Advance Technology Task Force

� Ownership Structure

� Existing Toll Collection System

� Improvements made 2005

� Improvements made 2006

� Improvements made 2007

� Future Improvements

Chicago, June 2008Chicago Skyway

17 May 2006 Chicago Skyway

Skyway Concession Company

Ownership Structure

100%

45%55%CINTRA MIG/MIP

Fernando Redondo, CEO

Cho Hang (“Gus”) Yeung, CFO

Belén Marcos, COO

SKYWAY CONCESSION

COMPANY LLC

SKYWAY CONCESSION

COMPANY HOLDINGS

LLC

17 May 2006 Chicago Skyway

Existing Toll Collection System

� Existing system

� System dated 1995

� No automatic payment methods

� Eight manual lanes in each direction

� Impossible widening

� Right of way limited by street and

railroad

� Peaks over plaza capacity

� 10% of the hours over 2,400 veh/hour

� Part of the lanes used by McDonald’s

� 3 lanes built but not usableDELAYS AT THE PLAZA

OVER 30 MIN

17 May 2006 Chicago Skyway

Toll collection improvements made in 2005

Reversible lanes

� 3 lanes available eastbound never used by City of Chicago

� 3 additional lanes operated manually

� Only operated westbound

ETC introduction

� I-Pass introduction on June 16th (2 months

implementation)

� 3 lanes per direction, operated with gates

� Contract with Illinois Tollway

� EZ-Pass accepted in September 26th

� Reduced waiting times to less than 10 minutes

17 May 2006 Chicago Skyway

Toll collection improvements made in 2006

� Reversible lanes completion

� Additional works to open 3 reversible lanes fully operational

� All lanes equipped both directions

� Only manual lanes for cars

� New manual toll collection system

� Better performance

17 May 2006 Chicago Skyway

Toll collection improvements made in 2007- 2008

� Reconfiguration of McDonald’s parking lot

� Additional collection lane and feeder lane added

� Electronic toll collection implemented in all lanes

� Contract with Indiana Toll Road instead of Illinois Tollway

17 May 2006 Chicago Skyway

ETC penetration

S K YWAY E T C P E NE T R AT ION: J UNE 2005-MAY 2008

0.0%

10.0%

20.0%

30.0%

40.0%

50.0%

60.0%

70.0%

80.0%

90.0%

J un-05

Nov-05

Apr-0

6

S ep-06

F eb-07

J ul-07

Dec-07

May-08

Light

Heavy

Total

17 May 2006 Chicago Skyway

Future Improvements

♦ Legislation and Enforcement agreement with City of Chicago

for gateless system

♦ McDonalds lease agreement ends in 2012

♦ Implementation of open road tolling