Paving Assessment Project ADDENDUM # 02 March 18, 2016 Page 1 of 2 ADDENDUM TO RFP DOCUMENTS ADDENDUM #02 Project: # 16-010 Solano Community College District Paving Assessment Project Date: March 15, 2016 The following clarifications are provided based on questions received or changes in District requirements and must be added/considered when completing your submittal: Acknowledgement of receipt of this ADDENDUM is required in the proposal’s cover letter of introduction. Please clearly note the addendum date and number. ITEM: ITEM NO. 1 – ANSWERS TO SUBMITTED QUESTIONS QUESTION – It was mentioned in the meeting that a BASEMAP TPO via AutoCAD/PDF would be provided to the attendees. ANSWER – A pdf basemap of the Fairfield Campus has been attached to this Addendum. A CAD file of the basemap will be emailed to all attendees of the mandatory pre-bid meeting. QUESTION – Our firm respectfully submits the following questions to the Solano Community College District regarding its SOQP for the Pavement Assessment Project: 1. Does the cover letter count toward the page 10 page limit? 2. Can we include resumes as an appendix? 3. Please confirm of the Example Reports should be enclosed as 5 separate bound documents, not part of the 10 page limit. 4. What is the District’s budget for this project? 5. Do the proposed fee schedule and the standard rate sheet count toward the 10 page limit? 6. Would the District consider the following proposed modifications to the Indemnifications portion of the Agreement for Professional Services?

Upload: others

Post on 24-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ADDENDUM TO RFP DOCUMENTS REVISEDPaving... · 2016. 8. 8. · ADDENDUM # 02 March 18, 2016 Page 1 of 2 ADDENDUM TO RFP DOCUMENTS. ADDENDUM #02 Project: # 16 -010 Solano Community

Paving Assessment Project ADDENDUM # 02

March 18, 2016 Page 1 of 2

ADDENDUM TO RFP DOCUMENTS

ADDENDUM #02

Project: # 16-010 Solano Community College District Paving Assessment Project

Date: March 15, 2016

The following clarifications are provided based on questions received or changes in District requirements and must be added/considered when completing your submittal: Acknowledgement of receipt of this ADDENDUM is required in the proposal’s cover letter of introduction. Please clearly note the addendum date and number.

ITEM:

ITEM NO. 1 – ANSWERS TO SUBMITTED QUESTIONS

QUESTION – It was mentioned in the meeting that a BASEMAP TPO via AutoCAD/PDF would be provided to the attendees. ANSWER – A pdf basemap of the Fairfield Campus has been attached to this Addendum. A CAD file of the basemap will be emailed to all attendees of the mandatory pre-bid meeting.

QUESTION – Our firm respectfully submits the following questions to the Solano Community College District regarding its SOQP for the Pavement Assessment Project:

1. Does the cover letter count toward the page 10 page limit? 2. Can we include resumes as an appendix? 3. Please confirm of the Example Reports should be enclosed as 5 separate

bound documents, not part of the 10 page limit. 4. What is the District’s budget for this project? 5. Do the proposed fee schedule and the standard rate sheet count toward the

10 page limit? 6. Would the District consider the following proposed modifications to the

Indemnifications portion of the Agreement for Professional Services?

Page 2: ADDENDUM TO RFP DOCUMENTS REVISEDPaving... · 2016. 8. 8. · ADDENDUM # 02 March 18, 2016 Page 1 of 2 ADDENDUM TO RFP DOCUMENTS. ADDENDUM #02 Project: # 16 -010 Solano Community

Paving Assessment Project ADDENDUM # 02

March 18, 2016 Page 2 of 2

a. 13. Indemnification. To the furthest extent permitted by California law, Contractor shall reimburse the apportioned costs to defend, indemnify, and hold harmless the District, its Governing Board, agents, representatives, officers, consultants, employees, trustees, and volunteers (the “indemnified parties”) from any and all pure economic claims to the extent caused by arising out of, pertaining to, or relating to the negligence, recklessness, or willful misconduct of the Contractor. The District shall have the right to accept or reject any legal representation that Contractor proposes to defend the indemnified parties. As to Claims for professional liability only, Consultant’s obligation to defend Indemnitees (as set forth above) is limited to the extent to which its professional liability insurance policy will provide such defense costs.

ANSWER – See below for corresponding answers to numbered questions above: 1. Cover Letter will not count against the 10 page double sided page limit. 2. Please include resumes in the ‘Staff Qualifications’ section of your submittal. 3. Confirmed. Please provide Example Reports as separately bound documents.

Example Reports will not count against the 10 page double sided limit. 4. A construction budget for this project has not been established. 5. The proposed fee schedule and the standard rate sheet will not count against

the 10 page double sided page limit. 6. The District will not consider modifications to the Agreement for Professional

Services. All respondents must include with their submittal a statement that the terms of the example Agreement for Professional Services Agreement are acceptable. Please note that any exceptions or changes requested to the Agreement may constitute grounds to reject the proposal.

Page 3: ADDENDUM TO RFP DOCUMENTS REVISEDPaving... · 2016. 8. 8. · ADDENDUM # 02 March 18, 2016 Page 1 of 2 ADDENDUM TO RFP DOCUMENTS. ADDENDUM #02 Project: # 16 -010 Solano Community

0

' '

0

..

\

-

.- 0

\

- .

-

.-

- -- .-

·f

o I

-

.-

a

Legend .g >-

---- / f I I I I 1

Boundary Line (Record)

Building Overhang

" "'

Curb & Gutter

Dirt Road

[dge of Pavement

Fenceline

Guard Rail Masonry Wall

.- -.---

(-,;- .-

.- r-·- ·- -· .-

z 0

ii: "u' "w'

" 0

,free / Shrub Dripline

Retainin g Wall Aerial Control Point

.. .-

.-

-

.- .- -0

,-• -- .-

arv

ad

ctv D

Air Release Valve

Area Drain

Cable N Utility Box

Catch Basin

C/eanout

-.

-( --- -

·- - \ -

.- -

<1 <1 <1<1 <1<1<1

df

LJ

liiil

nebx

Drinking Fountain

Drain Inlet

[/ectrical Utility Box

Electrical Panel

·- ---

·- .- .-

.-

.. ·- .. .- .- 0.- - .-

,•

- " f

.- .- •

[/ectrolier

Fire Hydrant

- .. ·- .. ,•

- --- .- - f

Fire Departmen t Connection Utility

Gas Meter

Gas Valve

.- :\.- .- .- .- .-

- - .-

icv D

Irrigation Control Valve

Parking Pay Station

Sanitary Sewer C/eanout

·- '

·- .- .- .-

·- ·- ·- --- ·-

·- .- .- .- .. .-

-· .-

0 w

l ,.. > ® Sanitary Sewer Manhole

Sign

.- .- - ..

.- - .-

"..'

0*sdca Site Light

Storm Drain C/eanout ·- .- .- . .- -. .- .-

@

s/b D

tbx D

o--js(

tsb n

ubx D

Storm Drain Manhole

Street Light Utility Box

Telephone Utility Box

Traffic Signal

Traffic Signal Utility Box

Utility Box - Type Unknown

Utility Manhole - Type Unknown

Utility Pole

Utility Vault - Type Unknown

0

0 0 -0

.- .-

.- -· -1---::- 01-·

--l .- -... _J·-

-.l iii-·-

.-. -

.-

·-

·- ·- .-

·- --- -

.- .-

.- .-

.-

.- ·- .- '\

·- '

.- .- .-

D wm Water Meter .- .- .- .- Water Valve

- .-

- •,

.- - ·- .- - 0·- .-

.-·- .- ·-

·- .. .- .- .- .. .. .- .- -· .- .- ·- .. .- .- .- .- .- \ .-

.- .-

.- ·- ,• .- ·-

.- .- .- .- .-

,• - .-

.- ·- .- ·-

.- .. .- .-

-.--- - r - ·- .- ·-

{., .- l

c..c/ -· ·- / ..;·:-: '

,• .- -

.- .-

Q

00

.- .-

.-

,•

.- ..

.- .-

.- .- .. .- .-

,... . .. - ( \

.- (_)

::r:: Q_

.- .-

Generaf Notes: represent surface

1 All features show ere compiled from an c.onditions of the pro1ec al rf. Id surveys and field aerial urve , supp·1leomf e2n0ta12.ieNo attempt has been

inspections i n Ap_n the extent or existence of munaddeergrtoounddeteurtn1:/i.tr1 ees or other features not surface visible.

2 Boundary lines show_n hereond are based uponare

(..'.) a Q_

2

< :5 a (/)

, t ( orted in g roun distances) and No

record do a rep f t field boundary survey. not t he result of comp e I ble at the time of survey title report was mad_e ava1 not represent current therefore boundary /1 nest m any are not show n or configurations. Easemen s, I , referenced hereon.

a < '<::(

a--1

J. 2) This plot is t d at 150 scale for the gener esheet The model was (/)

GRAPHIC SCALE 75 150

600

purpose of fitting on on d b.ols text and contours ·1 d t 40 scale an sym ,

fre1t ea O scale accuracy standard.

Datum Note: f th's topographic survey is

DATE

SCALE

DRAWN

April 20, 2012

1 " = 150'

150 -- I -.;}_llllllllll I - -'°1 ° 1111111111111111 The horizontal datum or Sytem, Zone 2 (NAOBJ,

the California Coordinate 2007.0). c. Owens

CHECKED

( IN FEET ) 1 inch = 150 ft.

epoch

The vertical datum is based on NAVO 88.

JOB NO. 512014. 1

·-

-

t _

o_

·- l

J

.-

,•

Page 4: ADDENDUM TO RFP DOCUMENTS REVISEDPaving... · 2016. 8. 8. · ADDENDUM # 02 March 18, 2016 Page 1 of 2 ADDENDUM TO RFP DOCUMENTS. ADDENDUM #02 Project: # 16 -010 Solano Community

SHEET NO.

1 or