Additional Agenda for 27th PSC meeting
A.2 Analysis of Tripping since last PSC
The following tripping will be discussed in detail.
S.No. Outage Event Category as per CEA Grid Standards
Date Time (in Hrs.)
1 17.05.2014 21:31 hrs Multiple element tripping at 400kV Muradnagar Station due to snapping of jumper and subsequent delayed clearance of fault.
GD‐1
2 18.05.2014 10:13hrs Multiple element tripping at of 400/220kV ICTs at Moradabad Station reportedly on overload.
GD‐1
3 22.05.2014 09:36hrs Multiple element tripping at 400kV Chamera‐II reportedly due to 400kV Kishenpur‐Chamera‐II line tripped on fault along with Unit ‐2 at Chamera‐II.
GD‐1
4 23.05.2014 15:48hrs Multiple element tripping of 400/220kV ICTs at Lucknow(UP) Station reportedly due to overloading along with tripping of 220kV Lucknow(PG)‐Chinhat line.
GD‐1
5 23.05.2014 16:18hrs Multiple element tripping at 400kV Sonepat(PG) reportedly due to snapping of Y‐phase conducter of 220kV Sonepat‐ Mohana ckt‐1 and delayed clearance of fault.
GD‐1
6 29.05.2014 13:19hrs Multiple element tripping at 400kV Parichha TPS reportedly due to non‐clearance of fault from Paricha end. Bus Bar protection was out of service at the station.
GD‐1
7 05.06.2014 00:03hrs Multiple element tripping at 400kV Khedar(Har) reportedly due to bursting of B‐ph CT of Bus coupler towards Main Bus‐1 & subsequent Bus Bar Protection operation for both Buses.
GD‐1
8 05.06.2014 01:03hrs Multiple element tripping at 400kV Azamgarh reportedly due to damage of R‐phase Inter connecting CT of Gorakhpur line. The station has Ring Bus scheme.
GD‐1
9 05.06.2014 13:10hrs Multiple element tripping at 400kV Chhabra TPS (Raj) reportedly due to tripping of 400kV Chhabra‐Bhilwara and subsequent Over voltage resulted from non‐opening of CB from Bhilwara end.
GD‐1
10 05.06.2014 23:56hrs Multiple element tripping at 400kV Agra(UP) reportedly due to blast in R‐phase CT of 220kV side of 400/220kV 315MVA ICT‐I. Bus bar protection was not available at the station.
GD‐1
11 06.06.2014 11:50hrs Multiple element tripping at 400kV Moradabad (UP) Station reportedly due to Y‐phase to ground fault in 220 kV Moradabad‐CB Ganj line. Distance protection &Backup protection did not operate .Bus bar protection is installed but not commissioned.
GD‐1
12 07.06.2014 00:11hrs Multiple element tripping at 400kV Azamgarh reportedly due to damage of B‐phase main CT of Sultanpur line. The station has Ring Bus scheme.
GD‐1
13 07.06.2014 15:37hrs Multiple element tripping at 400kV Daultabad (HVPNL) reportedly due to overloading.
GD‐1
14 08.06.2014 16:46hrs Multiple element tripping of Unit‐1&3 at 400kV Chamera‐II(HEP) reportedly due to damage of optical fiber cable.
GD‐1
15 09.06.2014 20:36hrs Multiple element tripping at 400kV Agra(UP) reportedly due to failure of R‐phase CT of 220kV side of 400/220kV 315MVA ICT‐2. Bus bar protection was not available at 220kV side of the station.
GD‐1
16 11.06.2014 14:41hrs Multiple element tripping at 400kV Agra(UP) reportedly due to flashover in the B‐phase bushing of 400kV side of 400/220kV 500MVA ICT . At the same time 400/220kV 315MVA ICT‐1 & 2, tripped in cascading on overload.
GD‐1
17 11.06.2014 16:52hrs Multiple element tripping at 400kV Karcham Wangtoo reportedly due to melting of Y‐phase Isolator of 400kV Abdullapur‐Karcham line.
GD‐1
18 12.06.2014 14:25hrs Multiple element tripping at 400kV Gurgaon GIS reportedly due to Y‐phase to earth fault.
GD‐1
19 16.06.2014 12:22hrs Multiple element tripping at 400kV Uri‐1(NHPC) reportedly due to R‐phase to ground fault and subsequent LBB protection operation.
GD‐1
20 19.06.2014 10:42hrs Multiple element tripping at 400kV Parichha TPS reportedly due to snapping of Y & B phase jumper of CT for 132 kV Mauranipur feeder with non‐clearance of fault. Bus bar protection was out of service.
GD‐1
21 22.06.2014 13:36hrs Multiple element tripping at 400kV Tehri HEP. GD‐1
22 28.06.2014 19:23hrs Multiple element tripping at 400kV Makhu(PSEB) reportedly due to R‐phase to earth fault in 400kV Nakodar‐Makhu and mal‐operation of Bus bar protection for Bus‐2.
GD‐1
23 03.07.2014 22:08hrs Multiple element tripping at 400kV Koteshwar (THDC)
GD‐1
24 16.07.2014 11:22hrs Multiple element tripping at 400kV Dulhasti HEP (NHPC) reportedly due to false DT signal sent.
GD‐1
25 25.07.2014 11:53hrs Multiple element tripping at 400kV Auraiya GPS(NTPC) reportedly due to L‐G fault and subsequent Bus Bar protection operation.
GD‐1
26 27.07.2014 18:35hrs Multiple element tripping at 400kV Bassi(PG) reportedly on L‐G fault and Over voltage.
GD‐1
Concerned utilities are requested to submit the detailed report and deliberate the same in PSC
AA.1 Tripping since last PSC
NRLDC has submitted the list of tripping since last PSC meeting. The list containing all the events except those given in A.2 is enclosed as Annex-A.
All utilities are requested to analyse these events in details and submit a copy of the report to NRLDC with a copy to NRPC
AA.2 Fresh Nominations to Operation Coordination sub-Committee (OCC)
Nominations for PSC were received long back and since then many changes would have taken place in organizational structure of member utilities. Constituents are therefore requested to submit fresh nominations to the Protection Sub-Committee. As per the Northern Regional Power Committee (Conduct of Business) Rules, 2006 (Sl no. 19.2)- “ Protection Sub-Committee shall be represented by constituent members of NRPC. Other than member s of NRPC constituents, there shall be one representative each of DISCOM, IPPs less than 1000 MW and Electricity Traders in the PC. The nominated representative shall be at the level of Chief Engineers or equivalent level and concerns with power system protection / testing in the region.”
All the constituents are requested to submit nominations by 31.08.2014.
AA.3 Mock Testing of SPS meant for contingency of Mundra-Mahendergarh HVDC
Mock Testing of SPS for Mundra-Mahendergarh HVDC was carried out on 08.07.2014 wherein certain deficiencies were observed. A detailed report of the Mock test is enclosed as Annex- B.
It can be seen from the Annex-B that (i) a number of feeders in Haryana & Rajasthan are not radial (ii) number of counters increased are either more or less than envisaged for certain feeders in all States except in Haryana and (iii) the load relief that would have been available if SPS had operated on the day of testing was much lesser than envisaged in Punjab, Rajasthan and UP (iv) The scheme has not operated at Bamnauli.
In 102nd OCC meeting held on 20.08.2014 it was decided that DTL would check the system at their end. If no problem is detected then scheme for this particular sub-station would again be tested.
AA.4 Mock testing of SPS for Interruption of import by NR at 765 kV Agra (from WR), was done on 03rd April, 2014.
Mock testing of SPS for Interruption of import by NR at 765 kV Agra (from WR), was done on 03rd April, 2014. Based on the report received from the concerned utilities it came it was found that scheme is not functional at 09 out of 14 sub-stations. In a separate meeting taken by MS, NRPC on 21st July, 2014 it was decided that POWERGRID would rectify the deficiencies and would report about the functionality of the scheme within a week. As per the information submitted by POWERGRID VIDE LETTER DATED 21.08.2014, the scheme has been made functional in 08 sub-stations namely Mainpuri, Nara, Merta, Mohali Jamsher and Narwana. In the same letter, POWERGRID informed due to non-
availability of radial feeder at 220 kV Kota sub-station of RVPNL, the scheme has not been connected. Further in 102nd OCC meeting held on 20.08.2014, RVPNL informed that the feeders OCC earmarked for the SPS is normally kept radial and scheme can be wired up to the designated feeders POWERGRID may update the status
AA.5 Sub. Group discussion to decide the protection related issues of Bamnauli – Jhatikara lines.
It was decided in the 24th NRPC Protection Sub. Committee Meeting to constitute a group to look into the protection related issues of Bamnauli – Jhatikara Line consequent upon conversion of portion of overhead line to underground cable by PPCL. The report of group is enclosed as Annexure-C.
Members may deliberate
Annex-A
S.No. Outage Event Category as per CEA Grid Standards
Date Time (in Hrs.)
1 10.05.2014 14:40 hrs Multiple element tripping from 220kV Moga(PSEB), Lehra Mohabbat TPS reportedly due to Bus bar protection operation.
GD‐1
2 12.05.2014 17.22 hrs Multiple element tripping at 220kV Auraiya due to 3‐ph fault and GT(Generator Transformer) HV (High Voltage) side earth fault.
GD‐1
3 13.05.2014 05:01hrs Multiple element tripping at 400kV Dhanoda(Haryana) reportedly due to overvoltage protection operated for 400kV Dhanoda‐Jhajjar D/C.
GI‐2
4 13.05.2014 20:06hrs Multiple element tripping at 400kV Moga (PG) due to multiple phase to earth faults.
GI‐2
5 14.05.2014 02:01hrs Multiple element tripping at 400kV Bassi Station reportedly due to overvoltage.
GI‐2
6 22.05.2014 10:05hrs Multiple element tripping at of 400/220kV ICTs at Moradabad Station reportedly on overload.
GD‐1
7 23.05.2014 11:32hrs Multiple element tripping of 220kV Unchahar‐RaiBareilly(PG) ckts reportedly due to phase to earth fault and LBB protection operation.
GI‐1
8 23.05.2014 16:06hrs Multiple element tripping at 220kV Rai‐Bareilly(PG) reportedly on phase to earth fault and overcurrent.
GD‐1
9 24.05.2014 19:30hrs Multiple element tripping at 220kV Kushkhera reportedly due to blasting of Y‐phase LA of 220kV Bhiwadi‐Kushkhera ckt‐1.
GD‐1
10 25.05.2014 19:11hrs Multiple element tripping at 400kV Ballabhgarh reportedly due to blasting of Y‐phase LA of 400kV Ballabgarh‐Mainpuri ckt‐2 along with mal‐operation of Bus bar protection.
GI‐2
11 29.05.2014 11:56hrs Multiple element tripping of all three ckts of 220kV Unchahar‐RaiBareilly(PG) reportedly due to phase to earth fault.
GI‐1
12 31.05.2014 14:11hrs Multiple element tripping at 220kV section of 400kV Mandola reportedly due to phase to earth fault and mal‐operation of Protection relay.
GD‐1
13 31.05.2014 17:35hrs Multiple element tripping of 400kV Mainpuri‐Parichha D/C reportedly due to collapse of towers.
GI‐2
14 01.06.2014 19:53hrs Multiple element tripping at 765kV Bhiwani(PG) reportedly due to Phase to earth fault.
GI‐2
15 01.06.2014 21:47hrs Complete Blackout at 220kV Samaypur(BBMB) Station reportedly due to delayed clearance of fault resulting in Bus Bar protection operation.
GD‐1
16 03.06.2014 14:25hrs Multiple element tripping of 220kV Unchahar‐Raibareilly ckt‐2&3.
GI‐1
17 05.06.2014 22:49 hrs Multiple element tripping of 220kV Bamnoli‐Dial ckt2 along with other causing voltage dip in nearby nodes.
GD‐1
18 06.06.2014 13:25 hrs Multiple element tripping at 400kV Singrauli TPS.
GI‐2
19 06.06.2014 17:06hrs Multiple element tripping at 400kV Sikar(PG) reportedly of 400kV Agra‐Sikar D/C on B‐phase to earth fault and 400kV Sikar‐Neemrana D/C on overvoltage.
GI‐2
20 07.06.2014 18:17hrs Multiple element tripping at 220kV Bhatinda & Lehra Mohabbat TPS(PSEB) reportedly due to fault in 220kV Bay‐2 of 100MVA ICT at Bhatinda TPS.
GD‐1
21 10.06.2014 13:14hrs Multiple element tripping at 220kV Panipat (HVPNL), reportedly due to blast of Y‐phase CT of 220/132kV ICT at Safidon S/S.
GD‐1
22 12.06.2014 17:51 hrs Multiple element tripping at 765kV Unnao(UP) reportedly due to R phase to earth fault and Overcurrent protection.
GI‐2
23 13.06.2014 17:45hrs Multiple element tripping of 400/220kV, 315MVA ICT‐1&5 at 400kV Mandola reportedly due to operation of PRD.
GI‐2
24 13.06.2014 18:19hrs Multiple element tripping of 400kV Kaithal‐Patiala D/C ckt reportedly due to tower collapse.
GI‐2
25 13.06.2014 19:32hrs Multiple element tripping at 400kV Shahjhapur (PG) reportedly on transient fault.
GI‐2
26 13.06.2014 20:44hrs Multiple element tripping of 400kV Muradnagar‐Panki on Y‐phase to earth fault & 400kV Unnao‐Panki on over reach setting of relay at Panki end.
GI‐2
27 21.06.2014 12:10hrs Multiple element tripping of Unit‐1,2&4 at 220kV Anta GPS.
GD‐1
28 21.06.2014 16:31hrs Multiple element tripping of 400kV Fatehpur‐Mainpuri D/C reportedly on phase to phase fault.
GI‐2
28 24.06.2014 09:34hrs Multiple element tripping in Rajasthan & wind generation Loss reportedly due to clearance of fault in zone‐2 in 220kV Akal‐Bhu line (Jumper at Bhu end snapped). LVRT setting problem of Wind turbine
GD‐1
30 29.06.2014 01:06hrs Multiple element tripping of 400kV Bhiwani‐Jind D/C reportedly due to tower collapse and fell on 400kV Bhiwadi‐Moga D/C, resulted in tripping of 400kV Bhiwadi‐Moga D/C also.
GI‐2
31 02.07.2014 14:03hrs Tower of 220kV Wazirabad‐Kashmiri gate D/C collapsed and fell on 220kV Wazirabad‐Geeta Colony D/C resulted into tripping of all 4 ckt's
GD‐1
32 05.07.2014 16:30hrs Tripping of 400kV Jhajjar‐Mundka D/C GI‐2
33 11.07.2014 23:24hrs Multiple element tripping at 220kV Khetri(Raj) reportedly due to Bus bar operation.
GD‐1
34 12.07.2014 05:25hrs Multiple element tripping at 220kV Moga (PSEB) reportedly due to failure of CT of Y‐ph at Moga (PSEB).
GD‐1
35 13.07.2014 18:32hrs Multiple element tripping at 220kV Nara (UP) reportedly due to transient fault.
GD‐1
36 20.07.2014 21:35hrs Multiple element tripping at 400kV Dhanonda (HVPNL) reportedly due to damage of isolator of 400kV Mohindergarh‐Dhanonda ckt‐1.
GI‐2
37 21.07.2014 17:36hrs Multiple element tripping of 220kV AD Hydro & 132kV Malana‐II reportedly due to single line to ground fault in 220kV AD Hydro‐Chhaur ckt.
GD‐1
38 21.07.2014 15:06hrs Multiple element tripping at 220kV Pampore(J&K) reportedly due to R‐phase to ground fault in 220kV Mirbazar‐Pampore ckt‐2.
GD‐1
39 27.07.2014 17:17hrs Multiple element tripping at 220kV Gorakhpur (UP) reportedly on Y‐ph to earth fault.
GD‐1
40 28.07.2014 18:58hrs Multiple element tripping at 400kV Muradnagar(UP) reportedly due to R‐phase to ground fault.
GI‐2
Annex-B
State Case 1
Case 2
Case 3
Case 4
Remarks
Haryana Load relief envisaged (MW)
150 300 600 700 Non-Radial feeders 1. 220kV-Lula Ahir Ckt-I&II of 400kV S/S Dhanunda 2. 132kV Dadri-Kalanor Ckt of 132kV S/S Charkhi-Dadri 3. 220kV PGCIL Ckt-I&II of 220kV S/S Nuna Majra
Load relief that would have been obtained in mock testing (MW)
0 0 244 244
Punjab Load relief envisaged (MW)
50 100 200 300 Counter increment more than the required at 66 kV Talwara-2 feeder of 220kV S/S Gobindgarh -1 66kV Gill Road Ckt-I & 66kV Dugri of 220kV S/S LaltonKalan
Load relief that would have been obtained in mock testing (MW)
40 80 123.75 170.6
Rajasthan Load relief envisaged (MW)
50 100 200 300 Non-radial feeders at Alwar S/s 132kV Alwar-Bansur, 132kV Alwar- Ramgarh, 132kV Alwar- Malakhera, 132kV Alwar-Mandawar 132kV Lamaba ,132kV Gotan & 132 Ratangarh-Sardarshahar Counter increment more than the required at Alwar S/s 132kV Alwar (Local), 132kV Alwar-Bansur, 132kVAlwar-Malakhera &132kV Alwar-Ramgarh feeders
Load relief that would have been obtained in mock testing (MW)
0 0 75 147
Uttar Pradesh
Load relief envisaged (MW)
50 100 200 300 Counter increment less than required at 132kV Thana bhawan & 132kV Jasala
Load relief that would have been obtained in mock testing (MW)
0 30 65 0
Delhi Load relief envisaged (MW)
0 0 200 300 SPS not operated at 400/220kV Sub-Station Bamnauli Load relief that would
have been obtained in mock testing (MW)
0 0 0 287