8250 Haverstick Road, Suite 285, Indianapolis, IN 46240 P: 317.638.8383 rossbar.com ADDENDUM NO. 1 PROJECT: Indiana School for the Deaf, Building 8 HVAC Renovation DAPW PROJECT NO: 49026008-20-040 R&B PROJECT NO: 2148-02 DATE: 04/22/2021 THIS ADDENDUM CONSISTS OF (2) 8 - 1/2” X 11” PAGES, (17) 30” X 42” SHEETS. The following additions, revisions and modifications are hereby made part of the contract documents, which shall be amended accordingly. Acknowledge receipt of addenda on bid form. Failure of your acknowledgement of receipt of this addendum may result in rejection of your offer. SPECIFICATIONS 1.01 Specification Section 232123-2.1-A-5 Add: Grundfos Pumps Inc. to list of acceptable manufacturer’s. 1.02 Specification Section 233600-2.01-A-11 Add: Johnson Controls International/York International Company to list of acceptable manufacturer’s. 1.03 Specification Section 236200-2.1-A-7 Add: Johnson Controls International/York International Company to list of acceptable manufacturer’s. 1.04 Specification Section 237313-2.1-A-8 Add: Johnson Controls International/York International Company to list of acceptable manufacturer’s. 1.05 Specification Section 237413-2.02-A-9 Add: Johnson Controls International/York International Company to list of acceptable manufacturer’s.

Upload: others

Post on 02-Oct-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ADDENDUM NO. 1 - Eastern Engineering

8250 Haverstick Road, Suite 285, Indianapolis, IN 46240

P: 317.638.8383

rossbar.com

ADDENDUM NO. 1

PROJECT: Indiana School for the Deaf, Building 8 HVAC Renovation

DAPW PROJECT NO: 49026008-20-040

R&B PROJECT NO: 2148-02

DATE: 04/22/2021

THIS ADDENDUM CONSISTS OF (2) 8 - 1/2” X 11” PAGES, (17) 30” X 42” SHEETS.

The following additions, revisions and modifications are hereby made part of the contract documents, which

shall be amended accordingly. Acknowledge receipt of addenda on bid form. Failure of your acknowledgement

of receipt of this addendum may result in rejection of your offer.

SPECIFICATIONS 1.01 Specification Section 232123-2.1-A-5 Add: Grundfos Pumps Inc. to list of acceptable manufacturer’s. 1.02 Specification Section 233600-2.01-A-11 Add: Johnson Controls International/York International Company to list of acceptable manufacturer’s. 1.03 Specification Section 236200-2.1-A-7 Add: Johnson Controls International/York International Company to list of acceptable manufacturer’s. 1.04 Specification Section 237313-2.1-A-8 Add: Johnson Controls International/York International Company to list of acceptable manufacturer’s. 1.05 Specification Section 237413-2.02-A-9 Add: Johnson Controls International/York International Company to list of acceptable manufacturer’s.

Page 2: ADDENDUM NO. 1 - Eastern Engineering

Page 2

BLDG 8 HVAC Renovation

Addendum No. 1

R&B Project Number 2148-02

2

DRAWINGS 2.01 COVER SHEET

• Revised sheet index.

2.02 M000 - MECHANICAL SYMBOLS & ABBREVIATIONS

• Added General Notes 25-27 2.03 M001 – FIRST FLOOR MECHANICAL RCP PLAN

• Added sheet. 2.04 M002 – SECOND FLOOR MECHANICAL RCP PLAN

• Added sheet. 2.05 M003 – THIRD FLOOR MECHANICAL RCP PLAN

• Added sheet. 2.06 MD100B - MECHANICAL

• Added note: DEMOLISH EXISTING CONDENSATE PUMP PNEUMATIC CONTROLS W/

NEW DDC CONTROLLERS • REVISED SHEET KEYNOTES 1&2.

2.07 MD101A – MECHANICAL FIRST FLOOR DEMO HVAC PLAN – AREA A

• Added View 2: “ENLARGED TYPICAL DORM ROOM – DEMO”

• Change keyed note 1 on sheet MD101A to read “...Demolish 20 existing thru wall PTAC

units..."

2.08 MD101B – MECHANICAL FIRST FLOOR DEMO HVAC PLAN – AREA B

• Change keyed note 1 on sheet MD101B to read “...Demolish 20 existing thru wall PTAC

units..."

• Changed keyed note 1 to 2 at column W/22.

2.09 MD101C – MECHANICAL FIRST FLOOR DEMO HVAC PLAN – AREA C (SHEET NOT

ISSUED IN ADDENDUM)

Page 3: ADDENDUM NO. 1 - Eastern Engineering

Page 2

BLDG 8 HVAC Renovation

Addendum No. 1

R&B Project Number 2148-02

3

• Change keyed note 1 on sheet MD101C to read “...Demolish 20 existing thru wall PTAC

units..."

2.10 MD102A – MECHANICAL FIRST FLOOR DEMO HVAC PLAN – AREA A (SHEET NOT

ISSUED IN ADDENDUM)

• Change keyed note 1 on sheet MD102A to read “...Demolish 20 existing thru wall

PTAC units..."

2.11 MD102B MECHANICAL SECOND FLOOR DEMO HVAC PLAN – AREA B (SHEET NOT

ISSUED IN ADDENDUM)

• Change keyed note 1 on sheet MD102B to read “...Demolish 20 existing thru wall PTAC

units..."

2.12 MD102C MECHANICAL SECOND FLOOR DEMO HVAC PLAN – AREA C (SHEET NOT

ISSUED IN ADDENDUM)

• Change keyed note 1 on sheet MD102C to read “...Demolish 20 existing thru wall

PTAC units..."

2.13 MD103A MECHANICAL THIRD FLOOR DEMO HVAC PLAN – AREA A

• Change keyed note 1 on sheet MD103A to read “...Demolish 20 existing thru wall

PTAC units..." • Added keynote 1 to PTAC unit on floor plan at column L/33.

2.14 MD103B MECHANICAL THIRD FLOOR DEMO HVAC PLAN – AREA B

• Change keyed note 3 to indicate 20 PTAC units. • Added keynote 3 to PTAC unit on floor plan at column L/23.

2.15 MD103C MECHANICAL THIRD FLOOR DEMO HVAC PLAN – AREA C (SHEET NOT

ISSUED IN ADDENDUM)

• Change keyed note 1 on sheet MD103C to read “...Demolish 20 existing thru wall

PTAC units..."

2.16 MD114A MECHANICAL ROOF DEMOLITION PLAN – AREA A

Page 4: ADDENDUM NO. 1 - Eastern Engineering

Page 2

BLDG 8 HVAC Renovation

Addendum No. 1

R&B Project Number 2148-02

4

• Added keyed note 7.

2.17 MD114B MECHANICAL ROOF DEMOLITION PLAN – AREA B

• Added keyed note 7. 2.18 M101A MECHANICAL FIRST FLOOR HVAC PLAN – AREA A

• Added View 2: “ENLARGED TYPICAL DORM ROOM - NEW 2.19 M201 - ENLARGED MECHANICAL ROOM PLANS

• Added note: “PROVIDE UNIT WITH A BASE RAIL AROUND THE FULL PERIMETER OF THE UNIT TO SUPPORT EXISTING CURBS” (4 Instances).

2.20 M402 - MECHANICAL DETAILS

• Added Detail #6: EXISTING VTU WITH DIFFUSER DETAIL (FOR REFERENCE ONLY) 2.21 M502 - MECHANICAL CONTROLS

• Added note 7 to “AIR TERMINAL UNIT VTU SEQUENCE OF OPERATION” • Revised HEAT EXCHANGER (HX-X) SEQUENCE OF OPERATION • Added note to HX diagram

2.22 M601 - MECHANICAL SCHEDULES

• Revised Boiler Schedule Press. Range

SIGNED: ______________________

TORY MCNEIL 04/22/2021

Page 5: ADDENDUM NO. 1 - Eastern Engineering

PROJECT DATA

PROJECT NAME: ISD RENOVATION

PROJECT DESCRIPTION: HEATING UPGRADES

PROJECT LOCATION: INDIANPOLIS, IN

BUILDING OWNER:INDIANA SCHOOL OF THE DEAF1200 E 42ND ST, INDIANAPOLIS, IN 46205OFFICE: (317) 550-4843

BUILDING DEPARTMENT: STATE OF INDIANA, DEPARTMENT OF HOMELAND SECURITY, CITY OF INDIANAPOLIS, DEPARTMENT OF CODE ENFORCEMENT

GOVERNING CODES: 2012 INDIANA BUILDING CODE 2012 INDIANA FIRE CODE 2012 INDIANA MECHANICAL CODE 2012 INDIANA PLUMBING CODE 2009 INDIANA ELECTRIC CODE INDIANA ACCESSIBILITY CODES

ARCHITECTURAL NOTES: ALL DOORS TO SWING IN THE PATH OF EGRESS, UNLESS NOTED OTHERWISE.

Ross & Baruzzini, Inc.8250 Haverstick Rd. Suite 285

Indianapolis, IN 46240Telephone: 317.638.8383

www.rossbar.com

M.E.P.

LOCATION MAP

VICINITY MAP

D:\U

se

rs\le

arlyw

ine\D

ocum

ents

\2148-0

2_IS

D B

uild

ing 8

_v19

_le

arlyw

ine.r

vt

4/2

2/2

021 5

:28

:33 P

M

Indiana School For The Deaf

Indiana School for the Deaf, Building #8 HVAC Renovation

1200 E 42nd St, Indianapolis, IN 46205

CONSTRUCTION DOCUMENTS - 09/01/2020

DAPW Project No. 49026008-20-040

ROSS & BARUZINNI PROJ NO:2148-02

DRAWING LISTSheet

NumberSheet Name

P000 PLUMBING SYMBOLS ABBREVIATIONS

PD100 PLUMBING BASEMENT FLOOR DEMOLITION PLAN - AREA B

P100 PLUMBING BASEMENT FLOOR PLAN - AREA B

P601 PLUMBING SCHEDULES

M000 MECHANICAL SYMBOLS & ABBREVIATIONS

M001 FIRST FLOOR MECHANICAL RCP PLAN

M002 SECOND FLOOR MECHANICAL RCP PLAN

M003 THIRD FLOOR MECHANICAL RCP PLAN

MD100B MECHANICAL BASEMENT FLOOR DEMO HVAC PLAN - AREA B

MD101A MECHANICAL FIRST FLOOR DEMO HVAC PLAN - AREA A

MD101B MECHANICAL FIRST FLOOR DEMO HVAC PLAN - AREA B

MD101C MECHANICAL FIRST FLOOR DEMO HVAC PLAN - AREA C

MD102A MECHANICAL SECOND FLOOR DEMO HVAC PLAN - AREA A

MD102B MECHANICAL SECOND FLOOR DEMO HVAC PLAN - AREA B

MD102C MECHANICAL SECOND FLOOR DEMO HVAC PLAN - AREA C

MD103A MECHANICAL THIRD FLOOR DEMO HVAC PLAN - AREA A

MD103B MECHANICAL THIRD FLOOR AND GYMNASIUM ROOF DEMO HVAC PLAN - AREA B

MD103C MECHANICAL THIRD FLOOR DEMO HVAC PLAN - AREA C

MD114A MECHANICAL ROOF DEMOLITION PLAN - AREA A

MD114B MECHANICAL ROOF DEMOLITION PLAN - AREA B

MD114C MECHANICAL ROOF DEMOLITION PLAN - AREA C

M100B MECHANICAL BASEMENT FLOOR HVAC PLAN - AREA B

M101A MECHANICAL FIRST FLOOR HVAC PLAN - AREA A

M101B MECHANICAL FIRST FLOOR HVAC PLAN - AREA B

M101C MECHANICAL FIRST FLOOR HVAC PLAN - AREA C

M102A MECHANICAL SECOND FLOOR HVAC PLAN - AREA A

M102B MECHANICAL SECOND FLOOR HVAC PLAN - AREA B

M102C MECHANICAL SECOND FLOOR HVAC PLAN - AREA C

M103A MECHANICAL THIRD FLOOR HVAC PLAN - AREA A

M103B MECHANICAL THIRD FLOOR HVAC PLAN - AREA B

M103C MECHANICAL THIRD FLOOR HVAC PLAN - AREA C

M114A MECHANICAL ROOF PLAN - AREA A

M114B MECHANICAL ROOF PLAN - AREA B

M114C MECHANICAL ROOF PLAN - AREA C

M201 ENLARGED MECHANICAL ROOM PLANS

M203 MECHANICAL PIPING DIAGRAM

M301 MECHANICAL BUILDING SECTIONS

M401 MECHANICAL DETAILS

M402 MECHANICAL DETAILS

M501 MECHANICAL CONTROLS

M502 MECHANICAL CONTROLS

M503 MECHANICAL CONTROLS

M504 MECHANICAL CONTROLS

M505 MECHANICAL CONTROLS

M601 MECHANICAL SCHEDULES

M602 MECHANICAL SCHEDULES

E000 ELECTRICAL SYMBOLS & ABBREVIATIONS

ED100B ELECTRICAL BASEMENT FLOOR DEMOLITION PLAN - AREA B

ED101A ELECTRICAL FIRST FLOOR DEMOLITION PLAN - AREA A

ED101B ELECTRICAL FIRST FLOOR DEMOLITION PLAN - AREA B

ED101C ELECTRICAL FIRST FLOOR DEMOLITION PLAN - AREA C

ED102A ELECTRICAL SECOND FLOOR DEMOLITION PLAN - AREA A

ED102B ELECTRICAL SECOND FLOOR DEMOLITION PLAN - AREA B

ED102C ELECTRICAL SECOND FLOOR DEMOLITION PLAN - AREA C

ED103A ELECTRICAL THIRD FLOOR DEMOLITION PLAN - AREA A

ED103B ELECTRICAL THIRD FLOOR DEMOLITION PLAN - AREA B

ED103C ELECTRICAL THIRD FLOOR DEMOLITION PLAN - AREA C

ED104A ELECTRICAL ROOF DEMOLITION PLAN - AREA A

ED104B ELECTRICAL ROOF DEMOLITION PLAN - AREA B

ED104C ELECTRICAL ROOF DEMOLITION PLAN - AREA C

E100B ELECTRICAL BASEMENT FLOOR PLAN - AREA B

E101A ELECTRICAL FIRST FLOOR PLAN - AREA A

E101B ELECTRICAL FIRST FLOOR PLAN - AREA B

E101C ELECTRICAL FIRST FLOOR PLAN - AREA C

E102A ELECTRICAL SECOND FLOOR PLAN - AREA A

E102B ELECTRICAL SECOND FLOOR PLAN - AREA B

E102C ELECTRICAL SECOND FLOOR PLAN - AREA C

E103A ELECTRICAL THIRD FLOOR PLAN - AREA A

E103B ELECTRICAL THIRD FLOOR PLAN - AREA B

E103C ELECTRICAL THIRD FLOOR PLAN - AREA C

E104A ELECTRICAL ROOF PLAN - AREA A

E104B ELECTRICAL ROOF PLAN - AREA B

E104C ELECTRICAL ROOF PLAN - AREA C

E401 ELECTRICAL RISER DIAGRAM

E501 ELECTRICAL SCHEDULES

CONSTRUCTION LAY-DOWN AREA

CONTRACTOR TO PROVIDE PRICING FOR THE FOLLOWING ALTERNATES:

A. Alternate 1: Domestic Water Heater Systema. Gas piping from utility plant to the building.b. New combustion air and flue piping for water heater and associated wall penetrations.c. Electrical to water heaters.d. Housekeeping pad.e. 2-Gas fired domestic water heaters.f. Demolition of 2-domestic electric water heaters.

B. Alternate 2: Basement Air Handlera. Demolition of CSAC-3 (AHU) in basement, CU-3 on roof and associated inline return

fan in the basement.b. New AHU-3 in basement, new CU-3 on roof and new inline return fan (IRF-03) in the

basement.C. Alternate 3: Packaged Terminal Air Conditioner (PTAC) replacement

a. Demo 19 existing PTAC units and provide new.b. Internal controls on equipment.c. New wall sleeves.

D. Alternate 4: Heating Water Boiler (Alternate 1 must be accepted)a. 1-Gas fired condensing boiler.b. Hew heating hot water piping to connect with existing system.c. New combustion air and flue piping for boiler and associated wall penetrations.d. Electrical to boiler.e. Housekeeping pad.

1

Page 6: ADDENDUM NO. 1 - Eastern Engineering

M

EXISTING TO REMAIN

AHU

1

FLEXIBLE DUCT

PIPE SYSTEM ABBREVIATIONS

KEYED NOTE

SECTION NUMBER

SHEET WHERE LOCATED

INTERFACE, EXISTING TO NEW

REFRIGERANT VENTRV

V VENT

LPS

HWS

HWR

LPR

HG

RS

RL

PC

REFRIGERANT HOT GAS

REFRIGERANT SUCTION

REFRIGERANT LIQUID

PUMPED CONDENSATE

LOW PRESSURE CONDENSATE RETURN (15 PSIG)

LOW PRESSURE STEAM SUPPLY (15 PSIG)

HEATING WATER SUPPLY

HEATING WATER RETURN

SRV STEAM RELIEF VENT

ROUND DUCT SIZE, (ACTUAL SIZE INDICATED)

ACCESS PANEL, TOP OR SIDE

TURNING VANES

CHANGE OF ELEVATION - RISE (R) OR DROP (D)

FLEXIBLE DUCT CONNECTION

UNIT NUMBER

EQUIPMENT DESIGNATION

SUPPLY AND OUTSIDE AIR SECTION UP

RETURN AIR SECTION UP

PUMP DISCHARGE

DRAIND

MOTORIZED DAMPER

MANUAL VOLUME DAMPER

FIRE DAMPER

TYPE OF SERVICE:S = SUPPLYR = RETURNE = EXHAUSTT = TRANSFER

AIR QUANTITYIN CFM

PD

DOMESTIC HOT WATERHW

MU MAKE-UP WATER (NON-POTABLE)

PRIMARY HEATING WATER SUPPLY

PRIMARY HEATING WATER RETURN

PHWS

PHWR

GRAVITY BACKDRAFT DAMPER

SUPPLY DIFFUSER AS SCHEDULED. ARROWS INDICATE DIRECTION OF AIR DISCHARGE. IF NO ARROWS ARE SHOWN ON PLAN, DEFAULT IS A 4-WAY THROW.

RETURN GRILLE OR REGISTER AS SCHEDULED

SLOT DIFFUSER AS SCHEDULED. ARROWS INDICATEDIRECTION OF AIR DISCHARGE. IF NO ARROWS ARE SHOWN ON PLAN, DEFAULT IS 2-WAY THROW.

SIDEWALL DIFFUSER AS SCHEDULED

BLOW DOWNBD

S-1100

FLOW ARROW

SCHEDULEDDEVICE NO

DEMO TO BE REMOVED

NEW WORK

UNIT NUMBER

DAMPER TYPE DESIGNATIONFSD

1

DUCT SIZE

12x12

12x12

12x12

12ø

R

AP

DUCT SIZE

DUCT SIZE, FIRST FIGURE IS SIDE SHOWN (CLEAR INSIDE, ADJUST FOR LINER)

PIPE LINE SYMBOLS

G

M

SUPPLY AND OUTSIDE AIR SECTION DOWN

RETURN AIR SECTION DOWN

SHUT OFF VALVE (SEE SPECIFICATION FOR TYPE)

BUTTERFLY VALVE

CHECK VALVE

GLOBE VALVE

CALIBRATED - ORIFACEBALANCING VALVE

PLUG VALVE

IN-LINE PUMP

ELBOW DOWN

ELBOW UP

TEE DOWN

TEE UP

CAP

FLANGE

DEMO TO BE REMOVED

CONCENTRICREDUCER/INCREASER

ECCENTRICREDUCER/INCREASER

Y - PATTERN STRAINER

TWO-WAY CONTROL VALVE

PRESSURE REGULATING VALVE (STEAM)

MEDIUM DETAIL FINE DETAIL

MOTORIZED BUTTERFLY VALVE

THREE-WAY CONTROL VALVE

UNION

AIR VENT (M - MANUAL, A - AUTOMATIC)

VACUUM BREAKER

GENERAL NOTES:

TEMPERATURE SENSOR

SIDEWALL RETURN OR EXHAUST AS SCHEDULED

PRESSURE AND TEMPERATURE TEST PORT

EQUIPMENT DESIGNATION GENERAL ABBREVIATIONS GENERAL ABBREVIATIONS, CONTINUED

BALL VALVE

GATE VALVE

M

AMS AIRFLOW MEASURING STATION

PRESSURE SENSOR

DUCT SYSTEM SYMBOLS

TEMPERATURE SENSOR WITH INSULATED SUB-BASEI

GENERAL SYMBOLS

THERMOMETER

PRESSURE GAGE WITH COCK

FLEX PIPE COUPLING

EXPANSION JOINT

PIPE ANCHOR

PIPE GUIDE

PITCH DOWN IN DIRECTION OF ARROW

FLOW ARROW

M WATER METER

T STEAM TRAP

Y - PATTERN STRAINER W/ BLOWDOWN VALVE

VALVE IN RISE (SEE SPECIFICATIONS FOR TYPE)

MULTI-PURPOSE PUMP DISCHARGE VALVE

3

EXHAUST GRILLE OR REGISTER AS SCHEDULED

PRESSURE REDUCING VALVE (HYDRONIC)

EXHAUST AIR SECTION UP

EXHAUST AIR SECTION DOWN

TEMPERATURE SENSOR WITH GUARDG

HUMIDITY SENSOR

PLAN NUMBER

SHEET WHERE LOCATED

1

M101

ACTIVE FLOW - LIMITING VALVE

AHU-1 EXISTING EQUIPMENT DESIGNATION

SOLENOID VALVE

RELIEF VALVE

CD CONDENSATE (STEAM) DRAIN

MPS

MPRMEDIUM PRESSURE CONDENSATE RETURN (60 PSIG)

MEDIUM PRESSURE STEAM SUPPLY (60PSIG)#

1

M101

T

T

T

H

P

FD

EXVAV-7-10

EXISTING AIR HANDLER DESIGNATION

EXISTING VAV BOX IDENTIFYER

EXISTING OVAL DUCT12/12

8250 H

AV

ER

ST

ICK

RD

S

UIT

E 2

85,

IND

IAN

AP

OLIS

, IN

46240

T

317.6

38.8

383

w

ww

.rossbar.

com

CHECKED BY:

© ROSS & BARUZZINI, INC. 2020

ISSUE DATE:

RB PROJ. NO.:

DESIGNED BY:

DRAWING TITLE:

DRAWING NO.:

WHEN THIS DRAWING IS

REPRODUCED AT ORIGINAL SCALE THIS BAR = 1 INCH

REVISIONS:

The Professional Engineer, whose signature and personal seal appear on

this document, assumes responsibility only for what appears hereon, and

disclaims responsibility for all other plans, specifications, estimates,

reports, documents or instruments not sealed by the Professional Engineer

relating to, or intended to be used for, any part or parts of the engineering

project to which this document refers. Prints sealed by the Engineer bear

the embossed or wet seal of the Engineer across the signature and date.

Copies of this document, as signed and sealed, have been retained by the

Professional Engineer. The Professional Engineer will not be responsible

for subsequent changes to this document, unless the changes are made

by the Engineer or with the Engineer's written authorization.

1 INCH

DATE DESCRIPTION

Dwg: of:

4/2

2/2

02

1 5

:28:3

3 P

M

2148-02

M000

TMM

India

na S

chool fo

r th

e D

eaf,

Build

ing #

8 H

VA

C R

enovation

1200 E

42nd S

t, India

napolis

, IN

46205

MECHANICAL SYMBOLS &ABBREVIATIONS

Ind

iana

Sch

ool F

or

Th

e D

ea

f

PR

OJE

CT

ST

AT

US

: C

ON

ST

RU

CT

ION

DO

CU

ME

NT

S

DA

PW

Pro

ject

No.

49026008-2

0-0

40

TMM

09/01/2020

ACC AIR COOLED CONDENSER

ACU AIR CONDITIONING UNIT

AF AIR FILTER

AHU AIR HANDLING UNIT

AS AIR SEPARATOR

B BOILER

CC COOLING COIL

CFP CHEMICAL FEED PUMP

CH CHILLER

CP CONDENSER WATER PUMP

CRAC COMPUTER ROOM AIR CONDITIONING UNIT

CRP CONDENSATE RETURN PUMP

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CVR CONVECTOR

EF EXHAUST FAN

EJ EXPANSION JOINT

ET EXPANSION TANK

F FAN

FCU FAN COIL UNIT

FD FIRE DAMPER

FSD COMBINATION FIRE/SMOKE DAMPER

FT FLASH TANK

FTR FIN-TUBE RADIATION

FTU FAN TERMINAL UNIT

GV GRAVITY VENTILATOR

H HUMIDIFIER

HC HEATING COIL

HEV HOOD EXHAUST VALVE

HWP HEATING WATER PUMP

HX HEAT EXCHANGER

L LOUVER

MAU MAKE-UP AIR UNIT

MD MOTORIZED DAMPER

P PUMP

PCWP PRIMARY CHILLED WATER PUMP

PG PIPE GUIDE

PRV PRESSURE REGULATING VALVE

PTAC PACKAGED TERMINAL AIR CONDITIONING UNIT

RAF RELIEF AIR FAN

RF RETURN FAN

RHC TERMINAL REHEAT COIL

RP RADIANT PANEL

RTU ROOFTOP UNIT

SAV SUPPLY AIR VALVE

SF SUPPLY FAN

ST STEAM TRAP

T TANK

UH UNIT HEATER

VAV VARIABLE AIR VOLUME BOX

VTU VARIABLE TERMINAL UNIT

WCC WATER COOLED CONDENSER

IPLV INTEGRATED PART-LOAD VALUE

ISP INTERNAL STATIC PRESSURE

JS JOIST SPACE

KW KILOWATTS

L LENGTH

LAT LEAVING AIR TEMPERATURE

LB(S) POUNDS

LF LINEAR FEET

LRA LOCKED ROTOR AMPS

LS LIGHT SPACE

LVL LEVEL

LWT LEAVING WATER TEMPERATURE

MAN MANUAL

MANU MANUFACTURER

MAX MAXIMUM

MBH THOUSAND BRITISH THERMAL UNITS PER HOUR

MCA MINIMUM CIRCUIT AMPS

MCC MOTOR CONTROL CENTER

MECH MECHANICAL

MERV MINIMUM EFFICIENCY REPORTING VALUE (ASHRAE 52.2)

MFR MANUFACTURER

MIN MINIMUM OR MINUTE (PER CONTEXT)

MTD MOUNTED

MTL METAL

MV MANUAL VENT

NC NORMALLY CLOSED OR NOISE CRITERIA (PER CONTEXT)

NIC NOT IN CONTRACT

NO NORMALLY OPEN OR NUMBER (PER CONTEXT)

NOM NOMINAL

NPLV NON-STANDARD PART LOAD VALUE

NPSH NET POSITIVE SUCTION HEAD

NTS NOT TO SCALE

OA OUTSIDE AIR

OBD OPPOSED BLADE DAMPER

OC ON CENTER

OD OUTSIDE DIAMETER

OT OIL TRAP

PA PIPE ANCHOR

PBD PARALLEL BLADE DAMPER

PC PUMPED CONDENSATE

PD PRESSURE DROP

PENT PENTHOUSE

PH PHASE

PHC PREHEAT COIL

PLBG PLUMBING

PNEU PNEUMATIC

PPH POUNDS PER HOUR

PRESS PRESSURE

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH ABSOLUTE

PSIG POUNDS PER SQUARE INCH GAUGE

QTY QUANTITY

RA RETURN AIR

RAD RADIATED

RD ROOF DRAIN

REFR REFRIGERANT

REQ REQUIRED

RH RELATIVE HUMIDITY

RLA RUNNING LOAD AMPS

RM ROOM

RND ROUND

RPM REVOLUTIONS PER MINUTE

SA SUPPLY AIR

SAN SANITARY

SEC'N SECTION

SEER SEASONAL ENERGY EFFICIENCY RATIO

SENS SENSIBLE

SF SQUARE FOOT

SH SENSIBLE HEAT

SHT SHEET

SND SOUND

SOL SOLENOID

SP STATIC PRESSURE

SPD STATIC PRESSURE DIFFERENTIAL

SPT STATIC PRESSURE TRANSMITTER

SQ SQUARE

SST STAINLESS STEEL

STL STEEL

STM STEAM

T&P TEMPERATURE AND PRESSURE

TC TEMPERATURE CONTROL

TD THERMODYNAMIC OR TEMPERATURE DIFFERENTIAL (PER CONTEXT)

TDH TOTAL DYNAMIC HEAD

TEMP TEMPERATURE

TOT TOTAL

TPD TOTAL PRESSURE DROP

TSP TOTAL STATIC PRESSURE

TYP TYPICAL

UC UNDERCUT DOOR

UG UNDERGROUND

UNO UNLESS NOTED OTHERWISE

V VOLTS

VAC VACUUM

VD VOLUME DAMPER (MANUAL)

VEL VELOCITY

VERT VERTICAL

VFD VARIABLE FREQUENCY DRIVE

VOL VOLUME

VTR VENT THRU ROOF

W WATT OR WIDTH (PER CONTEXT)

W/ WITH

W/O WITHOUT

WB WET BULB

WC WATER COLUMN

WG WATER GAUGE

WPD WATER PRESSURE DIFFERENTIAL

WT WEIGHT

A AIR OR AMP (PER CONTEXT)

ACC ACCESSORIES

AD ACCESS DOOR

AFF ABOVE FINISHED FLOOR

AFS AIR FLOW SWITCH

AHRI AIR CONDITIONING, HEATING, AND REFRIGERATION INSTITUTE

AI ANALOG SIGNAL INPUT

AMB AMBIENT

AO ANALOG SIGNAL OUTPUT

AP ACCESS PANEL

APD AIR PRESSURE DROP

APLV APPLICATION PART LOAD VALUE

APPROX APPROXIMATE

ARCH ARCHITECTURE/ARCHITECT

AUX AUXILIARY

AV AUTOMATIC VENT

AVG AVERAGE

BDD BACK DRAFT DAMPER

BFC BELOW FINISHED CEILING

BFP BACKFLOW PREVENTER

BHP BRAKE HORSEPOWER

BI BINARY SIGNAL INPUT

BMS BUILDING MANAGEMENT SYSTEM

BO BINARY SIGNAL OUTPUT

BOB BOTTOM OF BEAM

BOD BOTTOM OF DUCT

BOP BOTTOM OF PIPE

BS BEAM SPACE

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNITS PER HOUR

BWE BAKED WHITE ENAMEL

CAP CAPACITY

CAV CONSTANT AIR VOLUME

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CI CAST IRON

CLG COOLING DUCT (COLD DUCT)

CO CLEAN OUT

COMP COMPRESSOR

CONC CONCRETE

COND CONDENSATE

CONN CONNECTION

CORR CORRIDOR

CV CONTROL VALVE

D DEPTH

DB DRY BULB

DBA A-WEIGHTED DECIBELS

DEFL DEFLECTION

DEG DEGREES

DEG F DEGREES FAHRENHEIT

DES DESIGN

DIA DIAMETER

DIM DIMENSION

DISCH DISCHARGE

DIV DIVISION

DN DOWN

DP DIFFERENTIAL PRESSURE SENSOR

DPS DIFFERENTIAL PRESSURE SWITCH

DPT DIFFERENTIAL PRESSURE TRANSMITTER

DTL DETAIL

DWG(S) DRAWING(S)

EA EXHAUST AIR OR EACH (PER CONTEXT)

EAT ENTERING AIR TEMPERATURE

EER ENERGY EFFICIENT RATIO

EFF EFFICIENCY

ELEC ELECTRIC

ELEV ELEVATION

EQ EQUAL

ESP EXTERNAL STATIC PRESSURE

EWB ENTERING AIR WET BULB TEMPERATURE

EWT ENTERING WATER TEMPERATURE

EXH EXHAUST

EXIST, EX EXISTING

EXT EXTERNAL

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

FC FLEXIBLE CONNECTION

FD FLOOR DRAIN

FDC FIRE DEPARTMENT CONNECTION

FIN FINISHED

FLR FLOOR

FPF FINS PER FOOT

FPM FEET PER MINUTE

FS FLOW SWITCH

FT FEET

FT-HD HEAD IN FEET

GA GAUGE

GAL GALLONS

GALV GALVANIZED

GC GENERAL CONTRACTOR

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

H HEIGHT

HD HEAD

HEV HOSE END VALVE

HORIZ HORIZONTAL

HP HORSEPOWER

HR HOUR

HTG HEATING DUCT (HOT DECK)

HVAC HEATING, VENTILATING & AIR CONDITIONING

HW HOT WATER

HZ HERTZ

IB INVERTED BUCKET

IE INVERT ELEVATION

IN INCH/INCHES

INDIC INDICATOR

14. ALL DUCTWORK SHALL COMPLY WITH "HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE," 3RD EDITION, SMACNA 2005, EXCEPT WHERE MORE RESTRICTIVEREQUIREMENTS ARE SPECIFIED. ANY PLAN REFERENCES TO "SMACNA FIGURE ---" REFERS TO THIS STANDARD. SEE SPECIFICATIONS FOR SCHEDULE OF DUCT PRESSURE CLASSAND SEAL CLASS.

15. IN GENERAL, THE FINAL FLEX DUCT RUNOUT TO EACH DIFFUSER, REGISTER, OR GRILLE IS NOT SIZED ON PLANS. FLEX DUCT RUNOUT SIZE SHALL MATCH AIR OUTLET NECK SIZE,UNO.

16. IT IS THE INTENT OF THESE DRAWINGS THAT A MANUAL BALANCING DAMPER BE PROVIDED AT EVERY INDIVIDUAL DUCTED CONNECTION TO AN AIR DEVICE, UNLESS A BALANCINGDAMPER IS SCHEDULED TO BE FURNISHED WITH AIR DEVICE. VAV BOXES WITH SINGLE DIFFUSERS ARE NOT REQUIRED TO HAVE A BALANCING DAMPER.

17. ALL NEW DUCTWORK SIZES SHOWN ON PLANS ARE CLEAR INSIDE DIMENSIONS. CONTRACTOR SHALL ADJUST SHEET METAL SIZES AS NECESSARY TO ACCOMMODATE INTERNALDUCT LINER, IF SPECIFIED.

18. ALL EXISTING TEMPERATURE CONTROLS THAT ARE BEING DEMOLISHED OR DISABLED AS WORK OF THIS CONTRACT SHALL BE COMPLETELY REMOVED FROM BUILDING. THE T.C.CONTRACTOR IS RESPONSIBLE FOR UPGRADING ALL PNEUMATIC CONTROLS, ACCESSORIES, ETC. TO DDC WHETHER INDICATED ON PLANS OR NOT.

19. THE AIRSIDE AND HEATING HYDRONIC SYSTEM SHALL BE MEASURED AT EACH AIR HANDLER AND VAV BOX BY A CERTIFIED T&B CONTRACTOR PRIOR TO DEMOLITION. THE RESULTSSHALL BE SUBMITTED TO ENGINEER FOR RECORD PURPOSES PRIOR TO SUBMITTING NEW EQUIPMENT.

20. CONTRACTOR SHALL HAVE THE DOCUMENTS REVIEWED COMPLETELY BY A CERTIFIED BALANCING CONTRACTOR FOR THE INCLUSION OF THE NECESSARY ADDITIONAL AIR ANDHYDRONIC SYSTEM BALANCING DEVICES NOT SHOWN IN THESE DOCUMENTS FOR COMPLETE HVAC SYSTEM BALANCING. REFER TO SPECIFICATION SECTION 230593 FORCONSTRUCTION DOCUMENT EXAMINATION REPORT.

21. THE CONTRACTOR SHALL CONNECT THE NEW HVAC SYSTEM TO THE OWNER'S EXISTING BUILDING CONTROL SYSTEM. REFER TO THE SPECIFICATIONS FOR ADDITIONALREQUIREMENTS

22. IT SHOULD BE NOTED THAT SOME SYSTEMS (I.E. GENERAL EXHAUST) ARE REQUIRED TO BE BALANCES MORE THAN ONCE TO ASSURE DESIGN AIRFLOWS ARE PROVIDED.

23. FOR ALL SUSPENDED HVAC EQUIPMENT THAT WEIGHS 31 POUNDS OR MORE, LOCATED IN OR ABOVE OCCUPIED SPACES, THE CONTRACTOR SHALL SUPPORT THE EQUIPMENT TOPREVENT IT FROM FALLING FROM OR THROUGH THE CEILING IN THE EVENT OF A TERRORIST ATTACK(EXPLOSION). THIS SHALL INCLUDE BUT IT NOT LIMITED TO ALL VAV BOXES,ETC. SUPPORTS SHALL BE THE CONTRACTORS RESPONSIBILITY AND SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW.

24 ALL PUBLIC SPACES SHALL BE PROVIDED WITH SENSOR ONLY TYPE THERMOSTATS TIED INTO BAS. PRIVATE SPACES TO BE PROVIDED WITH ADJUSTABLE THERMOSTATS.

25 NEW THERMOSTATS TO CONTROL NEW VAV AND NEW FINNED TUBE CONTROL VALVE (WHERE APPLICABLE) SEE SEQUENCE OF OPERATIONS FOR MORE INFORMATION.

26 NEW CONTROL WIRING TO FOLLOW EXISTING PNEUMATIC TUBING AND BE CONCEALED IN WALL.

27. ROUTE NEW CONTROL WIRING DOWN TO FINNED TUBE CONTROL VALVE EXPOSED IN CONDUIT SIMILAR TO LEGRAND 800 SERIES. COLOR TO MATCH ADJACENT WALL.

1. THESE PLANS ARE DIAGRAMMATIC IN NATURE. THE CONTRACTOR SHALL BE PREPARED TO MAKE SOME ALTERATIONS TO THE EXACT LOCATION OF DUCTWORK, PIPING ANDEQUIPMENT FROM THE LOCATION INDICATED ON THESE DRAWINGS TO FIT ACTUAL JOB CONDITIONS.

2. ALL ELBOWS, FITTINGS, ETC., IN PIPING AND DUCTWORK REQUIRED TO CLEAR ALL JOB OBSTRUCTIONS ARE NOT NECESSARILY INDICATED. ALL NECESSARY TRANSITIONS, FITTINGSAND OFFSETS ARE REQUIRED WHETHER SHOWN OR NOT.

3. BECAUSE OF THE LIMITED SPACE AVAILABLE TO INSTALL ALL OF THE MECHANICAL WORK, COORDINATION BETWEEN THE VARIOUS TRADES IS OF THE UTMOST IMPORTANCE.

4. THE CONTRACTOR SHALL COORDINATE STAGING AND SCHEDULING WITH THE OWNER'S REPRESENTATIVE.

5. EXISTING CONDITIONS ARE BASED ON INFORMATION OBTAINED FROM PREVIOUS CONSTRUCTION DOCUMENTS AND INFORMAL FIELD OBSERVATION AND SHALL NOT BECONSTITUTED AS "AS BUILT." THE CONTRACTOR SHALL FIELD-VERIFY EXISTING CONDITIONS BEFORE THE ONSET OF CONSTRUCTION.

6. DEMOLISH ALL PIPING, DUCTWORK EQUIPMENT, ETC., SHOWN TO BE REMOVED, IN ITS ENTIRETY, INCLUDING ALL HANGERS AND SUPPORTS.

7. WHERE CONTRACTOR IS REQUIRED TO CONCEAL NEW WORK, REMOVE OR MODIFY EXISTING CONSTRUCTION OR EQUIPMENT, OR ATTACH TO EXISTING CONSTRUCTION, THECONTRACTOR SHALL REPAIR OR REPLACE EXISTING CONSTRUCTION AND MATERIALS TO MATCH CONDITIONS AT THE ONSET OF CONSTRUCTION. IT IS THE CONTRACTOR'SRESPONSIBILITY TO REMOVE AND REPLACE EXISTING CEILINGS AND WALLS REQUIRED FOR INSTALLATION OF MECHANICAL SYSTEMS.

8. THE OWNER SHALL MAINTAIN ALL SALVAGE RIGHTS OF EQUIPMENT AND MATERIALS REMOVED. ALL EQUIPMENT AND MATERIALS NOT CLAIMED BY THE OWNER SHALL BE REMOVEDFROM THE PREMISES BY THIS CONTRACTOR.

10. ALL WORK SHALL BE INSTALLED PER THE REFERENCE DETAILS, REGARDLESS OF WHETHER OR NOT THE DETAILS ARE CALLED OUT ON THE PLANS. IF NO DETAIL IS PROVIDED,INSTALL PER MANUFACTURER'S REQUIREMENTS.

11. PROVIDE VENTS AT ALL HYDRONIC PIPING HIGH POINTS, AND DRAINS AT ALL PIPING LOW POINTS, REGARDLESS OF WHETHER SHOWN OR NOT.

12. THE CONTRACTOR SHALL VERIFY THAT EXISTING REFRIGERANT PIPING IS ACCEPTABLE FOR REUSE BY EQUIPMENT MANUFACTURER. NEW PIPING SHALL BE PROVIDED ASNECESSARY. THE CONTRACTOR SHALL VERIFY ALL REFRIGERANT PIPE SIZING AND ROUTINGS WITH THEEQUIPMENT MANUFACTURER. THE CONTRACTOR SHALL ALSO PROVIDE ALL REQUIRED REFRIGERANTACCESSORIES AS RECOMMENDED BY THE EQUIPMENT MANUFACTURER FOR COMPLETE AND FULLYFUNCTIONAL SYSTEMS.

13. DO NOT SCALE THE LOCATION OF HVAC CEILING ELEMENTS, SUCH AS AIR INLETS AND OUTLETS, FROM THE M-SERIES DRAWINGS. M-SERIES DRAWINGS GOVERN TYPE, STYLE, ANDSIZE OF DIFFUSERS, REGISTERS, AND GRILLES.

8250 H

AV

ER

ST

ICK

RD

, #285

IND

IAN

AP

OLIS

, IN

46240

T 3

17.6

38.8

383

ww

w.r

ossbar.

com

1 04/22/21 ADDENDUM 1

1

Page 7: ADDENDUM NO. 1 - Eastern Engineering

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123123 1

23

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

A

C

1247

D

H

I

L

T

W

35 33 32 28 27 22 21

1

1

1

1 1 1 11

1

1 1

1

1 1 1 1 1

1 1

1

1

1 1 1

1

1 1 1 1

1

1

1 1 1

1

1

1

1 111

1

11

11

1

1

1

1

1 1

1

1

1

1

1

1

11

1

1

1 1

1

11

1

1

111

1

1

3

3

3

1

2

2 2 2

2

2

2

2

2

2 2

2

2

2

2

#

8250 H

AV

ER

ST

ICK

RD

S

UIT

E 2

85,

IND

IAN

AP

OLIS

, IN

46240

T

317.6

38.8

383

w

ww

.rossbar.

com

CHECKED BY:

© ROSS & BARUZZINI, INC. 2020

ISSUE DATE:

RB PROJ. NO.:

DESIGNED BY:

DRAWING TITLE:

DRAWING NO.:

WHEN THIS DRAWING IS

REPRODUCED AT ORIGINAL SCALE THIS BAR = 1 INCH

PRELIM

INARY

NOT F

OR

CONSTR

UCTIO

N

REVISIONS:

The Professional Engineer, whose signature and personal seal appear on

this document, assumes responsibility only for what appears hereon, and

disclaims responsibility for all other plans, specifications, estimates,

reports, documents or instruments not sealed by the Professional Engineer

relating to, or intended to be used for, any part or parts of the engineering

project to which this document refers. Prints sealed by the Engineer bear

the embossed or wet seal of the Engineer across the signature and date.

Copies of this document, as signed and sealed, have been retained by the

Professional Engineer. The Professional Engineer will not be responsible

for subsequent changes to this document, unless the changes are made

by the Engineer or with the Engineer's written authorization.

1 INCH

DATE DESCRIPTION

Dwg: of:

4/2

2/2

02

1 5

:28:3

3 P

M

2148-02

M001

Checker

India

na S

chool fo

r th

e D

eaf,

Build

ing #

8 H

VA

C R

enovation

1200 E

42nd S

t, India

napolis

, IN

46205

FIRST FLOOR MECHANICALRCP PLAN

Ind

iana

Sch

ool F

or

Th

e D

ea

f

PR

OJE

CT

ST

AT

US

: C

ON

ST

RU

CT

ION

DO

CU

ME

NT

S

DA

PW

Pro

ject

No.

49026008-2

0-0

40

Designer

09/01/2020

1 04/22/21 ADDENDUM 1

1/16" = 1'-0"1

FIRST FLOOR MECHANICAL PLAN

1

1. GYPSUM BOARD/PLASTER CEILING.

2. 2x2 LAY IN CEILING PANEL.

3. SPECIALTY SLOT CEILING.

SHEET KEYNOTES#

Page 8: ADDENDUM NO. 1 - Eastern Engineering

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123123 1

23

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

XXX

Second Floor

<−−−−

2’ 7 23/32"

Down 5

11/32"

21’−4"

A

C

1247

D

H

I

L

T

W

35 33 32 28 27 22 21

1 1 1 1 1 1

11

1

1

1 1

1 1

1

1

1 1 1

1

1

1

1

1 1

1

1

1 1 1 1

1

11

111

1 1

1 1

1 1 1 1

1

1

1

1

1

1 1

1

1

1

1

1

1

11

1

1

1 1

1

1

1

1

1

111

1

1

2

2

2

2

2

2

2 2

2

2

2

2

2

2

2

2

2

2

3

#

82

50

HA

VE

RS

TIC

K R

D

SU

ITE

285

, IN

DIA

NA

PO

LIS

, IN

46

240

T 3

17.6

38

.83

83

ww

w.r

ossba

r.co

m

CHECKED BY:

© ROSS & BARUZZINI, INC. 2020

ISSUE DATE:

RB PROJ. NO.:

DESIGNED BY:

DRAWING TITLE:

DRAWING NO.:

WHEN THIS DRAWING IS

REPRODUCED AT ORIGINAL SCALE THIS BAR = 1 INCH

PRELIM

INARY

NOT F

OR

CONSTR

UCTIO

N

REVISIONS:

The Professional Engineer, whose signature and personal seal appear on

this document, assumes responsibility only for what appears hereon, and

disclaims responsibility for all other plans, specifications, estimates,

reports, documents or instruments not sealed by the Professional Engineer

relating to, or intended to be used for, any part or parts of the engineering

project to which this document refers. Prints sealed by the Engineer bear

the embossed or wet seal of the Engineer across the signature and date.

Copies of this document, as signed and sealed, have been retained by the

Professional Engineer. The Professional Engineer will not be responsible

for subsequent changes to this document, unless the changes are made

by the Engineer or with the Engineer's written authorization.

1 INCH

DATE DESCRIPTION

Dwg: of:

4/2

2/2

02

1 5

:28:3

4 P

M

2148-02

M002

Checker

India

na S

chool fo

r th

e D

eaf,

Build

ing #

8 H

VA

C R

enovation

1200 E

42nd S

t, India

napolis

, IN

46205

SECOND FLOORMECHANICAL RCP PLAN

Ind

iana

Sch

ool F

or

Th

e D

ea

f

PR

OJE

CT

ST

AT

US

: C

ON

ST

RU

CT

ION

DO

CU

ME

NT

S

DA

PW

Pro

ject

No.

49026008-2

0-0

40

Designer

09/01/2020

1 04/22/21 ADDENDUM 1

1/16" = 1'-0"1

SECOND FLOOR MECHANICAL PLAN

1

1. GYPSUM BOARD/PLASTER CEILING.

2. 2x2 LAY IN CEILING PANEL.

3. SPECIALTY SLOT CEILING.

SHEET KEYNOTES#

Page 9: ADDENDUM NO. 1 - Eastern Engineering

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123123 1

23

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

OPEN TO FLOOR BELOW

BUILT UP ROOF

123

123

XXX

A

C

1247

D

H

I

L

T

W

35 33 32 28 27 22 21

1 1 1 1 1 1

11

1

1

1 1

1 1

1

1

1 1 1

1

1

1

1

1 1

1

1

1 1 1 1

1

11

111

1 1

1 1

1 1 1 1

1

1

1

1

1 1

1

1

1

1

1

1

11

1

1

1 1

1

1

1

1

1

111

1

1

2

2

2

2

2

2

2 2

2

2

2

2

2

2

2

2

2

2

3

#

82

50

HA

VE

RS

TIC

K R

D

SU

ITE

285

, IN

DIA

NA

PO

LIS

, IN

46

240

T 3

17.6

38

.83

83

ww

w.r

ossba

r.co

m

CHECKED BY:

© ROSS & BARUZZINI, INC. 2020

ISSUE DATE:

RB PROJ. NO.:

DESIGNED BY:

DRAWING TITLE:

DRAWING NO.:

WHEN THIS DRAWING IS

REPRODUCED AT ORIGINAL SCALE THIS BAR = 1 INCH

PRELIM

INARY

NOT F

OR

CONSTR

UCTIO

N

REVISIONS:

The Professional Engineer, whose signature and personal seal appear on

this document, assumes responsibility only for what appears hereon, and

disclaims responsibility for all other plans, specifications, estimates,

reports, documents or instruments not sealed by the Professional Engineer

relating to, or intended to be used for, any part or parts of the engineering

project to which this document refers. Prints sealed by the Engineer bear

the embossed or wet seal of the Engineer across the signature and date.

Copies of this document, as signed and sealed, have been retained by the

Professional Engineer. The Professional Engineer will not be responsible

for subsequent changes to this document, unless the changes are made

by the Engineer or with the Engineer's written authorization.

1 INCH

DATE DESCRIPTION

Dwg: of:

4/2

2/2

02

1 5

:28:3

4 P

M

2148-02

M003

Checker

India

na S

chool fo

r th

e D

eaf,

Build

ing #

8 H

VA

C R

enovation

1200 E

42nd S

t, India

napolis

, IN

46205

THIRD FLOOR MECHANICALRCP PLAN

Ind

iana

Sch

ool F

or

Th

e D

ea

f

PR

OJE

CT

ST

AT

US

: C

ON

ST

RU

CT

ION

DO

CU

ME

NT

S

DA

PW

Pro

ject

No.

49026008-2

0-0

40

Designer

09/01/2020

1 04/22/21 ADDENDUM 1

1/16" = 1'-0"1

THIRD FLOOR MECHANICAL PLAN

1

1. GYPSUM BOARD/PLASTER CEILING.

2. 2x2 LAY IN CEILING PANEL.

3. SPECIALTY SLOT CEILING.

SHEET KEYNOTES#

Page 10: ADDENDUM NO. 1 - Eastern Engineering

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

L T W

35

33

32

28

27

EXVAV8-01

EXVAV8-02

EXVAV8-03

EXVAV8-04

EXVAV-9-02

EXVAV-9-01

14ø

SA

16ø

SA

14"Ø SA FROM AHU-8 IN PENTHOUSE ABOVE

16"Ø SA FROM AHU-8 IN PENTHOUSE ABOVE

16ø

SA

14ø

SA

14"Ø SA FROM AHU-9 IN PENTHOUSE ABOVE

16"Ø SA FROM AHU-9 IN PENTHOUSE ABOVE

VTU

9-02

T

MATCHLINE

T T

T

T

T

T

TT

T

T

T T

T

T

T

T

T

TT

T

EXVAV-8-07

VTU

9-06VTU

9-05

VTU

9-04

VTU

9-03

EXVAV-9-06

VTU

9-07

VTU

9-08

VTU

9-09

VTU

9-10

EXVAV-9-11

VTU

9-11

VTU

9-12

VTU

9-13

VTU

8-05 VTU

8-06

VTU

8-07

VTU

8-08

VTU

8-09

VTU

8-10

VTU

8-11

VTU

8-12

VTU

8-13

VTU

7-06

VTU

8-02

T

VTU

9-01

PTAC-1

PTAC-1

VTU

8-04 T

T

VTU

8-03

VTU

8-01T

C133

C134

C135

C136

C137 C138

C139

C140

C141

C142

C143

C144

C145

C146

C147

C148

C149

C150

C151

C152

C153

C154

C155

C156

C157

C158C159

C160

C161

C162

C163

C164

C165

C166

C167

C168

C169

C170C171

C172

C173

C174

C175

C176

C177

C126

C127

C128

C129

C130

C131

C132

C124

C115

C123

EXVAV-9-13

EXVAV-8-05

EXVAV-9-12

EXVAV-9-10

EXVAV-9-09

EXVAV-9-08

EXVAV-9-07

EXVAV-9-05

EXVAV-9-04

EXVAV-9-03

EXVAV-8-06

EXVAV-8-08

EXVAV-8-09

EXVAV-8-10

EXVAV-8-11

EXVAV-8-12

EXVAV-8-13

EXVAV-7-06

T

1

1

2 2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

M101A

2

W

VTU-9-07

EXVAV-9-07

CONTRACTORS OPTION IN LIEU OF RETROFIT KIT: PROVIDE A NEW VAV BOX SIZED TO MATCH EXISTING SUPPLY DUCT (ALL SIZES MUST BE VERIFIED IN FIELD AND SUBMITTED FOR APPROVAL WITH SUBMITTAL). A NEW ACCESS DOOR TO BE PROVIDED IN CEILING BENEATH VAV BOX.

8250 H

AV

ER

ST

ICK

RD

S

UIT

E 2

85,

IND

IAN

AP

OLIS

, IN

46240

T

317.6

38.8

383

w

ww

.rossbar.

com

CHECKED BY:

© ROSS & BARUZZINI, INC. 2020

ISSUE DATE:

RB PROJ. NO.:

DESIGNED BY:

DRAWING TITLE:

DRAWING NO.:

WHEN THIS DRAWING IS

REPRODUCED AT ORIGINAL SCALE THIS BAR = 1 INCH

REVISIONS:

The Professional Engineer, whose signature and personal seal appear on

this document, assumes responsibility only for what appears hereon, and

disclaims responsibility for all other plans, specifications, estimates,

reports, documents or instruments not sealed by the Professional Engineer

relating to, or intended to be used for, any part or parts of the engineering

project to which this document refers. Prints sealed by the Engineer bear

the embossed or wet seal of the Engineer across the signature and date.

Copies of this document, as signed and sealed, have been retained by the

Professional Engineer. The Professional Engineer will not be responsible

for subsequent changes to this document, unless the changes are made

by the Engineer or with the Engineer's written authorization.

1 INCH

DATE DESCRIPTION

KEY PLAN

Dwg: of:

4/2

2/2

02

1 5

:28:3

4 P

M

2148-02

M101A

TMM

India

na S

chool fo

r th

e D

eaf,

Build

ing #

8 H

VA

C R

enovation

1200 E

42nd S

t, India

napolis

, IN

46205

MECHANICAL FIRST FLOORHVAC PLAN - AREA A

Ind

iana

Sch

ool F

or

Th

e D

ea

f

PR

OJE

CT

ST

AT

US

: C

ON

ST

RU

CT

ION

DO

CU

ME

NT

S

DA

PW

Pro

ject

No.

49026008-2

0-0

40

TMM

09/01/2020

1/8" = 1'-0"1

MECHANICAL FIRST FLOOR HVAC PLAN - AREA A

AREA A

AREA B

AREA C

TRUE NORTH

1. PROVIDE AN ALTERNATE PRICE FOR NEW THRU WALL PTAC UNITS. PROVIDE WITH ALL ACCESSORIES AND CONTROLS INDICATED ON SCHEDULES.

2. EXISTING FINNED TUBE HHW RADIATOR TO REMAIN. PNEUMATIC CONTROL VALVE TO BE REPLACED WITH NEW DDC CONTROL VALVE. VERIFY EXACT LOCATION IN FIELD.

SHEET KEYNOTES#

A. ALL EXISTING FIRE RATINGS TO BE MAINTAINED AFTER NEW CONSTRUCTION.

B. NEW VTU BOXES TO BE COORDINATED WITH EXISTING OBSTRUCTIONS INCLUDING LIGHTS, CEILING GRID, STRUCTURE, ETC. AND BE ORIENTED IN SUCH A MANNER TO PROVIDE MANUFACTURER'S RECOMMENDED CLEARANCES. IF CLEARANCES CANNOT BE MET THE VAV BOX SHALL BE RELOCATED AND RECONNECTED AT NO INCREASE IN PROJECT COST.

C. PROVIDE NEW DUCTWORK AS REQUIRED TO CONNECT NEW VTU'S AND VAV BOXES . SEE DETAILS FOR FURTHER CONNECTION INFORMATION.

D. EXISTING VAVs TO REMAIN. PNEUMATIC CONTROLS TO BE DEMOLISHED AND REPLACED WITH DDC CONTROL VTU ADAPTER KIT. SEE SCHEDULE FOR DETAILS. INSTALL NEW THRMOSTAT AND WIRING TO NEW VTU.

E. EXISTING CEILINGS TO BE REMOVED AS REQ'D TO PROVIDE NEW VAV BOXES. CEILING TO BE REPLACED UPON COMPLETION. ANY DAMAGED PARTS TO BE REPLACED AT NO CHANGE IN CONSTRUCTION COST.

GENERAL SHEET NOTES

1 04/22/21 ADDENDUM 1

1/4" = 1'-0"2

ENLARGED TYPICAL DORMROOM - NEW

T

1

Page 11: ADDENDUM NO. 1 - Eastern Engineering

T

28

27

CU

8

48x48 RA

AHU

8

P-8

1 1/4" HWR

1 1/4" HWS3" HWR

3" HWS

EXTEND LOW PRESSURE STEAM TO CONNECT WITH NEW STEAM DISTRIBUTION TUBING.

EXISTING EXHAUST FAN TO REMAIN. UPGRADE CONTROLS TO DDC

PROVIDE TRANSITIONS AND DUCTWORK TO MAKE NEW CONNECTIONS WITH AIR HANDLER

PROVIDE TRANSITIONS AND DUCTWORK TO MAKE NEW CONNECTIONS WITH AIR HANDLER

PROVIDE NEW SIDEWALL EXHAUST FAN. FOLLOW MANUFACTURER'S MOUNTING INSTRUCTION ON EXISTING WALL LOUVER. INSULATE AND SEAL REMAINING OPEN LOUVER WITH MIN. 1" BATT INSULATION.

WRF

8

PROVIDE UNIT WITH A BASE RAIL AROUND THE FULL PERIMETER OF THE UNIT TO SUPPORT ON EXISTING CURBS

L T

2

M301

CU-3

CU-6

NEW 4" HHWS/HHWR FROM FLOOR BELOW.

AHU-6

AHU-5

AHU-4

WRF-6

46x24 RA

50x26 SA

50x26 SA

60x30 R

A

36/20 SA

31/1

8 S

A

34/1

8 S

A

29/1

6

1

M301

TC PANEL AND VFD LOCATION

PROVIDE NEW REFRIGERANT PIPING IF REQUIRED BY EQUIPMENT MANUFACTURER.

29/16 RA

ELECTRICAL EQUIPMENT CLEARANCE

2" HHWS/HHWR

4" HHWS/HHWR

EXISTING 96x72 FRESH AIR INTAKE LOUVER

3" HHWS/HHWR

40x30 R

A40x30 R

A

EXISTING EXHAUST FAN

EXISTING LPS FROM FLOOR BELOW

P-6

NEW 42/20 SA DUCT BENEATH RA DUCT

90x30 RA DUCT OVER 42/20 SA DUCT

134x56 RA

MD

60x30 RA

60x30 RA DOWN

EXISTING 134x56 WALL LOUVER, PROVIDE INSULATED BLANK-OFF PANELS IN OPENINGS AROUND NEW SIDEWALL FAN CONNECTIONS.

PROVIDE AS PART OF BASEMENT AIR HANDLER ALTERNATE.

PROVIDE UNIT WITH A BASE RAIL AROUND THE FULL PERIMETER OF THE UNIT TO SUPPORT ON EXISTING CURBS

PROVIDE UNIT WITH A BASE RAIL AROUND THE FULL PERIMETER OF THE UNIT TO SUPPORT ON EXISTING CURBS

T

33

32

CU

9

WRF

9

AHU

9

PROVIDE NEW SIDEWALL EXHAUST FAN. FOLLOW MANUFACTURER'S MOUNTING INSTRUCTION ON EXISTING WALL LOUVER. INSULATE AND SEAL REMAINING OPEN LOUVER WITH MIN. 1" BATT INSULATION.

EXISTING EXHAUST FAN TO REMAIN. UPGRADE CONTROLS TO DDC

PROVIDE TRANSITIONS AND DUCTWORK TO MAKE NEW CONNECTIONS WITH AIR HANDLER

PROVIDE TRANSITIONS AND DUCTWORK TO MAKE NEW CONNECTIONS WITH AIR HANDLER

EXTEND LOW PRESSURE STEAM TO CONNECT WITH NEW STEAM DISTRIBUTION TUBING.

1 1/4" HWS 1 1/4" HWR

3" HWS

3" HWR

8250 H

AV

ER

ST

ICK

RD

S

UIT

E 2

85,

IND

IAN

AP

OLIS

, IN

46240

T

317.6

38.8

383

w

ww

.rossbar.

com

CHECKED BY:

© ROSS & BARUZZINI, INC. 2020

ISSUE DATE:

RB PROJ. NO.:

DESIGNED BY:

DRAWING TITLE:

DRAWING NO.:

WHEN THIS DRAWING IS

REPRODUCED AT ORIGINAL SCALE THIS BAR = 1 INCH

REVISIONS:

The Professional Engineer, whose signature and personal seal appear on

this document, assumes responsibility only for what appears hereon, and

disclaims responsibility for all other plans, specifications, estimates,

reports, documents or instruments not sealed by the Professional Engineer

relating to, or intended to be used for, any part or parts of the engineering

project to which this document refers. Prints sealed by the Engineer bear

the embossed or wet seal of the Engineer across the signature and date.

Copies of this document, as signed and sealed, have been retained by the

Professional Engineer. The Professional Engineer will not be responsible

for subsequent changes to this document, unless the changes are made

by the Engineer or with the Engineer's written authorization.

1 INCH

DATE DESCRIPTION

Dwg: of:

4/2

2/2

02

1 5

:28:3

5 P

M

2148-02

M201

TMM

India

na S

chool fo

r th

e D

eaf,

Build

ing #

8 H

VA

C R

enovation

1200 E

42nd S

t, India

napolis

, IN

46205

ENLARGED MECHANICALROOM PLANS

Ind

iana

Sch

ool F

or

Th

e D

ea

f

PR

OJE

CT

ST

AT

US

: C

ON

ST

RU

CT

ION

DO

CU

ME

NT

S

DA

PW

Pro

ject

No.

49026008-2

0-0

40

TMM

09/01/2020

1/4" = 1'-0"1

ENLARGED TYPICAL MECHANICAL PENTHOUSE PLAN - AHU-1, 2, 7, 8

1/4" = 1'-0"2

ENLARGED AREA B MECHANICAL PENTHOUSE PLAN

1. DISCONNECT AND DEMOLISH EXISTING 366 MBH OUTDOOR CONDENSING UNIT CU-9.

2. EXISTING EQUIPMENT SUPPORTS TO REMAIN.

3. CONTRACTOR TO DEMOLISH EXISTING REFRIGERANT PIPING AND REPLACE WITH NEW IF REQUIRED BY THE NEW AIR HANDLING UNIT OR CONDENSING UNIT MANUFACTURER.

4. DISCONNECT AND DEMOLISH PNEUMATIC TC PANEL.

5. DISCONNECT AND DEMOLISH EXISTING 8220 CFM AIR HANDLING UNIT CSAC-9, BENEATH 96x18 RA DUCT.

SHEET KEYNOTES#

1. BASE BID TO REPLACE PNEUMATIC CONTROL DEVICES.2. NEW POD AHU ALTERNATE TO PERFORM WORK INDICATED.

1/4" = 1'-0"3

ENLARGED TYPICAL MECHANICAL PENTHOUSE PLAN - AHU-9

1 04/22/21 ADDENDUM 1

PROVIDE UNIT WITH A BASE RAIL AROUND THE FULL PERIMETER OF THE UNIT TO SUPPORT ON EXISTING CURBS

1

1

1

1

Page 12: ADDENDUM NO. 1 - Eastern Engineering

END VIEW

SIDE VIEW

STEEL PIPE SUPPORTFRAMING

HPS OR LPR MAIN

STEEL PIPE GUIDE

FIELD INSTALLED PIPEINSULATION (SEE NOTE 1)

1. INSTALL PIPE INSULATION AT GUIDE SO AS NOT TO INTERFERE WITH MOVEMENT OF PIPE WITHIN GUIDE.

2. SET DIMENSION EQUAL TO 1/2 SPECIFIED THERMAL MOVEMENT AT ADJACENT EXPANSION JOINT.

3. LENGTH OF GUIDE LUGS SHALL BE NO LESS THAN 2/3 OF SPECIFIED THERMAL MOVEMENT AT ADJACENT EXPANSION JOINT.

NOTES:

SEE NOTE 2

SEE NOTE 3

DIRECTION OFTHERMALEXPANSION

360° INSULATION PROTECTION SHIELD (SEE NOTE 1)

INSULATION JACKET

PIPE INSULATION (SEE NOTE 2)

STEEL PIPE SUPPORT FRAMING (SEE STRUCTURAL DRAWING)

U-BOLT (SEE NOTE 3)

1/8" (MIN) TO 1/2" (MAX) GAP AROUND PIPE

HPS OR LPR MAIN

NOTES:

1.

2.

3.

INSULATION PROTECTION SHIELD SHALL BE 24" LONG.

AT SUPPORT LOCATIONS WHERE INSULATION IS FIELD INSTALLED, 360° HIGH DENSITY CALCIUM SILICATE OR CELLULAR GLASS INSERTS SHALL BE INSTALLED UNDER FULL LENGTH OF SHIELD.

U-BOLT ROD SIZE SHALL BE NO LESS THAN 3/4".

BOILER FLUE PERSPECIFICATION SECTION235100. SEE FLOOR PLANFOR CONTINUATION

PRESSURE ANDTEMPERATURE TEST PORT, TYP

PRESSURE GAGE, TYP

THERMOMETER, TYP

PHWR

COMBUSTION AIR INLETTO EXTERIOR

3/4" DRAIN WITH CAP

SHELL DRAIN VALVE PROVIDED WITH BOILER. EXTEND TO FLOOR DRAIN

Y-PATTERN STRAINER WITH BLOWDOWN VALVE, NIPPLE, AND CAP

NOTES:

1. CONDENSATE DRAIN ASSEMBLY PROVIDED BY BOILER MANUFACTURER.2. CONDENSATE NEUTRALIZING FILTER PROVIDED BY BOILER MANUFACTURER.3. REFER TO PLAN FOR PIPE SIZES.

MM

SEE PLBG DRAWINGSFOR CONTINUATION

1" GAS WITH PLUGSHUT-OFF VALVE

PHWS

M

PRESSURE RELIEF VALVE (SUPPLIED WITH BOILER)

DRAIN PIPING TO FLOORDRAIN WITHOUT SHUT-OFF VALVE

FLEXIBLE TUBING TO DRAIN CONDENSATE DRAINASSEMBLY

CONDENSATENEUTRALIZING FILTER

MIN 3" SEDIMENTTRAP

CHECK VALVE

UNION (TYP)

TO/FROM SECONDARY HOT WATER LOOP

BALL VALVE (TYP)

MANUAL AIR VENT, TYP

B

-

PHWP

1

CALIBRATED BALANCEVALVE

CHECK VALVE

SHUT-OFF VALVE (TYP), SEE SPEC FOR TYPE

IN-LINE PUMP. ORIENT PUMP AND MOTOR PER MANUFACTURERS INSTALLATION INSTRUCTIONS.

UNION OR FLANGE (TYP)

P

PRESSUREGAUGE WITHTRUMPET VALVE

STRAINER WITH BLOWDOWN VALVE, NIPPLE, AND CAP.

NOTES:

1. REFER TO PLANS AND PIPING DIAGRAMS FOR PIPE SIZES TO/FROM PUMP.

HYDRONIC RETURN MAIN

AIR FLOW

PROVIDE FLANGE, UNION, ORGROOVED MECHANICAL JOINT ATEACH CONNECTION TO EACH COIL(TYP)

TO ADDITIONAL COIL(S) IN MULTI-COILBANK (WHERE APPLICABLE). REFER TO NOTE 2.

PRESSURE AND TEMPERATURE TESTPLUGS INSTALL AT SAME ELEVATION

UNION OR FLANGE (TYP)SEE "HYDRONIC PIPING"SPEC FOR TYPE

STRAINER WITH 3/4" HOSE-END BLOW DOWN VALVE

SHUTOFF VALVE (TYP)SEE SPEC FOR TYPE

HYDRONICSUPPLY MAIN

REDUCER (TYP)

2-WAY PRESSINDEPENDENTCONTROL VALVE MANUAL AIR VENT (TYP)

AT EACH COIL INMULTI-COIL BANK

COIL

OFFSET PIPING TO CLEARCOIL PULL SPACE

3/4" COIL DRAIN VALVE, NIPPLE,AND CAP, AT EACH COIL INMULTI-COIL BANK, AND EACHMANUFACTURER PROVIDED DRAIN.

P&T

P&T

M

SEE NOTE 2

P&T

SEE NOTE 1

NOTES:1. BRANCH PIPES SHALL TAP THE BOTTOM OF

THE MAINS.

2. PROVIDE SHUTOFF VALVE AND CALIBRATED BALANCE VALVE IN THE RETURN LEG AND SHUTOFF VALVE IN SUPPLY LEGFROM EACH BRANCH OF A MULTI-COIL BANK. SINGLE COILS NEED NOT BE PROVIDED WITH ADDITIONAL VALVES.

THERMOMETER(TYP)

PRESSURE GUAGE (TYP)

8250 H

AV

ER

ST

ICK

RD

S

UIT

E 2

85,

IND

IAN

AP

OLIS

, IN

46240

T

317.6

38.8

383

w

ww

.rossbar.

com

CHECKED BY:

© ROSS & BARUZZINI, INC. 2020

ISSUE DATE:

RB PROJ. NO.:

DESIGNED BY:

DRAWING TITLE:

DRAWING NO.:

WHEN THIS DRAWING IS

REPRODUCED AT ORIGINAL SCALE THIS BAR = 1 INCH

REVISIONS:

The Professional Engineer, whose signature and personal seal appear on

this document, assumes responsibility only for what appears hereon, and

disclaims responsibility for all other plans, specifications, estimates,

reports, documents or instruments not sealed by the Professional Engineer

relating to, or intended to be used for, any part or parts of the engineering

project to which this document refers. Prints sealed by the Engineer bear

the embossed or wet seal of the Engineer across the signature and date.

Copies of this document, as signed and sealed, have been retained by the

Professional Engineer. The Professional Engineer will not be responsible

for subsequent changes to this document, unless the changes are made

by the Engineer or with the Engineer's written authorization.

1 INCH

DATE DESCRIPTION

Dwg: of:

4/2

2/2

02

1 5

:28:3

6 P

M

2148-02

M402

TMM

India

na S

chool fo

r th

e D

eaf,

Build

ing #

8 H

VA

C R

enovation

1200 E

42nd S

t, India

napolis

, IN

46205

MECHANICAL DETAILS

Ind

iana

Sch

ool F

or

Th

e D

ea

f

PR

OJE

CT

ST

AT

US

: C

ON

ST

RU

CT

ION

DO

CU

ME

NT

S

DA

PW

Pro

ject

No.

49026008-2

0-0

40

TMM

09/01/2020

NTS1

PIPE GUIDE DETAIL

NTS2

U-BOLT TUNNEL PIPESUPPORT DETAIL

NOT TO SCALE3

CONDENSING HOT WATER BOILER DETAIL -ALTERNATE

NTS5

INLINE PUMP DETAIL

NTS4

COIL CONNECTION WITH 2-WAY PRESSUREINDEPENDENT VALVE

1 04/22/21 ADDENDUM 1

NOT TO SCALE6

EXISTING VTU WITH DIFFUSER DETAIL(FOR REFERENCE ONLY)

1

Page 13: ADDENDUM NO. 1 - Eastern Engineering

T H

RA

OA

EA

SP HSPTT

NC

T H

RA-LSP

RA-T

OA-D

PF-PD

MA-T

RA-H RA-D

EA-D

TEMP-LL

SA-RH

SA-T

SA-HS-ALMAMS

OA-F

NC

NO

AIR HANDLING UNIT (AHU-4 & 5) CONTROLS DIAGRAM

SP

RA-SP

T

PH-T

SMOKE DETECTOR FURNISHED AND INSTALLED BY DIV. 26 AND/OR DIV. 28

SD

SUPPLY FAN

VFD

SF-S

SF-SS

SF-DATA

SF-SPD

AFMSSA-F

SMOKE DETECTOR FURNISHED AND INSTALLED BY DIV. 26 AND/OR DIV. 28

SD

DP

HW

S

HW

R

HW-VLV

NO

HW

C

T

OA-T

AIR HANDLING UNIT (AHU-4 & 5) SEQUENCE OF OPERATION

SYSTEM DESCRIPTIONTHIS UNIT PROVIDES VENTILATION AIR, CONTROLS BUILDING PRESSURE, AND PROVIDES HEATED AIR TO ROOM GYMNASIUM. AHU SHALL BE PROVIDED WITH ITS OWN DDC MICROPROCESSOR BASED CONTROL SYSTEM TO ACHIEVE THESE SEQUENCES OF OPERATION. THE BAS SHALL FULLY INTEGRATE WITH AHU PACKAGED DDC CONTROLS AND ADDITIONAL DDC CONTROLS SHALL BE PROVIDED VIA BAS SHOULD AHU CONTROLS FURNISHED WITH AHU NECESSITATE THESE SUPPLEMENTAL CONTROLS. CONTROL SYSTEM SHALL BE CAPABLE OF OPERATING IN OCCUPIED OR UNOCCUPIED MODES. AN OVERRIDE SWITCH SHALL BE PROVIDED FOR EACH UNIT TO ALLOW UNITS OPERATE IN OCCUPIED MODE FOR 2 HOURS (ADJ).

THE UNIT IS AN AIR HANDLING UNITS EQUIPPED WITH THE FOLLOWING:

- SUPPLY FAN - HOT WATER HEATING COIL- MERV-8 FILTER BANK

EQUIPMENT CONTROLLED OUTSIDE OF AHU:

- OUTSIDE AIR DAMPER- RELIEF/EXHAUST AIR DAMPER- OUTSIDE AIRFLOW MEASURING STATION FURNISHED BY AHU MANUFACTURER.

OCCUPIED MODE:PROGRAMMED OPERATING SCHEDULE SHALL BE COORDINATED WITH THE OWNER.

SUPPLY FANSTART/STOP: UPON RECEIVING A SIGNAL TO START, AFTER A 60 SECOND (ADJ) TIME DELAY TO ALLOW ASSOCIATED SMOKE DAMPERS TO OPEN, THE BAS SHALL START THE SUPPLY FAN VIA THE VFD. OUTSIDE AIR DAMPER SHALL OPEN TO ITS MINIMUM POSITION.

THE BAS SHALL VARY THE SPEED OF THE SUPPLY FAN VIA THE VFD TO MAINTAIN THE SUPPLY AIR STATIC PRESSURE SET POINT.

INSTALL A CURRENT STATUS SWITCH TO PROVE SUPPLY FAN OPERATION. LOCATE SWITCH SO IT CAN SENSE FAN OPERATION IN BOTH NORMAL AND BYPASS MODE OF THE VFD.

HIGH STATIC ALARM: INSTALL A PRESSURE SENSOR DOWNSTREAM OF THE SUPPLY FAN BEFORE ANY COILS, DAMPERS, FILTERS, ETC. THE PRESSURE SENSOR SHALL BE HARD WIRED TO THE SUPPLY FAN. IF THE STATIC PRESSURE EXCEEDS THE SET POINT OF 3” WC (ADJ), THE SUPPLY FAN SHALL SHUT-DOWN, REQUIRE A MANUAL RESET, AND AN ALARM SHALL BE SENT TO THE BAS.

UNOCCUPIED MODETHE UNIT SHALL CYCLE TO OCCUPIED MODE OPERATION EXCEPT AS NOTED HEREIN TO MEET THE UNOCCUPIED SPACE TEMPERATURE SET POINTS (78°F SUMMER AND 65°F WINTER). THE OUTSIDE AIR DAMPER SHALL BE FULLY CLOSED DURING ALL UNOCCUPIED HOURS EXCEPT WHEN OUTSIDE AIR ENTHALPY IS LOWER THAN RETURN AIR ENTHALPY WHICH WOULD ALLOW THE OUTSIDE AIR DAMPER TO MODULATE TO PROVIDE 55°F SUPPLY AIR.

MORNING WARM-UPENABLED AT OUTSIDE AIR TEMPERATURES BELOW 50°F (ADJ).

PRIOR TO OCCUPIED MODE BEING ENABLED, AT A TIME DETERMINED BY THE BMS BASED ON OUTSIDE AIR TEMPERATURE AND THE HISTORIC TIME IT TAKES THE INDIVIDUAL ZONES TO REACH OCCUPIED SPACE TEMPERATURE SET POINTS, THE UNIT SHALL ENTER THE MORNING WARM-UP MODE. IN THIS MODE, ALL VAV BOXES WHOSE SPACE TEMPERATURES ARE BELOW THE OCCUPIED HEATING SET POINT SHALL MODULATE THEIR DAMPERS FULLY OPEN. THE AIR HANDLING UNIT’S DISCHARGE SET POINT SHALL BE SET FOR 90°F. ONCE THE SPACE TEMPERATURE REACHES THE OCCUPIED MODE HEATING SET POINT, THE VAV BOXES DAMPERS SHALL MODULATE TO THEIR CLOSED POSITION. ONCE EVERY SPACE HAS REACHED ITS OCCUPIED MODE HEATING SET POINT OR MORE THAN 10% OF THE SPACES HAVE EXCEEDED THEIR COOLING MODE SET POINT, THE AIR HANDLING UNIT SHALL RETURN TO ITS NORMAL OCCUPIED MODE OPERATION.

FILTERSPROVIDE DIFFERENTIAL PRESSURE SENSORS ACROSS FILTER BANK.

PROVIDE AN ALARM TO THE OPERATOR’S WORKSTATION IF DIFFERENTIAL PRESSURE EXCEEDS SET POINT OF 0.75” WC (ADJ) FOR MERV-8 PRE-FILTERS.

SMOKE DETECTOR SAFETIESDUCT MOUNTED SMOKE DETECTORS SHALL BE HARDWIRED INDEPENDENT OF THE BMS TO DE-ENERGIZE SUPPLY AND RELIEF AIR FAN VFD'S AND CLOSE OUTSIDE AIR AND EXHAUST AIR DAMPERS AFTER 90 SECONDS (ADJ) DELAY.

COOLINGWHEN THE MIXED AIR TEMPERATURE SENSOR IS ABOVE SET POINT OF 52°F (ADJ), THE FOLLOWING SHALL OCCUR IN SEQUENCE:

THE HEATING CONTROL SHALL BE LOCKED OUT WHEN UNIT IS IN COOLING MODE.

IF OUTSIDE AIR TEMPERATURE IS LOWER THAN RETURN AIR TEMPERATURE, THE OUTSIDE AIR DAMPER SHALL MODULATE OPEN TO SATISFY SUPPLY AIR TEMPERATURE SENSOR SETPOINT OF 55°F (ADJ).

IF OUTSIDE AIR TEMPERATURE IS HIGHER THAN RETURN AIR TEMPERATURE, THE OUTSIDE AIR DAMPER SHALL MODULATE TO ITS MINIMUM POSITION.

HEATINGUPON A CALL FOR HEATING FROM THE SPACE THERMOSTAT, THE FOLLOWING SHALL OCCUR IN SEQUENCE:

OUTSIDE AIR DAMPER SHALL BE DRIVEN TO ITS MINIMUM POSITION

HOT WATER HEATING CONTROL VALVE SHALL OPEN TO ITS MINIMUM POSITION AND MODULATE TO MAINTAIN SPACE TEMPERATURE SETPOINT.

SPC-T

ATU-F-S

PRESSURE INDEPENDENT SUPPLY VAV BOX

SUPPLYAIR

AIRFLOW MEASURING RING

WALL MOUNTED SENSORS

ATU-S-DMPR

DISCHARGEAIR

SPC-WC

SPC-OCOR

AIR TERMINAL UNIT VTU SEQUENCE OF OPERATION

1. AIR TERMINAL UNITS (“VAV BOXES” OR “VARIABLE-VOLUME TERMINAL UNITS”) POINTS LIST, SCHEMATIC DIAGRAM, AND SEQUENCES OF OPERATION SHALL BE IN COMPLETE AND STRICT ACCORDANCE WITH ASHRAE GUIDELINE 36-2018 HIGH-PERFORMANCE SEQUENCES OF

OPERATION FOR HVAC SYSTEMS, INCLUDING ALL ADDENDA PUBLISHED BY ASHRAE AS OF THE ISSUE DATE OF THIS DRAWING, WITH MODIFICATIONS ONLY AS FURTHER SPECIFIED HEREIN.

2. APPLY GUIDELINE 36 TABLE 3.1.1.1 SPACE TEMPERATURE SETPOINTS (HEATING, COOLING, OCCUPIED, AND UNOCCUPIED) EXCEPT THAT VAV UNOCCUPIED COOLING SETPOINT SHALL BE 85 degF.

3. ANYWHERE GUIDELINE 36 OFFERS AN OPTION BETWEEN ASHRAE STANDARD 62.1 VENTILATION REQUIREMENTS OR CALIFORNIA TITLE 24, COMPLY WITH THE ASHRAE STANDARD 62.1

PROVISIONS.

4. THE FOLLOWING PARAMETERS ARE DEFINED ON AIR TERMINAL UNIT SCHEDULES ELSEWHERE ON THESE DRAWINGS:

a. ZONE MAXIMUM COOLING CFM, MAXIMUM HEATING CFM, AND MINIMUM AIRFLOW CFM.

b. ZONE MAXIMUM HEATING SUPPLY TEMPERATURE.c. CO2 SETPOINTS, IF APPLICABLE.

5. APPLY GUIDELINE 36 TABLE 4.1 FOR COOLING-ONLY AIR TERMINAL UNITS. APPLY TABLE 4.2 FOR AIR TERMINAL UNITS WITH REHEAT.

6. APPLY GUIDELINE 36 SEQUENCE 5.5 FOR COOLING-ONLY AIR TERMINAL UNITS AND SEQUENCE 5.6 FOR AIR TERMINAL UNITS WITH REHEAT (INCLUDING ALL REFERENCED TABLES, PARAGRAPHS, AND SECTIONS INVOKED THEREIN).

ACTN.C.

FACTORY-MOUNTED DAMPER ACTUATOR

T

DISCONNECT PNEUMATIC CONTROLS FROM EXIST. VAV TERMINAL

7. WHEN VAV IS AT ITS MINIMUM POSITION AND THERE IS A CALL FOR HEAT THE FINNED TUBE CONTROL VALVE SHALL OPEN TO ITS MINIMUM POSITION. THE CONTROL VALVE SHALL MODULATE TO MAINTAIN SPACE TEMP. SETPOINT. IF THE CONTROL VALVE IS AT ITS MINIMUM POSITION AND THERE IS NO CALL FOR HEAT FOR 10 MINUTES (ADJ) THE FINNED TUBE VALVE SHALL CLOSE.

1

HX-1

1/3 VALVE

HEAT EXCHANGER (HX-X) SEQUENCE OF OPERATION

SYSTEM IS EXISTING AND THE INTENT IS TO REPLACE THE PNEUMATIC CONTROLLERS WITH NEW DDC CONTROLLERS. THE SEQUENCE OF OPERATION SHALL REMAIN AS-IS. THE DIAGRAM IS SHOWN FOR REFERENCE ONLY AND EXACT QTY OF PNEUMATIC CONTROLLERS

THAT NEED REPLACED SHALL BE VERIFIED IN FIELD. ALL VALVES, SENSORS, ETC. INDICATED IN THE STEAM OR HHW SYSTEM SHALL

BE REPLACED.

STEAM TO HEATING HOT WATER CONTROLS DIAGRAM

LPS

LPR

HWS

HWR

TO BUILDING HEATING HOT WATER LOOP

FROM BUILDING HEATING HOT WATER PUMPS

2/3 VALVE

BUILDING STEAM PRESSURE

REDUCING VALVE

DOMESTIC WATER HEATER

M

LPR METER

DUPLEX CONDENSATE

RECEIVER PUMPLPR PC

CRP-1

MPS

HX-1 ISO

HWS-T

HWR-T

M

T

T

STEAM METER WILL BE MONITORED BY CAMPUS UTILITIES. IT WILL NOT BE CONNECTED TO BMS.

HWS-T

T

REPLACE PNEUMATIC CONTROL VALVES WITH NEW DDC CONTROL VALVES. BASE VALVE SELECTION ON A TOTAL STEAM LOAD OF 4,793 LBS/HR AT 2 PSI STEAM PRESSURE.

1

1

8250 H

AV

ER

ST

ICK

RD

S

UIT

E 2

85,

IND

IAN

AP

OLIS

, IN

46240

T

317.6

38.8

383

w

ww

.rossbar.

com

CHECKED BY:

© ROSS & BARUZZINI, INC. 2020

ISSUE DATE:

RB PROJ. NO.:

DESIGNED BY:

DRAWING TITLE:

DRAWING NO.:

WHEN THIS DRAWING IS

REPRODUCED AT ORIGINAL SCALE THIS BAR = 1 INCH

REVISIONS:

The Professional Engineer, whose signature and personal seal appear on

this document, assumes responsibility only for what appears hereon, and

disclaims responsibility for all other plans, specifications, estimates,

reports, documents or instruments not sealed by the Professional Engineer

relating to, or intended to be used for, any part or parts of the engineering

project to which this document refers. Prints sealed by the Engineer bear

the embossed or wet seal of the Engineer across the signature and date.

Copies of this document, as signed and sealed, have been retained by the

Professional Engineer. The Professional Engineer will not be responsible

for subsequent changes to this document, unless the changes are made

by the Engineer or with the Engineer's written authorization.

1 INCH

DATE DESCRIPTION

Dwg: of:

4/2

2/2

02

1 5

:28:3

6 P

M

2148-02

M502

TMM

India

na S

chool fo

r th

e D

eaf,

Build

ing #

8 H

VA

C R

enovation

1200 E

42nd S

t, India

napolis

, IN

46205

MECHANICAL CONTROLS

Ind

iana

Sch

ool F

or

Th

e D

ea

f

PR

OJE

CT

ST

AT

US

: C

ON

ST

RU

CT

ION

DO

CU

ME

NT

S

DA

PW

Pro

ject

No.

49026008-2

0-0

40

TMM

09/01/2020

AIR HANDLING UNIT (AHU-X) POINTS LIST - NO HEAT RECOVERY

CONTROLPOINT TAG SYSTEM POINT DESCRIPTION

INPUTS OUTPUTS ALARM REPORTS

NOTESDI AI DO AO HIG

H\L

OW

LIM

IT

SA

FE

TY

MA

INT

AN

EN

CE

AB

NO

RM

AL

ON

/OF

F O

PE

N/C

LO

SE

ALA

RM

RU

N T

IME

TO

TA

LIZ

AT

ION

TR

EN

D

BLD-P BUILDING PRESSURE ● ● ● ● (1)

EA-D EXHAUST AIR DAMPER ● ●

HW-VLV _____HEATING WATER VALVE OPEN/CLOSE ● ●

LPS-VLV _____HEATING WATER VALVE OPEN/CLOSE ● ●

MA-T MIXED AIR TEMPERATURE ● ● ● ●

OA-D OUTSIDE AIR DAMPER ● ● (3)

OA-F OUTSIDE AIRFLOW ● ●

OA-T OUTDOOR AIR TEMPERATURE ● ● (1)

PF-PD _____PRE-FILTER PRESSURE DROP ● ● ● ●

PH-T _____PRE-HEAT TEMPERATURE ● ● ● ●

RA-D RETURN AIR DAMPER ● ●

RA-H RETURN AIR HUMIDITY ● ● ● ● (2)

RA-LSP RETURN AIR STATIC PRESSURE ● ● ● ●

RA-SP RETURN AIR STATIC PRESSURE ● ● ● ●

RA-T RETURN AIR TEMPERATURE ● ● ● ●

RF-DATA RETURN FAN VFD DATA ● ● ● ● ● (2)

RF-S RETURN FAN STATUS ● ● ● ● ●

RF-SPD RETURN FAN VFD SPEED ● ●

RF-SS RETURN FAN START/STOP ● ●

SA-F SUPPLY AIRFLOW ● ●

SA-HS-ALM SUPPLY AIR HIGH STATIC ALARM ● ● ● ●

SA-RH _____SUPPLY AIR HIGH HUMIDITY ● ● ● ● (2)

SA-T SUPPLY AIR TEMPERATURE ● ● ● ●

SF-DATA SUPPLY FAN VFD DATA ● ● ● ● ● (2)

SF-S SUPPLY FAN STATUS ● ● ● ● ●

SF-SPD SUPPLY FAN VFD SPEED ● ●

SF-SS SUPPLY FAN START/STOP ● ●

TEMP-LL _____FREEZESTAT ● ● ● ● (2)

ATU (VAV) WITH REHEAT POINTS LIST

CONTROLPOINT TAG SYSTEM POINT DESCRIPTION

INPUTS OUTPUTS ALARM REPORTS

NOTESDI AI DO AO HIG

H\L

OW

LIM

IT

SA

FE

TY

MA

INT

AN

EN

CE

AB

NO

RM

AL

ON

/OF

F O

PE

N/C

LO

SE

ALA

RM

RU

N T

IME

TO

TA

LIZ

AT

ION

TR

EN

D

ATU-F-S SUPPLY AIR FLOW ● ●

ATU-S-DMPR SUPPLY AIR DAMPER POSITION MODULATION ● ●

SPC-OCOR OCCUPANCY OVERRIDE ● ● (2)

SPC-T SPACE TEMPERATURE ● ● ● ●

SPC-T SPACE TEMPERATURE ● ● ● ●

SPC-WC SETPOINT WARM-COOL ADJUSTMENT ● ● (2)

STEAM TO HEATING HOT WATER SYSTEM POINTS LIST

CONTROL POINT TAG SYSTEM POINT DESCRIPTION

INPUTS OUTPUTS ALARM REPORTS

NOTESDI AI DO AO HIG

H\L

OW

LIM

IT

SA

FE

TY

MA

INT

AN

EN

CE

AB

NO

RM

AL

ON

/OF

F O

PE

N/C

LO

SE

ALA

RM

RU

N T

IME

TO

TA

LIZ

AT

ION

TR

EN

D

B1-HWS-F HOT WATER SUPPLY FLOW ● ● ● ●

B1-HWS-T HOT WATER SUPPLY TEMERATURE ● ● ● ●

HW-BYP-VLV BYPASS VALVE ●

HW-BYP-VLV-P BYPASS VALVE POSITION

HWR-T HOT WATER RETURN TEMPERATURE BEFORE BYPASS ● ● ● ●

HWR-T2 HOT WATER RETURN TEMPERATURE AFTER BYPASS ● ● ● ●

HWS-F HOT WATER SYSTEM SUPPLY FLOW ●

HWS-T HOT WATER SUPPLY TEMPERATURE ● ● ● ●

P1-A VFD ALARM ● ● ● ● ●

P1-FT VFD FAULT ● ●

P1-S STATUS ● ● ● ● ●

P1-SP VFD SPEED ● ● ● ● ●

P1-SS ENABLE/DISABLE ● ● ● ● ●

P2-A VFD ALARM ● ● ● ● ●

P2-FT VFD FAULT ● ●

P2-S STATUS ● ● ● ● ●

P2-SP VFD SPEED ● ● ● ● ●

P2-SS ENABLE/DISABLE ● ● ● ● ●

1 04/22/21 ADDENDUM 1

Page 14: ADDENDUM NO. 1 - Eastern Engineering

HUMIDIFIER SCHEDULEUNIT

NUMBERLOCATION

HUMIDIFIERCONFIGURATION

TOTALAIRFLOW

(CFM)

MIN.OA(CFM)

DESIGNDB/WB(DEG F)

HUMIDIFICATIONSTEAM

(LBS/HR)

SOURCESTEAM

(PSI)

DUCTWIDTH

(IN)

DUCTHEIGHT

(IN)

ABSORPTIONDISTANCE-MAX

(IN)

BASIS OFDESIGN

NOTES

AHU-1 Roof HORIZ. DUCT 10650 5050 70/55.6 127 2 93 60 36 HygroMatik DDS 1,2,3,4

AHU-2 Roof HORIZ. DUCT 11600 5500 70/55.6 139 2 93 60 36 HygroMatik DDS 1,2,3,4

AHU-3 Basement Mech. Room HORIZ. DUCT 7360 4200 70/55.6 106 2 93 54 36 HygroMatik DDS 1,2,3,4

AHU-6 Roof HORIZ. DUCT 13600 5000 70/55.6 126 2 93 70 36 HygroMatik DDS 1,2,3,4

AHU-7 Roof HORIZ. DUCT 9800 4800 70/55.6 121 2 93 54 36 HygroMatik DDS 1,2,3,4

AHU-8 Roof HORIZ. DUCT 11500 6200 70/55.6 156 2 93 60 36 HygroMatik DDS 1,2,3,4

AHU-9 Roof HORIZ. DUCT 8550 4000 70/55.6 101 2 93 54 36 HygroMatik DDS 1,2,3,4

NOTES:

1. INSTALL HUMIDIFIER DISTRIBUTORS IN AIR DUCT. SEAL AROUND DISTRIBUTOR AIR TIGHT. VERIFY EXACT DIMENSIONS.

2. HUMIDIFIER MODULATING ELECTRIC ACTUATOR TO ACCEPT 0-10 VDC CONTROL SIGNAL FROM BAS SYSTEM.

3. PROVIDE WALL MOUNTED MODULATING CONTROL, DUCT MOUNTED HI-LIMIT HUMIDISTAT AND AIR PROVING SWITCH.

4. PROVIDE STAINLESS STEEL DRAIN PAN UNDER HUMIDIFIER DISTRIBUTORS.

8250 H

AV

ER

ST

ICK

RD

S

UIT

E 2

85,

IND

IAN

AP

OLIS

, IN

46240

T

317.6

38.8

383

w

ww

.rossbar.

com

CHECKED BY:

© ROSS & BARUZZINI, INC. 2020

ISSUE DATE:

RB PROJ. NO.:

DESIGNED BY:

DRAWING TITLE:

DRAWING NO.:

WHEN THIS DRAWING IS

REPRODUCED AT ORIGINAL SCALE THIS BAR = 1 INCH

REVISIONS:

The Professional Engineer, whose signature and personal seal appear on

this document, assumes responsibility only for what appears hereon, and

disclaims responsibility for all other plans, specifications, estimates,

reports, documents or instruments not sealed by the Professional Engineer

relating to, or intended to be used for, any part or parts of the engineering

project to which this document refers. Prints sealed by the Engineer bear

the embossed or wet seal of the Engineer across the signature and date.

Copies of this document, as signed and sealed, have been retained by the

Professional Engineer. The Professional Engineer will not be responsible

for subsequent changes to this document, unless the changes are made

by the Engineer or with the Engineer's written authorization.

1 INCH

DATE DESCRIPTION

Dwg: of:

4/2

2/2

02

1 5

:28:3

6 P

M

2148-02

M601

TMM

India

na S

chool fo

r th

e D

eaf,

Build

ing #

8 H

VA

C R

enovation

1200 E

42nd S

t, India

napolis

, IN

46205

MECHANICAL SCHEDULES

Ind

iana

Sch

ool F

or

Th

e D

ea

f

PR

OJE

CT

ST

AT

US

: C

ON

ST

RU

CT

ION

DO

CU

ME

NT

S

DA

PW

Pro

ject

No.

49026008-2

0-0

40

TMM

09/01/2020

2. PROVIDE AS AN ALTERNATE PRICE.

1. MANUFACTURER TO PROVIDE UNIT MOUNTED NON-FUSED DISCONNECT SWITCH. REUSE EXISTING ROOF CURB.

NOTES:

CONDENSING UNIT SCHEDULE

MARK

MFR. MODEL LOCATION SERVICE

COOLING OA TEMP COMPRESSOR CONDENSER

UNIT EER REFRIG

ELECTRICAL DATA

NOTESID # CAP (MBH)

DESIGN AMB(°F)

MIN AMB(°F)

QTYTONS

EA

AIR COOLEDFLA VOLTS

PHASEQTY FANS HP EA NOM RPM

CU 1 AAON CFA-050-D-A-8-GC00K ROOF AHU-1 538.9 95 45 4 12.5 4 0.75 1170 14.4 R410A 74 480 3 1

CU 2 AAON CFA-050-D-A-8-GC00K ROOF AHU-2 538.9 95 45 4 12.5 4 0.75 1170 14.4 R410A 74 480 3 1

CU 3 AAON CFA-025-C-A-8-DC00K ROOF AHU-3 280.4 95 45 2 12.5 4 0.75 1170 13.0 R410A 53 480 3 1, 2

CU 6 AAON CFA-040-D-0-8-GC00K ROOF AHU-6 453.5 95 45 4 10 4 1.5 1170 13.9 R410A 89 480 3 1

CU 7 AAON CFA-050-D-A-8-GC00K ROOF AHU-7 538.9 95 45 4 12.5 4 0.75 1170 13.4 R410A 74 480 3 1

CU 8 AAON CFA-050-D-A-8-GC00K ROOF AHU-8 538.9 95 45 4 12.5 4 0.75 1170 13.4 R410A 74 480 3 1

CU 9 AAON CFA-040-D-0-8-GC00K ROOF AHU-9 402.2 95 45 4 10 4 0.75 1170 13.8 R410A 53 480 3 1

5. PROVIDE AS AN ALTERNATE PRICE.

4. VFD TO PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR.

3. FUSED DISCONNECT SWITCH TO BE PROVIDED AND INSTALLED BY MANUFACTURER.

2. PROVIDE WITH INVERTER-READY OR INVERTER-DUTY MOTOR FOR VARIABLE SPEED OPERATION.

1. SOUND POWER LEVEL RATINGS SHOWN IN DECIBELS, REFERRED TO 10(-12) WATTS CALCULATED PER AMCA STANDARD 301.

NOTES:

FAN SCHEDULE

MARK

MFR. MODEL TYPE LOCATION SERVICE DRIVEAIRFLOW

(CFM)ESP (IN WC)

MAX FANSPEED (RPM)

MOTORSPEED (RPM)

MIN STATICEFF (%)

DESIGN DRIVELOSS (%)

MIN FAN EFF.GRADE

MAX SOUND POWER RATING (INLET / OUTLET)MAX WEIGHT

(LBS)

ELECTRICAL DATA

NOTESID #

OCTAVEAMPS HP VOLTS PHASE

63 125 250 500 1000 2000 4000 8000

IRF 3 GREENHECK BSQ-240-30 INLINE CENTRIFUGAL BASEMENT MECH. ROOM AREA B BELT 7,360 0.75 905 1725 43 4.8 65 83 86 87 79 78 74 67 61 450 4.8 3 460 3 1, 2, 3, 4, 5

WRF 1 GREENHECK CUBE-300-50 UPBLAST CENTRIFUGAL ROOF PENTHOUSE BELT 11,600 1 858 1725 43 4.0 65 85 90 92 82 79 74 69 65 350 7.6 5 460 3 1, 2, 3, 4

WRF 2 GREENHECK CUBE-300-50 UPBLAST CENTRIFUGAL ROOF PENTHOUSE BELT 11,600 1 858 1725 43 4.0 65 85 90 92 82 79 74 69 65 350 7.6 5 460 3 1, 2, 3, 4

WRF 6 GREENHECK CUBE-300-50 UPBLAST CENTRIFUGAL ROOF PENTHOUSE BELT 12,000 1 878 1725 41 4.0 65 85 91 93 83 80 75 70 66 350 7.6 5 460 3 1, 2, 3, 4

WRF 7 GREENHECK CUBE-300-50 UPBLAST CENTRIFUGAL ROOF PENTHOUSE BELT 11,600 1 858 1725 43 4.0 65 85 90 92 82 79 74 69 65 350 7.6 5 460 3 1, 2, 3, 4

WRF 8 GREENHECK CUBE-300-50 UPBLAST CENTRIFUGAL ROOF PENTHOUSE BELT 11,600 1 858 1725 43 4.0 65 85 90 92 82 79 74 69 65 350 7.6 5 460 3 1, 2, 3, 4

WRF 9 GREENHECK CUBE-300HP-50 UPBLAST CENTRIFUGAL ROOF PENTHOUSE BELT 8,550 1 919 1725 41 4.2 65 84 87 89 84 80 78 75 69 350 7.6 5 460 3 1, 2, 3, 4

2. PROVIDE AS AN ALTERNATE PRICE.

1. ELECTRICAL CONTRACTOR TO PROVIDE MOTOR STARTER AND DISCONNECT SWITCH.

NOTES:

PUMP SCHEDULE

MARKMFR. MODEL TYPE LOCATION SERVICE

WATER FLOW(GPM)

TDH (FT) MIN EFF (%)MOTOR

SPEED (RPM)

ELECTRICAL DATANOTES

ID # AMPS WATTS VOLTS PHASE

P 1 BELL & GOSSETT NRF-33 INLINE CENTRIFUGAL ROOF AHU-1 22 6 94% 2950 1.1 .125 120 1 1

P 2 BELL & GOSSETT NRF-33 INLINE CENTRIFUGAL ROOF AHU-2 22 6 94% 2950 1.1 .125 120 1 1

P 3 BELL & GOSSETT NRF-45 INLINE CENTRIFUGAL BASEMENT MECH. ROOM AHU-3 35 10 94% 3300 2.1 .270 120 1 1, 2

P 4 BELL & GOSSETT NRF-33 INLINE CENTRIFUGAL ROOF AHU-4 25 10 94% 2950 1.1 .125 120 1 1

P 5 BELL & GOSSETT NRF-33 INLINE CENTRIFUGAL ROOF AHU-5 25 10 94% 2950 1.1 .125 120 1 1

P 6 BELL & GOSSETT NRF-33 INLINE CENTRIFUGAL ROOF AHU-6 27 6 94% 2950 1.1 .125 120 1 1

P 7 BELL & GOSSETT NRF-33 INLINE CENTRIFUGAL ROOF AHU-7 22 6 94% 2950 1.1 .125 120 1 1

P 8 BELL & GOSSETT NRF-33 INLINE CENTRIFUGAL ROOF AHU-8 22 6 94% 2950 1.1 .125 120 1 1

P 9 BELL & GOSSETT NRF-22 INLINE CENTRIFUGAL ROOF AHU-9 18 13 94% 2940 0.8 .92 120 1 1

3. PROVIDE WITH MANUFACTURER'S SIDEWALL TERMINATION KITS.

2. PROVIDE WITH CONDENSATE NEUTRALIZATION KIT.

1. PROVIDE WITH FLUE CONDENSATE DRAIN TRAP.

NOTES:

BOILER SCHEDULE (BOILER SYSTEM ALTERNATE)

MARK

MFR. MODEL TYPE LOCATION SERVICENOM.

BOILERHP

CAPACITY (MBH)DESIGN

WATER FLOW(GPM)

MAX WATERPD (PSIG)

MIN WATERFLOW (GPM)

WATER TEMP (°F) BURNER ELECTRICAL DATA

NOTESID #

GROSSINPUT

GROSSOUTPUT

MIN DESIGNEFF (% @

FULL FIRE)SUPPLY

DESIGNTD

NATURAL GAS

AMPS VOLTS PHASECFH

PRESSRANGE (PSI)

B 1 LOCHINVAR KBN801 NAT. GAS BASEMENT MECH. ROOM AREA B 89.6 800 752 94 50 3.0 10 180 30 800 2 15 120 1 2, 3

B 2 LOCHINVAR KBN801 NAT. GAS BASEMENT MECH. ROOM AREA B 89.6 800 752 94 50 3.0 10 180 30 800 2 15 120 1 2, 3

10. PROVIDE HYGROMATIK DDS MODEL DIRECT STEAM INJECTION HUMIDIFIER. ABSORPTION DISTANCE TO BE NO GREATER THAN 36", VERIFY DUCT SIZE WITH EXISTING CONDITIONS.

9. NOT USED.

8. UNIT SPLITS SHALL BE SIZED TO ALLOW TO FIT THRU A STANDARD 36" SINGLE DOOR. IF SECTIONS ARE TOO LARGE TO FIT THRU DOOR THEN WALL LOUVER AND DUCTWORK TO BE REMOVED AND REINSTALLED TO MATCH EXISTING AT NO CHANGE IN...

7. PROVIDE PRICING UNDER BASEMENT AIR HANDLER ALTERNATE.

6. UNIT TO BE MOUNTED ON EQUIPMENT RAIL OF SUFFICIENT HEIGHT TO ALLOW FULL SIZE CONDENSATE TRAP FROM UNIT.

5. MANUFACTURER TO PROVIDE VFD'S AND NON-FUSED DISCONNECT SWITCHES; THAT ARE TO BE INSTALLED BY ELECTRICAL CONTRACTOR.

4. PROVIDE UNIT WITH SINGLE POINT ELECTRICAL CONNECTION.

3. PROVIDE WITH INVERTER-READY OR INVERTER-DUTY MOTOR FOR VARIABLE SPEED OPERATION.

2. SOUND POWER LEVEL RATINGS SHOWN IN DECIBELS, REFER TO 10(-12) WATTS CALCULATED PER AMCA STANDARD 301.

1. REFERENCE SPECIFIC EQUIPMENT COMPONENT FOR ELECTRICAL DATA WHEN MULTIPLE POWER CONNECTIONS ARE REQUIRED.

NOT...

AIR HANDLING UNIT SCHEDULE (1)

MARK

MFR. MODEL TYPE LOCATION MIN. OA (CFM)MAX SIZE(LxWxH)

MAXOPERATING

WEIGHT (LBS)

SUPPLY FAN

NOTESID #

TOTALAIRFLOW

(CFM)

STATIC PRESSUREDRIVE

MAX WHEELSIZE (IN)

MAX FANSPEED (RPM)

MIN. FAN EFF.(%)TSP (IN WC) ESP (IN WC)

AHU 1 AAON M2-H-022-R-3 SPLIT DX ROOF 5050 10'10x7'9x5'0 2966 10650 3.92 2.5 BELT 27.4 1477 57.6 2, 3, 4, 5, 6, 8, 10

AHU 2 AAON M2-H-022-R-3 SPLIT DX ROOF 5500 10'10x7'9x5'0 2966 11600 4.08 2.5 BELT 27.4 1558 56.4 2, 3, 4, 5, 6, 8, 10

AHU 3 AAON M2-H-018-R-3 SPLIT DX BASEMENT MECH. ROOM 4200 10'4x7'9x4'6 2559 7360 1.91 1.0 BELT 24.5 1302 54.1 2, 3, 4, 5, 6, 7, 8, 10

AHU 4 AAON M2-H-018-R-3 HTG ONLY ROOF 5050 8'8x7'9x4'6 2089 10000 1.84 1.0 BELT 27.4 1192 48.0 2, 3, 4, 5, 6, 8, 9

AHU 5 AAON M2-H-018-R-3 HTG ONLY ROOF 5050 8'8x7'9x4'6 2089 10000 1.84 1.0 BELT 27.4 1192 48.0 2, 3, 4, 5, 6, 8, 9

AHU 6 AAON M2-H-026-R-3 SPLIT DX ROOF 5000 11'4x7'9x5'10 3519 13600 3.94 2.5 BELT 27.4 1692 52.1 2, 3, 4, 5, 6, 9, 10

AHU 7 AAON M2-H-022-R-3 SPLIT DX ROOF 4800 10'9x7'4x4'6 2565 9800 4.11 2.5 BELT 24.5 1793 55.8 2, 3, 4, 5, 6, 8, 10

AHU 8 AAON M2-H-022-R-3 SPLIT DX ROOF 6200 10'10x7'9x5'0 2969 11500 4.07 2.5 BELT 27.4 1548 56.5 2, 3, 4, 5, 6, 8, 10

AHU 9 AAON M2-H-018-R-3 SPLIT DX ROOF 4000 10'4x7'9x4'6 2565 8550 3.88 2.5 BELT 24.5 1646 57.5 2, 3, 4, 5, 6, 8, 10

NOTES:

AIR HANDLING UNIT SCHEDULE (2)

MARK HEATING HOT WATER COIL

ID #CAPACITY

(MBH)MAX FACE

VELC. (FPM)EAT (°F) LAT (ºF)

WATER FLOW(GPM)

EWT (°F) LWT (ºF) ROWSMAX PD

AIR (IN WC) WATER (FT)

AHU 1 333.6 500 42 70 22 180 147 1 0.1 2

AHU 2 408.1 500 42 70 22 180 140.5 1 0.1 2

AHU 3 303.9 500 40 95 35 180 161.5 1 0.1 4.4

AHU 4 575.9 500 -5 95 25 180 130.9 2 0.1 4

AHU 5 575.9 500 -5 95 25 180 130.9 2 0.1 4

AHU 6 466.3 500 48 70 27 180 143.2 1 0.1 1.7

AHU 7 343.1 500 42 70 22 180 139.4 1 0.1 2

AHU 8 418.2 500 42 70 22 180 139.5 1 0.1 2

AHU 9 318.4 500 42 70 18 180 142.3 1 0.1 1.7

NOTES:

AIR HANDLING UNIT SCHEDULE (3)

MARK DIRECT EXPANSION COIL

ID #CAPACITY (MBH) MAX FACE

VELC. (FPM)

EATLAT (°F)

REFRIGERANT TYPE

# OFCIRCUITS

MAX PD AIR(IN WC)

CONDENSINGUNIT ID #SENS. TOTAL DB (°F) WB (°F)

AHU 1 350.4 509.4 400 84.48 68.62 55.75 R-410A 4 0.5 CU-1

AHU 2 375.3 540.4 400 84.48 68.62 56.37 R-410A 4 0.5 CU-2

AHU 3 197.6 273.3 400 86.41 69.86 62.84 R-410A 4 0.5 CU-3

AHU 4 - - - - -

AHU 5 - - - - -

AHU 6 427.8 609.4 400 82.35 67.21 55.15 R-410A 4 0.5 CU-6

AHU 7 316.1 456.1 400 84.80 68.83 56.77 R-410A 4 0.5 CU-7

AHU 8 382.2 557.6 400 85.78 69.46 56.84 R-410A 4 0.5 CU-8

AHU 9 281.8 409.7 400 84.36 68.54 55.54 R-410A 4 0.5 CU-9

NOTE...

AIR HANDLING UNIT SCHEDULE (4)

MARK FILTERS MAX SOUND POWER RATING (DISCHARGE / INLET / RADIATED) ELECTRICAL DATA

ID #

PRE OCTAVE BAND (HZ)FULL LOAD

AMPS

MAX.OVERCURRENT

PROTECTIONVOLTS PHASE

TYPEDESIGN APD

(IN WC)63 125 250 500 1000 2000 4000 8000

AHU 1 MERV 8 0.2 92 90 89 88 88 87 85 85 27 20 480 3

AHU 2 MERV 8 0.2 93 92 91 90 90 88 86 85 27 20 480 3

AHU 3 MERV 8 0.2 85 84 83 83 82 80 78 77 11 7.5 480 3

AHU 4 MERV 8 0.2 88 87 86 85 85 81 78 78 14 10 480 3

AHU 5 MERV 8 0.2 88 87 86 85 85 81 78 78 14 10 480 3

AHU 6 MERV 8 0.2 96 95 94 93 93 91 86 86 27 20 480 3

AHU 7 MERV 8 0.2 93 92 91 90 90 89 86 85 21 15 480 3

AHU 8 MERV 8 0.2 93 92 91 90 90 88 86 85 27 20 480 3

AHU 9 MERV 8 0.2 91 90 89 89 88 87 84 83 21 15 480 3

1. PROVIDE WALL SLEEVE ADAPTER TO UTILIZE EXISTING WALL OPENINGS.

NOTES:

PACKAGE TERMINAL AIR CONDITIONER SCHEDULE - ALTERNATE

MARK

MFR. MODEL TYPE LOCATIONTOTAL

AIRFLOW(CFM)

MIN. OA (CFM)

COOLING DATA HEATING DATA ELECTRICAL DATA

NOTESID # AMBIENT (ºF) EAT (ºF)

TOTAL(MBH)

MIN EFF(SEER)

AMBIENT (ºF) EAT

(°F)TYPE

CAP(MBH)

CONTROL AMPS HP VOLTS PHASE

DB WB DB WB DB

PTAC 1 FRIEDRICH PZE12R3SB-A ELECTRIC HEAT *SEE PLANS 470 75 95 72 78 65 12 10.6 -5 50 ELECTRIC 12.3 REMOTE TSTAT 5.92 0.1 265 1 1

1 04/22/21 ADDENDUM 1

4. PROVIDE WITH MANUFACTURER INSTALLED VFD.

3. PROVIDE POWERED BAROMETRIC RELIEF AND FULL ENTALPY ECONOMIZER FUNCTION WITH WEATHER HOODS AND BIRD SCREENS.

2. PROVIDE MANUFACTURER'S CURB ADAPTER TO ALLOW REUSE OF EXISTING ROOF CURB.

1. PROVIDE DISCONNECT SWITCH, GFI POWER OUTLET FIELD WIRED. RETURN AIR SMOKE DETECTORS PROVIDED AND WIRED BY EC, INSTALLED BY MC.

NOTES:

PACKAGED ROOFTOP UNIT SCHEDULE

MARK

MFR. MODEL TYPE LOCATION SERVICEMAX WEIGHT

W/ CURB(LBS)

SUPPLY FAN DIRECT EXPANSION COOLING PERFORMANCE

FILTER

MAX SOUND POWER RATING (DISCHARGE) ELECTRICAL DATA

NOTESID #

TOTALAIRFLOW

(CFM)MIN. OA (CFM)

STATIC PRESSUREDRIVE

CAPACITY (MBH) EAT (°F) LAT (°F)REFRIGERANT

TYPE

OCTAVE BAND (HZ)AMPS HP VOLTS PHASE

TSP (IN WC) ESP (IN WC) SENS. TOTAL DB WB DB WB 63 125 250 500 1000 2000 4000 8000

RTU 1 AAON RN-008-3-0-GB02 PACKAGED ROOF GYM 1500 2250 795 1.38 0.5 BELT 65.75 96.27 80 67 400 53.5 R-410A MERV 8 81 79 83 79 72 69 66 60 17 2 480 3 1, 2, 3, 4

RTU 2 AAON RN-008-3-0-GB02 PACKAGED ROOF GYM 1500 2250 795 1.38 0.5 BELT 65.75 96.27 80 67 400 53.5 R-410A MERV 8 81 79 83 79 72 69 66 60 17 2 480 3 1, 2, 3, 4

RTU 3 AAON RN-008-3-0-GB02 PACKAGED ROOF GYM 1500 2250 795 1.38 0.5 BELT 65.75 96.27 80 67 400 53.5 R-410A MERV 8 81 79 83 79 72 69 66 60 17 2 480 3 1, 2, 3, 4

RTU 4 AAON RN-008-3-0-GB02 PACKAGED ROOF GYM 1500 2250 795 1.38 0.5 BELT 65.75 96.27 80 67 400 53.5 R-410A MERV 8 81 79 83 79 72 69 66 60 17 2 480 3 1, 2, 3, 4

1

1

Page 15: ADDENDUM NO. 1 - Eastern Engineering

L

4

M301

42x44 RA 46x14 SA

32x44 R

A

36x30 RA

48x44 RA

8" HPS

6" LPS

PIPING TO/FROM TUNNEL

EXISTING WALL LOUVER TO REMAIN

EXISTING WALL LOUVER TO REMAIN

GENERAL MECH. ROOM EXHAUST FAN TO REMAIN.REPLACE DAMPER ACTUATOR AND FAN CONTROLS WITH DDC.

EXISTING HW STORAGE TANK TO REMAIN

EXISTING EXPANSION TANK TO REMAIN

12x10 S

A

SUPPLY AIR TO SERVE BOWLING ALLEY

6" LPS

4" PC

8" HPS

1 1/2" LPS

EXISTING STEAM TO HHW HEAT EXCHANGER TO REMAIN

PNEUMATIC CONTROLS AIR COMPRESSOR TO BE DISCONNECTED AND DEMOLISHED. EXISTING HOUSEKEEPING PAD TO BE EXTENDED AS NECESSARY TO ACCOMODATE NEW WORK.

4" PC

PROVIDE AS AN ALTERNATE PRICE: CSAC-3 TO BE DISCONNECTED AND DEMOLISHED. DUCTWORK TO BE REMOVED AS NECESSARY TO INSTALL NEW EQUIPMENT. SEE ROOF PLANS FOR DEMO OF CU-3.

12x10 S

A

MECH ROOM Cooridor

1308

Bowling Alley

1309

EXISTING CONDENSATE REMOVAL PUMP TO REMAIN

EXISTING ELECTRICAL CLEARANCE SPACE

DEMOLISH PNEUMATIC DAMPER ACTUATOR AND REPLACE WITH NEW.

BASEMENT AIR HANDLER ALTERNATE:CAP EXIST. STEAMDISTRIBUTION PIPING TO HUMIDIFIER

2

2

1

3

3

3

DEMOLISH PNEUMATIC TC PANEL

DEMOLISH EXISTING CONDENSATE PUMP PNEUMATIC CONTROLS W/ NEW DDC CONTROLLERS 1

A. BASE BID SCOPE TO UPGRADE CONTROLS; CONTROLLERS, ACTUATORS, VALVES, ETC. TO BE RETROFITTED FROM PNEUMATIC CONTROLS TO FULL DDC CONTROLS.

B. BASEMENT AHUR ALTERNATE: PROVIDE DEMOLITION WORK AS INDICATED ON THIS SHEET.

GENERAL SHEET NOTES

8250 H

AV

ER

ST

ICK

RD

S

UIT

E 2

85,

IND

IAN

AP

OLIS

, IN

46240

T

317.6

38.8

383

w

ww

.rossbar.

com

CHECKED BY:

© ROSS & BARUZZINI, INC. 2020

ISSUE DATE:

RB PROJ. NO.:

DESIGNED BY:

DRAWING TITLE:

DRAWING NO.:

WHEN THIS DRAWING IS

REPRODUCED AT ORIGINAL SCALE THIS BAR = 1 INCH

REVISIONS:

The Professional Engineer, whose signature and personal seal appear on

this document, assumes responsibility only for what appears hereon, and

disclaims responsibility for all other plans, specifications, estimates,

reports, documents or instruments not sealed by the Professional Engineer

relating to, or intended to be used for, any part or parts of the engineering

project to which this document refers. Prints sealed by the Engineer bear

the embossed or wet seal of the Engineer across the signature and date.

Copies of this document, as signed and sealed, have been retained by the

Professional Engineer. The Professional Engineer will not be responsible

for subsequent changes to this document, unless the changes are made

by the Engineer or with the Engineer's written authorization.

1 INCH

DATE DESCRIPTION

KEY PLAN

Dwg: of:

4/2

2/2

02

1 5

:28:3

6 P

M

2148-02

MD100B

TMM

India

na S

chool fo

r th

e D

eaf,

Build

ing #

8 H

VA

C R

enovation

1200 E

42nd S

t, India

napolis

, IN

46205

MECHANICAL BASEMENTFLOOR DEMO HVAC PLAN -

AREA B

Ind

iana

Sch

ool F

or

Th

e D

ea

f

PR

OJE

CT

ST

AT

US

: C

ON

ST

RU

CT

ION

DO

CU

ME

NT

S

DA

PW

Pro

ject

No.

49026008-2

0-0

40

TMM

09/01/2020

AREA A

AREA B

AREA C

AREA A

AREA B

AREA C

TRUE NORTH

1/4" = 1'-0"1

ENLARGED MECHANICAL BASEMENT FLOOR DEMOLITION PLAN - AREA B

GENERAL SHEET NOTES

1. REPLACE 3-WAY PNEUMATIC DHW ACTUATOR & VALVE WITH NEW DDC CONTROLLED ACTUATOR & VALVE. VERIFY SIZE, LOCATION, SEQUENCE IN FIELD.

2. REPLACE EXISTING 2-WAY STEAM CONTROL ACTUATOR & VALVE WITH NEW DDC CONTROL ACTUATOR & VALVE. VERIFY SIZE, LOCATION, SEQUENCE IN FIELD.

3. BASEMENT AIR HANDLER ALTERNATE: DEMOLISH THE MINIMUM AMOUNT OF DUCTWORK REQUIRED TO INSTALL NEW WORK.

SHEET KEYNOTES#

1 04/22/21 ADDENDUM 1

1

Page 16: ADDENDUM NO. 1 - Eastern Engineering

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

L T W

35

33

32

28

27

C133C134

C135

C136

C137

C138

C139

C140

C141

C142

C143C144C145C146

C147

C148

C149

C150

C151 C152

C153

C154

C155

C156

C157

C158C159

C160

C161

C163 C164C165

C166

C168

C169

C170C171

C172

C174

C175

C176

C177

C125

C128

C129

C130

C131

C131

C124

C115

C123

C133C134

C135

C136

C137

C138

C139

C140

C141

C142

C143C144C145C146

C147

C148

C149

C150

C151 C152

C153

C154

C155

C156

C157

C158C159

C160

C161

C163 C164C165

C166

C168

C169

C170C171

C172

C174

C175

C176

C177

C125

C128

C129

C130

C131

C131

C124

C115

C123

C133C134

C135

C136

C137

C138

C139

C140

C141

C142

C143C144C145C146

C147

C148

C149

C150

C151 C152

C153

C154

C155

C156

C157

C158C159

C160

C161

C163 C164C165

C166

C168

C169

C170C171

C172

C174

C175

C176

C177

C125

C128

C129

C130

C131

C131

C124

C115

C123

C133C134

C135

C136

C137

C138

C139

C140

C141

C142

C143C144C145C146

C147

C148

C149

C150

C151 C152

C153

C154

C155

C156

C157

C158C159

C160

C161

C163 C164C165

C166

C168

C169

C170C171

C172

C174

C175

C176

C177

C125

C128

C129

C130

C131

C131

C124

C115

C123

2

2

3 3

2

3

2

3

2

23

3 2

2

3

3

2

3

2

3

3

2

2

33

2

3

2

2

3

3

2

2

3

3

2

2

2

2

3

3

2

1

3

2

2

2

3

2

2

3

2

2

2

3

1

2

3

3

EXVAV-9-06

EXVAV-9-07

EXVAV-9-08

EXVAV-9-09

EXVAV-9-10

EXVAV-9-11

EXVAV-9-12

EXVAV-9-13

EXVAV-8-05

EXVAV-8-06

EXVAV-8-07

EXVAV-8-08

EXVAV-8-09

EXVAV-8-10

EXVAV-8-11

EXVAV-8-12

EXVAV8-01

EXVAV-8-13

EXVAV-7-06

EXVAV8-02

EXVAV8-03

EXVAV8-04

EXVAV-9-02

EXVAV-9-01

EXVAV-9-03

EXVAV-9-04EXVAV-9-05

MD101A

2

A. ALL EXISTING PNEUMATIC CONTROLS TO BE DEMOLISHED AND REPLACED WITH NEW DDC CONTROLS. VERIFY QUANTITY IN FIELD.

B. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS IN FIELD PRIOR TO COMMENCING DEMOLITION. ANY DISCREPANCIES BETWEEN FIELD CONDITIONS AND THESE DRAWINGS SHALL BE BROUGHT TO THE ENGINEERS ATTENTION PRIOR TO COMMENCING DEMOLITION. CONTRACTOR BEGINNING DEMOLITION SHALL INDICATE ACCEPTANCE OF THESE EXISTING CONDITIONS AND ANYTHING MISSING OR DAMAGED WILL BE DEEMED TO HAVE BEEN CAUSED BY THE CONTRACTOR AND MUST BE REPAIRED OR REPLACED AT NO INCREASE TO PROJECT COST.

C. ALL EXISTING FIRE RATINGS TO MAINTAINED DURING DEMOLITION AND NEW WORK.

D. NEW VTU BOXES TO BE COORDINATED WITH EXISTING OBSTRUCTIONS INCLUDING LIGHTS, CEILING GRID, STRUCTURE, ETC. AND BE ORIENTED IN SUCH A MANNER TO PROVIDE MANUFACTURER'S RECOMMENDED CLEARANCES. IF CLEARANCES CANNOT BE MET THE VAV BOX SHALL BE RELOCATED AND RECONNECTED AT NO INCREASE IN PROJECT COST.

E. DEMOLISH SA DUCTWORK AT EXISTING VAV BOXES TO THE EXTEND NECESSARY TO PROVIDE NEW VTU BOXES AND RECONNECT. SEE DETAILS FOR FURTHER CONNECTION INFORMATION.

F. EXISTING VAVs TO REMAIN. PNEUMATIC CONTROLS TO BE DEMOLISHED AND REPLACED WITH DDC CONTROL VTU ADAPTER KIT. SEE SCHEDULE FOR DETAILS. INSTALL NEW THRMOSTAT AND WIRING TO NEW VTU.

GENERAL SHEET NOTES

W

33

EXVAV-9-07

10ø

8250 H

AV

ER

ST

ICK

RD

S

UIT

E 2

85,

IND

IAN

AP

OLIS

, IN

46240

T

317.6

38.8

383

w

ww

.rossbar.

com

CHECKED BY:

© ROSS & BARUZZINI, INC. 2020

ISSUE DATE:

RB PROJ. NO.:

DESIGNED BY:

DRAWING TITLE:

DRAWING NO.:

WHEN THIS DRAWING IS

REPRODUCED AT ORIGINAL SCALE THIS BAR = 1 INCH

REVISIONS:

The Professional Engineer, whose signature and personal seal appear on

this document, assumes responsibility only for what appears hereon, and

disclaims responsibility for all other plans, specifications, estimates,

reports, documents or instruments not sealed by the Professional Engineer

relating to, or intended to be used for, any part or parts of the engineering

project to which this document refers. Prints sealed by the Engineer bear

the embossed or wet seal of the Engineer across the signature and date.

Copies of this document, as signed and sealed, have been retained by the

Professional Engineer. The Professional Engineer will not be responsible

for subsequent changes to this document, unless the changes are made

by the Engineer or with the Engineer's written authorization.

1 INCH

DATE DESCRIPTION

KEY PLAN

Dwg: of:

4/2

2/2

02

1 5

:28:3

6 P

M

2148-02

MD101A

TMM

India

na S

chool fo

r th

e D

eaf,

Build

ing #

8 H

VA

C R

enovation

1200 E

42nd S

t, India

napolis

, IN

46205

MECHANICAL FIRST FLOORDEMO HVAC PLAN - AREA A

Ind

iana

Sch

ool F

or

Th

e D

ea

f

PR

OJE

CT

ST

AT

US

: C

ON

ST

RU

CT

ION

DO

CU

ME

NT

S

DA

PW

Pro

ject

No.

49026008-2

0-0

40

TMM

09/01/2020

AREA A

AREA B

AREA C

TRUE NORTH

1. PROVIDE AN ALTERNATE PRICE TO DEMOLISH 20 EXISTING THRU WALL PTAC UNITS AND REPLACE WITH NEW.

2. EXISTING FINNED TUBE HHW RADIATOR TO REMAIN. CONTROL VALVE TO BE REPLACED WITH NEW DDC CONTROL VALVE.

3. DEMOLISH DUCTWORK UPSTREAM OF EXISTING VAV CONTROL BOX AS NECESSARY TO INSTALL NEW VTU CONTROLLERS ON NEW WORK SHEETS.

SHEET KEYNOTES#

1/8" = 1'-0"1

MECHANICAL FIRST FLOOR DEMOLITION PLAN - AREA A

1 04/22/21 ADDENDUM 1

1

1/4" = 1'-0"2

ENLARGED TYPICAL DORMROOM - DEMO

1

CONTRACTORS OPTION IN LIEU OF RETROFIT KIT: DEMOLISH PORTION OF DUCT UPSTREAM OF EXISTING VAV BOX LARGE ENOUGH TO ACCOMODATE NEW VAV BOX. EXISTING VAV BOX TO BE LOCKED OPEN.

Page 17: ADDENDUM NO. 1 - Eastern Engineering

123

123

123

123

123

123

123

123

123

123123

123

123

123

7

I

L T W

22

21

C125

C112 C113 C114 C115

C116

C119

C123

C103

C110

A101A168

C125

C112 C113 C114 C115

C116

C119

C123

C103

C110

A101A168

C125

C112 C113 C114 C115

C116

C119

C123

C103

C110

A101A168

C125

C112 C113 C114 C115

C116

C119

C123

C103

C110

A101A168

EXVAV-7-05

EXVAV-7-04

EXVAV-7-03

EXVAV-7-02

EXVAV7-01

EXVAV-6-01

EXVAV-6-02

EXVAV-6-03

EXVAV-2-07

EXVAV-6-04

EXVAV-6-05

1

1

2

1

2

2

2

2

2

2

2

2

2

2

2

2

22

3

3

3

3

33

3

3

3

34

4

1

A. ALL EXISTING PNEUMATIC CONTROLS TO BE DEMOLISHED AND REPLACED WITH NEW DDC CONTROLS. VERIFY QUANTITY IN FIELD.

B. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS IN FIELD PRIOR TO COMMENCING DEMOLITION. ANY DISCREPANCIES BETWEEN FIELD CONDITIONS AND THESE DRAWINGS SHALL BE BROUGHT TO THE ENGINEERS ATTENTION PRIOR TO COMMENCING DEMOLITION. CONTRACTOR BEGINNING DEMOLITION SHALL INDICATE ACCEPTANCE OF THESE EXISTING CONDITIONS AND ANYTHING MISSING OR DAMAGED WILL BE DEEMED TO HAVE BEEN CAUSED BY THE CONTRACTOR AND MUST BE REPAIRED OR REPLACED AT NO INCREASE TO PROJECT COST.

C. ALL EXISTING FIRE RATINGS TO MAINTAINED DURING DEMOLITION AND NEW WORK.

D. NEW VTU BOXES TO BE COORDINATED WITH EXISTING OBSTRUCTIONS INCLUDING LIGHTS, CEILING GRID, STRUCTURE, ETC. AND BE ORIENTED IN SUCH A MANNER TO PROVIDE MANUFACTURER'S RECOMMENDED CLEARANCES. IF CLEARANCES CANNOT BE MET THE VAV BOX SHALL BE RELOCATED AND RECONNECTED AT NO INCREASE IN PROJECT COST.

E. DEMOLISH SA DUCTWORK AT EXISTING VAV BOXES TO THE EXTEND NECESSARY TO PROVIDE NEW VTU BOXES AND RECONNECT. SEE DETAILS FOR FURTHER CONNECTION INFORMATION.

F. EXISTING VAVs TO REMAIN. PNEUMATIC CONTROLS TO BE DEMOLISHED AND REPLACED WITH DDC CONTROL VTU ADAPTER KIT. SEE SCHEDULE FOR DETAILS. INSTALL NEW THRMOSTAT AND WIRING TO NEW VTU.

GENERAL SHEET NOTES

8250 H

AV

ER

ST

ICK

RD

S

UIT

E 2

85,

IND

IAN

AP

OLIS

, IN

46240

T

317.6

38.8

383

w

ww

.rossbar.

com

CHECKED BY:

© ROSS & BARUZZINI, INC. 2020

ISSUE DATE:

RB PROJ. NO.:

DESIGNED BY:

DRAWING TITLE:

DRAWING NO.:

WHEN THIS DRAWING IS

REPRODUCED AT ORIGINAL SCALE THIS BAR = 1 INCH

REVISIONS:

The Professional Engineer, whose signature and personal seal appear on

this document, assumes responsibility only for what appears hereon, and

disclaims responsibility for all other plans, specifications, estimates,

reports, documents or instruments not sealed by the Professional Engineer

relating to, or intended to be used for, any part or parts of the engineering

project to which this document refers. Prints sealed by the Engineer bear

the embossed or wet seal of the Engineer across the signature and date.

Copies of this document, as signed and sealed, have been retained by the

Professional Engineer. The Professional Engineer will not be responsible

for subsequent changes to this document, unless the changes are made

by the Engineer or with the Engineer's written authorization.

1 INCH

DATE DESCRIPTION

KEY PLAN

Dwg: of:

4/2

2/2

02

1 5

:28:3

7 P

M

2148-02

MD101B

TMM

India

na S

chool fo

r th

e D

eaf,

Build

ing #

8 H

VA

C R

enovation

1200 E

42nd S

t, India

napolis

, IN

46205

MECHANICAL FIRST FLOORDEMO HVAC PLAN - AREA B

Ind

iana

Sch

ool F

or

Th

e D

ea

f

PR

OJE

CT

ST

AT

US

: C

ON

ST

RU

CT

ION

DO

CU

ME

NT

S

DA

PW

Pro

ject

No.

49026008-2

0-0

40

TMM

09/01/2020

AREA A

AREA B

AREA C

TRUE NORTH

1. PROVIDE AN ALTERNATE PRICE TO DEMOLISH 20 EXISTING THRU WALL PTAC UNITS AND REPLACE WITH NEW.

2. EXISTING FINNED TUBE HHW RADIATOR TO REMAIN. CONTROL VALVE TO BE REPLACED WITH NEW DDC CONTROL VALVE.

3. DEMOLISH DUCTWORK UPSTREAM OF EXISTING VAV CONTROL BOX AS NECESSARY TO INSTALL NEW VTU CONTROLLERS ON NEW WORK SHEETS.

4. DEMOLISH EXISTING PNEUMATIC CONTROLLERS AND VALVES AT CEILING MOUNTED UNIT HEATER. REPLACE WITH NEW DDC CONTROLS.

SHEET KEYNOTES#

1/8" = 1'-0"1

MECHANICAL FIRST FLOOR DEMOLITION PLAN - AREA B

1 04/22/21 ADDENDUM 1

1

Page 18: ADDENDUM NO. 1 - Eastern Engineering

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

XXX

L T W

35

33

32

28

27

MATCHLINE

3

1

A. ALL EXISTING PNEUMATIC CONTROLS TO BE DEMOLISHED AND REPLACED WITH NEW DDC CONTROLS. VERIFY QUANTITY IN FIELD.

B. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS IN FIELD PRIOR TO COMMENCING DEMOLITION. ANY DISCREPANCIES BETWEEN FIELD CONDITIONS AND THESE DRAWINGS SHALL BE BROUGHT TO THE ENGINEERS ATTENTION PRIOR TO COMMENCING DEMOLITION. CONTRACTOR BEGINNING DEMOLITION SHALL INDICATE ACCEPTANCE OF THESE EXISTING CONDITIONS AND ANYTHING MISSING OR DAMAGED WILL BE DEEMED TO HAVE BEEN CAUSED BY THE CONTRACTOR AND MUST BE REPAIRED OR REPLACED AT NO INCREASE TO PROJECT COST.

C. ALL EXISTING FIRE RATINGS TO MAINTAINED DURING DEMOLITION AND NEW WORK.

D. NEW VTU BOXES TO BE COORDINATED WITH EXISTING OBSTRUCTIONS INCLUDING LIGHTS, CEILING GRID, STRUCTURE, ETC. AND BE ORIENTED IN SUCH A MANNER TO PROVIDE MANUFACTURER'S RECOMMENDED CLEARANCES. IF CLEARANCES CANNOT BE MET THE VAV BOX SHALL BE RELOCATED AND RECONNECTED AT NO INCREASE IN PROJECT COST.

E. DEMOLISH SA DUCTWORK AT EXISTING VAV BOXES TO THE EXTEND NECESSARY TO PROVIDE NEW VTU BOXES AND RECONNECT. SEE DETAILS FOR FURTHER CONNECTION INFORMATION.

F. EXISTING VAVs TO REMAIN. PNEUMATIC CONTROLS TO BE DEMOLISHED AND REPLACED WITH DDC CONTROL VTU ADAPTER KIT. SEE SCHEDULE FOR DETAILS. INSTALL NEW THRMOSTAT AND WIRING TO NEW VTU.

GENERAL SHEET NOTES

8250 H

AV

ER

ST

ICK

RD

S

UIT

E 2

85,

IND

IAN

AP

OLIS

, IN

46240

T

317.6

38.8

383

w

ww

.rossbar.

com

CHECKED BY:

© ROSS & BARUZZINI, INC. 2020

ISSUE DATE:

RB PROJ. NO.:

DESIGNED BY:

DRAWING TITLE:

DRAWING NO.:

WHEN THIS DRAWING IS

REPRODUCED AT ORIGINAL SCALE THIS BAR = 1 INCH

REVISIONS:

The Professional Engineer, whose signature and personal seal appear on

this document, assumes responsibility only for what appears hereon, and

disclaims responsibility for all other plans, specifications, estimates,

reports, documents or instruments not sealed by the Professional Engineer

relating to, or intended to be used for, any part or parts of the engineering

project to which this document refers. Prints sealed by the Engineer bear

the embossed or wet seal of the Engineer across the signature and date.

Copies of this document, as signed and sealed, have been retained by the

Professional Engineer. The Professional Engineer will not be responsible

for subsequent changes to this document, unless the changes are made

by the Engineer or with the Engineer's written authorization.

1 INCH

DATE DESCRIPTION

KEY PLAN

Dwg: of:

4/2

2/2

02

1 5

:28:3

8 P

M

2148-02

MD103A

TMM

India

na S

chool fo

r th

e D

eaf,

Build

ing #

8 H

VA

C R

enovation

1200 E

42nd S

t, India

napolis

, IN

46205

MECHANICAL THIRD FLOORDEMO HVAC PLAN - AREA A

Ind

iana

Sch

ool F

or

Th

e D

ea

f

PR

OJE

CT

ST

AT

US

: C

ON

ST

RU

CT

ION

DO

CU

ME

NT

S

DA

PW

Pro

ject

No.

49026008-2

0-0

40

TMM

09/01/2020

AREA A

AREA B

AREA C

TRUE NORTH

1. PROVIDE AN ALTERNATE PRICE TO DEMOLISH 20 EXISTING THRU WALL PTAC UNITS AND REPLACE WITH NEW.

2. EXISTING FINNED TUBE HHW RADIATOR TO REMAIN. CONTROL VALVE TO BE REPLACED WITH NEW DDC CONTROL VALVE.

3. DEMOLISH DUCTWORK UPSTREAM OF EXISTING VAV CONTROL BOX AS NECESSARY TO INSTALL NEW VTU CONTROLLERS ON NEW WORK SHEETS.

4. DEMOLISH 1-1/2" HWS/HWR UP THRU THE 3RD FLOOR TO PENTHOUSE ABOVE. SEE SHEET M203 FOR MORE DETAILS.

SHEET KEYNOTES#

1/8" = 1'-0"1

MECHANICAL THIRD FLOOR DEMOLITION HVAC PLAN - AREA A

1

2

2

2

2

2

2

2

2 2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

3

3

3

3

3

3

3

3

3

3

3

3

3 3

3

3

3

3

3

3

3

3

3

3

3

33

3

3

3

4

4

3

1 04/22/21 ADDENDUM 1

1

1

1

Page 19: ADDENDUM NO. 1 - Eastern Engineering

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

123

OP

EN

TO

FL

OO

R B

ELO

W

BU

ILT

UP

RO

OF

7

L T W

22

21

SUPPLY AIR & RETURN AIR UP TO CSAC-4 & CSAC-5. SEE MECHANICAL PENTHOUSE DWG. MD114B FOR CONTINUATION.

32/1

2 S

A

18/1

2 S

A

34/18 SA DUCT UP TO CSAC-6 IN PENTHOUSE ABOVE

18/31 SA

EXVAV-7-27

EXVAV-7-25

EXVAV-7-26

14ø

SA

16ø

SA

HWS/HWR/LPS UP TO MECH. PENTHOUSE

28"Ø SA DUCT FROM AHU-7 IN PENTHOUSE ABOVE

EXVAV-7-24

EXVAV-7-23EXVAV-7-38 EXVAV-7-37

EXVAV-7-36

EXVAV-7-35

EXVAV-7-34

EXVAV-7-33

EXVAV-7-32EXVAV-7-31

MATCHLINE

MATCHLINE

A301A353

B301 B302

B303

B304B305

B306B307

B308

B309

B310C301

C302

C303

C304

C305

C306

C307

C308

C309

C310C311C364

C365

C366

C367 C368 C369

C370C371

C372C373

C374

EXVAV-6-12

EXVAV-6-13

EXVAV-6-16EXVAV-6-17

EXVAV-6-18

EXVAV-6-19

EXVAV-2-44

EXVAV-6-15

EXVAV-6-14

42 x 32 SA TO GYM CEILING BELOW TO REMAIN AS IS

31/18 SA DOWN

31/18 SA FROM CSAC-6 IN PENTHOUSE ABOVE

1

1

2

2

2

2

1

1

1

1

11

1

1

4

4

1

1

1

1

1

5

1

1

1

1

1

1

1

4

4

4

4

4

4

4

4

4

7

6

6

6

2

3

1

22

3

1

A. ALL EXISTING PNEUMATIC CONTROLS TO BE DEMOLISHED AND REPLACED WITH NEW DDC CONTROLS. VERIFY QUANTITY IN FIELD.

B. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS IN FIELD PRIOR TO COMMENCING DEMOLITION. ANY DISCREPANCIES BETWEEN FIELD CONDITIONS AND THESE DRAWINGS SHALL BE BROUGHT TO THE ENGINEERS ATTENTION PRIOR TO COMMENCING DEMOLITION. CONTRACTOR BEGINNING DEMOLITION SHALL INDICATE ACCEPTANCE OF THESE EXISTING CONDITIONS AND ANYTHING MISSING OR DAMAGED WILL BE DEEMED TO HAVE BEEN CAUSED BY THE CONTRACTOR AND MUST BE REPAIRED OR REPLACED AT NO INCREASE TO PROJECT COST.

C. ALL EXISTING FIRE RATINGS TO MAINTAINED DURING DEMOLITION AND NEW WORK.

D. NEW VTU BOXES TO BE COORDINATED WITH EXISTING OBSTRUCTIONS INCLUDING LIGHTS, CEILING GRID, STRUCTURE, ETC. AND BE ORIENTED IN SUCH A MANNER TO PROVIDE MANUFACTURER'S RECOMMENDED CLEARANCES. IF CLEARANCES CANNOT BE MET THE VAV BOX SHALL BE RELOCATED AND RECONNECTED AT NO INCREASE IN PROJECT COST.

E. DEMOLISH SA DUCTWORK AT EXISTING VAV BOXES TO THE EXTEND NECESSARY TO PROVIDE NEW VTU BOXES AND RECONNECT. SEE DETAILS FOR FURTHER CONNECTION INFORMATION.

F. EXISTING VAVs TO REMAIN. PNEUMATIC CONTROLS TO BE DEMOLISHED AND REPLACED WITH DDC CONTROL VTU ADAPTER KIT. SEE SCHEDULE FOR DETAILS. INSTALL NEW THRMOSTAT AND WIRING TO NEW VTU.

GENERAL SHEET NOTES

8250 H

AV

ER

ST

ICK

RD

S

UIT

E 2

85,

IND

IAN

AP

OLIS

, IN

46240

T

317.6

38.8

383

w

ww

.rossbar.

com

CHECKED BY:

© ROSS & BARUZZINI, INC. 2020

ISSUE DATE:

RB PROJ. NO.:

DESIGNED BY:

DRAWING TITLE:

DRAWING NO.:

WHEN THIS DRAWING IS

REPRODUCED AT ORIGINAL SCALE THIS BAR = 1 INCH

REVISIONS:

The Professional Engineer, whose signature and personal seal appear on

this document, assumes responsibility only for what appears hereon, and

disclaims responsibility for all other plans, specifications, estimates,

reports, documents or instruments not sealed by the Professional Engineer

relating to, or intended to be used for, any part or parts of the engineering

project to which this document refers. Prints sealed by the Engineer bear

the embossed or wet seal of the Engineer across the signature and date.

Copies of this document, as signed and sealed, have been retained by the

Professional Engineer. The Professional Engineer will not be responsible

for subsequent changes to this document, unless the changes are made

by the Engineer or with the Engineer's written authorization.

1 INCH

DATE DESCRIPTION

KEY PLAN

Dwg: of:

4/2

2/2

02

1 5

:28:3

9 P

M

2148-02

MD103B

TMM

India

na S

chool fo

r th

e D

eaf,

Build

ing #

8 H

VA

C R

enovation

1200 E

42nd S

t, India

napolis

, IN

46205

MECHANICAL THIRD FLOORAND GYMNASIUM ROOF

DEMO HVAC PLAN - AREA B

Ind

iana

Sch

ool F

or

Th

e D

ea

f

PR

OJE

CT

ST

AT

US

: C

ON

ST

RU

CT

ION

DO

CU

ME

NT

S

DA

PW

Pro

ject

No.

49026008-2

0-0

40

TMM

09/01/2020

AREA A

AREA B

AREA C

AREA A

AREA B

AREA C

1/8" = 1'-0"1

MECHANICAL THIRD FLOOR AND GYMNASIUM ROOF DEMOLITION HVAC PLAN - AREA B

TRUE NORTH

1. DEMO MEDIUM PRESSURE SA DUCT PRIOR TO EXISTING VAV BOX AS REQUIRED TO INSTALL NEW VTU CONTROL BOX.

2. DEMOLISH 4-EXISTING PACKAGED COOLING ONLY ROOFTOP UNITS. EXISTING ROOF CURB TO REMAIN FOR REUSE. EXISTING UNITS ARE TRANE MODEL NO. TCD090A40AAB.

3. PROVIDE ALTERNATE PRICE TO DEMOLISH PTAC/THRU WALL AC UNIT AND REPLACE WITH NEW SIMILAR UNIT. TYPICAL FOR 20 UNITS.

4. REPLACE EXISTING PNEUMATIC CONTROL VALVE AT UNDER SILL RADIANT HEATERS WITH NEW DDC CONTROL VALVE.

5. DEMOLISH 1-1/2" HWS/HWR UP THRU THE 3RD FLOOR TO PENTHOUSE ABOVE. SEE SHEET M203 FOR MORE DETAILS.

6. DEMOLISH PNEUMATIC HHW CONTROLS AT EXIST. REHEAT BOX. REHEAT BOX TO REMAIN AS-IS.

7. DEMOLISH 2" HWS/HWR UP PENTHOUSE ABOVE. SEE SHEET M203 FOR MORE DETAILS.

SHEET KEYNOTES#

1 04/22/21 ADDENDUM 1

1

Page 20: ADDENDUM NO. 1 - Eastern Engineering

L T W

35

33

32

28

27

MATCHLINE

MD114A

2

MD114A

2

MD114A

2

T

28

27

48x32 RA DUCT DOWN INTO RA PLENUM

EXISTING ELECTRICAL EQUIPMENT

28ø SA

120x48 LOUVER TO REMAIN

48x48 RA

106x48 RA

EXIST. 88x72 OA LOUVER TO REMAIN

1 1/4"

1 1/4"

1 1/2"

EXISTING SUPPORT RAILS. 16" TALL x 4" WIDE

DISCONNECT AND DEMOLISH CSAC. DEMOLISH DUCTWORK ONLY AS REQUIRED TO INSTALL NEW WORK

1 1/2" LPS TO HUMIDIFIER

DEMOLISH THE MINIMUM AMOUNT OF OA/RA DUCT NECESSARY TO PROVIDE NEW WORK.

DISCONNECT AND DEMOLISH CU-8. EXISTING CURBS TO REMAIN. COORDINATE CURBS AND REFRIGERANT PIPING WITH NEW APPROVED CONDENSING UNIT SUBMITTALS. PROVIDE NEW CURBS, SUPPORTS AND REFRIGERANT PIPING AS REQUIRED BY EQUIPMENT MANUFACTURER.

1 1/4"

1 1/4"

EXISTING HOT WATER UNIT HEATER TO REMAIN. DEMOLISH HWS/HWR DOWN TO FLOOR BELOW.

DISCONNECT STEAM HUMIDIFIER AS REQUIRED TO PROVIDE NEW WORK.

28'' DIA SA DOWN TO FLOORS

EXISTING EXHAUST AIR FAN AND ASSOCIATED DUCT TO REMAIN. EXISTING PNEUMATIC CONTROLLERS TO BE REPLACED WITH NEW DDC CONTROLLERS.

48x48 RA DUCT OVER TOP OF 28'' DIA SA DUCT

OVER THE TOP OF THE AIR HANDLING UNIT

DEMOLISH THE MINIMUM AMOUNT OF SA DUCT NECESSARY TO PROVIDE NEW WORK.

5

2

3

4

RETROFIT DAMPER TO USE DDC CONTROLS.

1

6

7

1

A. ALL EXISTING PNEUMATIC CONTROLS TO BE DEMOLISHED AND REPLACED WITH NEW DDC CONTROLS. VERIFY QUANTITY IN FIELD.

B. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS IN FIELD PRIOR TO COMMENCING DEMOLITION. ANY DISCREPANCIES BETWEEN FIELD CONDITIONS AND THESE DRAWINGS SHALL BE BROUGHT TO THE ENGINEERS ATTENTION PRIOR TO COMMENCING DEMOLITION. CONTRACTOR BEGINNING DEMOLITION SHALL INDICATE ACCEPTANCE OF THESE EXISTING CONDITIONS AND ANYTHING MISSING OR DAMAGED WILL BE DEEMED TO HAVE BEEN CAUSED BY THE CONTRACTOR AND MUST BE REPAIRED OR REPLACED AT NO INCREASE TO PROJECT COST.

C. ALL EXISTING FIRE RATINGS TO MAINTAINED DURING DEMOLITION AND NEW WORK.

D. NEW VTU BOXES TO BE COORDINATED WITH EXISTING OBSTRUCTIONS INCLUDING LIGHTS, CEILING GRID, STRUCTURE, ETC. AND BE ORIENTED IN SUCH A MANNER TO PROVIDE MANUFACTURER'S RECOMMENDED CLEARANCES. IF CLEARANCES CANNOT BE MET THE VAV BOX SHALL BE RELOCATED AND RECONNECTED AT NO INCREASE IN PROJECT COST.

E. DEMOLISH SA DUCTWORK AT EXISTING VAV BOXES TO THE EXTEND NECESSARY TO PROVIDE NEW VTU BOXES AND RECONNECT. SEE DETAILS FOR FURTHER CONNECTION INFORMATION.

F. EXISTING VAVs TO REMAIN. PNEUMATIC CONTROLS TO BE DEMOLISHED AND REPLACED WITH DDC CONTROL VTU ADAPTER KIT. SEE SCHEDULE FOR DETAILS. INSTALL NEW THRMOSTAT AND WIRING TO NEW VTU.

GENERAL SHEET NOTES

8250 H

AV

ER

ST

ICK

RD

S

UIT

E 2

85,

IND

IAN

AP

OLIS

, IN

46240

T

317.6

38.8

383

w

ww

.rossbar.

com

CHECKED BY:

© ROSS & BARUZZINI, INC. 2020

ISSUE DATE:

RB PROJ. NO.:

DESIGNED BY:

DRAWING TITLE:

DRAWING NO.:

WHEN THIS DRAWING IS

REPRODUCED AT ORIGINAL SCALE THIS BAR = 1 INCH

REVISIONS:

The Professional Engineer, whose signature and personal seal appear on

this document, assumes responsibility only for what appears hereon, and

disclaims responsibility for all other plans, specifications, estimates,

reports, documents or instruments not sealed by the Professional Engineer

relating to, or intended to be used for, any part or parts of the engineering

project to which this document refers. Prints sealed by the Engineer bear

the embossed or wet seal of the Engineer across the signature and date.

Copies of this document, as signed and sealed, have been retained by the

Professional Engineer. The Professional Engineer will not be responsible

for subsequent changes to this document, unless the changes are made

by the Engineer or with the Engineer's written authorization.

1 INCH

DATE DESCRIPTION

KEY PLAN

Dwg: of:

4/2

2/2

02

1 5

:28:4

0 P

M

2148-02

MD114A

TMM

India

na S

chool fo

r th

e D

eaf,

Build

ing #

8 H

VA

C R

enovation

1200 E

42nd S

t, India

napolis

, IN

46205

MECHANICAL ROOFDEMOLITION PLAN - AREA A

Ind

iana

Sch

ool F

or

Th

e D

ea

f

PR

OJE

CT

ST

AT

US

: C

ON

ST

RU

CT

ION

DO

CU

ME

NT

S

DA

PW

Pro

ject

No.

49026008-2

0-0

40

TMM

09/01/2020

1. DISCONNECT AND DEMOLISH EXISTING 11500 CFM AIR HANDLING UNIT CSAC-8.

2. EXISTING EQUIPMENT SUPPORTS TO REMAIN FOR REUSE.

3. CONTRACTOR TO DEMOLISH EXISTING REFRIGERANT PIPING AND REPLACE WITH NEW IF REQUIRED BY THE NEW AIR HANDLING UNIT OR CONDENSING UNIT MANUFACTURER.

4. DISCONNECT AND DEMOLISH PNEUMATIC TC PANEL.

5. DISCONNECT AND DEMOLISH EXISTING 502 MBH OUTDOOR CONDENSING UNIT CU-6.

6. REPLACE EXISTING UNIT HEATER CONTROLS WITH NEW DDC CONTROLS.

7. DEMOLISH AIR CLEARNER, HUMIDIFIER, ETC. ASSOCIATED WITH CSAC BEING REMOVED.

SHEET KEYNOTES#

AREA A

AREA B

AREA C

TRUE NORTH

1/8" = 1'-0"1

MECHANICAL ROOF DEMOLITION PLAN - AREA A

1/2" = 1'-0"2

MECHANICAL ROOF ENLARGED DEMOLITION PLAN

NOTE:

PLAN TYPICAL FOR ROOFTOP AIR HANDLING UNITS CSAC-1, CSAC-2, CSAC-7, CSAC-8.

1. BASE BID SHALL BE TO REPLACE EXISTING PNEUMATIC CONTROLS WITH NEW DDC CONTROLS AND DEMOLISH THE WORK INDICATED.

2. DEMOLITION FOR CSAC-9 SIMILAR. SEE ENLARGED NEW WORK PLAN FOR NEW WORK REQUIRED AT CSAC-9. 1 04/22/21 ADDENDUM 1

1

Page 21: ADDENDUM NO. 1 - Eastern Engineering

7

I

L T W

22

21

CSAC-7

CU-7

CU-3

CU-6

CSAC-6

CSAC-5

CSAC-4

1

2

3

4

4

MATCHLINE

MATCHLINE

MD114A

2

SEE MECHANICAL ROOF ENLARGED DEMOLITION PLAN ON SHEET MD114A FOR DEMOLITION OF EQUIPMENT IN THIS MECHANICAL PENTHOUSE.

MD114B

2

BASEMENT AIR HANDLER ALTERNATE

L T

36/20 SA

31/1

8 S

A

EXIST. WALL LOUVER TO REMAIN.

50x26 SA

80x30 RA

DOWN TO FLOOR BELOW

FROM BELOW WITH MOTORIZED DAMPER IN VERTICAL

50x26 SA

DOWN TO FLOOR BELOW

50x26 SA

40x30 R

A

46x24 RA

CSAC-4

CSAC-5

CSAC-6

MD MD

MD

60x30 RA

OA INTAKE

60x30 R

A

SA DOWN TO FLOOR BELOW

RA FROM BELOW

OA INTAKE LOUVER

50x26 SA

EXHAUST FAN AND ASSOCIATED CONTROL SEQUENCES TO REMAIN AS-IS. PNEUMATIC CONTROLLERS TO BE CONVERTED TO DDC.

34/18 SA DOWN TO FLOOR BELOW

31/18 SA DOWN TO FLOOR BELOW

34/18 SA

DEMO MINIMUM SA AS REQUIRED TO DO NEW WORK.

DISCONNECT AND DEMOLISH CSAC-6.

DEMOLISH HWS/HWR PIPING AND ASSOCIATED INLINE CIRCULATING PUMPS

DISCONNECT AND DEMOLISH CSAC-5.

DISCONNECT AND DEMOLISH CSAC-4.

40x30 RA

DEMOLISH HWS/HWR PIPING AND ASSOCIATED INLINE CIRCULATING PUMPS

MD5

5

6

6

6

6

M

6

6

7

1

7

7

1

1

A. ALL EXISTING PNEUMATIC CONTROLS TO BE DEMOLISHED AND REPLACED WITH NEW DDC CONTROLS. VERIFY QUANTITY IN FIELD.

B. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS IN FIELD PRIOR TO COMMENCING DEMOLITION. ANY DISCREPANCIES BETWEEN FIELD CONDITIONS AND THESE DRAWINGS SHALL BE BROUGHT TO THE ENGINEERS ATTENTION PRIOR TO COMMENCING DEMOLITION. CONTRACTOR BEGINNING DEMOLITION SHALL INDICATE ACCEPTANCE OF THESE EXISTING CONDITIONS AND ANYTHING MISSING OR DAMAGED WILL BE DEEMED TO HAVE BEEN CAUSED BY THE CONTRACTOR AND MUST BE REPAIRED OR REPLACED AT NO INCREASE TO PROJECT COST.

C. ALL EXISTING FIRE RATINGS TO MAINTAINED DURING DEMOLITION AND NEW WORK.

D. NEW VTU BOXES TO BE COORDINATED WITH EXISTING OBSTRUCTIONS INCLUDING LIGHTS, CEILING GRID, STRUCTURE, ETC. AND BE ORIENTED IN SUCH A MANNER TO PROVIDE MANUFACTURER'S RECOMMENDED CLEARANCES. IF CLEARANCES CANNOT BE MET THE VAV BOX SHALL BE RELOCATED AND RECONNECTED AT NO INCREASE IN PROJECT COST.

E. DEMOLISH SA DUCTWORK AT EXISTING VAV BOXES TO THE EXTEND NECESSARY TO PROVIDE NEW VTU BOXES AND RECONNECT. SEE DETAILS FOR FURTHER CONNECTION INFORMATION.

F. EXISTING VAVs TO REMAIN. PNEUMATIC CONTROLS TO BE DEMOLISHED AND REPLACED WITH DDC CONTROL VTU ADAPTER KIT. SEE SCHEDULE FOR DETAILS. INSTALL NEW THRMOSTAT AND WIRING TO NEW VTU.

GENERAL SHEET NOTES

8250 H

AV

ER

ST

ICK

RD

S

UIT

E 2

85,

IND

IAN

AP

OLIS

, IN

46240

T

317.6

38.8

383

w

ww

.rossbar.

com

CHECKED BY:

© ROSS & BARUZZINI, INC. 2020

ISSUE DATE:

RB PROJ. NO.:

DESIGNED BY:

DRAWING TITLE:

DRAWING NO.:

WHEN THIS DRAWING IS

REPRODUCED AT ORIGINAL SCALE THIS BAR = 1 INCH

REVISIONS:

The Professional Engineer, whose signature and personal seal appear on

this document, assumes responsibility only for what appears hereon, and

disclaims responsibility for all other plans, specifications, estimates,

reports, documents or instruments not sealed by the Professional Engineer

relating to, or intended to be used for, any part or parts of the engineering

project to which this document refers. Prints sealed by the Engineer bear

the embossed or wet seal of the Engineer across the signature and date.

Copies of this document, as signed and sealed, have been retained by the

Professional Engineer. The Professional Engineer will not be responsible

for subsequent changes to this document, unless the changes are made

by the Engineer or with the Engineer's written authorization.

1 INCH

DATE DESCRIPTION

KEY PLAN

Dwg: of:

4/2

2/2

02

1 5

:28:4

0 P

M

2148-02

MD114B

TMM

India

na S

chool fo

r th

e D

eaf,

Build

ing #

8 H

VA

C R

enovation

1200 E

42nd S

t, India

napolis

, IN

46205

MECHANICAL ROOFDEMOLITION PLAN - AREA B

Ind

iana

Sch

ool F

or

Th

e D

ea

f

PR

OJE

CT

ST

AT

US

: C

ON

ST

RU

CT

ION

DO

CU

ME

NT

S

DA

PW

Pro

ject

No.

49026008-2

0-0

40

TMM

09/01/2020

1. DISCONNECT AND DEMOLISH EXISTING 3125 CFM AIR HANDLING UNIT CSAC-4.

2. DISCONNECT AND DEMOLISH EXISTING 3125 CFM AIR HANDLING UNIT CSAC-5.

3. DISCONNECT AND DEMOLISH EXISTING AIR HANDLING UNIT CSAC-6.

4. DISCONNECT AND DEMOLISH EXISTING OUTDOOR CONDENSING UNIT. EQUIPMENT SUPPORTS TO REMAIN FOR REUSE. VERIFY WITH NEW EQUIPMENT MANUFACTURER THAT REFRIGERANT PIPING IS SUITABLE FOR REUSE. PROVIDE NEW PIPING IF REQUIRED BY NEW EQUIPMENT MANUFACTURER.

5. EXISTING UNIT HEATER CONTROLS TO BE UPGRADED TO DDC CONTROLS. PROVIDE ALT. PRICE TO DEMO AND RECONNECT HHW PIPING.

6. EXISTING PNEUMATIC MOTORIZED DAMPER ACTUATORS TO BE REPLACED WITH NEW DDC CONTROLLED ACTUATORS.

7. DEMOLISH AIR CLEANER, HUMIDIFIER, ETC. ASSOCIATED WITH CSAC BEING REMOVED.

SHEET KEYNOTES#

AREA A

AREA B

AREA C

TRUE NORTH

1/8" = 1'-0"1

MECHANICAL ROOF DEMOLITION PLAN - AREA B

1/4" = 1'-0"2

MECHANICAL ROOF ENLARGEDDEMOLITION PLAN - CSAC-4, CSAC-5,CSAC-6

1 04/22/21 ADDENDUM 1

1