.5, A350 Gr LF2, RF 125AARH) Nos. 1" 300# 21 0.00

Nos. 0.75" 300# 1 0.00

f) Blind Flanges (B-16.5, A105, RF 125 AARH) Nos. 6" 300# 6 0.00

Nos. 2" 300# 2 0.00

Nos. 1.5" 300# 2 0.00

Nos. 1" 300# 1 0.00

Nos. 0.75" 300# 2 0.00

g) Blind Flanges (B-16.5, A350 Gr LF2, RF 125 AARH) Nos. 4" 300# 1 0.00

D:\Vijyant\LPG\Tender\Re-TenderGandhar\sor\SOR- LPG - GNDR_RETENDER- Aril Revised.xls\Piping & MechSOR.No. 05/21/23KF(GNDR)/Piping &Mech/SOR-02, Rev-1

SCHEDULE OF RATESFOR

6" DIA. 1.4 KM LPG PIPELINE PROJECT OF GAIL, GANDHARPage 5 of 9

2 TERMINAL WORKS Figure in Rupees

I PIPING & MECHANICAL WORKS Sl. Description of Item Unit Size Rating/ Qty. Amount

No. Thk./ Sch. Figures Words

Unit Rate inclusive of all applicable taxes & duties

i) Spec. Blind Flanges (B-16.48, A105, FF 125AARH) Nos. 6" 300# 6 0.00

Nos. 2" 300# 5 0.00

j) Spec. Blind Flanges (B-16.48, A350 Gr. LF2, FF 125AARH) Nos. 4" 300# 1 0.00

2.3 Elbow (Seamless)a) 90° Elbow (A234 Gr. WPB, B-16.9, 1.5D, BW) Nos. 6" S40 16 0.00

Nos. 2" S80 10 0.00

b) 90° Elbow (A420 Gr. WPL6, B-16.9, 1.5D, BW) Nos. 4" S40 8 0.00

c) 90° Elbow (A350 Gr. LF2, B-16.11, 1.5D, SW 3000#) Nos. 1" S80 14 0.00

d) 45° Elbow (A234 Gr. WPB, B-16.9, 1.5D, BW) Nos. 6" S40 4 0.00

e) 45° Elbow (A420 Gr. WPL6, B-16.9, 1.5D, BW) Nos. 4" S40 2 0.00

2.4 Tee (Seamless)a) Equal Tees (A234 Gr. WPB, B16.9, BW) Nos. 6" NB S40 6 0.00

b) Equal Tees (A350 Gr. LF2, B-16.11, 1.5D, SW 3000#) Nos. 1" NB S80 4 0.00

2.5 Reduced Tees a) Reduced Tees (A420 Gr. WPL6, B16.9, BW)) Nos. 4" x 2" S40 x S80 0 0.00

2.6 Reducera) Concentric Reducer(A234 Gr. WPB, B16.9, BW) Nos. 6" x H" S40 x H 4 0.00

2.7 Weldoleta) Sockolet(A105, Bony Forge/Manufactures Stnd) Nos. 6" x 2" 3000# 12 0.00

D:\Vijyant\LPG\Tender\Re-TenderGandhar\sor\SOR- LPG - GNDR_RETENDER- Aril Revised.xls\Piping & MechSOR.No. 05/21/23KF(GNDR)/Piping &Mech/SOR-02, Rev-1

SCHEDULE OF RATESFOR

6" DIA. 1.4 KM LPG PIPELINE PROJECT OF GAIL, GANDHARPage 6 of 9

2 TERMINAL WORKS Figure in Rupees

I PIPING & MECHANICAL WORKS Sl. Description of Item Unit Size Rating/ Qty. Amount

No. Thk./ Sch. Figures Words

Unit Rate inclusive of all applicable taxes & duties

2.8 Sockoleta) Sockolet(A105, Bony Forge/Manufactures Stnd) Nos. 6" x 1½" 3000# 2 0.00

Nos. 6" x 1" 3000# 3 0.00

Nos. 6" x 3/4" 6000# 13 0.00

b) Sockolet(A350 Gr LF2, Bony Forge/MSS-SP-97) Nos. 4" x 1" 3000# 6 0.00

Nos. 4" x 0.75" 6000# 1 0.00Note: All butt welded fittings end shall match with connecting pipe thickness

Quantities indicated above against individual item rate are indicative only and may vary depending upon site condition & associated IFC drawings. Contractor shall assess the actual quantities before procurement and shall take prior approval of Engineer-in-charge.

3.0 SUPPLY OF EQUIPMENTComplete work of supply of Equipment including all taxes, duties, transportationand inspection charges but not limited to, the following items in accordancewith relevant specifications indicated in scope of work indicated in SCC,drawings, specification and instructions of Engineer-in-charge and as per allprovisions of the CONTRACT DOCUMENT.

- Handling including lifting, transportation from Contractor Stores to Company'sStore / erection site for items supplied by Contractor.

i) Supply of Thermal Safety Valves as per Data Sheets enclosed Nos 3/4" X 1" 300# 6 0.00ii) Supply of 'T' Type Strainer for strainng 150micron and above and with drain

plugNos 6" 300# 2 0.00

4.0 VALVES & OTHER ITEMSHandling including lifting and transportation from COMPANY's warehouse toCONTRACTOR'S Stores and/or work site and installation of all types of valves,including assembly of valve accessories, (if any) by bolting, threading orwelding, supply and insertion of gaskets, nuts & bolts, nipples, etc. at allelevations of pipe sleepers, supports or overhead on racks, equipment nozzles,& painting etc. supply of all consumables, manpower, equipment, etc. forcompletion of all works as per scope of work and as per drawings,specifications and instructions of Engineer-in-charge including servicing/cleaning of valves wherever requried.

4.1 Butt Welded Ball Valves i) Full Bore Manually operated API 6D Nos. 6" 300# 2 0.00

ii) Reduced Bore Manually Operated Valve API 6D Nos. 6" 300# 1 0.00

D:\Vijyant\LPG\Tender\Re-TenderGandhar\sor\SOR- LPG - GNDR_RETENDER- Aril Revised.xls\Piping & MechSOR.No. 05/21/23KF(GNDR)/Piping &Mech/SOR-02, Rev-1

SCHEDULE OF RATESFOR

6" DIA. 1.4 KM LPG PIPELINE PROJECT OF GAIL, GANDHARPage 7 of 9

2 TERMINAL WORKS Figure in Rupees

I PIPING & MECHANICAL WORKS Sl. Description of Item Unit Size Rating/ Qty. Amount

No. Thk./ Sch. Figures Words

Unit Rate inclusive of all applicable taxes & duties

iii) Reduced Bore Ball Valve API 6D Nos. 2" 300# 2 0.00

4.2 Flanged Valvesi) Reduced Bore Ball Valve API 6D(Gaskets and Fasteners as per Piping Material

Specification B1A)Nos. 6" 300# 7 0.00

Nos. 2" 300# 5 0.00

ii) Reduced Bore Ball Valve API 6D(Gaskets and Fasteners as per Piping MaterialSpecification B4A)

Nos. 4" 300# 2 0.00

Nos. 1" 300# 8 0.00

Nos. 3/4" 300# 1 0.00

iii) Globe Valve BS 1873(Gaskets and Fasteners as per Piping MaterialSpecification B1A)

Nos. 6" 300# 1 0.00

Nos. 2" 300# 5 0.00

4.3 Socket Welded Ball Valves Nos. 1" 800# 1 0.00

Nos. 3/4" 800# 13 0.00

4.4 Thermal Safety Valves Threaded on Inlet and Flanged on outlet(Gaskets andFasteners as per Piping Material Specification B4A)

Nos. 3/4" X 1" 300# 4 0.00

D:\Vijyant\LPG\Tender\Re-TenderGandhar\sor\SOR- LPG - GNDR_RETENDER- Aril Revised.xls\Piping & MechSOR.No. 05/21/23KF(GNDR)/Piping &Mech/SOR-02, Rev-1

SCHEDULE OF RATESFOR

6" DIA. 1.4 KM LPG PIPELINE PROJECT OF GAIL, GANDHARPage 8 of 9

2 TERMINAL WORKS Figure in Rupees

I PIPING & MECHANICAL WORKS Sl. Description of Item Unit Size Rating/ Qty. Amount

No. Thk./ Sch. Figures Words

Unit Rate inclusive of all applicable taxes & duties

5.0 RADIOGRAPHYPerformance of radiographic inspection by gamma radiation as per SCC clauseno. 3.2.3.1 and as per specifications in piping of all types and thicknessincluding providing/hiring of all necessary equipments, supply of allconsumables, and whatever else even though not expressely mentioned butrequired to perform the work as per specifications and instructions of Engineer-in-Charge (full circle re-radiography of the repaired joint and additionalradiography necessitated due to poor performance of contractor's welder shallbe carried out by the Contractor at his own cost and shall not be paid extra byCompany). Radiographs shall be submitted to the Engineer-in-Charge foracceptance, whose decision shall be final and binding.

Nos. of Joint

6" 110 0.00

4" 20 0.00

2" 60 0.00

Note : 1) The quantities given above against individual items are indicative and shallnot be considered to be binding. The quantities may be increased, decreasedor deleted at site at the time of actual execution and as per discretion of Owner/Engineer-in-charge. The unit rate shall be operated to work out the finalpayment due to Contractor.

6.0 Pipe Supports & Other Structuresa) Supply, fabrication and erection of all types of pipe supports like clamps,

saddle, guide stops, cradles, turn buckles, anchors, T-posts; stockade/ trestleand pipe bridge for overhead piping; frames for canopy, approach ladders andplatforms, crossover, cable tray supports, etc. including painting suitable forhighly corrosive area as per specification labour and supervision & completework as per drawings, specifications and instruction of Engineer-in-charge.(Bolts, nuts, washers, U-clamps etc. for supporting shall be supplied by theContractor within the rates quoted. These items will not be measured and paidseperately). The work is to be completed in all respect as per scope of workand specification.

M.Ton. 1.5 0.00

Notes:i) The quantities indicated are estimated values and hence are approximate. Final

payment will be made based on actual quantities to be certified by thePurchaser.

ii) The cost of MS bolts (permanent and service(, washers, electrodes, putty,gases, cost of straightening the raw materials, cutting of flats from plates andproviding splices, paints, tools, plants etc., as required for the work shall bedeemed to be included in the quoted rates.

iii) All handling and transport charges of raw materials and fabricated structuresincluding double handling, as required, for completion of work in accrodancewith time schedule, are deemed be included in the quoted rates.

D:\Vijyant\LPG\Tender\Re-TenderGandhar\sor\SOR- LPG - GNDR_RETENDER- Aril Revised.xls\Piping & MechSOR.No. 05/21/23KF(GNDR)/Piping &Mech/SOR-02, Rev-1

SCHEDULE OF RATESFOR

6" DIA. 1.4 KM LPG PIPELINE PROJECT OF GAIL, GANDHARPage 9 of 9

2 TERMINAL WORKS Figure in Rupees

I PIPING & MECHANICAL WORKS Sl. Description of Item Unit Size Rating/ Qty. Amount

No. Thk./ Sch. Figures Words

Unit Rate inclusive of all applicable taxes & duties

Note: (i) The bidder must indicate currency(ies) against each quoted item of the SOR. In Figure :

0.00

(ii) The total amount shall also be given by the bidder in the quoted currency(ies). In Word :

Place : _____________Date : _____________

Tender No.: 05/51/23KF(GNDR)/GAIL/001(v)AOffer No. & Date : ________________________________________________

Total Amount of quoted price (inclusive ofall applicable taxes & duties)

D:\Vijyant\LPG\Tender\Re-TenderGandhar\sor\SOR- LPG - GNDR_RETENDER- Aril Revised.xls\Piping & MechSOR.No. 05/21/23KF(GNDR)/Piping &Mech/SOR-02, Rev-1

SCHEDULE OF RATESFOR

6" DIA. 1.4 KM LPG PIPELINE PROJECT OF GAIL, GANDHARPage 1 of 2

2 TERMINAL WORKS Figure in Rupees

II CIVIL WORKSSl. Description of Items Unit Quantity AmountNo. Figures Words (In Rs.)

CIV-1 PLAIN CEMENT CONCRETE

Supplying and laying plain cement concrete of grade M 10C with stone aggregate40mm down grade (including shuttering if required) in all types of concrete worksincluding levelling courses below foundations, mass concrete works, chambers, cabletrench, under floors and any other locations, at all levels and locations as perdrawings, specifications and directions of the Engineer-in-charge.

M3 0.50 0.00

CIV-2 REINFORCED CEMENT CONCRETE IN SUB STRUCTURE WORKS

Providing and laying reinforced cement concrete of grade M-20 with 20mm and downgrade crushed stone aggregate in all types of sub-structures like foundations,pedestals, pedestal bases, pipe supports, sleepers cable trench, RCC retaining wallfoundation for boundary wall including construction joints, bitumen painting onsurfaces in contact with soil, providing and fixing reinforcing steel (@ 70 kg/cum),shuttering, supplying and fixing MS inserts, finishes etc. at all depths and levelscomplete as per drawings , specifications and directions of the Engineer-in-charge.

M3 1.00 0.00

CIV-3 REINFORCED CEMENT CONCRETE IN SUPER STRUCTURE WORKS

Providing and laying reinforced cement concrete of grade M-20 with 20 mm and downgrade crushed stone aggregate in all types of super-structures like columns, beams,except building superstructure if not covered elsewhere, pedestals, pipe supports,RCC retaining wall, boundary wall including construction joints, providing and fixingreinforcing steel (@ 90 kg/cum ), shuttering, supplying & fixing MS inserts, finishesetc. at all heights and levels complete as per drawings , specifications and directionsof the Engineer-in-charge.

M3 2.50 0.00

Unit Rate inclusive of all applicable taxes & duties

D:\Vijyant\LPG\Tender\Re-TenderGandhar\sor\SOR- LPG - GNDR_RETENDER- Aril Revised.xls\Civil SOR.No. 05/21/23KF(GNDR)/Civil /SOR-03, Rev-1

SCHEDULE OF RATESFOR

6" DIA. 1.4 KM LPG PIPELINE PROJECT OF GAIL, GANDHARPage 2 of 2

Sl. Description of Items Unit Quantity AmountNo. Figures Words (In Rs.)

Unit Rate inclusive of all applicable taxes & duties

'CIV-4 CHIPPING RCC FLOOR SLAB TO EXPOSE REINFORCEMENTChiselling RCC pavement/ foundations to expose reinforcement for either welding orhooking new reinforcement bars for further works.

M3 0.75 0.00

Note: Cost to include cleaning of chipped surface of all loose material, with wirebrush,scrubbing the reinforcement bars and application of bonding compound Pidicrete URPor equivalent before pouring fresh concrete.

Note: (i) The bidder must indicate currency(ies) against each quoted item of the SOR. In Figure : 0.00

(ii) The total amount shall also be given by the bidder in the quoted currency(ies). In Word :

Place : _____________Date : _____________ Name :

Designation :

Tender No.: 05/51/23KF(GNDR)/GAIL/001(v)AOffer No. & Date : ________________________________________________

Total Amount of quoted price (inclusive of all applicable taxes &

duties)

D:\Vijyant\LPG\Tender\Re-TenderGandhar\sor\SOR- LPG - GNDR_RETENDER- Aril Revised.xls\Civil SOR.No. 05/21/23KF(GNDR)/Civil /SOR-03, Rev-1

SCHEDULE OF RATESFOR

6" DIA. 1.4 KM LPG PIPELINE PROJECT OF GAIL, GANDHAR

Pages 1 of 6

2 TERMINAL WORKS Figure in Rupees

III INSTRUMENTATION , SCADA & TELECOM

Supply Rate Erection Rate Unit Rate Unit rate

FIELD INSTRUMENTATION

1.0 PRESSURE INSTRUMENTS

1.01 Supply , Installation of Pressure Gagues and their accessories inclusive of supply ofnecessary piping materials and tubings alongwith all necessary valves & fittings,fabrication and installation of impulse lines/ manifolds & hydraulic testing (exclusive ofcalibration of instruments) as per installation standard attached elsewhere in TenderDocument and Supply as per Data Sheet No.MEC/23kF(GAN)/05/E5/I/001/DS-PG

Nos. 4 0.00

1.02 Supply , Installation of Pressure Transmitters including mounting of Instrument onyoke, supply of yoke, supply and erection of supports for impulse lines whereverrequired, supply, fabrication & installation of SS manifolds/ SS impulse lines & SS valves& fittings with supports, hydraulic testing and painting of supports (exclusive ofcalibration of instruments) as per installation standard attached elsewhere in TenderDocument and Supply as per Data Sheet No.MEC/23kF(GAN)/05/E5/I/001/DS-PT

Nos. 2 0.00

1.03 Supply , Installation of Pressure Switches including mounting of Instrument on yoke,supply of yoke, supply and erection of supports for impulse lines wherever required,supply, fabrication & installation of SS manifolds/ SS impulse lines & SS valves & fittingswith supports, hydraulic testing and painting of supports (exclusive of calibration ofinstruments) as per installation standard attached elsewhere in Tender Document andSupply as per Data Sheet No.MEC/ 23kF(GAN)/05/E5/I/001/ DS-PS

Nos. 2 0.00

2.0 TEMPERATURE INSTRUMENTS

2.01 Supply , Installation of RTD with flanged Thermowell inclusive of installation ofthermowell on the nozzle and installation of instruments (exclusive of calibration ofinstruments) as per installation standard attached elsewhere in Tender Document andSupply as per Data Sheet No. MEC/23kF(GAN)/05/E5/I/001/DS-RTD

Nos. 2 0.00

2.02 Supply , Installation of RTD with flanged Thermowell inclusive of installation ofthermowell on the nozzle and installation of instruments (exclusive of calibration ofinstruments) as per installation standard attached elsewhere in Tender Document andSupply as per Data Sheet No. MEC/23kF(GAN)/05/E5/I/001/DS-TG

Nos. 2 0.00

Total AmountSL.NO. DESCRIPTION OF ITEMS UNIT QTY.

SOR.No. 05/21/23KF(GNDR)/Inst./SOR-04, Rev-1

SCHEDULE OF RATESFOR

6" DIA. 1.4 KM LPG PIPELINE PROJECT OF GAIL, GANDHAR

Pages 2 of 6

Supply Rate Erection Rate Unit Rate Unit rate

Total AmountSL.NO. DESCRIPTION OF ITEMS UNIT QTY.

SOR.No. 05/21/23KF(GNDR)/Inst./SOR-04, Rev-1

SCHEDULE OF RATESFOR

6" DIA. 1.4 KM LPG PIPELINE PROJECT OF GAIL, GANDHAR

Pages 3 of 6

Supply Rate Erection Rate Unit Rate Unit rate

Total AmountSL.NO. DESCRIPTION OF ITEMS UNIT QTY.

3.0 MISCELLANEOUS ITEMS

3.01 Supply, fabrication and erection of GI instrument air pipelines & fittings as per IS:1239Pt. I & II including supply, fabrication and erection of supports, pneumatic/ hydrostatictesting and painting of supports as per std., complete in all respects.

Sizes:a) ½" (Hvy.) Mtr. 30 0.00b) 1" (Hvy.) Mtr. 30 0.00

3.02 ROV pneumatic actuated spring type as per data sheet and specification.

Supply, Handling, transportation, installation including supply of gaskets & fasteners, removal and remounting,electrical termination,testing/calibration, supply and erection of supports for impulse lines where required, supply, fabrication & installation of manifolds/ impulse lines & fittings with supports, hydraulic testing, painting of supports as per std.

No. 1 0.00

3.03 Digital valve (FCV)- Electro-Hydraulic set stop with a microprocessor basedsingle arm batch Batch Controller as per data sheet and specification.

Supply, Handling, transportation, installation including supply of gaskets & fasteners,removal and remounting,electrical termination,testing/calibration, supply and erection ofsupports for impulse lines where required, supply, fabrication & installation of manifolds/impulse lines & fittings with supports, hydraulic testing, painting of supports as per std.

No. 1 0.00

4.0 CABLING

4.01 Laying of control, signal, Triad cables on main cable trays, perforated trays, trenchesincluding supply of all required cable glands(Explosion proof double compression type)and consumables like ferrules, clamps, PVC tubes, aluminium/SS tag plates etc.,clamping , ferruling, glanding of the cables, termination at both ends, includingshield/drain/ communication wire, providing/fixing of identifying tags and megger testingand loop testing but exclusive of supply & erection of GI Perforated tray.

i) Signal Cables- 1 P x 1.5 mm² (Type I) Mtr. 50 NA 0.00- 6 P x 0.5 mm² (Type II) Mtr. 700 NA 0.00

ii) RTD Cables- 4C x 1.5 mm² (Type-I) Mtr. 50 NA 0.00- 6 TRIAD x 1.5 mm² (Type - II) Mtr. 700 NA 0.00

SOR.No. 05/21/23KF(GNDR)/Inst./SOR-04, Rev-1

SCHEDULE OF RATESFOR

6" DIA. 1.4 KM LPG PIPELINE PROJECT OF GAIL, GANDHAR

Pages 4 of 6

Supply Rate Erection Rate Unit Rate Unit rate

Total AmountSL.NO. DESCRIPTION OF ITEMS UNIT QTY.

SOR.No. 05/21/23KF(GNDR)/Inst./SOR-04, Rev-1

SCHEDULE OF RATESFOR

6" DIA. 1.4 KM LPG PIPELINE PROJECT OF GAIL, GANDHAR

Pages 5 of 6

Supply Rate Erection Rate Unit Rate Unit rate

Total AmountSL.NO. DESCRIPTION OF ITEMS UNIT QTY.

iii) Control Cables- 12C x 1.5 mm² Mtr. 700 NA 0.00

v) 2C x 4 mm² Power Cable (copper conductor) Mtr. 50 NA 0.00

5.0 STRUCTURAL (Complete in all respect as per Scope of Work , related toInstrumentation)

5.01 Supply and erection of prefabricated perforated GI trays of thickness 2.5mm includingtees, bends and elbows, supply, fabrication and erection of required supports andpainting of supports with one coat of primer as per IS:2074 and 2 coats of finished paintincluding supply of paint as per std. and direction of Engineer-In-Charge.

Sizes :a) 60 mm wide X 30 mm high Mtr. 100 0.00b) 100 mm wide X 30 mm high Mtr. 100 0.00c) 200 mm wide X 30 mm high Mtr. 100 0.00

6.0 Excavation of trenches for burying the cables, preparation of same for laying of cable,filling with river sand, laying of brick, back filling and compacting of the excavated earthas per specifications including supply of sand and bricks and removal of surplus earthas per instructions of Engineer-in-Charge.Size of Trench:600 mm (Width) X 675 mm ( Depth) Mtrs. 80 NA 0.00

7.0 Handling, transportation, installation including supply of gaskets & fasteners, removaland remounting,electrical termination,testing/calibration, supply and erection of supportsfor impulse lines where required, supply, fabrication & installation of manifolds/ impulselines & fittings with supports, hydraulic testing, painting of supports as per std., butexclusive of supply of valves.

i) Mass Flow Meter with Flow Computer. Sets 2 N.A 0.008.0 Supply and installation of PVC pipes and sleeves for crossing of electrical cables as

required including supply of sealing compound.a) 100 mm of 10 meters length Nos. 1 0.00b) 150 mm of 10 meters length Nos. 1 0.00

9.0 Laying of Armoured Telecom communication cable (free issued by GAIL) in samepipeline trench direct buried and termination with connector if required as per instructionof Engineer-in-charge.

Mtrs 1500 0.00

SOR.No. 05/21/23KF(GNDR)/Inst./SOR-04, Rev-1

SCHEDULE OF RATESFOR

6" DIA. 1.4 KM LPG PIPELINE PROJECT OF GAIL, GANDHAR

Pages 6 of 6

Supply Rate Erection Rate Unit Rate Unit rate

Total AmountSL.NO. DESCRIPTION OF ITEMS UNIT QTY.

10.0 Supply and installation of Printer (Laser Jet A4) in control room No. 1 0.0011.0 Supply and installation dial up Modem as per existing availbale with GAIL. No. 1 0.00

Note : 1) The quantities given above against individual items are indicative and shall not beconsidered to be binding. The quantities may be increased, decreased or deleted at siteat the time of actual execution and as per discretion of Owner/ Engineer-in-charge. Theunit rate shall be operated to work out the final payment due to Contractor.

4) N.A : Not Applicable

2) Earthing related to instrumentation : All the requirements related to instrumentationearthing are in the scope of the contractor. The PLC system earthing is to be doneseparately and separate earth pits are required. Instrumentation junction boxes andfield instruments are also to be earthed.

3) The contractor shall have to provide hume pipes wherever required for crossing thedrains, trenches etc. for laying instrumentation cables. The supply of hume pipes, layingetc. are in the civil scope.

Note: (i) The bidder must indicate currency(ies) against each quoted item of the SOR.In Figure : 0.00

(ii) The total amount shall also be given by the bidder in the quoted currency(ies).In Word :

Place : _____________Date : _____________ Name :

Designation :

Tender No.: 05/51/23KF(GNDR)/GAIL/001(v)AOffer No. & Date : ________________________________________________

Total Amount of quoted price (inclusive of all applicable taxes &

duties)

SOR.No. 05/21/23KF(GNDR)/Inst./SOR-04, Rev-1

SCHEDULE OF RATESFOR

6" DIA. 1.4 KM LPG PIPELINE PROJECT OF GAIL, GANDHAR

Pages 1 of 2

2 TERMINAL WORKS Figure in Rupees

IV ELECTRICAL WORKSSl. Description of Items Unit Qty. Supply Erection Total No. Amount

1 Supply, installation, testing, commissioning of the complete earthing and lightningprotection system, earth electrodes/ pit, earth main ring, earthing of electricalequipments, instrument panels, field instruments, process equipments and pipes/flanges including all associated civil work with all material and labour as perspecification and drawings approved by the company.

a) Earth Pits- GI PIPE Electrode with 6 mm thick chequered plate cover Nos. 1 0.00

b) Earth Pits- Copper plate Electrode with 6 mm thick chequered plate cover Nos. 1 0.00

c) GI Strip (50X6) mm Mtr. 60 0.00

d) GI Strip (25X5) mm Mtr 30 0.00

e) Copper Strip (25X5) mm Mtr 30 0.00

f) GI Wire, Copper wire, wire rope and all balance earthing material including copper strip(50 mm x 2 mm thick) jumper for flanges etc. as per the specification.

Lot 1 0.00

unit Rate inclusive of all applicable taxes & duties

unit Rate inclusive of all applicable taxes & duties

D:\Vijyant\LPG\Tender\Re-TenderGandhar\sor\SOR- LPG - GNDR_RETENDER- Aril Revised.xls\Elect SOR.No. 05/21/23KF(GNDR)/Elect/SOR-05, Rev-1

SCHEDULE OF RATESFOR

6" DIA. 1.4 KM LPG PIPELINE PROJECT OF GAIL, GANDHAR

Pages 2 of 2

Sl. Description of Items Unit Qty. Supply Erection Total No. Amountunit Rate inclusive of all

applicable taxes & duties unit Rate inclusive of all applicable taxes & duties

2 Supply and laying of following sizes of class 'B' G.I.Pipe in required length fixed on steel,concrete or similar sructure, laid in trenches, ready to be buried in concrete includingcutting, threading, bending and similar works, supply of clamps, small iron structures,spacers and installation of seats, plugs, bushings etc. small civil works, including alllabour and materials complete as per approved drawings and directions of Engineer-In-Charge.

a) 40 mm NB M 10 0.00

b) 50 mm NB M 10 0.00

Note : Quantities given above are only estimated quantities. Procurement shall be doneas per actual site condition, instruction of engineer incharge and approved constructiondrawings.

Note: (i) The bidder must indicate currency(ies) against each quoted item of the SOR.In Figure : 0.00

(ii) The total amount shall also be given by the bidder in the quoted currency(ies).In Word :

Place : _____________Date : _____________ Name :

Designation :

Tender No.: 05/51/23KF(GNDR)/GAIL/001(v)A

Offer No. & Date : ________________________________________________

Total Amount of quoted price (inclusive of all applicable taxes & duties)

D:\Vijyant\LPG\Tender\Re-TenderGandhar\sor\SOR- LPG - GNDR_RETENDER- Aril Revised.xls\Elect SOR.No. 05/21/23KF(GNDR)/Elect/SOR-05, Rev-1

SCHEDULE OF RATESFOR

6" DIA. 1.4 KM LPG PIPELINE PROJECT OF GAIL, GANDHAR

Ann. - I to Addendum - I

Page 1 of 1SUMMARY OF PRICES (To be submitted with priced part of the offer)

Ref. : 05/51/23KF(GNDR)/GAIL/001 (v) A

Tender for Laying & Construction of Underground Steel Pipeline at Gandhar for LPG Project of M/s GAIL

All Amount in Rs.Sl. No. (In Figures) (In Words) CENVAT CREDIT

1 Total amount of quoted price for Mainline Works SOR 0.002 Terminal Works I) Total amount of quoted price for Piping & Mechanical Works

SOR0.00

II) Total amount of quoted price for Civil Works SOR 0.00III) Total amount of quoted price for Instrumentation Works SOR 0.00

IV) Total amount of quoted price for Electrical Works SOR 0.003 Gross Total Amount (inclusive of all applicable taxes &

duties) [1+(2-I)+(2-II)+(2-III)+(2-IV)]

0.00 0.00

4 Rebate (if any) offered on gross total amount (Sl.No. 3)above. (which will be applicable on each item of Schedule ofRate) _______ % of quoted rate

5 Amount of Rebate as per Sl.No. 4 above 0.00 0.006 Net total amount {3-5} (after considering rebate indicated at

Sl.No. 5)0.00 0.00

7 Service tax considered in quoted priceNotes: The total amount shall also be given by the bidder in the quoted currency(ies)

Place : _____________Date : _____________ Name :

Designation :

Tender No.: 05/51/23KF(GNDR)/GAIL/001(v)AOffer No. & Date : ________________________________________________

SCHEDULE OF RATESFOR

6" DIA. 1.4 KM LPG PIPELINE PROJECT OF GAIL, GANDHAR

Ann. - I to Addendum - I

Page 1 of 1

PROFORMA FOR EXTENDED STAY COMPENSATION (To be submitted with priced part of the offer)

Ref. : 05/51/23KF(GNDR)/GAIL/001 (v) A

Tender for Laying & Construction of Underground Steel Pipeline at Gandhar for LPG Project of M/s GAIL

All Amount in Rs.Sl. No. (In Figures) (In Words)

1.00 1.0 Rate of extended stay compensation beyond the schedulecompletion period and grace period for reasons solelyattributable to Owner.

Notes: 1) Extended stay compensation shall be loaded on the quoted prices as per relevant clauses in Instructions to bidder & Special Conditions of Contract.2) Bidder shall submit this format in Un-priced part duly stamped and signed without indicating the price. The price shall be submitted in the price party only.

Place : _____________Date : _____________ Name :