ADDENDUM NO. 1
PROJECT: Indiana School for the Deaf, Building 8 HVAC Renovation
DAPW PROJECT NO: 49026008-20-040
R&B PROJECT NO: 2148-02
DATE: 04/22/2021
THIS ADDENDUM CONSISTS OF (2) 8 - 1/2” X 11” PAGES, (17) 30” X 42” SHEETS.
The following additions, revisions and modifications are hereby made part of the contract documents, which
shall be amended accordingly. Acknowledge receipt of addenda on bid form. Failure of your acknowledgement
of receipt of this addendum may result in rejection of your offer.
SPECIFICATIONS 1.01 Specification Section 232123-2.1-A-5 Add: Grundfos Pumps Inc. to list of acceptable manufacturer’s. 1.02 Specification Section 233600-2.01-A-11 Add: Johnson Controls International/York International Company to list of acceptable manufacturer’s. 1.03 Specification Section 236200-2.1-A-7 Add: Johnson Controls International/York International Company to list of acceptable manufacturer’s. 1.04 Specification Section 237313-2.1-A-8 Add: Johnson Controls International/York International Company to list of acceptable manufacturer’s. 1.05 Specification Section 237413-2.02-A-9 Add: Johnson Controls International/York International Company to list of acceptable manufacturer’s.
Page 2
BLDG 8 HVAC Renovation
Addendum No. 1
R&B Project Number 2148-02
2
DRAWINGS 2.01 COVER SHEET
• Revised sheet index.
2.02 M000 - MECHANICAL SYMBOLS & ABBREVIATIONS
• Added General Notes 25-27 2.03 M001 – FIRST FLOOR MECHANICAL RCP PLAN
• Added sheet. 2.04 M002 – SECOND FLOOR MECHANICAL RCP PLAN
• Added sheet. 2.05 M003 – THIRD FLOOR MECHANICAL RCP PLAN
• Added sheet. 2.06 MD100B - MECHANICAL
• Added note: DEMOLISH EXISTING CONDENSATE PUMP PNEUMATIC CONTROLS W/
NEW DDC CONTROLLERS • REVISED SHEET KEYNOTES 1&2.
2.07 MD101A – MECHANICAL FIRST FLOOR DEMO HVAC PLAN – AREA A
• Added View 2: “ENLARGED TYPICAL DORM ROOM – DEMO”
• Change keyed note 1 on sheet MD101A to read “...Demolish 20 existing thru wall PTAC
units..."
2.08 MD101B – MECHANICAL FIRST FLOOR DEMO HVAC PLAN – AREA B
• Change keyed note 1 on sheet MD101B to read “...Demolish 20 existing thru wall PTAC
units..."
• Changed keyed note 1 to 2 at column W/22.
2.09 MD101C – MECHANICAL FIRST FLOOR DEMO HVAC PLAN – AREA C (SHEET NOT
ISSUED IN ADDENDUM)
Page 2
BLDG 8 HVAC Renovation
Addendum No. 1
R&B Project Number 2148-02
3
• Change keyed note 1 on sheet MD101C to read “...Demolish 20 existing thru wall PTAC
units..."
2.10 MD102A – MECHANICAL FIRST FLOOR DEMO HVAC PLAN – AREA A (SHEET NOT
ISSUED IN ADDENDUM)
• Change keyed note 1 on sheet MD102A to read “...Demolish 20 existing thru wall
PTAC units..."
2.11 MD102B MECHANICAL SECOND FLOOR DEMO HVAC PLAN – AREA B (SHEET NOT
ISSUED IN ADDENDUM)
• Change keyed note 1 on sheet MD102B to read “...Demolish 20 existing thru wall PTAC
units..."
2.12 MD102C MECHANICAL SECOND FLOOR DEMO HVAC PLAN – AREA C (SHEET NOT
ISSUED IN ADDENDUM)
• Change keyed note 1 on sheet MD102C to read “...Demolish 20 existing thru wall
PTAC units..."
2.13 MD103A MECHANICAL THIRD FLOOR DEMO HVAC PLAN – AREA A
• Change keyed note 1 on sheet MD103A to read “...Demolish 20 existing thru wall
PTAC units..." • Added keynote 1 to PTAC unit on floor plan at column L/33.
2.14 MD103B MECHANICAL THIRD FLOOR DEMO HVAC PLAN – AREA B
• Change keyed note 3 to indicate 20 PTAC units. • Added keynote 3 to PTAC unit on floor plan at column L/23.
2.15 MD103C MECHANICAL THIRD FLOOR DEMO HVAC PLAN – AREA C (SHEET NOT
ISSUED IN ADDENDUM)
• Change keyed note 1 on sheet MD103C to read “...Demolish 20 existing thru wall
PTAC units..."
2.16 MD114A MECHANICAL ROOF DEMOLITION PLAN – AREA A
Page 2
BLDG 8 HVAC Renovation
Addendum No. 1
R&B Project Number 2148-02
4
• Added keyed note 7.
2.17 MD114B MECHANICAL ROOF DEMOLITION PLAN – AREA B
• Added keyed note 7. 2.18 M101A MECHANICAL FIRST FLOOR HVAC PLAN – AREA A
• Added View 2: “ENLARGED TYPICAL DORM ROOM - NEW 2.19 M201 - ENLARGED MECHANICAL ROOM PLANS
• Added note: “PROVIDE UNIT WITH A BASE RAIL AROUND THE FULL PERIMETER OF THE UNIT TO SUPPORT EXISTING CURBS” (4 Instances).
2.20 M402 - MECHANICAL DETAILS
• Added Detail #6: EXISTING VTU WITH DIFFUSER DETAIL (FOR REFERENCE ONLY) 2.21 M502 - MECHANICAL CONTROLS
• Added note 7 to “AIR TERMINAL UNIT VTU SEQUENCE OF OPERATION” • Revised HEAT EXCHANGER (HX-X) SEQUENCE OF OPERATION • Added note to HX diagram
2.22 M601 - MECHANICAL SCHEDULES
• Revised Boiler Schedule Press. Range
SIGNED: ______________________
TORY MCNEIL 04/22/2021
PROJECT DATA
PROJECT NAME: ISD RENOVATION
PROJECT DESCRIPTION: HEATING UPGRADES
PROJECT LOCATION: INDIANPOLIS, IN
BUILDING OWNER:INDIANA SCHOOL OF THE DEAF1200 E 42ND ST, INDIANAPOLIS, IN 46205OFFICE: (317) 550-4843
BUILDING DEPARTMENT: STATE OF INDIANA, DEPARTMENT OF HOMELAND SECURITY, CITY OF INDIANAPOLIS, DEPARTMENT OF CODE ENFORCEMENT
GOVERNING CODES: 2012 INDIANA BUILDING CODE 2012 INDIANA FIRE CODE 2012 INDIANA MECHANICAL CODE 2012 INDIANA PLUMBING CODE 2009 INDIANA ELECTRIC CODE INDIANA ACCESSIBILITY CODES
ARCHITECTURAL NOTES: ALL DOORS TO SWING IN THE PATH OF EGRESS, UNLESS NOTED OTHERWISE.
Ross & Baruzzini, Inc.8250 Haverstick Rd. Suite 285
Indianapolis, IN 46240Telephone: 317.638.8383
www.rossbar.com
M.E.P.
LOCATION MAP
VICINITY MAP
D:\U
se
rs\le
arlyw
ine\D
ocum
ents
\2148-0
2_IS
D B
uild
ing 8
_v19
_le
arlyw
ine.r
vt
4/2
2/2
021 5
:28
:33 P
M
Indiana School For The Deaf
Indiana School for the Deaf, Building #8 HVAC Renovation
1200 E 42nd St, Indianapolis, IN 46205
CONSTRUCTION DOCUMENTS - 09/01/2020
DAPW Project No. 49026008-20-040
ROSS & BARUZINNI PROJ NO:2148-02
DRAWING LISTSheet
NumberSheet Name
P000 PLUMBING SYMBOLS ABBREVIATIONS
PD100 PLUMBING BASEMENT FLOOR DEMOLITION PLAN - AREA B
P100 PLUMBING BASEMENT FLOOR PLAN - AREA B
P601 PLUMBING SCHEDULES
M000 MECHANICAL SYMBOLS & ABBREVIATIONS
M001 FIRST FLOOR MECHANICAL RCP PLAN
M002 SECOND FLOOR MECHANICAL RCP PLAN
M003 THIRD FLOOR MECHANICAL RCP PLAN
MD100B MECHANICAL BASEMENT FLOOR DEMO HVAC PLAN - AREA B
MD101A MECHANICAL FIRST FLOOR DEMO HVAC PLAN - AREA A
MD101B MECHANICAL FIRST FLOOR DEMO HVAC PLAN - AREA B
MD101C MECHANICAL FIRST FLOOR DEMO HVAC PLAN - AREA C
MD102A MECHANICAL SECOND FLOOR DEMO HVAC PLAN - AREA A
MD102B MECHANICAL SECOND FLOOR DEMO HVAC PLAN - AREA B
MD102C MECHANICAL SECOND FLOOR DEMO HVAC PLAN - AREA C
MD103A MECHANICAL THIRD FLOOR DEMO HVAC PLAN - AREA A
MD103B MECHANICAL THIRD FLOOR AND GYMNASIUM ROOF DEMO HVAC PLAN - AREA B
MD103C MECHANICAL THIRD FLOOR DEMO HVAC PLAN - AREA C
MD114A MECHANICAL ROOF DEMOLITION PLAN - AREA A
MD114B MECHANICAL ROOF DEMOLITION PLAN - AREA B
MD114C MECHANICAL ROOF DEMOLITION PLAN - AREA C
M100B MECHANICAL BASEMENT FLOOR HVAC PLAN - AREA B
M101A MECHANICAL FIRST FLOOR HVAC PLAN - AREA A
M101B MECHANICAL FIRST FLOOR HVAC PLAN - AREA B
M101C MECHANICAL FIRST FLOOR HVAC PLAN - AREA C
M102A MECHANICAL SECOND FLOOR HVAC PLAN - AREA A
M102B MECHANICAL SECOND FLOOR HVAC PLAN - AREA B
M102C MECHANICAL SECOND FLOOR HVAC PLAN - AREA C
M103A MECHANICAL THIRD FLOOR HVAC PLAN - AREA A
M103B MECHANICAL THIRD FLOOR HVAC PLAN - AREA B
M103C MECHANICAL THIRD FLOOR HVAC PLAN - AREA C
M114A MECHANICAL ROOF PLAN - AREA A
M114B MECHANICAL ROOF PLAN - AREA B
M114C MECHANICAL ROOF PLAN - AREA C
M201 ENLARGED MECHANICAL ROOM PLANS
M203 MECHANICAL PIPING DIAGRAM
M301 MECHANICAL BUILDING SECTIONS
M401 MECHANICAL DETAILS
M402 MECHANICAL DETAILS
M501 MECHANICAL CONTROLS
M502 MECHANICAL CONTROLS
M503 MECHANICAL CONTROLS
M504 MECHANICAL CONTROLS
M505 MECHANICAL CONTROLS
M601 MECHANICAL SCHEDULES
M602 MECHANICAL SCHEDULES
E000 ELECTRICAL SYMBOLS & ABBREVIATIONS
ED100B ELECTRICAL BASEMENT FLOOR DEMOLITION PLAN - AREA B
ED101A ELECTRICAL FIRST FLOOR DEMOLITION PLAN - AREA A
ED101B ELECTRICAL FIRST FLOOR DEMOLITION PLAN - AREA B
ED101C ELECTRICAL FIRST FLOOR DEMOLITION PLAN - AREA C
ED102A ELECTRICAL SECOND FLOOR DEMOLITION PLAN - AREA A
ED102B ELECTRICAL SECOND FLOOR DEMOLITION PLAN - AREA B
ED102C ELECTRICAL SECOND FLOOR DEMOLITION PLAN - AREA C
ED103A ELECTRICAL THIRD FLOOR DEMOLITION PLAN - AREA A
ED103B ELECTRICAL THIRD FLOOR DEMOLITION PLAN - AREA B
ED103C ELECTRICAL THIRD FLOOR DEMOLITION PLAN - AREA C
ED104A ELECTRICAL ROOF DEMOLITION PLAN - AREA A
ED104B ELECTRICAL ROOF DEMOLITION PLAN - AREA B
ED104C ELECTRICAL ROOF DEMOLITION PLAN - AREA C
E100B ELECTRICAL BASEMENT FLOOR PLAN - AREA B
E101A ELECTRICAL FIRST FLOOR PLAN - AREA A
E101B ELECTRICAL FIRST FLOOR PLAN - AREA B
E101C ELECTRICAL FIRST FLOOR PLAN - AREA C
E102A ELECTRICAL SECOND FLOOR PLAN - AREA A
E102B ELECTRICAL SECOND FLOOR PLAN - AREA B
E102C ELECTRICAL SECOND FLOOR PLAN - AREA C
E103A ELECTRICAL THIRD FLOOR PLAN - AREA A
E103B ELECTRICAL THIRD FLOOR PLAN - AREA B
E103C ELECTRICAL THIRD FLOOR PLAN - AREA C
E104A ELECTRICAL ROOF PLAN - AREA A
E104B ELECTRICAL ROOF PLAN - AREA B
E104C ELECTRICAL ROOF PLAN - AREA C
E401 ELECTRICAL RISER DIAGRAM
E501 ELECTRICAL SCHEDULES
CONSTRUCTION LAY-DOWN AREA
CONTRACTOR TO PROVIDE PRICING FOR THE FOLLOWING ALTERNATES:
A. Alternate 1: Domestic Water Heater Systema. Gas piping from utility plant to the building.b. New combustion air and flue piping for water heater and associated wall penetrations.c. Electrical to water heaters.d. Housekeeping pad.e. 2-Gas fired domestic water heaters.f. Demolition of 2-domestic electric water heaters.
B. Alternate 2: Basement Air Handlera. Demolition of CSAC-3 (AHU) in basement, CU-3 on roof and associated inline return
fan in the basement.b. New AHU-3 in basement, new CU-3 on roof and new inline return fan (IRF-03) in the
basement.C. Alternate 3: Packaged Terminal Air Conditioner (PTAC) replacement
a. Demo 19 existing PTAC units and provide new.b. Internal controls on equipment.c. New wall sleeves.
D. Alternate 4: Heating Water Boiler (Alternate 1 must be accepted)a. 1-Gas fired condensing boiler.b. Hew heating hot water piping to connect with existing system.c. New combustion air and flue piping for boiler and associated wall penetrations.d. Electrical to boiler.e. Housekeeping pad.
1
M
EXISTING TO REMAIN
AHU
1
FLEXIBLE DUCT
PIPE SYSTEM ABBREVIATIONS
KEYED NOTE
SECTION NUMBER
SHEET WHERE LOCATED
INTERFACE, EXISTING TO NEW
REFRIGERANT VENTRV
V VENT
LPS
HWS
HWR
LPR
HG
RS
RL
PC
REFRIGERANT HOT GAS
REFRIGERANT SUCTION
REFRIGERANT LIQUID
PUMPED CONDENSATE
LOW PRESSURE CONDENSATE RETURN (15 PSIG)
LOW PRESSURE STEAM SUPPLY (15 PSIG)
HEATING WATER SUPPLY
HEATING WATER RETURN
SRV STEAM RELIEF VENT
ROUND DUCT SIZE, (ACTUAL SIZE INDICATED)
ACCESS PANEL, TOP OR SIDE
TURNING VANES
CHANGE OF ELEVATION - RISE (R) OR DROP (D)
FLEXIBLE DUCT CONNECTION
UNIT NUMBER
EQUIPMENT DESIGNATION
SUPPLY AND OUTSIDE AIR SECTION UP
RETURN AIR SECTION UP
PUMP DISCHARGE
DRAIND
MOTORIZED DAMPER
MANUAL VOLUME DAMPER
FIRE DAMPER
TYPE OF SERVICE:S = SUPPLYR = RETURNE = EXHAUSTT = TRANSFER
AIR QUANTITYIN CFM
PD
DOMESTIC HOT WATERHW
MU MAKE-UP WATER (NON-POTABLE)
PRIMARY HEATING WATER SUPPLY
PRIMARY HEATING WATER RETURN
PHWS
PHWR
GRAVITY BACKDRAFT DAMPER
SUPPLY DIFFUSER AS SCHEDULED. ARROWS INDICATE DIRECTION OF AIR DISCHARGE. IF NO ARROWS ARE SHOWN ON PLAN, DEFAULT IS A 4-WAY THROW.
RETURN GRILLE OR REGISTER AS SCHEDULED
SLOT DIFFUSER AS SCHEDULED. ARROWS INDICATEDIRECTION OF AIR DISCHARGE. IF NO ARROWS ARE SHOWN ON PLAN, DEFAULT IS 2-WAY THROW.
SIDEWALL DIFFUSER AS SCHEDULED
BLOW DOWNBD
S-1100
FLOW ARROW
SCHEDULEDDEVICE NO
DEMO TO BE REMOVED
NEW WORK
UNIT NUMBER
DAMPER TYPE DESIGNATIONFSD
1
DUCT SIZE
12x12
12x12
12x12
12ø
R
AP
DUCT SIZE
DUCT SIZE, FIRST FIGURE IS SIDE SHOWN (CLEAR INSIDE, ADJUST FOR LINER)
PIPE LINE SYMBOLS
G
M
SUPPLY AND OUTSIDE AIR SECTION DOWN
RETURN AIR SECTION DOWN
SHUT OFF VALVE (SEE SPECIFICATION FOR TYPE)
BUTTERFLY VALVE
CHECK VALVE
GLOBE VALVE
CALIBRATED - ORIFACEBALANCING VALVE
PLUG VALVE
IN-LINE PUMP
ELBOW DOWN
ELBOW UP
TEE DOWN
TEE UP
CAP
FLANGE
DEMO TO BE REMOVED
CONCENTRICREDUCER/INCREASER
ECCENTRICREDUCER/INCREASER
Y - PATTERN STRAINER
TWO-WAY CONTROL VALVE
PRESSURE REGULATING VALVE (STEAM)
MEDIUM DETAIL FINE DETAIL
MOTORIZED BUTTERFLY VALVE
THREE-WAY CONTROL VALVE
UNION
AIR VENT (M - MANUAL, A - AUTOMATIC)
VACUUM BREAKER
GENERAL NOTES:
TEMPERATURE SENSOR
SIDEWALL RETURN OR EXHAUST AS SCHEDULED
PRESSURE AND TEMPERATURE TEST PORT
EQUIPMENT DESIGNATION GENERAL ABBREVIATIONS GENERAL ABBREVIATIONS, CONTINUED
BALL VALVE
GATE VALVE
M
AMS AIRFLOW MEASURING STATION
PRESSURE SENSOR
DUCT SYSTEM SYMBOLS
TEMPERATURE SENSOR WITH INSULATED SUB-BASEI
GENERAL SYMBOLS
THERMOMETER
PRESSURE GAGE WITH COCK
FLEX PIPE COUPLING
EXPANSION JOINT
PIPE ANCHOR
PIPE GUIDE
PITCH DOWN IN DIRECTION OF ARROW
FLOW ARROW
M WATER METER
T STEAM TRAP
Y - PATTERN STRAINER W/ BLOWDOWN VALVE
VALVE IN RISE (SEE SPECIFICATIONS FOR TYPE)
MULTI-PURPOSE PUMP DISCHARGE VALVE
3
EXHAUST GRILLE OR REGISTER AS SCHEDULED
PRESSURE REDUCING VALVE (HYDRONIC)
EXHAUST AIR SECTION UP
EXHAUST AIR SECTION DOWN
TEMPERATURE SENSOR WITH GUARDG
HUMIDITY SENSOR
PLAN NUMBER
SHEET WHERE LOCATED
1
M101
ACTIVE FLOW - LIMITING VALVE
AHU-1 EXISTING EQUIPMENT DESIGNATION
SOLENOID VALVE
RELIEF VALVE
CD CONDENSATE (STEAM) DRAIN
MPS
MPRMEDIUM PRESSURE CONDENSATE RETURN (60 PSIG)
MEDIUM PRESSURE STEAM SUPPLY (60PSIG)#
1
M101
T
T
T
H
P
FD
EXVAV-7-10
EXISTING AIR HANDLER DESIGNATION
EXISTING VAV BOX IDENTIFYER
EXISTING OVAL DUCT12/12
8250 H
AV
ER
ST
ICK
RD
S
UIT
E 2
85,
IND
IAN
AP
OLIS
, IN
46240
T
317.6
38.8
383
w
ww
.rossbar.
com
CHECKED BY:
© ROSS & BARUZZINI, INC. 2020
ISSUE DATE:
RB PROJ. NO.:
DESIGNED BY:
DRAWING TITLE:
DRAWING NO.:
WHEN THIS DRAWING IS
REPRODUCED AT ORIGINAL SCALE THIS BAR = 1 INCH
REVISIONS:
The Professional Engineer, whose signature and personal seal appear on
this document, assumes responsibility only for what appears hereon, and
disclaims responsibility for all other plans, specifications, estimates,
reports, documents or instruments not sealed by the Professional Engineer
relating to, or intended to be used for, any part or parts of the engineering
project to which this document refers. Prints sealed by the Engineer bear
the embossed or wet seal of the Engineer across the signature and date.
Copies of this document, as signed and sealed, have been retained by the
Professional Engineer. The Professional Engineer will not be responsible
for subsequent changes to this document, unless the changes are made
by the Engineer or with the Engineer's written authorization.
1 INCH
DATE DESCRIPTION
Dwg: of:
4/2
2/2
02
1 5
:28:3
3 P
M
2148-02
M000
TMM
India
na S
chool fo
r th
e D
eaf,
Build
ing #
8 H
VA
C R
enovation
1200 E
42nd S
t, India
napolis
, IN
46205
MECHANICAL SYMBOLS &ABBREVIATIONS
Ind
iana
Sch
ool F
or
Th
e D
ea
f
PR
OJE
CT
ST
AT
US
: C
ON
ST
RU
CT
ION
DO
CU
ME
NT
S
DA
PW
Pro
ject
No.
49026008-2
0-0
40
TMM
09/01/2020
ACC AIR COOLED CONDENSER
ACU AIR CONDITIONING UNIT
AF AIR FILTER
AHU AIR HANDLING UNIT
AS AIR SEPARATOR
B BOILER
CC COOLING COIL
CFP CHEMICAL FEED PUMP
CH CHILLER
CP CONDENSER WATER PUMP
CRAC COMPUTER ROOM AIR CONDITIONING UNIT
CRP CONDENSATE RETURN PUMP
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CVR CONVECTOR
EF EXHAUST FAN
EJ EXPANSION JOINT
ET EXPANSION TANK
F FAN
FCU FAN COIL UNIT
FD FIRE DAMPER
FSD COMBINATION FIRE/SMOKE DAMPER
FT FLASH TANK
FTR FIN-TUBE RADIATION
FTU FAN TERMINAL UNIT
GV GRAVITY VENTILATOR
H HUMIDIFIER
HC HEATING COIL
HEV HOOD EXHAUST VALVE
HWP HEATING WATER PUMP
HX HEAT EXCHANGER
L LOUVER
MAU MAKE-UP AIR UNIT
MD MOTORIZED DAMPER
P PUMP
PCWP PRIMARY CHILLED WATER PUMP
PG PIPE GUIDE
PRV PRESSURE REGULATING VALVE
PTAC PACKAGED TERMINAL AIR CONDITIONING UNIT
RAF RELIEF AIR FAN
RF RETURN FAN
RHC TERMINAL REHEAT COIL
RP RADIANT PANEL
RTU ROOFTOP UNIT
SAV SUPPLY AIR VALVE
SF SUPPLY FAN
ST STEAM TRAP
T TANK
UH UNIT HEATER
VAV VARIABLE AIR VOLUME BOX
VTU VARIABLE TERMINAL UNIT
WCC WATER COOLED CONDENSER
IPLV INTEGRATED PART-LOAD VALUE
ISP INTERNAL STATIC PRESSURE
JS JOIST SPACE
KW KILOWATTS
L LENGTH
LAT LEAVING AIR TEMPERATURE
LB(S) POUNDS
LF LINEAR FEET
LRA LOCKED ROTOR AMPS
LS LIGHT SPACE
LVL LEVEL
LWT LEAVING WATER TEMPERATURE
MAN MANUAL
MANU MANUFACTURER
MAX MAXIMUM
MBH THOUSAND BRITISH THERMAL UNITS PER HOUR
MCA MINIMUM CIRCUIT AMPS
MCC MOTOR CONTROL CENTER
MECH MECHANICAL
MERV MINIMUM EFFICIENCY REPORTING VALUE (ASHRAE 52.2)
MFR MANUFACTURER
MIN MINIMUM OR MINUTE (PER CONTEXT)
MTD MOUNTED
MTL METAL
MV MANUAL VENT
NC NORMALLY CLOSED OR NOISE CRITERIA (PER CONTEXT)
NIC NOT IN CONTRACT
NO NORMALLY OPEN OR NUMBER (PER CONTEXT)
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
OA OUTSIDE AIR
OBD OPPOSED BLADE DAMPER
OC ON CENTER
OD OUTSIDE DIAMETER
OT OIL TRAP
PA PIPE ANCHOR
PBD PARALLEL BLADE DAMPER
PC PUMPED CONDENSATE
PD PRESSURE DROP
PENT PENTHOUSE
PH PHASE
PHC PREHEAT COIL
PLBG PLUMBING
PNEU PNEUMATIC
PPH POUNDS PER HOUR
PRESS PRESSURE
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH ABSOLUTE
PSIG POUNDS PER SQUARE INCH GAUGE
QTY QUANTITY
RA RETURN AIR
RAD RADIATED
RD ROOF DRAIN
REFR REFRIGERANT
REQ REQUIRED
RH RELATIVE HUMIDITY
RLA RUNNING LOAD AMPS
RM ROOM
RND ROUND
RPM REVOLUTIONS PER MINUTE
SA SUPPLY AIR
SAN SANITARY
SEC'N SECTION
SEER SEASONAL ENERGY EFFICIENCY RATIO
SENS SENSIBLE
SF SQUARE FOOT
SH SENSIBLE HEAT
SHT SHEET
SND SOUND
SOL SOLENOID
SP STATIC PRESSURE
SPD STATIC PRESSURE DIFFERENTIAL
SPT STATIC PRESSURE TRANSMITTER
SQ SQUARE
SST STAINLESS STEEL
STL STEEL
STM STEAM
T&P TEMPERATURE AND PRESSURE
TC TEMPERATURE CONTROL
TD THERMODYNAMIC OR TEMPERATURE DIFFERENTIAL (PER CONTEXT)
TDH TOTAL DYNAMIC HEAD
TEMP TEMPERATURE
TOT TOTAL
TPD TOTAL PRESSURE DROP
TSP TOTAL STATIC PRESSURE
TYP TYPICAL
UC UNDERCUT DOOR
UG UNDERGROUND
UNO UNLESS NOTED OTHERWISE
V VOLTS
VAC VACUUM
VD VOLUME DAMPER (MANUAL)
VEL VELOCITY
VERT VERTICAL
VFD VARIABLE FREQUENCY DRIVE
VOL VOLUME
VTR VENT THRU ROOF
W WATT OR WIDTH (PER CONTEXT)
W/ WITH
W/O WITHOUT
WB WET BULB
WC WATER COLUMN
WG WATER GAUGE
WPD WATER PRESSURE DIFFERENTIAL
WT WEIGHT
A AIR OR AMP (PER CONTEXT)
ACC ACCESSORIES
AD ACCESS DOOR
AFF ABOVE FINISHED FLOOR
AFS AIR FLOW SWITCH
AHRI AIR CONDITIONING, HEATING, AND REFRIGERATION INSTITUTE
AI ANALOG SIGNAL INPUT
AMB AMBIENT
AO ANALOG SIGNAL OUTPUT
AP ACCESS PANEL
APD AIR PRESSURE DROP
APLV APPLICATION PART LOAD VALUE
APPROX APPROXIMATE
ARCH ARCHITECTURE/ARCHITECT
AUX AUXILIARY
AV AUTOMATIC VENT
AVG AVERAGE
BDD BACK DRAFT DAMPER
BFC BELOW FINISHED CEILING
BFP BACKFLOW PREVENTER
BHP BRAKE HORSEPOWER
BI BINARY SIGNAL INPUT
BMS BUILDING MANAGEMENT SYSTEM
BO BINARY SIGNAL OUTPUT
BOB BOTTOM OF BEAM
BOD BOTTOM OF DUCT
BOP BOTTOM OF PIPE
BS BEAM SPACE
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNITS PER HOUR
BWE BAKED WHITE ENAMEL
CAP CAPACITY
CAV CONSTANT AIR VOLUME
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CI CAST IRON
CLG COOLING DUCT (COLD DUCT)
CO CLEAN OUT
COMP COMPRESSOR
CONC CONCRETE
COND CONDENSATE
CONN CONNECTION
CORR CORRIDOR
CV CONTROL VALVE
D DEPTH
DB DRY BULB
DBA A-WEIGHTED DECIBELS
DEFL DEFLECTION
DEG DEGREES
DEG F DEGREES FAHRENHEIT
DES DESIGN
DIA DIAMETER
DIM DIMENSION
DISCH DISCHARGE
DIV DIVISION
DN DOWN
DP DIFFERENTIAL PRESSURE SENSOR
DPS DIFFERENTIAL PRESSURE SWITCH
DPT DIFFERENTIAL PRESSURE TRANSMITTER
DTL DETAIL
DWG(S) DRAWING(S)
EA EXHAUST AIR OR EACH (PER CONTEXT)
EAT ENTERING AIR TEMPERATURE
EER ENERGY EFFICIENT RATIO
EFF EFFICIENCY
ELEC ELECTRIC
ELEV ELEVATION
EQ EQUAL
ESP EXTERNAL STATIC PRESSURE
EWB ENTERING AIR WET BULB TEMPERATURE
EWT ENTERING WATER TEMPERATURE
EXH EXHAUST
EXIST, EX EXISTING
EXT EXTERNAL
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
FC FLEXIBLE CONNECTION
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FIN FINISHED
FLR FLOOR
FPF FINS PER FOOT
FPM FEET PER MINUTE
FS FLOW SWITCH
FT FEET
FT-HD HEAD IN FEET
GA GAUGE
GAL GALLONS
GALV GALVANIZED
GC GENERAL CONTRACTOR
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
H HEIGHT
HD HEAD
HEV HOSE END VALVE
HORIZ HORIZONTAL
HP HORSEPOWER
HR HOUR
HTG HEATING DUCT (HOT DECK)
HVAC HEATING, VENTILATING & AIR CONDITIONING
HW HOT WATER
HZ HERTZ
IB INVERTED BUCKET
IE INVERT ELEVATION
IN INCH/INCHES
INDIC INDICATOR
14. ALL DUCTWORK SHALL COMPLY WITH "HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE," 3RD EDITION, SMACNA 2005, EXCEPT WHERE MORE RESTRICTIVEREQUIREMENTS ARE SPECIFIED. ANY PLAN REFERENCES TO "SMACNA FIGURE ---" REFERS TO THIS STANDARD. SEE SPECIFICATIONS FOR SCHEDULE OF DUCT PRESSURE CLASSAND SEAL CLASS.
15. IN GENERAL, THE FINAL FLEX DUCT RUNOUT TO EACH DIFFUSER, REGISTER, OR GRILLE IS NOT SIZED ON PLANS. FLEX DUCT RUNOUT SIZE SHALL MATCH AIR OUTLET NECK SIZE,UNO.
16. IT IS THE INTENT OF THESE DRAWINGS THAT A MANUAL BALANCING DAMPER BE PROVIDED AT EVERY INDIVIDUAL DUCTED CONNECTION TO AN AIR DEVICE, UNLESS A BALANCINGDAMPER IS SCHEDULED TO BE FURNISHED WITH AIR DEVICE. VAV BOXES WITH SINGLE DIFFUSERS ARE NOT REQUIRED TO HAVE A BALANCING DAMPER.
17. ALL NEW DUCTWORK SIZES SHOWN ON PLANS ARE CLEAR INSIDE DIMENSIONS. CONTRACTOR SHALL ADJUST SHEET METAL SIZES AS NECESSARY TO ACCOMMODATE INTERNALDUCT LINER, IF SPECIFIED.
18. ALL EXISTING TEMPERATURE CONTROLS THAT ARE BEING DEMOLISHED OR DISABLED AS WORK OF THIS CONTRACT SHALL BE COMPLETELY REMOVED FROM BUILDING. THE T.C.CONTRACTOR IS RESPONSIBLE FOR UPGRADING ALL PNEUMATIC CONTROLS, ACCESSORIES, ETC. TO DDC WHETHER INDICATED ON PLANS OR NOT.
19. THE AIRSIDE AND HEATING HYDRONIC SYSTEM SHALL BE MEASURED AT EACH AIR HANDLER AND VAV BOX BY A CERTIFIED T&B CONTRACTOR PRIOR TO DEMOLITION. THE RESULTSSHALL BE SUBMITTED TO ENGINEER FOR RECORD PURPOSES PRIOR TO SUBMITTING NEW EQUIPMENT.
20. CONTRACTOR SHALL HAVE THE DOCUMENTS REVIEWED COMPLETELY BY A CERTIFIED BALANCING CONTRACTOR FOR THE INCLUSION OF THE NECESSARY ADDITIONAL AIR ANDHYDRONIC SYSTEM BALANCING DEVICES NOT SHOWN IN THESE DOCUMENTS FOR COMPLETE HVAC SYSTEM BALANCING. REFER TO SPECIFICATION SECTION 230593 FORCONSTRUCTION DOCUMENT EXAMINATION REPORT.
21. THE CONTRACTOR SHALL CONNECT THE NEW HVAC SYSTEM TO THE OWNER'S EXISTING BUILDING CONTROL SYSTEM. REFER TO THE SPECIFICATIONS FOR ADDITIONALREQUIREMENTS
22. IT SHOULD BE NOTED THAT SOME SYSTEMS (I.E. GENERAL EXHAUST) ARE REQUIRED TO BE BALANCES MORE THAN ONCE TO ASSURE DESIGN AIRFLOWS ARE PROVIDED.
23. FOR ALL SUSPENDED HVAC EQUIPMENT THAT WEIGHS 31 POUNDS OR MORE, LOCATED IN OR ABOVE OCCUPIED SPACES, THE CONTRACTOR SHALL SUPPORT THE EQUIPMENT TOPREVENT IT FROM FALLING FROM OR THROUGH THE CEILING IN THE EVENT OF A TERRORIST ATTACK(EXPLOSION). THIS SHALL INCLUDE BUT IT NOT LIMITED TO ALL VAV BOXES,ETC. SUPPORTS SHALL BE THE CONTRACTORS RESPONSIBILITY AND SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW.
24 ALL PUBLIC SPACES SHALL BE PROVIDED WITH SENSOR ONLY TYPE THERMOSTATS TIED INTO BAS. PRIVATE SPACES TO BE PROVIDED WITH ADJUSTABLE THERMOSTATS.
25 NEW THERMOSTATS TO CONTROL NEW VAV AND NEW FINNED TUBE CONTROL VALVE (WHERE APPLICABLE) SEE SEQUENCE OF OPERATIONS FOR MORE INFORMATION.
26 NEW CONTROL WIRING TO FOLLOW EXISTING PNEUMATIC TUBING AND BE CONCEALED IN WALL.
27. ROUTE NEW CONTROL WIRING DOWN TO FINNED TUBE CONTROL VALVE EXPOSED IN CONDUIT SIMILAR TO LEGRAND 800 SERIES. COLOR TO MATCH ADJACENT WALL.
1. THESE PLANS ARE DIAGRAMMATIC IN NATURE. THE CONTRACTOR SHALL BE PREPARED TO MAKE SOME ALTERATIONS TO THE EXACT LOCATION OF DUCTWORK, PIPING ANDEQUIPMENT FROM THE LOCATION INDICATED ON THESE DRAWINGS TO FIT ACTUAL JOB CONDITIONS.
2. ALL ELBOWS, FITTINGS, ETC., IN PIPING AND DUCTWORK REQUIRED TO CLEAR ALL JOB OBSTRUCTIONS ARE NOT NECESSARILY INDICATED. ALL NECESSARY TRANSITIONS, FITTINGSAND OFFSETS ARE REQUIRED WHETHER SHOWN OR NOT.
3. BECAUSE OF THE LIMITED SPACE AVAILABLE TO INSTALL ALL OF THE MECHANICAL WORK, COORDINATION BETWEEN THE VARIOUS TRADES IS OF THE UTMOST IMPORTANCE.
4. THE CONTRACTOR SHALL COORDINATE STAGING AND SCHEDULING WITH THE OWNER'S REPRESENTATIVE.
5. EXISTING CONDITIONS ARE BASED ON INFORMATION OBTAINED FROM PREVIOUS CONSTRUCTION DOCUMENTS AND INFORMAL FIELD OBSERVATION AND SHALL NOT BECONSTITUTED AS "AS BUILT." THE CONTRACTOR SHALL FIELD-VERIFY EXISTING CONDITIONS BEFORE THE ONSET OF CONSTRUCTION.
6. DEMOLISH ALL PIPING, DUCTWORK EQUIPMENT, ETC., SHOWN TO BE REMOVED, IN ITS ENTIRETY, INCLUDING ALL HANGERS AND SUPPORTS.
7. WHERE CONTRACTOR IS REQUIRED TO CONCEAL NEW WORK, REMOVE OR MODIFY EXISTING CONSTRUCTION OR EQUIPMENT, OR ATTACH TO EXISTING CONSTRUCTION, THECONTRACTOR SHALL REPAIR OR REPLACE EXISTING CONSTRUCTION AND MATERIALS TO MATCH CONDITIONS AT THE ONSET OF CONSTRUCTION. IT IS THE CONTRACTOR'SRESPONSIBILITY TO REMOVE AND REPLACE EXISTING CEILINGS AND WALLS REQUIRED FOR INSTALLATION OF MECHANICAL SYSTEMS.
8. THE OWNER SHALL MAINTAIN ALL SALVAGE RIGHTS OF EQUIPMENT AND MATERIALS REMOVED. ALL EQUIPMENT AND MATERIALS NOT CLAIMED BY THE OWNER SHALL BE REMOVEDFROM THE PREMISES BY THIS CONTRACTOR.
10. ALL WORK SHALL BE INSTALLED PER THE REFERENCE DETAILS, REGARDLESS OF WHETHER OR NOT THE DETAILS ARE CALLED OUT ON THE PLANS. IF NO DETAIL IS PROVIDED,INSTALL PER MANUFACTURER'S REQUIREMENTS.
11. PROVIDE VENTS AT ALL HYDRONIC PIPING HIGH POINTS, AND DRAINS AT ALL PIPING LOW POINTS, REGARDLESS OF WHETHER SHOWN OR NOT.
12. THE CONTRACTOR SHALL VERIFY THAT EXISTING REFRIGERANT PIPING IS ACCEPTABLE FOR REUSE BY EQUIPMENT MANUFACTURER. NEW PIPING SHALL BE PROVIDED ASNECESSARY. THE CONTRACTOR SHALL VERIFY ALL REFRIGERANT PIPE SIZING AND ROUTINGS WITH THEEQUIPMENT MANUFACTURER. THE CONTRACTOR SHALL ALSO PROVIDE ALL REQUIRED REFRIGERANTACCESSORIES AS RECOMMENDED BY THE EQUIPMENT MANUFACTURER FOR COMPLETE AND FULLYFUNCTIONAL SYSTEMS.
13. DO NOT SCALE THE LOCATION OF HVAC CEILING ELEMENTS, SUCH AS AIR INLETS AND OUTLETS, FROM THE M-SERIES DRAWINGS. M-SERIES DRAWINGS GOVERN TYPE, STYLE, ANDSIZE OF DIFFUSERS, REGISTERS, AND GRILLES.
8250 H
AV
ER
ST
ICK
RD
, #285
IND
IAN
AP
OLIS
, IN
46240
T 3
17.6
38.8
383
ww
w.r
ossbar.
com
1 04/22/21 ADDENDUM 1
1
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123123 1
23
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
A
C
1247
D
H
I
L
T
W
35 33 32 28 27 22 21
1
1
1
1 1 1 11
1
1 1
1
1 1 1 1 1
1 1
1
1
1 1 1
1
1 1 1 1
1
1
1 1 1
1
1
1
1 111
1
11
11
1
1
1
1
1 1
1
1
1
1
1
1
11
1
1
1 1
1
11
1
1
111
1
1
3
3
3
1
2
2 2 2
2
2
2
2
2
2 2
2
2
2
2
#
8250 H
AV
ER
ST
ICK
RD
S
UIT
E 2
85,
IND
IAN
AP
OLIS
, IN
46240
T
317.6
38.8
383
w
ww
.rossbar.
com
CHECKED BY:
© ROSS & BARUZZINI, INC. 2020
ISSUE DATE:
RB PROJ. NO.:
DESIGNED BY:
DRAWING TITLE:
DRAWING NO.:
WHEN THIS DRAWING IS
REPRODUCED AT ORIGINAL SCALE THIS BAR = 1 INCH
PRELIM
INARY
NOT F
OR
CONSTR
UCTIO
N
REVISIONS:
The Professional Engineer, whose signature and personal seal appear on
this document, assumes responsibility only for what appears hereon, and
disclaims responsibility for all other plans, specifications, estimates,
reports, documents or instruments not sealed by the Professional Engineer
relating to, or intended to be used for, any part or parts of the engineering
project to which this document refers. Prints sealed by the Engineer bear
the embossed or wet seal of the Engineer across the signature and date.
Copies of this document, as signed and sealed, have been retained by the
Professional Engineer. The Professional Engineer will not be responsible
for subsequent changes to this document, unless the changes are made
by the Engineer or with the Engineer's written authorization.
1 INCH
DATE DESCRIPTION
Dwg: of:
4/2
2/2
02
1 5
:28:3
3 P
M
2148-02
M001
Checker
India
na S
chool fo
r th
e D
eaf,
Build
ing #
8 H
VA
C R
enovation
1200 E
42nd S
t, India
napolis
, IN
46205
FIRST FLOOR MECHANICALRCP PLAN
Ind
iana
Sch
ool F
or
Th
e D
ea
f
PR
OJE
CT
ST
AT
US
: C
ON
ST
RU
CT
ION
DO
CU
ME
NT
S
DA
PW
Pro
ject
No.
49026008-2
0-0
40
Designer
09/01/2020
1 04/22/21 ADDENDUM 1
1/16" = 1'-0"1
FIRST FLOOR MECHANICAL PLAN
1
1. GYPSUM BOARD/PLASTER CEILING.
2. 2x2 LAY IN CEILING PANEL.
3. SPECIALTY SLOT CEILING.
SHEET KEYNOTES#
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123123 1
23
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
XXX
Second Floor
<−−−−
2’ 7 23/32"
Down 5
11/32"
21’−4"
A
C
1247
D
H
I
L
T
W
35 33 32 28 27 22 21
1 1 1 1 1 1
11
1
1
1 1
1 1
1
1
1 1 1
1
1
1
1
1 1
1
1
1 1 1 1
1
11
111
1 1
1 1
1 1 1 1
1
1
1
1
1
1 1
1
1
1
1
1
1
11
1
1
1 1
1
1
1
1
1
111
1
1
2
2
2
2
2
2
2 2
2
2
2
2
2
2
2
2
2
2
3
#
82
50
HA
VE
RS
TIC
K R
D
SU
ITE
285
, IN
DIA
NA
PO
LIS
, IN
46
240
T 3
17.6
38
.83
83
ww
w.r
ossba
r.co
m
CHECKED BY:
© ROSS & BARUZZINI, INC. 2020
ISSUE DATE:
RB PROJ. NO.:
DESIGNED BY:
DRAWING TITLE:
DRAWING NO.:
WHEN THIS DRAWING IS
REPRODUCED AT ORIGINAL SCALE THIS BAR = 1 INCH
PRELIM
INARY
NOT F
OR
CONSTR
UCTIO
N
REVISIONS:
The Professional Engineer, whose signature and personal seal appear on
this document, assumes responsibility only for what appears hereon, and
disclaims responsibility for all other plans, specifications, estimates,
reports, documents or instruments not sealed by the Professional Engineer
relating to, or intended to be used for, any part or parts of the engineering
project to which this document refers. Prints sealed by the Engineer bear
the embossed or wet seal of the Engineer across the signature and date.
Copies of this document, as signed and sealed, have been retained by the
Professional Engineer. The Professional Engineer will not be responsible
for subsequent changes to this document, unless the changes are made
by the Engineer or with the Engineer's written authorization.
1 INCH
DATE DESCRIPTION
Dwg: of:
4/2
2/2
02
1 5
:28:3
4 P
M
2148-02
M002
Checker
India
na S
chool fo
r th
e D
eaf,
Build
ing #
8 H
VA
C R
enovation
1200 E
42nd S
t, India
napolis
, IN
46205
SECOND FLOORMECHANICAL RCP PLAN
Ind
iana
Sch
ool F
or
Th
e D
ea
f
PR
OJE
CT
ST
AT
US
: C
ON
ST
RU
CT
ION
DO
CU
ME
NT
S
DA
PW
Pro
ject
No.
49026008-2
0-0
40
Designer
09/01/2020
1 04/22/21 ADDENDUM 1
1/16" = 1'-0"1
SECOND FLOOR MECHANICAL PLAN
1
1. GYPSUM BOARD/PLASTER CEILING.
2. 2x2 LAY IN CEILING PANEL.
3. SPECIALTY SLOT CEILING.
SHEET KEYNOTES#
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123123 1
23
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
OPEN TO FLOOR BELOW
BUILT UP ROOF
123
123
XXX
A
C
1247
D
H
I
L
T
W
35 33 32 28 27 22 21
1 1 1 1 1 1
11
1
1
1 1
1 1
1
1
1 1 1
1
1
1
1
1 1
1
1
1 1 1 1
1
11
111
1 1
1 1
1 1 1 1
1
1
1
1
1 1
1
1
1
1
1
1
11
1
1
1 1
1
1
1
1
1
111
1
1
2
2
2
2
2
2
2 2
2
2
2
2
2
2
2
2
2
2
3
#
82
50
HA
VE
RS
TIC
K R
D
SU
ITE
285
, IN
DIA
NA
PO
LIS
, IN
46
240
T 3
17.6
38
.83
83
ww
w.r
ossba
r.co
m
CHECKED BY:
© ROSS & BARUZZINI, INC. 2020
ISSUE DATE:
RB PROJ. NO.:
DESIGNED BY:
DRAWING TITLE:
DRAWING NO.:
WHEN THIS DRAWING IS
REPRODUCED AT ORIGINAL SCALE THIS BAR = 1 INCH
PRELIM
INARY
NOT F
OR
CONSTR
UCTIO
N
REVISIONS:
The Professional Engineer, whose signature and personal seal appear on
this document, assumes responsibility only for what appears hereon, and
disclaims responsibility for all other plans, specifications, estimates,
reports, documents or instruments not sealed by the Professional Engineer
relating to, or intended to be used for, any part or parts of the engineering
project to which this document refers. Prints sealed by the Engineer bear
the embossed or wet seal of the Engineer across the signature and date.
Copies of this document, as signed and sealed, have been retained by the
Professional Engineer. The Professional Engineer will not be responsible
for subsequent changes to this document, unless the changes are made
by the Engineer or with the Engineer's written authorization.
1 INCH
DATE DESCRIPTION
Dwg: of:
4/2
2/2
02
1 5
:28:3
4 P
M
2148-02
M003
Checker
India
na S
chool fo
r th
e D
eaf,
Build
ing #
8 H
VA
C R
enovation
1200 E
42nd S
t, India
napolis
, IN
46205
THIRD FLOOR MECHANICALRCP PLAN
Ind
iana
Sch
ool F
or
Th
e D
ea
f
PR
OJE
CT
ST
AT
US
: C
ON
ST
RU
CT
ION
DO
CU
ME
NT
S
DA
PW
Pro
ject
No.
49026008-2
0-0
40
Designer
09/01/2020
1 04/22/21 ADDENDUM 1
1/16" = 1'-0"1
THIRD FLOOR MECHANICAL PLAN
1
1. GYPSUM BOARD/PLASTER CEILING.
2. 2x2 LAY IN CEILING PANEL.
3. SPECIALTY SLOT CEILING.
SHEET KEYNOTES#
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
L T W
35
33
32
28
27
EXVAV8-01
EXVAV8-02
EXVAV8-03
EXVAV8-04
EXVAV-9-02
EXVAV-9-01
14ø
SA
16ø
SA
14"Ø SA FROM AHU-8 IN PENTHOUSE ABOVE
16"Ø SA FROM AHU-8 IN PENTHOUSE ABOVE
16ø
SA
14ø
SA
14"Ø SA FROM AHU-9 IN PENTHOUSE ABOVE
16"Ø SA FROM AHU-9 IN PENTHOUSE ABOVE
VTU
9-02
T
MATCHLINE
T T
T
T
T
T
TT
T
T
T T
T
T
T
T
T
TT
T
EXVAV-8-07
VTU
9-06VTU
9-05
VTU
9-04
VTU
9-03
EXVAV-9-06
VTU
9-07
VTU
9-08
VTU
9-09
VTU
9-10
EXVAV-9-11
VTU
9-11
VTU
9-12
VTU
9-13
VTU
8-05 VTU
8-06
VTU
8-07
VTU
8-08
VTU
8-09
VTU
8-10
VTU
8-11
VTU
8-12
VTU
8-13
VTU
7-06
VTU
8-02
T
VTU
9-01
PTAC-1
PTAC-1
VTU
8-04 T
T
VTU
8-03
VTU
8-01T
C133
C134
C135
C136
C137 C138
C139
C140
C141
C142
C143
C144
C145
C146
C147
C148
C149
C150
C151
C152
C153
C154
C155
C156
C157
C158C159
C160
C161
C162
C163
C164
C165
C166
C167
C168
C169
C170C171
C172
C173
C174
C175
C176
C177
C126
C127
C128
C129
C130
C131
C132
C124
C115
C123
EXVAV-9-13
EXVAV-8-05
EXVAV-9-12
EXVAV-9-10
EXVAV-9-09
EXVAV-9-08
EXVAV-9-07
EXVAV-9-05
EXVAV-9-04
EXVAV-9-03
EXVAV-8-06
EXVAV-8-08
EXVAV-8-09
EXVAV-8-10
EXVAV-8-11
EXVAV-8-12
EXVAV-8-13
EXVAV-7-06
T
1
1
2 2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
M101A
2
W
VTU-9-07
EXVAV-9-07
CONTRACTORS OPTION IN LIEU OF RETROFIT KIT: PROVIDE A NEW VAV BOX SIZED TO MATCH EXISTING SUPPLY DUCT (ALL SIZES MUST BE VERIFIED IN FIELD AND SUBMITTED FOR APPROVAL WITH SUBMITTAL). A NEW ACCESS DOOR TO BE PROVIDED IN CEILING BENEATH VAV BOX.
8250 H
AV
ER
ST
ICK
RD
S
UIT
E 2
85,
IND
IAN
AP
OLIS
, IN
46240
T
317.6
38.8
383
w
ww
.rossbar.
com
CHECKED BY:
© ROSS & BARUZZINI, INC. 2020
ISSUE DATE:
RB PROJ. NO.:
DESIGNED BY:
DRAWING TITLE:
DRAWING NO.:
WHEN THIS DRAWING IS
REPRODUCED AT ORIGINAL SCALE THIS BAR = 1 INCH
REVISIONS:
The Professional Engineer, whose signature and personal seal appear on
this document, assumes responsibility only for what appears hereon, and
disclaims responsibility for all other plans, specifications, estimates,
reports, documents or instruments not sealed by the Professional Engineer
relating to, or intended to be used for, any part or parts of the engineering
project to which this document refers. Prints sealed by the Engineer bear
the embossed or wet seal of the Engineer across the signature and date.
Copies of this document, as signed and sealed, have been retained by the
Professional Engineer. The Professional Engineer will not be responsible
for subsequent changes to this document, unless the changes are made
by the Engineer or with the Engineer's written authorization.
1 INCH
DATE DESCRIPTION
KEY PLAN
Dwg: of:
4/2
2/2
02
1 5
:28:3
4 P
M
2148-02
M101A
TMM
India
na S
chool fo
r th
e D
eaf,
Build
ing #
8 H
VA
C R
enovation
1200 E
42nd S
t, India
napolis
, IN
46205
MECHANICAL FIRST FLOORHVAC PLAN - AREA A
Ind
iana
Sch
ool F
or
Th
e D
ea
f
PR
OJE
CT
ST
AT
US
: C
ON
ST
RU
CT
ION
DO
CU
ME
NT
S
DA
PW
Pro
ject
No.
49026008-2
0-0
40
TMM
09/01/2020
1/8" = 1'-0"1
MECHANICAL FIRST FLOOR HVAC PLAN - AREA A
AREA A
AREA B
AREA C
TRUE NORTH
1. PROVIDE AN ALTERNATE PRICE FOR NEW THRU WALL PTAC UNITS. PROVIDE WITH ALL ACCESSORIES AND CONTROLS INDICATED ON SCHEDULES.
2. EXISTING FINNED TUBE HHW RADIATOR TO REMAIN. PNEUMATIC CONTROL VALVE TO BE REPLACED WITH NEW DDC CONTROL VALVE. VERIFY EXACT LOCATION IN FIELD.
SHEET KEYNOTES#
A. ALL EXISTING FIRE RATINGS TO BE MAINTAINED AFTER NEW CONSTRUCTION.
B. NEW VTU BOXES TO BE COORDINATED WITH EXISTING OBSTRUCTIONS INCLUDING LIGHTS, CEILING GRID, STRUCTURE, ETC. AND BE ORIENTED IN SUCH A MANNER TO PROVIDE MANUFACTURER'S RECOMMENDED CLEARANCES. IF CLEARANCES CANNOT BE MET THE VAV BOX SHALL BE RELOCATED AND RECONNECTED AT NO INCREASE IN PROJECT COST.
C. PROVIDE NEW DUCTWORK AS REQUIRED TO CONNECT NEW VTU'S AND VAV BOXES . SEE DETAILS FOR FURTHER CONNECTION INFORMATION.
D. EXISTING VAVs TO REMAIN. PNEUMATIC CONTROLS TO BE DEMOLISHED AND REPLACED WITH DDC CONTROL VTU ADAPTER KIT. SEE SCHEDULE FOR DETAILS. INSTALL NEW THRMOSTAT AND WIRING TO NEW VTU.
E. EXISTING CEILINGS TO BE REMOVED AS REQ'D TO PROVIDE NEW VAV BOXES. CEILING TO BE REPLACED UPON COMPLETION. ANY DAMAGED PARTS TO BE REPLACED AT NO CHANGE IN CONSTRUCTION COST.
GENERAL SHEET NOTES
1 04/22/21 ADDENDUM 1
1/4" = 1'-0"2
ENLARGED TYPICAL DORMROOM - NEW
T
1
T
28
27
CU
8
48x48 RA
AHU
8
P-8
1 1/4" HWR
1 1/4" HWS3" HWR
3" HWS
EXTEND LOW PRESSURE STEAM TO CONNECT WITH NEW STEAM DISTRIBUTION TUBING.
EXISTING EXHAUST FAN TO REMAIN. UPGRADE CONTROLS TO DDC
PROVIDE TRANSITIONS AND DUCTWORK TO MAKE NEW CONNECTIONS WITH AIR HANDLER
PROVIDE TRANSITIONS AND DUCTWORK TO MAKE NEW CONNECTIONS WITH AIR HANDLER
PROVIDE NEW SIDEWALL EXHAUST FAN. FOLLOW MANUFACTURER'S MOUNTING INSTRUCTION ON EXISTING WALL LOUVER. INSULATE AND SEAL REMAINING OPEN LOUVER WITH MIN. 1" BATT INSULATION.
WRF
8
PROVIDE UNIT WITH A BASE RAIL AROUND THE FULL PERIMETER OF THE UNIT TO SUPPORT ON EXISTING CURBS
L T
2
M301
CU-3
CU-6
NEW 4" HHWS/HHWR FROM FLOOR BELOW.
AHU-6
AHU-5
AHU-4
WRF-6
46x24 RA
50x26 SA
50x26 SA
60x30 R
A
36/20 SA
31/1
8 S
A
34/1
8 S
A
29/1
6
1
M301
TC PANEL AND VFD LOCATION
PROVIDE NEW REFRIGERANT PIPING IF REQUIRED BY EQUIPMENT MANUFACTURER.
29/16 RA
ELECTRICAL EQUIPMENT CLEARANCE
2" HHWS/HHWR
4" HHWS/HHWR
EXISTING 96x72 FRESH AIR INTAKE LOUVER
3" HHWS/HHWR
40x30 R
A40x30 R
A
EXISTING EXHAUST FAN
EXISTING LPS FROM FLOOR BELOW
P-6
NEW 42/20 SA DUCT BENEATH RA DUCT
90x30 RA DUCT OVER 42/20 SA DUCT
134x56 RA
MD
60x30 RA
60x30 RA DOWN
EXISTING 134x56 WALL LOUVER, PROVIDE INSULATED BLANK-OFF PANELS IN OPENINGS AROUND NEW SIDEWALL FAN CONNECTIONS.
PROVIDE AS PART OF BASEMENT AIR HANDLER ALTERNATE.
PROVIDE UNIT WITH A BASE RAIL AROUND THE FULL PERIMETER OF THE UNIT TO SUPPORT ON EXISTING CURBS
PROVIDE UNIT WITH A BASE RAIL AROUND THE FULL PERIMETER OF THE UNIT TO SUPPORT ON EXISTING CURBS
T
33
32
CU
9
WRF
9
AHU
9
PROVIDE NEW SIDEWALL EXHAUST FAN. FOLLOW MANUFACTURER'S MOUNTING INSTRUCTION ON EXISTING WALL LOUVER. INSULATE AND SEAL REMAINING OPEN LOUVER WITH MIN. 1" BATT INSULATION.
EXISTING EXHAUST FAN TO REMAIN. UPGRADE CONTROLS TO DDC
PROVIDE TRANSITIONS AND DUCTWORK TO MAKE NEW CONNECTIONS WITH AIR HANDLER
PROVIDE TRANSITIONS AND DUCTWORK TO MAKE NEW CONNECTIONS WITH AIR HANDLER
EXTEND LOW PRESSURE STEAM TO CONNECT WITH NEW STEAM DISTRIBUTION TUBING.
1 1/4" HWS 1 1/4" HWR
3" HWS
3" HWR
8250 H
AV
ER
ST
ICK
RD
S
UIT
E 2
85,
IND
IAN
AP
OLIS
, IN
46240
T
317.6
38.8
383
w
ww
.rossbar.
com
CHECKED BY:
© ROSS & BARUZZINI, INC. 2020
ISSUE DATE:
RB PROJ. NO.:
DESIGNED BY:
DRAWING TITLE:
DRAWING NO.:
WHEN THIS DRAWING IS
REPRODUCED AT ORIGINAL SCALE THIS BAR = 1 INCH
REVISIONS:
The Professional Engineer, whose signature and personal seal appear on
this document, assumes responsibility only for what appears hereon, and
disclaims responsibility for all other plans, specifications, estimates,
reports, documents or instruments not sealed by the Professional Engineer
relating to, or intended to be used for, any part or parts of the engineering
project to which this document refers. Prints sealed by the Engineer bear
the embossed or wet seal of the Engineer across the signature and date.
Copies of this document, as signed and sealed, have been retained by the
Professional Engineer. The Professional Engineer will not be responsible
for subsequent changes to this document, unless the changes are made
by the Engineer or with the Engineer's written authorization.
1 INCH
DATE DESCRIPTION
Dwg: of:
4/2
2/2
02
1 5
:28:3
5 P
M
2148-02
M201
TMM
India
na S
chool fo
r th
e D
eaf,
Build
ing #
8 H
VA
C R
enovation
1200 E
42nd S
t, India
napolis
, IN
46205
ENLARGED MECHANICALROOM PLANS
Ind
iana
Sch
ool F
or
Th
e D
ea
f
PR
OJE
CT
ST
AT
US
: C
ON
ST
RU
CT
ION
DO
CU
ME
NT
S
DA
PW
Pro
ject
No.
49026008-2
0-0
40
TMM
09/01/2020
1/4" = 1'-0"1
ENLARGED TYPICAL MECHANICAL PENTHOUSE PLAN - AHU-1, 2, 7, 8
1/4" = 1'-0"2
ENLARGED AREA B MECHANICAL PENTHOUSE PLAN
1. DISCONNECT AND DEMOLISH EXISTING 366 MBH OUTDOOR CONDENSING UNIT CU-9.
2. EXISTING EQUIPMENT SUPPORTS TO REMAIN.
3. CONTRACTOR TO DEMOLISH EXISTING REFRIGERANT PIPING AND REPLACE WITH NEW IF REQUIRED BY THE NEW AIR HANDLING UNIT OR CONDENSING UNIT MANUFACTURER.
4. DISCONNECT AND DEMOLISH PNEUMATIC TC PANEL.
5. DISCONNECT AND DEMOLISH EXISTING 8220 CFM AIR HANDLING UNIT CSAC-9, BENEATH 96x18 RA DUCT.
SHEET KEYNOTES#
1. BASE BID TO REPLACE PNEUMATIC CONTROL DEVICES.2. NEW POD AHU ALTERNATE TO PERFORM WORK INDICATED.
1/4" = 1'-0"3
ENLARGED TYPICAL MECHANICAL PENTHOUSE PLAN - AHU-9
1 04/22/21 ADDENDUM 1
PROVIDE UNIT WITH A BASE RAIL AROUND THE FULL PERIMETER OF THE UNIT TO SUPPORT ON EXISTING CURBS
1
1
1
1
END VIEW
SIDE VIEW
STEEL PIPE SUPPORTFRAMING
HPS OR LPR MAIN
STEEL PIPE GUIDE
FIELD INSTALLED PIPEINSULATION (SEE NOTE 1)
1. INSTALL PIPE INSULATION AT GUIDE SO AS NOT TO INTERFERE WITH MOVEMENT OF PIPE WITHIN GUIDE.
2. SET DIMENSION EQUAL TO 1/2 SPECIFIED THERMAL MOVEMENT AT ADJACENT EXPANSION JOINT.
3. LENGTH OF GUIDE LUGS SHALL BE NO LESS THAN 2/3 OF SPECIFIED THERMAL MOVEMENT AT ADJACENT EXPANSION JOINT.
NOTES:
SEE NOTE 2
SEE NOTE 3
DIRECTION OFTHERMALEXPANSION
360° INSULATION PROTECTION SHIELD (SEE NOTE 1)
INSULATION JACKET
PIPE INSULATION (SEE NOTE 2)
STEEL PIPE SUPPORT FRAMING (SEE STRUCTURAL DRAWING)
U-BOLT (SEE NOTE 3)
1/8" (MIN) TO 1/2" (MAX) GAP AROUND PIPE
HPS OR LPR MAIN
NOTES:
1.
2.
3.
INSULATION PROTECTION SHIELD SHALL BE 24" LONG.
AT SUPPORT LOCATIONS WHERE INSULATION IS FIELD INSTALLED, 360° HIGH DENSITY CALCIUM SILICATE OR CELLULAR GLASS INSERTS SHALL BE INSTALLED UNDER FULL LENGTH OF SHIELD.
U-BOLT ROD SIZE SHALL BE NO LESS THAN 3/4".
BOILER FLUE PERSPECIFICATION SECTION235100. SEE FLOOR PLANFOR CONTINUATION
PRESSURE ANDTEMPERATURE TEST PORT, TYP
PRESSURE GAGE, TYP
THERMOMETER, TYP
PHWR
COMBUSTION AIR INLETTO EXTERIOR
3/4" DRAIN WITH CAP
SHELL DRAIN VALVE PROVIDED WITH BOILER. EXTEND TO FLOOR DRAIN
Y-PATTERN STRAINER WITH BLOWDOWN VALVE, NIPPLE, AND CAP
NOTES:
1. CONDENSATE DRAIN ASSEMBLY PROVIDED BY BOILER MANUFACTURER.2. CONDENSATE NEUTRALIZING FILTER PROVIDED BY BOILER MANUFACTURER.3. REFER TO PLAN FOR PIPE SIZES.
MM
SEE PLBG DRAWINGSFOR CONTINUATION
1" GAS WITH PLUGSHUT-OFF VALVE
PHWS
M
PRESSURE RELIEF VALVE (SUPPLIED WITH BOILER)
DRAIN PIPING TO FLOORDRAIN WITHOUT SHUT-OFF VALVE
FLEXIBLE TUBING TO DRAIN CONDENSATE DRAINASSEMBLY
CONDENSATENEUTRALIZING FILTER
MIN 3" SEDIMENTTRAP
CHECK VALVE
UNION (TYP)
TO/FROM SECONDARY HOT WATER LOOP
BALL VALVE (TYP)
MANUAL AIR VENT, TYP
B
-
PHWP
1
CALIBRATED BALANCEVALVE
CHECK VALVE
SHUT-OFF VALVE (TYP), SEE SPEC FOR TYPE
IN-LINE PUMP. ORIENT PUMP AND MOTOR PER MANUFACTURERS INSTALLATION INSTRUCTIONS.
UNION OR FLANGE (TYP)
P
PRESSUREGAUGE WITHTRUMPET VALVE
STRAINER WITH BLOWDOWN VALVE, NIPPLE, AND CAP.
NOTES:
1. REFER TO PLANS AND PIPING DIAGRAMS FOR PIPE SIZES TO/FROM PUMP.
HYDRONIC RETURN MAIN
AIR FLOW
PROVIDE FLANGE, UNION, ORGROOVED MECHANICAL JOINT ATEACH CONNECTION TO EACH COIL(TYP)
TO ADDITIONAL COIL(S) IN MULTI-COILBANK (WHERE APPLICABLE). REFER TO NOTE 2.
PRESSURE AND TEMPERATURE TESTPLUGS INSTALL AT SAME ELEVATION
UNION OR FLANGE (TYP)SEE "HYDRONIC PIPING"SPEC FOR TYPE
STRAINER WITH 3/4" HOSE-END BLOW DOWN VALVE
SHUTOFF VALVE (TYP)SEE SPEC FOR TYPE
HYDRONICSUPPLY MAIN
REDUCER (TYP)
2-WAY PRESSINDEPENDENTCONTROL VALVE MANUAL AIR VENT (TYP)
AT EACH COIL INMULTI-COIL BANK
COIL
OFFSET PIPING TO CLEARCOIL PULL SPACE
3/4" COIL DRAIN VALVE, NIPPLE,AND CAP, AT EACH COIL INMULTI-COIL BANK, AND EACHMANUFACTURER PROVIDED DRAIN.
P&T
P&T
M
SEE NOTE 2
P&T
SEE NOTE 1
NOTES:1. BRANCH PIPES SHALL TAP THE BOTTOM OF
THE MAINS.
2. PROVIDE SHUTOFF VALVE AND CALIBRATED BALANCE VALVE IN THE RETURN LEG AND SHUTOFF VALVE IN SUPPLY LEGFROM EACH BRANCH OF A MULTI-COIL BANK. SINGLE COILS NEED NOT BE PROVIDED WITH ADDITIONAL VALVES.
THERMOMETER(TYP)
PRESSURE GUAGE (TYP)
8250 H
AV
ER
ST
ICK
RD
S
UIT
E 2
85,
IND
IAN
AP
OLIS
, IN
46240
T
317.6
38.8
383
w
ww
.rossbar.
com
CHECKED BY:
© ROSS & BARUZZINI, INC. 2020
ISSUE DATE:
RB PROJ. NO.:
DESIGNED BY:
DRAWING TITLE:
DRAWING NO.:
WHEN THIS DRAWING IS
REPRODUCED AT ORIGINAL SCALE THIS BAR = 1 INCH
REVISIONS:
The Professional Engineer, whose signature and personal seal appear on
this document, assumes responsibility only for what appears hereon, and
disclaims responsibility for all other plans, specifications, estimates,
reports, documents or instruments not sealed by the Professional Engineer
relating to, or intended to be used for, any part or parts of the engineering
project to which this document refers. Prints sealed by the Engineer bear
the embossed or wet seal of the Engineer across the signature and date.
Copies of this document, as signed and sealed, have been retained by the
Professional Engineer. The Professional Engineer will not be responsible
for subsequent changes to this document, unless the changes are made
by the Engineer or with the Engineer's written authorization.
1 INCH
DATE DESCRIPTION
Dwg: of:
4/2
2/2
02
1 5
:28:3
6 P
M
2148-02
M402
TMM
India
na S
chool fo
r th
e D
eaf,
Build
ing #
8 H
VA
C R
enovation
1200 E
42nd S
t, India
napolis
, IN
46205
MECHANICAL DETAILS
Ind
iana
Sch
ool F
or
Th
e D
ea
f
PR
OJE
CT
ST
AT
US
: C
ON
ST
RU
CT
ION
DO
CU
ME
NT
S
DA
PW
Pro
ject
No.
49026008-2
0-0
40
TMM
09/01/2020
NTS1
PIPE GUIDE DETAIL
NTS2
U-BOLT TUNNEL PIPESUPPORT DETAIL
NOT TO SCALE3
CONDENSING HOT WATER BOILER DETAIL -ALTERNATE
NTS5
INLINE PUMP DETAIL
NTS4
COIL CONNECTION WITH 2-WAY PRESSUREINDEPENDENT VALVE
1 04/22/21 ADDENDUM 1
NOT TO SCALE6
EXISTING VTU WITH DIFFUSER DETAIL(FOR REFERENCE ONLY)
1
T H
RA
OA
EA
SP HSPTT
NC
T H
RA-LSP
RA-T
OA-D
PF-PD
MA-T
RA-H RA-D
EA-D
TEMP-LL
SA-RH
SA-T
SA-HS-ALMAMS
OA-F
NC
NO
AIR HANDLING UNIT (AHU-4 & 5) CONTROLS DIAGRAM
SP
RA-SP
T
PH-T
SMOKE DETECTOR FURNISHED AND INSTALLED BY DIV. 26 AND/OR DIV. 28
SD
SUPPLY FAN
VFD
SF-S
SF-SS
SF-DATA
SF-SPD
AFMSSA-F
SMOKE DETECTOR FURNISHED AND INSTALLED BY DIV. 26 AND/OR DIV. 28
SD
DP
HW
S
HW
R
HW-VLV
NO
HW
C
T
OA-T
AIR HANDLING UNIT (AHU-4 & 5) SEQUENCE OF OPERATION
SYSTEM DESCRIPTIONTHIS UNIT PROVIDES VENTILATION AIR, CONTROLS BUILDING PRESSURE, AND PROVIDES HEATED AIR TO ROOM GYMNASIUM. AHU SHALL BE PROVIDED WITH ITS OWN DDC MICROPROCESSOR BASED CONTROL SYSTEM TO ACHIEVE THESE SEQUENCES OF OPERATION. THE BAS SHALL FULLY INTEGRATE WITH AHU PACKAGED DDC CONTROLS AND ADDITIONAL DDC CONTROLS SHALL BE PROVIDED VIA BAS SHOULD AHU CONTROLS FURNISHED WITH AHU NECESSITATE THESE SUPPLEMENTAL CONTROLS. CONTROL SYSTEM SHALL BE CAPABLE OF OPERATING IN OCCUPIED OR UNOCCUPIED MODES. AN OVERRIDE SWITCH SHALL BE PROVIDED FOR EACH UNIT TO ALLOW UNITS OPERATE IN OCCUPIED MODE FOR 2 HOURS (ADJ).
THE UNIT IS AN AIR HANDLING UNITS EQUIPPED WITH THE FOLLOWING:
- SUPPLY FAN - HOT WATER HEATING COIL- MERV-8 FILTER BANK
EQUIPMENT CONTROLLED OUTSIDE OF AHU:
- OUTSIDE AIR DAMPER- RELIEF/EXHAUST AIR DAMPER- OUTSIDE AIRFLOW MEASURING STATION FURNISHED BY AHU MANUFACTURER.
OCCUPIED MODE:PROGRAMMED OPERATING SCHEDULE SHALL BE COORDINATED WITH THE OWNER.
SUPPLY FANSTART/STOP: UPON RECEIVING A SIGNAL TO START, AFTER A 60 SECOND (ADJ) TIME DELAY TO ALLOW ASSOCIATED SMOKE DAMPERS TO OPEN, THE BAS SHALL START THE SUPPLY FAN VIA THE VFD. OUTSIDE AIR DAMPER SHALL OPEN TO ITS MINIMUM POSITION.
THE BAS SHALL VARY THE SPEED OF THE SUPPLY FAN VIA THE VFD TO MAINTAIN THE SUPPLY AIR STATIC PRESSURE SET POINT.
INSTALL A CURRENT STATUS SWITCH TO PROVE SUPPLY FAN OPERATION. LOCATE SWITCH SO IT CAN SENSE FAN OPERATION IN BOTH NORMAL AND BYPASS MODE OF THE VFD.
HIGH STATIC ALARM: INSTALL A PRESSURE SENSOR DOWNSTREAM OF THE SUPPLY FAN BEFORE ANY COILS, DAMPERS, FILTERS, ETC. THE PRESSURE SENSOR SHALL BE HARD WIRED TO THE SUPPLY FAN. IF THE STATIC PRESSURE EXCEEDS THE SET POINT OF 3” WC (ADJ), THE SUPPLY FAN SHALL SHUT-DOWN, REQUIRE A MANUAL RESET, AND AN ALARM SHALL BE SENT TO THE BAS.
UNOCCUPIED MODETHE UNIT SHALL CYCLE TO OCCUPIED MODE OPERATION EXCEPT AS NOTED HEREIN TO MEET THE UNOCCUPIED SPACE TEMPERATURE SET POINTS (78°F SUMMER AND 65°F WINTER). THE OUTSIDE AIR DAMPER SHALL BE FULLY CLOSED DURING ALL UNOCCUPIED HOURS EXCEPT WHEN OUTSIDE AIR ENTHALPY IS LOWER THAN RETURN AIR ENTHALPY WHICH WOULD ALLOW THE OUTSIDE AIR DAMPER TO MODULATE TO PROVIDE 55°F SUPPLY AIR.
MORNING WARM-UPENABLED AT OUTSIDE AIR TEMPERATURES BELOW 50°F (ADJ).
PRIOR TO OCCUPIED MODE BEING ENABLED, AT A TIME DETERMINED BY THE BMS BASED ON OUTSIDE AIR TEMPERATURE AND THE HISTORIC TIME IT TAKES THE INDIVIDUAL ZONES TO REACH OCCUPIED SPACE TEMPERATURE SET POINTS, THE UNIT SHALL ENTER THE MORNING WARM-UP MODE. IN THIS MODE, ALL VAV BOXES WHOSE SPACE TEMPERATURES ARE BELOW THE OCCUPIED HEATING SET POINT SHALL MODULATE THEIR DAMPERS FULLY OPEN. THE AIR HANDLING UNIT’S DISCHARGE SET POINT SHALL BE SET FOR 90°F. ONCE THE SPACE TEMPERATURE REACHES THE OCCUPIED MODE HEATING SET POINT, THE VAV BOXES DAMPERS SHALL MODULATE TO THEIR CLOSED POSITION. ONCE EVERY SPACE HAS REACHED ITS OCCUPIED MODE HEATING SET POINT OR MORE THAN 10% OF THE SPACES HAVE EXCEEDED THEIR COOLING MODE SET POINT, THE AIR HANDLING UNIT SHALL RETURN TO ITS NORMAL OCCUPIED MODE OPERATION.
FILTERSPROVIDE DIFFERENTIAL PRESSURE SENSORS ACROSS FILTER BANK.
PROVIDE AN ALARM TO THE OPERATOR’S WORKSTATION IF DIFFERENTIAL PRESSURE EXCEEDS SET POINT OF 0.75” WC (ADJ) FOR MERV-8 PRE-FILTERS.
SMOKE DETECTOR SAFETIESDUCT MOUNTED SMOKE DETECTORS SHALL BE HARDWIRED INDEPENDENT OF THE BMS TO DE-ENERGIZE SUPPLY AND RELIEF AIR FAN VFD'S AND CLOSE OUTSIDE AIR AND EXHAUST AIR DAMPERS AFTER 90 SECONDS (ADJ) DELAY.
COOLINGWHEN THE MIXED AIR TEMPERATURE SENSOR IS ABOVE SET POINT OF 52°F (ADJ), THE FOLLOWING SHALL OCCUR IN SEQUENCE:
THE HEATING CONTROL SHALL BE LOCKED OUT WHEN UNIT IS IN COOLING MODE.
IF OUTSIDE AIR TEMPERATURE IS LOWER THAN RETURN AIR TEMPERATURE, THE OUTSIDE AIR DAMPER SHALL MODULATE OPEN TO SATISFY SUPPLY AIR TEMPERATURE SENSOR SETPOINT OF 55°F (ADJ).
IF OUTSIDE AIR TEMPERATURE IS HIGHER THAN RETURN AIR TEMPERATURE, THE OUTSIDE AIR DAMPER SHALL MODULATE TO ITS MINIMUM POSITION.
HEATINGUPON A CALL FOR HEATING FROM THE SPACE THERMOSTAT, THE FOLLOWING SHALL OCCUR IN SEQUENCE:
OUTSIDE AIR DAMPER SHALL BE DRIVEN TO ITS MINIMUM POSITION
HOT WATER HEATING CONTROL VALVE SHALL OPEN TO ITS MINIMUM POSITION AND MODULATE TO MAINTAIN SPACE TEMPERATURE SETPOINT.
SPC-T
ATU-F-S
PRESSURE INDEPENDENT SUPPLY VAV BOX
SUPPLYAIR
AIRFLOW MEASURING RING
WALL MOUNTED SENSORS
ATU-S-DMPR
DISCHARGEAIR
SPC-WC
SPC-OCOR
AIR TERMINAL UNIT VTU SEQUENCE OF OPERATION
1. AIR TERMINAL UNITS (“VAV BOXES” OR “VARIABLE-VOLUME TERMINAL UNITS”) POINTS LIST, SCHEMATIC DIAGRAM, AND SEQUENCES OF OPERATION SHALL BE IN COMPLETE AND STRICT ACCORDANCE WITH ASHRAE GUIDELINE 36-2018 HIGH-PERFORMANCE SEQUENCES OF
OPERATION FOR HVAC SYSTEMS, INCLUDING ALL ADDENDA PUBLISHED BY ASHRAE AS OF THE ISSUE DATE OF THIS DRAWING, WITH MODIFICATIONS ONLY AS FURTHER SPECIFIED HEREIN.
2. APPLY GUIDELINE 36 TABLE 3.1.1.1 SPACE TEMPERATURE SETPOINTS (HEATING, COOLING, OCCUPIED, AND UNOCCUPIED) EXCEPT THAT VAV UNOCCUPIED COOLING SETPOINT SHALL BE 85 degF.
3. ANYWHERE GUIDELINE 36 OFFERS AN OPTION BETWEEN ASHRAE STANDARD 62.1 VENTILATION REQUIREMENTS OR CALIFORNIA TITLE 24, COMPLY WITH THE ASHRAE STANDARD 62.1
PROVISIONS.
4. THE FOLLOWING PARAMETERS ARE DEFINED ON AIR TERMINAL UNIT SCHEDULES ELSEWHERE ON THESE DRAWINGS:
a. ZONE MAXIMUM COOLING CFM, MAXIMUM HEATING CFM, AND MINIMUM AIRFLOW CFM.
b. ZONE MAXIMUM HEATING SUPPLY TEMPERATURE.c. CO2 SETPOINTS, IF APPLICABLE.
5. APPLY GUIDELINE 36 TABLE 4.1 FOR COOLING-ONLY AIR TERMINAL UNITS. APPLY TABLE 4.2 FOR AIR TERMINAL UNITS WITH REHEAT.
6. APPLY GUIDELINE 36 SEQUENCE 5.5 FOR COOLING-ONLY AIR TERMINAL UNITS AND SEQUENCE 5.6 FOR AIR TERMINAL UNITS WITH REHEAT (INCLUDING ALL REFERENCED TABLES, PARAGRAPHS, AND SECTIONS INVOKED THEREIN).
ACTN.C.
FACTORY-MOUNTED DAMPER ACTUATOR
T
DISCONNECT PNEUMATIC CONTROLS FROM EXIST. VAV TERMINAL
7. WHEN VAV IS AT ITS MINIMUM POSITION AND THERE IS A CALL FOR HEAT THE FINNED TUBE CONTROL VALVE SHALL OPEN TO ITS MINIMUM POSITION. THE CONTROL VALVE SHALL MODULATE TO MAINTAIN SPACE TEMP. SETPOINT. IF THE CONTROL VALVE IS AT ITS MINIMUM POSITION AND THERE IS NO CALL FOR HEAT FOR 10 MINUTES (ADJ) THE FINNED TUBE VALVE SHALL CLOSE.
1
HX-1
1/3 VALVE
HEAT EXCHANGER (HX-X) SEQUENCE OF OPERATION
SYSTEM IS EXISTING AND THE INTENT IS TO REPLACE THE PNEUMATIC CONTROLLERS WITH NEW DDC CONTROLLERS. THE SEQUENCE OF OPERATION SHALL REMAIN AS-IS. THE DIAGRAM IS SHOWN FOR REFERENCE ONLY AND EXACT QTY OF PNEUMATIC CONTROLLERS
THAT NEED REPLACED SHALL BE VERIFIED IN FIELD. ALL VALVES, SENSORS, ETC. INDICATED IN THE STEAM OR HHW SYSTEM SHALL
BE REPLACED.
STEAM TO HEATING HOT WATER CONTROLS DIAGRAM
LPS
LPR
HWS
HWR
TO BUILDING HEATING HOT WATER LOOP
FROM BUILDING HEATING HOT WATER PUMPS
2/3 VALVE
BUILDING STEAM PRESSURE
REDUCING VALVE
DOMESTIC WATER HEATER
M
LPR METER
DUPLEX CONDENSATE
RECEIVER PUMPLPR PC
CRP-1
MPS
HX-1 ISO
HWS-T
HWR-T
M
T
T
STEAM METER WILL BE MONITORED BY CAMPUS UTILITIES. IT WILL NOT BE CONNECTED TO BMS.
HWS-T
T
REPLACE PNEUMATIC CONTROL VALVES WITH NEW DDC CONTROL VALVES. BASE VALVE SELECTION ON A TOTAL STEAM LOAD OF 4,793 LBS/HR AT 2 PSI STEAM PRESSURE.
1
1
8250 H
AV
ER
ST
ICK
RD
S
UIT
E 2
85,
IND
IAN
AP
OLIS
, IN
46240
T
317.6
38.8
383
w
ww
.rossbar.
com
CHECKED BY:
© ROSS & BARUZZINI, INC. 2020
ISSUE DATE:
RB PROJ. NO.:
DESIGNED BY:
DRAWING TITLE:
DRAWING NO.:
WHEN THIS DRAWING IS
REPRODUCED AT ORIGINAL SCALE THIS BAR = 1 INCH
REVISIONS:
The Professional Engineer, whose signature and personal seal appear on
this document, assumes responsibility only for what appears hereon, and
disclaims responsibility for all other plans, specifications, estimates,
reports, documents or instruments not sealed by the Professional Engineer
relating to, or intended to be used for, any part or parts of the engineering
project to which this document refers. Prints sealed by the Engineer bear
the embossed or wet seal of the Engineer across the signature and date.
Copies of this document, as signed and sealed, have been retained by the
Professional Engineer. The Professional Engineer will not be responsible
for subsequent changes to this document, unless the changes are made
by the Engineer or with the Engineer's written authorization.
1 INCH
DATE DESCRIPTION
Dwg: of:
4/2
2/2
02
1 5
:28:3
6 P
M
2148-02
M502
TMM
India
na S
chool fo
r th
e D
eaf,
Build
ing #
8 H
VA
C R
enovation
1200 E
42nd S
t, India
napolis
, IN
46205
MECHANICAL CONTROLS
Ind
iana
Sch
ool F
or
Th
e D
ea
f
PR
OJE
CT
ST
AT
US
: C
ON
ST
RU
CT
ION
DO
CU
ME
NT
S
DA
PW
Pro
ject
No.
49026008-2
0-0
40
TMM
09/01/2020
AIR HANDLING UNIT (AHU-X) POINTS LIST - NO HEAT RECOVERY
CONTROLPOINT TAG SYSTEM POINT DESCRIPTION
INPUTS OUTPUTS ALARM REPORTS
NOTESDI AI DO AO HIG
H\L
OW
LIM
IT
SA
FE
TY
MA
INT
AN
EN
CE
AB
NO
RM
AL
ON
/OF
F O
PE
N/C
LO
SE
ALA
RM
RU
N T
IME
TO
TA
LIZ
AT
ION
TR
EN
D
BLD-P BUILDING PRESSURE ● ● ● ● (1)
EA-D EXHAUST AIR DAMPER ● ●
HW-VLV _____HEATING WATER VALVE OPEN/CLOSE ● ●
LPS-VLV _____HEATING WATER VALVE OPEN/CLOSE ● ●
MA-T MIXED AIR TEMPERATURE ● ● ● ●
OA-D OUTSIDE AIR DAMPER ● ● (3)
OA-F OUTSIDE AIRFLOW ● ●
OA-T OUTDOOR AIR TEMPERATURE ● ● (1)
PF-PD _____PRE-FILTER PRESSURE DROP ● ● ● ●
PH-T _____PRE-HEAT TEMPERATURE ● ● ● ●
RA-D RETURN AIR DAMPER ● ●
RA-H RETURN AIR HUMIDITY ● ● ● ● (2)
RA-LSP RETURN AIR STATIC PRESSURE ● ● ● ●
RA-SP RETURN AIR STATIC PRESSURE ● ● ● ●
RA-T RETURN AIR TEMPERATURE ● ● ● ●
RF-DATA RETURN FAN VFD DATA ● ● ● ● ● (2)
RF-S RETURN FAN STATUS ● ● ● ● ●
RF-SPD RETURN FAN VFD SPEED ● ●
RF-SS RETURN FAN START/STOP ● ●
SA-F SUPPLY AIRFLOW ● ●
SA-HS-ALM SUPPLY AIR HIGH STATIC ALARM ● ● ● ●
SA-RH _____SUPPLY AIR HIGH HUMIDITY ● ● ● ● (2)
SA-T SUPPLY AIR TEMPERATURE ● ● ● ●
SF-DATA SUPPLY FAN VFD DATA ● ● ● ● ● (2)
SF-S SUPPLY FAN STATUS ● ● ● ● ●
SF-SPD SUPPLY FAN VFD SPEED ● ●
SF-SS SUPPLY FAN START/STOP ● ●
TEMP-LL _____FREEZESTAT ● ● ● ● (2)
ATU (VAV) WITH REHEAT POINTS LIST
CONTROLPOINT TAG SYSTEM POINT DESCRIPTION
INPUTS OUTPUTS ALARM REPORTS
NOTESDI AI DO AO HIG
H\L
OW
LIM
IT
SA
FE
TY
MA
INT
AN
EN
CE
AB
NO
RM
AL
ON
/OF
F O
PE
N/C
LO
SE
ALA
RM
RU
N T
IME
TO
TA
LIZ
AT
ION
TR
EN
D
ATU-F-S SUPPLY AIR FLOW ● ●
ATU-S-DMPR SUPPLY AIR DAMPER POSITION MODULATION ● ●
SPC-OCOR OCCUPANCY OVERRIDE ● ● (2)
SPC-T SPACE TEMPERATURE ● ● ● ●
SPC-T SPACE TEMPERATURE ● ● ● ●
SPC-WC SETPOINT WARM-COOL ADJUSTMENT ● ● (2)
STEAM TO HEATING HOT WATER SYSTEM POINTS LIST
CONTROL POINT TAG SYSTEM POINT DESCRIPTION
INPUTS OUTPUTS ALARM REPORTS
NOTESDI AI DO AO HIG
H\L
OW
LIM
IT
SA
FE
TY
MA
INT
AN
EN
CE
AB
NO
RM
AL
ON
/OF
F O
PE
N/C
LO
SE
ALA
RM
RU
N T
IME
TO
TA
LIZ
AT
ION
TR
EN
D
B1-HWS-F HOT WATER SUPPLY FLOW ● ● ● ●
B1-HWS-T HOT WATER SUPPLY TEMERATURE ● ● ● ●
HW-BYP-VLV BYPASS VALVE ●
HW-BYP-VLV-P BYPASS VALVE POSITION
HWR-T HOT WATER RETURN TEMPERATURE BEFORE BYPASS ● ● ● ●
HWR-T2 HOT WATER RETURN TEMPERATURE AFTER BYPASS ● ● ● ●
HWS-F HOT WATER SYSTEM SUPPLY FLOW ●
HWS-T HOT WATER SUPPLY TEMPERATURE ● ● ● ●
P1-A VFD ALARM ● ● ● ● ●
P1-FT VFD FAULT ● ●
P1-S STATUS ● ● ● ● ●
P1-SP VFD SPEED ● ● ● ● ●
P1-SS ENABLE/DISABLE ● ● ● ● ●
P2-A VFD ALARM ● ● ● ● ●
P2-FT VFD FAULT ● ●
P2-S STATUS ● ● ● ● ●
P2-SP VFD SPEED ● ● ● ● ●
P2-SS ENABLE/DISABLE ● ● ● ● ●
1 04/22/21 ADDENDUM 1
HUMIDIFIER SCHEDULEUNIT
NUMBERLOCATION
HUMIDIFIERCONFIGURATION
TOTALAIRFLOW
(CFM)
MIN.OA(CFM)
DESIGNDB/WB(DEG F)
HUMIDIFICATIONSTEAM
(LBS/HR)
SOURCESTEAM
(PSI)
DUCTWIDTH
(IN)
DUCTHEIGHT
(IN)
ABSORPTIONDISTANCE-MAX
(IN)
BASIS OFDESIGN
NOTES
AHU-1 Roof HORIZ. DUCT 10650 5050 70/55.6 127 2 93 60 36 HygroMatik DDS 1,2,3,4
AHU-2 Roof HORIZ. DUCT 11600 5500 70/55.6 139 2 93 60 36 HygroMatik DDS 1,2,3,4
AHU-3 Basement Mech. Room HORIZ. DUCT 7360 4200 70/55.6 106 2 93 54 36 HygroMatik DDS 1,2,3,4
AHU-6 Roof HORIZ. DUCT 13600 5000 70/55.6 126 2 93 70 36 HygroMatik DDS 1,2,3,4
AHU-7 Roof HORIZ. DUCT 9800 4800 70/55.6 121 2 93 54 36 HygroMatik DDS 1,2,3,4
AHU-8 Roof HORIZ. DUCT 11500 6200 70/55.6 156 2 93 60 36 HygroMatik DDS 1,2,3,4
AHU-9 Roof HORIZ. DUCT 8550 4000 70/55.6 101 2 93 54 36 HygroMatik DDS 1,2,3,4
NOTES:
1. INSTALL HUMIDIFIER DISTRIBUTORS IN AIR DUCT. SEAL AROUND DISTRIBUTOR AIR TIGHT. VERIFY EXACT DIMENSIONS.
2. HUMIDIFIER MODULATING ELECTRIC ACTUATOR TO ACCEPT 0-10 VDC CONTROL SIGNAL FROM BAS SYSTEM.
3. PROVIDE WALL MOUNTED MODULATING CONTROL, DUCT MOUNTED HI-LIMIT HUMIDISTAT AND AIR PROVING SWITCH.
4. PROVIDE STAINLESS STEEL DRAIN PAN UNDER HUMIDIFIER DISTRIBUTORS.
8250 H
AV
ER
ST
ICK
RD
S
UIT
E 2
85,
IND
IAN
AP
OLIS
, IN
46240
T
317.6
38.8
383
w
ww
.rossbar.
com
CHECKED BY:
© ROSS & BARUZZINI, INC. 2020
ISSUE DATE:
RB PROJ. NO.:
DESIGNED BY:
DRAWING TITLE:
DRAWING NO.:
WHEN THIS DRAWING IS
REPRODUCED AT ORIGINAL SCALE THIS BAR = 1 INCH
REVISIONS:
The Professional Engineer, whose signature and personal seal appear on
this document, assumes responsibility only for what appears hereon, and
disclaims responsibility for all other plans, specifications, estimates,
reports, documents or instruments not sealed by the Professional Engineer
relating to, or intended to be used for, any part or parts of the engineering
project to which this document refers. Prints sealed by the Engineer bear
the embossed or wet seal of the Engineer across the signature and date.
Copies of this document, as signed and sealed, have been retained by the
Professional Engineer. The Professional Engineer will not be responsible
for subsequent changes to this document, unless the changes are made
by the Engineer or with the Engineer's written authorization.
1 INCH
DATE DESCRIPTION
Dwg: of:
4/2
2/2
02
1 5
:28:3
6 P
M
2148-02
M601
TMM
India
na S
chool fo
r th
e D
eaf,
Build
ing #
8 H
VA
C R
enovation
1200 E
42nd S
t, India
napolis
, IN
46205
MECHANICAL SCHEDULES
Ind
iana
Sch
ool F
or
Th
e D
ea
f
PR
OJE
CT
ST
AT
US
: C
ON
ST
RU
CT
ION
DO
CU
ME
NT
S
DA
PW
Pro
ject
No.
49026008-2
0-0
40
TMM
09/01/2020
2. PROVIDE AS AN ALTERNATE PRICE.
1. MANUFACTURER TO PROVIDE UNIT MOUNTED NON-FUSED DISCONNECT SWITCH. REUSE EXISTING ROOF CURB.
NOTES:
CONDENSING UNIT SCHEDULE
MARK
MFR. MODEL LOCATION SERVICE
COOLING OA TEMP COMPRESSOR CONDENSER
UNIT EER REFRIG
ELECTRICAL DATA
NOTESID # CAP (MBH)
DESIGN AMB(°F)
MIN AMB(°F)
QTYTONS
EA
AIR COOLEDFLA VOLTS
PHASEQTY FANS HP EA NOM RPM
CU 1 AAON CFA-050-D-A-8-GC00K ROOF AHU-1 538.9 95 45 4 12.5 4 0.75 1170 14.4 R410A 74 480 3 1
CU 2 AAON CFA-050-D-A-8-GC00K ROOF AHU-2 538.9 95 45 4 12.5 4 0.75 1170 14.4 R410A 74 480 3 1
CU 3 AAON CFA-025-C-A-8-DC00K ROOF AHU-3 280.4 95 45 2 12.5 4 0.75 1170 13.0 R410A 53 480 3 1, 2
CU 6 AAON CFA-040-D-0-8-GC00K ROOF AHU-6 453.5 95 45 4 10 4 1.5 1170 13.9 R410A 89 480 3 1
CU 7 AAON CFA-050-D-A-8-GC00K ROOF AHU-7 538.9 95 45 4 12.5 4 0.75 1170 13.4 R410A 74 480 3 1
CU 8 AAON CFA-050-D-A-8-GC00K ROOF AHU-8 538.9 95 45 4 12.5 4 0.75 1170 13.4 R410A 74 480 3 1
CU 9 AAON CFA-040-D-0-8-GC00K ROOF AHU-9 402.2 95 45 4 10 4 0.75 1170 13.8 R410A 53 480 3 1
5. PROVIDE AS AN ALTERNATE PRICE.
4. VFD TO PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR.
3. FUSED DISCONNECT SWITCH TO BE PROVIDED AND INSTALLED BY MANUFACTURER.
2. PROVIDE WITH INVERTER-READY OR INVERTER-DUTY MOTOR FOR VARIABLE SPEED OPERATION.
1. SOUND POWER LEVEL RATINGS SHOWN IN DECIBELS, REFERRED TO 10(-12) WATTS CALCULATED PER AMCA STANDARD 301.
NOTES:
FAN SCHEDULE
MARK
MFR. MODEL TYPE LOCATION SERVICE DRIVEAIRFLOW
(CFM)ESP (IN WC)
MAX FANSPEED (RPM)
MOTORSPEED (RPM)
MIN STATICEFF (%)
DESIGN DRIVELOSS (%)
MIN FAN EFF.GRADE
MAX SOUND POWER RATING (INLET / OUTLET)MAX WEIGHT
(LBS)
ELECTRICAL DATA
NOTESID #
OCTAVEAMPS HP VOLTS PHASE
63 125 250 500 1000 2000 4000 8000
IRF 3 GREENHECK BSQ-240-30 INLINE CENTRIFUGAL BASEMENT MECH. ROOM AREA B BELT 7,360 0.75 905 1725 43 4.8 65 83 86 87 79 78 74 67 61 450 4.8 3 460 3 1, 2, 3, 4, 5
WRF 1 GREENHECK CUBE-300-50 UPBLAST CENTRIFUGAL ROOF PENTHOUSE BELT 11,600 1 858 1725 43 4.0 65 85 90 92 82 79 74 69 65 350 7.6 5 460 3 1, 2, 3, 4
WRF 2 GREENHECK CUBE-300-50 UPBLAST CENTRIFUGAL ROOF PENTHOUSE BELT 11,600 1 858 1725 43 4.0 65 85 90 92 82 79 74 69 65 350 7.6 5 460 3 1, 2, 3, 4
WRF 6 GREENHECK CUBE-300-50 UPBLAST CENTRIFUGAL ROOF PENTHOUSE BELT 12,000 1 878 1725 41 4.0 65 85 91 93 83 80 75 70 66 350 7.6 5 460 3 1, 2, 3, 4
WRF 7 GREENHECK CUBE-300-50 UPBLAST CENTRIFUGAL ROOF PENTHOUSE BELT 11,600 1 858 1725 43 4.0 65 85 90 92 82 79 74 69 65 350 7.6 5 460 3 1, 2, 3, 4
WRF 8 GREENHECK CUBE-300-50 UPBLAST CENTRIFUGAL ROOF PENTHOUSE BELT 11,600 1 858 1725 43 4.0 65 85 90 92 82 79 74 69 65 350 7.6 5 460 3 1, 2, 3, 4
WRF 9 GREENHECK CUBE-300HP-50 UPBLAST CENTRIFUGAL ROOF PENTHOUSE BELT 8,550 1 919 1725 41 4.2 65 84 87 89 84 80 78 75 69 350 7.6 5 460 3 1, 2, 3, 4
2. PROVIDE AS AN ALTERNATE PRICE.
1. ELECTRICAL CONTRACTOR TO PROVIDE MOTOR STARTER AND DISCONNECT SWITCH.
NOTES:
PUMP SCHEDULE
MARKMFR. MODEL TYPE LOCATION SERVICE
WATER FLOW(GPM)
TDH (FT) MIN EFF (%)MOTOR
SPEED (RPM)
ELECTRICAL DATANOTES
ID # AMPS WATTS VOLTS PHASE
P 1 BELL & GOSSETT NRF-33 INLINE CENTRIFUGAL ROOF AHU-1 22 6 94% 2950 1.1 .125 120 1 1
P 2 BELL & GOSSETT NRF-33 INLINE CENTRIFUGAL ROOF AHU-2 22 6 94% 2950 1.1 .125 120 1 1
P 3 BELL & GOSSETT NRF-45 INLINE CENTRIFUGAL BASEMENT MECH. ROOM AHU-3 35 10 94% 3300 2.1 .270 120 1 1, 2
P 4 BELL & GOSSETT NRF-33 INLINE CENTRIFUGAL ROOF AHU-4 25 10 94% 2950 1.1 .125 120 1 1
P 5 BELL & GOSSETT NRF-33 INLINE CENTRIFUGAL ROOF AHU-5 25 10 94% 2950 1.1 .125 120 1 1
P 6 BELL & GOSSETT NRF-33 INLINE CENTRIFUGAL ROOF AHU-6 27 6 94% 2950 1.1 .125 120 1 1
P 7 BELL & GOSSETT NRF-33 INLINE CENTRIFUGAL ROOF AHU-7 22 6 94% 2950 1.1 .125 120 1 1
P 8 BELL & GOSSETT NRF-33 INLINE CENTRIFUGAL ROOF AHU-8 22 6 94% 2950 1.1 .125 120 1 1
P 9 BELL & GOSSETT NRF-22 INLINE CENTRIFUGAL ROOF AHU-9 18 13 94% 2940 0.8 .92 120 1 1
3. PROVIDE WITH MANUFACTURER'S SIDEWALL TERMINATION KITS.
2. PROVIDE WITH CONDENSATE NEUTRALIZATION KIT.
1. PROVIDE WITH FLUE CONDENSATE DRAIN TRAP.
NOTES:
BOILER SCHEDULE (BOILER SYSTEM ALTERNATE)
MARK
MFR. MODEL TYPE LOCATION SERVICENOM.
BOILERHP
CAPACITY (MBH)DESIGN
WATER FLOW(GPM)
MAX WATERPD (PSIG)
MIN WATERFLOW (GPM)
WATER TEMP (°F) BURNER ELECTRICAL DATA
NOTESID #
GROSSINPUT
GROSSOUTPUT
MIN DESIGNEFF (% @
FULL FIRE)SUPPLY
DESIGNTD
NATURAL GAS
AMPS VOLTS PHASECFH
PRESSRANGE (PSI)
B 1 LOCHINVAR KBN801 NAT. GAS BASEMENT MECH. ROOM AREA B 89.6 800 752 94 50 3.0 10 180 30 800 2 15 120 1 2, 3
B 2 LOCHINVAR KBN801 NAT. GAS BASEMENT MECH. ROOM AREA B 89.6 800 752 94 50 3.0 10 180 30 800 2 15 120 1 2, 3
10. PROVIDE HYGROMATIK DDS MODEL DIRECT STEAM INJECTION HUMIDIFIER. ABSORPTION DISTANCE TO BE NO GREATER THAN 36", VERIFY DUCT SIZE WITH EXISTING CONDITIONS.
9. NOT USED.
8. UNIT SPLITS SHALL BE SIZED TO ALLOW TO FIT THRU A STANDARD 36" SINGLE DOOR. IF SECTIONS ARE TOO LARGE TO FIT THRU DOOR THEN WALL LOUVER AND DUCTWORK TO BE REMOVED AND REINSTALLED TO MATCH EXISTING AT NO CHANGE IN...
7. PROVIDE PRICING UNDER BASEMENT AIR HANDLER ALTERNATE.
6. UNIT TO BE MOUNTED ON EQUIPMENT RAIL OF SUFFICIENT HEIGHT TO ALLOW FULL SIZE CONDENSATE TRAP FROM UNIT.
5. MANUFACTURER TO PROVIDE VFD'S AND NON-FUSED DISCONNECT SWITCHES; THAT ARE TO BE INSTALLED BY ELECTRICAL CONTRACTOR.
4. PROVIDE UNIT WITH SINGLE POINT ELECTRICAL CONNECTION.
3. PROVIDE WITH INVERTER-READY OR INVERTER-DUTY MOTOR FOR VARIABLE SPEED OPERATION.
2. SOUND POWER LEVEL RATINGS SHOWN IN DECIBELS, REFER TO 10(-12) WATTS CALCULATED PER AMCA STANDARD 301.
1. REFERENCE SPECIFIC EQUIPMENT COMPONENT FOR ELECTRICAL DATA WHEN MULTIPLE POWER CONNECTIONS ARE REQUIRED.
NOT...
AIR HANDLING UNIT SCHEDULE (1)
MARK
MFR. MODEL TYPE LOCATION MIN. OA (CFM)MAX SIZE(LxWxH)
MAXOPERATING
WEIGHT (LBS)
SUPPLY FAN
NOTESID #
TOTALAIRFLOW
(CFM)
STATIC PRESSUREDRIVE
MAX WHEELSIZE (IN)
MAX FANSPEED (RPM)
MIN. FAN EFF.(%)TSP (IN WC) ESP (IN WC)
AHU 1 AAON M2-H-022-R-3 SPLIT DX ROOF 5050 10'10x7'9x5'0 2966 10650 3.92 2.5 BELT 27.4 1477 57.6 2, 3, 4, 5, 6, 8, 10
AHU 2 AAON M2-H-022-R-3 SPLIT DX ROOF 5500 10'10x7'9x5'0 2966 11600 4.08 2.5 BELT 27.4 1558 56.4 2, 3, 4, 5, 6, 8, 10
AHU 3 AAON M2-H-018-R-3 SPLIT DX BASEMENT MECH. ROOM 4200 10'4x7'9x4'6 2559 7360 1.91 1.0 BELT 24.5 1302 54.1 2, 3, 4, 5, 6, 7, 8, 10
AHU 4 AAON M2-H-018-R-3 HTG ONLY ROOF 5050 8'8x7'9x4'6 2089 10000 1.84 1.0 BELT 27.4 1192 48.0 2, 3, 4, 5, 6, 8, 9
AHU 5 AAON M2-H-018-R-3 HTG ONLY ROOF 5050 8'8x7'9x4'6 2089 10000 1.84 1.0 BELT 27.4 1192 48.0 2, 3, 4, 5, 6, 8, 9
AHU 6 AAON M2-H-026-R-3 SPLIT DX ROOF 5000 11'4x7'9x5'10 3519 13600 3.94 2.5 BELT 27.4 1692 52.1 2, 3, 4, 5, 6, 9, 10
AHU 7 AAON M2-H-022-R-3 SPLIT DX ROOF 4800 10'9x7'4x4'6 2565 9800 4.11 2.5 BELT 24.5 1793 55.8 2, 3, 4, 5, 6, 8, 10
AHU 8 AAON M2-H-022-R-3 SPLIT DX ROOF 6200 10'10x7'9x5'0 2969 11500 4.07 2.5 BELT 27.4 1548 56.5 2, 3, 4, 5, 6, 8, 10
AHU 9 AAON M2-H-018-R-3 SPLIT DX ROOF 4000 10'4x7'9x4'6 2565 8550 3.88 2.5 BELT 24.5 1646 57.5 2, 3, 4, 5, 6, 8, 10
NOTES:
AIR HANDLING UNIT SCHEDULE (2)
MARK HEATING HOT WATER COIL
ID #CAPACITY
(MBH)MAX FACE
VELC. (FPM)EAT (°F) LAT (ºF)
WATER FLOW(GPM)
EWT (°F) LWT (ºF) ROWSMAX PD
AIR (IN WC) WATER (FT)
AHU 1 333.6 500 42 70 22 180 147 1 0.1 2
AHU 2 408.1 500 42 70 22 180 140.5 1 0.1 2
AHU 3 303.9 500 40 95 35 180 161.5 1 0.1 4.4
AHU 4 575.9 500 -5 95 25 180 130.9 2 0.1 4
AHU 5 575.9 500 -5 95 25 180 130.9 2 0.1 4
AHU 6 466.3 500 48 70 27 180 143.2 1 0.1 1.7
AHU 7 343.1 500 42 70 22 180 139.4 1 0.1 2
AHU 8 418.2 500 42 70 22 180 139.5 1 0.1 2
AHU 9 318.4 500 42 70 18 180 142.3 1 0.1 1.7
NOTES:
AIR HANDLING UNIT SCHEDULE (3)
MARK DIRECT EXPANSION COIL
ID #CAPACITY (MBH) MAX FACE
VELC. (FPM)
EATLAT (°F)
REFRIGERANT TYPE
# OFCIRCUITS
MAX PD AIR(IN WC)
CONDENSINGUNIT ID #SENS. TOTAL DB (°F) WB (°F)
AHU 1 350.4 509.4 400 84.48 68.62 55.75 R-410A 4 0.5 CU-1
AHU 2 375.3 540.4 400 84.48 68.62 56.37 R-410A 4 0.5 CU-2
AHU 3 197.6 273.3 400 86.41 69.86 62.84 R-410A 4 0.5 CU-3
AHU 4 - - - - -
AHU 5 - - - - -
AHU 6 427.8 609.4 400 82.35 67.21 55.15 R-410A 4 0.5 CU-6
AHU 7 316.1 456.1 400 84.80 68.83 56.77 R-410A 4 0.5 CU-7
AHU 8 382.2 557.6 400 85.78 69.46 56.84 R-410A 4 0.5 CU-8
AHU 9 281.8 409.7 400 84.36 68.54 55.54 R-410A 4 0.5 CU-9
NOTE...
AIR HANDLING UNIT SCHEDULE (4)
MARK FILTERS MAX SOUND POWER RATING (DISCHARGE / INLET / RADIATED) ELECTRICAL DATA
ID #
PRE OCTAVE BAND (HZ)FULL LOAD
AMPS
MAX.OVERCURRENT
PROTECTIONVOLTS PHASE
TYPEDESIGN APD
(IN WC)63 125 250 500 1000 2000 4000 8000
AHU 1 MERV 8 0.2 92 90 89 88 88 87 85 85 27 20 480 3
AHU 2 MERV 8 0.2 93 92 91 90 90 88 86 85 27 20 480 3
AHU 3 MERV 8 0.2 85 84 83 83 82 80 78 77 11 7.5 480 3
AHU 4 MERV 8 0.2 88 87 86 85 85 81 78 78 14 10 480 3
AHU 5 MERV 8 0.2 88 87 86 85 85 81 78 78 14 10 480 3
AHU 6 MERV 8 0.2 96 95 94 93 93 91 86 86 27 20 480 3
AHU 7 MERV 8 0.2 93 92 91 90 90 89 86 85 21 15 480 3
AHU 8 MERV 8 0.2 93 92 91 90 90 88 86 85 27 20 480 3
AHU 9 MERV 8 0.2 91 90 89 89 88 87 84 83 21 15 480 3
1. PROVIDE WALL SLEEVE ADAPTER TO UTILIZE EXISTING WALL OPENINGS.
NOTES:
PACKAGE TERMINAL AIR CONDITIONER SCHEDULE - ALTERNATE
MARK
MFR. MODEL TYPE LOCATIONTOTAL
AIRFLOW(CFM)
MIN. OA (CFM)
COOLING DATA HEATING DATA ELECTRICAL DATA
NOTESID # AMBIENT (ºF) EAT (ºF)
TOTAL(MBH)
MIN EFF(SEER)
AMBIENT (ºF) EAT
(°F)TYPE
CAP(MBH)
CONTROL AMPS HP VOLTS PHASE
DB WB DB WB DB
PTAC 1 FRIEDRICH PZE12R3SB-A ELECTRIC HEAT *SEE PLANS 470 75 95 72 78 65 12 10.6 -5 50 ELECTRIC 12.3 REMOTE TSTAT 5.92 0.1 265 1 1
1 04/22/21 ADDENDUM 1
4. PROVIDE WITH MANUFACTURER INSTALLED VFD.
3. PROVIDE POWERED BAROMETRIC RELIEF AND FULL ENTALPY ECONOMIZER FUNCTION WITH WEATHER HOODS AND BIRD SCREENS.
2. PROVIDE MANUFACTURER'S CURB ADAPTER TO ALLOW REUSE OF EXISTING ROOF CURB.
1. PROVIDE DISCONNECT SWITCH, GFI POWER OUTLET FIELD WIRED. RETURN AIR SMOKE DETECTORS PROVIDED AND WIRED BY EC, INSTALLED BY MC.
NOTES:
PACKAGED ROOFTOP UNIT SCHEDULE
MARK
MFR. MODEL TYPE LOCATION SERVICEMAX WEIGHT
W/ CURB(LBS)
SUPPLY FAN DIRECT EXPANSION COOLING PERFORMANCE
FILTER
MAX SOUND POWER RATING (DISCHARGE) ELECTRICAL DATA
NOTESID #
TOTALAIRFLOW
(CFM)MIN. OA (CFM)
STATIC PRESSUREDRIVE
CAPACITY (MBH) EAT (°F) LAT (°F)REFRIGERANT
TYPE
OCTAVE BAND (HZ)AMPS HP VOLTS PHASE
TSP (IN WC) ESP (IN WC) SENS. TOTAL DB WB DB WB 63 125 250 500 1000 2000 4000 8000
RTU 1 AAON RN-008-3-0-GB02 PACKAGED ROOF GYM 1500 2250 795 1.38 0.5 BELT 65.75 96.27 80 67 400 53.5 R-410A MERV 8 81 79 83 79 72 69 66 60 17 2 480 3 1, 2, 3, 4
RTU 2 AAON RN-008-3-0-GB02 PACKAGED ROOF GYM 1500 2250 795 1.38 0.5 BELT 65.75 96.27 80 67 400 53.5 R-410A MERV 8 81 79 83 79 72 69 66 60 17 2 480 3 1, 2, 3, 4
RTU 3 AAON RN-008-3-0-GB02 PACKAGED ROOF GYM 1500 2250 795 1.38 0.5 BELT 65.75 96.27 80 67 400 53.5 R-410A MERV 8 81 79 83 79 72 69 66 60 17 2 480 3 1, 2, 3, 4
RTU 4 AAON RN-008-3-0-GB02 PACKAGED ROOF GYM 1500 2250 795 1.38 0.5 BELT 65.75 96.27 80 67 400 53.5 R-410A MERV 8 81 79 83 79 72 69 66 60 17 2 480 3 1, 2, 3, 4
1
1
L
4
M301
42x44 RA 46x14 SA
32x44 R
A
36x30 RA
48x44 RA
8" HPS
6" LPS
PIPING TO/FROM TUNNEL
EXISTING WALL LOUVER TO REMAIN
EXISTING WALL LOUVER TO REMAIN
GENERAL MECH. ROOM EXHAUST FAN TO REMAIN.REPLACE DAMPER ACTUATOR AND FAN CONTROLS WITH DDC.
EXISTING HW STORAGE TANK TO REMAIN
EXISTING EXPANSION TANK TO REMAIN
12x10 S
A
SUPPLY AIR TO SERVE BOWLING ALLEY
6" LPS
4" PC
8" HPS
1 1/2" LPS
EXISTING STEAM TO HHW HEAT EXCHANGER TO REMAIN
PNEUMATIC CONTROLS AIR COMPRESSOR TO BE DISCONNECTED AND DEMOLISHED. EXISTING HOUSEKEEPING PAD TO BE EXTENDED AS NECESSARY TO ACCOMODATE NEW WORK.
4" PC
PROVIDE AS AN ALTERNATE PRICE: CSAC-3 TO BE DISCONNECTED AND DEMOLISHED. DUCTWORK TO BE REMOVED AS NECESSARY TO INSTALL NEW EQUIPMENT. SEE ROOF PLANS FOR DEMO OF CU-3.
12x10 S
A
MECH ROOM Cooridor
1308
Bowling Alley
1309
EXISTING CONDENSATE REMOVAL PUMP TO REMAIN
EXISTING ELECTRICAL CLEARANCE SPACE
DEMOLISH PNEUMATIC DAMPER ACTUATOR AND REPLACE WITH NEW.
BASEMENT AIR HANDLER ALTERNATE:CAP EXIST. STEAMDISTRIBUTION PIPING TO HUMIDIFIER
2
2
1
3
3
3
DEMOLISH PNEUMATIC TC PANEL
DEMOLISH EXISTING CONDENSATE PUMP PNEUMATIC CONTROLS W/ NEW DDC CONTROLLERS 1
A. BASE BID SCOPE TO UPGRADE CONTROLS; CONTROLLERS, ACTUATORS, VALVES, ETC. TO BE RETROFITTED FROM PNEUMATIC CONTROLS TO FULL DDC CONTROLS.
B. BASEMENT AHUR ALTERNATE: PROVIDE DEMOLITION WORK AS INDICATED ON THIS SHEET.
GENERAL SHEET NOTES
8250 H
AV
ER
ST
ICK
RD
S
UIT
E 2
85,
IND
IAN
AP
OLIS
, IN
46240
T
317.6
38.8
383
w
ww
.rossbar.
com
CHECKED BY:
© ROSS & BARUZZINI, INC. 2020
ISSUE DATE:
RB PROJ. NO.:
DESIGNED BY:
DRAWING TITLE:
DRAWING NO.:
WHEN THIS DRAWING IS
REPRODUCED AT ORIGINAL SCALE THIS BAR = 1 INCH
REVISIONS:
The Professional Engineer, whose signature and personal seal appear on
this document, assumes responsibility only for what appears hereon, and
disclaims responsibility for all other plans, specifications, estimates,
reports, documents or instruments not sealed by the Professional Engineer
relating to, or intended to be used for, any part or parts of the engineering
project to which this document refers. Prints sealed by the Engineer bear
the embossed or wet seal of the Engineer across the signature and date.
Copies of this document, as signed and sealed, have been retained by the
Professional Engineer. The Professional Engineer will not be responsible
for subsequent changes to this document, unless the changes are made
by the Engineer or with the Engineer's written authorization.
1 INCH
DATE DESCRIPTION
KEY PLAN
Dwg: of:
4/2
2/2
02
1 5
:28:3
6 P
M
2148-02
MD100B
TMM
India
na S
chool fo
r th
e D
eaf,
Build
ing #
8 H
VA
C R
enovation
1200 E
42nd S
t, India
napolis
, IN
46205
MECHANICAL BASEMENTFLOOR DEMO HVAC PLAN -
AREA B
Ind
iana
Sch
ool F
or
Th
e D
ea
f
PR
OJE
CT
ST
AT
US
: C
ON
ST
RU
CT
ION
DO
CU
ME
NT
S
DA
PW
Pro
ject
No.
49026008-2
0-0
40
TMM
09/01/2020
AREA A
AREA B
AREA C
AREA A
AREA B
AREA C
TRUE NORTH
1/4" = 1'-0"1
ENLARGED MECHANICAL BASEMENT FLOOR DEMOLITION PLAN - AREA B
GENERAL SHEET NOTES
1. REPLACE 3-WAY PNEUMATIC DHW ACTUATOR & VALVE WITH NEW DDC CONTROLLED ACTUATOR & VALVE. VERIFY SIZE, LOCATION, SEQUENCE IN FIELD.
2. REPLACE EXISTING 2-WAY STEAM CONTROL ACTUATOR & VALVE WITH NEW DDC CONTROL ACTUATOR & VALVE. VERIFY SIZE, LOCATION, SEQUENCE IN FIELD.
3. BASEMENT AIR HANDLER ALTERNATE: DEMOLISH THE MINIMUM AMOUNT OF DUCTWORK REQUIRED TO INSTALL NEW WORK.
SHEET KEYNOTES#
1 04/22/21 ADDENDUM 1
1
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
L T W
35
33
32
28
27
C133C134
C135
C136
C137
C138
C139
C140
C141
C142
C143C144C145C146
C147
C148
C149
C150
C151 C152
C153
C154
C155
C156
C157
C158C159
C160
C161
C163 C164C165
C166
C168
C169
C170C171
C172
C174
C175
C176
C177
C125
C128
C129
C130
C131
C131
C124
C115
C123
C133C134
C135
C136
C137
C138
C139
C140
C141
C142
C143C144C145C146
C147
C148
C149
C150
C151 C152
C153
C154
C155
C156
C157
C158C159
C160
C161
C163 C164C165
C166
C168
C169
C170C171
C172
C174
C175
C176
C177
C125
C128
C129
C130
C131
C131
C124
C115
C123
C133C134
C135
C136
C137
C138
C139
C140
C141
C142
C143C144C145C146
C147
C148
C149
C150
C151 C152
C153
C154
C155
C156
C157
C158C159
C160
C161
C163 C164C165
C166
C168
C169
C170C171
C172
C174
C175
C176
C177
C125
C128
C129
C130
C131
C131
C124
C115
C123
C133C134
C135
C136
C137
C138
C139
C140
C141
C142
C143C144C145C146
C147
C148
C149
C150
C151 C152
C153
C154
C155
C156
C157
C158C159
C160
C161
C163 C164C165
C166
C168
C169
C170C171
C172
C174
C175
C176
C177
C125
C128
C129
C130
C131
C131
C124
C115
C123
2
2
3 3
2
3
2
3
2
23
3 2
2
3
3
2
3
2
3
3
2
2
33
2
3
2
2
3
3
2
2
3
3
2
2
2
2
3
3
2
1
3
2
2
2
3
2
2
3
2
2
2
3
1
2
3
3
EXVAV-9-06
EXVAV-9-07
EXVAV-9-08
EXVAV-9-09
EXVAV-9-10
EXVAV-9-11
EXVAV-9-12
EXVAV-9-13
EXVAV-8-05
EXVAV-8-06
EXVAV-8-07
EXVAV-8-08
EXVAV-8-09
EXVAV-8-10
EXVAV-8-11
EXVAV-8-12
EXVAV8-01
EXVAV-8-13
EXVAV-7-06
EXVAV8-02
EXVAV8-03
EXVAV8-04
EXVAV-9-02
EXVAV-9-01
EXVAV-9-03
EXVAV-9-04EXVAV-9-05
MD101A
2
A. ALL EXISTING PNEUMATIC CONTROLS TO BE DEMOLISHED AND REPLACED WITH NEW DDC CONTROLS. VERIFY QUANTITY IN FIELD.
B. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS IN FIELD PRIOR TO COMMENCING DEMOLITION. ANY DISCREPANCIES BETWEEN FIELD CONDITIONS AND THESE DRAWINGS SHALL BE BROUGHT TO THE ENGINEERS ATTENTION PRIOR TO COMMENCING DEMOLITION. CONTRACTOR BEGINNING DEMOLITION SHALL INDICATE ACCEPTANCE OF THESE EXISTING CONDITIONS AND ANYTHING MISSING OR DAMAGED WILL BE DEEMED TO HAVE BEEN CAUSED BY THE CONTRACTOR AND MUST BE REPAIRED OR REPLACED AT NO INCREASE TO PROJECT COST.
C. ALL EXISTING FIRE RATINGS TO MAINTAINED DURING DEMOLITION AND NEW WORK.
D. NEW VTU BOXES TO BE COORDINATED WITH EXISTING OBSTRUCTIONS INCLUDING LIGHTS, CEILING GRID, STRUCTURE, ETC. AND BE ORIENTED IN SUCH A MANNER TO PROVIDE MANUFACTURER'S RECOMMENDED CLEARANCES. IF CLEARANCES CANNOT BE MET THE VAV BOX SHALL BE RELOCATED AND RECONNECTED AT NO INCREASE IN PROJECT COST.
E. DEMOLISH SA DUCTWORK AT EXISTING VAV BOXES TO THE EXTEND NECESSARY TO PROVIDE NEW VTU BOXES AND RECONNECT. SEE DETAILS FOR FURTHER CONNECTION INFORMATION.
F. EXISTING VAVs TO REMAIN. PNEUMATIC CONTROLS TO BE DEMOLISHED AND REPLACED WITH DDC CONTROL VTU ADAPTER KIT. SEE SCHEDULE FOR DETAILS. INSTALL NEW THRMOSTAT AND WIRING TO NEW VTU.
GENERAL SHEET NOTES
W
33
EXVAV-9-07
10ø
8250 H
AV
ER
ST
ICK
RD
S
UIT
E 2
85,
IND
IAN
AP
OLIS
, IN
46240
T
317.6
38.8
383
w
ww
.rossbar.
com
CHECKED BY:
© ROSS & BARUZZINI, INC. 2020
ISSUE DATE:
RB PROJ. NO.:
DESIGNED BY:
DRAWING TITLE:
DRAWING NO.:
WHEN THIS DRAWING IS
REPRODUCED AT ORIGINAL SCALE THIS BAR = 1 INCH
REVISIONS:
The Professional Engineer, whose signature and personal seal appear on
this document, assumes responsibility only for what appears hereon, and
disclaims responsibility for all other plans, specifications, estimates,
reports, documents or instruments not sealed by the Professional Engineer
relating to, or intended to be used for, any part or parts of the engineering
project to which this document refers. Prints sealed by the Engineer bear
the embossed or wet seal of the Engineer across the signature and date.
Copies of this document, as signed and sealed, have been retained by the
Professional Engineer. The Professional Engineer will not be responsible
for subsequent changes to this document, unless the changes are made
by the Engineer or with the Engineer's written authorization.
1 INCH
DATE DESCRIPTION
KEY PLAN
Dwg: of:
4/2
2/2
02
1 5
:28:3
6 P
M
2148-02
MD101A
TMM
India
na S
chool fo
r th
e D
eaf,
Build
ing #
8 H
VA
C R
enovation
1200 E
42nd S
t, India
napolis
, IN
46205
MECHANICAL FIRST FLOORDEMO HVAC PLAN - AREA A
Ind
iana
Sch
ool F
or
Th
e D
ea
f
PR
OJE
CT
ST
AT
US
: C
ON
ST
RU
CT
ION
DO
CU
ME
NT
S
DA
PW
Pro
ject
No.
49026008-2
0-0
40
TMM
09/01/2020
AREA A
AREA B
AREA C
TRUE NORTH
1. PROVIDE AN ALTERNATE PRICE TO DEMOLISH 20 EXISTING THRU WALL PTAC UNITS AND REPLACE WITH NEW.
2. EXISTING FINNED TUBE HHW RADIATOR TO REMAIN. CONTROL VALVE TO BE REPLACED WITH NEW DDC CONTROL VALVE.
3. DEMOLISH DUCTWORK UPSTREAM OF EXISTING VAV CONTROL BOX AS NECESSARY TO INSTALL NEW VTU CONTROLLERS ON NEW WORK SHEETS.
SHEET KEYNOTES#
1/8" = 1'-0"1
MECHANICAL FIRST FLOOR DEMOLITION PLAN - AREA A
1 04/22/21 ADDENDUM 1
1
1/4" = 1'-0"2
ENLARGED TYPICAL DORMROOM - DEMO
1
CONTRACTORS OPTION IN LIEU OF RETROFIT KIT: DEMOLISH PORTION OF DUCT UPSTREAM OF EXISTING VAV BOX LARGE ENOUGH TO ACCOMODATE NEW VAV BOX. EXISTING VAV BOX TO BE LOCKED OPEN.
123
123
123
123
123
123
123
123
123
123123
123
123
123
7
I
L T W
22
21
C125
C112 C113 C114 C115
C116
C119
C123
C103
C110
A101A168
C125
C112 C113 C114 C115
C116
C119
C123
C103
C110
A101A168
C125
C112 C113 C114 C115
C116
C119
C123
C103
C110
A101A168
C125
C112 C113 C114 C115
C116
C119
C123
C103
C110
A101A168
EXVAV-7-05
EXVAV-7-04
EXVAV-7-03
EXVAV-7-02
EXVAV7-01
EXVAV-6-01
EXVAV-6-02
EXVAV-6-03
EXVAV-2-07
EXVAV-6-04
EXVAV-6-05
1
1
2
1
2
2
2
2
2
2
2
2
2
2
2
2
22
3
3
3
3
33
3
3
3
34
4
1
A. ALL EXISTING PNEUMATIC CONTROLS TO BE DEMOLISHED AND REPLACED WITH NEW DDC CONTROLS. VERIFY QUANTITY IN FIELD.
B. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS IN FIELD PRIOR TO COMMENCING DEMOLITION. ANY DISCREPANCIES BETWEEN FIELD CONDITIONS AND THESE DRAWINGS SHALL BE BROUGHT TO THE ENGINEERS ATTENTION PRIOR TO COMMENCING DEMOLITION. CONTRACTOR BEGINNING DEMOLITION SHALL INDICATE ACCEPTANCE OF THESE EXISTING CONDITIONS AND ANYTHING MISSING OR DAMAGED WILL BE DEEMED TO HAVE BEEN CAUSED BY THE CONTRACTOR AND MUST BE REPAIRED OR REPLACED AT NO INCREASE TO PROJECT COST.
C. ALL EXISTING FIRE RATINGS TO MAINTAINED DURING DEMOLITION AND NEW WORK.
D. NEW VTU BOXES TO BE COORDINATED WITH EXISTING OBSTRUCTIONS INCLUDING LIGHTS, CEILING GRID, STRUCTURE, ETC. AND BE ORIENTED IN SUCH A MANNER TO PROVIDE MANUFACTURER'S RECOMMENDED CLEARANCES. IF CLEARANCES CANNOT BE MET THE VAV BOX SHALL BE RELOCATED AND RECONNECTED AT NO INCREASE IN PROJECT COST.
E. DEMOLISH SA DUCTWORK AT EXISTING VAV BOXES TO THE EXTEND NECESSARY TO PROVIDE NEW VTU BOXES AND RECONNECT. SEE DETAILS FOR FURTHER CONNECTION INFORMATION.
F. EXISTING VAVs TO REMAIN. PNEUMATIC CONTROLS TO BE DEMOLISHED AND REPLACED WITH DDC CONTROL VTU ADAPTER KIT. SEE SCHEDULE FOR DETAILS. INSTALL NEW THRMOSTAT AND WIRING TO NEW VTU.
GENERAL SHEET NOTES
8250 H
AV
ER
ST
ICK
RD
S
UIT
E 2
85,
IND
IAN
AP
OLIS
, IN
46240
T
317.6
38.8
383
w
ww
.rossbar.
com
CHECKED BY:
© ROSS & BARUZZINI, INC. 2020
ISSUE DATE:
RB PROJ. NO.:
DESIGNED BY:
DRAWING TITLE:
DRAWING NO.:
WHEN THIS DRAWING IS
REPRODUCED AT ORIGINAL SCALE THIS BAR = 1 INCH
REVISIONS:
The Professional Engineer, whose signature and personal seal appear on
this document, assumes responsibility only for what appears hereon, and
disclaims responsibility for all other plans, specifications, estimates,
reports, documents or instruments not sealed by the Professional Engineer
relating to, or intended to be used for, any part or parts of the engineering
project to which this document refers. Prints sealed by the Engineer bear
the embossed or wet seal of the Engineer across the signature and date.
Copies of this document, as signed and sealed, have been retained by the
Professional Engineer. The Professional Engineer will not be responsible
for subsequent changes to this document, unless the changes are made
by the Engineer or with the Engineer's written authorization.
1 INCH
DATE DESCRIPTION
KEY PLAN
Dwg: of:
4/2
2/2
02
1 5
:28:3
7 P
M
2148-02
MD101B
TMM
India
na S
chool fo
r th
e D
eaf,
Build
ing #
8 H
VA
C R
enovation
1200 E
42nd S
t, India
napolis
, IN
46205
MECHANICAL FIRST FLOORDEMO HVAC PLAN - AREA B
Ind
iana
Sch
ool F
or
Th
e D
ea
f
PR
OJE
CT
ST
AT
US
: C
ON
ST
RU
CT
ION
DO
CU
ME
NT
S
DA
PW
Pro
ject
No.
49026008-2
0-0
40
TMM
09/01/2020
AREA A
AREA B
AREA C
TRUE NORTH
1. PROVIDE AN ALTERNATE PRICE TO DEMOLISH 20 EXISTING THRU WALL PTAC UNITS AND REPLACE WITH NEW.
2. EXISTING FINNED TUBE HHW RADIATOR TO REMAIN. CONTROL VALVE TO BE REPLACED WITH NEW DDC CONTROL VALVE.
3. DEMOLISH DUCTWORK UPSTREAM OF EXISTING VAV CONTROL BOX AS NECESSARY TO INSTALL NEW VTU CONTROLLERS ON NEW WORK SHEETS.
4. DEMOLISH EXISTING PNEUMATIC CONTROLLERS AND VALVES AT CEILING MOUNTED UNIT HEATER. REPLACE WITH NEW DDC CONTROLS.
SHEET KEYNOTES#
1/8" = 1'-0"1
MECHANICAL FIRST FLOOR DEMOLITION PLAN - AREA B
1 04/22/21 ADDENDUM 1
1
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
XXX
L T W
35
33
32
28
27
MATCHLINE
3
1
A. ALL EXISTING PNEUMATIC CONTROLS TO BE DEMOLISHED AND REPLACED WITH NEW DDC CONTROLS. VERIFY QUANTITY IN FIELD.
B. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS IN FIELD PRIOR TO COMMENCING DEMOLITION. ANY DISCREPANCIES BETWEEN FIELD CONDITIONS AND THESE DRAWINGS SHALL BE BROUGHT TO THE ENGINEERS ATTENTION PRIOR TO COMMENCING DEMOLITION. CONTRACTOR BEGINNING DEMOLITION SHALL INDICATE ACCEPTANCE OF THESE EXISTING CONDITIONS AND ANYTHING MISSING OR DAMAGED WILL BE DEEMED TO HAVE BEEN CAUSED BY THE CONTRACTOR AND MUST BE REPAIRED OR REPLACED AT NO INCREASE TO PROJECT COST.
C. ALL EXISTING FIRE RATINGS TO MAINTAINED DURING DEMOLITION AND NEW WORK.
D. NEW VTU BOXES TO BE COORDINATED WITH EXISTING OBSTRUCTIONS INCLUDING LIGHTS, CEILING GRID, STRUCTURE, ETC. AND BE ORIENTED IN SUCH A MANNER TO PROVIDE MANUFACTURER'S RECOMMENDED CLEARANCES. IF CLEARANCES CANNOT BE MET THE VAV BOX SHALL BE RELOCATED AND RECONNECTED AT NO INCREASE IN PROJECT COST.
E. DEMOLISH SA DUCTWORK AT EXISTING VAV BOXES TO THE EXTEND NECESSARY TO PROVIDE NEW VTU BOXES AND RECONNECT. SEE DETAILS FOR FURTHER CONNECTION INFORMATION.
F. EXISTING VAVs TO REMAIN. PNEUMATIC CONTROLS TO BE DEMOLISHED AND REPLACED WITH DDC CONTROL VTU ADAPTER KIT. SEE SCHEDULE FOR DETAILS. INSTALL NEW THRMOSTAT AND WIRING TO NEW VTU.
GENERAL SHEET NOTES
8250 H
AV
ER
ST
ICK
RD
S
UIT
E 2
85,
IND
IAN
AP
OLIS
, IN
46240
T
317.6
38.8
383
w
ww
.rossbar.
com
CHECKED BY:
© ROSS & BARUZZINI, INC. 2020
ISSUE DATE:
RB PROJ. NO.:
DESIGNED BY:
DRAWING TITLE:
DRAWING NO.:
WHEN THIS DRAWING IS
REPRODUCED AT ORIGINAL SCALE THIS BAR = 1 INCH
REVISIONS:
The Professional Engineer, whose signature and personal seal appear on
this document, assumes responsibility only for what appears hereon, and
disclaims responsibility for all other plans, specifications, estimates,
reports, documents or instruments not sealed by the Professional Engineer
relating to, or intended to be used for, any part or parts of the engineering
project to which this document refers. Prints sealed by the Engineer bear
the embossed or wet seal of the Engineer across the signature and date.
Copies of this document, as signed and sealed, have been retained by the
Professional Engineer. The Professional Engineer will not be responsible
for subsequent changes to this document, unless the changes are made
by the Engineer or with the Engineer's written authorization.
1 INCH
DATE DESCRIPTION
KEY PLAN
Dwg: of:
4/2
2/2
02
1 5
:28:3
8 P
M
2148-02
MD103A
TMM
India
na S
chool fo
r th
e D
eaf,
Build
ing #
8 H
VA
C R
enovation
1200 E
42nd S
t, India
napolis
, IN
46205
MECHANICAL THIRD FLOORDEMO HVAC PLAN - AREA A
Ind
iana
Sch
ool F
or
Th
e D
ea
f
PR
OJE
CT
ST
AT
US
: C
ON
ST
RU
CT
ION
DO
CU
ME
NT
S
DA
PW
Pro
ject
No.
49026008-2
0-0
40
TMM
09/01/2020
AREA A
AREA B
AREA C
TRUE NORTH
1. PROVIDE AN ALTERNATE PRICE TO DEMOLISH 20 EXISTING THRU WALL PTAC UNITS AND REPLACE WITH NEW.
2. EXISTING FINNED TUBE HHW RADIATOR TO REMAIN. CONTROL VALVE TO BE REPLACED WITH NEW DDC CONTROL VALVE.
3. DEMOLISH DUCTWORK UPSTREAM OF EXISTING VAV CONTROL BOX AS NECESSARY TO INSTALL NEW VTU CONTROLLERS ON NEW WORK SHEETS.
4. DEMOLISH 1-1/2" HWS/HWR UP THRU THE 3RD FLOOR TO PENTHOUSE ABOVE. SEE SHEET M203 FOR MORE DETAILS.
SHEET KEYNOTES#
1/8" = 1'-0"1
MECHANICAL THIRD FLOOR DEMOLITION HVAC PLAN - AREA A
1
2
2
2
2
2
2
2
2 2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
3
3
3
3
3
3
3
3
3
3
3
3
3 3
3
3
3
3
3
3
3
3
3
3
3
33
3
3
3
4
4
3
1 04/22/21 ADDENDUM 1
1
1
1
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
123
OP
EN
TO
FL
OO
R B
ELO
W
BU
ILT
UP
RO
OF
7
L T W
22
21
SUPPLY AIR & RETURN AIR UP TO CSAC-4 & CSAC-5. SEE MECHANICAL PENTHOUSE DWG. MD114B FOR CONTINUATION.
32/1
2 S
A
18/1
2 S
A
34/18 SA DUCT UP TO CSAC-6 IN PENTHOUSE ABOVE
18/31 SA
EXVAV-7-27
EXVAV-7-25
EXVAV-7-26
14ø
SA
16ø
SA
HWS/HWR/LPS UP TO MECH. PENTHOUSE
28"Ø SA DUCT FROM AHU-7 IN PENTHOUSE ABOVE
EXVAV-7-24
EXVAV-7-23EXVAV-7-38 EXVAV-7-37
EXVAV-7-36
EXVAV-7-35
EXVAV-7-34
EXVAV-7-33
EXVAV-7-32EXVAV-7-31
MATCHLINE
MATCHLINE
A301A353
B301 B302
B303
B304B305
B306B307
B308
B309
B310C301
C302
C303
C304
C305
C306
C307
C308
C309
C310C311C364
C365
C366
C367 C368 C369
C370C371
C372C373
C374
EXVAV-6-12
EXVAV-6-13
EXVAV-6-16EXVAV-6-17
EXVAV-6-18
EXVAV-6-19
EXVAV-2-44
EXVAV-6-15
EXVAV-6-14
42 x 32 SA TO GYM CEILING BELOW TO REMAIN AS IS
31/18 SA DOWN
31/18 SA FROM CSAC-6 IN PENTHOUSE ABOVE
1
1
2
2
2
2
1
1
1
1
11
1
1
4
4
1
1
1
1
1
5
1
1
1
1
1
1
1
4
4
4
4
4
4
4
4
4
7
6
6
6
2
3
1
22
3
1
A. ALL EXISTING PNEUMATIC CONTROLS TO BE DEMOLISHED AND REPLACED WITH NEW DDC CONTROLS. VERIFY QUANTITY IN FIELD.
B. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS IN FIELD PRIOR TO COMMENCING DEMOLITION. ANY DISCREPANCIES BETWEEN FIELD CONDITIONS AND THESE DRAWINGS SHALL BE BROUGHT TO THE ENGINEERS ATTENTION PRIOR TO COMMENCING DEMOLITION. CONTRACTOR BEGINNING DEMOLITION SHALL INDICATE ACCEPTANCE OF THESE EXISTING CONDITIONS AND ANYTHING MISSING OR DAMAGED WILL BE DEEMED TO HAVE BEEN CAUSED BY THE CONTRACTOR AND MUST BE REPAIRED OR REPLACED AT NO INCREASE TO PROJECT COST.
C. ALL EXISTING FIRE RATINGS TO MAINTAINED DURING DEMOLITION AND NEW WORK.
D. NEW VTU BOXES TO BE COORDINATED WITH EXISTING OBSTRUCTIONS INCLUDING LIGHTS, CEILING GRID, STRUCTURE, ETC. AND BE ORIENTED IN SUCH A MANNER TO PROVIDE MANUFACTURER'S RECOMMENDED CLEARANCES. IF CLEARANCES CANNOT BE MET THE VAV BOX SHALL BE RELOCATED AND RECONNECTED AT NO INCREASE IN PROJECT COST.
E. DEMOLISH SA DUCTWORK AT EXISTING VAV BOXES TO THE EXTEND NECESSARY TO PROVIDE NEW VTU BOXES AND RECONNECT. SEE DETAILS FOR FURTHER CONNECTION INFORMATION.
F. EXISTING VAVs TO REMAIN. PNEUMATIC CONTROLS TO BE DEMOLISHED AND REPLACED WITH DDC CONTROL VTU ADAPTER KIT. SEE SCHEDULE FOR DETAILS. INSTALL NEW THRMOSTAT AND WIRING TO NEW VTU.
GENERAL SHEET NOTES
8250 H
AV
ER
ST
ICK
RD
S
UIT
E 2
85,
IND
IAN
AP
OLIS
, IN
46240
T
317.6
38.8
383
w
ww
.rossbar.
com
CHECKED BY:
© ROSS & BARUZZINI, INC. 2020
ISSUE DATE:
RB PROJ. NO.:
DESIGNED BY:
DRAWING TITLE:
DRAWING NO.:
WHEN THIS DRAWING IS
REPRODUCED AT ORIGINAL SCALE THIS BAR = 1 INCH
REVISIONS:
The Professional Engineer, whose signature and personal seal appear on
this document, assumes responsibility only for what appears hereon, and
disclaims responsibility for all other plans, specifications, estimates,
reports, documents or instruments not sealed by the Professional Engineer
relating to, or intended to be used for, any part or parts of the engineering
project to which this document refers. Prints sealed by the Engineer bear
the embossed or wet seal of the Engineer across the signature and date.
Copies of this document, as signed and sealed, have been retained by the
Professional Engineer. The Professional Engineer will not be responsible
for subsequent changes to this document, unless the changes are made
by the Engineer or with the Engineer's written authorization.
1 INCH
DATE DESCRIPTION
KEY PLAN
Dwg: of:
4/2
2/2
02
1 5
:28:3
9 P
M
2148-02
MD103B
TMM
India
na S
chool fo
r th
e D
eaf,
Build
ing #
8 H
VA
C R
enovation
1200 E
42nd S
t, India
napolis
, IN
46205
MECHANICAL THIRD FLOORAND GYMNASIUM ROOF
DEMO HVAC PLAN - AREA B
Ind
iana
Sch
ool F
or
Th
e D
ea
f
PR
OJE
CT
ST
AT
US
: C
ON
ST
RU
CT
ION
DO
CU
ME
NT
S
DA
PW
Pro
ject
No.
49026008-2
0-0
40
TMM
09/01/2020
AREA A
AREA B
AREA C
AREA A
AREA B
AREA C
1/8" = 1'-0"1
MECHANICAL THIRD FLOOR AND GYMNASIUM ROOF DEMOLITION HVAC PLAN - AREA B
TRUE NORTH
1. DEMO MEDIUM PRESSURE SA DUCT PRIOR TO EXISTING VAV BOX AS REQUIRED TO INSTALL NEW VTU CONTROL BOX.
2. DEMOLISH 4-EXISTING PACKAGED COOLING ONLY ROOFTOP UNITS. EXISTING ROOF CURB TO REMAIN FOR REUSE. EXISTING UNITS ARE TRANE MODEL NO. TCD090A40AAB.
3. PROVIDE ALTERNATE PRICE TO DEMOLISH PTAC/THRU WALL AC UNIT AND REPLACE WITH NEW SIMILAR UNIT. TYPICAL FOR 20 UNITS.
4. REPLACE EXISTING PNEUMATIC CONTROL VALVE AT UNDER SILL RADIANT HEATERS WITH NEW DDC CONTROL VALVE.
5. DEMOLISH 1-1/2" HWS/HWR UP THRU THE 3RD FLOOR TO PENTHOUSE ABOVE. SEE SHEET M203 FOR MORE DETAILS.
6. DEMOLISH PNEUMATIC HHW CONTROLS AT EXIST. REHEAT BOX. REHEAT BOX TO REMAIN AS-IS.
7. DEMOLISH 2" HWS/HWR UP PENTHOUSE ABOVE. SEE SHEET M203 FOR MORE DETAILS.
SHEET KEYNOTES#
1 04/22/21 ADDENDUM 1
1
L T W
35
33
32
28
27
MATCHLINE
MD114A
2
MD114A
2
MD114A
2
T
28
27
48x32 RA DUCT DOWN INTO RA PLENUM
EXISTING ELECTRICAL EQUIPMENT
28ø SA
120x48 LOUVER TO REMAIN
48x48 RA
106x48 RA
EXIST. 88x72 OA LOUVER TO REMAIN
1 1/4"
1 1/4"
1 1/2"
EXISTING SUPPORT RAILS. 16" TALL x 4" WIDE
DISCONNECT AND DEMOLISH CSAC. DEMOLISH DUCTWORK ONLY AS REQUIRED TO INSTALL NEW WORK
1 1/2" LPS TO HUMIDIFIER
DEMOLISH THE MINIMUM AMOUNT OF OA/RA DUCT NECESSARY TO PROVIDE NEW WORK.
DISCONNECT AND DEMOLISH CU-8. EXISTING CURBS TO REMAIN. COORDINATE CURBS AND REFRIGERANT PIPING WITH NEW APPROVED CONDENSING UNIT SUBMITTALS. PROVIDE NEW CURBS, SUPPORTS AND REFRIGERANT PIPING AS REQUIRED BY EQUIPMENT MANUFACTURER.
1 1/4"
1 1/4"
EXISTING HOT WATER UNIT HEATER TO REMAIN. DEMOLISH HWS/HWR DOWN TO FLOOR BELOW.
DISCONNECT STEAM HUMIDIFIER AS REQUIRED TO PROVIDE NEW WORK.
28'' DIA SA DOWN TO FLOORS
EXISTING EXHAUST AIR FAN AND ASSOCIATED DUCT TO REMAIN. EXISTING PNEUMATIC CONTROLLERS TO BE REPLACED WITH NEW DDC CONTROLLERS.
48x48 RA DUCT OVER TOP OF 28'' DIA SA DUCT
OVER THE TOP OF THE AIR HANDLING UNIT
DEMOLISH THE MINIMUM AMOUNT OF SA DUCT NECESSARY TO PROVIDE NEW WORK.
5
2
3
4
RETROFIT DAMPER TO USE DDC CONTROLS.
1
6
7
1
A. ALL EXISTING PNEUMATIC CONTROLS TO BE DEMOLISHED AND REPLACED WITH NEW DDC CONTROLS. VERIFY QUANTITY IN FIELD.
B. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS IN FIELD PRIOR TO COMMENCING DEMOLITION. ANY DISCREPANCIES BETWEEN FIELD CONDITIONS AND THESE DRAWINGS SHALL BE BROUGHT TO THE ENGINEERS ATTENTION PRIOR TO COMMENCING DEMOLITION. CONTRACTOR BEGINNING DEMOLITION SHALL INDICATE ACCEPTANCE OF THESE EXISTING CONDITIONS AND ANYTHING MISSING OR DAMAGED WILL BE DEEMED TO HAVE BEEN CAUSED BY THE CONTRACTOR AND MUST BE REPAIRED OR REPLACED AT NO INCREASE TO PROJECT COST.
C. ALL EXISTING FIRE RATINGS TO MAINTAINED DURING DEMOLITION AND NEW WORK.
D. NEW VTU BOXES TO BE COORDINATED WITH EXISTING OBSTRUCTIONS INCLUDING LIGHTS, CEILING GRID, STRUCTURE, ETC. AND BE ORIENTED IN SUCH A MANNER TO PROVIDE MANUFACTURER'S RECOMMENDED CLEARANCES. IF CLEARANCES CANNOT BE MET THE VAV BOX SHALL BE RELOCATED AND RECONNECTED AT NO INCREASE IN PROJECT COST.
E. DEMOLISH SA DUCTWORK AT EXISTING VAV BOXES TO THE EXTEND NECESSARY TO PROVIDE NEW VTU BOXES AND RECONNECT. SEE DETAILS FOR FURTHER CONNECTION INFORMATION.
F. EXISTING VAVs TO REMAIN. PNEUMATIC CONTROLS TO BE DEMOLISHED AND REPLACED WITH DDC CONTROL VTU ADAPTER KIT. SEE SCHEDULE FOR DETAILS. INSTALL NEW THRMOSTAT AND WIRING TO NEW VTU.
GENERAL SHEET NOTES
8250 H
AV
ER
ST
ICK
RD
S
UIT
E 2
85,
IND
IAN
AP
OLIS
, IN
46240
T
317.6
38.8
383
w
ww
.rossbar.
com
CHECKED BY:
© ROSS & BARUZZINI, INC. 2020
ISSUE DATE:
RB PROJ. NO.:
DESIGNED BY:
DRAWING TITLE:
DRAWING NO.:
WHEN THIS DRAWING IS
REPRODUCED AT ORIGINAL SCALE THIS BAR = 1 INCH
REVISIONS:
The Professional Engineer, whose signature and personal seal appear on
this document, assumes responsibility only for what appears hereon, and
disclaims responsibility for all other plans, specifications, estimates,
reports, documents or instruments not sealed by the Professional Engineer
relating to, or intended to be used for, any part or parts of the engineering
project to which this document refers. Prints sealed by the Engineer bear
the embossed or wet seal of the Engineer across the signature and date.
Copies of this document, as signed and sealed, have been retained by the
Professional Engineer. The Professional Engineer will not be responsible
for subsequent changes to this document, unless the changes are made
by the Engineer or with the Engineer's written authorization.
1 INCH
DATE DESCRIPTION
KEY PLAN
Dwg: of:
4/2
2/2
02
1 5
:28:4
0 P
M
2148-02
MD114A
TMM
India
na S
chool fo
r th
e D
eaf,
Build
ing #
8 H
VA
C R
enovation
1200 E
42nd S
t, India
napolis
, IN
46205
MECHANICAL ROOFDEMOLITION PLAN - AREA A
Ind
iana
Sch
ool F
or
Th
e D
ea
f
PR
OJE
CT
ST
AT
US
: C
ON
ST
RU
CT
ION
DO
CU
ME
NT
S
DA
PW
Pro
ject
No.
49026008-2
0-0
40
TMM
09/01/2020
1. DISCONNECT AND DEMOLISH EXISTING 11500 CFM AIR HANDLING UNIT CSAC-8.
2. EXISTING EQUIPMENT SUPPORTS TO REMAIN FOR REUSE.
3. CONTRACTOR TO DEMOLISH EXISTING REFRIGERANT PIPING AND REPLACE WITH NEW IF REQUIRED BY THE NEW AIR HANDLING UNIT OR CONDENSING UNIT MANUFACTURER.
4. DISCONNECT AND DEMOLISH PNEUMATIC TC PANEL.
5. DISCONNECT AND DEMOLISH EXISTING 502 MBH OUTDOOR CONDENSING UNIT CU-6.
6. REPLACE EXISTING UNIT HEATER CONTROLS WITH NEW DDC CONTROLS.
7. DEMOLISH AIR CLEARNER, HUMIDIFIER, ETC. ASSOCIATED WITH CSAC BEING REMOVED.
SHEET KEYNOTES#
AREA A
AREA B
AREA C
TRUE NORTH
1/8" = 1'-0"1
MECHANICAL ROOF DEMOLITION PLAN - AREA A
1/2" = 1'-0"2
MECHANICAL ROOF ENLARGED DEMOLITION PLAN
NOTE:
PLAN TYPICAL FOR ROOFTOP AIR HANDLING UNITS CSAC-1, CSAC-2, CSAC-7, CSAC-8.
1. BASE BID SHALL BE TO REPLACE EXISTING PNEUMATIC CONTROLS WITH NEW DDC CONTROLS AND DEMOLISH THE WORK INDICATED.
2. DEMOLITION FOR CSAC-9 SIMILAR. SEE ENLARGED NEW WORK PLAN FOR NEW WORK REQUIRED AT CSAC-9. 1 04/22/21 ADDENDUM 1
1
7
I
L T W
22
21
CSAC-7
CU-7
CU-3
CU-6
CSAC-6
CSAC-5
CSAC-4
1
2
3
4
4
MATCHLINE
MATCHLINE
MD114A
2
SEE MECHANICAL ROOF ENLARGED DEMOLITION PLAN ON SHEET MD114A FOR DEMOLITION OF EQUIPMENT IN THIS MECHANICAL PENTHOUSE.
MD114B
2
BASEMENT AIR HANDLER ALTERNATE
L T
36/20 SA
31/1
8 S
A
EXIST. WALL LOUVER TO REMAIN.
50x26 SA
80x30 RA
DOWN TO FLOOR BELOW
FROM BELOW WITH MOTORIZED DAMPER IN VERTICAL
50x26 SA
DOWN TO FLOOR BELOW
50x26 SA
40x30 R
A
46x24 RA
CSAC-4
CSAC-5
CSAC-6
MD MD
MD
60x30 RA
OA INTAKE
60x30 R
A
SA DOWN TO FLOOR BELOW
RA FROM BELOW
OA INTAKE LOUVER
50x26 SA
EXHAUST FAN AND ASSOCIATED CONTROL SEQUENCES TO REMAIN AS-IS. PNEUMATIC CONTROLLERS TO BE CONVERTED TO DDC.
34/18 SA DOWN TO FLOOR BELOW
31/18 SA DOWN TO FLOOR BELOW
34/18 SA
DEMO MINIMUM SA AS REQUIRED TO DO NEW WORK.
DISCONNECT AND DEMOLISH CSAC-6.
DEMOLISH HWS/HWR PIPING AND ASSOCIATED INLINE CIRCULATING PUMPS
DISCONNECT AND DEMOLISH CSAC-5.
DISCONNECT AND DEMOLISH CSAC-4.
40x30 RA
DEMOLISH HWS/HWR PIPING AND ASSOCIATED INLINE CIRCULATING PUMPS
MD5
5
6
6
6
6
M
6
6
7
1
7
7
1
1
A. ALL EXISTING PNEUMATIC CONTROLS TO BE DEMOLISHED AND REPLACED WITH NEW DDC CONTROLS. VERIFY QUANTITY IN FIELD.
B. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS IN FIELD PRIOR TO COMMENCING DEMOLITION. ANY DISCREPANCIES BETWEEN FIELD CONDITIONS AND THESE DRAWINGS SHALL BE BROUGHT TO THE ENGINEERS ATTENTION PRIOR TO COMMENCING DEMOLITION. CONTRACTOR BEGINNING DEMOLITION SHALL INDICATE ACCEPTANCE OF THESE EXISTING CONDITIONS AND ANYTHING MISSING OR DAMAGED WILL BE DEEMED TO HAVE BEEN CAUSED BY THE CONTRACTOR AND MUST BE REPAIRED OR REPLACED AT NO INCREASE TO PROJECT COST.
C. ALL EXISTING FIRE RATINGS TO MAINTAINED DURING DEMOLITION AND NEW WORK.
D. NEW VTU BOXES TO BE COORDINATED WITH EXISTING OBSTRUCTIONS INCLUDING LIGHTS, CEILING GRID, STRUCTURE, ETC. AND BE ORIENTED IN SUCH A MANNER TO PROVIDE MANUFACTURER'S RECOMMENDED CLEARANCES. IF CLEARANCES CANNOT BE MET THE VAV BOX SHALL BE RELOCATED AND RECONNECTED AT NO INCREASE IN PROJECT COST.
E. DEMOLISH SA DUCTWORK AT EXISTING VAV BOXES TO THE EXTEND NECESSARY TO PROVIDE NEW VTU BOXES AND RECONNECT. SEE DETAILS FOR FURTHER CONNECTION INFORMATION.
F. EXISTING VAVs TO REMAIN. PNEUMATIC CONTROLS TO BE DEMOLISHED AND REPLACED WITH DDC CONTROL VTU ADAPTER KIT. SEE SCHEDULE FOR DETAILS. INSTALL NEW THRMOSTAT AND WIRING TO NEW VTU.
GENERAL SHEET NOTES
8250 H
AV
ER
ST
ICK
RD
S
UIT
E 2
85,
IND
IAN
AP
OLIS
, IN
46240
T
317.6
38.8
383
w
ww
.rossbar.
com
CHECKED BY:
© ROSS & BARUZZINI, INC. 2020
ISSUE DATE:
RB PROJ. NO.:
DESIGNED BY:
DRAWING TITLE:
DRAWING NO.:
WHEN THIS DRAWING IS
REPRODUCED AT ORIGINAL SCALE THIS BAR = 1 INCH
REVISIONS:
The Professional Engineer, whose signature and personal seal appear on
this document, assumes responsibility only for what appears hereon, and
disclaims responsibility for all other plans, specifications, estimates,
reports, documents or instruments not sealed by the Professional Engineer
relating to, or intended to be used for, any part or parts of the engineering
project to which this document refers. Prints sealed by the Engineer bear
the embossed or wet seal of the Engineer across the signature and date.
Copies of this document, as signed and sealed, have been retained by the
Professional Engineer. The Professional Engineer will not be responsible
for subsequent changes to this document, unless the changes are made
by the Engineer or with the Engineer's written authorization.
1 INCH
DATE DESCRIPTION
KEY PLAN
Dwg: of:
4/2
2/2
02
1 5
:28:4
0 P
M
2148-02
MD114B
TMM
India
na S
chool fo
r th
e D
eaf,
Build
ing #
8 H
VA
C R
enovation
1200 E
42nd S
t, India
napolis
, IN
46205
MECHANICAL ROOFDEMOLITION PLAN - AREA B
Ind
iana
Sch
ool F
or
Th
e D
ea
f
PR
OJE
CT
ST
AT
US
: C
ON
ST
RU
CT
ION
DO
CU
ME
NT
S
DA
PW
Pro
ject
No.
49026008-2
0-0
40
TMM
09/01/2020
1. DISCONNECT AND DEMOLISH EXISTING 3125 CFM AIR HANDLING UNIT CSAC-4.
2. DISCONNECT AND DEMOLISH EXISTING 3125 CFM AIR HANDLING UNIT CSAC-5.
3. DISCONNECT AND DEMOLISH EXISTING AIR HANDLING UNIT CSAC-6.
4. DISCONNECT AND DEMOLISH EXISTING OUTDOOR CONDENSING UNIT. EQUIPMENT SUPPORTS TO REMAIN FOR REUSE. VERIFY WITH NEW EQUIPMENT MANUFACTURER THAT REFRIGERANT PIPING IS SUITABLE FOR REUSE. PROVIDE NEW PIPING IF REQUIRED BY NEW EQUIPMENT MANUFACTURER.
5. EXISTING UNIT HEATER CONTROLS TO BE UPGRADED TO DDC CONTROLS. PROVIDE ALT. PRICE TO DEMO AND RECONNECT HHW PIPING.
6. EXISTING PNEUMATIC MOTORIZED DAMPER ACTUATORS TO BE REPLACED WITH NEW DDC CONTROLLED ACTUATORS.
7. DEMOLISH AIR CLEANER, HUMIDIFIER, ETC. ASSOCIATED WITH CSAC BEING REMOVED.
SHEET KEYNOTES#
AREA A
AREA B
AREA C
TRUE NORTH
1/8" = 1'-0"1
MECHANICAL ROOF DEMOLITION PLAN - AREA B
1/4" = 1'-0"2
MECHANICAL ROOF ENLARGEDDEMOLITION PLAN - CSAC-4, CSAC-5,CSAC-6
1 04/22/21 ADDENDUM 1
1