adv vacuum system changes, feb2010 ‘new stations’ generic layout preliminary...
DESCRIPTION
Station Turbo_PR or Turbo_SR, preliminary Turbo, to be purchased, normally with controller on board, rs232 necessary to visualize parameters Automatic valve with position indicator 2 gauges, to be purchased, normally same to the ones we have, but not necessarily Automatic valve with position indicator To the remote scrolls Tower links PI PETRANSCRIPT
![Page 1: AdV Vacuum system changes, Feb2010 ‘New stations’ generic Layout preliminary Cryotrap_NICryotrap_NE Cryotrap_WI Cryotrap_WE Cryotrap_DT ? Cryotrap_IB ?](https://reader036.vdocument.in/reader036/viewer/2022082621/5a4d1b567f8b9ab0599a98e8/html5/thumbnails/1.jpg)
AdV Vacuum system changes, Feb2010‘New stations’ generic Layoutpreliminary
Cryotrap_NI Cryotrap_NE
Cryotrap_WI
Cryotrap_WE
Cryotrap_DT ?
Cryotrap_IB ? Turbo_PR
Turbo_SR
Remote_scroll
300mN
300mW
Ions
Ions
Ions
Ions
Ions
![Page 2: AdV Vacuum system changes, Feb2010 ‘New stations’ generic Layout preliminary Cryotrap_NICryotrap_NE Cryotrap_WI Cryotrap_WE Cryotrap_DT ? Cryotrap_IB ?](https://reader036.vdocument.in/reader036/viewer/2022082621/5a4d1b567f8b9ab0599a98e8/html5/thumbnails/2.jpg)
AdV Vacuum system changes, Feb2010‘NDRC option b’ LayoutPreliminary
Cryotrap_NI Cryotrap_NE
Cryotrap_WI
Cryotrap_WE
Cryopump SR?
Cryopump PR?
Remote_scroll
300mN
300mW
Ions
Ions
Ions
Ions
Ions
DN?
DN?DN?
DN?
As a different with respect to present, the Link Valves shall close automatically to protect the vacuum inside tubes/towers
![Page 3: AdV Vacuum system changes, Feb2010 ‘New stations’ generic Layout preliminary Cryotrap_NICryotrap_NE Cryotrap_WI Cryotrap_WE Cryotrap_DT ? Cryotrap_IB ?](https://reader036.vdocument.in/reader036/viewer/2022082621/5a4d1b567f8b9ab0599a98e8/html5/thumbnails/3.jpg)
Station Turbo_PR or Turbo_SR, preliminary
Turbo, to be purchased, normally with controller on board, rs232 necessary to visualize parameters
Automatic valve with position indicator
2 gauges, to be purchased, normally same to the ones we have, but not necessarily
Automatic valve with position indicator
To the remote scrolls
Tower links
PI
PE
![Page 4: AdV Vacuum system changes, Feb2010 ‘New stations’ generic Layout preliminary Cryotrap_NICryotrap_NE Cryotrap_WI Cryotrap_WE Cryotrap_DT ? Cryotrap_IB ?](https://reader036.vdocument.in/reader036/viewer/2022082621/5a4d1b567f8b9ab0599a98e8/html5/thumbnails/4.jpg)
Ions, preliminaryCould be grouped near IB, DT, MC and also distributed (An option is to remove one TSP pump (P32) and put one Ion pump on that port). In alternative two additional Ion groups could be installed on two links, for instance near BS.
2 Ion pumps, 1 controller , for instance Varian starcell 500 + DUAL per pompe ioniche: RS232 RS422 RS485 ETERNET
Manual valve with position indicator
2 gauges, (PI+PE) to be purchased, normally same to the ones we have, but not necessarily
manual valve with position indicator
Tower links
PI
PE
![Page 5: AdV Vacuum system changes, Feb2010 ‘New stations’ generic Layout preliminary Cryotrap_NICryotrap_NE Cryotrap_WI Cryotrap_WE Cryotrap_DT ? Cryotrap_IB ?](https://reader036.vdocument.in/reader036/viewer/2022082621/5a4d1b567f8b9ab0599a98e8/html5/thumbnails/5.jpg)
Centralized scrolls, preliminary
Scrolls, to be purchased, could have rs232
Automatic valves with position indicator
3 PI gauges, to be purchased, normally same to the ones we have, but not necessarily
TowerIB TowerPR TowerBS TowerWI TowerSR TowerNI TowerDT
In parallel to V91, tbc
?
PI
PIPI
![Page 6: AdV Vacuum system changes, Feb2010 ‘New stations’ generic Layout preliminary Cryotrap_NICryotrap_NE Cryotrap_WI Cryotrap_WE Cryotrap_DT ? Cryotrap_IB ?](https://reader036.vdocument.in/reader036/viewer/2022082621/5a4d1b567f8b9ab0599a98e8/html5/thumbnails/6.jpg)
Cryotraps_DT/IB or Cryopumps_SR/PR, preliminary
tbc
![Page 7: AdV Vacuum system changes, Feb2010 ‘New stations’ generic Layout preliminary Cryotrap_NICryotrap_NE Cryotrap_WI Cryotrap_WE Cryotrap_DT ? Cryotrap_IB ?](https://reader036.vdocument.in/reader036/viewer/2022082621/5a4d1b567f8b9ab0599a98e8/html5/thumbnails/7.jpg)
Cryotraps 1of2, preliminary
2 systems like this one per each trap
Manual valve 200CF with position indicator
2 gauges to be purchased, normally same to the ones we have, but not necessarily
manual valve with position indicator
Large valve / tower link
Turbo, to be purchased, normally with controller on board, rs232 necessary to visualize parameters
Automatic valve with position indicator
2 gauges
Automatic valve with position indicator
Local scroll and also remote scroll?
Automatic valve with position indicator
existing large valve, to be linked to the control
PE
RGA PI
PI
PI
PE
PE2 TSP pumps
Manual valve with position indicator
Manual valve with position indicator
New or from 0m/3000m? Not from NI/NE...
![Page 8: AdV Vacuum system changes, Feb2010 ‘New stations’ generic Layout preliminary Cryotrap_NICryotrap_NE Cryotrap_WI Cryotrap_WE Cryotrap_DT ? Cryotrap_IB ?](https://reader036.vdocument.in/reader036/viewer/2022082621/5a4d1b567f8b9ab0599a98e8/html5/thumbnails/8.jpg)
Cryotraps 2of2, preliminary. Cryogenic controls, pid for level control and external tank
Electronics driver to be read (tbc) by remote, normally with a few low level output or rs232 or other
Automatic proportional valve, with position indicator, tbc
Automatic valve to be linked to the temp control
existing large valve, to be linked to the temp control
Level 1
ExternalTankLN2
Electronics driver to be read by remote, normally with a few low level output or rs232 or other
Level 2
PID
PID level regulator to be read by remote, normally with a few low level output or rs232 or other.Could retransmit the level and valve status
TemperatureSome temp readouts to be acquired. The controller will have relays to close also valves in case of high temp alarms
![Page 9: AdV Vacuum system changes, Feb2010 ‘New stations’ generic Layout preliminary Cryotrap_NICryotrap_NE Cryotrap_WI Cryotrap_WE Cryotrap_DT ? Cryotrap_IB ?](https://reader036.vdocument.in/reader036/viewer/2022082621/5a4d1b567f8b9ab0599a98e8/html5/thumbnails/9.jpg)
Double oring on bottom flanges.From the point of view of control system, it is one additional gauge per tower (pirani)
PICF16, to be metal sealed in case of helicofles
Double orings on end tower viewports too
![Page 10: AdV Vacuum system changes, Feb2010 ‘New stations’ generic Layout preliminary Cryotrap_NICryotrap_NE Cryotrap_WI Cryotrap_WE Cryotrap_DT ? Cryotrap_IB ?](https://reader036.vdocument.in/reader036/viewer/2022082621/5a4d1b567f8b9ab0599a98e8/html5/thumbnails/10.jpg)
300m N and W, preliminary
2 TSP pumps, 2 controllers.
Manual valve with position indicator, existing
2 gauges, (PI+PE) to be purchased, normally same to the ones we have, but not necessarily
manual valve with position indicator
3km tube, 300m from input
PE
PI
![Page 11: AdV Vacuum system changes, Feb2010 ‘New stations’ generic Layout preliminary Cryotrap_NICryotrap_NE Cryotrap_WI Cryotrap_WE Cryotrap_DT ? Cryotrap_IB ?](https://reader036.vdocument.in/reader036/viewer/2022082621/5a4d1b567f8b9ab0599a98e8/html5/thumbnails/11.jpg)
Turbo-booster at the existing tube stations 0m, 600m, ...(preliminary)
Smaller turbo, to be purchased, normally with controller on board, rs232 necessary to visualize parameters
Existing turbo pumping group V21, V22 , P21, P22, G21, G22
To the scroll
3km tube station 0, 600, ...
PI