addendum one to whom it may concern 1....addendum one march 12, 2018 to whom it may concern...
TRANSCRIPT
ADDENDUM ONE
March 12, 2018
TO WHOM IT MAY CONCERN
Reference: Pre-Bid meeting to RFP #735-18-8197 Fiber Relocation
Meeting minutes are below to the above referenced meeting held on March 7, 2018.
1. Estimated cost for removal of existing fiber should be included in bid. Existing fiber CANNOT be removed until AFTER the new Data Center in the Health Science and Human Services building is complete. Existing fiber will continue to be used until all new campus fiber is connected, tested and operational. The new fiber is to be installed alongside the existing fiber (contractor is NOT to use existing fiber as a means to pull new armored fiber into place).
Questions from Fiber Walk Through Meeting:
Q: Any conduit work needed.
A: No, conduits already exist.
Q: What is the Tunnel Size?
A: Tunnel size in generally 6X8.
Q: Is there a CAD file for the campus?
A: Yes, a CAD file is available (attached MSU_Base_Plan, 3)
Q: Health Science and Human Services conduit layout
A: Drawing is available (attached MSU-HS &HSC_ Addendum 2)
Q. Timeline for Health Sciences and Human Services available?
A: Yes, current construction table and timeline is available (attached March 5, 2018 Update Sundt)
If you have any questions please contact me at [email protected] or 940-397-4110.
Thank You
Steve Shelley Director of Purchasing/Contract Management
Activity Name OriginalDuration
RemainingDuration
Start Finish
Midwestern State Univeristy 903 325 11-Jan-16 08:00 AM A 14-Jun-19 05:00 PM
PRECONSTRUCTION 607 10 11-Jan-16 08:00 AM A 16-Mar-18 05:00 PM
PROJECT MILESTONES 399 275 16-Oct-17 08:00 AM A 16-May-19 05:00 PM
NTP Package 1 - Site / Utilities / Foundations 0 0 16-Oct-17 08:00 AM A
NTP Package 2 - Building 0 0 13-Dec-17 08:00 AM A
Project Start Package 1 0 0 18-Dec-17 12:00 AM A
Project Start Package 2 0 0 18-Dec-17 08:00 AM A
Start Foundation Operations 0 0 07-Feb-18 08:00 AM A
Complete Foundations and Substructure 0 0 13-Apr-18 05:00 PM
Place Level 1 0 0 26-Apr-18 05:00 PM
Place Level 2 0 0 15-May-18 05:00 PM
Place Level 3 0 0 01-Jun-18 05:00 PM
Place Level 4 0 0 19-Jun-18 05:00 PM
Place Level Roof 0 0 06-Jul-18 05:00 PM
Structural Topping Out 0 0 13-Jul-18 05:00 PM
Complete Concrete Frame 0 0 26-Jul-18 05:00 PM
Building Dry-in 0 0 02-Oct-18 05:00 PM
Permanent Power 0 0 09-Oct-18 05:00 PM
Blow Uncontrolled Air 0 0 16-Oct-18 05:00 PM
Project Substantial Completion 0 0 16-May-19 05:00 PM
PULL PLANNING 97 88 20-Feb-18 08:00 AM A 06-Jul-18 05:00 PM
Foundations & Underground 52 15 20-Feb-18 08:00 AM A 23-Mar-18 05:00 PM
Concrete Structure 55 55 19-Apr-18 08:00 AM 06-Jul-18 05:00 PM
PROJECT ADMINISTRATION 0 0
IMPACTS 384 305 20-Oct-17 12:00 AM A 16-May-19 05:00 PM
PROJECT DELAYS 384 27 20-Oct-17 12:00 AM A 16-May-19 05:00 PM
Weather 314 27 20-Feb-18 08:00 AM A 16-May-19 05:00 PM
Weather Delay - February 5 0 20-Feb-18 08:00 AM A 26-Feb-18 05:00 PM A
Expected Weather/Time Impacts Included in Schedule 27 27 10-Apr-19 08:00 AM 16-May-19 05:00 PM
Project Budget Overrun 34 0 20-Oct-17 12:00 AM A 13-Dec-17 12:00 AM A
Value Engineering and Approval by BOR 30 0 20-Oct-17 12:00 AM A 13-Dec-17 12:00 AM A
Package 1 Work Stopped due to Bids Exceeding CCL 0 0 20-Oct-17 12:00 AM A
Notice to Restart Package 1 Consturction 0 0 13-Dec-17 12:00 AM A
CHANGE ORDERS 103 15 18-Dec-17 12:00 AM A 23-Mar-18 05:00 PM
Post GMP Target Value Design 103 15 18-Dec-17 12:00 AM A 23-Mar-18 05:00 PM
Complete Renderings 20 5 18-Dec-17 12:00 AM A 09-Mar-18 05:00 PM
Drawing Revisions Complete Set 45 15 18-Dec-17 12:00 AM A 23-Mar-18 05:00 PM
Drawings Revisions Structural 45 3 18-Dec-17 08:00 AM A 07-Mar-18 05:00 PM
Issue for Pricing 0 0 23-Mar-18 05:00 PM
OWNER CONTINGENCY 3 0 29-Dec-17 08:00 AM A 05-Jan-18 05:00 PM A
PCO-001 3 0 29-Dec-17 08:00 AM A 05-Jan-18 05:00 PM A
PCO 001 - RFI 001 Remove Existing Foundatations 3 0 29-Dec-17 08:00 AM A 05-Jan-18 05:00 PM A
PROCUREMENT 251 141 22-Sep-17 08:00 AM A 20-Sep-18 05:00 PM
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019
Midwestern State Univeristy
PRECONSTRUCTION
PROJECT MILESTONES
NTP Package 1 - Site / Utilities / Foundations
NTP Package 2 - Building
Project Start Package 1
Project Start Package 2
Start Foundation Operations
Complete Foundations and Substructure
Place Level 1
Place Level 2
Place Level 3
Place Level 4
Place Level Roof
Structural Topping Out
Complete Concrete Frame
Building Dry-in
Permanent Power
Blow Uncontrolled Air
Project Substantial Completion
PULL PLANNING
IMPACTS
PROJECT DELAYS
Weather
Weather Delay - February
Expected Weather/Time Impacts Included in Schedule
Project Budget Overrun
Value Engineering and Approval by BOR
Package 1 Work Stopped due to Bids Exceeding CCL
Notice to Restart Package 1 Consturction
CHANGE ORDERS
Post GMP Target Value Design
Complete Renderings, Complete Renderings
Drawing Revisions Complete Set, Drawing Revisions Complete Set
Drawings Revisions Structural, Drawings Revisions Structural
Issue for Pricing
OWNER CONTINGENCY
PCO-001
PCO 001 - RFI 001 Remove Existing Foundatations
PROCUREMENT
Midwestern State University Health Science and Human Services Center Page 1 of 23 05-Mar-18 08:23 PM
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
SummaryMidwestern State University
Health Science & Human Services Center
Construction Schedule
Date Revision Checked Appr...
18-Dec-17 ... GMP #2 Schedule BA BA
05-Mar-18 ... Pre-Baseline Schedule Update BA BA
Activity Name OriginalDuration
RemainingDuration
Start Finish
CURRENT MASTER FORMAT 251 141 22-Sep-17 08:00 AM A 20-Sep-18 05:00 PM
DIVISION 01 - GENERAL REQUIREMENTS 10 0 22-Sep-17 08:00 AM A 13-Oct-17 12:00 AM A
Create Submittal Register 10 0 22-Sep-17 08:00 AM A 13-Oct-17 12:00 AM A
DIVISION 02 - EXISTING CONDITIONS 0 0
DIVISION 03 - CONCRETE 102 59 26-Dec-17 12:00 AM A 24-May-18 05:00 PM
Reinforcing Steel 102 59 26-Dec-17 12:00 AM A 24-May-18 05:00 PM
Drilled Piers 31 0 29-Dec-17 08:00 AM A 05-Feb-18 05:00 PM A
Drilled Pier Rebar Shop Drawings 15 0 29-Dec-17 08:00 AM A 05-Jan-18 05:00 PM A
Drilled Pier Rebar THS Approval 2 0 08-Jan-18 08:00 AM A 09-Jan-18 05:00 PM A
Drilled Pier Rebar A/E Approval 15 0 09-Jan-18 08:00 AM A 18-Jan-18 05:00 PM A
Drilled Pier Rebar Fab & Delivery 15 0 19-Jan-18 08:00 AM A 05-Feb-18 05:00 PM A
Grade Beams 31 12 26-Dec-17 12:00 AM A 20-Mar-18 05:00 PM
GB Rebar Shop Drawings 5 0 26-Dec-17 12:00 AM A 04-Jan-18 05:00 PM A
GB Rebar THS Approval 5 0 08-Jan-18 08:00 AM A 18-Jan-18 05:00 PM A
GB Rebar A/E Approval 15 0 18-Jan-18 08:00 AM A 06-Feb-18 05:00 PM A
GB South Rebar Fab & Delivery 12 2 07-Feb-18 08:00 AM A 06-Mar-18 05:00 PM
GB North Rebar Fab & Delivery 12 12 05-Mar-18 08:00 AM 20-Mar-18 05:00 PM
Level 1 Slab on Carton Forms 32 13 01-Feb-18 12:00 AM A 21-Mar-18 05:00 PM
Slab Rebar Shop Drawings 5 0 01-Feb-18 12:00 AM A 06-Feb-18 05:00 PM A
Slab Rebar THS Approval 2 0 07-Feb-18 08:00 AM A 07-Feb-18 05:00 PM A
Slab Rebar A/E Approval 15 1 07-Feb-18 08:00 AM A 05-Mar-18 05:00 PM
Slab South Rebar Fab & Delivery 12 12 06-Mar-18 08:00 AM 21-Mar-18 05:00 PM
Slab North Rebar Fab & Delivery 12 12 06-Mar-18 08:00 AM 21-Mar-18 05:00 PM
Columns 45 26 29-Jan-18 12:00 AM A 09-Apr-18 05:00 PM
Columns Rebar Shop Drawings 5 0 29-Jan-18 12:00 AM A 02-Feb-18 05:00 PM A
Columns Rebar THS Approval 2 0 05-Feb-18 08:00 AM A 15-Feb-18 05:00 PM A
Columns Rebar A/E Approval 15 2 15-Feb-18 08:00 AM A 06-Mar-18 05:00 PM
Columns South Rebar Fab & Delivery 12 12 07-Mar-18 08:00 AM 22-Mar-18 05:00 PM
Columns North Rebar Fab & Delivery 12 12 23-Mar-18 08:00 AM 09-Apr-18 05:00 PM
Level 2 41 41 08-Mar-18 08:00 AM 03-May-18 05:00 PM
L2 Rebar Shop Drawings 5 5 08-Mar-18 08:00 AM* 14-Mar-18 05:00 PM
L2 Rebar THS Approval 2 2 15-Mar-18 08:00 AM 16-Mar-18 05:00 PM
L2 Rebar A/E Approval 10 10 19-Mar-18 08:00 AM 30-Mar-18 05:00 PM
L2 South Rebar Fab & Delivery 12 12 02-Apr-18 08:00 AM 17-Apr-18 05:00 PM
L2 North Rebar Fab & Delivery 12 12 18-Apr-18 08:00 AM 03-May-18 05:00 PM
Level 3 41 41 15-Mar-18 08:00 AM 10-May-18 05:00 PM
L3 Rebar Shop Drawings 5 5 15-Mar-18 08:00 AM 21-Mar-18 05:00 PM
L3 Rebar THS Approval 2 2 22-Mar-18 08:00 AM 23-Mar-18 05:00 PM
L3 Rebar A/E Approval 10 10 26-Mar-18 08:00 AM 06-Apr-18 05:00 PM
L3 South Rebar Fab & Delivery 12 12 09-Apr-18 08:00 AM 24-Apr-18 05:00 PM
L3 North Rebar Fab & Delivery 12 12 25-Apr-18 08:00 AM 10-May-18 05:00 PM
Level 4 41 41 22-Mar-18 08:00 AM 17-May-18 05:00 PM
L4 Rebar Shop Drawings 5 5 22-Mar-18 08:00 AM 28-Mar-18 05:00 PM
L4 Rebar THS Approval 2 2 29-Mar-18 08:00 AM 30-Mar-18 05:00 PM
L4 Rebar A/E Approval 10 10 02-Apr-18 08:00 AM 13-Apr-18 05:00 PM
L4 South Rebar Fab & Delivery 12 12 16-Apr-18 08:00 AM 01-May-18 05:00 PM
L4 North Rebar Fab & Delivery 12 12 02-May-18 08:00 AM 17-May-18 05:00 PM
Level Roof 41 41 29-Mar-18 08:00 AM 24-May-18 05:00 PM
LR Rebar Shop Drawings 5 5 29-Mar-18 08:00 AM 04-Apr-18 05:00 PM
LR Rebar THS Approval 2 2 05-Apr-18 08:00 AM 06-Apr-18 05:00 PM
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019
CURRENT MASTER FORMAT
DIVISION 01 - GENERAL REQUIREMENTS
Create Submittal Register
DIVISION 03 - CONCRETE
Reinforcing Steel
Drilled Piers
Drilled Pier Rebar Shop Drawings
Drilled Pier Rebar THS Approval
Drilled Pier Rebar A/E Approval
Drilled Pier Rebar Fab & Delivery
Grade Beams
GB Rebar Shop Drawings
GB Rebar THS Approval
GB Rebar A/E Approval
GB South Rebar Fab & Delivery, GB South Rebar Fab & Delivery
GB North Rebar Fab & Delivery
Level 1 Slab on Carton Forms
Slab Rebar Shop Drawings
Slab Rebar THS Approval
Slab Rebar A/E Approval, Slab Rebar A/E Approval
Slab South Rebar Fab & Delivery
Slab North Rebar Fab & Delivery
Columns
Columns Rebar Shop Drawings
Columns Rebar THS Approval
Columns Rebar A/E Approval, Columns Rebar A/E Approval
Columns South Rebar Fab & Delivery
Columns North Rebar Fab & Delivery
Level 2
L2 Rebar Shop Drawings
L2 Rebar THS Approval
L2 Rebar A/E Approval
L2 South Rebar Fab & Delivery
L2 North Rebar Fab & Delivery
Level 3
L3 Rebar Shop Drawings
L3 Rebar THS Approval
L3 Rebar A/E Approval
L3 South Rebar Fab & Delivery
L3 North Rebar Fab & Delivery
Level 4
L4 Rebar Shop Drawings
L4 Rebar THS Approval
L4 Rebar A/E Approval
L4 South Rebar Fab & Delivery
L4 North Rebar Fab & Delivery
Level Roof
LR Rebar Shop Drawings
LR Rebar THS Approval
Midwestern State University Health Science and Human Services Center Page 2 of 23 05-Mar-18 08:23 PM
Activity Name OriginalDuration
RemainingDuration
Start Finish
LR Rebar A/E Approval 10 10 09-Apr-18 08:00 AM 20-Apr-18 05:00 PM
LR South Rebar Fab & Delivery 12 12 23-Apr-18 08:00 AM 08-May-18 05:00 PM
LR North Rebar Fab & Delivery 12 12 09-May-18 08:00 AM 24-May-18 05:00 PM
Formwork 35 35 08-Mar-18 08:00 AM 25-Apr-18 05:00 PM
Pan Deck Shop Drawings 10 10 08-Mar-18 08:00 AM* 21-Mar-18 05:00 PM
Pan Deck THS Approval 5 5 22-Mar-18 08:00 AM 28-Mar-18 05:00 PM
Pan Deck A/E Approval 10 10 29-Mar-18 08:00 AM 11-Apr-18 05:00 PM
Pan Deck Delivery 10 10 12-Apr-18 08:00 AM 25-Apr-18 05:00 PM
DIVISION 04 - MASONRY 91 91 05-Mar-18 08:00 AM 11-Jul-18 05:00 PM
Face Brick 91 91 05-Mar-18 08:00 AM 11-Jul-18 05:00 PM
Samples 91 91 05-Mar-18 08:00 AM 11-Jul-18 05:00 PM
Face Brick and Grout Samples 20 20 05-Mar-18 08:00 AM 30-Mar-18 05:00 PM
THS Review 1 1 02-Apr-18 08:00 AM 02-Apr-18 05:00 PM
A/E Approval 15 15 03-Apr-18 08:00 AM 23-Apr-18 05:00 PM
Fab & Deliver 55 55 24-Apr-18 08:00 AM 11-Jul-18 05:00 PM
Shop Drawings & Product Data 50 50 05-Mar-18 08:00 AM 11-May-18 05:00 PM
Face Brick Shop Drawings 10 10 05-Mar-18 08:00 AM 16-Mar-18 05:00 PM
THS Review 5 5 19-Mar-18 08:00 AM 23-Mar-18 05:00 PM
A/E Approval 15 15 26-Mar-18 08:00 AM 13-Apr-18 05:00 PM
Fab & Deliver 20 20 16-Apr-18 08:00 AM 11-May-18 05:00 PM
Cast Stone 65 65 05-Mar-18 08:00 AM 04-Jun-18 05:00 PM
Samples 55 55 05-Mar-18 08:00 AM 18-May-18 05:00 PM
Cast Stone & Grout Samples 5 5 05-Mar-18 08:00 AM 09-Mar-18 05:00 PM
THS Review 5 5 12-Mar-18 08:00 AM 16-Mar-18 05:00 PM
A/E Approval 15 15 19-Mar-18 08:00 AM 06-Apr-18 05:00 PM
Fab & Deliver 30 30 09-Apr-18 08:00 AM 18-May-18 05:00 PM
Shop Drawings & Product Data 65 65 05-Mar-18 08:00 AM 04-Jun-18 05:00 PM
Cast Stone Shop Drawings & Project Data 15 15 05-Mar-18 08:00 AM 23-Mar-18 05:00 PM
THS Review 5 5 26-Mar-18 08:00 AM 30-Mar-18 05:00 PM
A/E Approval 15 15 02-Apr-18 08:00 AM 20-Apr-18 05:00 PM
Fab & Deliver 30 30 23-Apr-18 08:00 AM 04-Jun-18 05:00 PM
Exterior Insulation & Flashing 45 45 05-Mar-18 08:00 AM 04-May-18 05:00 PM
Insualtion & Flashing Project Data 5 5 05-Mar-18 08:00 AM 09-Mar-18 05:00 PM
THS Review 5 5 12-Mar-18 08:00 AM 16-Mar-18 05:00 PM
A/E Approval 15 15 19-Mar-18 08:00 AM 06-Apr-18 05:00 PM
Fab & Deliver 20 20 09-Apr-18 08:00 AM 04-May-18 05:00 PM
DIVISION 05 - METALS 62 62 19-Feb-18 08:00 AM A 30-May-18 05:00 PM
Anchor Bolts & Embeds 30 7 19-Feb-18 08:00 AM A 13-Mar-18 05:00 PM
Fab & Deliver 5 0 19-Feb-18 08:00 AM A 23-Feb-18 05:00 PM A
Shop Drawings 5 5 05-Mar-18 08:00 AM 09-Mar-18 05:00 PM
THS Review 1 1 12-Mar-18 08:00 AM 12-Mar-18 05:00 PM
A/E Approval 1 1 13-Mar-18 08:00 AM 13-Mar-18 05:00 PM
Metal Pan Stairs 55 55 07-Mar-18 08:00 AM 22-May-18 05:00 PM
Shop Drawings 15 15 07-Mar-18 08:00 AM* 27-Mar-18 05:00 PM
THS Review 5 5 28-Mar-18 08:00 AM 03-Apr-18 05:00 PM
A/E Approval 15 15 04-Apr-18 08:00 AM 24-Apr-18 05:00 PM
Fab & Deliver 20 20 25-Apr-18 08:00 AM 22-May-18 05:00 PM
Building Structural Steel 60 60 07-Mar-18 08:00 AM 30-May-18 05:00 PM
Shop Drawings 20 20 07-Mar-18 08:00 AM* 03-Apr-18 05:00 PM
THS Review 5 5 04-Apr-18 08:00 AM 10-Apr-18 05:00 PM
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019
LR Rebar A/E Approval
LR South Rebar Fab & Delivery
LR North Rebar Fab & Delivery
Formwork
Pan Deck Shop Drawings
Pan Deck THS Approval
Pan Deck A/E Approval
Pan Deck Delivery
DIVISION 04 - MASONRY
Face Brick
Samples
Face Brick and Grout Samples
THS Review
A/E Approval
Fab & Deliver
Shop Drawings & Product Data
Face Brick Shop Drawings
THS Review
A/E Approval
Fab & Deliver
Cast Stone
Samples
Cast Stone & Grout Samples
THS Review
A/E Approval
Fab & Deliver
Shop Drawings & Product Data
Cast Stone Shop Drawings & Project Data
THS Review
A/E Approval
Fab & Deliver
Exterior Insulation & Flashing
Insualtion & Flashing Project Data
THS Review
A/E Approval
Fab & Deliver
DIVISION 05 - METALS
Anchor Bolts & Embeds
Fab & Deliver
Shop Drawings
THS Review
A/E Approval
Metal Pan Stairs
Shop Drawings
THS Review
A/E Approval
Fab & Deliver
Building Structural Steel
Shop Drawings
THS Review
Midwestern State University Health Science and Human Services Center Page 3 of 23 05-Mar-18 08:23 PM
Activity Name OriginalDuration
RemainingDuration
Start Finish
A/E Approval 15 15 11-Apr-18 08:00 AM 01-May-18 05:00 PM
Fab & Deliver 20 20 02-May-18 08:00 AM 30-May-18 05:00 PM
Metal Decking 60 60 07-Mar-18 08:00 AM 30-May-18 05:00 PM
Shop Drawings 20 20 07-Mar-18 08:00 AM* 03-Apr-18 05:00 PM
THS Review 5 5 04-Apr-18 08:00 AM 10-Apr-18 05:00 PM
A/E Approval 15 15 11-Apr-18 08:00 AM 01-May-18 05:00 PM
Fab & Deliver 20 20 02-May-18 08:00 AM 30-May-18 05:00 PM
Misc. Steel 0 0
Stainless Steel Handrail System 0 0
DIVISION 06 - WOODS / PLASTICS / COMPOSITES 0 0
Finish Carpentry 0 0
Casework 0 0
Prefinished Wood Paneling 0 0
DIVISION 07 - THERMAL / MOISTURE PROTECTION 0 0
TPO Roofing 0 0
Clay Tile Roofing 0 0
Elevator Pit Waterproofing 0 0
Fireproofing 0 0
Metal Panels 0 0
DIVISION 08 - OPENINGS 0 0
Doors / Frames / Hardware 0 0
Aluminum Window Systems 0 0
Glass and Glazing 0 0
DIVISION 09 - FINISHES 0 0
Flooring 0 0
Terrazzo 0 0
DIVISION 10 - SPECIALTIES 0 0
DIVISION 11 - EQUIPMENT 0 0
Patient Care Equipment 0 0
DIVISION 12 - FURNISHINGS 0 0
DIVISION 14 - CONVEYING EQUIPMENT 99 90 07-Feb-18 08:00 AM A 10-Jul-18 05:00 PM
Hydraulic Elevators 99 90 07-Feb-18 08:00 AM A 10-Jul-18 05:00 PM
Elevator Shop Drawings 15 0 07-Feb-18 08:00 AM A 08-Feb-18 05:00 PM A
Elevator THS Review 5 5 20-Feb-18 12:00 AM A 09-Mar-18 05:00 PM
Elevator A/E Approval 15 15 12-Mar-18 08:00 AM 30-Mar-18 05:00 PM
Elevator Fab & Delivery 70 70 02-Apr-18 08:00 AM 10-Jul-18 05:00 PM
DIVISION 21 - FIRE SUPPRESSION 0 0
Fire Pump 0 0
DIVISION 22 - PLUMBING 0 0
Boiler 0 0
Med Gas 0 0
DIVISION 23 - HVAC 0 0
Air Handling Units 0 0
CRAC Units 0 0
Air Distribution Equipment 0 0
Chilled Water Pumps 0 0
Penthouse Louvers 0 0
Exhuast Fans 0 0
DIVISION 26 - ELECTRICAL 126 126 26-Mar-18 08:00 AM 20-Sep-18 05:00 PM
Transformer 126 126 26-Mar-18 08:00 AM 20-Sep-18 05:00 PM
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019
A/E Approval
Fab & Deliver
Metal Decking
Shop Drawings
THS Review
A/E Approval
Fab & Deliver
DIVISION 14 - CONVEYING EQUIPMENT
Hydraulic Elevators
Elevator Shop Drawings
Elevator THS Review, Elevator THS Review
Elevator A/E Approval
Elevator Fab & Delivery
DIVISION 26 - ELECTRICAL
Transformer
Midwestern State University Health Science and Human Services Center Page 4 of 23 05-Mar-18 08:23 PM
Activity Name OriginalDuration
RemainingDuration
Start Finish
Transformer Shop Drawings & Product Data 15 15 26-Mar-18 08:00 AM* 13-Apr-18 05:00 PM
Transformer THS Review 1 1 16-Apr-18 08:00 AM 16-Apr-18 05:00 PM
Transformer A/E Approval 15 15 17-Apr-18 08:00 AM 07-May-18 05:00 PM
Transformer Fab & Delivery 95 95 08-May-18 08:00 AM 20-Sep-18 05:00 PM
Generator / ATS 0 0
UPS System 0 0
Gear 0 0
Lighting 0 0
DIVISION 27 - COMMUNICATIONS 0 0
Cable Tray System 0 0
DIVISION 28 - ELECTRONIC SAFETY / SECURITY 0 0
Fire Alarm System 0 0
DIVISION 31 - EARTHWORK 0 0
DIVISION 32 - EXTERIOR IMPROVEMENTS 0 0
DIVISION 33 - UTILITIES 10 0 08-Dec-17 12:00 AM A 02-Jan-18 12:00 AM A
Utility Product Data 5 0 08-Dec-17 12:00 AM A 13-Dec-17 12:00 AM A
Utility Approval 10 0 14-Dec-17 12:00 AM A 28-Dec-17 12:00 AM A
Utility Fab & Deliver 1 0 29-Dec-17 12:00 AM A 02-Jan-18 12:00 AM A
WORK PACKAGES 0 0
CONSTRUCTION 362 268 02-Nov-17 12:00 AM A 26-Mar-19 05:00 PM
MOBILIZATION / DEMOBILIZATION 49 0 02-Nov-17 12:00 AM A 28-Dec-17 12:00 AM A
Cut/Cap/Make Safe Site Electrical 5 0 02-Nov-17 12:00 AM A 06-Nov-17 12:00 AM A
Install Site Fencing 3 0 18-Dec-17 12:00 AM A 18-Dec-17 12:00 AM A
Install Tree Protection 5 0 19-Dec-17 08:00 AM A 28-Dec-17 12:00 AM A
SITEWORK 153 101 18-Dec-17 12:00 AM A 01-Aug-18 05:00 PM
Demolition 10 0 19-Dec-17 12:00 AM A 29-Dec-17 05:00 PM A
Remove Concrete Paving 10 0 19-Dec-17 12:00 AM A 29-Dec-17 05:00 PM A
Mass Excavation 10 0 18-Dec-17 12:00 AM A 08-Jan-18 05:00 PM A
Clear & Grub 5 0 18-Dec-17 12:00 AM A 22-Dec-17 12:00 AM A
Excavate for Building Pad Partial 2 0 28-Dec-17 12:00 AM A 28-Dec-17 08:00 AM A
Excavate for Building Pad Complete 5 0 04-Jan-18 08:00 AM A 08-Jan-18 05:00 PM A
Building Pad 4 0 09-Jan-18 08:00 AM A 25-Jan-18 05:00 PM A
Construct Buildng Pad 4 0 09-Jan-18 08:00 AM A 25-Jan-18 05:00 PM A
Site Utilities 133 101 08-Jan-18 08:00 AM A 01-Aug-18 05:00 PM
Water 72 40 08-Jan-18 08:00 AM A 04-May-18 05:00 PM
Install 8" Waterline South to Tomahawk Vault 5 0 08-Jan-18 08:00 AM A 19-Jan-18 05:00 PM A
Install 8" Waterline Tomahawk Vault to North 5 0 17-Jan-18 08:00 AM A 23-Jan-18 05:00 PM A
Install 8" Waterline Caddo Trail to East 5 0 17-Jan-18 08:00 AM A 19-Jan-18 05:00 PM A
Final Tie-in to Water Loop 1 1 12-Mar-18 08:00 AM* 12-Mar-18 05:00 PM
Water Service to the Building 5 5 16-Apr-18 08:00 AM 20-Apr-18 05:00 PM
Testing and Chlorination 4 4 23-Apr-18 08:00 AM 26-Apr-18 05:00 PM
Tie into Bridwell & Counceling 5 5 30-Apr-18 08:00 AM 04-May-18 05:00 PM
Sanitary 4 0 14-Feb-18 08:00 AM A 16-Feb-18 05:00 PM A
Excavate and Set Sanitary Manhole 1 0 14-Feb-18 08:00 AM A 14-Feb-18 05:00 PM A
Excavate and Install Sanitary Line to Building 2 0 15-Feb-18 08:00 AM A 16-Feb-18 05:00 PM A
Inspection and Cover-up 1 0 16-Feb-18 08:00 AM A 16-Feb-18 05:00 PM A
Storm 91 91 26-Mar-18 08:00 AM 01-Aug-18 05:00 PM
North Storm Line 10 10 26-Mar-18 08:00 AM 06-Apr-18 05:00 PM
Excavate and Set Storm Pipe 5 5 26-Mar-18 08:00 AM 30-Mar-18 05:00 PM
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019
Transformer Shop Drawings & Product Data
Transformer THS Review
Transformer A/E Approval
Transformer Fab & Delivery
DIVISION 33 - UTILITIES
Utility Product Data
Utility Approval
Utility Fab & Deliver
CONSTRUCTION
MOBILIZATION / DEMOBILIZATION
Cut/Cap/Make Safe Site Electrical
Install Site Fencing
Install Tree Protection
SITEWORK
Demolition
Remove Concrete Paving
Mass Excavation
Clear & Grub
Excavate for Building Pad Partial
Excavate for Building Pad Complete
Building Pad
Construct Buildng Pad
Site Utilities
Water
Install 8" Waterline South to Tomahawk Vault
Install 8" Waterline Tomahawk Vault to North
Install 8" Waterline Caddo Trail to East
Final Tie-in to Water Loop
Water Service to the Building
Testing and Chlorination
Tie into Bridwell & Counceling
Sanitary
Excavate and Set Sanitary Manhole
Excavate and Install Sanitary Line to Building
Inspection and Cover-up
Storm
North Storm Line
Excavate and Set Storm Pipe
Midwestern State University Health Science and Human Services Center Page 5 of 23 05-Mar-18 08:23 PM
Activity Name OriginalDuration
RemainingDuration
Start Finish
Set Grate Inlet 1 1 02-Apr-18 08:00 AM 02-Apr-18 05:00 PM
Backfill and Compact 1 1 03-Apr-18 08:00 AM 03-Apr-18 05:00 PM
Install Pump 1 1 04-Apr-18 08:00 AM 04-Apr-18 05:00 PM
Final Connection of Electrical 2 2 05-Apr-18 08:00 AM 06-Apr-18 05:00 PM
South Storm Line 8 8 23-Jul-18 08:00 AM 01-Aug-18 05:00 PM
Excavate and Set Storm Pipe 3 3 23-Jul-18 08:00 AM 25-Jul-18 05:00 PM
Set Grate Inlet 1 1 26-Jul-18 08:00 AM 26-Jul-18 05:00 PM
Backfill and Compact 1 1 27-Jul-18 08:00 AM 27-Jul-18 05:00 PM
Install Pump 1 1 30-Jul-18 08:00 AM 30-Jul-18 05:00 PM
Final Connection of Electrical 2 2 31-Jul-18 08:00 AM 01-Aug-18 05:00 PM
Hydronic 0 0
Electric 0 0
Data 0 0
Paving 0 0
Sidewalks at Colonnade 0 0
Parking Lot North 0 0
SUBSTRUCTURE 51 42 07-Feb-18 08:00 AM A 01-May-18 05:00 PM
Foundations 39 30 07-Feb-18 08:00 AM A 13-Apr-18 05:00 PM
Tie Pier Cages 5 0 07-Feb-18 08:00 AM A 16-Feb-18 05:00 PM A
Layout Building Piers 5 0 09-Feb-18 08:00 AM A 13-Feb-18 05:00 PM A
South 31 22 20-Feb-18 08:00 AM A 03-Apr-18 05:00 PM
Drilled Piers Primary Structure 12 7 20-Feb-18 08:00 AM A 13-Mar-18 05:00 PM
Underfloor Plumbing 10 10 06-Mar-18 08:00 AM 19-Mar-18 05:00 PM
Underfloor Electrical 10 10 06-Mar-18 08:00 AM 19-Mar-18 05:00 PM
Excavate - FRP Grade Beams South 15 15 14-Mar-18 08:00 AM 03-Apr-18 05:00 PM
Pier Caps South 5 5 14-Mar-18 08:00 AM 20-Mar-18 05:00 PM
North 23 23 14-Mar-18 08:00 AM 13-Apr-18 05:00 PM
Drilled Piers Primary Structure 8 8 14-Mar-18 08:00 AM 23-Mar-18 05:00 PM
Underfloor Plumbing 10 10 26-Mar-18 08:00 AM 06-Apr-18 05:00 PM
Underfloor Electrical 10 10 26-Mar-18 08:00 AM 06-Apr-18 05:00 PM
Excavate - FRP Grade Beams North 15 15 26-Mar-18 08:00 AM 13-Apr-18 05:00 PM
Pier Caps North 5 5 26-Mar-18 08:00 AM 30-Mar-18 05:00 PM
Level 1 20 20 04-Apr-18 08:00 AM 01-May-18 05:00 PM
South 14 14 04-Apr-18 08:00 AM 23-Apr-18 05:00 PM
Fine Grade Builidng Pad 2 2 04-Apr-18 08:00 AM 05-Apr-18 05:00 PM
Termite Treatment 1 1 06-Apr-18 08:00 AM 06-Apr-18 05:00 PM
Install Carton Forms 3 3 09-Apr-18 08:00 AM 11-Apr-18 05:00 PM
Install Vapor Barrier 1 1 12-Apr-18 08:00 AM 12-Apr-18 05:00 PM
Install Slab Reinforcing 3 3 13-Apr-18 08:00 AM 17-Apr-18 05:00 PM
Place Slab 1 1 18-Apr-18 08:00 AM 18-Apr-18 05:00 PM
Columns to L2 3 3 19-Apr-18 08:00 AM 23-Apr-18 05:00 PM
North 12 12 16-Apr-18 08:00 AM 01-May-18 05:00 PM
Fine Grade Builidng Pad 2 2 16-Apr-18 08:00 AM 17-Apr-18 05:00 PM
Termite Treatment 1 1 18-Apr-18 08:00 AM 18-Apr-18 05:00 PM
Install Carton Forms 2 2 19-Apr-18 08:00 AM 20-Apr-18 05:00 PM
Install Vapor Barrier 1 1 23-Apr-18 08:00 AM 23-Apr-18 05:00 PM
Install Slab Reinforcing 2 2 24-Apr-18 08:00 AM 25-Apr-18 05:00 PM
Place Slab 1 1 26-Apr-18 08:00 AM 26-Apr-18 05:00 PM
Columns to L2 3 3 27-Apr-18 08:00 AM 01-May-18 05:00 PM
SUPERSTRUCTURE 65 65 26-Apr-18 08:00 AM 27-Jul-18 05:00 PM
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019
Set Grate Inlet
Backfill and Compact
Install Pump
Final Connection of Electrical
South Storm Line
Excavate and Set Storm Pipe
Set Grate Inlet
Backfill and Compact
Install Pump
Final Connection of Electrical
SUBSTRUCTURE
Foundations
Tie Pier Cages
Layout Building Piers
South
Drilled Piers Primary Structure, Drilled Piers Primary Structure
Underfloor Plumbing
Underfloor Electrical
Excavate - FRP Grade Beams South
Pier Caps South
North
Drilled Piers Primary Structure
Underfloor Plumbing
Underfloor Electrical
Excavate - FRP Grade Beams North
Pier Caps North
Level 1
South
Fine Grade Builidng Pad
Termite Treatment
Install Carton Forms
Install Vapor Barrier
Install Slab Reinforcing
Place Slab
Columns to L2
North
Fine Grade Builidng Pad
Termite Treatment
Install Carton Forms
Install Vapor Barrier
Install Slab Reinforcing
Place Slab
Columns to L2
SUPERSTRUCTURE
Midwestern State University Health Science and Human Services Center Page 6 of 23 05-Mar-18 08:23 PM
Activity Name OriginalDuration
RemainingDuration
Start Finish
Level 2 48 48 26-Apr-18 08:00 AM 03-Jul-18 05:00 PM
South 43 43 26-Apr-18 08:00 AM 26-Jun-18 05:00 PM
L2P1 Form Deck 7 7 26-Apr-18 08:00 AM 04-May-18 05:00 PM
L2P1 Reinforce Deck 4 4 02-May-18 08:00 AM 07-May-18 05:00 PM
L2P1 Place Deck 1 1 08-May-18 08:00 AM 08-May-18 05:00 PM
L2P1 Cure Deck 5 5 09-May-18 08:00 AM 15-May-18 05:00 PM
Columns to L3 3 3 09-May-18 08:00 AM 11-May-18 05:00 PM
L2P1 Strip and Reshore Deck 3 3 16-May-18 08:00 AM 18-May-18 05:00 PM
L2P1 Remove Reshores 2 2 25-Jun-18 08:00 AM 26-Jun-18 05:00 PM
North 41 41 07-May-18 08:00 AM 03-Jul-18 05:00 PM
L2P2 Form Deck 5 5 07-May-18 08:00 AM 11-May-18 05:00 PM
L2P2 Reinforce Deck 3 3 10-May-18 08:00 AM 14-May-18 05:00 PM
L2P2 Place Deck 1 1 15-May-18 08:00 AM 15-May-18 05:00 PM
L2P2 Cure Deck 5 5 16-May-18 08:00 AM 22-May-18 05:00 PM
Columns to L3 3 3 16-May-18 08:00 AM 18-May-18 05:00 PM
L2P2 Strip and Reshore Deck 3 3 23-May-18 08:00 AM 25-May-18 05:00 PM
L2P2 Remove Reshores 2 2 02-Jul-18 08:00 AM 03-Jul-18 05:00 PM
Level 3 48 48 14-May-18 08:00 AM 20-Jul-18 05:00 PM
South 43 43 14-May-18 08:00 AM 13-Jul-18 05:00 PM
L3P1 Form Deck 7 7 14-May-18 08:00 AM 22-May-18 05:00 PM
L3P1 Reinforce Deck 4 4 18-May-18 08:00 AM 23-May-18 05:00 PM
L3P1 Place Deck 1 1 24-May-18 08:00 AM 24-May-18 05:00 PM
L3P1 Cure Deck 5 5 25-May-18 08:00 AM 01-Jun-18 05:00 PM
Columns to L4 3 3 25-May-18 08:00 AM 30-May-18 05:00 PM
L3P1 Strip and Reshore Deck 3 3 04-Jun-18 08:00 AM 06-Jun-18 05:00 PM
L3P1 Remove Reshores 2 2 12-Jul-18 08:00 AM 13-Jul-18 05:00 PM
North 41 41 23-May-18 08:00 AM 20-Jul-18 05:00 PM
L3P2 Form Deck 5 5 23-May-18 08:00 AM 30-May-18 05:00 PM
L3P2 Reinforce Deck 3 3 29-May-18 08:00 AM 31-May-18 05:00 PM
L3P2 Place Deck 1 1 01-Jun-18 08:00 AM 01-Jun-18 05:00 PM
L3P2 Cure Deck 5 5 04-Jun-18 08:00 AM 08-Jun-18 05:00 PM
Columns to L4 3 3 04-Jun-18 08:00 AM 06-Jun-18 05:00 PM
L3P2 Strip and Reshore Deck 3 3 11-Jun-18 08:00 AM 13-Jun-18 05:00 PM
L3P2 Remove Reshores 2 2 19-Jul-18 08:00 AM 20-Jul-18 05:00 PM
Level 4 36 36 31-May-18 08:00 AM 20-Jul-18 05:00 PM
South 31 31 31-May-18 08:00 AM 13-Jul-18 05:00 PM
L4P1 Form Deck 7 7 31-May-18 08:00 AM 08-Jun-18 05:00 PM
L4P1 Reinforce Deck 4 4 06-Jun-18 08:00 AM 11-Jun-18 05:00 PM
L4P1 Place Deck 1 1 12-Jun-18 08:00 AM 12-Jun-18 05:00 PM
L4P1 Cure Deck 5 5 13-Jun-18 08:00 AM 19-Jun-18 05:00 PM
Columns to Roof 3 3 13-Jun-18 08:00 AM 15-Jun-18 05:00 PM
L4P1 Strip and Reshore Deck 3 3 20-Jun-18 08:00 AM 22-Jun-18 05:00 PM
L4P1 Remove Reshores 2 2 12-Jul-18 08:00 AM 13-Jul-18 05:00 PM
North 29 29 11-Jun-18 08:00 AM 20-Jul-18 05:00 PM
L4P2 Form Deck 5 5 11-Jun-18 08:00 AM 15-Jun-18 05:00 PM
L4P2 Reinforce Deck 3 3 14-Jun-18 08:00 AM 18-Jun-18 05:00 PM
L4P2 Place Deck 1 1 19-Jun-18 08:00 AM 19-Jun-18 05:00 PM
L4P2 Cure Deck 5 5 20-Jun-18 08:00 AM 26-Jun-18 05:00 PM
Columns to Roof 3 3 20-Jun-18 08:00 AM 22-Jun-18 05:00 PM
L4P2 Strip and Reshore Deck 3 3 27-Jun-18 08:00 AM 29-Jun-18 05:00 PM
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019
Level 2
South
L2P1 Form Deck
L2P1 Reinforce Deck
L2P1 Place Deck
L2P1 Cure Deck
Columns to L3
L2P1 Strip and Reshore Deck
L2P1 Remove Reshores
North
L2P2 Form Deck
L2P2 Reinforce Deck
L2P2 Place Deck
L2P2 Cure Deck
Columns to L3
L2P2 Strip and Reshore Deck
L2P2 Remove Reshores
Level 3
South
L3P1 Form Deck
L3P1 Reinforce Deck
L3P1 Place Deck
L3P1 Cure Deck
Columns to L4
L3P1 Strip and Reshore Deck
L3P1 Remove Reshores
North
L3P2 Form Deck
L3P2 Reinforce Deck
L3P2 Place Deck
L3P2 Cure Deck
Columns to L4
L3P2 Strip and Reshore Deck
L3P2 Remove Reshores
Level 4
South
L4P1 Form Deck
L4P1 Reinforce Deck
L4P1 Place Deck
L4P1 Cure Deck
Columns to Roof
L4P1 Strip and Reshore Deck
L4P1 Remove Reshores
North
L4P2 Form Deck
L4P2 Reinforce Deck
L4P2 Place Deck
L4P2 Cure Deck
Columns to Roof
L4P2 Strip and Reshore Deck
Midwestern State University Health Science and Human Services Center Page 7 of 23 05-Mar-18 08:23 PM
Activity Name OriginalDuration
RemainingDuration
Start Finish
L4P2 Remove Reshores 2 2 19-Jul-18 08:00 AM 20-Jul-18 05:00 PM
Composite Deck at Atrium 9 9 02-Jul-18 08:00 AM 13-Jul-18 05:00 PM
Set Steel Beams and Bridging 5 5 02-Jul-18 08:00 AM 09-Jul-18 05:00 PM
Fasten Metal Deck 3 3 10-Jul-18 08:00 AM 12-Jul-18 05:00 PM
Place Concrete 1 1 13-Jul-18 08:00 AM 13-Jul-18 05:00 PM
Level Roof 29 29 18-Jun-18 08:00 AM 27-Jul-18 05:00 PM
South 20 20 18-Jun-18 08:00 AM 16-Jul-18 05:00 PM
LRP1 Form Deck 7 7 18-Jun-18 08:00 AM 26-Jun-18 05:00 PM
LRP1 Reinforce Deck 4 4 22-Jun-18 08:00 AM 27-Jun-18 05:00 PM
LRP1 Place Deck 1 1 28-Jun-18 08:00 AM 28-Jun-18 05:00 PM
LRP1 Cure Deck 5 5 29-Jun-18 08:00 AM 06-Jul-18 05:00 PM
LR Parapet Wall 11 11 29-Jun-18 08:00 AM 16-Jul-18 05:00 PM
LRP1 Strip 3 3 09-Jul-18 08:00 AM 11-Jul-18 05:00 PM
North 21 21 27-Jun-18 08:00 AM 26-Jul-18 05:00 PM
LRP2 Form Deck 5 5 27-Jun-18 08:00 AM 03-Jul-18 05:00 PM
LRP2 Reinforce Deck 3 3 02-Jul-18 08:00 AM 05-Jul-18 05:00 PM
LRP2 Place Deck 1 1 06-Jul-18 08:00 AM 06-Jul-18 05:00 PM
LRP2 Cure Deck 5 5 09-Jul-18 08:00 AM 13-Jul-18 05:00 PM
LRP2 Strip 3 3 16-Jul-18 08:00 AM 18-Jul-18 05:00 PM
LR Parapet Wall 8 8 17-Jul-18 08:00 AM 26-Jul-18 05:00 PM
Metal Deck at Atrium 7 7 19-Jul-18 08:00 AM 27-Jul-18 05:00 PM
Set Steel Beams and Bridging 5 5 19-Jul-18 08:00 AM 25-Jul-18 05:00 PM
Fasten Metal Deck 2 2 26-Jul-18 08:00 AM 27-Jul-18 05:00 PM
Roof Structures 15 15 09-Jul-18 08:00 AM 27-Jul-18 05:00 PM
Screenwalls 15 15 09-Jul-18 08:00 AM 27-Jul-18 05:00 PM
Erect Columns & Beams for Screenwall 5 5 09-Jul-18 08:00 AM 13-Jul-18 05:00 PM
Paint Columns & Beams 5 5 16-Jul-18 08:00 AM 20-Jul-18 05:00 PM
Install Panel System 5 5 23-Jul-18 08:00 AM 27-Jul-18 05:00 PM
Stair 2 - SW Corner & Penthouse 20 20 31-May-18 08:00 AM 27-Jun-18 05:00 PM
Erect Columns & Beams 5 5 31-May-18 08:00 AM 06-Jun-18 05:00 PM
Erect Pan Stairs 5 5 07-Jun-18 08:00 AM 13-Jun-18 05:00 PM
Erect Center Handrails 5 5 14-Jun-18 08:00 AM 20-Jun-18 05:00 PM
Install Perimeter Metal Studs 5 5 14-Jun-18 08:00 AM 20-Jun-18 05:00 PM
Fasten Metal Decking 5 5 14-Jun-18 08:00 AM 20-Jun-18 05:00 PM
Install Sheathing & Waterproofing 5 5 21-Jun-18 08:00 AM 27-Jun-18 05:00 PM
Stair 3 - South 20 20 07-Jun-18 08:00 AM 05-Jul-18 05:00 PM
Erect Columns & Beams 5 5 07-Jun-18 08:00 AM 13-Jun-18 05:00 PM
Erect Pan Stairs 5 5 14-Jun-18 08:00 AM 20-Jun-18 05:00 PM
Erect Center Handrails 5 5 21-Jun-18 08:00 AM 27-Jun-18 05:00 PM
Install Perimeter Metal Studs 5 5 21-Jun-18 08:00 AM 27-Jun-18 05:00 PM
Install Sheathing & Waterproofing 5 5 28-Jun-18 08:00 AM 05-Jul-18 05:00 PM
Stair 1 - NW Corner 20 20 14-Jun-18 08:00 AM 12-Jul-18 05:00 PM
Erect Columns & Beams 5 5 14-Jun-18 08:00 AM 20-Jun-18 05:00 PM
Erect Pan Stairs 5 5 21-Jun-18 08:00 AM 27-Jun-18 05:00 PM
Erect Center Handrails 5 5 28-Jun-18 08:00 AM 05-Jul-18 05:00 PM
Install Perimeter Metal Studs 5 5 28-Jun-18 08:00 AM 05-Jul-18 05:00 PM
Install Sheathing & Waterproofing 5 5 06-Jul-18 08:00 AM 12-Jul-18 05:00 PM
Main Stair (Atrium) 34 34 07-Jun-18 08:00 AM 25-Jul-18 05:00 PM
Erect Pan Stairs 5 5 07-Jun-18 08:00 AM 13-Jun-18 05:00 PM
Erect Center Handrails 5 5 06-Jul-18 08:00 AM 12-Jul-18 05:00 PM
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019
L4P2 Remove Reshores
Composite Deck at Atrium
Set Steel Beams and Bridging
Fasten Metal Deck
Place Concrete
Level Roof
South
LRP1 Form Deck
LRP1 Reinforce Deck
LRP1 Place Deck
LRP1 Cure Deck
LR Parapet Wall
LRP1 Strip
North
LRP2 Form Deck
LRP2 Reinforce Deck
LRP2 Place Deck
LRP2 Cure Deck
LRP2 Strip
LR Parapet Wall
Metal Deck at Atrium
Set Steel Beams and Bridging
Fasten Metal Deck
Roof Structures
Screenwalls
Erect Columns & Beams for Screenwall
Paint Columns & Beams
Install Panel System
Stair 2 - SW Corner & Penthouse
Erect Columns & Beams
Erect Pan Stairs
Erect Center Handrails
Install Perimeter Metal Studs
Fasten Metal Decking
Install Sheathing & Waterproofing
Stair 3 - South
Erect Columns & Beams
Erect Pan Stairs
Erect Center Handrails
Install Perimeter Metal Studs
Install Sheathing & Waterproofing
Stair 1 - NW Corner
Erect Columns & Beams
Erect Pan Stairs
Erect Center Handrails
Install Perimeter Metal Studs
Install Sheathing & Waterproofing
Main Stair (Atrium)
Erect Pan Stairs
Erect Center Handrails
Midwestern State University Health Science and Human Services Center Page 8 of 23 05-Mar-18 08:23 PM
Activity Name OriginalDuration
RemainingDuration
Start Finish
Erect Columns & Beams 5 5 19-Jul-18 08:00 AM 25-Jul-18 05:00 PM
EXTERIOR SKIN 78 78 27-Jun-18 08:00 AM 16-Oct-18 05:00 PM
Sequence 1 - West Elevation (Mech Yard to NW Corner) 63 63 05-Jul-18 08:00 AM 02-Oct-18 05:00 PM
Level 1 31 31 05-Jul-18 08:00 AM 16-Aug-18 05:00 PM
Frame Exterior Walls - West 5 5 05-Jul-18 08:00 AM 11-Jul-18 05:00 PM
Install Sheathing - West 6 6 12-Jul-18 08:00 AM 19-Jul-18 05:00 PM
Install Lintels - West 3 3 12-Jul-18 08:00 AM 16-Jul-18 05:00 PM
Prep Sheathing - West 0 0 20-Jul-18 08:00 AM 20-Jul-18 08:00 AM
Waterproofing - Air Barrier - West 0 0 20-Jul-18 08:00 AM 20-Jul-18 08:00 AM
Masonry - West 10 10 27-Jul-18 08:00 AM 09-Aug-18 05:00 PM
Glass & Glazing - West 5 5 10-Aug-18 08:00 AM 16-Aug-18 05:00 PM
Level 2 24 24 23-Jul-18 08:00 AM 23-Aug-18 05:00 PM
Frame Exterior Walls - West 5 5 23-Jul-18 08:00 AM 27-Jul-18 05:00 PM
Install Sheathing - West 6 6 30-Jul-18 08:00 AM 06-Aug-18 05:00 PM
Install Lintels - West 3 3 30-Jul-18 08:00 AM 01-Aug-18 05:00 PM
Prep Sheathing - West 0 0 07-Aug-18 08:00 AM 07-Aug-18 08:00 AM
Waterproofing - Air Barrier - West 0 0 07-Aug-18 08:00 AM 07-Aug-18 08:00 AM
Masonry - West 10 10 10-Aug-18 08:00 AM 23-Aug-18 05:00 PM
Level 3 39 39 23-Jul-18 08:00 AM 14-Sep-18 05:00 PM
Frame Exterior Walls - West 5 5 23-Jul-18 08:00 AM 27-Jul-18 05:00 PM
Install Sheathing - West 6 6 30-Jul-18 08:00 AM 06-Aug-18 05:00 PM
Install Lintels - West 3 3 30-Jul-18 08:00 AM 01-Aug-18 05:00 PM
Prep Sheathing - West 0 0 07-Aug-18 08:00 AM 07-Aug-18 08:00 AM
Waterproofing - Air Barrier - West 0 0 07-Aug-18 08:00 AM 07-Aug-18 08:00 AM
Masonry - West 10 10 24-Aug-18 08:00 AM 07-Sep-18 05:00 PM
Glass & Glazing - West 5 5 10-Sep-18 08:00 AM 14-Sep-18 05:00 PM
Level 4 46 46 26-Jul-18 08:00 AM 28-Sep-18 05:00 PM
Frame Exterior Walls - West 5 5 26-Jul-18 08:00 AM 01-Aug-18 05:00 PM
Install Sheathing - West 6 6 02-Aug-18 08:00 AM 09-Aug-18 05:00 PM
Install Lintels - West 3 3 02-Aug-18 08:00 AM 06-Aug-18 05:00 PM
Prep Sheathing - West 0 0 10-Aug-18 08:00 AM 10-Aug-18 08:00 AM
Waterproofing - Air Barrier - West 0 0 10-Aug-18 08:00 AM 10-Aug-18 08:00 AM
Masonry - West 10 10 10-Sep-18 08:00 AM 21-Sep-18 05:00 PM
Glass & Glazing - West 5 5 24-Sep-18 08:00 AM 28-Sep-18 05:00 PM
Curtainwall 7 7 24-Sep-18 08:00 AM 02-Oct-18 05:00 PM
Install Curtainwall System - West 7 7 24-Sep-18 08:00 AM 02-Oct-18 05:00 PM
Sequence 2 - South Elevation (South Point to SE Metal Panels)63 63 27-Jun-18 08:00 AM 25-Sep-18 05:00 PM
Level 1 28 28 27-Jun-18 08:00 AM 06-Aug-18 05:00 PM
Frame Exterior Walls - South 5 5 27-Jun-18 08:00 AM 03-Jul-18 05:00 PM
Install Sheathing - South 6 6 05-Jul-18 08:00 AM 12-Jul-18 05:00 PM
Install Lintels - South 3 3 05-Jul-18 08:00 AM 09-Jul-18 05:00 PM
Prep Sheathing - South 0 0 13-Jul-18 08:00 AM 13-Jul-18 08:00 AM
Waterproofing - Air Barrier - South 0 0 13-Jul-18 08:00 AM 13-Jul-18 08:00 AM
Masonry - South 10 10 17-Jul-18 08:00 AM 30-Jul-18 05:00 PM
Glass & Glazing - South 5 5 31-Jul-18 08:00 AM 06-Aug-18 05:00 PM
Level 2 31 31 16-Jul-18 08:00 AM 27-Aug-18 05:00 PM
Frame Exterior Walls - South 5 5 16-Jul-18 08:00 AM 20-Jul-18 05:00 PM
Install Sheathing - South 6 6 23-Jul-18 08:00 AM 30-Jul-18 05:00 PM
Install Lintels - South 3 3 23-Jul-18 08:00 AM 25-Jul-18 05:00 PM
Prep Sheathing - South 0 0 31-Jul-18 08:00 AM 31-Jul-18 08:00 AM
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019
Erect Columns & Beams
EXTERIOR SKIN
Sequence 1 - West Elevation (Mech Yard to NW Corner)
Level 1
Frame Exterior Walls - West
Install Sheathing - West
Install Lintels - West
Prep Sheathing - West
Waterproofing - Air Barrier - West
Masonry - West
Glass & Glazing - West
Level 2
Frame Exterior Walls - West
Install Sheathing - West
Install Lintels - West
Prep Sheathing - West
Waterproofing - Air Barrier - West
Masonry - West
Level 3
Frame Exterior Walls - West
Install Sheathing - West
Install Lintels - West
Prep Sheathing - West
Waterproofing - Air Barrier - West
Masonry - West
Glass & Glazing - West
Level 4
Frame Exterior Walls - West
Install Sheathing - West
Install Lintels - West
Prep Sheathing - West
Waterproofing - Air Barrier - West
Masonry - West
Glass & Glazing - West
Curtainwall
Install Curtainwall System - West
Sequence 2 - South Elevation (South Point to SE Metal Panels)
Level 1
Frame Exterior Walls - South
Install Sheathing - South
Install Lintels - South
Prep Sheathing - South
Waterproofing - Air Barrier - South
Masonry - South
Glass & Glazing - South
Level 2
Frame Exterior Walls - South
Install Sheathing - South
Install Lintels - South
Prep Sheathing - South
Midwestern State University Health Science and Human Services Center Page 9 of 23 05-Mar-18 08:23 PM
Activity Name OriginalDuration
RemainingDuration
Start Finish
Waterproofing - Air Barrier - South 0 0 31-Jul-18 08:00 AM 31-Jul-18 08:00 AM
Masonry - South 10 10 31-Jul-18 08:00 AM 13-Aug-18 05:00 PM
Glass & Glazing - South 10 10 14-Aug-18 08:00 AM 27-Aug-18 05:00 PM
Level 3 41 41 16-Jul-18 08:00 AM 11-Sep-18 05:00 PM
Frame Exterior Walls - South 5 5 16-Jul-18 08:00 AM 20-Jul-18 05:00 PM
Install Sheathing - South 6 6 23-Jul-18 08:00 AM 30-Jul-18 05:00 PM
Install Lintels - South 3 3 23-Jul-18 08:00 AM 25-Jul-18 05:00 PM
Prep Sheathing - South 0 0 31-Jul-18 08:00 AM 31-Jul-18 08:00 AM
Waterproofing - Air Barrier - South 0 0 31-Jul-18 08:00 AM 31-Jul-18 08:00 AM
Masonry - South 10 10 14-Aug-18 08:00 AM 27-Aug-18 05:00 PM
Glass & Glazing - South 10 10 28-Aug-18 08:00 AM 11-Sep-18 05:00 PM
Level 4 48 48 19-Jul-18 08:00 AM 25-Sep-18 05:00 PM
Frame Exterior Walls - South 5 5 19-Jul-18 08:00 AM 25-Jul-18 05:00 PM
Install Sheathing - Sotth 6 6 26-Jul-18 08:00 AM 02-Aug-18 05:00 PM
Install Lintels - South 3 3 26-Jul-18 08:00 AM 30-Jul-18 05:00 PM
Prep Sheathing - South 0 0 03-Aug-18 08:00 AM 03-Aug-18 08:00 AM
Waterproofing - Air Barrier - South 0 0 03-Aug-18 08:00 AM 03-Aug-18 08:00 AM
Masonry - South 10 10 28-Aug-18 08:00 AM 11-Sep-18 05:00 PM
Glass & Glazing - South 10 10 12-Sep-18 08:00 AM 25-Sep-18 05:00 PM
Sequence 3 - North Elevation (NW Corner to NE Metal Panels)68 68 05-Jul-18 08:00 AM 09-Oct-18 05:00 PM
Level 1 63 63 05-Jul-18 08:00 AM 02-Oct-18 05:00 PM
Frame Exterior Walls - North 5 5 05-Jul-18 08:00 AM 11-Jul-18 05:00 PM
Install Sheathing - North 6 6 12-Jul-18 08:00 AM 19-Jul-18 05:00 PM
Install Lintels - North 3 3 12-Jul-18 08:00 AM 16-Jul-18 05:00 PM
Prep Sheathing - North 0 0 20-Jul-18 08:00 AM 20-Jul-18 08:00 AM
Waterproofing - Air Barrier - North 0 0 20-Jul-18 08:00 AM 20-Jul-18 08:00 AM
Masonry - North 10 10 12-Sep-18 08:00 AM 25-Sep-18 05:00 PM
Glass & Glazing - North 5 5 26-Sep-18 08:00 AM 02-Oct-18 05:00 PM
Level 2 21 21 23-Jul-18 08:00 AM 20-Aug-18 05:00 PM
Frame Exterior Walls - North 5 5 23-Jul-18 08:00 AM 27-Jul-18 05:00 PM
Install Sheathing - North 6 6 30-Jul-18 08:00 AM 06-Aug-18 05:00 PM
Install Lintels - North 3 3 30-Jul-18 08:00 AM 01-Aug-18 05:00 PM
Prep Sheathing - North 0 0 07-Aug-18 08:00 AM 07-Aug-18 08:00 AM
Waterproofing - Air Barrier - North 0 0 07-Aug-18 08:00 AM 07-Aug-18 08:00 AM
Masonry - North 10 10 07-Aug-18 08:00 AM 20-Aug-18 05:00 PM
Level 3 56 56 23-Jul-18 08:00 AM 09-Oct-18 05:00 PM
Frame Exterior Walls - North 5 5 23-Jul-18 08:00 AM 27-Jul-18 05:00 PM
Install Sheathing - North 6 6 30-Jul-18 08:00 AM 06-Aug-18 05:00 PM
Install Lintels - North 3 3 30-Jul-18 08:00 AM 01-Aug-18 05:00 PM
Prep Sheathing - North 0 0 07-Aug-18 08:00 AM 07-Aug-18 08:00 AM
Waterproofing - Air Barrier - North 0 0 07-Aug-18 08:00 AM 07-Aug-18 08:00 AM
Masonry - North 10 10 21-Aug-18 08:00 AM 04-Sep-18 05:00 PM
Glass & Glazing - North 5 5 03-Oct-18 08:00 AM 09-Oct-18 05:00 PM
Level 4 48 48 26-Jul-18 08:00 AM 02-Oct-18 05:00 PM
Frame Exterior Walls - North 5 5 26-Jul-18 08:00 AM 01-Aug-18 05:00 PM
Install Sheathing - North 6 6 02-Aug-18 08:00 AM 09-Aug-18 05:00 PM
Install Lintels - North 3 3 02-Aug-18 08:00 AM 06-Aug-18 05:00 PM
Prep Sheathing - North 0 0 10-Aug-18 08:00 AM 10-Aug-18 08:00 AM
Waterproofing - Air Barrier - North 0 0 10-Aug-18 08:00 AM 10-Aug-18 08:00 AM
Masonry - North 10 10 05-Sep-18 08:00 AM 18-Sep-18 05:00 PM
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019
Waterproofing - Air Barrier - South
Masonry - South
Glass & Glazing - South
Level 3
Frame Exterior Walls - South
Install Sheathing - South
Install Lintels - South
Prep Sheathing - South
Waterproofing - Air Barrier - South
Masonry - South
Glass & Glazing - South
Level 4
Frame Exterior Walls - South
Install Sheathing - Sotth
Install Lintels - South
Prep Sheathing - South
Waterproofing - Air Barrier - South
Masonry - South
Glass & Glazing - South
Sequence 3 - North Elevation (NW Corner to NE Metal Panels)
Level 1
Frame Exterior Walls - North
Install Sheathing - North
Install Lintels - North
Prep Sheathing - North
Waterproofing - Air Barrier - North
Masonry - North
Glass & Glazing - North
Level 2
Frame Exterior Walls - North
Install Sheathing - North
Install Lintels - North
Prep Sheathing - North
Waterproofing - Air Barrier - North
Masonry - North
Level 3
Frame Exterior Walls - North
Install Sheathing - North
Install Lintels - North
Prep Sheathing - North
Waterproofing - Air Barrier - North
Masonry - North
Glass & Glazing - North
Level 4
Frame Exterior Walls - North
Install Sheathing - North
Install Lintels - North
Prep Sheathing - North
Waterproofing - Air Barrier - North
Masonry - North
Midwestern State University Health Science and Human Services Center Page 10 of 23 05-Mar-18 08:23 PM
Activity Name OriginalDuration
RemainingDuration
Start Finish
Glass & Glazing - North 10 10 19-Sep-18 08:00 AM 02-Oct-18 05:00 PM
Sequence 4 - SW Serpentine Wall 20 20 19-Sep-18 08:00 AM 16-Oct-18 05:00 PM
Serpentine Walls 20 20 19-Sep-18 08:00 AM 16-Oct-18 05:00 PM
Masonry 10 10 19-Sep-18 08:00 AM 02-Oct-18 05:00 PM
Glass & Glazing 10 10 03-Oct-18 08:00 AM 16-Oct-18 05:00 PM
East Elevation 30 30 02-Aug-18 08:00 AM 13-Sep-18 05:00 PM
Curtainwall 30 30 02-Aug-18 08:00 AM 13-Sep-18 05:00 PM
Infil Framing at Metal Panels - East 5 5 02-Aug-18 08:00 AM 08-Aug-18 05:00 PM
Install Sheating - East 5 5 09-Aug-18 08:00 AM 15-Aug-18 05:00 PM
Prep Sheathing - East 0 0 16-Aug-18 08:00 AM 16-Aug-18 08:00 AM
Waterproofing - Air Barrier - East 0 0 16-Aug-18 08:00 AM 16-Aug-18 08:00 AM
Install Metal Panels - East 10 10 16-Aug-18 08:00 AM 29-Aug-18 05:00 PM
Install Curtainwall System - East 20 20 16-Aug-18 08:00 AM 13-Sep-18 05:00 PM
COLONNADE 55 55 12-Sep-18 08:00 AM 29-Nov-18 05:00 PM
Place Sidewalks 15 15 12-Sep-18 08:00 AM 02-Oct-18 05:00 PM
FRP South Walk 5 5 12-Sep-18 08:00 AM 18-Sep-18 05:00 PM
FRP North Walk 5 5 19-Sep-18 08:00 AM 25-Sep-18 05:00 PM
FRP West Walk 5 5 24-Sep-18 08:00 AM 28-Sep-18 05:00 PM
FRP East Walk 5 5 26-Sep-18 08:00 AM 02-Oct-18 05:00 PM
Structure 17 17 01-Oct-18 08:00 AM 23-Oct-18 05:00 PM
Erect Steel West 5 5 01-Oct-18 08:00 AM 05-Oct-18 05:00 PM
Erect Steel North 5 5 08-Oct-18 08:00 AM 12-Oct-18 05:00 PM
Light Gauge Trusses West 7 7 08-Oct-18 08:00 AM 16-Oct-18 05:00 PM
Light Gauge Trusses North 7 7 15-Oct-18 08:00 AM 23-Oct-18 05:00 PM
Masonry & Stone 30 30 17-Oct-18 08:00 AM 29-Nov-18 05:00 PM
Masonry & Stone Canopy West 17 17 17-Oct-18 08:00 AM 08-Nov-18 05:00 PM
Masonry & Stone Canopy North 20 20 24-Oct-18 08:00 AM 20-Nov-18 05:00 PM
Seal Joints 5 5 21-Nov-18 08:00 AM 29-Nov-18 05:00 PM
Soffit 25 25 19-Sep-18 08:00 AM 23-Oct-18 05:00 PM
MEP Rough in 5 5 19-Sep-18 08:00 AM 25-Sep-18 05:00 PM
Framing 5 5 26-Sep-18 08:00 AM 02-Oct-18 05:00 PM
Plaster 15 15 03-Oct-18 08:00 AM 23-Oct-18 05:00 PM
ROOFING 92 92 09-Jul-18 08:00 AM 14-Nov-18 05:00 PM
Main Roof 65 65 09-Jul-18 08:00 AM 08-Oct-18 05:00 PM
Install Wood Blocking South 10 10 09-Jul-18 08:00 AM 20-Jul-18 05:00 PM
Install Wood Blocking North 10 10 24-Jul-18 08:00 AM 06-Aug-18 05:00 PM
Install TPO Roof South 20 20 30-Jul-18 08:00 AM 24-Aug-18 05:00 PM
Install TPO Roof North 20 20 27-Aug-18 08:00 AM 24-Sep-18 05:00 PM
Set Roof Drains South 5 5 27-Aug-18 08:00 AM 31-Aug-18 05:00 PM
Install Metal Coping South 5 5 27-Aug-18 08:00 AM 31-Aug-18 05:00 PM
Set Roof Drains North 5 5 25-Sep-18 08:00 AM 01-Oct-18 05:00 PM
Install Metal Coping North 5 5 25-Sep-18 08:00 AM 01-Oct-18 05:00 PM
Install Lightning Protection 5 5 02-Oct-18 08:00 AM 08-Oct-18 05:00 PM
Penthouse Roof 60 60 23-Jul-18 08:00 AM 15-Oct-18 05:00 PM
Install Wood Blocking 2 2 23-Jul-18 08:00 AM 24-Jul-18 05:00 PM
Install TPO Roof 5 5 23-Jul-18 08:00 AM 27-Jul-18 05:00 PM
Set Roof Drains 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM
Install Metal Coping 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM
Install Lightning Protection 5 5 09-Oct-18 08:00 AM 15-Oct-18 05:00 PM
Mechanical Equipment 11 11 16-Jul-18 08:00 AM 30-Jul-18 05:00 PM
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019
Glass & Glazing - North
Sequence 4 - SW Serpentine Wall
Serpentine Walls
Masonry
Glass & Glazing
East Elevation
Curtainwall
Infil Framing at Metal Panels - East
Install Sheating - East
Prep Sheathing - East
Waterproofing - Air Barrier - East
Install Metal Panels - East
Install Curtainwall System - East
COLONNADE
Place Sidewalks
FRP South Walk
FRP North Walk
FRP West Walk
FRP East Walk
Structure
Erect Steel West
Erect Steel North
Light Gauge Trusses West
Light Gauge Trusses North
Masonry & Stone
Masonry & Stone Canopy West
Masonry & Stone Canopy North
Seal Joints
Soffit
MEP Rough in
Framing
Plaster
ROOFING
Main Roof
Install Wood Blocking South
Install Wood Blocking North
Install TPO Roof South
Install TPO Roof North
Set Roof Drains South
Install Metal Coping South
Set Roof Drains North
Install Metal Coping North
Install Lightning Protection
Penthouse Roof
Install Wood Blocking
Install TPO Roof
Set Roof Drains
Install Metal Coping
Install Lightning Protection
Mechanical Equipment
Midwestern State University Health Science and Human Services Center Page 11 of 23 05-Mar-18 08:23 PM
Activity Name OriginalDuration
RemainingDuration
Start Finish
Set Roof Curbs 5 5 16-Jul-18 08:00 AM 20-Jul-18 05:00 PM
Set Air Handling Units 1 1 23-Jul-18 08:00 AM 23-Jul-18 05:00 PM
Set Exhaust Fans 5 5 24-Jul-18 08:00 AM 30-Jul-18 05:00 PM
Colonnade Roofs 21 21 17-Oct-18 08:00 AM 14-Nov-18 05:00 PM
Plywood Substrate West 5 5 17-Oct-18 08:00 AM 23-Oct-18 05:00 PM
Plywood Substrate North 5 5 24-Oct-18 08:00 AM 30-Oct-18 05:00 PM
Tile Roof West 11 11 24-Oct-18 08:00 AM 07-Nov-18 05:00 PM
Tile Roof North 11 11 31-Oct-18 08:00 AM 14-Nov-18 05:00 PM
ELEVATORS 168 168 12-Mar-18 08:00 AM 05-Nov-18 05:00 PM
Drill Elevator Jack Holes 2 2 12-Mar-18 08:00 AM* 13-Mar-18 05:00 PM
Structural Steel Columns & Beams 10 10 07-Jun-18 08:00 AM 20-Jun-18 05:00 PM
Set Hoist Beam 3 3 21-Jun-18 08:00 AM 25-Jun-18 05:00 PM
Install Shaft Wall 10 10 26-Jun-18 08:00 AM 10-Jul-18 05:00 PM
Level 1 Elevator Safety 1 1 11-Jul-18 08:00 AM 11-Jul-18 05:00 PM
Level 2 Elevator Safety 1 1 12-Jul-18 08:00 AM 12-Jul-18 05:00 PM
Level 3 Elevator Safety 1 1 13-Jul-18 08:00 AM 13-Jul-18 05:00 PM
Level 4 Elevator Safety 1 1 16-Jul-18 08:00 AM 16-Jul-18 05:00 PM
Elevator Installation 50 50 27-Aug-18 08:00 AM 05-Nov-18 05:00 PM
Elevator Shaft 0 0
Elevator Machine Room 0 0
INTERIOR FRAMING & ROUGH-IN 60 60 27-Jun-18 08:00 AM 20-Sep-18 05:00 PM
Level 1 40 40 27-Jun-18 08:00 AM 22-Aug-18 05:00 PM
South 25 25 27-Jun-18 08:00 AM 01-Aug-18 05:00 PM
Layout 3 3 27-Jun-18 08:00 AM 29-Jun-18 05:00 PM
Frame Priority Walls & Top Out 5 5 02-Jul-18 08:00 AM 09-Jul-18 05:00 PM
Install Inwall Blocking 5 5 02-Jul-18 08:00 AM 09-Jul-18 05:00 PM
Plumbing Wall Rough-in 10 10 05-Jul-18 08:00 AM 18-Jul-18 05:00 PM
Electrical Wall Rough-in 10 10 05-Jul-18 08:00 AM 18-Jul-18 05:00 PM
Frame Non-Priority Walls 5 5 10-Jul-18 08:00 AM 16-Jul-18 05:00 PM
Inwall Insulation 5 5 10-Jul-18 08:00 AM 16-Jul-18 05:00 PM
One-side Drywall 5 5 19-Jul-18 08:00 AM 25-Jul-18 05:00 PM
Inspections 5 5 19-Jul-18 08:00 AM 25-Jul-18 05:00 PM
Close Walls 5 5 26-Jul-18 08:00 AM 01-Aug-18 05:00 PM
North 35 35 05-Jul-18 08:00 AM 22-Aug-18 05:00 PM
Layout 5 5 05-Jul-18 08:00 AM 11-Jul-18 05:00 PM
Frame Priority Walls & Top Out 5 5 12-Jul-18 08:00 AM 18-Jul-18 05:00 PM
Install Inwall Blocking 5 5 12-Jul-18 08:00 AM 18-Jul-18 05:00 PM
CMU Buildout NW Corner 10 10 12-Jul-18 08:00 AM 25-Jul-18 05:00 PM
Plumbing Wall Rough-in 10 10 16-Jul-18 08:00 AM 27-Jul-18 05:00 PM
Electrical Wall Rough-in 10 10 16-Jul-18 08:00 AM 27-Jul-18 05:00 PM
Frame Non-Priority Walls 10 10 19-Jul-18 08:00 AM 01-Aug-18 05:00 PM
Inwall Insulation 5 5 19-Jul-18 08:00 AM 25-Jul-18 05:00 PM
One-side Drywall 5 5 02-Aug-18 08:00 AM 08-Aug-18 05:00 PM
Inspections 5 5 09-Aug-18 08:00 AM 15-Aug-18 05:00 PM
Close Walls 5 5 16-Aug-18 08:00 AM 22-Aug-18 05:00 PM
Level 2 40 40 16-Jul-18 08:00 AM 10-Sep-18 05:00 PM
South 35 35 16-Jul-18 08:00 AM 31-Aug-18 05:00 PM
Layout 5 5 16-Jul-18 08:00 AM 20-Jul-18 05:00 PM
Frame Priority Walls & Top Out 5 5 23-Jul-18 08:00 AM 27-Jul-18 05:00 PM
Install Inwall Blocking 5 5 23-Jul-18 08:00 AM 27-Jul-18 05:00 PM
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019
Set Roof Curbs
Set Air Handling Units
Set Exhaust Fans
Colonnade Roofs
Plywood Substrate West
Plywood Substrate North
Tile Roof West
Tile Roof North
ELEVATORS
Drill Elevator Jack Holes
Structural Steel Columns & Beams
Set Hoist Beam
Install Shaft Wall
Level 1 Elevator Safety
Level 2 Elevator Safety
Level 3 Elevator Safety
Level 4 Elevator Safety
Elevator Installation
INTERIOR FRAMING & ROUGH-IN
Level 1
South
Layout
Frame Priority Walls & Top Out
Install Inwall Blocking
Plumbing Wall Rough-in
Electrical Wall Rough-in
Frame Non-Priority Walls
Inwall Insulation
One-side Drywall
Inspections
Close Walls
North
Layout
Frame Priority Walls & Top Out
Install Inwall Blocking
CMU Buildout NW Corner
Plumbing Wall Rough-in
Electrical Wall Rough-in
Frame Non-Priority Walls
Inwall Insulation
One-side Drywall
Inspections
Close Walls
Level 2
South
Layout
Frame Priority Walls & Top Out
Install Inwall Blocking
Midwestern State University Health Science and Human Services Center Page 12 of 23 05-Mar-18 08:23 PM
Activity Name OriginalDuration
RemainingDuration
Start Finish
Plumbing Wall Rough-in 10 10 25-Jul-18 08:00 AM 07-Aug-18 05:00 PM
Electrical Wall Rough-in 10 10 25-Jul-18 08:00 AM 07-Aug-18 05:00 PM
Frame Non-Priority Walls 10 10 30-Jul-18 08:00 AM 10-Aug-18 05:00 PM
Inwall Insulation 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM
One-side Drywall 5 5 13-Aug-18 08:00 AM 17-Aug-18 05:00 PM
Inspections 5 5 20-Aug-18 08:00 AM 24-Aug-18 05:00 PM
Close Walls 5 5 27-Aug-18 08:00 AM 31-Aug-18 05:00 PM
North 35 35 23-Jul-18 08:00 AM 10-Sep-18 05:00 PM
Layout 5 5 23-Jul-18 08:00 AM 27-Jul-18 05:00 PM
Frame Priority Walls & Top Out 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM
Install Inwall Blocking 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM
Plumbing Wall Rough-in 10 10 01-Aug-18 08:00 AM 14-Aug-18 05:00 PM
Electrical Wall Rough-in 10 10 01-Aug-18 08:00 AM 14-Aug-18 05:00 PM
Frame Non-Priority Walls 10 10 06-Aug-18 08:00 AM 17-Aug-18 05:00 PM
Inwall Insulation 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM
One-side Drywall 5 5 20-Aug-18 08:00 AM 24-Aug-18 05:00 PM
Inspections 5 5 27-Aug-18 08:00 AM 31-Aug-18 05:00 PM
Close Walls 5 5 04-Sep-18 08:00 AM 10-Sep-18 05:00 PM
Level 3 35 35 16-Jul-18 08:00 AM 31-Aug-18 05:00 PM
South 30 30 16-Jul-18 08:00 AM 24-Aug-18 05:00 PM
Layout 5 5 16-Jul-18 08:00 AM 20-Jul-18 05:00 PM
Frame Priority Walls & Top Out 5 5 23-Jul-18 08:00 AM 27-Jul-18 05:00 PM
Install Inwall Blocking 5 5 23-Jul-18 08:00 AM 27-Jul-18 05:00 PM
Plumbing Wall Rough-in 10 10 25-Jul-18 08:00 AM 07-Aug-18 05:00 PM
Electrical Wall Rough-in 10 10 25-Jul-18 08:00 AM 07-Aug-18 05:00 PM
Frame Non-Priority Walls 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM
Inwall Insulation 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM
One-side Drywall 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM
Inspections 5 5 13-Aug-18 08:00 AM 17-Aug-18 05:00 PM
Close Walls 5 5 20-Aug-18 08:00 AM 24-Aug-18 05:00 PM
North 30 30 23-Jul-18 08:00 AM 31-Aug-18 05:00 PM
Layout 5 5 23-Jul-18 08:00 AM 27-Jul-18 05:00 PM
Frame Priority Walls & Top Out 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM
Install Inwall Blocking 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM
Plumbing Wall Rough-in 10 10 01-Aug-18 08:00 AM 14-Aug-18 05:00 PM
Electrical Wall Rough-in 10 10 01-Aug-18 08:00 AM 14-Aug-18 05:00 PM
Frame Non-Priority Walls 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM
Inwall Insulation 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM
One-side Drywall 5 5 13-Aug-18 08:00 AM 17-Aug-18 05:00 PM
Inspections 5 5 20-Aug-18 08:00 AM 24-Aug-18 05:00 PM
Close Walls 5 5 27-Aug-18 08:00 AM 31-Aug-18 05:00 PM
Level 4 50 50 12-Jul-18 08:00 AM 20-Sep-18 05:00 PM
South 45 45 12-Jul-18 08:00 AM 13-Sep-18 05:00 PM
Layout 5 5 12-Jul-18 08:00 AM 18-Jul-18 05:00 PM
Frame Priority Walls & Top Out 5 5 19-Jul-18 08:00 AM 25-Jul-18 05:00 PM
Install Inwall Blocking 5 5 19-Jul-18 08:00 AM 25-Jul-18 05:00 PM
Plumbing Wall Rough-in 10 10 23-Jul-18 08:00 AM 03-Aug-18 05:00 PM
Electrical Wall Rough-in 10 10 23-Jul-18 08:00 AM 03-Aug-18 05:00 PM
Frame Non-Priority Walls 10 10 26-Jul-18 08:00 AM 08-Aug-18 05:00 PM
Inwall Insulation 10 10 26-Jul-18 08:00 AM 08-Aug-18 05:00 PM
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019
Plumbing Wall Rough-in
Electrical Wall Rough-in
Frame Non-Priority Walls
Inwall Insulation
One-side Drywall
Inspections
Close Walls
North
Layout
Frame Priority Walls & Top Out
Install Inwall Blocking
Plumbing Wall Rough-in
Electrical Wall Rough-in
Frame Non-Priority Walls
Inwall Insulation
One-side Drywall
Inspections
Close Walls
Level 3
South
Layout
Frame Priority Walls & Top Out
Install Inwall Blocking
Plumbing Wall Rough-in
Electrical Wall Rough-in
Frame Non-Priority Walls
Inwall Insulation
One-side Drywall
Inspections
Close Walls
North
Layout
Frame Priority Walls & Top Out
Install Inwall Blocking
Plumbing Wall Rough-in
Electrical Wall Rough-in
Frame Non-Priority Walls
Inwall Insulation
One-side Drywall
Inspections
Close Walls
Level 4
South
Layout
Frame Priority Walls & Top Out
Install Inwall Blocking
Plumbing Wall Rough-in
Electrical Wall Rough-in
Frame Non-Priority Walls
Inwall Insulation
Midwestern State University Health Science and Human Services Center Page 13 of 23 05-Mar-18 08:23 PM
Activity Name OriginalDuration
RemainingDuration
Start Finish
One-side Drywall 10 10 09-Aug-18 08:00 AM 22-Aug-18 05:00 PM
Inspections 5 5 23-Aug-18 08:00 AM 29-Aug-18 05:00 PM
Close Walls 10 10 30-Aug-18 08:00 AM 13-Sep-18 05:00 PM
North 45 45 19-Jul-18 08:00 AM 20-Sep-18 05:00 PM
Layout 5 5 19-Jul-18 08:00 AM 25-Jul-18 05:00 PM
Frame Priority Walls & Top Out 5 5 26-Jul-18 08:00 AM 01-Aug-18 05:00 PM
Install Inwall Blocking 5 5 26-Jul-18 08:00 AM 01-Aug-18 05:00 PM
Plumbing Wall Rough-in 10 10 30-Jul-18 08:00 AM 10-Aug-18 05:00 PM
Electrical Wall Rough-in 10 10 30-Jul-18 08:00 AM 10-Aug-18 05:00 PM
Frame Non-Priority Walls 10 10 02-Aug-18 08:00 AM 15-Aug-18 05:00 PM
Inwall Insulation 10 10 02-Aug-18 08:00 AM 15-Aug-18 05:00 PM
One-side Drywall 10 10 16-Aug-18 08:00 AM 29-Aug-18 05:00 PM
Inspections 5 5 30-Aug-18 08:00 AM 06-Sep-18 05:00 PM
Close Walls 10 10 07-Sep-18 08:00 AM 20-Sep-18 05:00 PM
Penthouse Structure 10 10 28-Jun-18 08:00 AM 12-Jul-18 05:00 PM
West 10 10 28-Jun-18 08:00 AM 12-Jul-18 05:00 PM
Plumbing Wall Rough-in 5 5 28-Jun-18 08:00 AM 05-Jul-18 05:00 PM
Electrical Wall Rough-in 5 5 28-Jun-18 08:00 AM 05-Jul-18 05:00 PM
Inwall Insulation 2 2 06-Jul-18 08:00 AM 09-Jul-18 05:00 PM
Inspections 1 1 10-Jul-18 08:00 AM 10-Jul-18 05:00 PM
Close Walls 2 2 11-Jul-18 08:00 AM 12-Jul-18 05:00 PM
ABOVE CEILING ROUGH-IN 127 127 27-Jun-18 08:00 AM 28-Dec-18 05:00 PM
Level 1 67 67 27-Jun-18 08:00 AM 01-Oct-18 05:00 PM
South 45 45 27-Jun-18 08:00 AM 29-Aug-18 05:00 PM
Electrical 25 25 27-Jun-18 08:00 AM 01-Aug-18 05:00 PM
Electrical Feeders 5 5 27-Jun-18 08:00 AM 03-Jul-18 05:00 PM
Branch Conduit 20 20 05-Jul-18 08:00 AM 01-Aug-18 05:00 PM
Mechanical 22 22 02-Jul-18 08:00 AM 01-Aug-18 05:00 PM
HVAC Equipment 2 2 02-Jul-18 08:00 AM 03-Jul-18 05:00 PM
Main Ductwork 10 10 05-Jul-18 08:00 AM 18-Jul-18 05:00 PM
Mechaincal Piping 10 10 05-Jul-18 08:00 AM 18-Jul-18 05:00 PM
Insulate Ductwork 10 10 19-Jul-18 08:00 AM 01-Aug-18 05:00 PM
Branch Ductwork 5 5 19-Jul-18 08:00 AM 25-Jul-18 05:00 PM
HVAC Controls Conduit 5 5 19-Jul-18 08:00 AM 25-Jul-18 05:00 PM
Plumbing 20 20 05-Jul-18 08:00 AM 01-Aug-18 05:00 PM
Roof Drains 10 10 05-Jul-18 08:00 AM 18-Jul-18 05:00 PM
Waste & Vent 10 10 05-Jul-18 08:00 AM 18-Jul-18 05:00 PM
Domestic Water 10 10 05-Jul-18 08:00 AM 18-Jul-18 05:00 PM
Medical Gas 5 5 05-Jul-18 08:00 AM 11-Jul-18 05:00 PM
Plumbing Insulation 10 10 19-Jul-18 08:00 AM 01-Aug-18 05:00 PM
Fire Protection 10 10 19-Jul-18 08:00 AM 01-Aug-18 05:00 PM
Fire Protection Mains 5 5 19-Jul-18 08:00 AM 25-Jul-18 05:00 PM
Fire Protection Branch Lines 5 5 26-Jul-18 08:00 AM 01-Aug-18 05:00 PM
Low Voltage 30 30 19-Jul-18 08:00 AM 29-Aug-18 05:00 PM
Cable Tray 10 10 19-Jul-18 08:00 AM 01-Aug-18 05:00 PM
Fire Alarm / Security 5 5 19-Jul-18 08:00 AM 25-Jul-18 05:00 PM
Communications 20 20 02-Aug-18 08:00 AM 29-Aug-18 05:00 PM
AV Wiring 20 20 02-Aug-18 08:00 AM 29-Aug-18 05:00 PM
Misc Structural Supports 5 5 05-Jul-18 08:00 AM 11-Jul-18 05:00 PM
Restroom Supports 5 5 05-Jul-18 08:00 AM 11-Jul-18 05:00 PM
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019
One-side Drywall
Inspections
Close Walls
North
Layout
Frame Priority Walls & Top Out
Install Inwall Blocking
Plumbing Wall Rough-in
Electrical Wall Rough-in
Frame Non-Priority Walls
Inwall Insulation
One-side Drywall
Inspections
Close Walls
Penthouse Structure
West
Plumbing Wall Rough-in
Electrical Wall Rough-in
Inwall Insulation
Inspections
Close Walls
ABOVE CEILING ROUGH-IN
Level 1
South
Electrical
Electrical Feeders
Branch Conduit
Mechanical
HVAC Equipment
Main Ductwork
Mechaincal Piping
Insulate Ductwork
Branch Ductwork
HVAC Controls Conduit
Plumbing
Roof Drains
Waste & Vent
Domestic Water
Medical Gas
Plumbing Insulation
Fire Protection
Fire Protection Mains
Fire Protection Branch Lines
Low Voltage
Cable Tray
Fire Alarm / Security
Communications
AV Wiring
Misc Structural Supports
Restroom Supports
Midwestern State University Health Science and Human Services Center Page 14 of 23 05-Mar-18 08:23 PM
Activity Name OriginalDuration
RemainingDuration
Start Finish
A/V Supports 5 5 05-Jul-18 08:00 AM 11-Jul-18 05:00 PM
Operable Partition Support 5 5 05-Jul-18 08:00 AM 11-Jul-18 05:00 PM
North 45 45 30-Jul-18 08:00 AM 01-Oct-18 05:00 PM
Electrical 25 25 30-Jul-18 08:00 AM 31-Aug-18 05:00 PM
Electrical Feeders 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM
Branch Conduit 20 20 06-Aug-18 08:00 AM 31-Aug-18 05:00 PM
Mechanical 25 25 30-Jul-18 08:00 AM 31-Aug-18 05:00 PM
HVAC Equipment 2 2 30-Jul-18 08:00 AM 31-Jul-18 05:00 PM
Main Ductwork 10 10 06-Aug-18 08:00 AM 17-Aug-18 05:00 PM
Mechaincal Piping 10 10 06-Aug-18 08:00 AM 17-Aug-18 05:00 PM
Insulate Ductwork 10 10 20-Aug-18 08:00 AM 31-Aug-18 05:00 PM
Branch Ductwork 5 5 20-Aug-18 08:00 AM 24-Aug-18 05:00 PM
HVAC Controls Conduit 5 5 20-Aug-18 08:00 AM 24-Aug-18 05:00 PM
Plumbing 20 20 06-Aug-18 08:00 AM 31-Aug-18 05:00 PM
Roof Drains 10 10 06-Aug-18 08:00 AM 17-Aug-18 05:00 PM
Waste & Vent 10 10 06-Aug-18 08:00 AM 17-Aug-18 05:00 PM
Domestic Water 10 10 06-Aug-18 08:00 AM 17-Aug-18 05:00 PM
Medical Gas 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM
Plumbing Insulation 10 10 20-Aug-18 08:00 AM 31-Aug-18 05:00 PM
Fire Protection 10 10 20-Aug-18 08:00 AM 31-Aug-18 05:00 PM
Fire Protection Mains 5 5 20-Aug-18 08:00 AM 24-Aug-18 05:00 PM
Fire Protection Branch Lines 5 5 27-Aug-18 08:00 AM 31-Aug-18 05:00 PM
Low Voltage 30 30 20-Aug-18 08:00 AM 01-Oct-18 05:00 PM
Cable Tray 10 10 20-Aug-18 08:00 AM 31-Aug-18 05:00 PM
Fire Alarm / Security 5 5 20-Aug-18 08:00 AM 24-Aug-18 05:00 PM
Communications 20 20 04-Sep-18 08:00 AM 01-Oct-18 05:00 PM
AV Wiring 20 20 04-Sep-18 08:00 AM 01-Oct-18 05:00 PM
Misc Structural Supports 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM
A/V Supports 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM
Dental Equipment Supports 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM
Level 2 70 70 23-Jul-18 08:00 AM 29-Oct-18 05:00 PM
South 60 60 23-Jul-18 08:00 AM 15-Oct-18 05:00 PM
Electrical 25 25 23-Jul-18 08:00 AM 24-Aug-18 05:00 PM
Electrical Feeders 5 5 23-Jul-18 08:00 AM 27-Jul-18 05:00 PM
Branch Conduit 20 20 30-Jul-18 08:00 AM 24-Aug-18 05:00 PM
Mechanical 40 40 23-Jul-18 08:00 AM 17-Sep-18 05:00 PM
HVAC Equipment 2 2 23-Jul-18 08:00 AM 24-Jul-18 05:00 PM
Main Ductwork 10 10 20-Aug-18 08:00 AM 31-Aug-18 05:00 PM
Mechaincal Piping 10 10 20-Aug-18 08:00 AM 31-Aug-18 05:00 PM
Insulate Ductwork 10 10 04-Sep-18 08:00 AM 17-Sep-18 05:00 PM
Branch Ductwork 5 5 04-Sep-18 08:00 AM 10-Sep-18 05:00 PM
HVAC Controls Conduit 5 5 04-Sep-18 08:00 AM 10-Sep-18 05:00 PM
Plumbing 25 25 13-Aug-18 08:00 AM 17-Sep-18 05:00 PM
Medical Gas 5 5 13-Aug-18 08:00 AM 17-Aug-18 05:00 PM
Roof Drains 10 10 20-Aug-18 08:00 AM 31-Aug-18 05:00 PM
Waste & Vent 10 10 20-Aug-18 08:00 AM 31-Aug-18 05:00 PM
Domestic Water 10 10 20-Aug-18 08:00 AM 31-Aug-18 05:00 PM
Plumbing Insulation 10 10 04-Sep-18 08:00 AM 17-Sep-18 05:00 PM
Fire Protection 10 10 04-Sep-18 08:00 AM 17-Sep-18 05:00 PM
Fire Protection Mains 5 5 04-Sep-18 08:00 AM 10-Sep-18 05:00 PM
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019
A/V Supports
Operable Partition Support
North
Electrical
Electrical Feeders
Branch Conduit
Mechanical
HVAC Equipment
Main Ductwork
Mechaincal Piping
Insulate Ductwork
Branch Ductwork
HVAC Controls Conduit
Plumbing
Roof Drains
Waste & Vent
Domestic Water
Medical Gas
Plumbing Insulation
Fire Protection
Fire Protection Mains
Fire Protection Branch Lines
Low Voltage
Cable Tray
Fire Alarm / Security
Communications
AV Wiring
Misc Structural Supports
A/V Supports
Dental Equipment Supports
Level 2
South
Electrical
Electrical Feeders
Branch Conduit
Mechanical
HVAC Equipment
Main Ductwork
Mechaincal Piping
Insulate Ductwork
Branch Ductwork
HVAC Controls Conduit
Plumbing
Medical Gas
Roof Drains
Waste & Vent
Domestic Water
Plumbing Insulation
Fire Protection
Fire Protection Mains
Midwestern State University Health Science and Human Services Center Page 15 of 23 05-Mar-18 08:23 PM
Activity Name OriginalDuration
RemainingDuration
Start Finish
Fire Protection Branch Lines 5 5 11-Sep-18 08:00 AM 17-Sep-18 05:00 PM
Low Voltage 30 30 04-Sep-18 08:00 AM 15-Oct-18 05:00 PM
Cable Tray 10 10 04-Sep-18 08:00 AM 17-Sep-18 05:00 PM
Fire Alarm / Security 5 5 04-Sep-18 08:00 AM 10-Sep-18 05:00 PM
Communications 20 20 18-Sep-18 08:00 AM 15-Oct-18 05:00 PM
AV Wiring 20 20 18-Sep-18 08:00 AM 15-Oct-18 05:00 PM
Misc Structural Supports 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM
Restroom Supports 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM
A/V Supports 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM
North 65 65 30-Jul-18 08:00 AM 29-Oct-18 05:00 PM
Electrical 25 25 30-Jul-18 08:00 AM 31-Aug-18 05:00 PM
Electrical Feeders 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM
Branch Conduit 20 20 06-Aug-18 08:00 AM 31-Aug-18 05:00 PM
Mechanical 45 45 30-Jul-18 08:00 AM 01-Oct-18 05:00 PM
HVAC Equipment 2 2 30-Jul-18 08:00 AM 31-Jul-18 05:00 PM
Main Ductwork 10 10 04-Sep-18 08:00 AM 17-Sep-18 05:00 PM
Mechaincal Piping 10 10 04-Sep-18 08:00 AM 17-Sep-18 05:00 PM
Insulate Ductwork 10 10 18-Sep-18 08:00 AM 01-Oct-18 05:00 PM
Branch Ductwork 5 5 18-Sep-18 08:00 AM 24-Sep-18 05:00 PM
HVAC Controls Conduit 5 5 18-Sep-18 08:00 AM 24-Sep-18 05:00 PM
Plumbing 30 30 20-Aug-18 08:00 AM 01-Oct-18 05:00 PM
Medical Gas 5 5 20-Aug-18 08:00 AM 24-Aug-18 05:00 PM
Roof Drains 10 10 04-Sep-18 08:00 AM 17-Sep-18 05:00 PM
Waste & Vent 10 10 04-Sep-18 08:00 AM 17-Sep-18 05:00 PM
Domestic Water 10 10 04-Sep-18 08:00 AM 17-Sep-18 05:00 PM
Plumbing Insulation 10 10 18-Sep-18 08:00 AM 01-Oct-18 05:00 PM
Fire Protection 10 10 18-Sep-18 08:00 AM 01-Oct-18 05:00 PM
Fire Protection Mains 5 5 18-Sep-18 08:00 AM 24-Sep-18 05:00 PM
Fire Protection Branch Lines 5 5 25-Sep-18 08:00 AM 01-Oct-18 05:00 PM
Low Voltage 30 30 18-Sep-18 08:00 AM 29-Oct-18 05:00 PM
Cable Tray 10 10 18-Sep-18 08:00 AM 01-Oct-18 05:00 PM
Fire Alarm / Security 5 5 18-Sep-18 08:00 AM 24-Sep-18 05:00 PM
Communications 20 20 02-Oct-18 08:00 AM 29-Oct-18 05:00 PM
AV Wiring 20 20 02-Oct-18 08:00 AM 29-Oct-18 05:00 PM
Misc Structural Supports 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM
A/V Supports 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM
X-Ray Supports 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM
Operating Room Supports 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM
Level 3 90 90 23-Jul-18 08:00 AM 28-Nov-18 05:00 PM
South 80 80 23-Jul-18 08:00 AM 12-Nov-18 05:00 PM
Electrical 25 25 23-Jul-18 08:00 AM 24-Aug-18 05:00 PM
Electrical Feeders 5 5 23-Jul-18 08:00 AM 27-Jul-18 05:00 PM
Branch Conduit 20 20 30-Jul-18 08:00 AM 24-Aug-18 05:00 PM
Mechanical 60 60 23-Jul-18 08:00 AM 15-Oct-18 05:00 PM
HVAC Equipment 2 2 23-Jul-18 08:00 AM 24-Jul-18 05:00 PM
Main Ductwork 10 10 18-Sep-18 08:00 AM 01-Oct-18 05:00 PM
Mechaincal Piping 10 10 18-Sep-18 08:00 AM 01-Oct-18 05:00 PM
Insulate Ductwork 10 10 02-Oct-18 08:00 AM 15-Oct-18 05:00 PM
Branch Ductwork 5 5 02-Oct-18 08:00 AM 08-Oct-18 05:00 PM
HVAC Controls Conduit 5 5 02-Oct-18 08:00 AM 08-Oct-18 05:00 PM
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019
Fire Protection Branch Lines
Low Voltage
Cable Tray
Fire Alarm / Security
Communications
AV Wiring
Misc Structural Supports
Restroom Supports
A/V Supports
North
Electrical
Electrical Feeders
Branch Conduit
Mechanical
HVAC Equipment
Main Ductwork
Mechaincal Piping
Insulate Ductwork
Branch Ductwork
HVAC Controls Conduit
Plumbing
Medical Gas
Roof Drains
Waste & Vent
Domestic Water
Plumbing Insulation
Fire Protection
Fire Protection Mains
Fire Protection Branch Lines
Low Voltage
Cable Tray
Fire Alarm / Security
Communications
AV Wiring
Misc Structural Supports
A/V Supports
X-Ray Supports
Operating Room Supports
Level 3
South
Electrical
Electrical Feeders
Branch Conduit
Mechanical
HVAC Equipment
Main Ductwork
Mechaincal Piping
Insulate Ductwork
Branch Ductwork
HVAC Controls Conduit
Midwestern State University Health Science and Human Services Center Page 16 of 23 05-Mar-18 08:23 PM
Activity Name OriginalDuration
RemainingDuration
Start Finish
Plumbing 35 35 27-Aug-18 08:00 AM 15-Oct-18 05:00 PM
Medical Gas 5 5 27-Aug-18 08:00 AM 31-Aug-18 05:00 PM
Roof Drains 10 10 18-Sep-18 08:00 AM 01-Oct-18 05:00 PM
Waste & Vent 10 10 18-Sep-18 08:00 AM 01-Oct-18 05:00 PM
Domestic Water 10 10 18-Sep-18 08:00 AM 01-Oct-18 05:00 PM
Plumbing Insulation 10 10 02-Oct-18 08:00 AM 15-Oct-18 05:00 PM
Fire Protection 10 10 02-Oct-18 08:00 AM 15-Oct-18 05:00 PM
Fire Protection Mains 5 5 02-Oct-18 08:00 AM 08-Oct-18 05:00 PM
Fire Protection Branch Lines 5 5 09-Oct-18 08:00 AM 15-Oct-18 05:00 PM
Low Voltage 30 30 02-Oct-18 08:00 AM 12-Nov-18 05:00 PM
Cable Tray 10 10 02-Oct-18 08:00 AM 15-Oct-18 05:00 PM
Fire Alarm / Security 5 5 02-Oct-18 08:00 AM 08-Oct-18 05:00 PM
Communications 20 20 16-Oct-18 08:00 AM 12-Nov-18 05:00 PM
AV Wiring 20 20 16-Oct-18 08:00 AM 12-Nov-18 05:00 PM
Misc Structural Supports 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM
Restroom Supports 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM
A/V Supports 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM
Hangdown Supports at Atrium 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM
North 85 85 30-Jul-18 08:00 AM 28-Nov-18 05:00 PM
Electrical 25 25 30-Jul-18 08:00 AM 31-Aug-18 05:00 PM
Electrical Feeders 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM
Branch Conduit 20 20 06-Aug-18 08:00 AM 31-Aug-18 05:00 PM
Mechanical 65 65 30-Jul-18 08:00 AM 29-Oct-18 05:00 PM
HVAC Equipment 2 2 30-Jul-18 08:00 AM 31-Jul-18 05:00 PM
Main Ductwork 10 10 02-Oct-18 08:00 AM 15-Oct-18 05:00 PM
Mechaincal Piping 10 10 02-Oct-18 08:00 AM 15-Oct-18 05:00 PM
Insulate Ductwork 10 10 16-Oct-18 08:00 AM 29-Oct-18 05:00 PM
Branch Ductwork 5 5 16-Oct-18 08:00 AM 22-Oct-18 05:00 PM
HVAC Controls Conduit 5 5 16-Oct-18 08:00 AM 22-Oct-18 05:00 PM
Plumbing 40 40 04-Sep-18 08:00 AM 29-Oct-18 05:00 PM
Medical Gas 5 5 04-Sep-18 08:00 AM 10-Sep-18 05:00 PM
Roof Drains 10 10 02-Oct-18 08:00 AM 15-Oct-18 05:00 PM
Waste & Vent 10 10 02-Oct-18 08:00 AM 15-Oct-18 05:00 PM
Domestic Water 10 10 02-Oct-18 08:00 AM 15-Oct-18 05:00 PM
Plumbing Insulation 10 10 16-Oct-18 08:00 AM 29-Oct-18 05:00 PM
Fire Protection 10 10 16-Oct-18 08:00 AM 29-Oct-18 05:00 PM
Fire Protection Mains 5 5 16-Oct-18 08:00 AM 22-Oct-18 05:00 PM
Fire Protection Branch Lines 5 5 23-Oct-18 08:00 AM 29-Oct-18 05:00 PM
Low Voltage 30 30 16-Oct-18 08:00 AM 28-Nov-18 05:00 PM
Cable Tray 10 10 16-Oct-18 08:00 AM 29-Oct-18 05:00 PM
Fire Alarm / Security 5 5 16-Oct-18 08:00 AM 22-Oct-18 05:00 PM
Communications 20 20 30-Oct-18 08:00 AM 28-Nov-18 05:00 PM
AV Wiring 20 20 30-Oct-18 08:00 AM 28-Nov-18 05:00 PM
Misc Structural Supports 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM
A/V Supports 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM
Handown Supports at Atrium 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM
Level 4 112 112 19-Jul-18 08:00 AM 28-Dec-18 05:00 PM
South 102 102 19-Jul-18 08:00 AM 12-Dec-18 05:00 PM
Electrical 25 25 19-Jul-18 08:00 AM 22-Aug-18 05:00 PM
Electrical Feeders 5 5 19-Jul-18 08:00 AM 25-Jul-18 05:00 PM
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019
Plumbing
Medical Gas
Roof Drains
Waste & Vent
Domestic Water
Plumbing Insulation
Fire Protection
Fire Protection Mains
Fire Protection Branch Lines
Low Voltage
Cable Tray
Fire Alarm / Security
Communications
AV Wiring
Misc Structural Supports
Restroom Supports
A/V Supports
Hangdown Supports at Atrium
North
Electrical
Electrical Feeders
Branch Conduit
Mechanical
HVAC Equipment
Main Ductwork
Mechaincal Piping
Insulate Ductwork
Branch Ductwork
HVAC Controls Conduit
Plumbing
Medical Gas
Roof Drains
Waste & Vent
Domestic Water
Plumbing Insulation
Fire Protection
Fire Protection Mains
Fire Protection Branch Lines
Low Voltage
Cable Tray
Fire Alarm / Security
Communications
AV Wiring
Misc Structural Supports
A/V Supports
Handown Supports at Atrium
Level 4
South
Electrical
Electrical Feeders
Midwestern State University Health Science and Human Services Center Page 17 of 23 05-Mar-18 08:23 PM
Activity Name OriginalDuration
RemainingDuration
Start Finish
Branch Conduit 20 20 26-Jul-18 08:00 AM 22-Aug-18 05:00 PM
Mechanical 82 82 19-Jul-18 08:00 AM 12-Nov-18 05:00 PM
HVAC Equipment 2 2 19-Jul-18 08:00 AM 20-Jul-18 05:00 PM
Main Ductwork 10 10 16-Oct-18 08:00 AM 29-Oct-18 05:00 PM
Mechaincal Piping 10 10 16-Oct-18 08:00 AM 29-Oct-18 05:00 PM
Insulate Ductwork 10 10 30-Oct-18 08:00 AM 12-Nov-18 05:00 PM
Branch Ductwork 5 5 30-Oct-18 08:00 AM 05-Nov-18 05:00 PM
HVAC Controls Conduit 5 5 30-Oct-18 08:00 AM 05-Nov-18 05:00 PM
Plumbing 20 20 16-Oct-18 08:00 AM 12-Nov-18 05:00 PM
Roof Drains 10 10 16-Oct-18 08:00 AM 29-Oct-18 05:00 PM
Waste & Vent 10 10 16-Oct-18 08:00 AM 29-Oct-18 05:00 PM
Domestic Water 10 10 16-Oct-18 08:00 AM 29-Oct-18 05:00 PM
Plumbing Insulation 10 10 30-Oct-18 08:00 AM 12-Nov-18 05:00 PM
Fire Protection 10 10 30-Oct-18 08:00 AM 12-Nov-18 05:00 PM
Fire Protection Mains 5 5 30-Oct-18 08:00 AM 05-Nov-18 05:00 PM
Fire Protection Branch Lines 5 5 06-Nov-18 08:00 AM 12-Nov-18 05:00 PM
Low Voltage 30 30 30-Oct-18 08:00 AM 12-Dec-18 05:00 PM
Cable Tray 10 10 30-Oct-18 08:00 AM 12-Nov-18 05:00 PM
Fire Alarm / Security 5 5 30-Oct-18 08:00 AM 05-Nov-18 05:00 PM
Communications 20 20 13-Nov-18 08:00 AM 12-Dec-18 05:00 PM
AV Wiring 20 20 13-Nov-18 08:00 AM 12-Dec-18 05:00 PM
Misc Structural Supports 5 5 26-Jul-18 08:00 AM 01-Aug-18 05:00 PM
Restroom Supports 5 5 26-Jul-18 08:00 AM 01-Aug-18 05:00 PM
A/V Supports 5 5 26-Jul-18 08:00 AM 01-Aug-18 05:00 PM
North 107 107 26-Jul-18 08:00 AM 28-Dec-18 05:00 PM
Electrical 25 25 26-Jul-18 08:00 AM 29-Aug-18 05:00 PM
Electrical Feeders 5 5 26-Jul-18 08:00 AM 01-Aug-18 05:00 PM
Branch Conduit 20 20 02-Aug-18 08:00 AM 29-Aug-18 05:00 PM
Mechanical 87 87 26-Jul-18 08:00 AM 28-Nov-18 05:00 PM
HVAC Equipment 2 2 26-Jul-18 08:00 AM 27-Jul-18 05:00 PM
Main Ductwork 10 10 30-Oct-18 08:00 AM 12-Nov-18 05:00 PM
Mechaincal Piping 10 10 30-Oct-18 08:00 AM 12-Nov-18 05:00 PM
Insulate Ductwork 10 10 13-Nov-18 08:00 AM 28-Nov-18 05:00 PM
Branch Ductwork 5 5 13-Nov-18 08:00 AM 19-Nov-18 05:00 PM
HVAC Controls Conduit 5 5 13-Nov-18 08:00 AM 19-Nov-18 05:00 PM
Plumbing 20 20 30-Oct-18 08:00 AM 28-Nov-18 05:00 PM
Roof Drains 10 10 30-Oct-18 08:00 AM 12-Nov-18 05:00 PM
Waste & Vent 10 10 30-Oct-18 08:00 AM 12-Nov-18 05:00 PM
Domestic Water 10 10 30-Oct-18 08:00 AM 12-Nov-18 05:00 PM
Plumbing Insulation 10 10 13-Nov-18 08:00 AM 28-Nov-18 05:00 PM
Fire Protection 10 10 13-Nov-18 08:00 AM 28-Nov-18 05:00 PM
Fire Protection Mains 5 5 13-Nov-18 08:00 AM 19-Nov-18 05:00 PM
Fire Protection Branch Lines 5 5 20-Nov-18 08:00 AM 28-Nov-18 05:00 PM
Low Voltage 30 30 13-Nov-18 08:00 AM 28-Dec-18 05:00 PM
Cable Tray 10 10 13-Nov-18 08:00 AM 28-Nov-18 05:00 PM
Fire Alarm / Security 5 5 13-Nov-18 08:00 AM 19-Nov-18 05:00 PM
Communications 20 20 29-Nov-18 08:00 AM 28-Dec-18 05:00 PM
AV Wiring 20 20 29-Nov-18 08:00 AM 28-Dec-18 05:00 PM
Misc Structural Supports 5 5 02-Aug-18 08:00 AM 08-Aug-18 05:00 PM
A/V Supports 5 5 02-Aug-18 08:00 AM 08-Aug-18 05:00 PM
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019
Branch Conduit
Mechanical
HVAC Equipment
Main Ductwork
Mechaincal Piping
Insulate Ductwork
Branch Ductwork
HVAC Controls Conduit
Plumbing
Roof Drains
Waste & Vent
Domestic Water
Plumbing Insulation
Fire Protection
Fire Protection Mains
Fire Protection Branch Lines
Low Voltage
Cable Tray
Fire Alarm / Security
Communications
AV Wiring
Misc Structural Supports
Restroom Supports
A/V Supports
North
Electrical
Electrical Feeders
Branch Conduit
Mechanical
HVAC Equipment
Main Ductwork
Mechaincal Piping
Insulate Ductwork
Branch Ductwork
HVAC Controls Conduit
Plumbing
Roof Drains
Waste & Vent
Domestic Water
Plumbing Insulation
Fire Protection
Fire Protection Mains
Fire Protection Branch Lines
Low Voltage
Cable Tray
Fire Alarm / Security
Communications
AV Wiring
Misc Structural Supports
A/V Supports
Midwestern State University Health Science and Human Services Center Page 18 of 23 05-Mar-18 08:23 PM
Activity Name OriginalDuration
RemainingDuration
Start Finish
Atrium 56 56 30-Jul-18 08:00 AM 16-Oct-18 05:00 PM
Electrical 3 3 30-Jul-18 08:00 AM 01-Aug-18 05:00 PM
Branch Conduit 3 3 30-Jul-18 08:00 AM 01-Aug-18 05:00 PM
Fire Protection 6 6 09-Oct-18 08:00 AM 16-Oct-18 05:00 PM
Fire Protection Mains 3 3 09-Oct-18 08:00 AM 11-Oct-18 05:00 PM
Fire Protection Branch Lines 3 3 12-Oct-18 08:00 AM 16-Oct-18 05:00 PM
Penthouse Structure 25 25 30-Jul-18 08:00 AM 31-Aug-18 05:00 PM
Electrical 10 10 30-Jul-18 08:00 AM 10-Aug-18 05:00 PM
Electrical Feeders 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM
Branch Conduit 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM
Mechanical 10 10 06-Aug-18 08:00 AM 17-Aug-18 05:00 PM
Medium Pressure Ductwork 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM
Mechaincal Piping 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM
Mechanical Equipment 10 10 06-Aug-18 08:00 AM 17-Aug-18 05:00 PM
Insulate Ductwork 5 5 13-Aug-18 08:00 AM 17-Aug-18 05:00 PM
Plumbing 15 15 06-Aug-18 08:00 AM 24-Aug-18 05:00 PM
Roof Drains 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM
Waste & Vent 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM
Domestic Water 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM
Medical Gas 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM
Plumbing Equipment 10 10 06-Aug-18 08:00 AM 17-Aug-18 05:00 PM
Plumbing Insulation 5 5 13-Aug-18 08:00 AM 17-Aug-18 05:00 PM
Pipe Labeling 5 5 20-Aug-18 08:00 AM 24-Aug-18 05:00 PM
Fire Protection 15 15 13-Aug-18 08:00 AM 31-Aug-18 05:00 PM
Fire Protection Mains 5 5 13-Aug-18 08:00 AM 17-Aug-18 05:00 PM
Fire Protection Branch Lines 5 5 20-Aug-18 08:00 AM 24-Aug-18 05:00 PM
Fire Protection Drops 5 5 27-Aug-18 08:00 AM 31-Aug-18 05:00 PM
Low Voltage 5 5 20-Aug-18 08:00 AM 24-Aug-18 05:00 PM
Communications 5 5 20-Aug-18 08:00 AM 24-Aug-18 05:00 PM
Fire Alarm / Security 5 5 20-Aug-18 08:00 AM 24-Aug-18 05:00 PM
MECHANICAL / ELECTRICAL ROOMS 63 63 26-Jul-18 08:00 AM 23-Oct-18 05:00 PM
Mechanical Yard 15 15 24-Sep-18 08:00 AM 12-Oct-18 05:00 PM
Set Transformer 7 7 24-Sep-18 08:00 AM 02-Oct-18 05:00 PM
Masonry at Sevice Yard 10 10 24-Sep-18 08:00 AM 05-Oct-18 05:00 PM
Set Generator 5 5 08-Oct-18 08:00 AM 12-Oct-18 05:00 PM
Set CRAC Condensing Units 5 5 08-Oct-18 08:00 AM 12-Oct-18 05:00 PM
Electrical 63 63 26-Jul-18 08:00 AM 23-Oct-18 05:00 PM
Level 1 63 63 26-Jul-18 08:00 AM 23-Oct-18 05:00 PM
Main Electrical Room 63 63 26-Jul-18 08:00 AM 23-Oct-18 05:00 PM
Prep & Paint Walls 2 2 26-Jul-18 08:00 AM 27-Jul-18 05:00 PM
Install Gear 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM
Install Panels 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM
Install Fire Alarm Panels 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM
Install Energy Management Panel 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM
Pull Secondary Feeders to ATS 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM
Pull Feeders to Sub Panels 5 5 13-Aug-18 08:00 AM 17-Aug-18 05:00 PM
Energize Gear 5 5 03-Oct-18 08:00 AM 09-Oct-18 05:00 PM
Seal Floors 5 5 10-Oct-18 08:00 AM 16-Oct-18 05:00 PM
Final Paint Walls 5 5 17-Oct-18 08:00 AM 23-Oct-18 05:00 PM
Electrical Distribution 61 61 30-Jul-18 08:00 AM 23-Oct-18 05:00 PM
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019
Atrium
Electrical
Branch Conduit
Fire Protection
Fire Protection Mains
Fire Protection Branch Lines
Penthouse Structure
Electrical
Electrical Feeders
Branch Conduit
Mechanical
Medium Pressure Ductwork
Mechaincal Piping
Mechanical Equipment
Insulate Ductwork
Plumbing
Roof Drains
Waste & Vent
Domestic Water
Medical Gas
Plumbing Equipment
Plumbing Insulation
Pipe Labeling
Fire Protection
Fire Protection Mains
Fire Protection Branch Lines
Fire Protection Drops
Low Voltage
Communications
Fire Alarm / Security
MECHANICAL / ELECTRICAL ROOMS
Mechanical Yard
Set Transformer
Masonry at Sevice Yard
Set Generator
Set CRAC Condensing Units
Electrical
Level 1
Main Electrical Room
Prep & Paint Walls
Install Gear
Install Panels
Install Fire Alarm Panels
Install Energy Management Panel
Pull Secondary Feeders to ATS
Pull Feeders to Sub Panels
Energize Gear
Seal Floors
Final Paint Walls
Electrical Distribution
Midwestern State University Health Science and Human Services Center Page 19 of 23 05-Mar-18 08:23 PM
Activity Name OriginalDuration
RemainingDuration
Start Finish
Prep & Paint Walls 2 2 30-Jul-18 08:00 AM 31-Jul-18 05:00 PM
Set Panels 5 5 01-Aug-18 08:00 AM 07-Aug-18 05:00 PM
Terminate Feeders 5 5 20-Aug-18 08:00 AM 24-Aug-18 05:00 PM
Seal Floors 5 5 10-Oct-18 08:00 AM 16-Oct-18 05:00 PM
Final Paint Walls 5 5 17-Oct-18 08:00 AM 23-Oct-18 05:00 PM
Level 2 59 59 01-Aug-18 08:00 AM 23-Oct-18 05:00 PM
Electrical Distribution 59 59 01-Aug-18 08:00 AM 23-Oct-18 05:00 PM
Prep & Paint Walls 2 2 01-Aug-18 08:00 AM 02-Aug-18 05:00 PM
Set Panels 5 5 08-Aug-18 08:00 AM 14-Aug-18 05:00 PM
Terminate Feeders 5 5 15-Aug-18 08:00 AM 21-Aug-18 05:00 PM
Seal Floors 5 5 10-Oct-18 08:00 AM 16-Oct-18 05:00 PM
Final Paint Walls 5 5 17-Oct-18 08:00 AM 23-Oct-18 05:00 PM
Level 3 57 57 03-Aug-18 08:00 AM 23-Oct-18 05:00 PM
Electrical Distribution 57 57 03-Aug-18 08:00 AM 23-Oct-18 05:00 PM
Prep & Paint Walls 2 2 03-Aug-18 08:00 AM 06-Aug-18 05:00 PM
Set Panels 5 5 15-Aug-18 08:00 AM 21-Aug-18 05:00 PM
Terminate Feeders 5 5 22-Aug-18 08:00 AM 28-Aug-18 05:00 PM
Seal Floors 5 5 10-Oct-18 08:00 AM 16-Oct-18 05:00 PM
Final Paint Walls 5 5 17-Oct-18 08:00 AM 23-Oct-18 05:00 PM
Level 4 55 55 07-Aug-18 08:00 AM 23-Oct-18 05:00 PM
Electrical Distibution 55 55 07-Aug-18 08:00 AM 23-Oct-18 05:00 PM
Prep & Paint Walls 2 2 07-Aug-18 08:00 AM 08-Aug-18 05:00 PM
Set Panels 5 5 22-Aug-18 08:00 AM 28-Aug-18 05:00 PM
Terminate Feeders 5 5 29-Aug-18 08:00 AM 05-Sep-18 05:00 PM
Seal Floors 5 5 10-Oct-18 08:00 AM 16-Oct-18 05:00 PM
Final Paint Walls 5 5 17-Oct-18 08:00 AM 23-Oct-18 05:00 PM
NE Equipment Room 0 0
NE Fire Pump Room 0 0
NE Dental Equipment Room 0 0
Communications 0 0
Level 1 0 0
Data Center 0 0
MDF Room 0 0
Level 2 0 0
IDF Room 0 0
Level 3 0 0
IDF Room 0 0
Level 4 0 0
IDF Room 0 0
SW Mechanical Penthouse 0 0
INTERIOR FINISHES 125 125 25-Sep-18 08:00 AM 26-Mar-19 05:00 PM
Atrium 80 80 25-Sep-18 08:00 AM 21-Jan-19 05:00 PM
Install Cementitious Fireproofing 5 5 25-Sep-18 08:00 AM 01-Oct-18 05:00 PM
Frame Ceiling 5 5 02-Oct-18 08:00 AM 08-Oct-18 05:00 PM
Sheetrock Ceiling 5 5 09-Oct-18 08:00 AM 15-Oct-18 05:00 PM
Tape / Float / Texture 10 10 16-Oct-18 08:00 AM 29-Oct-18 05:00 PM
Prime Coat & Paint Ceiling 5 5 30-Oct-18 08:00 AM 05-Nov-18 05:00 PM
Install Interior Storefront 10 10 06-Nov-18 08:00 AM 19-Nov-18 05:00 PM
Install Wood Paneling 10 10 20-Nov-18 08:00 AM 05-Dec-18 05:00 PM
Install Level 1 Stair 5 5 06-Dec-18 08:00 AM 12-Dec-18 05:00 PM
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019
Prep & Paint Walls
Set Panels
Terminate Feeders
Seal Floors
Final Paint Walls
Level 2
Electrical Distribution
Prep & Paint Walls
Set Panels
Terminate Feeders
Seal Floors
Final Paint Walls
Level 3
Electrical Distribution
Prep & Paint Walls
Set Panels
Terminate Feeders
Seal Floors
Final Paint Walls
Level 4
Electrical Distibution
Prep & Paint Walls
Set Panels
Terminate Feeders
Seal Floors
Final Paint Walls
INTERIOR FINISHES
Atrium
Install Cementitious Fireproofing
Frame Ceiling
Sheetrock Ceiling
Tape / Float / Texture
Prime Coat & Paint Ceiling
Install Interior Storefront
Install Wood Paneling
Install Level 1 Stair
Midwestern State University Health Science and Human Services Center Page 20 of 23 05-Mar-18 08:23 PM
Activity Name OriginalDuration
RemainingDuration
Start Finish
Paint Stair 5 5 13-Dec-18 08:00 AM 19-Dec-18 05:00 PM
Install Terrazzo 20 20 20-Dec-18 08:00 AM 21-Jan-19 05:00 PM
Level 1 49 49 17-Oct-18 08:00 AM 28-Dec-18 05:00 PM
South 39 39 17-Oct-18 08:00 AM 12-Dec-18 05:00 PM
Tape/Float Walls 10 10 17-Oct-18 08:00 AM 30-Oct-18 05:00 PM
Texture Walls 10 10 22-Oct-18 08:00 AM 02-Nov-18 05:00 PM
Prime & First Coat of Paint 10 10 25-Oct-18 08:00 AM 07-Nov-18 05:00 PM
Ceiling Grid 8 8 30-Oct-18 08:00 AM 08-Nov-18 05:00 PM
Lighting Installation 10 10 01-Nov-18 08:00 AM 14-Nov-18 05:00 PM
Mechanical Drops 5 5 01-Nov-18 08:00 AM 07-Nov-18 05:00 PM
Fire Sprinkler Drops 5 5 01-Nov-18 08:00 AM 07-Nov-18 05:00 PM
Specialty Devices in Ceiling 10 10 01-Nov-18 08:00 AM 14-Nov-18 05:00 PM
Install Door Frames 5 5 08-Nov-18 08:00 AM 14-Nov-18 05:00 PM
Install Millwork / Casework 5 5 08-Nov-18 08:00 AM 14-Nov-18 05:00 PM
Drop Ceiling Tiles 5 5 15-Nov-18 08:00 AM 21-Nov-18 05:00 PM
Install Doors & Hardware 5 5 26-Nov-18 08:00 AM 30-Nov-18 05:00 PM
Install Flooring 10 10 26-Nov-18 08:00 AM 07-Dec-18 05:00 PM
Final Paint 10 10 29-Nov-18 08:00 AM 12-Dec-18 05:00 PM
North 39 39 31-Oct-18 08:00 AM 28-Dec-18 05:00 PM
Tape/Float Walls 10 10 31-Oct-18 08:00 AM 13-Nov-18 05:00 PM
Texture Walls 10 10 05-Nov-18 08:00 AM 16-Nov-18 05:00 PM
Prime & First Coat of Paint 10 10 08-Nov-18 08:00 AM 21-Nov-18 05:00 PM
Ceiling Grid 8 8 13-Nov-18 08:00 AM 26-Nov-18 05:00 PM
Lighting Installation 10 10 15-Nov-18 08:00 AM 30-Nov-18 05:00 PM
Mechanical Drops 5 5 15-Nov-18 08:00 AM 21-Nov-18 05:00 PM
Fire Sprinkler Drops 5 5 15-Nov-18 08:00 AM 21-Nov-18 05:00 PM
Specialty Devices in Ceiling 10 10 15-Nov-18 08:00 AM 30-Nov-18 05:00 PM
Install Door Frames 5 5 26-Nov-18 08:00 AM 30-Nov-18 05:00 PM
Install Millwork / Casework 5 5 26-Nov-18 08:00 AM 30-Nov-18 05:00 PM
Drop Ceiling Tiles 5 5 03-Dec-18 08:00 AM 07-Dec-18 05:00 PM
Install Doors & Hardware 5 5 03-Dec-18 08:00 AM 07-Dec-18 05:00 PM
Install Flooring 10 10 10-Dec-18 08:00 AM 21-Dec-18 05:00 PM
Final Paint 10 10 13-Dec-18 08:00 AM 28-Dec-18 05:00 PM
Level 2 49 49 14-Nov-18 08:00 AM 28-Jan-19 05:00 PM
South 39 39 14-Nov-18 08:00 AM 14-Jan-19 05:00 PM
Tape/Float Walls 10 10 14-Nov-18 08:00 AM 29-Nov-18 05:00 PM
Texture Walls 10 10 19-Nov-18 08:00 AM 04-Dec-18 05:00 PM
Prime & First Coat of Paint 10 10 26-Nov-18 08:00 AM 07-Dec-18 05:00 PM
Ceiling Grid 8 8 29-Nov-18 08:00 AM 10-Dec-18 05:00 PM
Lighting Installation 10 10 03-Dec-18 08:00 AM 14-Dec-18 05:00 PM
Mechanical Drops 5 5 03-Dec-18 08:00 AM 07-Dec-18 05:00 PM
Fire Sprinkler Drops 5 5 03-Dec-18 08:00 AM 07-Dec-18 05:00 PM
Specialty Devices in Ceiling 10 10 03-Dec-18 08:00 AM 14-Dec-18 05:00 PM
Install Door Frames 5 5 10-Dec-18 08:00 AM 14-Dec-18 05:00 PM
Install Millwork / Casework 5 5 10-Dec-18 08:00 AM 14-Dec-18 05:00 PM
Drop Ceiling Tiles 5 5 17-Dec-18 08:00 AM 21-Dec-18 05:00 PM
Install Doors & Hardware 5 5 17-Dec-18 08:00 AM 21-Dec-18 05:00 PM
Install Flooring 10 10 26-Dec-18 08:00 AM 09-Jan-19 05:00 PM
Final Paint 10 10 31-Dec-18 08:00 AM 14-Jan-19 05:00 PM
North 39 39 30-Nov-18 08:00 AM 28-Jan-19 05:00 PM
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019
Paint Stair
Install Terrazzo
Level 1
South
Tape/Float Walls
Texture Walls
Prime & First Coat of Paint
Ceiling Grid
Lighting Installation
Mechanical Drops
Fire Sprinkler Drops
Specialty Devices in Ceiling
Install Door Frames
Install Millwork / Casework
Drop Ceiling Tiles
Install Doors & Hardware
Install Flooring
Final Paint
North
Tape/Float Walls
Texture Walls
Prime & First Coat of Paint
Ceiling Grid
Lighting Installation
Mechanical Drops
Fire Sprinkler Drops
Specialty Devices in Ceiling
Install Door Frames
Install Millwork / Casework
Drop Ceiling Tiles
Install Doors & Hardware
Install Flooring
Final Paint
Level 2
South
Tape/Float Walls
Texture Walls
Prime & First Coat of Paint
Ceiling Grid
Lighting Installation
Mechanical Drops
Fire Sprinkler Drops
Specialty Devices in Ceiling
Install Door Frames
Install Millwork / Casework
Drop Ceiling Tiles
Install Doors & Hardware
Install Flooring
Final Paint
North
Midwestern State University Health Science and Human Services Center Page 21 of 23 05-Mar-18 08:23 PM
Activity Name OriginalDuration
RemainingDuration
Start Finish
Tape/Float Walls 10 10 30-Nov-18 08:00 AM 13-Dec-18 05:00 PM
Texture Walls 10 10 05-Dec-18 08:00 AM 18-Dec-18 05:00 PM
Prime & First Coat of Paint 10 10 10-Dec-18 08:00 AM 21-Dec-18 05:00 PM
Ceiling Grid 8 8 13-Dec-18 08:00 AM 26-Dec-18 05:00 PM
Lighting Installation 10 10 17-Dec-18 08:00 AM 02-Jan-19 05:00 PM
Mechanical Drops 5 5 17-Dec-18 08:00 AM 21-Dec-18 05:00 PM
Fire Sprinkler Drops 5 5 17-Dec-18 08:00 AM 21-Dec-18 05:00 PM
Specialty Devices in Ceiling 10 10 17-Dec-18 08:00 AM 02-Jan-19 05:00 PM
Install Door Frames 5 5 26-Dec-18 08:00 AM 02-Jan-19 05:00 PM
Install Millwork / Casework 5 5 26-Dec-18 08:00 AM 02-Jan-19 05:00 PM
Drop Ceiling Tiles 10 10 03-Jan-19 08:00 AM 16-Jan-19 05:00 PM
Install Doors & Hardware 5 5 03-Jan-19 08:00 AM 09-Jan-19 05:00 PM
Install Flooring 10 10 10-Jan-19 08:00 AM 23-Jan-19 05:00 PM
Final Paint 10 10 15-Jan-19 08:00 AM 28-Jan-19 05:00 PM
Level 3 49 49 14-Dec-18 08:00 AM 26-Feb-19 05:00 PM
South 39 39 14-Dec-18 08:00 AM 11-Feb-19 05:00 PM
Tape/Float Walls 10 10 14-Dec-18 08:00 AM 31-Dec-18 05:00 PM
Texture Walls 10 10 19-Dec-18 08:00 AM 04-Jan-19 05:00 PM
Prime & First Coat of Paint 10 10 26-Dec-18 08:00 AM 09-Jan-19 05:00 PM
Ceiling Grid 8 8 31-Dec-18 08:00 AM 10-Jan-19 05:00 PM
Lighting Installation 10 10 03-Jan-19 08:00 AM 16-Jan-19 05:00 PM
Mechanical Drops 5 5 03-Jan-19 08:00 AM 09-Jan-19 05:00 PM
Fire Sprinkler Drops 5 5 03-Jan-19 08:00 AM 09-Jan-19 05:00 PM
Specialty Devices in Ceiling 10 10 03-Jan-19 08:00 AM 16-Jan-19 05:00 PM
Install Door Frames 5 5 10-Jan-19 08:00 AM 16-Jan-19 05:00 PM
Install Millwork / Casework 5 5 10-Jan-19 08:00 AM 16-Jan-19 05:00 PM
Drop Ceiling Tiles 10 10 17-Jan-19 08:00 AM 30-Jan-19 05:00 PM
Install Doors & Hardware 5 5 17-Jan-19 08:00 AM 23-Jan-19 05:00 PM
Install Flooring 10 10 24-Jan-19 08:00 AM 06-Feb-19 05:00 PM
Final Paint 10 10 29-Jan-19 08:00 AM 11-Feb-19 05:00 PM
North 39 39 02-Jan-19 08:00 AM 26-Feb-19 05:00 PM
Tape/Float Walls 10 10 02-Jan-19 08:00 AM 15-Jan-19 05:00 PM
Texture Walls 10 10 07-Jan-19 08:00 AM 18-Jan-19 05:00 PM
Prime & First Coat of Paint 10 10 10-Jan-19 08:00 AM 23-Jan-19 05:00 PM
Ceiling Grid 8 8 15-Jan-19 08:00 AM 24-Jan-19 05:00 PM
Lighting Installation 10 10 17-Jan-19 08:00 AM 30-Jan-19 05:00 PM
Mechanical Drops 5 5 17-Jan-19 08:00 AM 23-Jan-19 05:00 PM
Fire Sprinkler Drops 5 5 17-Jan-19 08:00 AM 23-Jan-19 05:00 PM
Specialty Devices in Ceiling 10 10 17-Jan-19 08:00 AM 30-Jan-19 05:00 PM
Install Door Frames 5 5 24-Jan-19 08:00 AM 30-Jan-19 05:00 PM
Install Millwork / Casework 5 5 24-Jan-19 08:00 AM 30-Jan-19 05:00 PM
Drop Ceiling Tiles 10 10 31-Jan-19 08:00 AM 13-Feb-19 05:00 PM
Install Doors & Hardware 5 5 31-Jan-19 08:00 AM 06-Feb-19 05:00 PM
Install Flooring 10 10 07-Feb-19 08:00 AM 21-Feb-19 05:00 PM
Final Paint 10 10 12-Feb-19 08:00 AM 26-Feb-19 05:00 PM
Level 4 49 49 16-Jan-19 08:00 AM 26-Mar-19 05:00 PM
South 39 39 16-Jan-19 08:00 AM 12-Mar-19 05:00 PM
Tape/Float Walls 10 10 16-Jan-19 08:00 AM 29-Jan-19 05:00 PM
Texture Walls 10 10 21-Jan-19 08:00 AM 01-Feb-19 05:00 PM
Prime & First Coat of Paint 10 10 24-Jan-19 08:00 AM 06-Feb-19 05:00 PM
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019
Tape/Float Walls
Texture Walls
Prime & First Coat of Paint
Ceiling Grid
Lighting Installation
Mechanical Drops
Fire Sprinkler Drops
Specialty Devices in Ceiling
Install Door Frames
Install Millwork / Casework
Drop Ceiling Tiles
Install Doors & Hardware
Install Flooring
Final Paint
Level 3
South
Tape/Float Walls
Texture Walls
Prime & First Coat of Paint
Ceiling Grid
Lighting Installation
Mechanical Drops
Fire Sprinkler Drops
Specialty Devices in Ceiling
Install Door Frames
Install Millwork / Casework
Drop Ceiling Tiles
Install Doors & Hardware
Install Flooring
Final Paint
North
Tape/Float Walls
Texture Walls
Prime & First Coat of Paint
Ceiling Grid
Lighting Installation
Mechanical Drops
Fire Sprinkler Drops
Specialty Devices in Ceiling
Install Door Frames
Install Millwork / Casework
Drop Ceiling Tiles
Install Doors & Hardware
Install Flooring
Final Paint
Level 4
South
Tape/Float Walls
Texture Walls
Prime & First Coat of Paint
Midwestern State University Health Science and Human Services Center Page 22 of 23 05-Mar-18 08:23 PM
Activity Name OriginalDuration
RemainingDuration
Start Finish
Ceiling Grid 8 8 29-Jan-19 08:00 AM 07-Feb-19 05:00 PM
Lighting Installation 10 10 31-Jan-19 08:00 AM 13-Feb-19 05:00 PM
Mechanical Drops 5 5 31-Jan-19 08:00 AM 06-Feb-19 05:00 PM
Fire Sprinkler Drops 5 5 31-Jan-19 08:00 AM 06-Feb-19 05:00 PM
Specialty Devices in Ceiling 10 10 31-Jan-19 08:00 AM 13-Feb-19 05:00 PM
Install Door Frames 5 5 07-Feb-19 08:00 AM 13-Feb-19 05:00 PM
Install Millwork / Casework 5 5 07-Feb-19 08:00 AM 13-Feb-19 05:00 PM
Drop Ceiling Tiles 10 10 14-Feb-19 08:00 AM 28-Feb-19 05:00 PM
Install Doors & Hardware 5 5 14-Feb-19 08:00 AM 21-Feb-19 05:00 PM
Install Flooring 10 10 22-Feb-19 08:00 AM 07-Mar-19 05:00 PM
Final Paint 10 10 27-Feb-19 08:00 AM 12-Mar-19 05:00 PM
North 39 39 30-Jan-19 08:00 AM 26-Mar-19 05:00 PM
Tape/Float Walls 10 10 30-Jan-19 08:00 AM 12-Feb-19 05:00 PM
Texture Walls 10 10 04-Feb-19 08:00 AM 15-Feb-19 05:00 PM
Prime & First Coat of Paint 10 10 07-Feb-19 08:00 AM 21-Feb-19 05:00 PM
Ceiling Grid 8 8 12-Feb-19 08:00 AM 22-Feb-19 05:00 PM
Lighting Installation 10 10 14-Feb-19 08:00 AM 28-Feb-19 05:00 PM
Mechanical Drops 5 5 14-Feb-19 08:00 AM 21-Feb-19 05:00 PM
Fire Sprinkler Drops 5 5 14-Feb-19 08:00 AM 21-Feb-19 05:00 PM
Specialty Devices in Ceiling 10 10 14-Feb-19 08:00 AM 28-Feb-19 05:00 PM
Install Door Frames 5 5 22-Feb-19 08:00 AM 28-Feb-19 05:00 PM
Install Millwork / Casework 5 5 22-Feb-19 08:00 AM 28-Feb-19 05:00 PM
Drop Ceiling Tiles 10 10 01-Mar-19 08:00 AM 14-Mar-19 05:00 PM
Install Doors & Hardware 5 5 01-Mar-19 08:00 AM 07-Mar-19 05:00 PM
Install Flooring 10 10 08-Mar-19 08:00 AM 21-Mar-19 05:00 PM
Final Paint 10 10 13-Mar-19 08:00 AM 26-Mar-19 05:00 PM
Penthouse 0 0
Stair 1 - NW 0 0
Stair 2 - SW 0 0
Stair 3 - S 0 0
Atrium Stair 0 0
START UP / COMMISSIONING 0 0
Systems Testing 0 0
Test & Balance 0 0
PUNCH LIST 202 202 30-Jul-18 08:00 AM 16-May-19 05:00 PM
Pre-punch 175 175 30-Jul-18 08:00 AM 09-Apr-19 05:00 PM
Pre - Punch List Level Roof 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM
Pre - Punch List Level 1 10 10 31-Dec-18 08:00 AM 14-Jan-19 05:00 PM
Pre - Punch List Level 2 10 10 29-Jan-19 08:00 AM 11-Feb-19 05:00 PM
Pre - Punch List Level 3 10 10 27-Feb-19 08:00 AM 12-Mar-19 05:00 PM
Pre - Punch List Level 4 10 10 27-Mar-19 08:00 AM 09-Apr-19 05:00 PM
Substantial Completion 0 0 16-May-19 05:00 PM 16-May-19 05:00 PM
Final Substantial Completion Date 0 0 16-May-19 05:00 PM*
Final Punchlist 0 0
OWNER ACTIVITIES 0 0 14-Jun-19 05:00 PM 14-Jun-19 05:00 PM
Owner Move-in 0 0 14-Jun-19 05:00 PM 14-Jun-19 05:00 PM
Final Completion Date 0 0 14-Jun-19 05:00 PM
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019
Ceiling Grid
Lighting Installation
Mechanical Drops
Fire Sprinkler Drops
Specialty Devices in Ceiling
Install Door Frames
Install Millwork / Casework
Drop Ceiling Tiles
Install Doors & Hardware
Install Flooring
Final Paint
North
Tape/Float Walls
Texture Walls
Prime & First Coat of Paint
Ceiling Grid
Lighting Installation
Mechanical Drops
Fire Sprinkler Drops
Specialty Devices in Ceiling
Install Door Frames
Install Millwork / Casework
Drop Ceiling Tiles
Install Doors & Hardware
Install Flooring
Final Paint
PUNCH LIST
Pre-punch
Pre - Punch List Level Roof
Pre - Punch List Level 1
Pre - Punch List Level 2
Pre - Punch List Level 3
Pre - Punch List Level 4
Substantial Completion
Final Substantial Completion Date
OWNER ACTIVITIES
Owner Move-in
Final Completion Date
Midwestern State University Health Science and Human Services Center Page 23 of 23 05-Mar-18 08:23 PM
UP
PLPL
??
?
PL
30'-0
"
40'-0"
45'-0"
PL PL PL
PL
PL
PL
PLPL
PLPLPL
PL
PL
PL
PLPL
PL
BL BL
T3.0
51
1T4
.03
3T4
.03
4T4
.03
12
34
56
12
34
56
A B C D E
A B C D E
ISSU
E DA
TE:
SHEE
T NO
.
PROJ
ECT
NO.:
PRIN
CIPA
L:
PROJ
. MGR
.:
PROJ
. ARC
H.:
DRAW
N BY
:
Q.C.
:
1612
.00
R. S
COTT
, AIA
G. C
ONAW
AY, A
IA
V. L
AZAR
, AIA
© S
EPTE
MBE
R 1
, 201
7
MIDWESTERN STATE UNIVERSITYLOUIS J RODRIGUEZ DR
WITCHITA FALLS, TX 76308
| |
|P
: (51
2) 4
78-6
001
F
: (51
2) 4
78-2
771
100%
CONS
TRUC
TION
DOCU
MEN
TS
This drawing and design is the intellectual property of DataCom Design Group. and its clients.No entity/person shall make copies and/or modifications to this file without written permission by DataComDesign Group. This drawing shall not be used for purposes other than as intended for this project. © 2017
© 2
017
Dat
aCom
Des
ign
Gro
up.
1" =
30'
-0"
1SI
TE P
LAN
- COM
MUN
ICAT
IONS
SIT
E P
LAN
-C
OM
MU
NIC
ATI
ON
S
NO
.D
ATE
REF
. /
DES
CR
IPTI
ON
19/2
7/17
ADDE
NDUM
#2