addendum no. 2 - welcome to the city of mobile, alabama€¦ · · 2016-04-13addendum no. 2 to:...
TRANSCRIPT
Addendum No. 2 To: Pre-Bid Conference Attendees and Registered Plan holders From: Cynthia L. Klotz, AIA City of Mobile Architectural Engineering Department Re: City of Mobile Alabama Cruise Terminal Improvements Electrical and Mechanical Project #CT-017-16 Date: March 28, 2016 This Addendum forms a part of, and modifies, the Bid Documents for the above referenced project, dated March 7, 2016. Acknowledge the receipt of this Addendum No. 2 and all subsequent Addenda, if any, in the space provided on the Bid Form. Failure to do so may subject Bidder to disqualification. General: N/A Forms and Specifications: Item 1. Add Specification Section 07823 Operations and Maintenance Manuals (attached) Item 2. Add Specification Section 07839 Project Record Documents (attached) Item 3. Add Specification Section 07841 Through Penetration Fire Stop System(attached) Drawings: Item 1. Hanging HVAC Equipment in the CBP Area is moved into the storage room. Metal
platforms for interior and exterior HVAC Units will be provided under separate contract, and the floor level for each shall be 8’-4” Above Finish Floor or Finshed Grade. Duct openings will be provided under separate contract, but Fire Penetration Systems should be provided under this contract.
Item 2. The following drawing sheets should be replaced in their entirety: Changes are clouded
and flagged with revision triangles.
2 of 2
P-1.0 – GROUND LEVEL PLUMBING; Labled Add #2, March 28, 2016 lower right hand corner. In revision box, labeled as Rev 1, March 22, 2016 (attached) M-1.0 – HVAC SCHEDULES; Labled Add #2, March 28, 2016 lower right hand corner. In revision box, labeled as Rev 1, March 22, 2016 (attached) M-2.0 – GROUND LEVEL HVAC PLAN; Labled Add #2, March 28, 2016 lower right hand corner. In revision box, labeled as Rev 1, March 22, 2016 (attached) E-2.1 – GROUND LEVEL POWER; Labeled Rev#2, Add #2 in Revision box. In lower right hand corner labeled Add #2, March 28, 2016. (attached)
Item 3. P-1.0 – GROUND LEVEL PLUMBING (attached) a. At cut and patched slab at new sanitary sewer line, add this note:
Note: Confirm depth and slope of existing line and determine location to connect new line into the existing. Remove slab as minimally as possible. Install sanitary line. Drill and set #4 bars 4” into concrete at 32’ O.C maximum in epoxy gel (Sika AnchorFix 3001). Replace slab with 4000 psi concrete (maximum 1 ½” aggregate, 4” slump, w/c ratio .49) and coat sides of opening with an epoxy bonding agent (Sikadur 32, Hi-Mod). Finish of the patch shall match the finish of the surrounding concrete.
END OF ADDENDUM NO. 2
OPERATION AND MAINTENANCE DATA 017823 - 1
SECTION 017823 - OPERATION AND MAINTENANCE DATA
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes administrative and procedural requirements for preparing operation and maintenance manuals, including the following: 1. Operation manuals for systems, subsystems, and equipment. 2. Maintenance manuals for the care and maintenance of products, materials, and finishes,
systems and equipment.
B. See Divisions 01 through 16 Sections for specific operation and maintenance manual requirements for the Work in those Sections.
1.2 SUBMITTALS
A. Manual: Submit two copies of each manual in final form at least 15 days before final inspection. Architect will return copy with comments within 10 days after final inspection.
1. Correct or modify each manual to comply with Architect's comments. Submit 2 copies of each corrected manual within 10 days of receipt of Architect's comments.
2. Provide PDF copies on 2 discs. Submit with the corrected manual.
PART 2 - PRODUCTS
2.1 MANUALS, GENERAL
A. Organization: Unless otherwise indicated, organize each manual into a separate section for each system and subsystem, and a separate section for each piece of equipment not part of a system. Each manual shall contain a title page, table of contents, and manual contents.
B. Title Page: Enclose title page in transparent plastic sleeve. Include the following information:
1. Subject matter included in manual. 2. Name and address of Project. 3. Name and address of Owner. 4. Date of submittal. 5. Name, address, and telephone number of Contractor. 6. Name and address of Architect and Engineer. 7. Cross-reference to related systems in other operation and maintenance manuals.
C. Table of Contents: List each product included in manual, identified by product name, indexed to the content of the volume, and cross-referenced to Specification Section number in Project Manual.
OPERATION AND MAINTENANCE DATA 017823 - 2
D. Manual Contents: Organize into sets of manageable size. Arrange contents alphabetically by system, subsystem, and equipment. If possible, assemble instructions for subsystems, equipment, and components of one system into a single binder.
1. Binders: Heavy-duty, 3-ring, vinyl-covered, loose-leaf binders, in thickness necessary to accommodate contents, sized to hold 8-1/2-by-11-inch (215-by-280-mm) paper; with clear plastic sleeve on spine to hold label describing contents and with pockets inside covers to hold folded oversize sheets.
a. Identify each binder on front and spine, with printed title "OPERATION AND MAINTENANCE MANUAL," Project title or name, and subject matter of contents. Indicate volume number for multiple-volume sets.
2. Dividers: Heavy-paper dividers with plastic-covered tabs for each section. Mark each tab to indicate contents. Include typed list of products and major components of equipment included in the section on each divider, cross-referenced to Specification Section number and title of Project Manual.
3. Protective Plastic Sleeves: Transparent plastic sleeves designed to enclose diagnostic software diskettes for computerized electronic equipment.
4. Drawings: Attach reinforced, punched binder tabs on drawings and bind with text.
a. If oversize drawings are necessary, fold drawings to same size as text pages and use as foldouts.
b. If drawings are too large to be used as foldouts, fold and place drawings in labeled envelopes and bind envelopes in rear of manual. At appropriate locations in manual, insert typewritten pages indicating drawing titles, descriptions of contents, and drawing locations.
2.2 OPERATION MANUALS
A. Content: In addition to requirements in this Section, include operation data required in individual Specification Sections and equipment descriptions, operating standards, operating procedures, operating logs, wiring and control diagrams, and license requirements.
B. Descriptions: Include the following:
1. Product name and model number. 2. Manufacturer's name. 3. Equipment identification with serial number of each component. 4. Equipment function. 5. Operating characteristics. 6. Limiting conditions. 7. Performance curves. 8. Engineering data and tests. 9. Complete nomenclature and number of replacement parts.
C. Operating Procedures: Include start-up, break-in, and control procedures; stopping and normal shutdown instructions; routine, normal, seasonal, and weekend operating instructions; and required sequences for electric or electronic systems.
OPERATION AND MAINTENANCE DATA 017823 - 3
D. Systems and Equipment Controls: Describe the sequence of operation, and diagram controls as installed.
E. Piped Systems: Diagram piping as installed, and identify color-coding where required for identification.
2.3 PRODUCT MAINTENANCE MANUAL
A. Content: Organize manual into a separate section for each product, material, and finish. Include source information, product information, maintenance procedures, repair materials and sources, and warranties and bonds, as described below.
B. Source Information: List each product included in manual, identified by product name and arranged to match manual's table of contents. For each product, list name, address, and telephone number of Installer or supplier and maintenance service agent, and cross-reference Specification Section number and title in Project Manual.
C. Product Information: Include the following, as applicable:
1. Product name and model number. 2. Manufacturer's name. 3. Color, pattern, and texture. 4. Material and chemical composition. 5. Reordering information for specially manufactured products.
D. Maintenance Procedures: Include manufacturer's written recommendations and inspection procedures, types of cleaning agents, methods of cleaning, schedule for cleaning and maintenance, and repair instructions.
E. Repair Materials and Sources: Include lists of materials and local sources of materials and related services.
F. Warranties and Bonds: Include copies of warranties and bonds and lists of circumstances and conditions that would affect validity of warranties or bonds.
2.4 SYSTEMS AND EQUIPMENT MAINTENANCE MANUAL
A. Content: For each system, subsystem, and piece of equipment not part of a system, include source information, manufacturers' maintenance documentation, maintenance procedures, maintenance and service schedules, spare parts list and source information, maintenance service contracts, and warranty and bond information, as described below.
B. Source Information: List each system, subsystem, and piece of equipment included in manual, identified by product name and arranged to match manual's table of contents. For each product, list name, address, and telephone number of Installer or supplier and maintenance service agent, and cross-reference Specification Section number and title in Project Manual.
C. Manufacturers' Maintenance Documentation: Manufacturers' maintenance documentation including maintenance instructions, drawings and diagrams for maintenance, nomenclature of
OPERATION AND MAINTENANCE DATA 017823 - 4
parts and components, and recommended spare parts for each component part or piece of equipment:
D. Maintenance Procedures: Include test and inspection instructions, troubleshooting guide, disassembly instructions, and adjusting instructions, and demonstration and training videotape if available, that detail essential maintenance procedures.
E. Submit demonstration and training video for all lighting control systems.
F. Maintenance and Service Schedules: Include service and lubrication requirements, list of required lubricants for equipment, and separate schedules for preventive and routine maintenance and service with standard time allotment.
G. Spare Parts List and Source Information: Include lists of replacement and repair parts, with parts identified and cross-referenced to manufacturers' maintenance documentation and local sources of maintenance materials and related services.
H. Maintenance Service Contracts: Include copies of maintenance agreements with name and telephone number of service agent.
I. Warranties and Bonds: Include copies of warranties and bonds and lists of circumstances and conditions that would affect validity of warranties or bonds.
PART 3 - EXECUTION
3.1 MANUAL PREPARATION
A. Product Maintenance Manual: Assemble a complete set of maintenance data indicating care and maintenance of each product, material, and finish incorporated into the Work.
B. Operation and Maintenance Manuals: Assemble a complete set of operation and maintenance data indicating operation and maintenance of each system, subsystem, and piece of equipment not part of a system.
C. Manufacturers' Data: Where manuals contain manufacturers' standard printed data, include only sheets pertinent to product or component installed. Mark each sheet to identify each product or component incorporated into the Work. If data include more than one item in a tabular format, identify each item using appropriate references from the Contract Documents. Identify data applicable to the Work and delete references to information not applicable.
D. Drawings: Prepare drawings supplementing manufacturers' printed data to illustrate the relationship of component parts of equipment and systems and to illustrate control sequence and flow diagrams. Coordinate these drawings with information contained in Record Drawings to ensure correct illustration of completed installation.
1. Do not use original Project Record Documents as part of operation and maintenance manuals.
OPERATION AND MAINTENANCE DATA 017823 - 5
E. Comply with Division 01 Section "Closeout Procedures" for schedule for submitting operation and maintenance documentation.
END OF SECTION 017823
PROJECT RECORD DOCUMENTS 017839 - 1
SECTION 017839 - PROJECT RECORD DOCUMENTS
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes administrative and procedural requirements for Project Record Documents, including the following:
1. Record Drawings. 2. Record Specifications. 3. Record Product Data.
B. See Division 01 Section "Operation and Maintenance Data" for operation and maintenance manual requirements.
C. See Divisions 01 through 16 Sections for specific requirements for Project Record Documents of the Work in those Sections.
1.2 SUBMITTALS
A. Record Drawings: Comply with the following:
1. Number of Copies: Submit two sets of marked-up Record Prints. 2. Number of Copies: Submit copies of Record Drawings as follows:
a. Final Submittal: Submit two sets of marked-up Record Prints
B. Record Specifications: Submit two copies of Project's Specifications, including addenda and contract modifications.
C. Record Product Data: Submit two copies of each Product Data submittal.
D. Submit PDF’s of Record Drawings, Record Specification, and Record Product Date on 2 discs.
PART 2 - PRODUCTS
2.1 RECORD DRAWINGS
A. Record Prints: Maintain one set of blue- or black-line white prints of the Contract Drawings and Shop Drawings.
1. Preparation: Mark Record Prints to show the actual installation where installation varies from that shown originally. Require individual or entity who obtained record data, whether individual or entity is Installer, subcontractor, or similar entity, to prepare the marked-up Record Prints.
PROJECT RECORD DOCUMENTS 017839 - 2
a. Give particular attention to information on concealed elements that would be difficult to identify or measure and record later.
b. Record data as soon as possible after obtaining it. Record and check the markup before enclosing concealed installations.
2. Mark the Contract Drawings or Shop Drawings, whichever is most capable of showing actual physical conditions, completely and accurately. If Shop Drawings are marked, show cross-reference on the Contract Drawings.
3. Mark record sets with erasable, red-colored pencil. Use other colors to distinguish between changes for different categories of the Work at same location.
4. Note Construction Change Directive numbers, alternate numbers, Change Order numbers, and similar identification, where applicable.
B. Format: Identify and date each Record Drawing; include the designation "PROJECT RECORD DRAWING" in a prominent location.
1. Record Prints: Organize Record Prints and newly prepared Record Drawings into manageable sets. Bind each set with durable paper cover sheets. Include identification on cover sheets.
2. Record Transparencies: Organize into unbound sets matching Record Prints. Place transparencies in durable tube-type drawing containers with end caps. Mark end cap of each container with identification. If container does not include a complete set, identify Drawings included.
3. Record CAD Drawings: Organize CAD information into separate electronic files that correspond to each sheet of the Contract Drawings. Name each file with the sheet identification. Include identification in each CAD file.
4. Identification: As follows:
a. Project name. b. Date. c. Designation "PROJECT RECORD DRAWINGS." d. Name of Architect and Engineer. e. Name of Contractor.
2.2 RECORD SPECIFICATIONS
A. Preparation: Mark Specifications to indicate the actual product installation where installation varies from that indicated in Specifications, addenda, and contract modifications.
1. Give particular attention to information on concealed products and installations that cannot be readily identified and recorded later.
2. Mark copy with the proprietary name and model number of products, materials, and equipment furnished, including substitutions and product options selected.
3. Record the name of manufacturer, supplier, Installer, and other information necessary to provide a record of selections made.
4. Note related Change Orders, Record Product Data, and Record Drawings where applicable.
PROJECT RECORD DOCUMENTS 017839 - 3
2.3 RECORD PRODUCT DATA
A. Preparation: Mark Product Data to indicate the actual product installation where installation varies substantially from that indicated in Product Data submittal.
1. Give particular attention to information on concealed products and installations that cannot be readily identified and recorded later.
2. Include significant changes in the product delivered to Project site and changes in manufacturer's written instructions for installation.
3. Note related Change Orders, Record Specifications, and Record Drawings where applicable.
2.4 MISCELLANEOUS RECORD SUBMITTALS
A. Assemble miscellaneous records required by other Specification Sections for miscellaneous record keeping and submittal in connection with actual performance of the Work. Bind or file miscellaneous records and identify each, ready for continued use and reference.
PART 3 - EXECUTION
3.1 RECORDING AND MAINTENANCE
A. Recording: Maintain one copy of each submittal during the construction period for Project Record Document purposes. Post changes and modifications to Project Record Documents as they occur; do not wait until the end of Project.
B. Maintenance of Record Documents and Samples: Store Record Documents and Samples in the field office apart from the Contract Documents used for construction. Do not use Project Record Documents for construction purposes. Maintain Record Documents in good order and in a clean, dry, legible condition, protected from deterioration and loss. Provide access to Project Record Documents for Architect's reference during normal working hours.
END OF SECTION 017839
THROUGH-PENETRATION FIRESTOP SYSTEMS 07841 - 1
SECTION 07841 - THROUGH-PENETRATION FIRESTOP SYSTEMS
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes through-penetration firestop systems for penetrations through fire-resistance-rated constructions, including both empty openings and openings containing penetrating items.
1.2 PERFORMANCE REQUIREMENTS
A. General: For penetrations through fire-resistance-rated constructions, including both empty openings and openings containing penetrating items, provide through-penetration firestop systems that are produced and installed to resist spread of fire according to requirements indicated, resist passage of smoke and other gases, and maintain original fire-resistance rating of construction penetrated.
B. Provide rated systems equal to the fire rating of the building component being penetrated.
C. Rated Systems: Provide through-penetration firestop systems with the following ratings determined per ASTM E 814 or UL 1479: 1. F-Rated Systems: Provide through-penetration firestop systems with F-ratings indicated,
but not less than that equaling or exceeding fire-resistance rating of constructions penetrated.
2. T-Rated Systems: For the following conditions, provide through-penetration firestop systems with T-ratings indicated, as well as F-ratings, where systems protect penetrating items exposed to potential contact with adjacent materials in occupiable floor areas: a. Penetrations located outside wall cavities. b. Penetrations located outside fire-resistance-rated shaft enclosures.
D. For through-penetration firestop systems exposed to view, traffic, moisture, and physical damage, provide products that, after curing, do not deteriorate when exposed to these conditions both during and after construction. 1. For piping penetrations for plumbing and wet-pipe sprinkler systems, provide moisture-
resistant through-penetration firestop systems. 2. For penetrations involving insulated piping, provide through-penetration firestop systems
not requiring removal of insulation.
E. For through-penetration firestop systems exposed to view, provide products with flame-spread and smoke-developed indexes of less than 25 and 450, respectively, as determined per ASTM E 84.
1.3 SUBMITTALS
A. Product Data: For each type of product indicated.
THROUGH-PENETRATION FIRESTOP SYSTEMS 07841 - 2
B. Shop Drawings: For each through-penetration firestop system, submit documentation, including illustrations, from a qualified testing and inspecting agency, showing each type of construction condition penetrated, relationships to adjoining construction, and type of penetrating item. 1. Where Project conditions require modification to a qualified testing and inspecting
agency's illustration for a particular through-penetration firestop condition, submit illustration, with modifications marked, approved by through-penetration firestop system manufacturer's fire-protection engineer as an engineering judgment or equivalent fire-resistance-rated assembly.
1.4 QUALITY ASSURANCE
A. Fire-Test-Response Characteristics: Provide through-penetration firestop systems that comply with the following requirements and those specified in Part 1 "Performance Requirements" Article: 1. Firestopping tests are performed by a qualified testing and inspecting agency. A
qualified testing and inspecting agency is UL, OPL or ITS, or another agency performing testing and follow-up inspection services for firestop systems acceptable to authorities having jurisdiction.
B. Coordinate construction of openings and penetrating items to ensure that through-penetration firestop systems are installed according to specified requirements.
C. Do not cover up through-penetration firestop system installations that will become concealed behind other construction until each installation has been examined by Owner's inspecting agency and building inspector, if required by authorities having jurisdiction.
PART 2 - PRODUCTS
2.1 FIRESTOPPING
A. Compatibility: Provide through-penetration firestop systems that are compatible with one another; with the substrates forming openings; and with the items, if any, penetrating through-penetration firestop systems, under conditions of service and application, as demonstrated by through-penetration firestop system manufacturer based on testing and field experience.
B. Accessories: Provide components for each through-penetration firestop system that are needed to install fill materials and to comply with Part 1 "Performance Requirements" Article. Use only components specified by through-penetration firestop system manufacturer and approved by qualified testing and inspecting agency for firestop systems indicated.
THROUGH-PENETRATION FIRESTOP SYSTEMS 07841 - 3
PART 3 - EXECUTION
3.1 THROUGH-PENETRATION FIRESTOP SYSTEM INSTALLATION
A. General: Install through-penetration firestop systems to comply with Part 1 "Performance Requirements" Article and with firestop system manufacturer's written installation instructions and published drawings for products and applications indicated.
B. Install forming/damming/backing materials and other accessories of types required to support fill materials during their application and in the position needed to produce cross-sectional shapes and depths required to achieve fire ratings indicated. 1. After installing fill materials and allowing them to fully cure, remove combustible
forming materials and other accessories not indicated as permanent components of firestop systems.
C. Install fill materials for firestop systems by proven techniques to produce the following results: 1. Fill voids and cavities formed by openings, forming materials, accessories, and
penetrating items as required in order to achieve fire-resistance ratings indicated. 2. Apply materials so they contact and adhere to substrates formed by openings and
penetrating items. 3. For fill materials that will remain exposed after completing Work, finish to produce
smooth, uniform surfaces that are flush with adjoining finishes.
D. Identification: Identify through-penetration firestop systems with preprinted metal or plastic labels. Attach labels permanently to surfaces adjacent to and within 6 inches (150 mm) of edge of the firestop systems so that labels will be visible to anyone seeking to remove penetrating items or firestop systems. Use mechanical fasteners for metal labels. Include the following information on labels: 1. The words "Warning - Through-Penetration Firestop System - Do Not Disturb. Notify
Building Management of Any Damage."
3.2 FIELD QUALITY CONTROL
A. Where deficiencies are found, repair or replace through-penetration firestop systems so they comply with requirements.
B. Proceed with enclosing through-penetration firestop systems with other construction only after inspection reports are issued and firestop installations comply with requirements.
END OF SECTION 07841
1
N
GROUND LEVEL PLUMBING PLAN
1
32'16'16' 0'
SCALE: 1/16"=1'-0"
2
SHEET NOTES
EXISTING FIRE DEPARTMENT CONNECTION TO BE ROTATED TOWARD
DRIVEWAY. COORDINATE WORK WITH FIRE SPRINKLER CONTRACTOR.
FOOD WASTE DISPOSER IN STAINLESS STEEL TABLE. COORDINATE WITH
ARCHITECTURAL PLANS.
EXISTING FAUCET TO BE REPLACED NEW WITH BATTERY POWERED SLOAN
OPTIMA SENSOR FAUCET. FIELD VERIFY FAUCET IN ADJACENT WOMENS
RESTROOM AS SLOAN MODEL EAF 150-ISM AND DUPLICATE FOR MEN'S
RESTROOM.
EXISTING ELEVATOR PIT SUMP PUMP DISCHARGE PIPING TO BE
REWORKED.REMOVE PIPING TO A POINT BELOW GRADE FOR CONNECTION OF
NEW PIPING INSTALLED ABOVE GRADE SHALL BE ENCASED IN A CONCRETE
CURB AS IT EXTENDS FOR DISCHARGE INTO INLET GRATE. CONCRETE CURB
SHALL PROTECT PIPING FROM DAMAGE.
NEW 3" HUB DRAIN FOR CONDENSATE DISPOSAL. CUT INTO EXISTING
VERTICAL SANITARY WASTE PIPING. INSULATE TRAP AND HORIZONTAL
PORTION SERVING CONDENSATE. COORDINATE INSTALLATION WITH
MECHANICAL CONTRACTOR.
PROVIDE 1/2" HW/CW BRANCH CONNECTIONS FROM ADJACENT RESTROOM
FOR CONNECTION TO DISPOSER.
TWO COMPARTMENT SINK. REFERENCE ARCHITECTURAL PLANS FOR SINK
AND FAUCET DESCRIPTION. CONTRACTOR SHALL PROVIDE AND INSTALL SINK
WITH FAUCET. PROVIDE 1/2" HW/CW BRANCH CONNECTIONS FROM ADJACENT
RESTROOM. CONNECT SANITARY WASTE TO EXISTING SANITARY WASTE
WHERE INDICATED.
3
4
5
6
2
EXISTING 6"
CLEANOUT. FIELD
VERIFY EXACT
LOCATION.
6"
EXISTING 1-1/4"
DOMESTIC WATER.
FIELD VERIFY EXACT
LOCATION.
EXISTING 6" SANITARY
WASTE. FIELD VERIFY
EXACT LOCATION.
1
EXISTING 6" SANITARY
WASTE. FIELD VERIFY
EXACT LOCATION.
3
6
FCO
5
5
4
7
7
1
1
CR
UIS
E T
ER
MIN
AL R
EP
AIR
S
MO
BILE
, A
LA
BA
MA
SEAL
NU
MB
ER
RE
VIS
IO
N
RE
VIS
IO
N D
ES
CR
IP
TIO
N
DESIGNED BY:
DRAWN BY:
CHECKED BY:
DATE:
SHEET TITLE:
SHEET:
03-07-2016
Pensacola, FL 32502
Dell Consulting project: 15-113
129 E. Government Street
P: 850-332-5687 F: 850-332-6629
Andrew W. Maurin 25105Alabama Certificate Number CA-4146-E
MEP Engineering
GROUND LEVEL
RJS
RJS
PLUMBING
RJS
P-1.0
RE
VIS
IO
NS
3
-2
2-1
61
SPLIT SYSTEM DX UNIT SCHEDULE
AIR DATA COOLING CAPACITY ELECTRIC REHEAT FILTER ELECTRICAL DATA
MARK EXTERNAL COMPRESSOR OUTDOOR MINIMUM OUTDOOR UNIT INDOOR UNIT OUTDOOR UNIT INDOOR UNIT
AHU/ TOTAL OUTSIDE STATIC MOTOR EDB EWB AMBIENT SENSIBLE TOTAL CONTROL STRIP TYPE MIN
(RLA)
FAN EFFICIENCY MCA MOCP MCA MOCP NOTES
HPU
(CFM) (CFM)
PRESSURE
(HP) (F) (F) (F)
BTUH BTUH STAGES HEAT MERV
(FLA)
VOLTS Hz PHASE VOLTS Hz PHASE
(AMPS) (AMPS) (AMPS) (AMPS)
(in of H2O) (KW)
12,000
0 0.5 1.0 80 67 9548,833 61,176
- 0 1" 8 7.8 1.0 13.5 SEER 460 60 3 208 60 1 10.7 15 10.0 151, 2, 3, 4, 6
NOTES
1 COORDINATE ALL ELECTRICAL REQUIREMENTS WITH SPECIFIC EQUIPMENT MANUFACTURER'S REQUIREMENTS AND THE ELECTRICAL CONTRACTOR.
2
PROVIDE AIR HANDLING UNIT WITH FACTORY MOUNTED SINGLE POINT POWER DISCONNECT TO SERVE BOTH THE FAN MOTOR AND STRIP HEAT.
3
BASIS OF DESIGN LENNOX ACX/CBX OR TSA/TAA SERIES.
4
5
MECHANICAL CONTRACTOR SHALL PROVIDE AND INSTALL RETURN DUCT MOUNTED SMOKE DETECTOR.
INTERLOCK OPERATION OF AHU-1 AND AHU-2 WITH OAAH-1. AHU-1 AND AHU-2 FAN SHALL RUN CONTINUOUSLY DURING OCCUPIED HOURS. OAAU-1 SHALL ALSO RUN CONTINUOUSLY DURING OCCUPIED HOURS. HPU-2 AND HPU-2 SHALL CYCLE AS NECESSARY TO MAINTAIN INDOOR SETPOINT TEMPERATURE.
DUCTLESS SPLIT UNIT SCHEDULE
AIR DATA COOLING CAPACITY
(AT AHRI STANDARD 210/240)
OUTDOOR ELECTRICAL DATA
MARK MINIMUM UNIT
DSSCU/ TOTAL EDB EWB AMBIENT TOTAL SEER WEIGHT MCA MOCP NOTES
(CFM) (°F) (°F) (°F)
BTUH
(LBS)
VOLTS Hz PHASE
(AMPS) (AMPS)
1 330 80 67 9510,500
13.00 150 120 60 1 14.3 201,2,3,4
NOTES
1 COORDINATE ALL ELECTRICAL REQUIREMENTS WITH THE ELECTRICAL CONTRACTOR.
2
PROVIDE UNIT AS A SINGLE POINT POWER CONNECTION TO THE OUTDOOR UNIT. POWER TO INDOOR UNIT IS SUPPLIED
FROM THE OUTDOOR UNIT.
3
PROVIDE UNIT WITH REMOTE WALL MOUNTED TYPE THERMOSTAT. PROVIDE INTEGRAL CONDENSATE PUMP. EXTEND INSULATED
SCH 40 PVC CONDENSATE DRAIN FROM UNIT TO NEAREST FLOOR DRAIN OR JANITOR'S SINK FOR DISPOSAL.
4
BASIS OF DESIGN MITSUBISHI PKA/PUY. INDOOR UNIT IS TO BE SURFACE MOUNTED ON THE WALL AS HIGH AS POSSIBLE.
100% OUTSIDE AIR SPLIT SYSTEM UNIT SCHEDULE
AIR DATA COOLING CAPACITY ELECTRIC REHEAT FILTER ELECTRICAL DATA
MARK EXTERNAL COMPRESSOR OUTDOOR OUTDOOR UNIT INDOOR UNIT OUTDOOR UNIT INDOOR UNIT
OAAU/ TOTAL OUTSIDE STATIC MOTOR EDB EWB AMBIENT SENSIBLE TOTAL CONTROL STRIP TYPE MIN
(RLA)
FAN AREA MCA MOCP MCA MOCP NOTES
OACU
(CFM) (CFM)
PRESSURE
(HP) (F) (F) (F)
BTUH BTUH STAGES HEAT MERV
(FLA)
SERVED VOLTS Hz PHASE VOLTS Hz PHASE
(AMPS) (AMPS) (AMPS) (AMPS)
(in of H2O) (KW)
1 3000 3000 0.5 84 80 95106,000 295,700
4 50 1" 8 ... ... CUSTOMS 60 3 60 3 7.0 15 78.6 801, 2, 3
NOTES
1 COORDINATE ALL ELECTRICAL REQUIREMENTS WITH THE ELECTRICAL CONTRACTOR.
2
PROVIDE AIR HANDLING UNIT WITH FACTORY MOUNTED SINGLE POINT POWER CONNECTION TO SERVE BOTH THE FAN MOTOR AND STRIP HEAT.
3BASIS OF DESIGN ADDISON RCA / VCA 351 OUTDOOR UNIT CABINET, COIL, COMPRESSOR, AND PIPING SHALL BE COATED WITH HERESITE OR EQUAL CORROSION RESISTANT PAINT.
460 460 2.0
LDB
(F)
52.6
6OUTDOOR UNIT CABINET, COIL, COMPRESSOR, AND PIPING SHALL BE COATED WITH HERESITE OR EQUAL CORROSION RESISTANT PAINT.
DSSAH/
24,000
80 67 950.5 2.084,845 119,500
2 25 1" 8
2 @ 7.8 2 @ 1.3
11.2 EER 460 60 3 460 60 3 21.0 251, 2, 3, 4, 5, 61,500
34,000
80 67 950.5 2.084,845 119,500
2 25 1" 8
2 @ 7.8 2 @ 1.3
11.2 EER 460 60 3 460 60 3 21.0 251, 2, 3, 4, 5, 61,500
FAN SCHEDULE
MOTOR ELECTRICAL DATA
AIR STATIC
MARK FLOW PRESSURE DRIVE FAN FAN INTERLOCK MAXIMUM MAXIMUM
NOTES
FAN
(CFM) (in of H20)
TYPE TYPE SERVICE WITH RPM SONES WATTS VOLTS Hz PHASE
EF-1
NOTES
1 COORDINATE ALL ELECTRICAL REQUIREMENTS WITH THE ELECTRICAL CONTRACTOR.
2
PROVIDE FAN WITH WALL DISCHARGE CAP AND SOLID STATE SPEED CONTROLLER. CONTROLLER SHALL BE LOCATED ABOVE THE CEILING ADJACENT TO THE FAN. CONTRACTOR SHALL PROVIDE AND INSTALL
CEILING ACCESS PANEL FOR HARD CEILINGS.
0.3 DIRECT INLINE FUME HOOD HOOD SWITCH 1203 3.5 120 60 1450 134
1, 2
42.0 45
42.0 45
2 330 80 67 9510,500
13.00 150 120 60 1 14.3 201,2,3,4
1
1
1
CR
UIS
E T
ER
MIN
AL R
EP
AIR
S
MO
BILE
, A
LA
BA
MA
SEAL
NU
MB
ER
RE
VIS
IO
N
RE
VIS
IO
N D
ES
CR
IP
TIO
N
DESIGNED BY:
DRAWN BY:
CHECKED BY:
DATE:
SHEET TITLE:
SHEET:
03-07-2016
Pensacola, FL 32502
Dell Consulting project: 15-113
129 E. Government Street
P: 850-332-5687 F: 850-332-6629
Andrew W. Maurin 25105Alabama Certificate Number CA-4146-E
MEP Engineering
HVAC SCHEDULES
RJS
RJS
RJS
M-1.0
RE
VIS
IO
NS
3
-2
2-1
61
N
GROUND LEVEL HVAC PLAN
1
32'16'16' 0'
SCALE: 1/16"=1'-0"
AHU-2
AHU-3
OAAHU-1
DSSCU-1
DSSAH-1
AHU-1
CU-1
1
2
SHEET NOTES
EXISTING FAN TO BE REPLACED. FAN REPLACEMENT TO BE
COORDINATED WITH ORIGINAL MANUFACTURER'S BUY BACK PROGRAM.
COORDINATE INSTALLATION WITH OTHER TRADES.
NEW FAN TO BE INSTALLED IN THIS GENERAL LOCATION. NEW FAN
SHALL DUPLICATE FANS TO BE REPLACED AT EAST END OF BUS DROP
OFF LANE. COORDINATE ELECTRICAL REQUIREMENTS WITH THE
ELECTRICAL CONTRACTOR.
FUME HOOD EXHAUST FAN. EXTEND DUCT AS INDICTED AS HIGH AS
POSSIBLE THROUGH PARKING GARAGE.
TERMINATE DUCT POINTING DOWNWARD WITH BIRD SCREEN.
PROVIDE 3 HOUR FIRE DAMPER AND ACCESS DOOR AT DUCT
PENETRATION OF WALL.
FUME HOOD. REFERENCE ARCHITECTURAL PLANS FOR ADDITIONAL
INFORMATION.
NEW DUCTLESS SPLIT SYSTEM FOR SERVER ROOM. INSTALL INDOOR
UNIT ON WALL AS HIGH AS POSSIBLE. EXTEND INSULATED PUMPED
CONDENSATE FROM INDOOR UNIT THROUGH CEILING SPACE FOR
DISCHARGE INTO JANITOR'S SINK FOR DISPOSAL.
INSTALL DUCTLESS SPLIT SYSTEM OUTDOOR UNIT ON WALL MOUNTED
BRACKET AS HIGH AS POSSIBLE. ROUTE REFRIGERANT PIPING INTO
CUSTOMS AREA CEILING SPACE. CONTINUE ABOVE CEILING AS
NECESSARY FOR CONNECTION TO INDOOR UNIT.
TRANSITION RETURN AIR DUCT FROM FULL SIZE OF UNIT OPENING TO
36x20 AND EXTEND THROUGH WALL AS INDICATED. PROVIDE 2 HOPUR
FIRE DAMPER AT WALL PENETRATION. TERMINATE DUCT AT WALL WITH
A 36x24 HEAVY DUTY RETURN AIR GRILLE. CONNECT 16x14 OUTSIDE AIR
DUCT TO RETURN AIR DUCT AS INDICATED. BALANCE FOR 1,500 CFM.
INSTALL AIR HANDLING UNIT ON NEW PLATFORM. PROVIDE WITH
AUXILIARY DRAIN PAN UNDER UNIT. PROVIDE WITH A CONDENSATE
PUMP. EXTEND INSULATED PUMPED CONDENSATE DRAIN PIPING TO
NEW HUB DRAIN CUT INTO EXISTING SANITARY WASTE LINE.
REFERENCE DRAWING P-1.0 FOR HUB DRAIN LOCATION.
EXISTING EXHAUST FAN TO REMAIN. CONTRACTOR SHALL ENSURE THE
FAN IS IN PROPER WORKING ORDER. CONTRACTOR SHALL PERFORM A
FULL MAINTENANCE INSPECTION DETAILING REQUIREMENTS TO MAKE
THE FAN READY FOR OPERATION.
THIS FAN TO HAVE A BLANK OFF SHEET METAL PANEL INSTALLED ON
THE INTAKE OF THE FAN. THE DISCONNECT FOR THE FAN SHALL BE
LOCKED IN THE OFF POSITION.
ROUTE REFRIGERANT PIPING OUT THROUGH EXTERIOR WALL. EXTEND
UNDER NEW EQUIPMENT PLATFORM AND TURN UP FOR CONNECTION TO
NEW UNITS.
TRANSITION OUTSIDE AIR INTAKE DUCT FROM FULL SIZE OF UNIT
OPENING TO 24x24 OVER TO THE EXTERIOR WALL AND TURN DOWN IN
FRONT OF THE EXISTING INTAKE LOUVER. CONNECT 24x24 OUTSIDE
AIR DUCT TO EXISTING LOUVER. BLANK OFF UNUSED PORTION OF
LOUVER.
EXISTING UNIT HEATER TO REMAIN. ENSURE HEATER IS FUNCTIONING
PROPERLY. CONTRACTOR SHALL PROVIDE A WRITTEN REPORT
DETAILING ANY DEFICIENCIES ASSOCIATED WITH THE UNIT HEATER.
PROVIDE UNIT WITH 24" LONG RETURN AIR DUCT FULL SIZE OF UNIT
OPENING. TERMINATE DUCT WITH 1/2" GALVANIZED WIRE CLOTH.
EXTEND EXHAUST DUCT TO NORTH SIDE OF PARKING GARAGE.
TERMINATE AT EDGE OF PARKING GARAGE DECK FOOTPRINT.
CONTRACTOR SHALL PROVIDE SHOP DRAWING OF DUCT ROUTE
SHOWING EXISTING EQUIPMENT TO ENSURE DUCT ROUTE AVOIDS
CONFLICTS.
BASIS OF DESIGN FOR FAN IS "BIG ASS" MODEL "POWERFOIL X3.0 14'"
BASIS OF DESIGN FOR FAN IS "BIG ASS" MODEL "POWERFOIL X3.0 16'"
3
EF-1
1
1
24
"Ø
F
AB
RIC
D
UC
T
12
"Ø
12
"Ø
E
XH
AU
ST
D
UC
T
4
2
1
1
16
10
11
11
3 5
6
T
T
T
AHU-3
AHU-2
7
8
11 12 11 12 11 12
MVD
24
"Ø
F
AB
RIC
D
UC
T
4
5
6
7
8
9
10
11
12
13
14
15
16
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
NE
W P
AR
TIT
IO
N W
AL
L
17
17
18
18
18
18
19
20
20
20
19
19
19
30x14
16x14
24x24
MVD
2
4
"
Ø
F
A
B
R
I
C
D
U
C
T
14
9
1
1
1
1
1
CR
UIS
E T
ER
MIN
AL R
EP
AIR
S
MO
BILE
, A
LA
BA
MA
SEAL
NU
MB
ER
RE
VIS
IO
N
RE
VIS
IO
N D
ES
CR
IP
TIO
N
DESIGNED BY:
DRAWN BY:
CHECKED BY:
DATE:
SHEET TITLE:
SHEET:
03-07-2016
Pensacola, FL 32502
Dell Consulting project: 15-113
129 E. Government Street
P: 850-332-5687 F: 850-332-6629
Andrew W. Maurin 25105Alabama Certificate Number CA-4146-E
MEP Engineering
GROUND LEVEL
RJS
RJS
HVAC PLAN
RJS
M-2.0
RE
VIS
IO
NS
3
-2
2-1
61