addendum no. 1 - arnell-westarnell-west.com/wp-content/uploads/2018/02/dfcm-addendum... ·...

11
4110 State Office Building, Salt Lake City, Utah 84114 · telephone 801-538-3017 · facsimile 801-538-3267 · www.dfcm.utah.gov Department of Administrative Services TANI PACK DOWNING Executive Director Division of Facilities Construction and Management State of Utah JIM R. RUSSELL Director GARY R. HERBERT Governor SPENCER J COX Lieutenant Governor Addendum No. 1 Date: February 23, 2018 To: Pre-Qualified General Contractors From: Randy Mellor – Project Manager, DFCM Reference: Remodel Executive Area Calvin Rampton Building Utah Department of Transportation DFCM Project No. 18275900 Subject: Addendum No. 1 Pages Addendum Cover Sheet 1 page Architects Addendum 10 pages Total 11 pages Note: This Addendum shall be included as part of the Contract Documents. Items in this Addendum apply to all drawings and specification sections whether referenced or not involving the portion of the work added, deleted, modified, or otherwise addressed in the Addendum. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to Disqualification. 1.1 SCHEDULE: There are no project schedule changes. 1.2 GENERAL ITEMS: See Architect’s Addendum No. 1 dated 2/27/18.

Upload: others

Post on 24-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Addendum No. 1 - Arnell-Westarnell-west.com/wp-content/uploads/2018/02/DFCM-Addendum... · 2018-02-28 · raceways is required a routing sketch shall be provided to architect and

4110 State Office Building, Salt Lake City, Utah 84114 · telephone 801-538-3017 · facsimile 801-538-3267 · www.dfcm.utah.gov

Department of Administrative Services

TANI PACK DOWNING Executive Director Division of Facilities Construction and Management

State of Utah JIM R. RUSSELL Director GARY R. HERBERT

Governor

SPENCER J COX Lieutenant Governor

Addendum No. 1 Date: February 23, 2018 To: Pre-Qualified General Contractors From: Randy Mellor – Project Manager, DFCM Reference: Remodel Executive Area Calvin Rampton Building Utah Department of Transportation DFCM Project No. 18275900 Subject: Addendum No. 1 Pages Addendum Cover Sheet 1 page Architects Addendum 10 pages Total 11 pages Note: This Addendum shall be included as part of the Contract Documents. Items in this Addendum apply to all drawings and specification sections whether referenced or not involving the portion of the work added, deleted, modified, or otherwise addressed in the Addendum. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to Disqualification. 1.1 SCHEDULE: There are no project schedule changes. 1.2 GENERAL ITEMS: See Architect’s Addendum No. 1 dated 2/27/18.

Page 2: Addendum No. 1 - Arnell-Westarnell-west.com/wp-content/uploads/2018/02/DFCM-Addendum... · 2018-02-28 · raceways is required a routing sketch shall be provided to architect and

“ O u r S u c c e s s I s M e a s u r e d B y T h e L e v e l O f O u r C l i e n t ’ s S u c c e s s ” .

S C O T T P . E V A N S – A R C H I T E C T & A S S O C I A T E S P . C .1 0 8 W e s t C e n t e r S t r e e t , B o u n t i f u l , U t a h 8 4 0 1 0

P h o n e 8 0 1 - 2 9 8 - 1 3 6 8 F a x 8 0 1 - 2 9 8 - 2 1 9 2 i n f o @ s p e - a r c h i t e c t . c o m w w w . s p e - a r c h i t e c t . c o m

2/27/18

Project:

Rampton Building UDOT Executive Area Remodel

Addendum #01The data included herein is issued by the Architect as a clarification and addition to drawings, specifications, and contract documents relative to the above project. Except as effected by data herein, all other parts of the Contract Documents shall remain in full force and effect as issued by the Owner1/10/18. (This Date Applies to all Project Bid Documents). It shall be the sole responsibility of the bidder to appropriately disseminate this data to all concerned prior to the assigned bid date and time. Receipt of the addendum shall be recorded by the bidder in the appropriate space on the proposal form included in the Contract Documents.

Page 3: Addendum No. 1 - Arnell-Westarnell-west.com/wp-content/uploads/2018/02/DFCM-Addendum... · 2018-02-28 · raceways is required a routing sketch shall be provided to architect and

I. GENERAL

None

Page 4: Addendum No. 1 - Arnell-Westarnell-west.com/wp-content/uploads/2018/02/DFCM-Addendum... · 2018-02-28 · raceways is required a routing sketch shall be provided to architect and

II. ARCHITECTURAL

Item #1: Executive Office 110 Open Closet

In the open closet area of Executive Office 110, provide a new coat hanging rod with a 12” deep, 1” thick plastic laminate shelf above it.

On the opposite wall of the coat hanging rod and shelf, provide three (3) wall mounted hard hat hanging hooks.

Page 5: Addendum No. 1 - Arnell-Westarnell-west.com/wp-content/uploads/2018/02/DFCM-Addendum... · 2018-02-28 · raceways is required a routing sketch shall be provided to architect and

III. MECHANICAL

None

Page 6: Addendum No. 1 - Arnell-Westarnell-west.com/wp-content/uploads/2018/02/DFCM-Addendum... · 2018-02-28 · raceways is required a routing sketch shall be provided to architect and

IV. ELECTRICAL / AV

See attached.

Page 7: Addendum No. 1 - Arnell-Westarnell-west.com/wp-content/uploads/2018/02/DFCM-Addendum... · 2018-02-28 · raceways is required a routing sketch shall be provided to architect and

February 26, 2018Scott P. EvansScott P. Evans Architect & Associates P.C.108 West Center StreetBountiful, UT 84010

Project:20170523 - UDOT Executive Area RemodelRE: Addendum #01

This Addenda shall be considered part of the Contract Documents and Project Manual for the above-mentioned project as though it had been issued at the same time and shall be incorporated integrally therewith. Where provisions of the following supplementary data differ from those of the original Contract Documents and Project Manual, the Addendum shall govern and take precedence.

Please forward the following clarifications to the contractors:

GENERAL ELECTRICAL ITEMS

Q: Can you tell me where panel L1 is?

Page 8: Addendum No. 1 - Arnell-Westarnell-west.com/wp-content/uploads/2018/02/DFCM-Addendum... · 2018-02-28 · raceways is required a routing sketch shall be provided to architect and

March 31, 2016Scott P. EvansScott P. Evans Architect & Associates P.C.ADDENDUM 1Page 2 of 2

Q: Where the access control panel is located?

Answer: The Access Control and Fire Alarm panels are located in the basement

GENERAL ELECTRICAL ITEMS

EP101 – removed General Note #11 from the drawing set, which stated: ALL NEW POWER CIRCUIT SHALL BE CIRCUITED TO THE NEAREST ELECTRICAL PANEL WITH CAPACITY. FOR BIDDING PURPOSES ASSUME 30 FEET OF CONDUCTORS PAST GRID LINE A5. FIELD VERIFY EXACT LOCATION. PROVIDE A PER UNIT COST, PER FOOT INSTALLED, FOR EACH CIRCUIT TYPE ON PROJECT FOR ADD/CREDIT ONCE EXACT ROUTING OF CIRCUITS IS DETERMINED.

EJ601 – revised detail A2 to clarify equipment location

TA601 – revised Audio System Single Line Diagram to include correct ceiling microphones.

ATTACHMENTS<EP101, EJ601, TA601>

If you have any questions, please contact our office.

Sincerely

By:

Spencer C. Little, P.E. Principal Electrical Engineer

Page 9: Addendum No. 1 - Arnell-Westarnell-west.com/wp-content/uploads/2018/02/DFCM-Addendum... · 2018-02-28 · raceways is required a routing sketch shall be provided to architect and

J

J

JSP

JSC

S

J

J

C D E F G H J K

9

8

7

6

10

FB8

FB8

FB8

5

CC

+66" +66"

Space

132

Space

133Space

134

Space

135 Space

136

Space

137

Space

138

Space

139

Space

140

Space

141

Space

142

Space

143

Space

144

Space

145

Space

146

Space

147

Space

148

Space

151

WAITING

102

HALL

105RECEPTION

104

EXECUTIVE

OFFICE

110

CORRIDOR

111

FILE

112

OFFICE

117

OFFICE

116

CONF.

119

OFFICE

118

CONF.

107

HALL

109

COLLABORATION

103

CUBICLE FARM

115

SECRETARY

108

HALL

106

PASSAGE

113

COPY

114

"P1D"

"P1C"

P1C-6

P1C-6

P1C-6

P1C-6

P1C-6

P1C-12

P1C-12

P1C-12 P1C-10

P1C-10

P1C-10

P1C-10

P1C-8

P1C-8

P1C-16

P1C-16

P1C-16

P1C-14

P1C-14

P1C-14P1C-14

P1C-24

P1C-28

P1C-32

P1C-34

FB8

P1C-36

P1C-37

P1C-39

P1C-8

P1C-41

P1D-24

P1C-6

P1D-32

P1C-14

P1C-16

P1C-13

P1C-13

P1C-13

P1C-13

P1C-12

P1C-10

P1C-13

P1C-26

NOT IN SCOPE

NOT IN SCOPE

NOT IN SCOPE NOT IN

SCOPE

NOT IN SCOPE

NOT IN SCOPE

NOT IN SCOPE

NOT IN SCOPE

NOT IN SCOPE

NOT IN SCOPE

NOT IN SCOPE

NOT IN SCOPE

NOT IN SCOPE

NOT IN SCOPE

NOT IN SCOPE

NOT IN SCOPE

NOT IN SCOPE

FB8

P1D-38

1

P1C-30

MICR+48"

P1D-42

P1D-40REF

1

+66"

+66" CC

CC

P1D-16

P1D-18

1

P1D-20

P1D-22

+66"

COPYRIGHT:© 2017 SCOTT P. EVANS - ARCHITECT

DESIGNED BY:

CHECKED BY:

SPE PROJECT #:

OWNER PROJECT #:

SCOTT P. EVANS ARCHITECT &

ASSOCIATES P.C.

108 West Center StreetBountiful, Utah 84010

t.801.298.1368 - [email protected]

1 2 3 4 5

1 2 3 4 5

A

B

C

D

DRAWN BY:A

B

C

D

18275900

17-19

CBC

SCL

SCL

SHEET NUMBER:

SHEET TITLE:

ISSUED:

NO. DATE DESCRIPTION

PROFESSIONAL STAMP:

ARCHITECT'S INFORMATION:

PROJECT NAME:

REVISIONS:

NO. DATE DESCRIPTION

#

Last P

lotted:

CODE OFFICIAL STAMP:

#01 01/10/2018 CONSTRUCTION BID SET

2/2

6/2

01

8 5

:49:2

0 P

M

UD

OT

EX

EC

UT

IVE

AR

EA

RE

MO

DE

L

4501 S

OU

TH

CO

NS

TIT

UT

ION

BLV

D.

SA

LT

LA

KE

CIT

Y,

UT

AH

84119

LEVEL 1 POWERPLAN

EP101

GENERAL SHEET NOTES

SHEET KEYNOTES1 PROVIDE CONDUIT ROUGH-IN FOR AV CONTROLS. REFER TO AV DRAWINGS AND

COORDINATE WITH EQUIPMENT INSTALLER FOR SIZING AND EXACT LOCATION.

1 CONTRACTOR IS RESPONSIBLE FOR ALL LINE VOLTAGE AS PART OF THISPROJECT. PROVIDE LINE VOLTAGE REQUIRED TO ALL SYSTEMS PROVIDED ASPART OF THIS PROJECT. COORDINATE WITH ALL OTHER DISCIPLINES ANDDRAWINGS.

2 CONTRACTOR IS RESPONSIBLE FOR ALL DEVICES, GEAR, CABLE, CONDUCTORS,TERMINATIONS, OVERCURRENT PROTECTION DEVICES, AND HEAD ENDEQUIPMENT AS PART OF THIS PROJECT.

3 CORE DRILL THE FLOOR FOR POKE THROUGHS. COORDINATE EXACT LOCATIONWITH ARCHITECT.

4 VERIFY FLOOR BOX, POWER POLE, AND POKE-THROUGH DEVICE LOCATIONS WITHARCHITECT/OWNER PRIOR TO ROUGH IN OR INSTALLATION.

5 ALL RACEWAYS SHALL BE CONCEALED IN WALLS, FLOORS, AND CEILING UNLESSOTHERWISE NOTED. INSTANCES WHERE EXPOSED OR SURFACE MOUNTEDRACEWAYS IS REQUIRED A ROUTING SKETCH SHALL BE PROVIDED TO ARCHITECTAND ENGINEER. RACEWAY TYPE SHALL BE SELECTED BY ENGINEER. FINISH OFRACEWAY SHALL BE SELECTED BY ARCHITECT.

6 PROVIDE ELECTRICAL CONNECTIONS TO SYSTEMS FURNITURE. DESIGN IS BASEDON 1 CIRCUIT WIRE SYSTEM. VERIFY WIRING CONFIGURATION AND FEED POINTWITH SYSTEMS FURNITURE INSTALLER PRIOR TO INSTALLATION. COORDINATEWITH FURNITURE INSTALLER SUCH THAT CIRCUITS ARE UNIFORMLY DISTRIBUTEDTO NO MORE THAN 2 WORKSTATIONS PER CIRCUIT AND EACH WORKSTATIONONLY HAVING AVAILABLE ITS ASSIGNED CIRCUIT. COPIERS OR PRINTERS LOCATEDIN A GROUP OF WORKSTATIONS SHALL RECEIVE A DEDICATED CIRCUIT.

7 EACH WORK STATION IN THE SYSTEMS FURNITURE SHALL HAVE A MINIMUM OR 2EACH POWER OUTLETS AND 1 EACH VOICE/DATA OUTLET. ADDITIONAL POWERAND VOICE/DATA OUTLETS SHALL BE COORDINATED PRIOR TO ROUGH-IN WITHOWNER.

8 PROVIDE NEW CIRCUIT BREAKERS IN EXISTING PANEL FOR ALL NEW CIRCUITS.FIELD VERIFY PANELBOARD TYPE AND BREAKER TYPE.

9 COORDINATE EXACT LOCATION OF ELECTRICAL CONNECTION POINT TO ROOF TOPUNITS AND ALL OTHER MECHANICAL EQUIPMENT TO ENSURE APPROPRIATE ROOFPENETRATION LOCATIONS.

10 PROVIDE ELECTRICAL CONNECTION TO MOTORIZED DOORS WITH ALL POWER ANDCONTROL WIRING PER MANUFACTURES WRITTEN INSTRUCTIONS. COORDINATEOPERATION OF DOORS WITH SECURITY, FIRE, AND SMOKE CONTROL SEQUENCESOF OPERATION.

SCALE: 1/8" = 1'-0"1LEVEL 1 POWER PLAN

1 2018-02-26

ADDENDUM #1

1

02-26-2018

Page 10: Addendum No. 1 - Arnell-Westarnell-west.com/wp-content/uploads/2018/02/DFCM-Addendum... · 2018-02-28 · raceways is required a routing sketch shall be provided to architect and

2 EA, 1.25" C

TO ACCESSIBLE CEILING

1 EA, .75" CTP

1 EA, 1" C

1 EA, 1" C

1 EA, 1.25" C

WALL

TO LIGHTING CONTROL

CP1FLOOR,TYP.

14.5" SQUAREJUNCTION BOX

1 EA, 1.25" C

1 EA, 1.25" C

WALL

M

2 EA, 1.25" C

TO ACCESSIBLE CEILING

1 EA, .75" C

1 EA, 1" C

1 EA, 1.25" C

TO LIGHTING CONTROL

CEILING ENCLOSURE

TPWALL

CP5WALL

TO ACCESSIBLE CEILING

1 EA, 1.25" C

M70WALL2 EA, 1.25" C

TO ACCESSIBLE CEILING

1 EA, .75" C

1 EA, 1" C

1 EA, 1.25" C

TO LIGHTING CONTROL

CP6FLOOR,TYP.

14.5" SQUAREJUNCTION BOX

1 EA, 1.25" C

M70WALL

TP

1 EA, 1" C

WALL

M32L

1 EA, 1.25" C

WALL2

1 EA, 0.75" C

1 EA, .75" C

SCEILING, TYP S

2 EA, 1.25" C

TO BUILDING CABLE TRAY(STUB INTO TRAY)

TO NEAREST TELECOM ROOMELECTRICAL SERVICEGROUND BUS BAR. AFFIXCONDUCTOR TO GROUNDBUS BAR.

#6 THHN W/ GREENINSULATION

7' COIL FOR TERMINATION

BY AV INSTALLER

1 EA, 1.25" C

CEILING. TYP

1 EA, .75" C

TO THE LIGHTING CONTROLSYSTEM INTERFACE

1 EA, .75" C

FLOOR, TYP

1 EA, 1" C

MEP

1 EA, .75" C

CEILING, TYP

TP

1 EA, 1" C

WALL, TYP

14.5" SQUAREJUNCTION BOX

CP2

1 EA, 1.25" C

1 EA, 1" C

CEILING, TYP

1 EA, .75" C

SCEILING, TYP S

1 EA, .75" C

SCEILING, TYP S

A4AV RACEWAY RISER DIAGRAM

C4AV SYSTEMS RACEWAY RISER DIAGRAM

A2AV SYSTEMS RACEWAY RISER DIAGRAM

B2AV SYSTEMS RACEWAY RISER DIAGRAM

C2AV SYSTEMS RACEWAY RISER DIAGRAM

NO SCALE - TYPICAL OF CONFERENCE ROOM 107

NO SCALE - TYPICAL OF EXECUTIVE OFFICE 110

NO SCALE - TYPICAL OF CUBICLE FARM 115, COLLABORATION 128

NO SCALE - TYPICAL OF LOBBY 108

NO SCALE - TYPICAL OF CONFERENCE 119

E E

1

1

COPYRIGHT:© 2017 SCOTT P. EVANS - ARCHITECT

DESIGNED BY:

CHECKED BY:

SPE PROJECT #:

OWNER PROJECT #:

SCOTT P. EVANS ARCHITECT &

ASSOCIATES P.C.

108 West Center StreetBountiful, Utah 84010

t.801.298.1368 - [email protected]

1 2 3 4 5

1 2 3 4 5

A

B

C

D

DRAWN BY:A

B

C

D

18275900

17-19

CBC

SCL

SCL

SHEET NUMBER:

SHEET TITLE:

ISSUED:

NO. DATE DESCRIPTION

PROFESSIONAL STAMP:

ARCHITECT'S INFORMATION:

PROJECT NAME:

REVISIONS:

NO. DATE DESCRIPTION

#

Last P

lotted:

CODE OFFICIAL STAMP:

#01 01/10/2018 CONSTRUCTION BID SET

2/2

6/2

018

12:0

1:0

6 P

M

UD

OT

EX

EC

UT

IVE

AR

EA

RE

MO

DE

L

4501 S

OU

TH

CO

NS

TIT

UT

ION

BLV

D.

SA

LT

LA

KE

CIT

Y,

UT

AH

84119

AUDIO-VIDEOROUGH-INDIAGRAMS

EJ601

1 2018-02-26

ADDENDUM #1

02-26-2018

Page 11: Addendum No. 1 - Arnell-Westarnell-west.com/wp-content/uploads/2018/02/DFCM-Addendum... · 2018-02-28 · raceways is required a routing sketch shall be provided to architect and

120 VAC TVSS

TO ALLEQUIPMENT

120 VAC TVSS

TO ALLEQUIPMENT

RELAY

HDBT

ENET

ENET

TP

TO/FROMOWNER

NETWORK

CREDENZA RACK

CREDENZA RACK

HRX

MONITOR BOX

RS-232COD

HDBTHRX

MONITOR BOX

COD

ENETTO/FROM

OWNERNETWORK

HDMI

L

DPS

HDMI

HDMI

CREDENZA RACK

HDBTHRX

PROJECTOR BOX

COD2ENET

TO/FROMOWNER

NETWORK

HDMI

DMS

HDMI

HDMI

HDMI

HDMI

RS-232

RELAY

HDBTENET

ENET

TP

TO/FROMOWNER

NETWORK

CREDENZA RACK

HRX

PROJECTOR BOX

RS-232COD

RS-232

HDCI

VGA

M70

M70

RELAY 70V

SS

8W 8W

CEILING, TYP.

CP1

HDCI

HDBT

MICM

DPS/NS

CP2HDBT

ECS/NS

HDMI

CP8

WPS

PC

CP2

HDMI

HDMI

HDBT

1

2

3

4

5

6

3

1

2RELAY

DPS

HDBTENET

ENET

TP

TO/FROMOWNER

NETWORK

CREDENZA RACK

HDBT

CREDENZA RACK

HRX

MONITOR BOX

RS-232COD

HDBTHRX

MONITOR BOX

HDCI

COD3ENET

TO/FROMOWNER

NETWORK

HDMI

L

DPS

HDMI

HDMI

HDMI

RS-232

RELAY 70V

SS

8W 8W

CEILING, TYP.

M70

M70

3

P

CP6

ENETCP1

RS-232TO LIGHTING CONTROL

RS-232TO LIGHTING CONTROL

CREDENZA RACK

COD2L

DSP

L

L

L 70V

SS

8W 8W

CEILING, TYP.

L/R

MICM

CP8

L/R

1

2

3 1

1 1

MICM

7,8NC

FROM DMS

4,5NC

2

L/RMEP1

4,5 NC

TO/FROMOWNER'S

NETWORK

HRXHDMI

HRXCP5HDBT

WALL

SB

DPS2

WVS

TPNET

TO/FROM OWNER NETWORKENET

HDMI

HDMI

HDBTM52

L

MONITOR BOX & MOUNT

RS-232TO LIGHTING CONTROL

E

E

NO SCALE - TYPICAL OF EXECUTIVE OFFICE 110

NO SCALE - TYPICAL OF EXECUTIVE OFFICE 110 NO SCALE - TYPICAL OF CONFERENCE ROOM 107

NO SCALE - TYPICAL OF CONFERENCE ROOM 107

NO SCALE (TYPICAL OF COLLABORATION 103 AND CUBICLE FARM 115)

NO SCALE - TYPICAL OF CONFERENCE ROOM 119

NO SCALE - TYPICAL OF CONFERENCE ROOM 119 NO SCALE - TYPICAL OF CONFERENCE ROOM 107NO SCALE

D2CONTROL SYSTEM SINGLE LINE RISER DIAGRAM

C2AUDIO- VIDEO SYSTEM SINGLE LINE RISER DIAGRAM

C4CONTROL SYSTEM SINGLE LINE RISER DIAGRAM

B4VIDEO SYSTEM SINGLE LINE RISER DIAGRAM

D4

AUDIO-VIDEO SINGLE LINE DIAGRAM -COLLABORATION AND CUBICLE FARM

B2CONTROL SYSTEM SINGLE LINE RISER DIAGRAM

A2AUDIO- VIDEO SYSTEM SINGLE LINE RISER DIAGRAM

B4AUDIO SYSTEM SINGLE LINE RISER DIAGRAM

A1

SINGLE LINE DIAGRAM -DIGITAL SIGNAGE

CEILING BOX

MONITOR BOX & MONITOR MOUNT

M32LETHERNET

DPHDMI

TYP.

1

COPYRIGHT:© 2017 SCOTT P. EVANS - ARCHITECT

DESIGNED BY:

CHECKED BY:

SPE PROJECT #:

OWNER PROJECT #:

SCOTT P. EVANS ARCHITECT &

ASSOCIATES P.C.

108 West Center StreetBountiful, Utah 84010

t.801.298.1368 - [email protected]

1 2 3 4 5

1 2 3 4 5

A

B

C

D

DRAWN BY:A

B

C

D

18275900

17-19

CBC

SCL

SCL

SHEET NUMBER:

SHEET TITLE:

ISSUED:

NO. DATE DESCRIPTION

PROFESSIONAL STAMP:

ARCHITECT'S INFORMATION:

PROJECT NAME:

REVISIONS:

NO. DATE DESCRIPTION

#

Last P

lotted:

CODE OFFICIAL STAMP:

#01 01/10/2018 CONSTRUCTION BID SET

2/2

6/2

018

12:0

1:1

2 P

M

UD

OT

EX

EC

UT

IVE

AR

EA

RE

MO

DE

L

4501 S

OU

TH

CO

NS

TIT

UT

ION

BLV

D.

SA

LT

LA

KE

CIT

Y,

UT

AH

84119

AUDIO-VIDEOSYSTEMS DIAGRAMS

TA601

1 2018-02-26

ADDENDUM #1

02-26-2018