ADDENDUM ONE March 12, 2018 TO WHOM IT MAY CONCERN Reference: Pre-Bid meeting to RFP #735-18-8197 Fiber Relocation Meeting minutes are below to the above referenced meeting held on March 7, 2018. 1. Estimated cost for removal of existing fiber should be included in bid. Existing fiber CANNOT be removed until AFTER the new Data Center in the Health Science and Human Services building is complete. Existing fiber will continue to be used until all new campus fiber is connected, tested and operational. The new fiber is to be installed alongside the existing fiber (contractor is NOT to use existing fiber as a means to pull new armored fiber into place). Questions from Fiber Walk Through Meeting: Q: Any conduit work needed. A: No, conduits already exist. Q: What is the Tunnel Size? A: Tunnel size in generally 6X8. Q: Is there a CAD file for the campus? A: Yes, a CAD file is available (attached MSU_Base_Plan, 3) Q: Health Science and Human Services conduit layout A: Drawing is available (attached MSU-HS &HSC_ Addendum 2) Q. Timeline for Health Sciences and Human Services available? A: Yes, current construction table and timeline is available (attached March 5, 2018 Update Sundt)

Upload: others

Post on 27-Apr-2020

17 views

Category:

Documents


0 download

TRANSCRIPT

ADDENDUM ONE

March 12, 2018

TO WHOM IT MAY CONCERN

Reference: Pre-Bid meeting to RFP #735-18-8197 Fiber Relocation

Meeting minutes are below to the above referenced meeting held on March 7, 2018.

1. Estimated cost for removal of existing fiber should be included in bid. Existing fiber CANNOT be removed until AFTER the new Data Center in the Health Science and Human Services building is complete. Existing fiber will continue to be used until all new campus fiber is connected, tested and operational. The new fiber is to be installed alongside the existing fiber (contractor is NOT to use existing fiber as a means to pull new armored fiber into place).

Questions from Fiber Walk Through Meeting:

Q: Any conduit work needed.

A: No, conduits already exist.

Q: What is the Tunnel Size?

A: Tunnel size in generally 6X8.

Q: Is there a CAD file for the campus?

A: Yes, a CAD file is available (attached MSU_Base_Plan, 3)

Q: Health Science and Human Services conduit layout

A: Drawing is available (attached MSU-HS &HSC_ Addendum 2)

Q. Timeline for Health Sciences and Human Services available?

A: Yes, current construction table and timeline is available (attached March 5, 2018 Update Sundt)

If you have any questions please contact me at [email protected] or 940-397-4110.

Thank You

Steve Shelley Director of Purchasing/Contract Management

Activity Name OriginalDuration

RemainingDuration

Start Finish

Midwestern State Univeristy 903 325 11-Jan-16 08:00 AM A 14-Jun-19 05:00 PM

PRECONSTRUCTION 607 10 11-Jan-16 08:00 AM A 16-Mar-18 05:00 PM

PROJECT MILESTONES 399 275 16-Oct-17 08:00 AM A 16-May-19 05:00 PM

NTP Package 1 - Site / Utilities / Foundations 0 0 16-Oct-17 08:00 AM A

NTP Package 2 - Building 0 0 13-Dec-17 08:00 AM A

Project Start Package 1 0 0 18-Dec-17 12:00 AM A

Project Start Package 2 0 0 18-Dec-17 08:00 AM A

Start Foundation Operations 0 0 07-Feb-18 08:00 AM A

Complete Foundations and Substructure 0 0 13-Apr-18 05:00 PM

Place Level 1 0 0 26-Apr-18 05:00 PM

Place Level 2 0 0 15-May-18 05:00 PM

Place Level 3 0 0 01-Jun-18 05:00 PM

Place Level 4 0 0 19-Jun-18 05:00 PM

Place Level Roof 0 0 06-Jul-18 05:00 PM

Structural Topping Out 0 0 13-Jul-18 05:00 PM

Complete Concrete Frame 0 0 26-Jul-18 05:00 PM

Building Dry-in 0 0 02-Oct-18 05:00 PM

Permanent Power 0 0 09-Oct-18 05:00 PM

Blow Uncontrolled Air 0 0 16-Oct-18 05:00 PM

Project Substantial Completion 0 0 16-May-19 05:00 PM

PULL PLANNING 97 88 20-Feb-18 08:00 AM A 06-Jul-18 05:00 PM

Foundations & Underground 52 15 20-Feb-18 08:00 AM A 23-Mar-18 05:00 PM

Concrete Structure 55 55 19-Apr-18 08:00 AM 06-Jul-18 05:00 PM

PROJECT ADMINISTRATION 0 0

IMPACTS 384 305 20-Oct-17 12:00 AM A 16-May-19 05:00 PM

PROJECT DELAYS 384 27 20-Oct-17 12:00 AM A 16-May-19 05:00 PM

Weather 314 27 20-Feb-18 08:00 AM A 16-May-19 05:00 PM

Weather Delay - February 5 0 20-Feb-18 08:00 AM A 26-Feb-18 05:00 PM A

Expected Weather/Time Impacts Included in Schedule 27 27 10-Apr-19 08:00 AM 16-May-19 05:00 PM

Project Budget Overrun 34 0 20-Oct-17 12:00 AM A 13-Dec-17 12:00 AM A

Value Engineering and Approval by BOR 30 0 20-Oct-17 12:00 AM A 13-Dec-17 12:00 AM A

Package 1 Work Stopped due to Bids Exceeding CCL 0 0 20-Oct-17 12:00 AM A

Notice to Restart Package 1 Consturction 0 0 13-Dec-17 12:00 AM A

CHANGE ORDERS 103 15 18-Dec-17 12:00 AM A 23-Mar-18 05:00 PM

Post GMP Target Value Design 103 15 18-Dec-17 12:00 AM A 23-Mar-18 05:00 PM

Complete Renderings 20 5 18-Dec-17 12:00 AM A 09-Mar-18 05:00 PM

Drawing Revisions Complete Set 45 15 18-Dec-17 12:00 AM A 23-Mar-18 05:00 PM

Drawings Revisions Structural 45 3 18-Dec-17 08:00 AM A 07-Mar-18 05:00 PM

Issue for Pricing 0 0 23-Mar-18 05:00 PM

OWNER CONTINGENCY 3 0 29-Dec-17 08:00 AM A 05-Jan-18 05:00 PM A

PCO-001 3 0 29-Dec-17 08:00 AM A 05-Jan-18 05:00 PM A

PCO 001 - RFI 001 Remove Existing Foundatations 3 0 29-Dec-17 08:00 AM A 05-Jan-18 05:00 PM A

PROCUREMENT 251 141 22-Sep-17 08:00 AM A 20-Sep-18 05:00 PM

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct

Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019

Midwestern State Univeristy

PRECONSTRUCTION

PROJECT MILESTONES

NTP Package 1 - Site / Utilities / Foundations

NTP Package 2 - Building

Project Start Package 1

Project Start Package 2

Start Foundation Operations

Complete Foundations and Substructure

Place Level 1

Place Level 2

Place Level 3

Place Level 4

Place Level Roof

Structural Topping Out

Complete Concrete Frame

Building Dry-in

Permanent Power

Blow Uncontrolled Air

Project Substantial Completion

PULL PLANNING

IMPACTS

PROJECT DELAYS

Weather

Weather Delay - February

Expected Weather/Time Impacts Included in Schedule

Project Budget Overrun

Value Engineering and Approval by BOR

Package 1 Work Stopped due to Bids Exceeding CCL

Notice to Restart Package 1 Consturction

CHANGE ORDERS

Post GMP Target Value Design

Complete Renderings, Complete Renderings

Drawing Revisions Complete Set, Drawing Revisions Complete Set

Drawings Revisions Structural, Drawings Revisions Structural

Issue for Pricing

OWNER CONTINGENCY

PCO-001

PCO 001 - RFI 001 Remove Existing Foundatations

PROCUREMENT

Midwestern State University Health Science and Human Services Center Page 1 of 23 05-Mar-18 08:23 PM

Remaining Level of Effort

Actual Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

SummaryMidwestern State University

Health Science & Human Services Center

Construction Schedule

Date Revision Checked Appr...

18-Dec-17 ... GMP #2 Schedule BA BA

05-Mar-18 ... Pre-Baseline Schedule Update BA BA

Activity Name OriginalDuration

RemainingDuration

Start Finish

CURRENT MASTER FORMAT 251 141 22-Sep-17 08:00 AM A 20-Sep-18 05:00 PM

DIVISION 01 - GENERAL REQUIREMENTS 10 0 22-Sep-17 08:00 AM A 13-Oct-17 12:00 AM A

Create Submittal Register 10 0 22-Sep-17 08:00 AM A 13-Oct-17 12:00 AM A

DIVISION 02 - EXISTING CONDITIONS 0 0

DIVISION 03 - CONCRETE 102 59 26-Dec-17 12:00 AM A 24-May-18 05:00 PM

Reinforcing Steel 102 59 26-Dec-17 12:00 AM A 24-May-18 05:00 PM

Drilled Piers 31 0 29-Dec-17 08:00 AM A 05-Feb-18 05:00 PM A

Drilled Pier Rebar Shop Drawings 15 0 29-Dec-17 08:00 AM A 05-Jan-18 05:00 PM A

Drilled Pier Rebar THS Approval 2 0 08-Jan-18 08:00 AM A 09-Jan-18 05:00 PM A

Drilled Pier Rebar A/E Approval 15 0 09-Jan-18 08:00 AM A 18-Jan-18 05:00 PM A

Drilled Pier Rebar Fab & Delivery 15 0 19-Jan-18 08:00 AM A 05-Feb-18 05:00 PM A

Grade Beams 31 12 26-Dec-17 12:00 AM A 20-Mar-18 05:00 PM

GB Rebar Shop Drawings 5 0 26-Dec-17 12:00 AM A 04-Jan-18 05:00 PM A

GB Rebar THS Approval 5 0 08-Jan-18 08:00 AM A 18-Jan-18 05:00 PM A

GB Rebar A/E Approval 15 0 18-Jan-18 08:00 AM A 06-Feb-18 05:00 PM A

GB South Rebar Fab & Delivery 12 2 07-Feb-18 08:00 AM A 06-Mar-18 05:00 PM

GB North Rebar Fab & Delivery 12 12 05-Mar-18 08:00 AM 20-Mar-18 05:00 PM

Level 1 Slab on Carton Forms 32 13 01-Feb-18 12:00 AM A 21-Mar-18 05:00 PM

Slab Rebar Shop Drawings 5 0 01-Feb-18 12:00 AM A 06-Feb-18 05:00 PM A

Slab Rebar THS Approval 2 0 07-Feb-18 08:00 AM A 07-Feb-18 05:00 PM A

Slab Rebar A/E Approval 15 1 07-Feb-18 08:00 AM A 05-Mar-18 05:00 PM

Slab South Rebar Fab & Delivery 12 12 06-Mar-18 08:00 AM 21-Mar-18 05:00 PM

Slab North Rebar Fab & Delivery 12 12 06-Mar-18 08:00 AM 21-Mar-18 05:00 PM

Columns 45 26 29-Jan-18 12:00 AM A 09-Apr-18 05:00 PM

Columns Rebar Shop Drawings 5 0 29-Jan-18 12:00 AM A 02-Feb-18 05:00 PM A

Columns Rebar THS Approval 2 0 05-Feb-18 08:00 AM A 15-Feb-18 05:00 PM A

Columns Rebar A/E Approval 15 2 15-Feb-18 08:00 AM A 06-Mar-18 05:00 PM

Columns South Rebar Fab & Delivery 12 12 07-Mar-18 08:00 AM 22-Mar-18 05:00 PM

Columns North Rebar Fab & Delivery 12 12 23-Mar-18 08:00 AM 09-Apr-18 05:00 PM

Level 2 41 41 08-Mar-18 08:00 AM 03-May-18 05:00 PM

L2 Rebar Shop Drawings 5 5 08-Mar-18 08:00 AM* 14-Mar-18 05:00 PM

L2 Rebar THS Approval 2 2 15-Mar-18 08:00 AM 16-Mar-18 05:00 PM

L2 Rebar A/E Approval 10 10 19-Mar-18 08:00 AM 30-Mar-18 05:00 PM

L2 South Rebar Fab & Delivery 12 12 02-Apr-18 08:00 AM 17-Apr-18 05:00 PM

L2 North Rebar Fab & Delivery 12 12 18-Apr-18 08:00 AM 03-May-18 05:00 PM

Level 3 41 41 15-Mar-18 08:00 AM 10-May-18 05:00 PM

L3 Rebar Shop Drawings 5 5 15-Mar-18 08:00 AM 21-Mar-18 05:00 PM

L3 Rebar THS Approval 2 2 22-Mar-18 08:00 AM 23-Mar-18 05:00 PM

L3 Rebar A/E Approval 10 10 26-Mar-18 08:00 AM 06-Apr-18 05:00 PM

L3 South Rebar Fab & Delivery 12 12 09-Apr-18 08:00 AM 24-Apr-18 05:00 PM

L3 North Rebar Fab & Delivery 12 12 25-Apr-18 08:00 AM 10-May-18 05:00 PM

Level 4 41 41 22-Mar-18 08:00 AM 17-May-18 05:00 PM

L4 Rebar Shop Drawings 5 5 22-Mar-18 08:00 AM 28-Mar-18 05:00 PM

L4 Rebar THS Approval 2 2 29-Mar-18 08:00 AM 30-Mar-18 05:00 PM

L4 Rebar A/E Approval 10 10 02-Apr-18 08:00 AM 13-Apr-18 05:00 PM

L4 South Rebar Fab & Delivery 12 12 16-Apr-18 08:00 AM 01-May-18 05:00 PM

L4 North Rebar Fab & Delivery 12 12 02-May-18 08:00 AM 17-May-18 05:00 PM

Level Roof 41 41 29-Mar-18 08:00 AM 24-May-18 05:00 PM

LR Rebar Shop Drawings 5 5 29-Mar-18 08:00 AM 04-Apr-18 05:00 PM

LR Rebar THS Approval 2 2 05-Apr-18 08:00 AM 06-Apr-18 05:00 PM

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct

Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019

CURRENT MASTER FORMAT

DIVISION 01 - GENERAL REQUIREMENTS

Create Submittal Register

DIVISION 03 - CONCRETE

Reinforcing Steel

Drilled Piers

Drilled Pier Rebar Shop Drawings

Drilled Pier Rebar THS Approval

Drilled Pier Rebar A/E Approval

Drilled Pier Rebar Fab & Delivery

Grade Beams

GB Rebar Shop Drawings

GB Rebar THS Approval

GB Rebar A/E Approval

GB South Rebar Fab & Delivery, GB South Rebar Fab & Delivery

GB North Rebar Fab & Delivery

Level 1 Slab on Carton Forms

Slab Rebar Shop Drawings

Slab Rebar THS Approval

Slab Rebar A/E Approval, Slab Rebar A/E Approval

Slab South Rebar Fab & Delivery

Slab North Rebar Fab & Delivery

Columns

Columns Rebar Shop Drawings

Columns Rebar THS Approval

Columns Rebar A/E Approval, Columns Rebar A/E Approval

Columns South Rebar Fab & Delivery

Columns North Rebar Fab & Delivery

Level 2

L2 Rebar Shop Drawings

L2 Rebar THS Approval

L2 Rebar A/E Approval

L2 South Rebar Fab & Delivery

L2 North Rebar Fab & Delivery

Level 3

L3 Rebar Shop Drawings

L3 Rebar THS Approval

L3 Rebar A/E Approval

L3 South Rebar Fab & Delivery

L3 North Rebar Fab & Delivery

Level 4

L4 Rebar Shop Drawings

L4 Rebar THS Approval

L4 Rebar A/E Approval

L4 South Rebar Fab & Delivery

L4 North Rebar Fab & Delivery

Level Roof

LR Rebar Shop Drawings

LR Rebar THS Approval

Midwestern State University Health Science and Human Services Center Page 2 of 23 05-Mar-18 08:23 PM

Activity Name OriginalDuration

RemainingDuration

Start Finish

LR Rebar A/E Approval 10 10 09-Apr-18 08:00 AM 20-Apr-18 05:00 PM

LR South Rebar Fab & Delivery 12 12 23-Apr-18 08:00 AM 08-May-18 05:00 PM

LR North Rebar Fab & Delivery 12 12 09-May-18 08:00 AM 24-May-18 05:00 PM

Formwork 35 35 08-Mar-18 08:00 AM 25-Apr-18 05:00 PM

Pan Deck Shop Drawings 10 10 08-Mar-18 08:00 AM* 21-Mar-18 05:00 PM

Pan Deck THS Approval 5 5 22-Mar-18 08:00 AM 28-Mar-18 05:00 PM

Pan Deck A/E Approval 10 10 29-Mar-18 08:00 AM 11-Apr-18 05:00 PM

Pan Deck Delivery 10 10 12-Apr-18 08:00 AM 25-Apr-18 05:00 PM

DIVISION 04 - MASONRY 91 91 05-Mar-18 08:00 AM 11-Jul-18 05:00 PM

Face Brick 91 91 05-Mar-18 08:00 AM 11-Jul-18 05:00 PM

Samples 91 91 05-Mar-18 08:00 AM 11-Jul-18 05:00 PM

Face Brick and Grout Samples 20 20 05-Mar-18 08:00 AM 30-Mar-18 05:00 PM

THS Review 1 1 02-Apr-18 08:00 AM 02-Apr-18 05:00 PM

A/E Approval 15 15 03-Apr-18 08:00 AM 23-Apr-18 05:00 PM

Fab & Deliver 55 55 24-Apr-18 08:00 AM 11-Jul-18 05:00 PM

Shop Drawings & Product Data 50 50 05-Mar-18 08:00 AM 11-May-18 05:00 PM

Face Brick Shop Drawings 10 10 05-Mar-18 08:00 AM 16-Mar-18 05:00 PM

THS Review 5 5 19-Mar-18 08:00 AM 23-Mar-18 05:00 PM

A/E Approval 15 15 26-Mar-18 08:00 AM 13-Apr-18 05:00 PM

Fab & Deliver 20 20 16-Apr-18 08:00 AM 11-May-18 05:00 PM

Cast Stone 65 65 05-Mar-18 08:00 AM 04-Jun-18 05:00 PM

Samples 55 55 05-Mar-18 08:00 AM 18-May-18 05:00 PM

Cast Stone & Grout Samples 5 5 05-Mar-18 08:00 AM 09-Mar-18 05:00 PM

THS Review 5 5 12-Mar-18 08:00 AM 16-Mar-18 05:00 PM

A/E Approval 15 15 19-Mar-18 08:00 AM 06-Apr-18 05:00 PM

Fab & Deliver 30 30 09-Apr-18 08:00 AM 18-May-18 05:00 PM

Shop Drawings & Product Data 65 65 05-Mar-18 08:00 AM 04-Jun-18 05:00 PM

Cast Stone Shop Drawings & Project Data 15 15 05-Mar-18 08:00 AM 23-Mar-18 05:00 PM

THS Review 5 5 26-Mar-18 08:00 AM 30-Mar-18 05:00 PM

A/E Approval 15 15 02-Apr-18 08:00 AM 20-Apr-18 05:00 PM

Fab & Deliver 30 30 23-Apr-18 08:00 AM 04-Jun-18 05:00 PM

Exterior Insulation & Flashing 45 45 05-Mar-18 08:00 AM 04-May-18 05:00 PM

Insualtion & Flashing Project Data 5 5 05-Mar-18 08:00 AM 09-Mar-18 05:00 PM

THS Review 5 5 12-Mar-18 08:00 AM 16-Mar-18 05:00 PM

A/E Approval 15 15 19-Mar-18 08:00 AM 06-Apr-18 05:00 PM

Fab & Deliver 20 20 09-Apr-18 08:00 AM 04-May-18 05:00 PM

DIVISION 05 - METALS 62 62 19-Feb-18 08:00 AM A 30-May-18 05:00 PM

Anchor Bolts & Embeds 30 7 19-Feb-18 08:00 AM A 13-Mar-18 05:00 PM

Fab & Deliver 5 0 19-Feb-18 08:00 AM A 23-Feb-18 05:00 PM A

Shop Drawings 5 5 05-Mar-18 08:00 AM 09-Mar-18 05:00 PM

THS Review 1 1 12-Mar-18 08:00 AM 12-Mar-18 05:00 PM

A/E Approval 1 1 13-Mar-18 08:00 AM 13-Mar-18 05:00 PM

Metal Pan Stairs 55 55 07-Mar-18 08:00 AM 22-May-18 05:00 PM

Shop Drawings 15 15 07-Mar-18 08:00 AM* 27-Mar-18 05:00 PM

THS Review 5 5 28-Mar-18 08:00 AM 03-Apr-18 05:00 PM

A/E Approval 15 15 04-Apr-18 08:00 AM 24-Apr-18 05:00 PM

Fab & Deliver 20 20 25-Apr-18 08:00 AM 22-May-18 05:00 PM

Building Structural Steel 60 60 07-Mar-18 08:00 AM 30-May-18 05:00 PM

Shop Drawings 20 20 07-Mar-18 08:00 AM* 03-Apr-18 05:00 PM

THS Review 5 5 04-Apr-18 08:00 AM 10-Apr-18 05:00 PM

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct

Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019

LR Rebar A/E Approval

LR South Rebar Fab & Delivery

LR North Rebar Fab & Delivery

Formwork

Pan Deck Shop Drawings

Pan Deck THS Approval

Pan Deck A/E Approval

Pan Deck Delivery

DIVISION 04 - MASONRY

Face Brick

Samples

Face Brick and Grout Samples

THS Review

A/E Approval

Fab & Deliver

Shop Drawings & Product Data

Face Brick Shop Drawings

THS Review

A/E Approval

Fab & Deliver

Cast Stone

Samples

Cast Stone & Grout Samples

THS Review

A/E Approval

Fab & Deliver

Shop Drawings & Product Data

Cast Stone Shop Drawings & Project Data

THS Review

A/E Approval

Fab & Deliver

Exterior Insulation & Flashing

Insualtion & Flashing Project Data

THS Review

A/E Approval

Fab & Deliver

DIVISION 05 - METALS

Anchor Bolts & Embeds

Fab & Deliver

Shop Drawings

THS Review

A/E Approval

Metal Pan Stairs

Shop Drawings

THS Review

A/E Approval

Fab & Deliver

Building Structural Steel

Shop Drawings

THS Review

Midwestern State University Health Science and Human Services Center Page 3 of 23 05-Mar-18 08:23 PM

Activity Name OriginalDuration

RemainingDuration

Start Finish

A/E Approval 15 15 11-Apr-18 08:00 AM 01-May-18 05:00 PM

Fab & Deliver 20 20 02-May-18 08:00 AM 30-May-18 05:00 PM

Metal Decking 60 60 07-Mar-18 08:00 AM 30-May-18 05:00 PM

Shop Drawings 20 20 07-Mar-18 08:00 AM* 03-Apr-18 05:00 PM

THS Review 5 5 04-Apr-18 08:00 AM 10-Apr-18 05:00 PM

A/E Approval 15 15 11-Apr-18 08:00 AM 01-May-18 05:00 PM

Fab & Deliver 20 20 02-May-18 08:00 AM 30-May-18 05:00 PM

Misc. Steel 0 0

Stainless Steel Handrail System 0 0

DIVISION 06 - WOODS / PLASTICS / COMPOSITES 0 0

Finish Carpentry 0 0

Casework 0 0

Prefinished Wood Paneling 0 0

DIVISION 07 - THERMAL / MOISTURE PROTECTION 0 0

TPO Roofing 0 0

Clay Tile Roofing 0 0

Elevator Pit Waterproofing 0 0

Fireproofing 0 0

Metal Panels 0 0

DIVISION 08 - OPENINGS 0 0

Doors / Frames / Hardware 0 0

Aluminum Window Systems 0 0

Glass and Glazing 0 0

DIVISION 09 - FINISHES 0 0

Flooring 0 0

Terrazzo 0 0

DIVISION 10 - SPECIALTIES 0 0

DIVISION 11 - EQUIPMENT 0 0

Patient Care Equipment 0 0

DIVISION 12 - FURNISHINGS 0 0

DIVISION 14 - CONVEYING EQUIPMENT 99 90 07-Feb-18 08:00 AM A 10-Jul-18 05:00 PM

Hydraulic Elevators 99 90 07-Feb-18 08:00 AM A 10-Jul-18 05:00 PM

Elevator Shop Drawings 15 0 07-Feb-18 08:00 AM A 08-Feb-18 05:00 PM A

Elevator THS Review 5 5 20-Feb-18 12:00 AM A 09-Mar-18 05:00 PM

Elevator A/E Approval 15 15 12-Mar-18 08:00 AM 30-Mar-18 05:00 PM

Elevator Fab & Delivery 70 70 02-Apr-18 08:00 AM 10-Jul-18 05:00 PM

DIVISION 21 - FIRE SUPPRESSION 0 0

Fire Pump 0 0

DIVISION 22 - PLUMBING 0 0

Boiler 0 0

Med Gas 0 0

DIVISION 23 - HVAC 0 0

Air Handling Units 0 0

CRAC Units 0 0

Air Distribution Equipment 0 0

Chilled Water Pumps 0 0

Penthouse Louvers 0 0

Exhuast Fans 0 0

DIVISION 26 - ELECTRICAL 126 126 26-Mar-18 08:00 AM 20-Sep-18 05:00 PM

Transformer 126 126 26-Mar-18 08:00 AM 20-Sep-18 05:00 PM

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct

Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019

A/E Approval

Fab & Deliver

Metal Decking

Shop Drawings

THS Review

A/E Approval

Fab & Deliver

DIVISION 14 - CONVEYING EQUIPMENT

Hydraulic Elevators

Elevator Shop Drawings

Elevator THS Review, Elevator THS Review

Elevator A/E Approval

Elevator Fab & Delivery

DIVISION 26 - ELECTRICAL

Transformer

Midwestern State University Health Science and Human Services Center Page 4 of 23 05-Mar-18 08:23 PM

Activity Name OriginalDuration

RemainingDuration

Start Finish

Transformer Shop Drawings & Product Data 15 15 26-Mar-18 08:00 AM* 13-Apr-18 05:00 PM

Transformer THS Review 1 1 16-Apr-18 08:00 AM 16-Apr-18 05:00 PM

Transformer A/E Approval 15 15 17-Apr-18 08:00 AM 07-May-18 05:00 PM

Transformer Fab & Delivery 95 95 08-May-18 08:00 AM 20-Sep-18 05:00 PM

Generator / ATS 0 0

UPS System 0 0

Gear 0 0

Lighting 0 0

DIVISION 27 - COMMUNICATIONS 0 0

Cable Tray System 0 0

DIVISION 28 - ELECTRONIC SAFETY / SECURITY 0 0

Fire Alarm System 0 0

DIVISION 31 - EARTHWORK 0 0

DIVISION 32 - EXTERIOR IMPROVEMENTS 0 0

DIVISION 33 - UTILITIES 10 0 08-Dec-17 12:00 AM A 02-Jan-18 12:00 AM A

Utility Product Data 5 0 08-Dec-17 12:00 AM A 13-Dec-17 12:00 AM A

Utility Approval 10 0 14-Dec-17 12:00 AM A 28-Dec-17 12:00 AM A

Utility Fab & Deliver 1 0 29-Dec-17 12:00 AM A 02-Jan-18 12:00 AM A

WORK PACKAGES 0 0

CONSTRUCTION 362 268 02-Nov-17 12:00 AM A 26-Mar-19 05:00 PM

MOBILIZATION / DEMOBILIZATION 49 0 02-Nov-17 12:00 AM A 28-Dec-17 12:00 AM A

Cut/Cap/Make Safe Site Electrical 5 0 02-Nov-17 12:00 AM A 06-Nov-17 12:00 AM A

Install Site Fencing 3 0 18-Dec-17 12:00 AM A 18-Dec-17 12:00 AM A

Install Tree Protection 5 0 19-Dec-17 08:00 AM A 28-Dec-17 12:00 AM A

SITEWORK 153 101 18-Dec-17 12:00 AM A 01-Aug-18 05:00 PM

Demolition 10 0 19-Dec-17 12:00 AM A 29-Dec-17 05:00 PM A

Remove Concrete Paving 10 0 19-Dec-17 12:00 AM A 29-Dec-17 05:00 PM A

Mass Excavation 10 0 18-Dec-17 12:00 AM A 08-Jan-18 05:00 PM A

Clear & Grub 5 0 18-Dec-17 12:00 AM A 22-Dec-17 12:00 AM A

Excavate for Building Pad Partial 2 0 28-Dec-17 12:00 AM A 28-Dec-17 08:00 AM A

Excavate for Building Pad Complete 5 0 04-Jan-18 08:00 AM A 08-Jan-18 05:00 PM A

Building Pad 4 0 09-Jan-18 08:00 AM A 25-Jan-18 05:00 PM A

Construct Buildng Pad 4 0 09-Jan-18 08:00 AM A 25-Jan-18 05:00 PM A

Site Utilities 133 101 08-Jan-18 08:00 AM A 01-Aug-18 05:00 PM

Water 72 40 08-Jan-18 08:00 AM A 04-May-18 05:00 PM

Install 8" Waterline South to Tomahawk Vault 5 0 08-Jan-18 08:00 AM A 19-Jan-18 05:00 PM A

Install 8" Waterline Tomahawk Vault to North 5 0 17-Jan-18 08:00 AM A 23-Jan-18 05:00 PM A

Install 8" Waterline Caddo Trail to East 5 0 17-Jan-18 08:00 AM A 19-Jan-18 05:00 PM A

Final Tie-in to Water Loop 1 1 12-Mar-18 08:00 AM* 12-Mar-18 05:00 PM

Water Service to the Building 5 5 16-Apr-18 08:00 AM 20-Apr-18 05:00 PM

Testing and Chlorination 4 4 23-Apr-18 08:00 AM 26-Apr-18 05:00 PM

Tie into Bridwell & Counceling 5 5 30-Apr-18 08:00 AM 04-May-18 05:00 PM

Sanitary 4 0 14-Feb-18 08:00 AM A 16-Feb-18 05:00 PM A

Excavate and Set Sanitary Manhole 1 0 14-Feb-18 08:00 AM A 14-Feb-18 05:00 PM A

Excavate and Install Sanitary Line to Building 2 0 15-Feb-18 08:00 AM A 16-Feb-18 05:00 PM A

Inspection and Cover-up 1 0 16-Feb-18 08:00 AM A 16-Feb-18 05:00 PM A

Storm 91 91 26-Mar-18 08:00 AM 01-Aug-18 05:00 PM

North Storm Line 10 10 26-Mar-18 08:00 AM 06-Apr-18 05:00 PM

Excavate and Set Storm Pipe 5 5 26-Mar-18 08:00 AM 30-Mar-18 05:00 PM

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct

Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019

Transformer Shop Drawings & Product Data

Transformer THS Review

Transformer A/E Approval

Transformer Fab & Delivery

DIVISION 33 - UTILITIES

Utility Product Data

Utility Approval

Utility Fab & Deliver

CONSTRUCTION

MOBILIZATION / DEMOBILIZATION

Cut/Cap/Make Safe Site Electrical

Install Site Fencing

Install Tree Protection

SITEWORK

Demolition

Remove Concrete Paving

Mass Excavation

Clear & Grub

Excavate for Building Pad Partial

Excavate for Building Pad Complete

Building Pad

Construct Buildng Pad

Site Utilities

Water

Install 8" Waterline South to Tomahawk Vault

Install 8" Waterline Tomahawk Vault to North

Install 8" Waterline Caddo Trail to East

Final Tie-in to Water Loop

Water Service to the Building

Testing and Chlorination

Tie into Bridwell & Counceling

Sanitary

Excavate and Set Sanitary Manhole

Excavate and Install Sanitary Line to Building

Inspection and Cover-up

Storm

North Storm Line

Excavate and Set Storm Pipe

Midwestern State University Health Science and Human Services Center Page 5 of 23 05-Mar-18 08:23 PM

Activity Name OriginalDuration

RemainingDuration

Start Finish

Set Grate Inlet 1 1 02-Apr-18 08:00 AM 02-Apr-18 05:00 PM

Backfill and Compact 1 1 03-Apr-18 08:00 AM 03-Apr-18 05:00 PM

Install Pump 1 1 04-Apr-18 08:00 AM 04-Apr-18 05:00 PM

Final Connection of Electrical 2 2 05-Apr-18 08:00 AM 06-Apr-18 05:00 PM

South Storm Line 8 8 23-Jul-18 08:00 AM 01-Aug-18 05:00 PM

Excavate and Set Storm Pipe 3 3 23-Jul-18 08:00 AM 25-Jul-18 05:00 PM

Set Grate Inlet 1 1 26-Jul-18 08:00 AM 26-Jul-18 05:00 PM

Backfill and Compact 1 1 27-Jul-18 08:00 AM 27-Jul-18 05:00 PM

Install Pump 1 1 30-Jul-18 08:00 AM 30-Jul-18 05:00 PM

Final Connection of Electrical 2 2 31-Jul-18 08:00 AM 01-Aug-18 05:00 PM

Hydronic 0 0

Electric 0 0

Data 0 0

Paving 0 0

Sidewalks at Colonnade 0 0

Parking Lot North 0 0

SUBSTRUCTURE 51 42 07-Feb-18 08:00 AM A 01-May-18 05:00 PM

Foundations 39 30 07-Feb-18 08:00 AM A 13-Apr-18 05:00 PM

Tie Pier Cages 5 0 07-Feb-18 08:00 AM A 16-Feb-18 05:00 PM A

Layout Building Piers 5 0 09-Feb-18 08:00 AM A 13-Feb-18 05:00 PM A

South 31 22 20-Feb-18 08:00 AM A 03-Apr-18 05:00 PM

Drilled Piers Primary Structure 12 7 20-Feb-18 08:00 AM A 13-Mar-18 05:00 PM

Underfloor Plumbing 10 10 06-Mar-18 08:00 AM 19-Mar-18 05:00 PM

Underfloor Electrical 10 10 06-Mar-18 08:00 AM 19-Mar-18 05:00 PM

Excavate - FRP Grade Beams South 15 15 14-Mar-18 08:00 AM 03-Apr-18 05:00 PM

Pier Caps South 5 5 14-Mar-18 08:00 AM 20-Mar-18 05:00 PM

North 23 23 14-Mar-18 08:00 AM 13-Apr-18 05:00 PM

Drilled Piers Primary Structure 8 8 14-Mar-18 08:00 AM 23-Mar-18 05:00 PM

Underfloor Plumbing 10 10 26-Mar-18 08:00 AM 06-Apr-18 05:00 PM

Underfloor Electrical 10 10 26-Mar-18 08:00 AM 06-Apr-18 05:00 PM

Excavate - FRP Grade Beams North 15 15 26-Mar-18 08:00 AM 13-Apr-18 05:00 PM

Pier Caps North 5 5 26-Mar-18 08:00 AM 30-Mar-18 05:00 PM

Level 1 20 20 04-Apr-18 08:00 AM 01-May-18 05:00 PM

South 14 14 04-Apr-18 08:00 AM 23-Apr-18 05:00 PM

Fine Grade Builidng Pad 2 2 04-Apr-18 08:00 AM 05-Apr-18 05:00 PM

Termite Treatment 1 1 06-Apr-18 08:00 AM 06-Apr-18 05:00 PM

Install Carton Forms 3 3 09-Apr-18 08:00 AM 11-Apr-18 05:00 PM

Install Vapor Barrier 1 1 12-Apr-18 08:00 AM 12-Apr-18 05:00 PM

Install Slab Reinforcing 3 3 13-Apr-18 08:00 AM 17-Apr-18 05:00 PM

Place Slab 1 1 18-Apr-18 08:00 AM 18-Apr-18 05:00 PM

Columns to L2 3 3 19-Apr-18 08:00 AM 23-Apr-18 05:00 PM

North 12 12 16-Apr-18 08:00 AM 01-May-18 05:00 PM

Fine Grade Builidng Pad 2 2 16-Apr-18 08:00 AM 17-Apr-18 05:00 PM

Termite Treatment 1 1 18-Apr-18 08:00 AM 18-Apr-18 05:00 PM

Install Carton Forms 2 2 19-Apr-18 08:00 AM 20-Apr-18 05:00 PM

Install Vapor Barrier 1 1 23-Apr-18 08:00 AM 23-Apr-18 05:00 PM

Install Slab Reinforcing 2 2 24-Apr-18 08:00 AM 25-Apr-18 05:00 PM

Place Slab 1 1 26-Apr-18 08:00 AM 26-Apr-18 05:00 PM

Columns to L2 3 3 27-Apr-18 08:00 AM 01-May-18 05:00 PM

SUPERSTRUCTURE 65 65 26-Apr-18 08:00 AM 27-Jul-18 05:00 PM

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct

Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019

Set Grate Inlet

Backfill and Compact

Install Pump

Final Connection of Electrical

South Storm Line

Excavate and Set Storm Pipe

Set Grate Inlet

Backfill and Compact

Install Pump

Final Connection of Electrical

SUBSTRUCTURE

Foundations

Tie Pier Cages

Layout Building Piers

South

Drilled Piers Primary Structure, Drilled Piers Primary Structure

Underfloor Plumbing

Underfloor Electrical

Excavate - FRP Grade Beams South

Pier Caps South

North

Drilled Piers Primary Structure

Underfloor Plumbing

Underfloor Electrical

Excavate - FRP Grade Beams North

Pier Caps North

Level 1

South

Fine Grade Builidng Pad

Termite Treatment

Install Carton Forms

Install Vapor Barrier

Install Slab Reinforcing

Place Slab

Columns to L2

North

Fine Grade Builidng Pad

Termite Treatment

Install Carton Forms

Install Vapor Barrier

Install Slab Reinforcing

Place Slab

Columns to L2

SUPERSTRUCTURE

Midwestern State University Health Science and Human Services Center Page 6 of 23 05-Mar-18 08:23 PM

Activity Name OriginalDuration

RemainingDuration

Start Finish

Level 2 48 48 26-Apr-18 08:00 AM 03-Jul-18 05:00 PM

South 43 43 26-Apr-18 08:00 AM 26-Jun-18 05:00 PM

L2P1 Form Deck 7 7 26-Apr-18 08:00 AM 04-May-18 05:00 PM

L2P1 Reinforce Deck 4 4 02-May-18 08:00 AM 07-May-18 05:00 PM

L2P1 Place Deck 1 1 08-May-18 08:00 AM 08-May-18 05:00 PM

L2P1 Cure Deck 5 5 09-May-18 08:00 AM 15-May-18 05:00 PM

Columns to L3 3 3 09-May-18 08:00 AM 11-May-18 05:00 PM

L2P1 Strip and Reshore Deck 3 3 16-May-18 08:00 AM 18-May-18 05:00 PM

L2P1 Remove Reshores 2 2 25-Jun-18 08:00 AM 26-Jun-18 05:00 PM

North 41 41 07-May-18 08:00 AM 03-Jul-18 05:00 PM

L2P2 Form Deck 5 5 07-May-18 08:00 AM 11-May-18 05:00 PM

L2P2 Reinforce Deck 3 3 10-May-18 08:00 AM 14-May-18 05:00 PM

L2P2 Place Deck 1 1 15-May-18 08:00 AM 15-May-18 05:00 PM

L2P2 Cure Deck 5 5 16-May-18 08:00 AM 22-May-18 05:00 PM

Columns to L3 3 3 16-May-18 08:00 AM 18-May-18 05:00 PM

L2P2 Strip and Reshore Deck 3 3 23-May-18 08:00 AM 25-May-18 05:00 PM

L2P2 Remove Reshores 2 2 02-Jul-18 08:00 AM 03-Jul-18 05:00 PM

Level 3 48 48 14-May-18 08:00 AM 20-Jul-18 05:00 PM

South 43 43 14-May-18 08:00 AM 13-Jul-18 05:00 PM

L3P1 Form Deck 7 7 14-May-18 08:00 AM 22-May-18 05:00 PM

L3P1 Reinforce Deck 4 4 18-May-18 08:00 AM 23-May-18 05:00 PM

L3P1 Place Deck 1 1 24-May-18 08:00 AM 24-May-18 05:00 PM

L3P1 Cure Deck 5 5 25-May-18 08:00 AM 01-Jun-18 05:00 PM

Columns to L4 3 3 25-May-18 08:00 AM 30-May-18 05:00 PM

L3P1 Strip and Reshore Deck 3 3 04-Jun-18 08:00 AM 06-Jun-18 05:00 PM

L3P1 Remove Reshores 2 2 12-Jul-18 08:00 AM 13-Jul-18 05:00 PM

North 41 41 23-May-18 08:00 AM 20-Jul-18 05:00 PM

L3P2 Form Deck 5 5 23-May-18 08:00 AM 30-May-18 05:00 PM

L3P2 Reinforce Deck 3 3 29-May-18 08:00 AM 31-May-18 05:00 PM

L3P2 Place Deck 1 1 01-Jun-18 08:00 AM 01-Jun-18 05:00 PM

L3P2 Cure Deck 5 5 04-Jun-18 08:00 AM 08-Jun-18 05:00 PM

Columns to L4 3 3 04-Jun-18 08:00 AM 06-Jun-18 05:00 PM

L3P2 Strip and Reshore Deck 3 3 11-Jun-18 08:00 AM 13-Jun-18 05:00 PM

L3P2 Remove Reshores 2 2 19-Jul-18 08:00 AM 20-Jul-18 05:00 PM

Level 4 36 36 31-May-18 08:00 AM 20-Jul-18 05:00 PM

South 31 31 31-May-18 08:00 AM 13-Jul-18 05:00 PM

L4P1 Form Deck 7 7 31-May-18 08:00 AM 08-Jun-18 05:00 PM

L4P1 Reinforce Deck 4 4 06-Jun-18 08:00 AM 11-Jun-18 05:00 PM

L4P1 Place Deck 1 1 12-Jun-18 08:00 AM 12-Jun-18 05:00 PM

L4P1 Cure Deck 5 5 13-Jun-18 08:00 AM 19-Jun-18 05:00 PM

Columns to Roof 3 3 13-Jun-18 08:00 AM 15-Jun-18 05:00 PM

L4P1 Strip and Reshore Deck 3 3 20-Jun-18 08:00 AM 22-Jun-18 05:00 PM

L4P1 Remove Reshores 2 2 12-Jul-18 08:00 AM 13-Jul-18 05:00 PM

North 29 29 11-Jun-18 08:00 AM 20-Jul-18 05:00 PM

L4P2 Form Deck 5 5 11-Jun-18 08:00 AM 15-Jun-18 05:00 PM

L4P2 Reinforce Deck 3 3 14-Jun-18 08:00 AM 18-Jun-18 05:00 PM

L4P2 Place Deck 1 1 19-Jun-18 08:00 AM 19-Jun-18 05:00 PM

L4P2 Cure Deck 5 5 20-Jun-18 08:00 AM 26-Jun-18 05:00 PM

Columns to Roof 3 3 20-Jun-18 08:00 AM 22-Jun-18 05:00 PM

L4P2 Strip and Reshore Deck 3 3 27-Jun-18 08:00 AM 29-Jun-18 05:00 PM

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct

Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019

Level 2

South

L2P1 Form Deck

L2P1 Reinforce Deck

L2P1 Place Deck

L2P1 Cure Deck

Columns to L3

L2P1 Strip and Reshore Deck

L2P1 Remove Reshores

North

L2P2 Form Deck

L2P2 Reinforce Deck

L2P2 Place Deck

L2P2 Cure Deck

Columns to L3

L2P2 Strip and Reshore Deck

L2P2 Remove Reshores

Level 3

South

L3P1 Form Deck

L3P1 Reinforce Deck

L3P1 Place Deck

L3P1 Cure Deck

Columns to L4

L3P1 Strip and Reshore Deck

L3P1 Remove Reshores

North

L3P2 Form Deck

L3P2 Reinforce Deck

L3P2 Place Deck

L3P2 Cure Deck

Columns to L4

L3P2 Strip and Reshore Deck

L3P2 Remove Reshores

Level 4

South

L4P1 Form Deck

L4P1 Reinforce Deck

L4P1 Place Deck

L4P1 Cure Deck

Columns to Roof

L4P1 Strip and Reshore Deck

L4P1 Remove Reshores

North

L4P2 Form Deck

L4P2 Reinforce Deck

L4P2 Place Deck

L4P2 Cure Deck

Columns to Roof

L4P2 Strip and Reshore Deck

Midwestern State University Health Science and Human Services Center Page 7 of 23 05-Mar-18 08:23 PM

Activity Name OriginalDuration

RemainingDuration

Start Finish

L4P2 Remove Reshores 2 2 19-Jul-18 08:00 AM 20-Jul-18 05:00 PM

Composite Deck at Atrium 9 9 02-Jul-18 08:00 AM 13-Jul-18 05:00 PM

Set Steel Beams and Bridging 5 5 02-Jul-18 08:00 AM 09-Jul-18 05:00 PM

Fasten Metal Deck 3 3 10-Jul-18 08:00 AM 12-Jul-18 05:00 PM

Place Concrete 1 1 13-Jul-18 08:00 AM 13-Jul-18 05:00 PM

Level Roof 29 29 18-Jun-18 08:00 AM 27-Jul-18 05:00 PM

South 20 20 18-Jun-18 08:00 AM 16-Jul-18 05:00 PM

LRP1 Form Deck 7 7 18-Jun-18 08:00 AM 26-Jun-18 05:00 PM

LRP1 Reinforce Deck 4 4 22-Jun-18 08:00 AM 27-Jun-18 05:00 PM

LRP1 Place Deck 1 1 28-Jun-18 08:00 AM 28-Jun-18 05:00 PM

LRP1 Cure Deck 5 5 29-Jun-18 08:00 AM 06-Jul-18 05:00 PM

LR Parapet Wall 11 11 29-Jun-18 08:00 AM 16-Jul-18 05:00 PM

LRP1 Strip 3 3 09-Jul-18 08:00 AM 11-Jul-18 05:00 PM

North 21 21 27-Jun-18 08:00 AM 26-Jul-18 05:00 PM

LRP2 Form Deck 5 5 27-Jun-18 08:00 AM 03-Jul-18 05:00 PM

LRP2 Reinforce Deck 3 3 02-Jul-18 08:00 AM 05-Jul-18 05:00 PM

LRP2 Place Deck 1 1 06-Jul-18 08:00 AM 06-Jul-18 05:00 PM

LRP2 Cure Deck 5 5 09-Jul-18 08:00 AM 13-Jul-18 05:00 PM

LRP2 Strip 3 3 16-Jul-18 08:00 AM 18-Jul-18 05:00 PM

LR Parapet Wall 8 8 17-Jul-18 08:00 AM 26-Jul-18 05:00 PM

Metal Deck at Atrium 7 7 19-Jul-18 08:00 AM 27-Jul-18 05:00 PM

Set Steel Beams and Bridging 5 5 19-Jul-18 08:00 AM 25-Jul-18 05:00 PM

Fasten Metal Deck 2 2 26-Jul-18 08:00 AM 27-Jul-18 05:00 PM

Roof Structures 15 15 09-Jul-18 08:00 AM 27-Jul-18 05:00 PM

Screenwalls 15 15 09-Jul-18 08:00 AM 27-Jul-18 05:00 PM

Erect Columns & Beams for Screenwall 5 5 09-Jul-18 08:00 AM 13-Jul-18 05:00 PM

Paint Columns & Beams 5 5 16-Jul-18 08:00 AM 20-Jul-18 05:00 PM

Install Panel System 5 5 23-Jul-18 08:00 AM 27-Jul-18 05:00 PM

Stair 2 - SW Corner & Penthouse 20 20 31-May-18 08:00 AM 27-Jun-18 05:00 PM

Erect Columns & Beams 5 5 31-May-18 08:00 AM 06-Jun-18 05:00 PM

Erect Pan Stairs 5 5 07-Jun-18 08:00 AM 13-Jun-18 05:00 PM

Erect Center Handrails 5 5 14-Jun-18 08:00 AM 20-Jun-18 05:00 PM

Install Perimeter Metal Studs 5 5 14-Jun-18 08:00 AM 20-Jun-18 05:00 PM

Fasten Metal Decking 5 5 14-Jun-18 08:00 AM 20-Jun-18 05:00 PM

Install Sheathing & Waterproofing 5 5 21-Jun-18 08:00 AM 27-Jun-18 05:00 PM

Stair 3 - South 20 20 07-Jun-18 08:00 AM 05-Jul-18 05:00 PM

Erect Columns & Beams 5 5 07-Jun-18 08:00 AM 13-Jun-18 05:00 PM

Erect Pan Stairs 5 5 14-Jun-18 08:00 AM 20-Jun-18 05:00 PM

Erect Center Handrails 5 5 21-Jun-18 08:00 AM 27-Jun-18 05:00 PM

Install Perimeter Metal Studs 5 5 21-Jun-18 08:00 AM 27-Jun-18 05:00 PM

Install Sheathing & Waterproofing 5 5 28-Jun-18 08:00 AM 05-Jul-18 05:00 PM

Stair 1 - NW Corner 20 20 14-Jun-18 08:00 AM 12-Jul-18 05:00 PM

Erect Columns & Beams 5 5 14-Jun-18 08:00 AM 20-Jun-18 05:00 PM

Erect Pan Stairs 5 5 21-Jun-18 08:00 AM 27-Jun-18 05:00 PM

Erect Center Handrails 5 5 28-Jun-18 08:00 AM 05-Jul-18 05:00 PM

Install Perimeter Metal Studs 5 5 28-Jun-18 08:00 AM 05-Jul-18 05:00 PM

Install Sheathing & Waterproofing 5 5 06-Jul-18 08:00 AM 12-Jul-18 05:00 PM

Main Stair (Atrium) 34 34 07-Jun-18 08:00 AM 25-Jul-18 05:00 PM

Erect Pan Stairs 5 5 07-Jun-18 08:00 AM 13-Jun-18 05:00 PM

Erect Center Handrails 5 5 06-Jul-18 08:00 AM 12-Jul-18 05:00 PM

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct

Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019

L4P2 Remove Reshores

Composite Deck at Atrium

Set Steel Beams and Bridging

Fasten Metal Deck

Place Concrete

Level Roof

South

LRP1 Form Deck

LRP1 Reinforce Deck

LRP1 Place Deck

LRP1 Cure Deck

LR Parapet Wall

LRP1 Strip

North

LRP2 Form Deck

LRP2 Reinforce Deck

LRP2 Place Deck

LRP2 Cure Deck

LRP2 Strip

LR Parapet Wall

Metal Deck at Atrium

Set Steel Beams and Bridging

Fasten Metal Deck

Roof Structures

Screenwalls

Erect Columns & Beams for Screenwall

Paint Columns & Beams

Install Panel System

Stair 2 - SW Corner & Penthouse

Erect Columns & Beams

Erect Pan Stairs

Erect Center Handrails

Install Perimeter Metal Studs

Fasten Metal Decking

Install Sheathing & Waterproofing

Stair 3 - South

Erect Columns & Beams

Erect Pan Stairs

Erect Center Handrails

Install Perimeter Metal Studs

Install Sheathing & Waterproofing

Stair 1 - NW Corner

Erect Columns & Beams

Erect Pan Stairs

Erect Center Handrails

Install Perimeter Metal Studs

Install Sheathing & Waterproofing

Main Stair (Atrium)

Erect Pan Stairs

Erect Center Handrails

Midwestern State University Health Science and Human Services Center Page 8 of 23 05-Mar-18 08:23 PM

Activity Name OriginalDuration

RemainingDuration

Start Finish

Erect Columns & Beams 5 5 19-Jul-18 08:00 AM 25-Jul-18 05:00 PM

EXTERIOR SKIN 78 78 27-Jun-18 08:00 AM 16-Oct-18 05:00 PM

Sequence 1 - West Elevation (Mech Yard to NW Corner) 63 63 05-Jul-18 08:00 AM 02-Oct-18 05:00 PM

Level 1 31 31 05-Jul-18 08:00 AM 16-Aug-18 05:00 PM

Frame Exterior Walls - West 5 5 05-Jul-18 08:00 AM 11-Jul-18 05:00 PM

Install Sheathing - West 6 6 12-Jul-18 08:00 AM 19-Jul-18 05:00 PM

Install Lintels - West 3 3 12-Jul-18 08:00 AM 16-Jul-18 05:00 PM

Prep Sheathing - West 0 0 20-Jul-18 08:00 AM 20-Jul-18 08:00 AM

Waterproofing - Air Barrier - West 0 0 20-Jul-18 08:00 AM 20-Jul-18 08:00 AM

Masonry - West 10 10 27-Jul-18 08:00 AM 09-Aug-18 05:00 PM

Glass & Glazing - West 5 5 10-Aug-18 08:00 AM 16-Aug-18 05:00 PM

Level 2 24 24 23-Jul-18 08:00 AM 23-Aug-18 05:00 PM

Frame Exterior Walls - West 5 5 23-Jul-18 08:00 AM 27-Jul-18 05:00 PM

Install Sheathing - West 6 6 30-Jul-18 08:00 AM 06-Aug-18 05:00 PM

Install Lintels - West 3 3 30-Jul-18 08:00 AM 01-Aug-18 05:00 PM

Prep Sheathing - West 0 0 07-Aug-18 08:00 AM 07-Aug-18 08:00 AM

Waterproofing - Air Barrier - West 0 0 07-Aug-18 08:00 AM 07-Aug-18 08:00 AM

Masonry - West 10 10 10-Aug-18 08:00 AM 23-Aug-18 05:00 PM

Level 3 39 39 23-Jul-18 08:00 AM 14-Sep-18 05:00 PM

Frame Exterior Walls - West 5 5 23-Jul-18 08:00 AM 27-Jul-18 05:00 PM

Install Sheathing - West 6 6 30-Jul-18 08:00 AM 06-Aug-18 05:00 PM

Install Lintels - West 3 3 30-Jul-18 08:00 AM 01-Aug-18 05:00 PM

Prep Sheathing - West 0 0 07-Aug-18 08:00 AM 07-Aug-18 08:00 AM

Waterproofing - Air Barrier - West 0 0 07-Aug-18 08:00 AM 07-Aug-18 08:00 AM

Masonry - West 10 10 24-Aug-18 08:00 AM 07-Sep-18 05:00 PM

Glass & Glazing - West 5 5 10-Sep-18 08:00 AM 14-Sep-18 05:00 PM

Level 4 46 46 26-Jul-18 08:00 AM 28-Sep-18 05:00 PM

Frame Exterior Walls - West 5 5 26-Jul-18 08:00 AM 01-Aug-18 05:00 PM

Install Sheathing - West 6 6 02-Aug-18 08:00 AM 09-Aug-18 05:00 PM

Install Lintels - West 3 3 02-Aug-18 08:00 AM 06-Aug-18 05:00 PM

Prep Sheathing - West 0 0 10-Aug-18 08:00 AM 10-Aug-18 08:00 AM

Waterproofing - Air Barrier - West 0 0 10-Aug-18 08:00 AM 10-Aug-18 08:00 AM

Masonry - West 10 10 10-Sep-18 08:00 AM 21-Sep-18 05:00 PM

Glass & Glazing - West 5 5 24-Sep-18 08:00 AM 28-Sep-18 05:00 PM

Curtainwall 7 7 24-Sep-18 08:00 AM 02-Oct-18 05:00 PM

Install Curtainwall System - West 7 7 24-Sep-18 08:00 AM 02-Oct-18 05:00 PM

Sequence 2 - South Elevation (South Point to SE Metal Panels)63 63 27-Jun-18 08:00 AM 25-Sep-18 05:00 PM

Level 1 28 28 27-Jun-18 08:00 AM 06-Aug-18 05:00 PM

Frame Exterior Walls - South 5 5 27-Jun-18 08:00 AM 03-Jul-18 05:00 PM

Install Sheathing - South 6 6 05-Jul-18 08:00 AM 12-Jul-18 05:00 PM

Install Lintels - South 3 3 05-Jul-18 08:00 AM 09-Jul-18 05:00 PM

Prep Sheathing - South 0 0 13-Jul-18 08:00 AM 13-Jul-18 08:00 AM

Waterproofing - Air Barrier - South 0 0 13-Jul-18 08:00 AM 13-Jul-18 08:00 AM

Masonry - South 10 10 17-Jul-18 08:00 AM 30-Jul-18 05:00 PM

Glass & Glazing - South 5 5 31-Jul-18 08:00 AM 06-Aug-18 05:00 PM

Level 2 31 31 16-Jul-18 08:00 AM 27-Aug-18 05:00 PM

Frame Exterior Walls - South 5 5 16-Jul-18 08:00 AM 20-Jul-18 05:00 PM

Install Sheathing - South 6 6 23-Jul-18 08:00 AM 30-Jul-18 05:00 PM

Install Lintels - South 3 3 23-Jul-18 08:00 AM 25-Jul-18 05:00 PM

Prep Sheathing - South 0 0 31-Jul-18 08:00 AM 31-Jul-18 08:00 AM

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct

Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019

Erect Columns & Beams

EXTERIOR SKIN

Sequence 1 - West Elevation (Mech Yard to NW Corner)

Level 1

Frame Exterior Walls - West

Install Sheathing - West

Install Lintels - West

Prep Sheathing - West

Waterproofing - Air Barrier - West

Masonry - West

Glass & Glazing - West

Level 2

Frame Exterior Walls - West

Install Sheathing - West

Install Lintels - West

Prep Sheathing - West

Waterproofing - Air Barrier - West

Masonry - West

Level 3

Frame Exterior Walls - West

Install Sheathing - West

Install Lintels - West

Prep Sheathing - West

Waterproofing - Air Barrier - West

Masonry - West

Glass & Glazing - West

Level 4

Frame Exterior Walls - West

Install Sheathing - West

Install Lintels - West

Prep Sheathing - West

Waterproofing - Air Barrier - West

Masonry - West

Glass & Glazing - West

Curtainwall

Install Curtainwall System - West

Sequence 2 - South Elevation (South Point to SE Metal Panels)

Level 1

Frame Exterior Walls - South

Install Sheathing - South

Install Lintels - South

Prep Sheathing - South

Waterproofing - Air Barrier - South

Masonry - South

Glass & Glazing - South

Level 2

Frame Exterior Walls - South

Install Sheathing - South

Install Lintels - South

Prep Sheathing - South

Midwestern State University Health Science and Human Services Center Page 9 of 23 05-Mar-18 08:23 PM

Activity Name OriginalDuration

RemainingDuration

Start Finish

Waterproofing - Air Barrier - South 0 0 31-Jul-18 08:00 AM 31-Jul-18 08:00 AM

Masonry - South 10 10 31-Jul-18 08:00 AM 13-Aug-18 05:00 PM

Glass & Glazing - South 10 10 14-Aug-18 08:00 AM 27-Aug-18 05:00 PM

Level 3 41 41 16-Jul-18 08:00 AM 11-Sep-18 05:00 PM

Frame Exterior Walls - South 5 5 16-Jul-18 08:00 AM 20-Jul-18 05:00 PM

Install Sheathing - South 6 6 23-Jul-18 08:00 AM 30-Jul-18 05:00 PM

Install Lintels - South 3 3 23-Jul-18 08:00 AM 25-Jul-18 05:00 PM

Prep Sheathing - South 0 0 31-Jul-18 08:00 AM 31-Jul-18 08:00 AM

Waterproofing - Air Barrier - South 0 0 31-Jul-18 08:00 AM 31-Jul-18 08:00 AM

Masonry - South 10 10 14-Aug-18 08:00 AM 27-Aug-18 05:00 PM

Glass & Glazing - South 10 10 28-Aug-18 08:00 AM 11-Sep-18 05:00 PM

Level 4 48 48 19-Jul-18 08:00 AM 25-Sep-18 05:00 PM

Frame Exterior Walls - South 5 5 19-Jul-18 08:00 AM 25-Jul-18 05:00 PM

Install Sheathing - Sotth 6 6 26-Jul-18 08:00 AM 02-Aug-18 05:00 PM

Install Lintels - South 3 3 26-Jul-18 08:00 AM 30-Jul-18 05:00 PM

Prep Sheathing - South 0 0 03-Aug-18 08:00 AM 03-Aug-18 08:00 AM

Waterproofing - Air Barrier - South 0 0 03-Aug-18 08:00 AM 03-Aug-18 08:00 AM

Masonry - South 10 10 28-Aug-18 08:00 AM 11-Sep-18 05:00 PM

Glass & Glazing - South 10 10 12-Sep-18 08:00 AM 25-Sep-18 05:00 PM

Sequence 3 - North Elevation (NW Corner to NE Metal Panels)68 68 05-Jul-18 08:00 AM 09-Oct-18 05:00 PM

Level 1 63 63 05-Jul-18 08:00 AM 02-Oct-18 05:00 PM

Frame Exterior Walls - North 5 5 05-Jul-18 08:00 AM 11-Jul-18 05:00 PM

Install Sheathing - North 6 6 12-Jul-18 08:00 AM 19-Jul-18 05:00 PM

Install Lintels - North 3 3 12-Jul-18 08:00 AM 16-Jul-18 05:00 PM

Prep Sheathing - North 0 0 20-Jul-18 08:00 AM 20-Jul-18 08:00 AM

Waterproofing - Air Barrier - North 0 0 20-Jul-18 08:00 AM 20-Jul-18 08:00 AM

Masonry - North 10 10 12-Sep-18 08:00 AM 25-Sep-18 05:00 PM

Glass & Glazing - North 5 5 26-Sep-18 08:00 AM 02-Oct-18 05:00 PM

Level 2 21 21 23-Jul-18 08:00 AM 20-Aug-18 05:00 PM

Frame Exterior Walls - North 5 5 23-Jul-18 08:00 AM 27-Jul-18 05:00 PM

Install Sheathing - North 6 6 30-Jul-18 08:00 AM 06-Aug-18 05:00 PM

Install Lintels - North 3 3 30-Jul-18 08:00 AM 01-Aug-18 05:00 PM

Prep Sheathing - North 0 0 07-Aug-18 08:00 AM 07-Aug-18 08:00 AM

Waterproofing - Air Barrier - North 0 0 07-Aug-18 08:00 AM 07-Aug-18 08:00 AM

Masonry - North 10 10 07-Aug-18 08:00 AM 20-Aug-18 05:00 PM

Level 3 56 56 23-Jul-18 08:00 AM 09-Oct-18 05:00 PM

Frame Exterior Walls - North 5 5 23-Jul-18 08:00 AM 27-Jul-18 05:00 PM

Install Sheathing - North 6 6 30-Jul-18 08:00 AM 06-Aug-18 05:00 PM

Install Lintels - North 3 3 30-Jul-18 08:00 AM 01-Aug-18 05:00 PM

Prep Sheathing - North 0 0 07-Aug-18 08:00 AM 07-Aug-18 08:00 AM

Waterproofing - Air Barrier - North 0 0 07-Aug-18 08:00 AM 07-Aug-18 08:00 AM

Masonry - North 10 10 21-Aug-18 08:00 AM 04-Sep-18 05:00 PM

Glass & Glazing - North 5 5 03-Oct-18 08:00 AM 09-Oct-18 05:00 PM

Level 4 48 48 26-Jul-18 08:00 AM 02-Oct-18 05:00 PM

Frame Exterior Walls - North 5 5 26-Jul-18 08:00 AM 01-Aug-18 05:00 PM

Install Sheathing - North 6 6 02-Aug-18 08:00 AM 09-Aug-18 05:00 PM

Install Lintels - North 3 3 02-Aug-18 08:00 AM 06-Aug-18 05:00 PM

Prep Sheathing - North 0 0 10-Aug-18 08:00 AM 10-Aug-18 08:00 AM

Waterproofing - Air Barrier - North 0 0 10-Aug-18 08:00 AM 10-Aug-18 08:00 AM

Masonry - North 10 10 05-Sep-18 08:00 AM 18-Sep-18 05:00 PM

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct

Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019

Waterproofing - Air Barrier - South

Masonry - South

Glass & Glazing - South

Level 3

Frame Exterior Walls - South

Install Sheathing - South

Install Lintels - South

Prep Sheathing - South

Waterproofing - Air Barrier - South

Masonry - South

Glass & Glazing - South

Level 4

Frame Exterior Walls - South

Install Sheathing - Sotth

Install Lintels - South

Prep Sheathing - South

Waterproofing - Air Barrier - South

Masonry - South

Glass & Glazing - South

Sequence 3 - North Elevation (NW Corner to NE Metal Panels)

Level 1

Frame Exterior Walls - North

Install Sheathing - North

Install Lintels - North

Prep Sheathing - North

Waterproofing - Air Barrier - North

Masonry - North

Glass & Glazing - North

Level 2

Frame Exterior Walls - North

Install Sheathing - North

Install Lintels - North

Prep Sheathing - North

Waterproofing - Air Barrier - North

Masonry - North

Level 3

Frame Exterior Walls - North

Install Sheathing - North

Install Lintels - North

Prep Sheathing - North

Waterproofing - Air Barrier - North

Masonry - North

Glass & Glazing - North

Level 4

Frame Exterior Walls - North

Install Sheathing - North

Install Lintels - North

Prep Sheathing - North

Waterproofing - Air Barrier - North

Masonry - North

Midwestern State University Health Science and Human Services Center Page 10 of 23 05-Mar-18 08:23 PM

Activity Name OriginalDuration

RemainingDuration

Start Finish

Glass & Glazing - North 10 10 19-Sep-18 08:00 AM 02-Oct-18 05:00 PM

Sequence 4 - SW Serpentine Wall 20 20 19-Sep-18 08:00 AM 16-Oct-18 05:00 PM

Serpentine Walls 20 20 19-Sep-18 08:00 AM 16-Oct-18 05:00 PM

Masonry 10 10 19-Sep-18 08:00 AM 02-Oct-18 05:00 PM

Glass & Glazing 10 10 03-Oct-18 08:00 AM 16-Oct-18 05:00 PM

East Elevation 30 30 02-Aug-18 08:00 AM 13-Sep-18 05:00 PM

Curtainwall 30 30 02-Aug-18 08:00 AM 13-Sep-18 05:00 PM

Infil Framing at Metal Panels - East 5 5 02-Aug-18 08:00 AM 08-Aug-18 05:00 PM

Install Sheating - East 5 5 09-Aug-18 08:00 AM 15-Aug-18 05:00 PM

Prep Sheathing - East 0 0 16-Aug-18 08:00 AM 16-Aug-18 08:00 AM

Waterproofing - Air Barrier - East 0 0 16-Aug-18 08:00 AM 16-Aug-18 08:00 AM

Install Metal Panels - East 10 10 16-Aug-18 08:00 AM 29-Aug-18 05:00 PM

Install Curtainwall System - East 20 20 16-Aug-18 08:00 AM 13-Sep-18 05:00 PM

COLONNADE 55 55 12-Sep-18 08:00 AM 29-Nov-18 05:00 PM

Place Sidewalks 15 15 12-Sep-18 08:00 AM 02-Oct-18 05:00 PM

FRP South Walk 5 5 12-Sep-18 08:00 AM 18-Sep-18 05:00 PM

FRP North Walk 5 5 19-Sep-18 08:00 AM 25-Sep-18 05:00 PM

FRP West Walk 5 5 24-Sep-18 08:00 AM 28-Sep-18 05:00 PM

FRP East Walk 5 5 26-Sep-18 08:00 AM 02-Oct-18 05:00 PM

Structure 17 17 01-Oct-18 08:00 AM 23-Oct-18 05:00 PM

Erect Steel West 5 5 01-Oct-18 08:00 AM 05-Oct-18 05:00 PM

Erect Steel North 5 5 08-Oct-18 08:00 AM 12-Oct-18 05:00 PM

Light Gauge Trusses West 7 7 08-Oct-18 08:00 AM 16-Oct-18 05:00 PM

Light Gauge Trusses North 7 7 15-Oct-18 08:00 AM 23-Oct-18 05:00 PM

Masonry & Stone 30 30 17-Oct-18 08:00 AM 29-Nov-18 05:00 PM

Masonry & Stone Canopy West 17 17 17-Oct-18 08:00 AM 08-Nov-18 05:00 PM

Masonry & Stone Canopy North 20 20 24-Oct-18 08:00 AM 20-Nov-18 05:00 PM

Seal Joints 5 5 21-Nov-18 08:00 AM 29-Nov-18 05:00 PM

Soffit 25 25 19-Sep-18 08:00 AM 23-Oct-18 05:00 PM

MEP Rough in 5 5 19-Sep-18 08:00 AM 25-Sep-18 05:00 PM

Framing 5 5 26-Sep-18 08:00 AM 02-Oct-18 05:00 PM

Plaster 15 15 03-Oct-18 08:00 AM 23-Oct-18 05:00 PM

ROOFING 92 92 09-Jul-18 08:00 AM 14-Nov-18 05:00 PM

Main Roof 65 65 09-Jul-18 08:00 AM 08-Oct-18 05:00 PM

Install Wood Blocking South 10 10 09-Jul-18 08:00 AM 20-Jul-18 05:00 PM

Install Wood Blocking North 10 10 24-Jul-18 08:00 AM 06-Aug-18 05:00 PM

Install TPO Roof South 20 20 30-Jul-18 08:00 AM 24-Aug-18 05:00 PM

Install TPO Roof North 20 20 27-Aug-18 08:00 AM 24-Sep-18 05:00 PM

Set Roof Drains South 5 5 27-Aug-18 08:00 AM 31-Aug-18 05:00 PM

Install Metal Coping South 5 5 27-Aug-18 08:00 AM 31-Aug-18 05:00 PM

Set Roof Drains North 5 5 25-Sep-18 08:00 AM 01-Oct-18 05:00 PM

Install Metal Coping North 5 5 25-Sep-18 08:00 AM 01-Oct-18 05:00 PM

Install Lightning Protection 5 5 02-Oct-18 08:00 AM 08-Oct-18 05:00 PM

Penthouse Roof 60 60 23-Jul-18 08:00 AM 15-Oct-18 05:00 PM

Install Wood Blocking 2 2 23-Jul-18 08:00 AM 24-Jul-18 05:00 PM

Install TPO Roof 5 5 23-Jul-18 08:00 AM 27-Jul-18 05:00 PM

Set Roof Drains 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM

Install Metal Coping 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM

Install Lightning Protection 5 5 09-Oct-18 08:00 AM 15-Oct-18 05:00 PM

Mechanical Equipment 11 11 16-Jul-18 08:00 AM 30-Jul-18 05:00 PM

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct

Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019

Glass & Glazing - North

Sequence 4 - SW Serpentine Wall

Serpentine Walls

Masonry

Glass & Glazing

East Elevation

Curtainwall

Infil Framing at Metal Panels - East

Install Sheating - East

Prep Sheathing - East

Waterproofing - Air Barrier - East

Install Metal Panels - East

Install Curtainwall System - East

COLONNADE

Place Sidewalks

FRP South Walk

FRP North Walk

FRP West Walk

FRP East Walk

Structure

Erect Steel West

Erect Steel North

Light Gauge Trusses West

Light Gauge Trusses North

Masonry & Stone

Masonry & Stone Canopy West

Masonry & Stone Canopy North

Seal Joints

Soffit

MEP Rough in

Framing

Plaster

ROOFING

Main Roof

Install Wood Blocking South

Install Wood Blocking North

Install TPO Roof South

Install TPO Roof North

Set Roof Drains South

Install Metal Coping South

Set Roof Drains North

Install Metal Coping North

Install Lightning Protection

Penthouse Roof

Install Wood Blocking

Install TPO Roof

Set Roof Drains

Install Metal Coping

Install Lightning Protection

Mechanical Equipment

Midwestern State University Health Science and Human Services Center Page 11 of 23 05-Mar-18 08:23 PM

Activity Name OriginalDuration

RemainingDuration

Start Finish

Set Roof Curbs 5 5 16-Jul-18 08:00 AM 20-Jul-18 05:00 PM

Set Air Handling Units 1 1 23-Jul-18 08:00 AM 23-Jul-18 05:00 PM

Set Exhaust Fans 5 5 24-Jul-18 08:00 AM 30-Jul-18 05:00 PM

Colonnade Roofs 21 21 17-Oct-18 08:00 AM 14-Nov-18 05:00 PM

Plywood Substrate West 5 5 17-Oct-18 08:00 AM 23-Oct-18 05:00 PM

Plywood Substrate North 5 5 24-Oct-18 08:00 AM 30-Oct-18 05:00 PM

Tile Roof West 11 11 24-Oct-18 08:00 AM 07-Nov-18 05:00 PM

Tile Roof North 11 11 31-Oct-18 08:00 AM 14-Nov-18 05:00 PM

ELEVATORS 168 168 12-Mar-18 08:00 AM 05-Nov-18 05:00 PM

Drill Elevator Jack Holes 2 2 12-Mar-18 08:00 AM* 13-Mar-18 05:00 PM

Structural Steel Columns & Beams 10 10 07-Jun-18 08:00 AM 20-Jun-18 05:00 PM

Set Hoist Beam 3 3 21-Jun-18 08:00 AM 25-Jun-18 05:00 PM

Install Shaft Wall 10 10 26-Jun-18 08:00 AM 10-Jul-18 05:00 PM

Level 1 Elevator Safety 1 1 11-Jul-18 08:00 AM 11-Jul-18 05:00 PM

Level 2 Elevator Safety 1 1 12-Jul-18 08:00 AM 12-Jul-18 05:00 PM

Level 3 Elevator Safety 1 1 13-Jul-18 08:00 AM 13-Jul-18 05:00 PM

Level 4 Elevator Safety 1 1 16-Jul-18 08:00 AM 16-Jul-18 05:00 PM

Elevator Installation 50 50 27-Aug-18 08:00 AM 05-Nov-18 05:00 PM

Elevator Shaft 0 0

Elevator Machine Room 0 0

INTERIOR FRAMING & ROUGH-IN 60 60 27-Jun-18 08:00 AM 20-Sep-18 05:00 PM

Level 1 40 40 27-Jun-18 08:00 AM 22-Aug-18 05:00 PM

South 25 25 27-Jun-18 08:00 AM 01-Aug-18 05:00 PM

Layout 3 3 27-Jun-18 08:00 AM 29-Jun-18 05:00 PM

Frame Priority Walls & Top Out 5 5 02-Jul-18 08:00 AM 09-Jul-18 05:00 PM

Install Inwall Blocking 5 5 02-Jul-18 08:00 AM 09-Jul-18 05:00 PM

Plumbing Wall Rough-in 10 10 05-Jul-18 08:00 AM 18-Jul-18 05:00 PM

Electrical Wall Rough-in 10 10 05-Jul-18 08:00 AM 18-Jul-18 05:00 PM

Frame Non-Priority Walls 5 5 10-Jul-18 08:00 AM 16-Jul-18 05:00 PM

Inwall Insulation 5 5 10-Jul-18 08:00 AM 16-Jul-18 05:00 PM

One-side Drywall 5 5 19-Jul-18 08:00 AM 25-Jul-18 05:00 PM

Inspections 5 5 19-Jul-18 08:00 AM 25-Jul-18 05:00 PM

Close Walls 5 5 26-Jul-18 08:00 AM 01-Aug-18 05:00 PM

North 35 35 05-Jul-18 08:00 AM 22-Aug-18 05:00 PM

Layout 5 5 05-Jul-18 08:00 AM 11-Jul-18 05:00 PM

Frame Priority Walls & Top Out 5 5 12-Jul-18 08:00 AM 18-Jul-18 05:00 PM

Install Inwall Blocking 5 5 12-Jul-18 08:00 AM 18-Jul-18 05:00 PM

CMU Buildout NW Corner 10 10 12-Jul-18 08:00 AM 25-Jul-18 05:00 PM

Plumbing Wall Rough-in 10 10 16-Jul-18 08:00 AM 27-Jul-18 05:00 PM

Electrical Wall Rough-in 10 10 16-Jul-18 08:00 AM 27-Jul-18 05:00 PM

Frame Non-Priority Walls 10 10 19-Jul-18 08:00 AM 01-Aug-18 05:00 PM

Inwall Insulation 5 5 19-Jul-18 08:00 AM 25-Jul-18 05:00 PM

One-side Drywall 5 5 02-Aug-18 08:00 AM 08-Aug-18 05:00 PM

Inspections 5 5 09-Aug-18 08:00 AM 15-Aug-18 05:00 PM

Close Walls 5 5 16-Aug-18 08:00 AM 22-Aug-18 05:00 PM

Level 2 40 40 16-Jul-18 08:00 AM 10-Sep-18 05:00 PM

South 35 35 16-Jul-18 08:00 AM 31-Aug-18 05:00 PM

Layout 5 5 16-Jul-18 08:00 AM 20-Jul-18 05:00 PM

Frame Priority Walls & Top Out 5 5 23-Jul-18 08:00 AM 27-Jul-18 05:00 PM

Install Inwall Blocking 5 5 23-Jul-18 08:00 AM 27-Jul-18 05:00 PM

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct

Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019

Set Roof Curbs

Set Air Handling Units

Set Exhaust Fans

Colonnade Roofs

Plywood Substrate West

Plywood Substrate North

Tile Roof West

Tile Roof North

ELEVATORS

Drill Elevator Jack Holes

Structural Steel Columns & Beams

Set Hoist Beam

Install Shaft Wall

Level 1 Elevator Safety

Level 2 Elevator Safety

Level 3 Elevator Safety

Level 4 Elevator Safety

Elevator Installation

INTERIOR FRAMING & ROUGH-IN

Level 1

South

Layout

Frame Priority Walls & Top Out

Install Inwall Blocking

Plumbing Wall Rough-in

Electrical Wall Rough-in

Frame Non-Priority Walls

Inwall Insulation

One-side Drywall

Inspections

Close Walls

North

Layout

Frame Priority Walls & Top Out

Install Inwall Blocking

CMU Buildout NW Corner

Plumbing Wall Rough-in

Electrical Wall Rough-in

Frame Non-Priority Walls

Inwall Insulation

One-side Drywall

Inspections

Close Walls

Level 2

South

Layout

Frame Priority Walls & Top Out

Install Inwall Blocking

Midwestern State University Health Science and Human Services Center Page 12 of 23 05-Mar-18 08:23 PM

Activity Name OriginalDuration

RemainingDuration

Start Finish

Plumbing Wall Rough-in 10 10 25-Jul-18 08:00 AM 07-Aug-18 05:00 PM

Electrical Wall Rough-in 10 10 25-Jul-18 08:00 AM 07-Aug-18 05:00 PM

Frame Non-Priority Walls 10 10 30-Jul-18 08:00 AM 10-Aug-18 05:00 PM

Inwall Insulation 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM

One-side Drywall 5 5 13-Aug-18 08:00 AM 17-Aug-18 05:00 PM

Inspections 5 5 20-Aug-18 08:00 AM 24-Aug-18 05:00 PM

Close Walls 5 5 27-Aug-18 08:00 AM 31-Aug-18 05:00 PM

North 35 35 23-Jul-18 08:00 AM 10-Sep-18 05:00 PM

Layout 5 5 23-Jul-18 08:00 AM 27-Jul-18 05:00 PM

Frame Priority Walls & Top Out 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM

Install Inwall Blocking 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM

Plumbing Wall Rough-in 10 10 01-Aug-18 08:00 AM 14-Aug-18 05:00 PM

Electrical Wall Rough-in 10 10 01-Aug-18 08:00 AM 14-Aug-18 05:00 PM

Frame Non-Priority Walls 10 10 06-Aug-18 08:00 AM 17-Aug-18 05:00 PM

Inwall Insulation 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM

One-side Drywall 5 5 20-Aug-18 08:00 AM 24-Aug-18 05:00 PM

Inspections 5 5 27-Aug-18 08:00 AM 31-Aug-18 05:00 PM

Close Walls 5 5 04-Sep-18 08:00 AM 10-Sep-18 05:00 PM

Level 3 35 35 16-Jul-18 08:00 AM 31-Aug-18 05:00 PM

South 30 30 16-Jul-18 08:00 AM 24-Aug-18 05:00 PM

Layout 5 5 16-Jul-18 08:00 AM 20-Jul-18 05:00 PM

Frame Priority Walls & Top Out 5 5 23-Jul-18 08:00 AM 27-Jul-18 05:00 PM

Install Inwall Blocking 5 5 23-Jul-18 08:00 AM 27-Jul-18 05:00 PM

Plumbing Wall Rough-in 10 10 25-Jul-18 08:00 AM 07-Aug-18 05:00 PM

Electrical Wall Rough-in 10 10 25-Jul-18 08:00 AM 07-Aug-18 05:00 PM

Frame Non-Priority Walls 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM

Inwall Insulation 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM

One-side Drywall 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM

Inspections 5 5 13-Aug-18 08:00 AM 17-Aug-18 05:00 PM

Close Walls 5 5 20-Aug-18 08:00 AM 24-Aug-18 05:00 PM

North 30 30 23-Jul-18 08:00 AM 31-Aug-18 05:00 PM

Layout 5 5 23-Jul-18 08:00 AM 27-Jul-18 05:00 PM

Frame Priority Walls & Top Out 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM

Install Inwall Blocking 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM

Plumbing Wall Rough-in 10 10 01-Aug-18 08:00 AM 14-Aug-18 05:00 PM

Electrical Wall Rough-in 10 10 01-Aug-18 08:00 AM 14-Aug-18 05:00 PM

Frame Non-Priority Walls 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM

Inwall Insulation 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM

One-side Drywall 5 5 13-Aug-18 08:00 AM 17-Aug-18 05:00 PM

Inspections 5 5 20-Aug-18 08:00 AM 24-Aug-18 05:00 PM

Close Walls 5 5 27-Aug-18 08:00 AM 31-Aug-18 05:00 PM

Level 4 50 50 12-Jul-18 08:00 AM 20-Sep-18 05:00 PM

South 45 45 12-Jul-18 08:00 AM 13-Sep-18 05:00 PM

Layout 5 5 12-Jul-18 08:00 AM 18-Jul-18 05:00 PM

Frame Priority Walls & Top Out 5 5 19-Jul-18 08:00 AM 25-Jul-18 05:00 PM

Install Inwall Blocking 5 5 19-Jul-18 08:00 AM 25-Jul-18 05:00 PM

Plumbing Wall Rough-in 10 10 23-Jul-18 08:00 AM 03-Aug-18 05:00 PM

Electrical Wall Rough-in 10 10 23-Jul-18 08:00 AM 03-Aug-18 05:00 PM

Frame Non-Priority Walls 10 10 26-Jul-18 08:00 AM 08-Aug-18 05:00 PM

Inwall Insulation 10 10 26-Jul-18 08:00 AM 08-Aug-18 05:00 PM

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct

Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019

Plumbing Wall Rough-in

Electrical Wall Rough-in

Frame Non-Priority Walls

Inwall Insulation

One-side Drywall

Inspections

Close Walls

North

Layout

Frame Priority Walls & Top Out

Install Inwall Blocking

Plumbing Wall Rough-in

Electrical Wall Rough-in

Frame Non-Priority Walls

Inwall Insulation

One-side Drywall

Inspections

Close Walls

Level 3

South

Layout

Frame Priority Walls & Top Out

Install Inwall Blocking

Plumbing Wall Rough-in

Electrical Wall Rough-in

Frame Non-Priority Walls

Inwall Insulation

One-side Drywall

Inspections

Close Walls

North

Layout

Frame Priority Walls & Top Out

Install Inwall Blocking

Plumbing Wall Rough-in

Electrical Wall Rough-in

Frame Non-Priority Walls

Inwall Insulation

One-side Drywall

Inspections

Close Walls

Level 4

South

Layout

Frame Priority Walls & Top Out

Install Inwall Blocking

Plumbing Wall Rough-in

Electrical Wall Rough-in

Frame Non-Priority Walls

Inwall Insulation

Midwestern State University Health Science and Human Services Center Page 13 of 23 05-Mar-18 08:23 PM

Activity Name OriginalDuration

RemainingDuration

Start Finish

One-side Drywall 10 10 09-Aug-18 08:00 AM 22-Aug-18 05:00 PM

Inspections 5 5 23-Aug-18 08:00 AM 29-Aug-18 05:00 PM

Close Walls 10 10 30-Aug-18 08:00 AM 13-Sep-18 05:00 PM

North 45 45 19-Jul-18 08:00 AM 20-Sep-18 05:00 PM

Layout 5 5 19-Jul-18 08:00 AM 25-Jul-18 05:00 PM

Frame Priority Walls & Top Out 5 5 26-Jul-18 08:00 AM 01-Aug-18 05:00 PM

Install Inwall Blocking 5 5 26-Jul-18 08:00 AM 01-Aug-18 05:00 PM

Plumbing Wall Rough-in 10 10 30-Jul-18 08:00 AM 10-Aug-18 05:00 PM

Electrical Wall Rough-in 10 10 30-Jul-18 08:00 AM 10-Aug-18 05:00 PM

Frame Non-Priority Walls 10 10 02-Aug-18 08:00 AM 15-Aug-18 05:00 PM

Inwall Insulation 10 10 02-Aug-18 08:00 AM 15-Aug-18 05:00 PM

One-side Drywall 10 10 16-Aug-18 08:00 AM 29-Aug-18 05:00 PM

Inspections 5 5 30-Aug-18 08:00 AM 06-Sep-18 05:00 PM

Close Walls 10 10 07-Sep-18 08:00 AM 20-Sep-18 05:00 PM

Penthouse Structure 10 10 28-Jun-18 08:00 AM 12-Jul-18 05:00 PM

West 10 10 28-Jun-18 08:00 AM 12-Jul-18 05:00 PM

Plumbing Wall Rough-in 5 5 28-Jun-18 08:00 AM 05-Jul-18 05:00 PM

Electrical Wall Rough-in 5 5 28-Jun-18 08:00 AM 05-Jul-18 05:00 PM

Inwall Insulation 2 2 06-Jul-18 08:00 AM 09-Jul-18 05:00 PM

Inspections 1 1 10-Jul-18 08:00 AM 10-Jul-18 05:00 PM

Close Walls 2 2 11-Jul-18 08:00 AM 12-Jul-18 05:00 PM

ABOVE CEILING ROUGH-IN 127 127 27-Jun-18 08:00 AM 28-Dec-18 05:00 PM

Level 1 67 67 27-Jun-18 08:00 AM 01-Oct-18 05:00 PM

South 45 45 27-Jun-18 08:00 AM 29-Aug-18 05:00 PM

Electrical 25 25 27-Jun-18 08:00 AM 01-Aug-18 05:00 PM

Electrical Feeders 5 5 27-Jun-18 08:00 AM 03-Jul-18 05:00 PM

Branch Conduit 20 20 05-Jul-18 08:00 AM 01-Aug-18 05:00 PM

Mechanical 22 22 02-Jul-18 08:00 AM 01-Aug-18 05:00 PM

HVAC Equipment 2 2 02-Jul-18 08:00 AM 03-Jul-18 05:00 PM

Main Ductwork 10 10 05-Jul-18 08:00 AM 18-Jul-18 05:00 PM

Mechaincal Piping 10 10 05-Jul-18 08:00 AM 18-Jul-18 05:00 PM

Insulate Ductwork 10 10 19-Jul-18 08:00 AM 01-Aug-18 05:00 PM

Branch Ductwork 5 5 19-Jul-18 08:00 AM 25-Jul-18 05:00 PM

HVAC Controls Conduit 5 5 19-Jul-18 08:00 AM 25-Jul-18 05:00 PM

Plumbing 20 20 05-Jul-18 08:00 AM 01-Aug-18 05:00 PM

Roof Drains 10 10 05-Jul-18 08:00 AM 18-Jul-18 05:00 PM

Waste & Vent 10 10 05-Jul-18 08:00 AM 18-Jul-18 05:00 PM

Domestic Water 10 10 05-Jul-18 08:00 AM 18-Jul-18 05:00 PM

Medical Gas 5 5 05-Jul-18 08:00 AM 11-Jul-18 05:00 PM

Plumbing Insulation 10 10 19-Jul-18 08:00 AM 01-Aug-18 05:00 PM

Fire Protection 10 10 19-Jul-18 08:00 AM 01-Aug-18 05:00 PM

Fire Protection Mains 5 5 19-Jul-18 08:00 AM 25-Jul-18 05:00 PM

Fire Protection Branch Lines 5 5 26-Jul-18 08:00 AM 01-Aug-18 05:00 PM

Low Voltage 30 30 19-Jul-18 08:00 AM 29-Aug-18 05:00 PM

Cable Tray 10 10 19-Jul-18 08:00 AM 01-Aug-18 05:00 PM

Fire Alarm / Security 5 5 19-Jul-18 08:00 AM 25-Jul-18 05:00 PM

Communications 20 20 02-Aug-18 08:00 AM 29-Aug-18 05:00 PM

AV Wiring 20 20 02-Aug-18 08:00 AM 29-Aug-18 05:00 PM

Misc Structural Supports 5 5 05-Jul-18 08:00 AM 11-Jul-18 05:00 PM

Restroom Supports 5 5 05-Jul-18 08:00 AM 11-Jul-18 05:00 PM

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct

Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019

One-side Drywall

Inspections

Close Walls

North

Layout

Frame Priority Walls & Top Out

Install Inwall Blocking

Plumbing Wall Rough-in

Electrical Wall Rough-in

Frame Non-Priority Walls

Inwall Insulation

One-side Drywall

Inspections

Close Walls

Penthouse Structure

West

Plumbing Wall Rough-in

Electrical Wall Rough-in

Inwall Insulation

Inspections

Close Walls

ABOVE CEILING ROUGH-IN

Level 1

South

Electrical

Electrical Feeders

Branch Conduit

Mechanical

HVAC Equipment

Main Ductwork

Mechaincal Piping

Insulate Ductwork

Branch Ductwork

HVAC Controls Conduit

Plumbing

Roof Drains

Waste & Vent

Domestic Water

Medical Gas

Plumbing Insulation

Fire Protection

Fire Protection Mains

Fire Protection Branch Lines

Low Voltage

Cable Tray

Fire Alarm / Security

Communications

AV Wiring

Misc Structural Supports

Restroom Supports

Midwestern State University Health Science and Human Services Center Page 14 of 23 05-Mar-18 08:23 PM

Activity Name OriginalDuration

RemainingDuration

Start Finish

A/V Supports 5 5 05-Jul-18 08:00 AM 11-Jul-18 05:00 PM

Operable Partition Support 5 5 05-Jul-18 08:00 AM 11-Jul-18 05:00 PM

North 45 45 30-Jul-18 08:00 AM 01-Oct-18 05:00 PM

Electrical 25 25 30-Jul-18 08:00 AM 31-Aug-18 05:00 PM

Electrical Feeders 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM

Branch Conduit 20 20 06-Aug-18 08:00 AM 31-Aug-18 05:00 PM

Mechanical 25 25 30-Jul-18 08:00 AM 31-Aug-18 05:00 PM

HVAC Equipment 2 2 30-Jul-18 08:00 AM 31-Jul-18 05:00 PM

Main Ductwork 10 10 06-Aug-18 08:00 AM 17-Aug-18 05:00 PM

Mechaincal Piping 10 10 06-Aug-18 08:00 AM 17-Aug-18 05:00 PM

Insulate Ductwork 10 10 20-Aug-18 08:00 AM 31-Aug-18 05:00 PM

Branch Ductwork 5 5 20-Aug-18 08:00 AM 24-Aug-18 05:00 PM

HVAC Controls Conduit 5 5 20-Aug-18 08:00 AM 24-Aug-18 05:00 PM

Plumbing 20 20 06-Aug-18 08:00 AM 31-Aug-18 05:00 PM

Roof Drains 10 10 06-Aug-18 08:00 AM 17-Aug-18 05:00 PM

Waste & Vent 10 10 06-Aug-18 08:00 AM 17-Aug-18 05:00 PM

Domestic Water 10 10 06-Aug-18 08:00 AM 17-Aug-18 05:00 PM

Medical Gas 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM

Plumbing Insulation 10 10 20-Aug-18 08:00 AM 31-Aug-18 05:00 PM

Fire Protection 10 10 20-Aug-18 08:00 AM 31-Aug-18 05:00 PM

Fire Protection Mains 5 5 20-Aug-18 08:00 AM 24-Aug-18 05:00 PM

Fire Protection Branch Lines 5 5 27-Aug-18 08:00 AM 31-Aug-18 05:00 PM

Low Voltage 30 30 20-Aug-18 08:00 AM 01-Oct-18 05:00 PM

Cable Tray 10 10 20-Aug-18 08:00 AM 31-Aug-18 05:00 PM

Fire Alarm / Security 5 5 20-Aug-18 08:00 AM 24-Aug-18 05:00 PM

Communications 20 20 04-Sep-18 08:00 AM 01-Oct-18 05:00 PM

AV Wiring 20 20 04-Sep-18 08:00 AM 01-Oct-18 05:00 PM

Misc Structural Supports 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM

A/V Supports 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM

Dental Equipment Supports 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM

Level 2 70 70 23-Jul-18 08:00 AM 29-Oct-18 05:00 PM

South 60 60 23-Jul-18 08:00 AM 15-Oct-18 05:00 PM

Electrical 25 25 23-Jul-18 08:00 AM 24-Aug-18 05:00 PM

Electrical Feeders 5 5 23-Jul-18 08:00 AM 27-Jul-18 05:00 PM

Branch Conduit 20 20 30-Jul-18 08:00 AM 24-Aug-18 05:00 PM

Mechanical 40 40 23-Jul-18 08:00 AM 17-Sep-18 05:00 PM

HVAC Equipment 2 2 23-Jul-18 08:00 AM 24-Jul-18 05:00 PM

Main Ductwork 10 10 20-Aug-18 08:00 AM 31-Aug-18 05:00 PM

Mechaincal Piping 10 10 20-Aug-18 08:00 AM 31-Aug-18 05:00 PM

Insulate Ductwork 10 10 04-Sep-18 08:00 AM 17-Sep-18 05:00 PM

Branch Ductwork 5 5 04-Sep-18 08:00 AM 10-Sep-18 05:00 PM

HVAC Controls Conduit 5 5 04-Sep-18 08:00 AM 10-Sep-18 05:00 PM

Plumbing 25 25 13-Aug-18 08:00 AM 17-Sep-18 05:00 PM

Medical Gas 5 5 13-Aug-18 08:00 AM 17-Aug-18 05:00 PM

Roof Drains 10 10 20-Aug-18 08:00 AM 31-Aug-18 05:00 PM

Waste & Vent 10 10 20-Aug-18 08:00 AM 31-Aug-18 05:00 PM

Domestic Water 10 10 20-Aug-18 08:00 AM 31-Aug-18 05:00 PM

Plumbing Insulation 10 10 04-Sep-18 08:00 AM 17-Sep-18 05:00 PM

Fire Protection 10 10 04-Sep-18 08:00 AM 17-Sep-18 05:00 PM

Fire Protection Mains 5 5 04-Sep-18 08:00 AM 10-Sep-18 05:00 PM

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct

Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019

A/V Supports

Operable Partition Support

North

Electrical

Electrical Feeders

Branch Conduit

Mechanical

HVAC Equipment

Main Ductwork

Mechaincal Piping

Insulate Ductwork

Branch Ductwork

HVAC Controls Conduit

Plumbing

Roof Drains

Waste & Vent

Domestic Water

Medical Gas

Plumbing Insulation

Fire Protection

Fire Protection Mains

Fire Protection Branch Lines

Low Voltage

Cable Tray

Fire Alarm / Security

Communications

AV Wiring

Misc Structural Supports

A/V Supports

Dental Equipment Supports

Level 2

South

Electrical

Electrical Feeders

Branch Conduit

Mechanical

HVAC Equipment

Main Ductwork

Mechaincal Piping

Insulate Ductwork

Branch Ductwork

HVAC Controls Conduit

Plumbing

Medical Gas

Roof Drains

Waste & Vent

Domestic Water

Plumbing Insulation

Fire Protection

Fire Protection Mains

Midwestern State University Health Science and Human Services Center Page 15 of 23 05-Mar-18 08:23 PM

Activity Name OriginalDuration

RemainingDuration

Start Finish

Fire Protection Branch Lines 5 5 11-Sep-18 08:00 AM 17-Sep-18 05:00 PM

Low Voltage 30 30 04-Sep-18 08:00 AM 15-Oct-18 05:00 PM

Cable Tray 10 10 04-Sep-18 08:00 AM 17-Sep-18 05:00 PM

Fire Alarm / Security 5 5 04-Sep-18 08:00 AM 10-Sep-18 05:00 PM

Communications 20 20 18-Sep-18 08:00 AM 15-Oct-18 05:00 PM

AV Wiring 20 20 18-Sep-18 08:00 AM 15-Oct-18 05:00 PM

Misc Structural Supports 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM

Restroom Supports 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM

A/V Supports 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM

North 65 65 30-Jul-18 08:00 AM 29-Oct-18 05:00 PM

Electrical 25 25 30-Jul-18 08:00 AM 31-Aug-18 05:00 PM

Electrical Feeders 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM

Branch Conduit 20 20 06-Aug-18 08:00 AM 31-Aug-18 05:00 PM

Mechanical 45 45 30-Jul-18 08:00 AM 01-Oct-18 05:00 PM

HVAC Equipment 2 2 30-Jul-18 08:00 AM 31-Jul-18 05:00 PM

Main Ductwork 10 10 04-Sep-18 08:00 AM 17-Sep-18 05:00 PM

Mechaincal Piping 10 10 04-Sep-18 08:00 AM 17-Sep-18 05:00 PM

Insulate Ductwork 10 10 18-Sep-18 08:00 AM 01-Oct-18 05:00 PM

Branch Ductwork 5 5 18-Sep-18 08:00 AM 24-Sep-18 05:00 PM

HVAC Controls Conduit 5 5 18-Sep-18 08:00 AM 24-Sep-18 05:00 PM

Plumbing 30 30 20-Aug-18 08:00 AM 01-Oct-18 05:00 PM

Medical Gas 5 5 20-Aug-18 08:00 AM 24-Aug-18 05:00 PM

Roof Drains 10 10 04-Sep-18 08:00 AM 17-Sep-18 05:00 PM

Waste & Vent 10 10 04-Sep-18 08:00 AM 17-Sep-18 05:00 PM

Domestic Water 10 10 04-Sep-18 08:00 AM 17-Sep-18 05:00 PM

Plumbing Insulation 10 10 18-Sep-18 08:00 AM 01-Oct-18 05:00 PM

Fire Protection 10 10 18-Sep-18 08:00 AM 01-Oct-18 05:00 PM

Fire Protection Mains 5 5 18-Sep-18 08:00 AM 24-Sep-18 05:00 PM

Fire Protection Branch Lines 5 5 25-Sep-18 08:00 AM 01-Oct-18 05:00 PM

Low Voltage 30 30 18-Sep-18 08:00 AM 29-Oct-18 05:00 PM

Cable Tray 10 10 18-Sep-18 08:00 AM 01-Oct-18 05:00 PM

Fire Alarm / Security 5 5 18-Sep-18 08:00 AM 24-Sep-18 05:00 PM

Communications 20 20 02-Oct-18 08:00 AM 29-Oct-18 05:00 PM

AV Wiring 20 20 02-Oct-18 08:00 AM 29-Oct-18 05:00 PM

Misc Structural Supports 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM

A/V Supports 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM

X-Ray Supports 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM

Operating Room Supports 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM

Level 3 90 90 23-Jul-18 08:00 AM 28-Nov-18 05:00 PM

South 80 80 23-Jul-18 08:00 AM 12-Nov-18 05:00 PM

Electrical 25 25 23-Jul-18 08:00 AM 24-Aug-18 05:00 PM

Electrical Feeders 5 5 23-Jul-18 08:00 AM 27-Jul-18 05:00 PM

Branch Conduit 20 20 30-Jul-18 08:00 AM 24-Aug-18 05:00 PM

Mechanical 60 60 23-Jul-18 08:00 AM 15-Oct-18 05:00 PM

HVAC Equipment 2 2 23-Jul-18 08:00 AM 24-Jul-18 05:00 PM

Main Ductwork 10 10 18-Sep-18 08:00 AM 01-Oct-18 05:00 PM

Mechaincal Piping 10 10 18-Sep-18 08:00 AM 01-Oct-18 05:00 PM

Insulate Ductwork 10 10 02-Oct-18 08:00 AM 15-Oct-18 05:00 PM

Branch Ductwork 5 5 02-Oct-18 08:00 AM 08-Oct-18 05:00 PM

HVAC Controls Conduit 5 5 02-Oct-18 08:00 AM 08-Oct-18 05:00 PM

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct

Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019

Fire Protection Branch Lines

Low Voltage

Cable Tray

Fire Alarm / Security

Communications

AV Wiring

Misc Structural Supports

Restroom Supports

A/V Supports

North

Electrical

Electrical Feeders

Branch Conduit

Mechanical

HVAC Equipment

Main Ductwork

Mechaincal Piping

Insulate Ductwork

Branch Ductwork

HVAC Controls Conduit

Plumbing

Medical Gas

Roof Drains

Waste & Vent

Domestic Water

Plumbing Insulation

Fire Protection

Fire Protection Mains

Fire Protection Branch Lines

Low Voltage

Cable Tray

Fire Alarm / Security

Communications

AV Wiring

Misc Structural Supports

A/V Supports

X-Ray Supports

Operating Room Supports

Level 3

South

Electrical

Electrical Feeders

Branch Conduit

Mechanical

HVAC Equipment

Main Ductwork

Mechaincal Piping

Insulate Ductwork

Branch Ductwork

HVAC Controls Conduit

Midwestern State University Health Science and Human Services Center Page 16 of 23 05-Mar-18 08:23 PM

Activity Name OriginalDuration

RemainingDuration

Start Finish

Plumbing 35 35 27-Aug-18 08:00 AM 15-Oct-18 05:00 PM

Medical Gas 5 5 27-Aug-18 08:00 AM 31-Aug-18 05:00 PM

Roof Drains 10 10 18-Sep-18 08:00 AM 01-Oct-18 05:00 PM

Waste & Vent 10 10 18-Sep-18 08:00 AM 01-Oct-18 05:00 PM

Domestic Water 10 10 18-Sep-18 08:00 AM 01-Oct-18 05:00 PM

Plumbing Insulation 10 10 02-Oct-18 08:00 AM 15-Oct-18 05:00 PM

Fire Protection 10 10 02-Oct-18 08:00 AM 15-Oct-18 05:00 PM

Fire Protection Mains 5 5 02-Oct-18 08:00 AM 08-Oct-18 05:00 PM

Fire Protection Branch Lines 5 5 09-Oct-18 08:00 AM 15-Oct-18 05:00 PM

Low Voltage 30 30 02-Oct-18 08:00 AM 12-Nov-18 05:00 PM

Cable Tray 10 10 02-Oct-18 08:00 AM 15-Oct-18 05:00 PM

Fire Alarm / Security 5 5 02-Oct-18 08:00 AM 08-Oct-18 05:00 PM

Communications 20 20 16-Oct-18 08:00 AM 12-Nov-18 05:00 PM

AV Wiring 20 20 16-Oct-18 08:00 AM 12-Nov-18 05:00 PM

Misc Structural Supports 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM

Restroom Supports 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM

A/V Supports 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM

Hangdown Supports at Atrium 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM

North 85 85 30-Jul-18 08:00 AM 28-Nov-18 05:00 PM

Electrical 25 25 30-Jul-18 08:00 AM 31-Aug-18 05:00 PM

Electrical Feeders 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM

Branch Conduit 20 20 06-Aug-18 08:00 AM 31-Aug-18 05:00 PM

Mechanical 65 65 30-Jul-18 08:00 AM 29-Oct-18 05:00 PM

HVAC Equipment 2 2 30-Jul-18 08:00 AM 31-Jul-18 05:00 PM

Main Ductwork 10 10 02-Oct-18 08:00 AM 15-Oct-18 05:00 PM

Mechaincal Piping 10 10 02-Oct-18 08:00 AM 15-Oct-18 05:00 PM

Insulate Ductwork 10 10 16-Oct-18 08:00 AM 29-Oct-18 05:00 PM

Branch Ductwork 5 5 16-Oct-18 08:00 AM 22-Oct-18 05:00 PM

HVAC Controls Conduit 5 5 16-Oct-18 08:00 AM 22-Oct-18 05:00 PM

Plumbing 40 40 04-Sep-18 08:00 AM 29-Oct-18 05:00 PM

Medical Gas 5 5 04-Sep-18 08:00 AM 10-Sep-18 05:00 PM

Roof Drains 10 10 02-Oct-18 08:00 AM 15-Oct-18 05:00 PM

Waste & Vent 10 10 02-Oct-18 08:00 AM 15-Oct-18 05:00 PM

Domestic Water 10 10 02-Oct-18 08:00 AM 15-Oct-18 05:00 PM

Plumbing Insulation 10 10 16-Oct-18 08:00 AM 29-Oct-18 05:00 PM

Fire Protection 10 10 16-Oct-18 08:00 AM 29-Oct-18 05:00 PM

Fire Protection Mains 5 5 16-Oct-18 08:00 AM 22-Oct-18 05:00 PM

Fire Protection Branch Lines 5 5 23-Oct-18 08:00 AM 29-Oct-18 05:00 PM

Low Voltage 30 30 16-Oct-18 08:00 AM 28-Nov-18 05:00 PM

Cable Tray 10 10 16-Oct-18 08:00 AM 29-Oct-18 05:00 PM

Fire Alarm / Security 5 5 16-Oct-18 08:00 AM 22-Oct-18 05:00 PM

Communications 20 20 30-Oct-18 08:00 AM 28-Nov-18 05:00 PM

AV Wiring 20 20 30-Oct-18 08:00 AM 28-Nov-18 05:00 PM

Misc Structural Supports 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM

A/V Supports 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM

Handown Supports at Atrium 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM

Level 4 112 112 19-Jul-18 08:00 AM 28-Dec-18 05:00 PM

South 102 102 19-Jul-18 08:00 AM 12-Dec-18 05:00 PM

Electrical 25 25 19-Jul-18 08:00 AM 22-Aug-18 05:00 PM

Electrical Feeders 5 5 19-Jul-18 08:00 AM 25-Jul-18 05:00 PM

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct

Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019

Plumbing

Medical Gas

Roof Drains

Waste & Vent

Domestic Water

Plumbing Insulation

Fire Protection

Fire Protection Mains

Fire Protection Branch Lines

Low Voltage

Cable Tray

Fire Alarm / Security

Communications

AV Wiring

Misc Structural Supports

Restroom Supports

A/V Supports

Hangdown Supports at Atrium

North

Electrical

Electrical Feeders

Branch Conduit

Mechanical

HVAC Equipment

Main Ductwork

Mechaincal Piping

Insulate Ductwork

Branch Ductwork

HVAC Controls Conduit

Plumbing

Medical Gas

Roof Drains

Waste & Vent

Domestic Water

Plumbing Insulation

Fire Protection

Fire Protection Mains

Fire Protection Branch Lines

Low Voltage

Cable Tray

Fire Alarm / Security

Communications

AV Wiring

Misc Structural Supports

A/V Supports

Handown Supports at Atrium

Level 4

South

Electrical

Electrical Feeders

Midwestern State University Health Science and Human Services Center Page 17 of 23 05-Mar-18 08:23 PM

Activity Name OriginalDuration

RemainingDuration

Start Finish

Branch Conduit 20 20 26-Jul-18 08:00 AM 22-Aug-18 05:00 PM

Mechanical 82 82 19-Jul-18 08:00 AM 12-Nov-18 05:00 PM

HVAC Equipment 2 2 19-Jul-18 08:00 AM 20-Jul-18 05:00 PM

Main Ductwork 10 10 16-Oct-18 08:00 AM 29-Oct-18 05:00 PM

Mechaincal Piping 10 10 16-Oct-18 08:00 AM 29-Oct-18 05:00 PM

Insulate Ductwork 10 10 30-Oct-18 08:00 AM 12-Nov-18 05:00 PM

Branch Ductwork 5 5 30-Oct-18 08:00 AM 05-Nov-18 05:00 PM

HVAC Controls Conduit 5 5 30-Oct-18 08:00 AM 05-Nov-18 05:00 PM

Plumbing 20 20 16-Oct-18 08:00 AM 12-Nov-18 05:00 PM

Roof Drains 10 10 16-Oct-18 08:00 AM 29-Oct-18 05:00 PM

Waste & Vent 10 10 16-Oct-18 08:00 AM 29-Oct-18 05:00 PM

Domestic Water 10 10 16-Oct-18 08:00 AM 29-Oct-18 05:00 PM

Plumbing Insulation 10 10 30-Oct-18 08:00 AM 12-Nov-18 05:00 PM

Fire Protection 10 10 30-Oct-18 08:00 AM 12-Nov-18 05:00 PM

Fire Protection Mains 5 5 30-Oct-18 08:00 AM 05-Nov-18 05:00 PM

Fire Protection Branch Lines 5 5 06-Nov-18 08:00 AM 12-Nov-18 05:00 PM

Low Voltage 30 30 30-Oct-18 08:00 AM 12-Dec-18 05:00 PM

Cable Tray 10 10 30-Oct-18 08:00 AM 12-Nov-18 05:00 PM

Fire Alarm / Security 5 5 30-Oct-18 08:00 AM 05-Nov-18 05:00 PM

Communications 20 20 13-Nov-18 08:00 AM 12-Dec-18 05:00 PM

AV Wiring 20 20 13-Nov-18 08:00 AM 12-Dec-18 05:00 PM

Misc Structural Supports 5 5 26-Jul-18 08:00 AM 01-Aug-18 05:00 PM

Restroom Supports 5 5 26-Jul-18 08:00 AM 01-Aug-18 05:00 PM

A/V Supports 5 5 26-Jul-18 08:00 AM 01-Aug-18 05:00 PM

North 107 107 26-Jul-18 08:00 AM 28-Dec-18 05:00 PM

Electrical 25 25 26-Jul-18 08:00 AM 29-Aug-18 05:00 PM

Electrical Feeders 5 5 26-Jul-18 08:00 AM 01-Aug-18 05:00 PM

Branch Conduit 20 20 02-Aug-18 08:00 AM 29-Aug-18 05:00 PM

Mechanical 87 87 26-Jul-18 08:00 AM 28-Nov-18 05:00 PM

HVAC Equipment 2 2 26-Jul-18 08:00 AM 27-Jul-18 05:00 PM

Main Ductwork 10 10 30-Oct-18 08:00 AM 12-Nov-18 05:00 PM

Mechaincal Piping 10 10 30-Oct-18 08:00 AM 12-Nov-18 05:00 PM

Insulate Ductwork 10 10 13-Nov-18 08:00 AM 28-Nov-18 05:00 PM

Branch Ductwork 5 5 13-Nov-18 08:00 AM 19-Nov-18 05:00 PM

HVAC Controls Conduit 5 5 13-Nov-18 08:00 AM 19-Nov-18 05:00 PM

Plumbing 20 20 30-Oct-18 08:00 AM 28-Nov-18 05:00 PM

Roof Drains 10 10 30-Oct-18 08:00 AM 12-Nov-18 05:00 PM

Waste & Vent 10 10 30-Oct-18 08:00 AM 12-Nov-18 05:00 PM

Domestic Water 10 10 30-Oct-18 08:00 AM 12-Nov-18 05:00 PM

Plumbing Insulation 10 10 13-Nov-18 08:00 AM 28-Nov-18 05:00 PM

Fire Protection 10 10 13-Nov-18 08:00 AM 28-Nov-18 05:00 PM

Fire Protection Mains 5 5 13-Nov-18 08:00 AM 19-Nov-18 05:00 PM

Fire Protection Branch Lines 5 5 20-Nov-18 08:00 AM 28-Nov-18 05:00 PM

Low Voltage 30 30 13-Nov-18 08:00 AM 28-Dec-18 05:00 PM

Cable Tray 10 10 13-Nov-18 08:00 AM 28-Nov-18 05:00 PM

Fire Alarm / Security 5 5 13-Nov-18 08:00 AM 19-Nov-18 05:00 PM

Communications 20 20 29-Nov-18 08:00 AM 28-Dec-18 05:00 PM

AV Wiring 20 20 29-Nov-18 08:00 AM 28-Dec-18 05:00 PM

Misc Structural Supports 5 5 02-Aug-18 08:00 AM 08-Aug-18 05:00 PM

A/V Supports 5 5 02-Aug-18 08:00 AM 08-Aug-18 05:00 PM

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct

Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019

Branch Conduit

Mechanical

HVAC Equipment

Main Ductwork

Mechaincal Piping

Insulate Ductwork

Branch Ductwork

HVAC Controls Conduit

Plumbing

Roof Drains

Waste & Vent

Domestic Water

Plumbing Insulation

Fire Protection

Fire Protection Mains

Fire Protection Branch Lines

Low Voltage

Cable Tray

Fire Alarm / Security

Communications

AV Wiring

Misc Structural Supports

Restroom Supports

A/V Supports

North

Electrical

Electrical Feeders

Branch Conduit

Mechanical

HVAC Equipment

Main Ductwork

Mechaincal Piping

Insulate Ductwork

Branch Ductwork

HVAC Controls Conduit

Plumbing

Roof Drains

Waste & Vent

Domestic Water

Plumbing Insulation

Fire Protection

Fire Protection Mains

Fire Protection Branch Lines

Low Voltage

Cable Tray

Fire Alarm / Security

Communications

AV Wiring

Misc Structural Supports

A/V Supports

Midwestern State University Health Science and Human Services Center Page 18 of 23 05-Mar-18 08:23 PM

Activity Name OriginalDuration

RemainingDuration

Start Finish

Atrium 56 56 30-Jul-18 08:00 AM 16-Oct-18 05:00 PM

Electrical 3 3 30-Jul-18 08:00 AM 01-Aug-18 05:00 PM

Branch Conduit 3 3 30-Jul-18 08:00 AM 01-Aug-18 05:00 PM

Fire Protection 6 6 09-Oct-18 08:00 AM 16-Oct-18 05:00 PM

Fire Protection Mains 3 3 09-Oct-18 08:00 AM 11-Oct-18 05:00 PM

Fire Protection Branch Lines 3 3 12-Oct-18 08:00 AM 16-Oct-18 05:00 PM

Penthouse Structure 25 25 30-Jul-18 08:00 AM 31-Aug-18 05:00 PM

Electrical 10 10 30-Jul-18 08:00 AM 10-Aug-18 05:00 PM

Electrical Feeders 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM

Branch Conduit 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM

Mechanical 10 10 06-Aug-18 08:00 AM 17-Aug-18 05:00 PM

Medium Pressure Ductwork 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM

Mechaincal Piping 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM

Mechanical Equipment 10 10 06-Aug-18 08:00 AM 17-Aug-18 05:00 PM

Insulate Ductwork 5 5 13-Aug-18 08:00 AM 17-Aug-18 05:00 PM

Plumbing 15 15 06-Aug-18 08:00 AM 24-Aug-18 05:00 PM

Roof Drains 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM

Waste & Vent 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM

Domestic Water 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM

Medical Gas 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM

Plumbing Equipment 10 10 06-Aug-18 08:00 AM 17-Aug-18 05:00 PM

Plumbing Insulation 5 5 13-Aug-18 08:00 AM 17-Aug-18 05:00 PM

Pipe Labeling 5 5 20-Aug-18 08:00 AM 24-Aug-18 05:00 PM

Fire Protection 15 15 13-Aug-18 08:00 AM 31-Aug-18 05:00 PM

Fire Protection Mains 5 5 13-Aug-18 08:00 AM 17-Aug-18 05:00 PM

Fire Protection Branch Lines 5 5 20-Aug-18 08:00 AM 24-Aug-18 05:00 PM

Fire Protection Drops 5 5 27-Aug-18 08:00 AM 31-Aug-18 05:00 PM

Low Voltage 5 5 20-Aug-18 08:00 AM 24-Aug-18 05:00 PM

Communications 5 5 20-Aug-18 08:00 AM 24-Aug-18 05:00 PM

Fire Alarm / Security 5 5 20-Aug-18 08:00 AM 24-Aug-18 05:00 PM

MECHANICAL / ELECTRICAL ROOMS 63 63 26-Jul-18 08:00 AM 23-Oct-18 05:00 PM

Mechanical Yard 15 15 24-Sep-18 08:00 AM 12-Oct-18 05:00 PM

Set Transformer 7 7 24-Sep-18 08:00 AM 02-Oct-18 05:00 PM

Masonry at Sevice Yard 10 10 24-Sep-18 08:00 AM 05-Oct-18 05:00 PM

Set Generator 5 5 08-Oct-18 08:00 AM 12-Oct-18 05:00 PM

Set CRAC Condensing Units 5 5 08-Oct-18 08:00 AM 12-Oct-18 05:00 PM

Electrical 63 63 26-Jul-18 08:00 AM 23-Oct-18 05:00 PM

Level 1 63 63 26-Jul-18 08:00 AM 23-Oct-18 05:00 PM

Main Electrical Room 63 63 26-Jul-18 08:00 AM 23-Oct-18 05:00 PM

Prep & Paint Walls 2 2 26-Jul-18 08:00 AM 27-Jul-18 05:00 PM

Install Gear 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM

Install Panels 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM

Install Fire Alarm Panels 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM

Install Energy Management Panel 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM

Pull Secondary Feeders to ATS 5 5 06-Aug-18 08:00 AM 10-Aug-18 05:00 PM

Pull Feeders to Sub Panels 5 5 13-Aug-18 08:00 AM 17-Aug-18 05:00 PM

Energize Gear 5 5 03-Oct-18 08:00 AM 09-Oct-18 05:00 PM

Seal Floors 5 5 10-Oct-18 08:00 AM 16-Oct-18 05:00 PM

Final Paint Walls 5 5 17-Oct-18 08:00 AM 23-Oct-18 05:00 PM

Electrical Distribution 61 61 30-Jul-18 08:00 AM 23-Oct-18 05:00 PM

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct

Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019

Atrium

Electrical

Branch Conduit

Fire Protection

Fire Protection Mains

Fire Protection Branch Lines

Penthouse Structure

Electrical

Electrical Feeders

Branch Conduit

Mechanical

Medium Pressure Ductwork

Mechaincal Piping

Mechanical Equipment

Insulate Ductwork

Plumbing

Roof Drains

Waste & Vent

Domestic Water

Medical Gas

Plumbing Equipment

Plumbing Insulation

Pipe Labeling

Fire Protection

Fire Protection Mains

Fire Protection Branch Lines

Fire Protection Drops

Low Voltage

Communications

Fire Alarm / Security

MECHANICAL / ELECTRICAL ROOMS

Mechanical Yard

Set Transformer

Masonry at Sevice Yard

Set Generator

Set CRAC Condensing Units

Electrical

Level 1

Main Electrical Room

Prep & Paint Walls

Install Gear

Install Panels

Install Fire Alarm Panels

Install Energy Management Panel

Pull Secondary Feeders to ATS

Pull Feeders to Sub Panels

Energize Gear

Seal Floors

Final Paint Walls

Electrical Distribution

Midwestern State University Health Science and Human Services Center Page 19 of 23 05-Mar-18 08:23 PM

Activity Name OriginalDuration

RemainingDuration

Start Finish

Prep & Paint Walls 2 2 30-Jul-18 08:00 AM 31-Jul-18 05:00 PM

Set Panels 5 5 01-Aug-18 08:00 AM 07-Aug-18 05:00 PM

Terminate Feeders 5 5 20-Aug-18 08:00 AM 24-Aug-18 05:00 PM

Seal Floors 5 5 10-Oct-18 08:00 AM 16-Oct-18 05:00 PM

Final Paint Walls 5 5 17-Oct-18 08:00 AM 23-Oct-18 05:00 PM

Level 2 59 59 01-Aug-18 08:00 AM 23-Oct-18 05:00 PM

Electrical Distribution 59 59 01-Aug-18 08:00 AM 23-Oct-18 05:00 PM

Prep & Paint Walls 2 2 01-Aug-18 08:00 AM 02-Aug-18 05:00 PM

Set Panels 5 5 08-Aug-18 08:00 AM 14-Aug-18 05:00 PM

Terminate Feeders 5 5 15-Aug-18 08:00 AM 21-Aug-18 05:00 PM

Seal Floors 5 5 10-Oct-18 08:00 AM 16-Oct-18 05:00 PM

Final Paint Walls 5 5 17-Oct-18 08:00 AM 23-Oct-18 05:00 PM

Level 3 57 57 03-Aug-18 08:00 AM 23-Oct-18 05:00 PM

Electrical Distribution 57 57 03-Aug-18 08:00 AM 23-Oct-18 05:00 PM

Prep & Paint Walls 2 2 03-Aug-18 08:00 AM 06-Aug-18 05:00 PM

Set Panels 5 5 15-Aug-18 08:00 AM 21-Aug-18 05:00 PM

Terminate Feeders 5 5 22-Aug-18 08:00 AM 28-Aug-18 05:00 PM

Seal Floors 5 5 10-Oct-18 08:00 AM 16-Oct-18 05:00 PM

Final Paint Walls 5 5 17-Oct-18 08:00 AM 23-Oct-18 05:00 PM

Level 4 55 55 07-Aug-18 08:00 AM 23-Oct-18 05:00 PM

Electrical Distibution 55 55 07-Aug-18 08:00 AM 23-Oct-18 05:00 PM

Prep & Paint Walls 2 2 07-Aug-18 08:00 AM 08-Aug-18 05:00 PM

Set Panels 5 5 22-Aug-18 08:00 AM 28-Aug-18 05:00 PM

Terminate Feeders 5 5 29-Aug-18 08:00 AM 05-Sep-18 05:00 PM

Seal Floors 5 5 10-Oct-18 08:00 AM 16-Oct-18 05:00 PM

Final Paint Walls 5 5 17-Oct-18 08:00 AM 23-Oct-18 05:00 PM

NE Equipment Room 0 0

NE Fire Pump Room 0 0

NE Dental Equipment Room 0 0

Communications 0 0

Level 1 0 0

Data Center 0 0

MDF Room 0 0

Level 2 0 0

IDF Room 0 0

Level 3 0 0

IDF Room 0 0

Level 4 0 0

IDF Room 0 0

SW Mechanical Penthouse 0 0

INTERIOR FINISHES 125 125 25-Sep-18 08:00 AM 26-Mar-19 05:00 PM

Atrium 80 80 25-Sep-18 08:00 AM 21-Jan-19 05:00 PM

Install Cementitious Fireproofing 5 5 25-Sep-18 08:00 AM 01-Oct-18 05:00 PM

Frame Ceiling 5 5 02-Oct-18 08:00 AM 08-Oct-18 05:00 PM

Sheetrock Ceiling 5 5 09-Oct-18 08:00 AM 15-Oct-18 05:00 PM

Tape / Float / Texture 10 10 16-Oct-18 08:00 AM 29-Oct-18 05:00 PM

Prime Coat & Paint Ceiling 5 5 30-Oct-18 08:00 AM 05-Nov-18 05:00 PM

Install Interior Storefront 10 10 06-Nov-18 08:00 AM 19-Nov-18 05:00 PM

Install Wood Paneling 10 10 20-Nov-18 08:00 AM 05-Dec-18 05:00 PM

Install Level 1 Stair 5 5 06-Dec-18 08:00 AM 12-Dec-18 05:00 PM

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct

Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019

Prep & Paint Walls

Set Panels

Terminate Feeders

Seal Floors

Final Paint Walls

Level 2

Electrical Distribution

Prep & Paint Walls

Set Panels

Terminate Feeders

Seal Floors

Final Paint Walls

Level 3

Electrical Distribution

Prep & Paint Walls

Set Panels

Terminate Feeders

Seal Floors

Final Paint Walls

Level 4

Electrical Distibution

Prep & Paint Walls

Set Panels

Terminate Feeders

Seal Floors

Final Paint Walls

INTERIOR FINISHES

Atrium

Install Cementitious Fireproofing

Frame Ceiling

Sheetrock Ceiling

Tape / Float / Texture

Prime Coat & Paint Ceiling

Install Interior Storefront

Install Wood Paneling

Install Level 1 Stair

Midwestern State University Health Science and Human Services Center Page 20 of 23 05-Mar-18 08:23 PM

Activity Name OriginalDuration

RemainingDuration

Start Finish

Paint Stair 5 5 13-Dec-18 08:00 AM 19-Dec-18 05:00 PM

Install Terrazzo 20 20 20-Dec-18 08:00 AM 21-Jan-19 05:00 PM

Level 1 49 49 17-Oct-18 08:00 AM 28-Dec-18 05:00 PM

South 39 39 17-Oct-18 08:00 AM 12-Dec-18 05:00 PM

Tape/Float Walls 10 10 17-Oct-18 08:00 AM 30-Oct-18 05:00 PM

Texture Walls 10 10 22-Oct-18 08:00 AM 02-Nov-18 05:00 PM

Prime & First Coat of Paint 10 10 25-Oct-18 08:00 AM 07-Nov-18 05:00 PM

Ceiling Grid 8 8 30-Oct-18 08:00 AM 08-Nov-18 05:00 PM

Lighting Installation 10 10 01-Nov-18 08:00 AM 14-Nov-18 05:00 PM

Mechanical Drops 5 5 01-Nov-18 08:00 AM 07-Nov-18 05:00 PM

Fire Sprinkler Drops 5 5 01-Nov-18 08:00 AM 07-Nov-18 05:00 PM

Specialty Devices in Ceiling 10 10 01-Nov-18 08:00 AM 14-Nov-18 05:00 PM

Install Door Frames 5 5 08-Nov-18 08:00 AM 14-Nov-18 05:00 PM

Install Millwork / Casework 5 5 08-Nov-18 08:00 AM 14-Nov-18 05:00 PM

Drop Ceiling Tiles 5 5 15-Nov-18 08:00 AM 21-Nov-18 05:00 PM

Install Doors & Hardware 5 5 26-Nov-18 08:00 AM 30-Nov-18 05:00 PM

Install Flooring 10 10 26-Nov-18 08:00 AM 07-Dec-18 05:00 PM

Final Paint 10 10 29-Nov-18 08:00 AM 12-Dec-18 05:00 PM

North 39 39 31-Oct-18 08:00 AM 28-Dec-18 05:00 PM

Tape/Float Walls 10 10 31-Oct-18 08:00 AM 13-Nov-18 05:00 PM

Texture Walls 10 10 05-Nov-18 08:00 AM 16-Nov-18 05:00 PM

Prime & First Coat of Paint 10 10 08-Nov-18 08:00 AM 21-Nov-18 05:00 PM

Ceiling Grid 8 8 13-Nov-18 08:00 AM 26-Nov-18 05:00 PM

Lighting Installation 10 10 15-Nov-18 08:00 AM 30-Nov-18 05:00 PM

Mechanical Drops 5 5 15-Nov-18 08:00 AM 21-Nov-18 05:00 PM

Fire Sprinkler Drops 5 5 15-Nov-18 08:00 AM 21-Nov-18 05:00 PM

Specialty Devices in Ceiling 10 10 15-Nov-18 08:00 AM 30-Nov-18 05:00 PM

Install Door Frames 5 5 26-Nov-18 08:00 AM 30-Nov-18 05:00 PM

Install Millwork / Casework 5 5 26-Nov-18 08:00 AM 30-Nov-18 05:00 PM

Drop Ceiling Tiles 5 5 03-Dec-18 08:00 AM 07-Dec-18 05:00 PM

Install Doors & Hardware 5 5 03-Dec-18 08:00 AM 07-Dec-18 05:00 PM

Install Flooring 10 10 10-Dec-18 08:00 AM 21-Dec-18 05:00 PM

Final Paint 10 10 13-Dec-18 08:00 AM 28-Dec-18 05:00 PM

Level 2 49 49 14-Nov-18 08:00 AM 28-Jan-19 05:00 PM

South 39 39 14-Nov-18 08:00 AM 14-Jan-19 05:00 PM

Tape/Float Walls 10 10 14-Nov-18 08:00 AM 29-Nov-18 05:00 PM

Texture Walls 10 10 19-Nov-18 08:00 AM 04-Dec-18 05:00 PM

Prime & First Coat of Paint 10 10 26-Nov-18 08:00 AM 07-Dec-18 05:00 PM

Ceiling Grid 8 8 29-Nov-18 08:00 AM 10-Dec-18 05:00 PM

Lighting Installation 10 10 03-Dec-18 08:00 AM 14-Dec-18 05:00 PM

Mechanical Drops 5 5 03-Dec-18 08:00 AM 07-Dec-18 05:00 PM

Fire Sprinkler Drops 5 5 03-Dec-18 08:00 AM 07-Dec-18 05:00 PM

Specialty Devices in Ceiling 10 10 03-Dec-18 08:00 AM 14-Dec-18 05:00 PM

Install Door Frames 5 5 10-Dec-18 08:00 AM 14-Dec-18 05:00 PM

Install Millwork / Casework 5 5 10-Dec-18 08:00 AM 14-Dec-18 05:00 PM

Drop Ceiling Tiles 5 5 17-Dec-18 08:00 AM 21-Dec-18 05:00 PM

Install Doors & Hardware 5 5 17-Dec-18 08:00 AM 21-Dec-18 05:00 PM

Install Flooring 10 10 26-Dec-18 08:00 AM 09-Jan-19 05:00 PM

Final Paint 10 10 31-Dec-18 08:00 AM 14-Jan-19 05:00 PM

North 39 39 30-Nov-18 08:00 AM 28-Jan-19 05:00 PM

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct

Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019

Paint Stair

Install Terrazzo

Level 1

South

Tape/Float Walls

Texture Walls

Prime & First Coat of Paint

Ceiling Grid

Lighting Installation

Mechanical Drops

Fire Sprinkler Drops

Specialty Devices in Ceiling

Install Door Frames

Install Millwork / Casework

Drop Ceiling Tiles

Install Doors & Hardware

Install Flooring

Final Paint

North

Tape/Float Walls

Texture Walls

Prime & First Coat of Paint

Ceiling Grid

Lighting Installation

Mechanical Drops

Fire Sprinkler Drops

Specialty Devices in Ceiling

Install Door Frames

Install Millwork / Casework

Drop Ceiling Tiles

Install Doors & Hardware

Install Flooring

Final Paint

Level 2

South

Tape/Float Walls

Texture Walls

Prime & First Coat of Paint

Ceiling Grid

Lighting Installation

Mechanical Drops

Fire Sprinkler Drops

Specialty Devices in Ceiling

Install Door Frames

Install Millwork / Casework

Drop Ceiling Tiles

Install Doors & Hardware

Install Flooring

Final Paint

North

Midwestern State University Health Science and Human Services Center Page 21 of 23 05-Mar-18 08:23 PM

Activity Name OriginalDuration

RemainingDuration

Start Finish

Tape/Float Walls 10 10 30-Nov-18 08:00 AM 13-Dec-18 05:00 PM

Texture Walls 10 10 05-Dec-18 08:00 AM 18-Dec-18 05:00 PM

Prime & First Coat of Paint 10 10 10-Dec-18 08:00 AM 21-Dec-18 05:00 PM

Ceiling Grid 8 8 13-Dec-18 08:00 AM 26-Dec-18 05:00 PM

Lighting Installation 10 10 17-Dec-18 08:00 AM 02-Jan-19 05:00 PM

Mechanical Drops 5 5 17-Dec-18 08:00 AM 21-Dec-18 05:00 PM

Fire Sprinkler Drops 5 5 17-Dec-18 08:00 AM 21-Dec-18 05:00 PM

Specialty Devices in Ceiling 10 10 17-Dec-18 08:00 AM 02-Jan-19 05:00 PM

Install Door Frames 5 5 26-Dec-18 08:00 AM 02-Jan-19 05:00 PM

Install Millwork / Casework 5 5 26-Dec-18 08:00 AM 02-Jan-19 05:00 PM

Drop Ceiling Tiles 10 10 03-Jan-19 08:00 AM 16-Jan-19 05:00 PM

Install Doors & Hardware 5 5 03-Jan-19 08:00 AM 09-Jan-19 05:00 PM

Install Flooring 10 10 10-Jan-19 08:00 AM 23-Jan-19 05:00 PM

Final Paint 10 10 15-Jan-19 08:00 AM 28-Jan-19 05:00 PM

Level 3 49 49 14-Dec-18 08:00 AM 26-Feb-19 05:00 PM

South 39 39 14-Dec-18 08:00 AM 11-Feb-19 05:00 PM

Tape/Float Walls 10 10 14-Dec-18 08:00 AM 31-Dec-18 05:00 PM

Texture Walls 10 10 19-Dec-18 08:00 AM 04-Jan-19 05:00 PM

Prime & First Coat of Paint 10 10 26-Dec-18 08:00 AM 09-Jan-19 05:00 PM

Ceiling Grid 8 8 31-Dec-18 08:00 AM 10-Jan-19 05:00 PM

Lighting Installation 10 10 03-Jan-19 08:00 AM 16-Jan-19 05:00 PM

Mechanical Drops 5 5 03-Jan-19 08:00 AM 09-Jan-19 05:00 PM

Fire Sprinkler Drops 5 5 03-Jan-19 08:00 AM 09-Jan-19 05:00 PM

Specialty Devices in Ceiling 10 10 03-Jan-19 08:00 AM 16-Jan-19 05:00 PM

Install Door Frames 5 5 10-Jan-19 08:00 AM 16-Jan-19 05:00 PM

Install Millwork / Casework 5 5 10-Jan-19 08:00 AM 16-Jan-19 05:00 PM

Drop Ceiling Tiles 10 10 17-Jan-19 08:00 AM 30-Jan-19 05:00 PM

Install Doors & Hardware 5 5 17-Jan-19 08:00 AM 23-Jan-19 05:00 PM

Install Flooring 10 10 24-Jan-19 08:00 AM 06-Feb-19 05:00 PM

Final Paint 10 10 29-Jan-19 08:00 AM 11-Feb-19 05:00 PM

North 39 39 02-Jan-19 08:00 AM 26-Feb-19 05:00 PM

Tape/Float Walls 10 10 02-Jan-19 08:00 AM 15-Jan-19 05:00 PM

Texture Walls 10 10 07-Jan-19 08:00 AM 18-Jan-19 05:00 PM

Prime & First Coat of Paint 10 10 10-Jan-19 08:00 AM 23-Jan-19 05:00 PM

Ceiling Grid 8 8 15-Jan-19 08:00 AM 24-Jan-19 05:00 PM

Lighting Installation 10 10 17-Jan-19 08:00 AM 30-Jan-19 05:00 PM

Mechanical Drops 5 5 17-Jan-19 08:00 AM 23-Jan-19 05:00 PM

Fire Sprinkler Drops 5 5 17-Jan-19 08:00 AM 23-Jan-19 05:00 PM

Specialty Devices in Ceiling 10 10 17-Jan-19 08:00 AM 30-Jan-19 05:00 PM

Install Door Frames 5 5 24-Jan-19 08:00 AM 30-Jan-19 05:00 PM

Install Millwork / Casework 5 5 24-Jan-19 08:00 AM 30-Jan-19 05:00 PM

Drop Ceiling Tiles 10 10 31-Jan-19 08:00 AM 13-Feb-19 05:00 PM

Install Doors & Hardware 5 5 31-Jan-19 08:00 AM 06-Feb-19 05:00 PM

Install Flooring 10 10 07-Feb-19 08:00 AM 21-Feb-19 05:00 PM

Final Paint 10 10 12-Feb-19 08:00 AM 26-Feb-19 05:00 PM

Level 4 49 49 16-Jan-19 08:00 AM 26-Mar-19 05:00 PM

South 39 39 16-Jan-19 08:00 AM 12-Mar-19 05:00 PM

Tape/Float Walls 10 10 16-Jan-19 08:00 AM 29-Jan-19 05:00 PM

Texture Walls 10 10 21-Jan-19 08:00 AM 01-Feb-19 05:00 PM

Prime & First Coat of Paint 10 10 24-Jan-19 08:00 AM 06-Feb-19 05:00 PM

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct

Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019

Tape/Float Walls

Texture Walls

Prime & First Coat of Paint

Ceiling Grid

Lighting Installation

Mechanical Drops

Fire Sprinkler Drops

Specialty Devices in Ceiling

Install Door Frames

Install Millwork / Casework

Drop Ceiling Tiles

Install Doors & Hardware

Install Flooring

Final Paint

Level 3

South

Tape/Float Walls

Texture Walls

Prime & First Coat of Paint

Ceiling Grid

Lighting Installation

Mechanical Drops

Fire Sprinkler Drops

Specialty Devices in Ceiling

Install Door Frames

Install Millwork / Casework

Drop Ceiling Tiles

Install Doors & Hardware

Install Flooring

Final Paint

North

Tape/Float Walls

Texture Walls

Prime & First Coat of Paint

Ceiling Grid

Lighting Installation

Mechanical Drops

Fire Sprinkler Drops

Specialty Devices in Ceiling

Install Door Frames

Install Millwork / Casework

Drop Ceiling Tiles

Install Doors & Hardware

Install Flooring

Final Paint

Level 4

South

Tape/Float Walls

Texture Walls

Prime & First Coat of Paint

Midwestern State University Health Science and Human Services Center Page 22 of 23 05-Mar-18 08:23 PM

Activity Name OriginalDuration

RemainingDuration

Start Finish

Ceiling Grid 8 8 29-Jan-19 08:00 AM 07-Feb-19 05:00 PM

Lighting Installation 10 10 31-Jan-19 08:00 AM 13-Feb-19 05:00 PM

Mechanical Drops 5 5 31-Jan-19 08:00 AM 06-Feb-19 05:00 PM

Fire Sprinkler Drops 5 5 31-Jan-19 08:00 AM 06-Feb-19 05:00 PM

Specialty Devices in Ceiling 10 10 31-Jan-19 08:00 AM 13-Feb-19 05:00 PM

Install Door Frames 5 5 07-Feb-19 08:00 AM 13-Feb-19 05:00 PM

Install Millwork / Casework 5 5 07-Feb-19 08:00 AM 13-Feb-19 05:00 PM

Drop Ceiling Tiles 10 10 14-Feb-19 08:00 AM 28-Feb-19 05:00 PM

Install Doors & Hardware 5 5 14-Feb-19 08:00 AM 21-Feb-19 05:00 PM

Install Flooring 10 10 22-Feb-19 08:00 AM 07-Mar-19 05:00 PM

Final Paint 10 10 27-Feb-19 08:00 AM 12-Mar-19 05:00 PM

North 39 39 30-Jan-19 08:00 AM 26-Mar-19 05:00 PM

Tape/Float Walls 10 10 30-Jan-19 08:00 AM 12-Feb-19 05:00 PM

Texture Walls 10 10 04-Feb-19 08:00 AM 15-Feb-19 05:00 PM

Prime & First Coat of Paint 10 10 07-Feb-19 08:00 AM 21-Feb-19 05:00 PM

Ceiling Grid 8 8 12-Feb-19 08:00 AM 22-Feb-19 05:00 PM

Lighting Installation 10 10 14-Feb-19 08:00 AM 28-Feb-19 05:00 PM

Mechanical Drops 5 5 14-Feb-19 08:00 AM 21-Feb-19 05:00 PM

Fire Sprinkler Drops 5 5 14-Feb-19 08:00 AM 21-Feb-19 05:00 PM

Specialty Devices in Ceiling 10 10 14-Feb-19 08:00 AM 28-Feb-19 05:00 PM

Install Door Frames 5 5 22-Feb-19 08:00 AM 28-Feb-19 05:00 PM

Install Millwork / Casework 5 5 22-Feb-19 08:00 AM 28-Feb-19 05:00 PM

Drop Ceiling Tiles 10 10 01-Mar-19 08:00 AM 14-Mar-19 05:00 PM

Install Doors & Hardware 5 5 01-Mar-19 08:00 AM 07-Mar-19 05:00 PM

Install Flooring 10 10 08-Mar-19 08:00 AM 21-Mar-19 05:00 PM

Final Paint 10 10 13-Mar-19 08:00 AM 26-Mar-19 05:00 PM

Penthouse 0 0

Stair 1 - NW 0 0

Stair 2 - SW 0 0

Stair 3 - S 0 0

Atrium Stair 0 0

START UP / COMMISSIONING 0 0

Systems Testing 0 0

Test & Balance 0 0

PUNCH LIST 202 202 30-Jul-18 08:00 AM 16-May-19 05:00 PM

Pre-punch 175 175 30-Jul-18 08:00 AM 09-Apr-19 05:00 PM

Pre - Punch List Level Roof 5 5 30-Jul-18 08:00 AM 03-Aug-18 05:00 PM

Pre - Punch List Level 1 10 10 31-Dec-18 08:00 AM 14-Jan-19 05:00 PM

Pre - Punch List Level 2 10 10 29-Jan-19 08:00 AM 11-Feb-19 05:00 PM

Pre - Punch List Level 3 10 10 27-Feb-19 08:00 AM 12-Mar-19 05:00 PM

Pre - Punch List Level 4 10 10 27-Mar-19 08:00 AM 09-Apr-19 05:00 PM

Substantial Completion 0 0 16-May-19 05:00 PM 16-May-19 05:00 PM

Final Substantial Completion Date 0 0 16-May-19 05:00 PM*

Final Punchlist 0 0

OWNER ACTIVITIES 0 0 14-Jun-19 05:00 PM 14-Jun-19 05:00 PM

Owner Move-in 0 0 14-Jun-19 05:00 PM 14-Jun-19 05:00 PM

Final Completion Date 0 0 14-Jun-19 05:00 PM

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct

Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019Qtr 4, 2019

Ceiling Grid

Lighting Installation

Mechanical Drops

Fire Sprinkler Drops

Specialty Devices in Ceiling

Install Door Frames

Install Millwork / Casework

Drop Ceiling Tiles

Install Doors & Hardware

Install Flooring

Final Paint

North

Tape/Float Walls

Texture Walls

Prime & First Coat of Paint

Ceiling Grid

Lighting Installation

Mechanical Drops

Fire Sprinkler Drops

Specialty Devices in Ceiling

Install Door Frames

Install Millwork / Casework

Drop Ceiling Tiles

Install Doors & Hardware

Install Flooring

Final Paint

PUNCH LIST

Pre-punch

Pre - Punch List Level Roof

Pre - Punch List Level 1

Pre - Punch List Level 2

Pre - Punch List Level 3

Pre - Punch List Level 4

Substantial Completion

Final Substantial Completion Date

OWNER ACTIVITIES

Owner Move-in

Final Completion Date

Midwestern State University Health Science and Human Services Center Page 23 of 23 05-Mar-18 08:23 PM

UP

PLPL

??

?

PL

30'-0

"

40'-0"

45'-0"

PL PL PL

PL

PL

PL

PLPL

PLPLPL

PL

PL

PL

PLPL

PL

BL BL

T3.0

51

1T4

.03

3T4

.03

4T4

.03

12

34

56

12

34

56

A B C D E

A B C D E

ISSU

E DA

TE:

SHEE

T NO

.

PROJ

ECT

NO.:

PRIN

CIPA

L:

PROJ

. MGR

.:

PROJ

. ARC

H.:

DRAW

N BY

:

Q.C.

:

1612

.00

R. S

COTT

, AIA

G. C

ONAW

AY, A

IA

V. L

AZAR

, AIA

© S

EPTE

MBE

R 1

, 201

7

MIDWESTERN STATE UNIVERSITYLOUIS J RODRIGUEZ DR

WITCHITA FALLS, TX 76308

| |

|P

: (51

2) 4

78-6

001

F

: (51

2) 4

78-2

771

100%

CONS

TRUC

TION

DOCU

MEN

TS

This drawing and design is the intellectual property of DataCom Design Group. and its clients.No entity/person shall make copies and/or modifications to this file without written permission by DataComDesign Group. This drawing shall not be used for purposes other than as intended for this project. © 2017

© 2

017

Dat

aCom

Des

ign

Gro

up.

1" =

30'

-0"

1SI

TE P

LAN

- COM

MUN

ICAT

IONS

SIT

E P

LAN

-C

OM

MU

NIC

ATI

ON

S

NO

.D

ATE

REF

. /

DES

CR

IPTI

ON

19/2

7/17

ADDE

NDUM

#2