Paving Assessment Project ADDENDUM # 02
March 18, 2016 Page 1 of 2
ADDENDUM TO RFP DOCUMENTS
ADDENDUM #02
Project: # 16-010 Solano Community College District Paving Assessment Project
Date: March 15, 2016
The following clarifications are provided based on questions received or changes in District requirements and must be added/considered when completing your submittal: Acknowledgement of receipt of this ADDENDUM is required in the proposal’s cover letter of introduction. Please clearly note the addendum date and number.
ITEM:
ITEM NO. 1 – ANSWERS TO SUBMITTED QUESTIONS
QUESTION – It was mentioned in the meeting that a BASEMAP TPO via AutoCAD/PDF would be provided to the attendees. ANSWER – A pdf basemap of the Fairfield Campus has been attached to this Addendum. A CAD file of the basemap will be emailed to all attendees of the mandatory pre-bid meeting.
QUESTION – Our firm respectfully submits the following questions to the Solano Community College District regarding its SOQP for the Pavement Assessment Project:
1. Does the cover letter count toward the page 10 page limit? 2. Can we include resumes as an appendix? 3. Please confirm of the Example Reports should be enclosed as 5 separate
bound documents, not part of the 10 page limit. 4. What is the District’s budget for this project? 5. Do the proposed fee schedule and the standard rate sheet count toward the
10 page limit? 6. Would the District consider the following proposed modifications to the
Indemnifications portion of the Agreement for Professional Services?
Paving Assessment Project ADDENDUM # 02
March 18, 2016 Page 2 of 2
a. 13. Indemnification. To the furthest extent permitted by California law, Contractor shall reimburse the apportioned costs to defend, indemnify, and hold harmless the District, its Governing Board, agents, representatives, officers, consultants, employees, trustees, and volunteers (the “indemnified parties”) from any and all pure economic claims to the extent caused by arising out of, pertaining to, or relating to the negligence, recklessness, or willful misconduct of the Contractor. The District shall have the right to accept or reject any legal representation that Contractor proposes to defend the indemnified parties. As to Claims for professional liability only, Consultant’s obligation to defend Indemnitees (as set forth above) is limited to the extent to which its professional liability insurance policy will provide such defense costs.
ANSWER – See below for corresponding answers to numbered questions above: 1. Cover Letter will not count against the 10 page double sided page limit. 2. Please include resumes in the ‘Staff Qualifications’ section of your submittal. 3. Confirmed. Please provide Example Reports as separately bound documents.
Example Reports will not count against the 10 page double sided limit. 4. A construction budget for this project has not been established. 5. The proposed fee schedule and the standard rate sheet will not count against
the 10 page double sided page limit. 6. The District will not consider modifications to the Agreement for Professional
Services. All respondents must include with their submittal a statement that the terms of the example Agreement for Professional Services Agreement are acceptable. Please note that any exceptions or changes requested to the Agreement may constitute grounds to reject the proposal.
0
' '
0
..
\
-
.- 0
\
- .
-
.-
- -- .-
·f
o I
-
.-
a
Legend .g >-
---- / f I I I I 1
Boundary Line (Record)
Building Overhang
" "'
Curb & Gutter
Dirt Road
[dge of Pavement
Fenceline
Guard Rail Masonry Wall
.- -.---
(-,;- .-
.- r-·- ·- -· .-
z 0
ii: "u' "w'
" 0
,free / Shrub Dripline
Retainin g Wall Aerial Control Point
.. .-
.-
-
.- .- -0
,-• -- .-
arv
ad
ctv D
Air Release Valve
Area Drain
Cable N Utility Box
Catch Basin
C/eanout
-.
-( --- -
·- - \ -
.- -
<1 <1 <1<1 <1<1<1
df
LJ
liiil
nebx
Drinking Fountain
Drain Inlet
[/ectrical Utility Box
Electrical Panel
·- ---
·- .- .-
.-
.. ·- .. .- .- 0.- - .-
,•
- " f
.- .- •
[/ectrolier
Fire Hydrant
- .. ·- .. ,•
- --- .- - f
Fire Departmen t Connection Utility
Gas Meter
Gas Valve
.- :\.- .- .- .- .-
- - .-
icv D
Irrigation Control Valve
Parking Pay Station
Sanitary Sewer C/eanout
·- '
·- .- .- .-
·- ·- ·- --- ·-
·- .- .- .- .. .-
-· .-
0 w
l ,.. > ® Sanitary Sewer Manhole
Sign
.- .- - ..
.- - .-
"..'
0*sdca Site Light
Storm Drain C/eanout ·- .- .- . .- -. .- .-
@
s/b D
tbx D
o--js(
tsb n
ubx D
Storm Drain Manhole
Street Light Utility Box
Telephone Utility Box
Traffic Signal
Traffic Signal Utility Box
Utility Box - Type Unknown
Utility Manhole - Type Unknown
Utility Pole
Utility Vault - Type Unknown
0
0 0 -0
.- .-
.- -· -1---::- 01-·
--l .- -... _J·-
-.l iii-·-
.-. -
.-
·-
·- ·- .-
·- --- -
.- .-
.- .-
.-
.- ·- .- '\
·- '
.- .- .-
D wm Water Meter .- .- .- .- Water Valve
- .-
- •,
.- - ·- .- - 0·- .-
.-·- .- ·-
·- .. .- .- .- .. .. .- .- -· .- .- ·- .. .- .- .- .- .- \ .-
.- .-
.- ·- ,• .- ·-
.- .- .- .- .-
,• - .-
.- ·- .- ·-
.- .. .- .-
-.--- - r - ·- .- ·-
{., .- l
c..c/ -· ·- / ..;·:-: '
,• .- -
.- .-
Q
00
.- .-
.-
,•
.- ..
.- .-
.- .- .. .- .-
,... . .. - ( \
.- (_)
::r:: Q_
.- .-
Generaf Notes: represent surface
1 All features show ere compiled from an c.onditions of the pro1ec al rf. Id surveys and field aerial urve , supp·1leomf e2n0ta12.ieNo attempt has been
inspections i n Ap_n the extent or existence of munaddeergrtoounddeteurtn1:/i.tr1 ees or other features not surface visible.
2 Boundary lines show_n hereond are based uponare
(..'.) a Q_
2
< :5 a (/)
, t ( orted in g roun distances) and No
record do a rep f t field boundary survey. not t he result of comp e I ble at the time of survey title report was mad_e ava1 not represent current therefore boundary /1 nest m any are not show n or configurations. Easemen s, I , referenced hereon.
a < '<::(
a--1
J. 2) This plot is t d at 150 scale for the gener esheet The model was (/)
GRAPHIC SCALE 75 150
600
purpose of fitting on on d b.ols text and contours ·1 d t 40 scale an sym ,
fre1t ea O scale accuracy standard.
Datum Note: f th's topographic survey is
DATE
SCALE
DRAWN
April 20, 2012
1 " = 150'
150 -- I -.;}_llllllllll I - -'°1 ° 1111111111111111 The horizontal datum or Sytem, Zone 2 (NAOBJ,
the California Coordinate 2007.0). c. Owens
CHECKED
( IN FEET ) 1 inch = 150 ft.
epoch
The vertical datum is based on NAVO 88.
JOB NO. 512014. 1
·-
-
t _
o_
·- l
J
.-
,•
SHEET NO.
1 or