advanced planning and scheduling profile options setups

434
Table of Contents Advanced Planning and Scheduling Profile Options .................................................................... 14 MRP: Calculate MATO Demand ........................................................................................... 14 MRP: Calculate Plan Performance .......................................................................................15 MRP: Calculate Supply Demand ........................................................................................... 16 MRP: Category Set for Backlog Form ................................................................................... 17 MRP: Compute Standard Mandatory Components for ATO Models ....................................17 MRP: Cutoff History Days ..................................................................................................... 18 MRP: Disable Project Validation ........................................................................................... 19 MRP: Explode Demand Through Phantom Component ....................................................... 20 MRP: Firm Internal Req Transferred to OE ........................................................................... 21 MRP: Hash Area Size (Bytes) ............................................................................................... 22 MRP: Ignore Alternate BOM/Routing .................................................................................... 22 MRP: Ignore Zero Quantity Demands in Calculating First Bucket for Statistical Forecasting 23 MRP: Net All Purchase Orders Prior To Requisitions ........................................................... 23 MRP: Old Sales Orders Cutoff Days ..................................................................................... 24 MRP: Persist ATP Results .................................................................................................... 25 MRP: Plan Revenue Discount Percent ................................................................................. 25 MRP: Plan Revenue Price List .............................................................................................. 26 MRP: Planning Manager Run First Time ..............................................................................26 MRP: RHX Check Profile ...................................................................................................... 27 MRP: Round Source Entries ................................................................................................. 27 MRP: Sort Area Size (Bytes) ................................................................................................. 28 MRP: Update Requested Completion Date when Releasing Reschedules .......................... 28 MRP: Use Alternate SQL for Daily Cleanup .......................................................................... 29 MRP: Use Progress Bar for Backlog Workbench .................................................................. 29 MRP: i2 Batch Client Timeout ............................................................................................... 30 MRP: i2 Calc Cumulative Yield ............................................................................................. 31 MRP: i2 Check if FP installed ................................................................................................ 31 MRP: i2 Data Load Timeout .................................................................................................. 31 MRP: i2 Date Constant ......................................................................................................... 32 MRP: i2 Debug Mode ............................................................................................................ 32 MRP: i2 Factory Planner Exec Dir Attr Number .................................................................... 33 MRP: i2 Factory Planner User Attribute Number .................................................................. 33 MRP: i2 Job Change Attribute Number ................................................................................. 34 MRP: i2 Log Directory ........................................................................................................... 34 MRP: i2 Net Change Dir ........................................................................................................ 35 MRP: i2 RHYTHM Aggregate Resource Attribute Number ................................................... 35 MRP: i2 RHYTHM BC Delimiter ............................................................................................ 36 MRP: i2 RHYTHM BOM Attribute Consumed attribute number ............................................ 36 MRP: i2 RHYTHM BOM Attribute Produced attribute number .............................................. 37 MRP: i2 RHYTHM Batch Client Filter .................................................................................... 37 MRP: i2 RHYTHM Cooldown Time Attribute Number ........................................................... 38 MRP: i2 RHYTHM Delimiter .................................................................................................. 38 MRP: i2 RHYTHM Enable Attribute Base Planning .............................................................. 38 MRP: i2 RHYTHM Estimated Queue Time Attribute Number ............................................... 39

Upload: senthamarai-selvan-b

Post on 09-Feb-2016

574 views

Category:

Documents


8 download

TRANSCRIPT

Page 1: Advanced Planning and Scheduling Profile Options Setups

Table of ContentsAdvanced Planning and Scheduling Profile Options....................................................................14

MRP: Calculate MATO Demand...........................................................................................14MRP: Calculate Plan Performance.......................................................................................15MRP: Calculate Supply Demand...........................................................................................16MRP: Category Set for Backlog Form...................................................................................17MRP: Compute Standard Mandatory Components for ATO Models....................................17MRP: Cutoff History Days.....................................................................................................18MRP: Disable Project Validation...........................................................................................19MRP: Explode Demand Through Phantom Component.......................................................20MRP: Firm Internal Req Transferred to OE...........................................................................21MRP: Hash Area Size (Bytes)...............................................................................................22MRP: Ignore Alternate BOM/Routing....................................................................................22MRP: Ignore Zero Quantity Demands in Calculating First Bucket for Statistical Forecasting23MRP: Net All Purchase Orders Prior To Requisitions...........................................................23MRP: Old Sales Orders Cutoff Days.....................................................................................24MRP: Persist ATP Results....................................................................................................25MRP: Plan Revenue Discount Percent.................................................................................25MRP: Plan Revenue Price List..............................................................................................26MRP: Planning Manager Run First Time..............................................................................26MRP: RHX Check Profile......................................................................................................27MRP: Round Source Entries.................................................................................................27MRP: Sort Area Size (Bytes).................................................................................................28MRP: Update Requested Completion Date when Releasing Reschedules..........................28MRP: Use Alternate SQL for Daily Cleanup..........................................................................29MRP: Use Progress Bar for Backlog Workbench..................................................................29MRP: i2 Batch Client Timeout...............................................................................................30MRP: i2 Calc Cumulative Yield.............................................................................................31MRP: i2 Check if FP installed................................................................................................31MRP: i2 Data Load Timeout..................................................................................................31MRP: i2 Date Constant.........................................................................................................32MRP: i2 Debug Mode............................................................................................................32MRP: i2 Factory Planner Exec Dir Attr Number....................................................................33MRP: i2 Factory Planner User Attribute Number..................................................................33MRP: i2 Job Change Attribute Number.................................................................................34MRP: i2 Log Directory...........................................................................................................34MRP: i2 Net Change Dir........................................................................................................35MRP: i2 RHYTHM Aggregate Resource Attribute Number...................................................35MRP: i2 RHYTHM BC Delimiter............................................................................................36MRP: i2 RHYTHM BOM Attribute Consumed attribute number............................................36MRP: i2 RHYTHM BOM Attribute Produced attribute number..............................................37MRP: i2 RHYTHM Batch Client Filter....................................................................................37MRP: i2 RHYTHM Cooldown Time Attribute Number...........................................................38MRP: i2 RHYTHM Delimiter..................................................................................................38MRP: i2 RHYTHM Enable Attribute Base Planning..............................................................38MRP: i2 RHYTHM Estimated Queue Time Attribute Number...............................................39

Page 2: Advanced Planning and Scheduling Profile Options Setups

MRP: i2 RHYTHM Factory Planner Data Dir Attribute Number............................................39MRP: i2 RHYTHM Factory Planner Host Attribute Number..................................................40MRP: i2 RHYTHM Factory Planner Port Attribute Number...................................................40MRP: i2 RHYTHM Inventory Attribute Alias Separator.........................................................41MRP: i2 RHYTHM Minimum Queue Time Attribute Number................................................41MRP: i2 RHYTHM OE Attribute Consumed attribute number...............................................42MRP: i2 RHYTHM Offloadable To Attribute Number............................................................42MRP: i2 RHYTHM Offloadable from Attribute Number.........................................................43MRP: i2 RHYTHM PO Attribute Alias attribute number........................................................43MRP: i2 RHYTHM Part Buffer Style Attribute Number..........................................................44MRP: i2 RHYTHM Resource Type Attribute Number...........................................................44MRP: i2 RHYTHM released as firm manufacturing order.....................................................45MRP: i2 RhythmLink Data Directory.....................................................................................45MRP: i2 RhythmLink Executable Directory...........................................................................46MRP: i2 RhythmLink Host.....................................................................................................46MRP: i2 RhythmLink Port Number........................................................................................47MRP: i2 RhythmLink User.....................................................................................................47MRP: i2 Start Factory Planner Client....................................................................................47MRP: i2 Start RhythmLink Client...........................................................................................48MRP: i2 WIP Job Load Timeout............................................................................................48MRP:ATP Assignment Set....................................................................................................49MRP:ATP Database Link......................................................................................................49MRP:Activate OLP................................................................................................................50MRP:Allow Safety Stock Pegging.........................................................................................50MRP:Backlog Progress Timeout...........................................................................................51MRP:Calculate Excess Exceptions on Time Fence..............................................................51MRP:Combine Sugg Rep Schedules....................................................................................52MRP:Complete Supply Chain ATP.......................................................................................53MRP:Compute Sales Order Changes...................................................................................53MRP:Consume Fcst Set Summary.......................................................................................54MRP:Consume Forecast.......................................................................................................54MRP:Consume MDS.............................................................................................................55MRP:Consume MPS.............................................................................................................55MRP:Create Time fence........................................................................................................56MRP:Cutoff Date Offset Months............................................................................................57MRP:Debug Mode.................................................................................................................57MRP:Default Criteria Set.......................................................................................................58MRP:Default DRP Plan Name..............................................................................................59MRP:Default Forecast Date..................................................................................................59MRP:Default Forecast Name................................................................................................59MRP:Default Plan Name.......................................................................................................60MRP:Default Schedule Name...............................................................................................60MRP:Default Sourcing Assignment Set................................................................................61MRP:Demand Time Fence Days..........................................................................................62MRP:Derive PO supply date from need by date...................................................................62MRP:Enhanced Exception....................................................................................................63MRP:Environment variable to set path for MRP files............................................................63MRP:Firm Planned Order Time Fence..................................................................................64MRP:Include Schd Rcpts in Use-up......................................................................................65MRP:Include Substitute Components...................................................................................65

Page 3: Advanced Planning and Scheduling Profile Options Setups

MRP:Interface Table History Days........................................................................................66MRP:MPS Relief Batch Size.................................................................................................66MRP:MPS Relief Direction....................................................................................................67MRP:Maintain Original Schedule Version.............................................................................67MRP:Perform Planning Manager Functions in Loads...........................................................68MRP:Planner Batch Size.......................................................................................................68MRP:Planner Workers..........................................................................................................69MRP:Planning Manager Batch Size......................................................................................69MRP:Planning Manager Max Workers..................................................................................70MRP:Purchasing By Revision...............................................................................................70MRP:Purge Batch Size.........................................................................................................71MRP:Recommend action within PTF....................................................................................71MRP:Repetitive Past Due Supply Days................................................................................72MRP:Requisition Load Group Option....................................................................................73MRP:Retain Dates Within Calendar Boundary.....................................................................73MRP:Snapshot Pause for Lock (Minutes).............................................................................74MRP:Snapshot Substitute Parts............................................................................................74MRP:Snapshot Workers........................................................................................................75MRP:Sourcing Rule Category Set.........................................................................................75MRP:Time Fence Warning....................................................................................................76MRP:Trace Mode..................................................................................................................76MRP:Use Direct Load Option................................................................................................77MRP:Use Ship Arrived Flag..................................................................................................77MRP_NEW_PLANNER_BACK_COMPATIBILITY................................................................78MSC : Consider all supplies for VMI replenishment calculation............................................79MSC : Consume Highest Revision Forecast.........................................................................80MSC : Publish Supply Commit based on pegging information..............................................80MSC : VMI Requisitions Need By Date at RTF end..............................................................81MSC: 64-bit Planner Platform...............................................................................................81MSC: APCC Calendar Code.................................................................................................82MSC: APCC Category Set 1.................................................................................................83MSC: APCC Category Set 2.................................................................................................83MSC: APCC Category Set 3.................................................................................................84MSC: APCC Currency Code.................................................................................................85MSC: APCC Period Set name..............................................................................................85MSC: ATP Allocation Method................................................................................................86MSC: ATP Capacity Allocation..............................................................................................87MSC: ATP Debug Mode........................................................................................................87MSC: ATP Enforces Lead Time for ATO Model....................................................................88MSC: ATP Infinite Time Fence Pad......................................................................................89MSC: ATP Synchronization Downtime (minutes)..................................................................90MSC: ATP Web Service Responsibility.................................................................................91MSC: ATP Web Service User...............................................................................................91MSC: AVOID RE-SOURCING SALES ORDERS.................................................................92MSC: Action Allowed on ATP 24x7 Plan While Running......................................................92MSC: Aggregate Resource Name Flexfield Attribute............................................................93MSC: Align Component Demand Date with Pegging Date...................................................94MSC: Allocated ATP Forward Consumption Method............................................................95MSC: Allocation Assignment Category Set...........................................................................96MSC: Allow Release of Planned Orders from Demand Schedule Plan................................96

Page 4: Advanced Planning and Scheduling Profile Options Setups

MSC: Allow release of replenishments above suggested quantity.......................................97MSC: Analytics Currency Code.............................................................................................97MSC: Anchor date for calculating operation yields...............................................................98MSC: Anchor date for calculating remaining shelf life...........................................................99MSC: Apply Lot Modifiers in Weekly/Period Buckets............................................................99MSC: Apply Order Modifier To Start Quantity.....................................................................100MSC: Apply Safety Stock Change interval to non MRP Planned Safety Stock..................101MSC: Apply shortage and excess tolerance to planned orders..........................................101MSC: Auto-Release Compression Days Tolerance............................................................102MSC: Automatically Recalculate Operation Time...............................................................103MSC: Avoid Re-Sourcing Sales Orders..............................................................................104MSC: BPEL Demantra Password.......................................................................................104MSC: BPEL Demantra Username.......................................................................................105MSC: BPEL Domain Name.................................................................................................105MSC: BPEL End Point URI.................................................................................................106MSC: BPEL Process Version..............................................................................................106MSC: Batch Size for Self Service Loads.............................................................................107MSC: Batchable Flag..........................................................................................................107MSC: Batching Window......................................................................................................108MSC: Buy Order Processing Lead Time Calendar.............................................................108MSC: CP Debug Level........................................................................................................109MSC: Calendar Reference for Bucketing............................................................................110MSC: Cancel Oustanding Sales Order Quantities..............................................................110MSC: Category Set for Jobs without an Item Reference....................................................111MSC: Category Set for Liability Analysis.............................................................................112MSC: Category for Jobs without an Item Reference...........................................................112MSC: Category set for CP Horizontal View.........................................................................113MSC: Category set for Strategic Planning..........................................................................113MSC: Choice of item for which to create supplies in substitute relationship.......................114MSC: Circular sourcing surplus days..................................................................................115MSC: Class Hierarchy.........................................................................................................115MSC: Closest Quantity Pegging..........................................................................................116MSC: Collaborative Planning Default Calendar..................................................................116MSC: Collect Item, Material and Resource Costs...............................................................117MSC: Collect PS SNO Data................................................................................................117MSC: Collection Window for Trading Partner Changes (Days)..........................................118MSC: Collections Snapshot Threshold...............................................................................118MSC: Compute Project Exception.......................................................................................119MSC: Configuration.............................................................................................................120MSC: Consolidate Interplant Demands...............................................................................120MSC: Consume Forecast Inside Demand Time Fence.......................................................121MSC: Consume forecast with no demand class.................................................................122MSC: Consume forecasts using Internal Sales Orders.......................................................123MSC: Cost Type..................................................................................................................124MSC: Cost of Using a BOM/ Routing Flexfield Attribute.....................................................124MSC: Create Resource Requirements for all Operations...................................................125MSC: Currency Conversion Type.......................................................................................125MSC: Custom allocation......................................................................................................126MSC: DPP Demand Priority Details viewing buckets..........................................................127MSC: DPP Discrete Job Cutoff Window (Days)..................................................................127

Page 5: Advanced Planning and Scheduling Profile Options Setups

MSC: DPP Related Exception Additional Offset Days........................................................128MSC: DRP Multitasking Group ID's per Process................................................................128MSC: DRP Multitasking Max Concurrent Processes..........................................................129MSC: Daily Allocation to Maintain Safety Stock Level........................................................129MSC: Day UOM..................................................................................................................130MSC: Days of Resource Availability before sysdate...........................................................131MSC: Debug Level..............................................................................................................131MSC: Debug Module...........................................................................................................132MSC: Default Project for Supplies Pegged to Excess.........................................................132MSC: Default Workbench Height........................................................................................133MSC: Default Workbench Width.........................................................................................133MSC: Degree of Parallelism for Index Creation..................................................................134MSC: Demand Priority Flexfield Attribute............................................................................134MSC: Demand Satisfied Percent Threshold for Pegging....................................................135MSC: Display Order Rescheduling Supplies.......................................................................136MSC: Display Supplier Item in Collaborative Planning.......................................................136MSC: Display Warning Message When Rescheduling Recommendation Not Suggested bythe Plan...............................................................................................................................137MSC: Distribution Planning Ship Date................................................................................138MSC: EBS source instance for OTM...................................................................................138MSC: ENFORCE CRITERIA REQUIREMENT BEFORE EXECUTING QUERY................139MSC: Enable 64 bit snapshot..............................................................................................140MSC: Enable ATP Summary Mode.....................................................................................140MSC: Enable ATP Workflow...............................................................................................141MSC: Enable ATP for Phantom Components.....................................................................142MSC: Enable Advanced Constraints...................................................................................142MSC: Enable Allocated ATP...............................................................................................143MSC: Enable DRP Multitasking..........................................................................................144MSC: Enable Diagnostic ATP.............................................................................................144MSC: Enable Enhanced Sourcing.......................................................................................145MSC: Enable Group Based Netting....................................................................................146MSC: Enable Java Debug...................................................................................................146MSC: Enable Priority Pegging.............................................................................................147MSC: Enforce Hard Links....................................................................................................147MSC: Enhanced Project Netting.........................................................................................148MSC: Excess and Safety Stock by Demand Class.............................................................149MSC: File Flush Limit..........................................................................................................150MSC: Firm Internal Requisition Time Fence.......................................................................150MSC: Firm Intransit and PO in Receiving Supplies.............................................................151MSC: Flush All Items for Simulation....................................................................................152MSC: Forecast Priority Flexfield Attribute...........................................................................152MSC: Forecast Spreading Calendar...................................................................................153MSC: Forecast Spreading Calendar...................................................................................153MSC: Future Days for Currency Conversion.......................................................................154MSC: Gateway URL to External Application.......................................................................155MSC: Generate Exceptions in CP.......................................................................................155MSC: Generate Notifications for Transportation Updates...................................................156MSC: HP Maximum Displayed Item Count.........................................................................156MSC: High Volume Items....................................................................................................157MSC: History Days for Currency Conversion......................................................................158

Page 6: Advanced Planning and Scheduling Profile Options Setups

MSC: Horizontal Plan Demand Bucketing Preference........................................................158MSC: Horizontal Plan Extension Program..........................................................................159MSC: Hour UOM.................................................................................................................159MSC: INTER PLANT DEM PRIORITY................................................................................160MSC: IO UI Performance tuning.........................................................................................161MSC: Ignore ATP Check for Configured Item from Sales Order in ODS-ATP....................161MSC: Ignore PTF during CTP.............................................................................................162MSC: Include Firm Planned Orders In Firm Allocation Window..........................................162MSC: Include Manufacturing Calendar in ATP Sales Order Ship Date Calculations..........163MSC: Include Safety Stocks in Priority Based Pegging......................................................164MSC: Inflate WIP Resource Requirements.........................................................................164MSC: Inventory Rebalancing Surplus Inventory Basis........................................................165MSC: JInitiator Version.......................................................................................................166MSC: Launch Analyze Plan Partition..................................................................................167MSC: Launch System Sql Loader.......................................................................................167MSC: Launch Workflow-Enabled Exception Message Notifications...................................168MSC: Level for Calculating Liability.....................................................................................169MSC: Limit Gantt Chart Orders View Hierarchy..................................................................169MSC: MPS Auto-Firm Planned Orders...............................................................................170MSC: Map Server Host.......................................................................................................171MSC: Map Server Port........................................................................................................171MSC: Maximum Capacity....................................................................................................172MSC: Maximum Percentage variation in safety stock values.............................................172MSC: Maximum number of planned orders per demand....................................................173MSC: Maximum number of planned orders per demand(1)................................................173MSC: Minimize Project Cross Peg within Window..............................................................174MSC: Minimize changes to chronological sequence of supplies while rescheduling..........175MSC: Minimum Capacity.....................................................................................................176MSC: Minimum Percentage variation in safety stock values..............................................176MSC: Minimum Supply/Demand Percent for Pegging........................................................177MSC: Move Past Due To Sysdate......................................................................................177MSC: Net Change Temp Dir...............................................................................................178MSC: New Forecast Auto Plan...........................................................................................179MSC: New Planner Backward Compatibility.......................................................................179MSC: New Supply Commit Auto Plan.................................................................................181MSC: Number of Workers for Self Service Loads...............................................................182MSC: OTHER with zero allocation percent is valid demand class......................................182MSC: OTM Punchout URI...................................................................................................183MSC: OTM Responsibility...................................................................................................184MSC: OTM User..................................................................................................................184MSC: Operator Company Name.........................................................................................185MSC: Order Number-CA Mandatory for CVMI....................................................................185MSC: Order Type for Consigned VMI.................................................................................186MSC: Organization containing generic BOM for forecast explosion...................................186MSC: Overwrite all Order Forecast records........................................................................187MSC: Overwrite all supplier capacity records.....................................................................187MSC: PS - Snapshot Base Package...................................................................................188MSC: PS - Snapshot Beginning Inventory Package...........................................................189MSC: PS - Snapshot Calendar Package............................................................................189MSC: PS - Snapshot Customer Package...........................................................................190

Page 7: Advanced Planning and Scheduling Profile Options Setups

MSC: PS - Snapshot Distribution Package.........................................................................190MSC: PS - Snapshot Enterprise Forecast Package............................................................191MSC: PS - Snapshot Inventory Safety Targets Package....................................................191MSC: PS - Snapshot Manufacturing Package....................................................................192MSC: PS - Snapshot Purchase Orders Package................................................................192MSC: PS - Snapshot Sales Orders Package......................................................................193MSC: PS - Snapshot Supplier Package..............................................................................193MSC: PS - Snapshot Transfer Orders Package..................................................................194MSC: PS - Snapshot Work Orders Package.......................................................................194MSC: PS Consistent Resource Assignment.......................................................................195MSC: PS Currency Symbol.................................................................................................196MSC: PS Enable CRO Scheduling.....................................................................................196MSC: PS Enable RMO Scheduling.....................................................................................197MSC: PS Firm Past Due WO..............................................................................................197MSC: PS Run Application Script.........................................................................................198MSC: PS Run Connector Script..........................................................................................198MSC: PS/SNO API Version.................................................................................................199MSC: PS/SNO Alignment Date...........................................................................................199MSC: PS/SNO App Server URL.........................................................................................200MSC: PS/SNO Client Install Path........................................................................................200MSC: PS/SNO Compress Xml Files...................................................................................201MSC: PS/SNO Data Store Path..........................................................................................202MSC: PS/SNO Debug Mode...............................................................................................202MSC: PS/SNO Download XML Files...................................................................................203MSC: PS/SNO Use DB for Integration Data.......................................................................203MSC: Pass List Price to OM in DRP Release.....................................................................204MSC: Peg Firm Supply First................................................................................................204MSC: Peg to maximize supply usage.................................................................................205MSC: Perform ATP check for Internal Sales Orders...........................................................205MSC: Plan co-products.......................................................................................................206MSC: Plan for order at risk calculation................................................................................207MSC: Planning Currency.....................................................................................................208MSC: Pre-Flush...................................................................................................................208MSC: Prefer Consumption within Forecast Bucket.............................................................209MSC: Priority for Substitute Items Flexfield Attribute..........................................................210MSC: Priority of Alternate Resources for an Operation Flexfield Attribute..........................210MSC: Production Plan for Transportation updates..............................................................211MSC: Project Task Collection Window Days......................................................................212MSC: Provide Warning For Dates Entered on Non-work Days...........................................212MSC: Provide Warning when Sales Order Quantity is Changed........................................213MSC: Purchase Order Dock Date Calculation Preference..................................................214MSC: Purge Exception Days...............................................................................................214MSC: Purge Staging and Entity Key Translation Tables.....................................................215MSC: Read Profiles From DB.............................................................................................216MSC: Refresh Site to Region Mappings Event...................................................................216MSC: Refresh Snapshots Pending Timeout.......................................................................217MSC: Region Instance........................................................................................................218MSC: Release WIP Dtls if Order Date different then BOM Revision Date..........................218MSC: Released Only By User.............................................................................................219MSC: Resource Group for a Line Flexfield Attribute...........................................................220

Page 8: Advanced Planning and Scheduling Profile Options Setups

MSC: Resource Type for an Operation Flexfield Attribute..................................................220MSC: Respect Minimum Remaining Shelf Life Days..........................................................221MSC: Retain Time for Non-ATPable Items.........................................................................222MSC: Return Best Source in Global ATP............................................................................222MSC: SCEM Engine Launch Events...................................................................................223MSC: SNO - Snapshot Base Package................................................................................224MSC: SNO - Snapshot Beginning Inventory Package........................................................224MSC: SNO - Snapshot Calendar Package.........................................................................225MSC: SNO - Snapshot Customer Package........................................................................225MSC: SNO - Snapshot Demand Package..........................................................................226MSC: SNO - Snapshot Distribution Package......................................................................226MSC: SNO - Snapshot Enterprise Forecast Package.........................................................227MSC: SNO - Snapshot Fixed Production Package.............................................................228MSC: SNO - Snapshot Inventory Safety Targets Package.................................................228MSC: SNO - Snapshot Manufacturing Package.................................................................229MSC: SNO - Snapshot Manufacturing Package(1).............................................................229MSC: SNO - Snapshot Purchase Orders Package.............................................................230MSC: SNO - Snapshot Sales Orders Package...................................................................231MSC: SNO - Snapshot Supplier Package...........................................................................231MSC: SNO - Snapshot Transfer Orders Package...............................................................232MSC: SNO - Snapshot Work Orders Package....................................................................233MSC: SNO Connector Precision.........................................................................................233MSC: SNO Currency Precision...........................................................................................234MSC: SNO Decimal Precision.............................................................................................234MSC: SNO Optimization Type............................................................................................235MSC: SNO Publish On Client..............................................................................................236MSC: SNO Run Application Script......................................................................................236MSC: SNO Run Connector Script.......................................................................................237MSC: SNO Transportation Capacity By..............................................................................237MSC: Safety Stock Project..................................................................................................238MSC: Safety stock change interval (Days)..........................................................................239MSC: Sales Orders Offset Days.........................................................................................239MSC: Scope of Analyze Plan Partition................................................................................240MSC: Selection order for Firm Supplies in backward allocation window............................241MSC: Self Service Loads Delimiter.....................................................................................242MSC: Service Level Category Set.......................................................................................242MSC: Service Planning Enabled.........................................................................................243MSC: Service Planning Item Safety Stock Level Value......................................................244MSC: Share Plan Partitions................................................................................................244MSC: Shelf Life Override of Order Modifiers for Transfer Orders.......................................245MSC: Simultaneous Resource Sequence Flexfield Attribute..............................................246MSC: Smoothing method to calculate Safety stock within Change interval........................246MSC: Source Instance ID....................................................................................................247MSC: Source Setup Required.............................................................................................247MSC: Sourcing History Start Date Offset(in months)..........................................................248MSC: Sourcing Rule Category Set......................................................................................249MSC: Sourcing Variance Tolerance....................................................................................250MSC: Split Planned Order to perform safety stock pegging................................................251MSC: Split Planned Orders for Scheduling Flexibility.........................................................251MSC: Supplier Capacity Accumulation(multiplier)...............................................................252

Page 9: Advanced Planning and Scheduling Profile Options Setups

MSC: Suppress Exception for Selection of Alternates........................................................253MSC: Temp Index Extent Size(Bytes).................................................................................253MSC: Temp Table Extent Size(Bytes)................................................................................254MSC: Unit of Measure.........................................................................................................254MSC: Update Requested Completion Date when Releasing Reschedules........................255MSC: Update Use Up Date.................................................................................................256MSC: Use Enhanced Forward ATP....................................................................................256MSC: Use FIFO Pegging....................................................................................................257MSC: Use Optimization Phase Supply Due Dates for Pegging..........................................257MSC: Use Shipping/Receiving Calendar............................................................................258MSC: Use attribute based netting.......................................................................................259MSC: VMI Default Query.....................................................................................................260MSC: Value of N for all top/bottom-N reports in Dashboards.............................................260MSC: Vertical view default query........................................................................................261MSC: Wait Time to Obtain Lock on Table/Partition for Snapshot Delete Worker (in sec)..261MSC: Write MBP Flat Files.................................................................................................262MSC:ATP Assignment Set..................................................................................................262MSC:Coll Error Debug Mode..............................................................................................263MSC:Coll Performance Debug Mode..................................................................................264MSC:Collect Completed Jobs.............................................................................................265MSC:Collect Routing...........................................................................................................265MSC:Criticality Category Set...............................................................................................266MSC:Prevent Loops when pegging Non-Standard Jobs.....................................................267MSC:Release only orders pegging fully to on han..............................................................267MSC:Select Sourcing Rules In ATP Based On...................................................................268MSC_ENFORCE_MODEL_LT............................................................................................268MSC_USE_HASH_KEY......................................................................................................269MSD: AW Tablespace.........................................................................................................270MSD: Calculate Planning Percentages...............................................................................270MSD: Category Set Name...................................................................................................271MSD: Client Debugging.......................................................................................................271MSD: Conversion Type.......................................................................................................272MSD: Currency Code..........................................................................................................272MSD: Customer Attribute....................................................................................................273MSD: Default DP Scenario..................................................................................................273MSD: Enabled Organization for Item Collections................................................................274MSD: Excess and Obsolescence, Liability Category Set Name.........................................274MSD: MAXVALUECOUNT for edges in XWDEVKIT..........................................................275MSD: Master Org................................................................................................................275MSD: OLAP Directory Alias................................................................................................276MSD: OLAP Initial Page Pool..............................................................................................276MSD: OLAP Maximum Page Pool......................................................................................277MSD: OLAP Workflow Page Pool.......................................................................................277MSD: One Step Collection..................................................................................................278MSD: Two-Level Planning...................................................................................................278MSD: Use Classic Even Allocation.....................................................................................279MSD: Use Classic Worksheet.............................................................................................280MSD:View Scope measures are editable............................................................................280MSD_DEM: Category Set Name.........................................................................................281MSD_DEM: Conversion Type.............................................................................................281

Page 10: Advanced Planning and Scheduling Profile Options Setups

MSD_DEM: Currency Code................................................................................................282MSD_DEM: Customer Attribute..........................................................................................282MSD_DEM: Data Profile for Price Lists...............................................................................283MSD_DEM: Debug Mode....................................................................................................283MSD_DEM: Fiscal Calendar...............................................................................................284MSD_DEM: Host URL.........................................................................................................284MSD_DEM: Master Org......................................................................................................285MSD_DEM: Maximum seeded units available for price lists...............................................285MSD_DEM: Schema...........................................................................................................286MSD_DEM: Two-Level Planning.........................................................................................286MSO: Activity Selection Window (in Days)..........................................................................287MSO: Additional Demand Slices for Shared Supply Rescheduling....................................287MSO: Allow Partial Demand Completion............................................................................288MSO: Allow Schedule Gaps for Shared Supplies...............................................................289MSO: Allow Simultaneous Resource To End At Different Time..........................................290MSO: Allow Simultaneous Resources to End at Different Times........................................291MSO: Alternate Process Penalty.........................................................................................292MSO: Alternate Resource Penalty......................................................................................292MSO: Alternate Resource Selection Method......................................................................293MSO: Alternate Source Penalty..........................................................................................293MSO: Apply Windows for Firm Scheduling.........................................................................294MSO: Avoid non working days for Buy/Transfer order dates..............................................294MSO: Barrier Optimizer Algorithm Choice..........................................................................295MSO: Batching Precision....................................................................................................296MSO: Big M Value for SCO.................................................................................................296MSO: CPLEX Crash Parameter..........................................................................................297MSO: CPLEX Refactor Rate...............................................................................................298MSO: CPLEX Scaling Factor..............................................................................................298MSO: CPLEX messages to screen indicator......................................................................299MSO: Calculate Constraint Exceptions...............................................................................299MSO: Capacity Units Recalculation Threshold...................................................................300MSO: Check Redundant Constraints..................................................................................301MSO: Choice of supply for substitution...............................................................................302MSO: Component offset logic for optimization....................................................................302MSO: Continuous transfer across organizations.................................................................303MSO: Convergent Supplies Consumption Pattern..............................................................304MSO: Convergent Supplies Consumption Pattern for Inter-Org and Supplier Sourced orders............................................................................................................................................304MSO: Convergent Supplies Consumption Pattern for Intra-Org Sourced orders................305MSO: Cost Roll-up incremental factor.................................................................................306MSO: Create Aggregate Supply for Unsatisfied Demands within Planning Time Fence....307MSO: DS Scheduling Window............................................................................................308MSO: Default Forecast Priority...........................................................................................308MSO: Default Idle Time Tolerance (Hours).........................................................................309MSO: Default Resource Sequencing Window (in Days).....................................................309MSO: Default Sales Order Priority......................................................................................310MSO: Default Timestamp Safety Stocks.............................................................................311MSO: Default Timestamp for Forecasts..............................................................................312MSO: Default Timestamp for Sales Orders.........................................................................313MSO: Default Value for Maximum Acceptable Days Early.................................................313

Page 11: Advanced Planning and Scheduling Profile Options Setups

MSO: Delay Fulfillment of Small Demands.........................................................................314MSO: Demand Size Tolerance Before Splitting Planned Orders........................................315MSO: Demand Type Priority...............................................................................................315MSO: Demand Window Size...............................................................................................316MSO: Disable Inference of Item Substitution Relationship.................................................317MSO: Divergent Supply Feeding Pattern............................................................................317MSO: Divergent Supply Feeding Pattern for Inter-Org and Supplier Sourced orders.........318MSO: Divergent Supply Feeding Pattern for Intra-Org Sourced orders..............................319MSO: Dual Simplex Parameter...........................................................................................319MSO: EDD Demand Cutoff Priority.....................................................................................320MSO: EDD Scheduling Window Control.............................................................................321MSO: Enable Advanced Sequencing..................................................................................322MSO: Enable Cost Rollup for Optimization.........................................................................322MSO: Enable Decision Rules..............................................................................................323MSO: Enable Hard Links Globally.......................................................................................324MSO: Enable Rounding of Fractional Supplies For Service Planning................................324MSO: Enable sourcing split for end item substitution..........................................................325MSO: Enforce Minimum Transfer Quantities......................................................................326MSO: Enforce Resource Sequence Contiguity...................................................................327MSO: Firm Purchase Orders Within Time Fence................................................................327MSO: Firm Requisitions Within Time Fence.......................................................................328MSO: Firm Supply Allocation Window (Backward days).....................................................329MSO: Firm Supply Allocation Window (Forward days).......................................................330MSO: Firm Work Orders/Operations Within Time Fence....................................................331MSO: Floating Point Precision............................................................................................331MSO: Floating Point Precision for Increments of Shift Start/End Times Within a PlanningBucket.................................................................................................................................332MSO: Floating Point Precision for Order Q.........................................................................332MSO: Floating Point Precision for Planning Bucket Efficiency............................................333MSO: Floating Point Precision for Transportation Capacities (Volume).............................333MSO: Floating Point Precision for Transportation Capacities (Weight)..............................334MSO: Floating Point Precision for Usage in Routings.........................................................335MSO: Generate Compression Days Exception...................................................................335MSO: Generate Compression/Firming Exceptions for Orders in Progress.........................336MSO: Generate Shared Supply Exceptions........................................................................337MSO: Global Batchable Flag...............................................................................................338MSO: Global Chargeable Flag............................................................................................338MSO: Global Time Limit......................................................................................................339MSO: HLS flat files path......................................................................................................339MSO: Hard link scheduling window.....................................................................................340MSO: Hard link scheduling window expansion factor.........................................................341MSO: Heuristic type............................................................................................................341MSO: Incremental Planned Orders.....................................................................................342MSO: Internal Demand Aggregation Within Optimization...................................................342MSO: Inventory Carrying Costs Percentage.......................................................................343MSO: JIT Selector Window Size.........................................................................................344MSO: LP Constraint Batch Size..........................................................................................344MSO: LP Markowitz Coefficient..........................................................................................345MSO: LP Optimization Algorithm........................................................................................345MSO: Late Demands Exceptions Tolerance Minutes.........................................................346

Page 12: Advanced Planning and Scheduling Profile Options Setups

MSO: Lead Time Control....................................................................................................347MSO: List Size for Pricing Candidates................................................................................348MSO: Lookahead days to net co-product/by-product supplies before creating plannedorders..................................................................................................................................348MSO: Max Gap Tolerence on SDS.....................................................................................349MSO: Maximium Number of Prepones...............................................................................349MSO: Maximize Search of Availability Intervals..................................................................350MSO: Maximize Use of Unfirm PurchOrd/WorkOrd in Optimization...................................351MSO: Maximum Activity Duration.......................................................................................352MSO: Maximum Allowable Days Late.................................................................................352MSO: Maximum Allowable Days Late before Forecast Expiration......................................353MSO: Maximum Alternate Combinations............................................................................354MSO: Maximum Demands Per Group for Advanced Sequencing......................................354MSO: Maximum Demands per Group.................................................................................355MSO: Maximum Demands per Slice...................................................................................356MSO: Maximum Inventory Level % of Safety Stock............................................................356MSO: Maximum Lead Time Factor.....................................................................................357MSO: Maximum Number of Demands in a Hard Linked Demand Set................................358MSO: Maximum Number of Pull for Operation....................................................................358MSO: Maximum Number of Pushes for Operation..............................................................359MSO: Maximum Operations Per Slice................................................................................360MSO: Maximum Resource Over-capacity...........................................................................360MSO: Maximum Simplex Iterations.....................................................................................361MSO: Maximum number of pulls/push for hard linked operations......................................362MSO: Minimize Supply Duration.........................................................................................362MSO: Minimum Processing Lead Time Adjustment Factor................................................363MSO: Multiplier To Derive Supply Allocation Window.........................................................363MSO: Net All Firm Supplies Before Creating Planned Order..............................................364MSO: Network routing cycle time coefficient.......................................................................365MSO: Network routing fixed time window...........................................................................366MSO: Nfl Backward Compression Pct................................................................................367MSO: Nfl Forward Compression Pct...................................................................................367MSO: Number of Backtracks Allowed.................................................................................368MSO: Number of Demand Groups for Optimization............................................................368MSO: Number of Iterations for Local Search......................................................................369MSO: Number of LP Phases for Safety Stock Calculation..................................................370MSO: Number of Threads for Optimization.........................................................................370MSO: Optimization Advanced Start....................................................................................371MSO: Optimization Daily Aggregation Buckets...................................................................372MSO: Optimization Weekly Aggregation Buckets...............................................................372MSO: Order Modifier Max Searching Depth.......................................................................373MSO: Overlap Activities by MTQ........................................................................................374MSO: Peg By-product Supplies..........................................................................................375MSO: Penalty Basis for Changeovers.................................................................................375MSO: Penalty Cost Factor for Exceeding Item Material Capacity Flexfield Attribute..........376MSO: Penalty Cost Factor for Exceeding Material Capacity...............................................377MSO: Penalty Cost Factor for Exceeding Material Capacity Flexfield Attribute..................377MSO: Penalty Cost Factor for Exceeding Org Material Capacity Flexfield Attribute...........378MSO: Penalty Cost Factor for Exceeding Org Resource Capacity Flexfield Attribute........379MSO: Penalty Cost Factor for Exceeding Org Transportation Capacity Flexfield Attribute379

Page 13: Advanced Planning and Scheduling Profile Options Setups

MSO: Penalty Cost Factor for Exceeding Resource Capacity............................................380MSO: Penalty Cost Factor for Exceeding Resource Capacity Flexfield Attribute...............381MSO: Penalty Cost Factor for Exceeding Transportation Capacity Flexfield Attribute.......381MSO: Penalty Cost Factor for Late Demands.....................................................................382MSO: Penalty Cost Factor for Late Forecasts Flexfield Attribute........................................382MSO: Penalty Cost Factor for Late Item Demands Flexfield Attribute................................383MSO: Penalty Cost Factor for Late Org Demands Flexfield Attribute.................................384MSO: Penalty Cost Factor for Late Sales Orders Flexfield Attribute..................................384MSO: Penalty Increase Tolerance Percentage in Local Search.........................................385MSO: Penalty multiplier outside unconstrained..................................................................386MSO: Percent Complete Before Resequencing..................................................................386MSO: Postpone Use of Alternates to Latest Possible Time................................................387MSO: Preemption Slack Ratio............................................................................................387MSO: Preprocessing Aggregator Fill...................................................................................388MSO: Preprocessing Aggregator Limit................................................................................388MSO: Preprocessing Flag for LP Matrix..............................................................................389MSO: Preprocessor LP Compression.................................................................................390MSO: Primal Simplex Parameter........................................................................................390MSO: Primal/Dual Preprocessing Reduction......................................................................391MSO: Pull push base..........................................................................................................391MSO: Pull push offset.........................................................................................................392MSO: Queue Time Factor...................................................................................................393MSO: Re-computation percentage for sequence generation..............................................393MSO: Reschedule Jobs Out to Reduce Inventory Carrying Costs......................................394MSO: Reschedule Shared Supply to Influence Batching....................................................395MSO: Resource Adjustment Factor For Improved Offloading to Alternates.......................395MSO: Resource Batching Strategy.....................................................................................396MSO: Resource Group for the Line Flexfield Attribute........................................................397MSO: Respect Activity Contiguity Flag for Process Supplies.............................................397MSO: Respect EDD Scheduling windows for Lead Times..................................................398MSO: SCO Dual Variables Tolerance.................................................................................399MSO: SCO Reduced Cost Tolerance.................................................................................399MSO: SCO TRIANGULATION............................................................................................400MSO: STL Buffer Size.........................................................................................................400MSO: Schedule Across Breaks...........................................................................................401MSO: Schedule All Firm Planned Orders First....................................................................401MSO: Schedule Simultaneous Resources Across Breaks..................................................402MSO: Schedule window width.............................................................................................403MSO: Scheduler Time Step................................................................................................403MSO: Scheduling Activity Selection Window......................................................................404MSO: Scheduling Window UOM.........................................................................................404MSO: Setup Pattern Calculation Window...........................................................................405MSO: Simplex Feasibility Tolerance...................................................................................406MSO: Simplex Optimality Tolerance...................................................................................406MSO: Simplex Perturbation Constant.................................................................................407MSO: Simplex Perturbation Limit........................................................................................408MSO: Simplex Perturbation Parameter...............................................................................408MSO: Simplex Presolve Limit..............................................................................................409MSO: Simplex Singularity Repair Limit...............................................................................409MSO: Skip Firm SDS Activities During Justify....................................................................410

Page 14: Advanced Planning and Scheduling Profile Options Setups

MSO: Slack Hours For Batch Resource..............................................................................410MSO: Solve Dual Problem..................................................................................................411MSO: Sourcing Allocation Window.....................................................................................412MSO: Split Planned Orders for Assigned Units...................................................................412MSO: Spread Resource Consumption Within Optimization................................................413MSO: Substitute Item Penalty.............................................................................................414MSO: Supplies used for satisfying transient safety stock...................................................414MSO: Supply Reschedule Window Size for Safety Stock Pegging.....................................415MSO: Supply Window Size.................................................................................................416MSO: Synchronize Chargeable Resources to Respect Hard Links....................................416MSO: Target Inventory Level % of Safety Stock.................................................................417MSO: Transfer Quantity Threshold for Enforceing Hard Links............................................417MSO: UOM for converting Changeover Time to Penalty....................................................418MSO: Upper Limit for Maximum Time Offset for Hard Links...............................................419MSO: Use Breaks in Calculation of Unconstrained Scheduling Windows..........................419MSO: Use Collections Start Time.......................................................................................420MSO: Use Customer Site in End Item Substitution Rule....................................................421MSO: Use Discrete Job Resource Usage to Consume Resource Capacity.......................421MSO: Use Effectivity Date to Infer End Item Substitution Priority.......................................422MSO: Use Existing Supplies in Alternate BOM/Subs. Comp..............................................423MSO: Use Item Shelf Life Days in Scheduling Buy/Transfer Orders..................................424MSO: Use JIT dates from high level scheduling results......................................................424MSO: Use Of Assigned Units In Scheduling.......................................................................425MSO: Use Optimization and Decision Rules for Simulation................................................426MSO: Use SCO Time Aggregation.....................................................................................426MSO: Use Safety Lead Time..............................................................................................427MSO: Use Sequencing Template........................................................................................428MSO: Use Shift Definitions When Scheduling Lead Times.................................................429MSO: Use Up Existing Supply of Primary Components Before Substitute.........................430MSO: Write Inline forecasting flat files................................................................................430MSR: Budget Category Set.................................................................................................431MSR: Budget Enditem Favor Factor...................................................................................432MSR: Postponement Factor................................................................................................432MSR: Probability Distribution Type.....................................................................................433MSR: Safety Stock Holding Strategy..................................................................................433

Advanced Planning and Scheduling Profile Options

MRP: Calculate MATO Demand

Profile Code MRPProfile Option Name MRP_CALC_MATO_DEMANDDescription This profile option is used by ASCP to support forecast consumption

processesfor Multi-level ATO models. Set to Yes if these processes are utilized.

This was used only until 11.5.9. From 11.5.10 this profile is not used.

Note Reference(s)

Page 15: Advanced Planning and Scheduling Profile Options Setups

Bug Reference(s) 3125951

3125891Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: Calculate Plan Performance

Profile Code MRPProfile Option Name MRP_CALCULATE_PLAN_PERFORMANCEDescription Not used in Oracle Advanced Planning

This profile is used to decide upon whether the request Calculate Plan performance Indicators needs to be run at the end of MRP Launch or not.

This was an optional program used to gather info from MRP and load into tables used by the old Business Intelligence programs. More information is available in Note: 783088.1

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 16: Advanced Planning and Scheduling Profile Options Setups

MRP: Calculate Supply Demand

Profile Code MRPProfile Option Name MRP_ATP_CALC_SDDescription When set to Yes, this profile controls whether

detailed supply / demand data is retrieved and retained for viewing during an ATP Inquiry.

This data is viewed by selecting ATP Details in the Inquiry form. Performance can be slowed when theprofile is set to Yes.

For better performance, set it to Yes, run an ATP Inquiry and view the details, and then set it back to No. Set this profile to Yes only when you need to view the detailed supply demand and horizontal plan information for an ATP inquiry. You can set the profile at the user level.

When the profile = Yes, then MRP_ATP_DETAILS_TEMP gets rows with record_type = 1, 2 and 3.Record Type 1 and 2 are used to show detailed information available when you use rt-click functionality in the Pegging window of the ATP Details.Record_Type = 3 is the pegging information seen in the ATP details screen.

When the profile = No, we still insert record_type = 3 into the table so we can display the pegging information in the ATP Details screen.For example, if the item is a large configuration with many rows in the pegging view, then we could still insert many records into the table with only record_type = 3

Note Reference(s) 368229.1 565918.1 436771.1

Bug Reference(s)Document References(s) Oracle Global Order Promising Implementation and User's Guide

-1-1-1-1-1

Page 17: Advanced Planning and Scheduling Profile Options Setups

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

MRP: Category Set for Backlog Form

Profile Code MRPProfile Option Name MRP_BALWB_CATEGORY_SETDescription Not used by Advanced Supply Chain PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: Compute Standard Mandatory Components for ATO Models

Profile Code MRPProfile Option Name MRP_EXPLODE_ATODescription Determines whether to call the CTO API to calculate the dependent demand

for ATO items during the Refresh Snapshots process.

This will cause performance to be slower when Yes.

Setting this to Yes would be normal if ATO Models are present in the system.Collections code will default this profile to Yes if it is NULL. Set this profile in the EBS Source instance when you have distributed installation.

Page 18: Advanced Planning and Scheduling Profile Options Setups

Note: Refresh Collection Snapshots will finish with warning when:• CTO BOM not found for the item• CTO_API was exploding the BOM and returns a warning

from the CTO code.

We print the following for CTO BOM not found - this is a setup violation - since the requirement for CTO is to configure and create the [STAR] item using CTO Auto-Create or by progressing the sales order.

Warning: Item_ID = 781553, ORG_ID=5002 ; No BOM found for configured item in ship-from org.

You may safely disregard this warning if the configured item is transferred across orgs, and the warning points to an org in which no assembly of the configured item takes place. If you are using ODS based ATP, please check that you have the BOM in shipping org. If you are using PDS based ATP, please check that item attribute ""Create Configured Item, BOM"" equals ""Based on Model"" and BOM exists in ship-from org.

DOCUMENTATION BUG: The documentation has this profile backwards.

Default Value - No

Note Reference(s) 179522.1

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: Cutoff History Days

Profile Code MRPProfile Option Name MRP_CUTOFF_HISTORY_DAYSDescription Not used by Advanced Supply Chain Planning

Note 303809.1 has more information about this Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes

Page 19: Advanced Planning and Scheduling Profile Options Setups

12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: Disable Project Validation

Profile Code MRPProfile Option Name MRP_DISABLE_PROJECT_VALIDATIONDescription Special profile for Seiban project numbers. Used

for release of planned orders from the ASCP workbench. Profile set in EBS Source in distributed installation.

Valid values are:

• Yes - project validation won't be executed. • No - the project validation will be executed.

Default Value - No when NULL

11.5.10 Patch 6903209One off patch released by DEV. Also included in 1st APS Source Side UI patch 7427625 and all Source Side rollups since October 2008

Bug 6903209One off patch released for 11.5.10

12.0.6 bypass code included in $MRP_TOP/patch/115/MRPRLWFB.pls 120.1.12000000.6 BUT - the profile is not created, and must be created manually - see below

12.1.1 and abovebypass code included in

Page 20: Advanced Planning and Scheduling Profile Options Setups

$MRP_TOP/patch/115/MRPRLWFB.pls 120.1.12010000.2 and aboveBUT - the profile is not created, and must be created manually - see below

Maunual Profile Creation detailsApplication - Master Scheduling/MRPHierarchy Type - SecurityHierarchy Type Access Level Visible and Updatable at the following levelsSite, Application, Responsibility, User

SQL validation:SQL="select lookup_code, meaning \"MRP:DisableProjectValidation\"into :profile_option_value, :visible_option_valuefrom fnd_lookupswhere lookup_type = 'YES_NO'"Column="\"MRP:DisableProjectValidation\"(*)"

Note Reference(s)

Bug Reference(s) 6865274Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning YesCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: Explode Demand Through Phantom Component

Profile Code MRP

Page 21: Advanced Planning and Scheduling Profile Options Setups

Profile Option Name MRP_EXPL_DEM_THROUGH_PHANTOMDescription Not used in Oracle Advanced Planning.

This is used by MRP to decide whether demand needs to be exploded through Phantom components or not.

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: Firm Internal Req Transferred to OE

Profile Code MRPProfile Option Name MRP_FIRM_OE_XFERRED_INTERNAL_REQDescription Valid values are:

• Yes - all internal requisitions transferred to Oracle Order Management are treated as firm supplies by Oracle Advanced Supply Chain Planning

• No - Oracle Advanced Supply Chain Planning may generate reschedule recommendations for these internal requisitions.

Rescheduled recommendations cannot be released to purchasing for internalrequisitions. To reschedule recommendations, cancel the internal requisition in the source instance and create a new requisition with the new date.

Default Value - Yes Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning YesCollaborative Planning NoInventory Optimization No

Page 22: Advanced Planning and Scheduling Profile Options Setups

Service Parts Planning YesAll Plan Types NoEnforce Constraints – Not Optimized No

Enforce Constraints – Optimized No

Disable Constraints – Not Optimized No

Disable Constraints – Optimized NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization YesAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: Hash Area Size (Bytes)

Profile Code MRPProfile Option Name MRP_HASH_AREA_SIZEDescription Used in 11.5.9 and below for Data Collections.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: Ignore Alternate BOM/Routing

Profile Code MRPProfile Option Name MRP_IGNORE_ALTERNATESDescription Not Used in Oracle Advanced Planning, only for Oracle MRP.

Ref Bug 3824520Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning No

Page 23: Advanced Planning and Scheduling Profile Options Setups

Collaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: Ignore Zero Quantity Demands in Calculating First Bucket for Statistical Forecasting

Profile Code MRPProfile Option Name MRP_IGNORE_ZERO_QTY_DEMANDSDescription Not used in Oracle Advanced Planning.

This is for standard MRP Forecasting functionality - program INCFIFNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: Net All Purchase Orders Prior To Requisitions

Profile Code MRPProfile Option Name MRP_FIRM_REQS_WITHIN_TFDescription Use this profile to specify whether or not the planning engine should net all

existing supplies prior to netting purchase requisitions.

• Yes - Net purchase orders, then net purchase requisitions. This may result in purchase requisitions with schedule dates earlier than purchase orders being canceled or rescheduled out.

• No - Net purchase orders and purchase requisitions together. Note: If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option.

Default - No

Page 24: Advanced Planning and Scheduling Profile Options Setups

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: Old Sales Orders Cutoff Days

Profile Code MRPProfile Option Name MRP_OLD_SO_CUTOFF_DAYSDescription Not used in Oracle Advanced Planning.

Used by MRP to decide on the amount of sales order to be considered going backward from sysdate.

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 25: Advanced Planning and Scheduling Profile Options Setups

MRP: Persist ATP Results

Profile Code MRPProfile Option Name MRP_ATP_PERSISTDescription As per bug# 5102683, profile added in 11.5.9. I could not find the profile

information in 11.5.10 or R12 docsNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

MRP: Plan Revenue Discount Percent

Profile Code MRPProfile Option Name MRP_BIS_AV_DISCOUNTDescription Specifies the average discount percent applied to all items in a plan. This

value is a key performance indicator used to calculate performance in a planfor Business Intelligence reports. Valid values are:

• Integers between 0 and 100.

Optional - Average Discount to be applied when calculating Revenue of a plan as part of Plan Performance Indicators Set on EBS Source and APS Destination in a distributed installation.

Default Value - NULLNote Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning No

Page 26: Advanced Planning and Scheduling Profile Options Setups

Inventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: Plan Revenue Price List

Profile Code MRPProfile Option Name MRP_BIS_PRICE_LISTDescription Lookup for Price List in Order Management Optional - Price List used to

calculate revenue of a plan as part of Plan Performance Indicators- from SO_PRICE_LISTS. Valid values are:

• Numeric

This value is a key performance indicator used to calculate performance in a plan for Business Intelligence reports. Set in EBS Source in a distributed installation.

Default Value - NULLNote Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: Planning Manager Run First Time

Profile Code MRPProfile Option Name MRP_PLNG_MGR_FIRST_TIMEDescription Not used by Oracle Advanced Planning.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles

Page 27: Advanced Planning and Scheduling Profile Options Setups

11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: RHX Check Profile

Profile Code MRPProfile Option Name MRP_RHX_CHECK_PROFILE_FPDescription Not used by Oracle Advanced Planning.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: Round Source Entries

Profile Code MRPProfile Option Name MRP_ROUND_SOURCE_ENTRIESDescription Not used in Oracle Advanced Planning.

Used by MRP to decide whether to round forecast or sales order quantities when loading the forecast or MDS.

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 Profile

Page 28: Advanced Planning and Scheduling Profile Options Setups

Data Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: Sort Area Size (Bytes)

Profile Code MRPProfile Option Name MRP_SORT_AREA_SIZEDescription Used for Data Collections in 11.5.9 and below.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: Update Requested Completion Date when Releasing Reschedules

Profile Code MRPProfile Option Name MRP_UPD_REQ_DATE_RELDescription Not used in Oracle Advanced Supply Planning.

Exists in release code for MRP Planning in MRP_REL_PLAN_PUB

File $MRP_TOP/patch/115/sql/MRPPRELB.pls

See profile for Advanced Supply Chain Planning - MSC: Update Requested Completion Date when Releasing Reschedules

Note Reference(s) Bug Reference(s)Document References(s)

Page 29: Advanced Planning and Scheduling Profile Options Setups

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: Use Alternate SQL for Daily Cleanup

Profile Code MRPProfile Option Name MRP_ALTERNATE_SQLDescription Not used for Advanced Planning. This is for the planning manager Once-A-

Day Task Worker operations.Ref Bug 3958467

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: Use Progress Bar for Backlog Workbench

Profile Code MRPProfile Option Name MRP_ATP_PROGRESS_BARDescription The progress bar is querying of the TCF Socket server to get status report

on how much processing has been completed. When running high volume, this causes too much processing and can slow or halt effective operation of the Backlog Workbench.

• Yes - shows the progress bar in the Backlog Workbench form

Page 30: Advanced Planning and Scheduling Profile Options Setups

• No - do not show the progress bar in the Backlog Workbenchform. For high volume processing in the Order Backlog Workbench, set this profile = No. This disables the progress bar in the form.

Default value = YesNote Reference(s)

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

MRP: i2 Batch Client Timeout

Profile Code MRPProfile Option Name MRP_I2_P_BC_TIMEOUTDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 31: Advanced Planning and Scheduling Profile Options Setups

MRP: i2 Calc Cumulative Yield

Profile Code MRPProfile Option Name MRP_I2_P_ENABLE_CUMUL_YIELDDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: i2 Check if FP installed

Profile Code MRPProfile Option Name MRP_I2_P_CHECK_FOR_FPDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: i2 Data Load Timeout

Profile Code MRP

Page 32: Advanced Planning and Scheduling Profile Options Setups

Profile Option Name MRP_I2_P_DATA_LOAD_TIMEOUTDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: i2 Date Constant

Profile Code MRPProfile Option Name MRP_I2_P_DATE_CONSTANTDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: i2 Debug Mode

Profile Code MRPProfile Option Name MRP_I2_P_DEBUGDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)

Page 33: Advanced Planning and Scheduling Profile Options Setups

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: i2 Factory Planner Exec Dir Attr Number

Profile Code MRPProfile Option Name MRP_I2_P_FP_EDIR_ATTR_NUMDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: i2 Factory Planner User Attribute Number

Profile Code MRPProfile Option Name MRP_I2_P_FP_USER_ATTR_NUMDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance No

Page 34: Advanced Planning and Scheduling Profile Options Setups

Advanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: i2 Job Change Attribute Number

Profile Code MRPProfile Option Name MRP_I2_P_JC_ATTR_NUMDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: i2 Log Directory

Profile Code MRPProfile Option Name MRP_I2_P_LOG_DIRDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning No

Page 35: Advanced Planning and Scheduling Profile Options Setups

Rapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: i2 Net Change Dir

Profile Code MRPProfile Option Name MRP_I2_P_FP_NET_DIRDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: i2 RHYTHM Aggregate Resource Attribute Number

Profile Code MRPProfile Option Name MRP_I2_P_AGG_RES_ATTR_NUMDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization No

Page 36: Advanced Planning and Scheduling Profile Options Setups

Advanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: i2 RHYTHM BC Delimiter

Profile Code MRPProfile Option Name MRP_I2_P_BC_DELIMITERDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: i2 RHYTHM BOM Attribute Consumed attribute number

Profile Code MRPProfile Option Name MRP_I2_P_BOM_AC_ATTR_NUMDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 37: Advanced Planning and Scheduling Profile Options Setups

MRP: i2 RHYTHM BOM Attribute Produced attribute number

Profile Code MRPProfile Option Name MRP_I2_P_BOM_AP_ATTR_NUMDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: i2 RHYTHM Batch Client Filter

Profile Code MRPProfile Option Name MRP_I2_P_BCL_FILTERDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 38: Advanced Planning and Scheduling Profile Options Setups

MRP: i2 RHYTHM Cooldown Time Attribute Number

Profile Code MRPProfile Option Name MRP_I2_P_RES_CDT_ATTR_NUMDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: i2 RHYTHM Delimiter

Profile Code MRPProfile Option Name MRP_I2_P_DELIMITERDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: i2 RHYTHM Enable Attribute Base Planning

Profile Code MRP

Page 39: Advanced Planning and Scheduling Profile Options Setups

Profile Option Name MRP_I2_P_ENABLE_ABPDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: i2 RHYTHM Estimated Queue Time Attribute Number

Profile Code MRPProfile Option Name MRP_I2_P_RES_EQT_ATTR_NUMDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: i2 RHYTHM Factory Planner Data Dir AttributeNumber

Profile Code MRPProfile Option Name MRP_I2_P_FP_DD_ATTR_NUMDescription Not used in Oracle Advanced Planning

Page 40: Advanced Planning and Scheduling Profile Options Setups

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: i2 RHYTHM Factory Planner Host Attribute Number

Profile Code MRPProfile Option Name MRP_I2_P_FP_HOST_ATTR_NUMDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: i2 RHYTHM Factory Planner Port Attribute Number

Profile Code MRPProfile Option Name MRP_I2_P_FP_PORT_ATTR_NUMDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)

Page 41: Advanced Planning and Scheduling Profile Options Setups

Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: i2 RHYTHM Inventory Attribute Alias Separator

Profile Code MRPProfile Option Name MRP_I2_P_INV_AA_SEPDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: i2 RHYTHM Minimum Queue Time Attribute Number

Profile Code MRPProfile Option Name MRP_I2_P_RES_MQT_ATTR_NUMDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles

Page 42: Advanced Planning and Scheduling Profile Options Setups

11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: i2 RHYTHM OE Attribute Consumed attribute number

Profile Code MRPProfile Option Name MRP_I2_P_OE_AC_ATTR_NUMDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: i2 RHYTHM Offloadable To Attribute Number

Profile Code MRPProfile Option Name MRP_I2_P_RES_OFFTO_ATTR_NUMDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance No

Page 43: Advanced Planning and Scheduling Profile Options Setups

Advanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: i2 RHYTHM Offloadable from Attribute Number

Profile Code MRPProfile Option Name MRP_I2_P_RES_OFFFROM_ATTR_NUMDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: i2 RHYTHM PO Attribute Alias attribute number

Profile Code MRPProfile Option Name MRP_I2_P_PO_AA_ATTR_NUMDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning No

Page 44: Advanced Planning and Scheduling Profile Options Setups

Collaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: i2 RHYTHM Part Buffer Style Attribute Number

Profile Code MRPProfile Option Name MRP_I2_P_BUF_STYLE_ATTR_NUMDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: i2 RHYTHM Resource Type Attribute Number

Profile Code MRPProfile Option Name MRP_I2_P_RES_TYP_ATTR_NUMDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning No

Page 45: Advanced Planning and Scheduling Profile Options Setups

Demantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: i2 RHYTHM released as firm manufacturing order

Profile Code MRPProfile Option Name MRP_I2_P_RELEASED_AS_FIRMDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: i2 RhythmLink Data Directory

Profile Code MRPProfile Option Name MRP_I2_P_RL_DATA_DIRDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center No

Page 46: Advanced Planning and Scheduling Profile Options Setups

Global Order Promising No

MRP: i2 RhythmLink Executable Directory

Profile Code MRPProfile Option Name MRP_I2_P_RL_EXEC_DIRDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: i2 RhythmLink Host

Profile Code MRPProfile Option Name MRP_I2_P_RL_HOSTDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 47: Advanced Planning and Scheduling Profile Options Setups

MRP: i2 RhythmLink Port Number

Profile Code MRPProfile Option Name MRP_I2_P_RL_PORT_NUMDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: i2 RhythmLink User

Profile Code MRPProfile Option Name MRP_I2_P_RL_USERDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: i2 Start Factory Planner Client

Profile Code MRP

Page 48: Advanced Planning and Scheduling Profile Options Setups

Profile Option Name MRP_I2_P_START_FP_CLIENTDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: i2 Start RhythmLink Client

Profile Code MRPProfile Option Name MRP_I2_P_START_RL_CLIENTDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP: i2 WIP Job Load Timeout

Profile Code MRPProfile Option Name MRP_I2_P_JOB_LOAD_TIMEOUTDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)

Page 49: Advanced Planning and Scheduling Profile Options Setups

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:ATP Assignment Set

Profile Code MRPProfile Option Name MRP_ATP_ASSIGN_SETDescription Indicates the assignment set name for use with Oracle Global Order

Promising. When set to Null, Oracle Global Order Promising uses the assignment set from profile MSC: ATP Assignment Set from Oracle Advanced Planning Solution instance. Update this profile at site level on the source instance

Note Reference(s) 147243.1

Bug Reference(s) 4567833Document References(s) -1

-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

MRP:ATP Database Link

Profile Code MRPProfile Option Name MRP_ATP_DATABASE_LINKDescription Determines whether distributed Order Promising is used. This profile is

Page 50: Advanced Planning and Scheduling Profile Options Setups

obsolete in 11.5.10 and later releases.Note Reference(s)

Bug Reference(s) 3049003Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:Activate OLP

Profile Code MRPProfile Option Name MRP-OLPDescription Not used by Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:Allow Safety Stock Pegging

Profile Code MRPProfile Option Name MRP_ALLOW_SS_PEGGINGDescription This is a MRP Profile. Not used in advanced Supply Chain PlanningNote Reference(s)

Bug Reference(s) 5924044

Page 51: Advanced Planning and Scheduling Profile Options Setups

Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:Backlog Progress Timeout

Profile Code MRPProfile Option Name MRP_BALWB_TIMEOUTDescription Not used by Oracle Advanced Planning.Note Reference(s)

Bug Reference(s) 5500074Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

MRP:Calculate Excess Exceptions on Time Fence

Profile Code MRPProfile Option Name MRP_CALC_EXCESS_EXCEPTDescription Indicates whether excess exceptions are calculated at the time fence or up to

the time fence• Yes: The planning engine issuesexceptions only at the time

fence date.• No: The planning engine issues individual exception.

Page 52: Advanced Planning and Scheduling Profile Options Setups

Valid values: yes/noDefault value: yes

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:Combine Sugg Rep Schedules

Profile Code MRPProfile Option Name MRP_COMBINE_REP_SCHEDULEDescription Combines repetitive schedules, if scheduled back-to-back for the same

quantity. Used only by unconstrained plans

Valid values: yes/noDefault value: yes

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 53: Advanced Planning and Scheduling Profile Options Setups

MRP:Complete Supply Chain ATP

Profile Code MRPProfile Option Name MRP_COMPLETE_SCATPDescription Not used by Advanced Supply Chain Planning.

Note Reference(s)

Bug Reference(s) 26558912941520

Document References(s) -1-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:Compute Sales Order Changes

Profile Code MRPProfile Option Name MRP_COMPUTE_SO_CHANGESDescription Not used by Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center No

Page 54: Advanced Planning and Scheduling Profile Options Setups

Global Order Promising No

MRP:Consume Fcst Set Summary

Profile Code MRPProfile Option Name MRP_CONSUME_FC_SET_SUMMARYDescription Not used by Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:Consume Forecast

Profile Code MRPProfile Option Name MRP_FORECAST_CONSUMPTIONDescription Not used in Oracle Advanced Planning.Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center No

Page 55: Advanced Planning and Scheduling Profile Options Setups

Global Order Promising No

MRP:Consume MDS

Profile Code MRPProfile Option Name MRP_MDS_CONSUMPTIONDescription If set to yes, planning manager needs to be running when loading MDS in the

ASCP plan

Note Reference(s) 790125.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:Consume MPS

Profile Code MRPProfile Option Name MRP_MPS_CONSUMPTIONDescription If set to yes, planning manager needs to be running on the source to collect

WIP/PO supplies.Note Reference(s) 790125.1

Bug Reference(s) 4890962Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Page 56: Advanced Planning and Scheduling Profile Options Setups

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:Create Time fence

Profile Code MRPProfile Option Name MRP_FIRM_ORDER_TFDescription Instructs the planning engine to create a natural time fence on firm work

orders, purchase orders, flow schedules and shipments. Valid values are:• Yes - create a natural time fence based on firm work orders,

purchase orders, flow schedules, and shipments

• No - the planning engine does not create a time fence

The planning engine honors the item attribute Planning Time Fence regardless of the value of this profile option.

Note Reference(s) 399888.1 422361.1

Bug Reference(s)Document References(s) -1

-1-1-1-1-1-1-1-1-1-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Page 57: Advanced Planning and Scheduling Profile Options Setups

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:Cutoff Date Offset Months

Profile Code MRPProfile Option Name MRP_CUTOFF_DATE_OFFSETDescription Determines how many months of resource availability should be computed

for resources and simulation sets. No resource availability is calculated beyond this horizon. For constrained plans beyond this horizon, resource capacity is viewed as infinite. Set this value to your plan horizon

Valid values: Integer >= 0Default value: 6

Note Reference(s)

Bug Reference(s) 4736046Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:Debug Mode

Profile Code MRPProfile Option Name MRP_DEBUGDescription Enables debug messages within Oracle Advanced Supply Chain Planning

when set to Yes.Valid values: yes/no

Page 58: Advanced Planning and Scheduling Profile Options Setups

Default value: NoNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance YesAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning YesCollaborative Planning NoInventory Optimization YesService Parts Planning Yes

All Plan Types NoEnforce Constraints – Not Optimized No

Enforce Constraints – Optimized No

Disable Constraints – Not Optimized No

Disable Constraints – Optimized NoRapid Planning NoDemand Planning YesDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

MRP:Default Criteria Set

Profile Code MRPProfile Option Name MRP_DEFAULT_CRITERIA_SETDescription Not used by Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 59: Advanced Planning and Scheduling Profile Options Setups

MRP:Default DRP Plan Name

Profile Code MRPProfile Option Name MRP_DEFAULT_DRP_NAMEDescription Not used by Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:Default Forecast Date

Profile Code MRPProfile Option Name MRP_DEFAULT_FORECAST_DATEDescription Not used by Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:Default Forecast Name

Profile Code MRP

Page 60: Advanced Planning and Scheduling Profile Options Setups

Profile Option Name MRP_DEFAULT_FORECASTDescription Not used by Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:Default Plan Name

Profile Code MRPProfile Option Name MRP_DEFAULT_PLANDescription Not used by Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:Default Schedule Name

Profile Code MRPProfile Option Name MRP_DEFAULT_SCHEDULEDescription Not used by Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)

Page 61: Advanced Planning and Scheduling Profile Options Setups

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:Default Sourcing Assignment Set

Profile Code MRPProfile Option Name MRP_DEFAULT_ASSIGNMENT_SETDescription Not used by Oracle Advanced Planning.

Used in Oracle Purchasing to determine the sourcing assignment set to assign sources to requisitions.

Note Reference(s) 209633.1 763822.1

Bug Reference(s) 7362528Document References(s) Oracle Global Order Promising Implementation and User's Guide

-1-1Oracle Master Scheduling/MRP and Oracle Supply Chain Planning User's Guide-1

Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

Page 62: Advanced Planning and Scheduling Profile Options Setups

MRP:Demand Time Fence Days

Profile Code MRPProfile Option Name MRP_DEMAND_TFDescription Not used by Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:Derive PO supply date from need by date

Profile Code MRPProfile Option Name MRP_CALC_SUPDT_FROM_NBDTDescription Not used in ASCP

Used in Inventory Supply Demand form - Ref Bug 7260101

Check the value of the profile MRP:Derive PO supply date from need by dateIf this set to No, set it to Yes. Then, we derive the PO due date as need by date + post processing lead time.

This calculation is done during the supply/demand inquiry.If this is not set, then the date displayed in the supply/demand inquiry is the expected_delivery_date in mtl_supply.

Note Reference(s)

Bug Reference(s) 7260101Document References(s) -1

Page 63: Advanced Planning and Scheduling Profile Options Setups

Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:Enhanced Exception

Profile Code MRPProfile Option Name MRP_ENHANCED_EXCEPTIONDescription Not used by Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:Environment variable to set path for MRP files

Profile Code MRPProfile Option Name MRP_FILES_PATH_ENV_VARDescription Specifies appropriate path for the MRP files. If this profile option is not used,

files are written to the $APPLOUT directory.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections No

Page 64: Advanced Planning and Scheduling Profile Options Setups

Item Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:Firm Planned Order Time Fence

Profile Code MRPProfile Option Name MRP_FIRM_PO_TFDescription Instructs the planning engine to create a natural time fence for an item at the

completion date of the latest firm planned order. Valid values are:• Yes - firm planned orders create a natural time fence.

• No - planning engine does not create a time fence at a firm

planned order

If the overwrite option in the plan is set to overwrite all, then all firm planned orders are deleted

Note Reference(s)

Bug Reference(s) 36420862553205

Document References(s) -1-1-1-1-1-1-1-1-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types No

Page 65: Advanced Planning and Scheduling Profile Options Setups

Unconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:Include Schd Rcpts in Use-up

Profile Code MRPProfile Option Name MRP_SCH_RCP_USEUPDescription If this profile option is set to Yes, it includes scheduled receipts when

computing the engineering change order use-up date.Note Reference(s)

Bug Reference(s) 5087357Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:Include Substitute Components

Profile Code MRPProfile Option Name MRP_ATP_SUB_COMPDescription This profile option indicates whether to include substitute components in

Order Promising calculation. Can update at the site level

Valid values are Yes and No.Default value = Yes

Note Reference(s)

Page 66: Advanced Planning and Scheduling Profile Options Setups

Bug Reference(s) 31623341555350

Document References(s) -1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

MRP:Interface Table History Days

Profile Code MRPProfile Option Name MRP_INTERFACE_HISTORY_DAYSDescription Not used by Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:MPS Relief Batch Size

Profile Code MRPProfile Option Name MRP_MPS_RELIEF_BATCHDescription Not used in Oracle Advanced Planning.

This is for standard MRP processing of MPS Relief.

Page 67: Advanced Planning and Scheduling Profile Options Setups

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:MPS Relief Direction

Profile Code MRPProfile Option Name MRP_MPS_RELIEF_DIRECTION_CONTROLDescription Not used by Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:Maintain Original Schedule Version

Profile Code MRPProfile Option Name MRP_ORIGINAL_SCHEDULE_VERSIONDescription Not used in Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes

Page 68: Advanced Planning and Scheduling Profile Options Setups

12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:Perform Planning Manager Functions in Loads

Profile Code MRPProfile Option Name MRP_PLANNING_MANAGER_IN_LOADSDescription Not used by Oracle Advanced PlanningNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:Planner Batch Size

Profile Code MRPProfile Option Name MRP_PLANNER_BATCH_SIZEDescription Not used by Oracle Advanced Planning. This profile is used by the MRP

planning manager. This impacts ASCP only in the sense that it affects how the planning manager runs.

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance No

Page 69: Advanced Planning and Scheduling Profile Options Setups

Advanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:Planner Workers

Profile Code MRPProfile Option Name MRP_PLANNER_WORKERSDescription Not used by Oracle Advanced Planning. This profile is used by the MRP

Planning Manager.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:Planning Manager Batch Size

Profile Code MRPProfile Option Name MRP_SCHED_MGR_BATCH_SIZEDescription Not used by Oracle Advanced Planning.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization No

Page 70: Advanced Planning and Scheduling Profile Options Setups

Service Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:Planning Manager Max Workers

Profile Code MRPProfile Option Name MRP_SCHED_MGR_MAX_WORKERSDescription Not used by Oracle Advanced Planning.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:Purchasing By Revision

Profile Code MRPProfile Option Name MRP_PURCHASING_BY_REVISIONDescription When set to Yes, creates purchase requisitions using the latest revision date

on the item.Note Reference(s)

238838.1

Bug Reference(s) 3939138Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC No

Page 71: Advanced Planning and Scheduling Profile Options Setups

Distribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:Purge Batch Size

Profile Code MRPProfile Option Name MRP_PURGE_BATCH_SIZEDescription Used by Oracle Advanced Supply Chain Planning collections and SnapshotNote Reference(s) .111955.1

Bug Reference(s) 4590579Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning YesCollaborative Planning NoInventory Optimization YesService Parts Planning Yes

All Plan Types NoEnforce Constraints – Not Optimized No

Enforce Constraints – Optimized No

Disable Constraints – Not Optimized No

Disable Constraints – Optimized NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization YesAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:Recommend action within PTF

Profile Code MRPProfile Option Name MRP_REC_ACTION_IN_PTFDescription Affects exceptions and recommendations. It instructs the planning engine, in

unconstrained plans, to generate recommendations for scheduled receipts earlier than Planning Time Fence Date.

Page 72: Advanced Planning and Scheduling Profile Options Setups

This profile is not used for MSO (constrained planning), looks at planning time fence control.

Note Reference(s)

Bug Reference(s) 2980511Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:Repetitive Past Due Supply Days

Profile Code MRPProfile Option Name MRP_REP_PAST_DUE_SUPPLYDescription Not used by Oracle Advanced Planning.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 73: Advanced Planning and Scheduling Profile Options Setups

MRP:Requisition Load Group Option

Profile Code MRPProfile Option Name MRP_LOAD_REQ_GROUP_BYDescription Obsolete in 11.5.10 and later.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:Retain Dates Within Calendar Boundary

Profile Code MRPProfile Option Name MRP_RETAIN_DATES_WTIN_CAL_BOUNDARYDescription Determines whether to pull dates outside the calendar boundary into

calendar horizon.Note Reference(s)

Bug Reference(s) 4874810Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 74: Advanced Planning and Scheduling Profile Options Setups

MRP:Snapshot Pause for Lock (Minutes)

Profile Code MRPProfile Option Name MRP_SNAPSHOT_PAUSE_FOR_LOCKDescription Not used by Oracle Advanced Planning.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:Snapshot Substitute Parts

Profile Code MRPProfile Option Name MRP_SNAP_SUBSTITUTESDescription Not used in Oracle Advanced Planning.Note Reference(s)

Bug Reference(s) 6436732Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 75: Advanced Planning and Scheduling Profile Options Setups

MRP:Snapshot Workers

Profile Code MRPProfile Option Name MRP_SNAPSHOT_WORKERSDescription Determines number of workers launched by the snapshot monitor. When set

to 0, the Snapshot runs as a single- threaded process. Snapshot workers collect data on bills of material, work in process, on- hand quantities, purchasing, firm planned orders, routings, and work-in-process job resource requirements.

Note Reference(s) 111955.1 824317.1 130995.1

Bug Reference(s)Document References(s) -1

-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:Sourcing Rule Category Set

Profile Code MRPProfile Option Name MRP_SRA_CATEGORY_SETDescription Not used in Advanced Supply Chain Planning

Indicates the category set used when Oracle Supply Chain Planning or Oracle Purchasing creates sourcing assignments at category-org or categorylevel.

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning No

Page 76: Advanced Planning and Scheduling Profile Options Setups

Inventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:Time Fence Warning

Profile Code MRPProfile Option Name MRP_MPS_TIME_FENCE_WARNINGDescription Not used in Oracle Advanced Planning.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:Trace Mode

Profile Code MRPProfile Option Name MRP_TRACEDescription Determines whether trace is enabled for all Oracle Advanced Supply Chain

Planning processes.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning No

Page 77: Advanced Planning and Scheduling Profile Options Setups

Demantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:Use Direct Load Option

Profile Code MRPProfile Option Name MRP_DIRECT_LOADDescription Valid values are:

• Yes - SQL Loader is called directly to load rows into the database during planning.

• No

Default Value - No Note Reference(s) 307443.1

Bug Reference(s)Document References(s) -1

Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types YesUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning YesCollaborative Planning NoInventory Optimization YesService Parts Planning Yes

All Plan Types NoEnforce Constraints – Not Optimized No

Enforce Constraints – Optimized No

Disable Constraints – Not Optimized No

Disable Constraints – Optimized NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP:Use Ship Arrived Flag

Profile Code MRPProfile Option Name MRP_SHIP_ARRIVE_FLAGDescription From Note 179522.1, this profile is used when collecting Instransit Supplies.

Valid values are:

Page 78: Advanced Planning and Scheduling Profile Options Setups

• Yes - then we check the WSH_NEW_DELIVERIES.ULTIMATE_DROPOFF_DATE to populate MRP_AP_INTRANSIT_SUPPLIES_V.ARRIVED_FLAG

• Arrived - then we do not collect this supply• No - Then we collect the intransit supply.

Default Value - NoNote Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MRP_NEW_PLANNER_BACK_COMPATIBILITY

Profile Code MRPProfile Option Name MRP_NEW_PLANNER_BACK_COMPATIBILITYDescription Per bug 9848641:

There have been changes back and forth with this profile in combination with MSC: New Planner Backward Compatibility.

1. MRP profile will remain the same. It will decided whether an item should be treated as phantom or not.2. MSC on the other hand will now decide whether the new algorithm would be used or the old one. Yes would mean old and No would mean new.

Yes - Phantoms will be treated as regular items and planned orders will be created.

No - Phantoms will be exploded, and not appear in the plan.

Page 79: Advanced Planning and Scheduling Profile Options Setups

Default - Null - which is No

Note Reference(s)

Bug Reference(s) 9848641Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types YesUnconstrained Plan YesConstrained – EDD Yes

Constrained – ECC YesDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning Yes

All Plan Types YesEnforce Constraints – Not Optimized Yes

Enforce Constraints – Optimized Yes

Disable Constraints – Not Optimized Yes

Disable Constraints – Optimized YesRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC : Consider all supplies for VMI replenishment calculation

Profile Code MSCProfile Option Name MSC_VMI_ALL_SUPPLYDescription When profile is set as yes the VMI engine considers all manually created

PO/PR/ASN/Shipments as supply and account them in replenishment calculation

Note Reference(s)

Bug Reference(s) 5949512Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning Yes

Page 80: Advanced Planning and Scheduling Profile Options Setups

Inventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC : Consume Highest Revision Forecast

Profile Code MSCProfile Option Name MSC_CONSUME_HIGHEST_REV_FCSTDescription Guides whether Sales Orders for lower revisions in the supersession chain

will consume against the highest revision forecast or not. Valid values are:

• Yes - Lower revision SOs consume against forecast of only theHighest revision

• No

Default Value - YesNote Reference(s)

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC : Publish Supply Commit based on pegging information

Profile Code MSCProfile Option Name MSC_PUBLISH_SUPPLY_COMMITDescription Enables or disables detailed publish of supply commits as a single supply

commit record or multiple supply commit records if there are multiple supplies to meet the demand. Valid values are:

Page 81: Advanced Planning and Scheduling Profile Options Setups

• Yes• No

Default Value - NoNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning YesInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC : VMI Requisitions Need By Date at RTF end

Profile Code MSCProfile Option Name MSC_VMI_REQUISTION_AT_RTF_ENDDescription When set to yes, this profile option ignores the release time fenceNote Reference(s)

Bug Reference(s) 6001195Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning YesInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: 64-bit Planner Platform

Profile Code MSCProfile Option Name MSC_PLANNER_PLATFORM

Page 82: Advanced Planning and Scheduling Profile Options Setups

Description Set to the supported 64-bit platforms. Valid values are:

• Sun 64-bit• HP 64-bit• AIX 64-bit• Linux 64-bit• HP Itanium 64-bit

Note Reference(s) 254810.1

Bug Reference(s) 6836990Document References(s) -1

Oracle Advanced Supply Chain Planning Implementation and User's Guide-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: APCC Calendar Code

Profile Code MSCProfile Option Name MSC_HUB_CAL_CODEDescription Used in the dashboard to code manufacturing calendar.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning No

Page 83: Advanced Planning and Scheduling Profile Options Setups

Rapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: APCC Category Set 1

Profile Code MSCProfile Option Name MSC_HUB_CAT_SET_ID_1Description Used to filter the category set name. Only 3 category sets are supported, and

dashboards will use this profile in the dashboards.Note Reference(s) 844667.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center YesManufacturing Operations Center NoGlobal Order Promising No

MSC: APCC Category Set 2

Profile Code MSCProfile Option Name MSC_HUB_CAT_SET_ID_2Description This profile works in conjunction with MSC: APCC Category Set 1 and MSC:

APCC Category Set 3. These profiles govern which category set the analytical layer when displaying the item-category hierarchy uses.

It precomputes the data for all three hierarchies, but displays the data using only the MSC: APCC Category Set 1 value. Therefore, if the user wants to view using the value in MSC: APCC Category Set 2, the values in these two profiles must be switched. The user can then see the results using the new category set, which is now in the MSC: APCC Category Set 1 profile.

There is no need to rerun the plan or republish it to APCC, however, if user decides to use a completely new category set, which is not currently in these three profiles, then theprofile values must be updated, and the plans must be rerun, or republished,

Page 84: Advanced Planning and Scheduling Profile Options Setups

to APCC for the change to take effect.

This is a site level profileNote Reference(s) 759571.1

844667.1

Bug Reference(s) 6836737Document References(s) -1

-1-1-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center YesManufacturing Operations Center NoGlobal Order Promising No

MSC: APCC Category Set 3

Profile Code MSCProfile Option Name MSC_HUB_CAT_SET_ID_3Description This profile works in conjunction with MSC: APCC Category Set 1 and MSC:

APCC Category Set 2. These profiles govern which category set the analytical layer when displaying the item-category hierarchy uses.

It precomputes the data for all three hierarchies, but displays the data using only the MSC: APCC Category Set 1 value. Therefore, if the user wants to view using the value in MSC: APCC Category Set 3, the values in these two profiles must be switched. The user can then see the results using the new category set, which is now in the MSC: APCC Category Set 1 profile.

There is no need to rerun the plan or republish it to APCC, however, if user decides to use a completely new category set, which is not currently in these three profiles, then theprofile values must be updated, and the plans must be rerun, or republished, to APCC for the change to take effect.

This is a site level profile.Note Reference(s)

844667.1

Bug Reference(s)Document References(s) -1

-1-1

Page 85: Advanced Planning and Scheduling Profile Options Setups

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center YesManufacturing Operations Center NoGlobal Order Promising No

MSC: APCC Currency Code

Profile Code MSCProfile Option Name MSC_HUB_CUR_CODE_RPTDescription The analytical layer to convert the values in functional currency to a common

reporting currency uses this. This profile is used as the reporting currency for APCC.

Please note that if this profile is changed the plan must be republished to APCC repository to see the data in the new currency.

This is a site level profile.Note Reference(s) 759571.1

844667.1

Bug Reference(s)Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center YesManufacturing Operations Center NoGlobal Order Promising No

MSC: APCC Period Set name

Profile Code MSCProfile Option Name MSC_HUB_PERIOD_SET_NAME

Page 86: Advanced Planning and Scheduling Profile Options Setups

Description The analytical layer and the dashboards that display time in the hierarchy of days, fiscal periods, quarters, and year use this.

This is a site level profile.Note Reference(s) 759571.1

844667.1

Bug Reference(s)Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center YesManufacturing Operations Center NoGlobal Order Promising No

MSC: ATP Allocation Method

Profile Code MSCProfile Option Name MSC_ALLOCATION_METHODDescription Determines the allocation method used by ATP. This is a site level profile.

Valid values are:• User-Defined Allocation Percentage• Demand Priority

Default Value - NULLNote Reference(s) 334286.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization No

Page 87: Advanced Planning and Scheduling Profile Options Setups

Advanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

MSC: ATP Capacity Allocation

Profile Code MSCProfile Option Name MSC_CAP_ALLOCATIONDescription Set it to No. You should only set it to Yes with specific instruction from Oracle

Applications development. Valid values are:• Yes• Noe

Default Value - NoNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

MSC: ATP Debug Mode

Profile Code MSCProfile Option Name MSC_ATP_DEBUGDescription Determines whether to enable debug messages within Oracle Global Order

Promising. You can update it at the user level. Valid values are:• Debug Only: ATP generates a log file for an ATP request. • Debug and Database Trace: ATP generates a log file and a

database trace file. • Database Trace Only: ATP generates a database trace file. • None: ATP does not generate log file or database trace file.

Default Value - Null

Page 88: Advanced Planning and Scheduling Profile Options Setups

In a distributed installation where you have separate EBS Source and APS Destination, then when checking ATP from the EBS source, you should have profile set at User Level on EBS and at site level on APS instance.

Note Reference(s) 954333.1 122372.1

Bug Reference(s)Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

MSC: ATP Enforces Lead Time for ATO Model

Profile Code MSCProfile Option Name MSC_ENFORCE_MODEL_LTDescription Use this profile option to specify how ATP considers lead-time. Valid values

are:

• Yes - ATP always enforces lead-times for non-ATPable ATO models

• No - ATP does not enforce lead-times for non-ATPable ATO models

Based on recent information we found the following:

11.5.9, customers could schedule Non-ATPable ATO models with leadtime values in Processing leadtime columns.

Starting in 11.5.10, you must use this profile to

Page 89: Advanced Planning and Scheduling Profile Options Setups

schedule Non-ATPable models with a lead time offset.AND the lead time used for this is Fixed and Variable Lead Time, NOT the processing lead time value.

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

MSC: ATP Infinite Time Fence Pad

Profile Code MSCProfile Option Name MSC_ATP_INFINITE_TF_PADDescription Oracle Global Order Promising adds the number of days specified in this

profile option to the infinite time fence you specify in an ATP rule. It inflates the infinite time fence by that number of days. Valid values are:

• Interger >=0

Use this profile option when you want an infinite time fence date for an item to be based on the item manufacturing lead-times plus extra days.

This is a site level profile option.

Default Value - NullNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning No

Page 90: Advanced Planning and Scheduling Profile Options Setups

Collaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

MSC: ATP Synchronization Downtime (minutes)

Profile Code MSCProfile Option Name MSC_ATP_SYNC_DOWNTIMEDescription You may need to set this profile option if you run available to promise in 24x7

mode. When new sales orders come in while the synchronization process is running, the process can run for a long time if the order volume is high. Available to promise cannot switch to the new plan until the process finishes.Specify the ATP downtime in minutes. During the downtime, there are no new sales orders for available to promise to process. The synchronization process can finish as soon as possible. There is a trade-off between available to promise downtime and the time it takes to switch to the refreshedplan. Valid values are:

• Integer>0

This is a site level profile option.

Default Value - NullNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

Page 91: Advanced Planning and Scheduling Profile Options Setups

MSC: ATP Web Service Responsibility

Profile Code MSCProfile Option Name MSC_WS_ATP_FNDRESPDescription Responsibility used when ATP web service is invokedNote Reference(s)

Bug Reference(s) 6625571Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

MSC: ATP Web Service User

Profile Code MSCProfile Option Name MSC_WS_ATP_FNDUSERDescription User used when ATP web service is invokedNote Reference(s)

Bug Reference(s) 6625571Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

Page 92: Advanced Planning and Scheduling Profile Options Setups

MSC: AVOID RE-SOURCING SALES ORDERS

Profile Code MSCProfile Option Name MSC: AVOID RE-SOURCING SALES ORDERSDescription Reconcile: Does this need to have Internal name changed to

MSC_AVOID_RESOURCING_SALES_ORDERSOR is this a duplicate?? Possible values: Yes or NoDefault: YesYes - To maintain backward compatibility. Planning logic will avoid sourcing sales orders.This will disable the following functionalities: plan by arrival date, change shipmethods, andchange source org for sales order lines.No - With this setting, you can plan by arrival date, change ship methods, and change source org provided you have set up the correct sourcing rules.

Note Reference(s) 352277.1

Bug Reference(s) 6134419Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Action Allowed on ATP 24x7 Plan While Running

Profile Code MSCProfile Option Name MSC_ALLOWED_ACTION_24X7Description This profile option controls whether you can access and make changes to the

ATP plan while it is running in 24x7 mode. The changes you make to the plan while it is running will not be reflected in the refreshed plan. If you set this profile option, consider setting MSC: ATP Synchronization Downtime (minutes). This is a site level profile option.

Valid values are: • Yes • No

Default Value - No

Page 93: Advanced Planning and Scheduling Profile Options Setups

Must be using INV: Capable to Promise - ATP/CTPbased on planning outputIn the Plan Names form, the ATP Flag must be checked for the plan you wish to use for 24x7 ATPWhen launching the plan, you must use parameter Enable 24x7 ATP = Yes

Note Reference(s)

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types YesUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning Yes

All Plan Types YesEnforce Constraints – Not Optimized No

Enforce Constraints – Optimized No

Disable Constraints – Not Optimized No

Disable Constraints – Optimized NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

MSC: Aggregate Resource Name Flexfield Attribute

Profile Code MSCProfile Option Name MSC_AGGREG_RES_NAMEDescription This profile option stores the name of the flexfield column that contains the

value in the corresponding table. See 'Flexfield Attributes, page A-1 for moreinformation.

• Set in EBS Source in a distributed installation.

Created by Create Planning Flexfields concurrent request.Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 Profile

Page 94: Advanced Planning and Scheduling Profile Options Setups

Data Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Align Component Demand Date with Pegging Date

Profile Code MSCProfile Option Name MSC_ALIGN_COMP_DMD_WITH_PEGDescription Per Bug 6512739The work orders are scheduled out further than planned

order--"cross scheduling", because the assembly level, the pegging window is very large, causing some early component supplies are pegged (via multi-hop) to late high priority demand. The scheduler's right justification pushes the work orders out. . Introduce a profile MSC: Align Component Demand Date with Pegging Date.

• Yes - the component demand will be pushed out in the first place, so it has less chance to grab the work orders

First introduced in 11.5.9 - Bug 5903195Forward ported to 11.5.10 and included in ASCP Engine/UI RUP #33 Forward ported to R12 in Bug 6266579 and present in CU3 patch 6731645 and included in 12.0.6 Fixed in base release of 12.1.1

Note Reference(s)

Bug Reference(s) 65127396266579

Document References(s) -1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization No

Page 95: Advanced Planning and Scheduling Profile Options Setups

Advanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Allocated ATP Forward Consumption Method

Profile Code MSCProfile Option Name MSC_ATP_FORWARD_CONSUME_METHODDescription This profile controls the forward consumption method for allocated available

to promise using the user-defined allocation percentage method. Valid valuesare:

• Reduce future supply from lowest priority: The shortage --after consuming its own allocated supply and available supply from a lower priority--is accounted for by using available future supply from the lowest priority. If all the demand classes are at the same priority, the shortage from ademand class consumes its own future supply. Use this if you prefer to delay some of the committed demand and hold the supply for higher priority demand classes.

• Reduce available supply from any priority: The shortage --after consuming its own allocated supply and available supply from lower priority--is accounted for by using availablesupply from higher priority demand classes. Therefore, committed demand must be accounted for before allowing more promises.

This is a site level profile option.

Default Value - Reduce future supply from lowest priorityNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

Page 96: Advanced Planning and Scheduling Profile Options Setups

MSC: Allocation Assignment Category Set

Profile Code MSCProfile Option Name MSC_ALLOC_CATEGORY_SETDescription The Assign Allocation Rule form and the Sourcing assignment form both use

the MSC: Sourcing Category Set to determine the valid category set. Use this profile option if you want the allocation rule category set to be different from the sourcingassignments category set.

Note Reference(s)

Bug Reference(s) 3128505Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Allow Release of Planned Orders from Demand Schedule Plan

Profile Code MSCProfile Option Name MSC_DRP_RELEASE_FROM_MRPDescription This profile option provides increased flexibility for releasing planned orders

and applies only to manual release. It is not considered for auto-release. MPS and MPP planned orders cannot be auto-released from the MRP. The planning engine assumes that if the item is marked so that auto-release is allowed then auto-release has already occurred from the MPS or the MPP. Valid values are:

• Yes - You can release demand schedule MPP or MPP planned orders from the lower level plan

• No - You cannot release demand schedule MPP or MPP planned orders from the lower level plan

Note Reference(s) 795033.1

Bug Reference(s) 5852065Document References(s) -1

-1-1-1

Dependent Profiles

Page 97: Advanced Planning and Scheduling Profile Options Setups

11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Allow release of replenishments above suggested quantity

Profile Code MSCProfile Option Name MSC_VMI_RELEASE_ABOVE_MAXDescription When set to yes, this will allow users to replenish more than the suggested

quantity.Note Reference(s)

Bug Reference(s) 3389269Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Analytics Currency Code

Profile Code MSCProfile Option Name MSC_ANALYTICS_CURRENCY_CODEDescription No Documentation available for this profile.Note Reference(s) Bug Reference(s)

Page 98: Advanced Planning and Scheduling Profile Options Setups

Document References(s)Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Anchor date for calculating operation yields

Profile Code MSCProfile Option Name MSC_OPERATION_YIELD_TYPEDescription Use this profile option to instruct the planning engine on which effectivity date

to use when it generates resource requirements of operations with yields. This profile option applies to discrete jobs and Oracle ShopFloor Management (OSFM) routings with primary network scheduling method.

• Order start date: Use the order start date to check for operation effectivity and select yield value.

• Operation start date: Use the operation start date to check for operation effectivity and select yield value.

The planning engine uses lead-time percent to calculate the operation start date; it assumes that the lead-time percent of an operation that is effective in the future is the same as the lead-time percent of the operation it replaces. Ifan operation's effectivity ends within a time bucket, the planning engine assumes that its effectivity ends on the first day of the time bucket.

Note Reference(s)

Bug Reference(s) 3161454Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning No

Page 99: Advanced Planning and Scheduling Profile Options Setups

Inventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Anchor date for calculating remaining shelf life

Profile Code MSCProfile Option Name MSC_USE_SHIP_DAYS_FOR_MRSLDescription Specifies arrival date or ship date as the anchor date to use when calculating

the remaining shelf lifeNote Reference(s) 760046.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Apply Lot Modifiers in Weekly/Period Buckets

Profile Code MSCProfile Option Name MSC_APPLY_LOT_MODIFIERDescription Determines whether order modifiers are considered when creating planned

orders for weekly or period time buckets. Valid values are:

• Yes - considers order modifiers in these calculations• No - does not consider order modifiers in these calculations

Default Value - NULL (Yes)Note Reference(s)

Page 100: Advanced Planning and Scheduling Profile Options Setups

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization YesService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Apply Order Modifier To Start Quantity

Profile Code MSCProfile Option Name MSC_APPLY_OM_TO_START_QTYDescription Use this profile option to specify whether order modifiers are applied to start

quantities for discrete or lot based jobs. This behavior only applies to routingsthat have operation yield. In this case the start quantity may be different from the expected supply quantity. Valid values are:

• Yes - The planning engine inflates the order start quantity by the routing operation yield and then applies order modifiers.

• No - The planning engine applies the order modifiers to the end quantity

Default Value - NoNote Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types YesUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning YesCollaborative Planning NoInventory Optimization YesService Parts Planning NoRapid Planning NoDemand Planning NoDemantra No

Page 101: Advanced Planning and Scheduling Profile Options Setups

Strategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Apply Safety Stock Change interval to non MRP Planned Safety Stock

Profile Code MSCProfile Option Name MSC_SS_SMOOTH_NON_MRPDescription Use this profile option to specify the safety stock to which the smoothing

within time interval applies: Valid values are:• Yes - Smoothing applies to all types of safety stock• No - Smoothing applies only to MRP planned safety stock

Note Reference(s) 276707.1 759329.1

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Apply shortage and excess tolerance to planned orders

Profile Code MSCProfile Option Name MSC_APPLY_TOL_PLAN_ORDDescription Introduced in ASCP Egnine/UI rollup #33

Valid values are:

• Yes - The shortage tolerance and excess percentages are applied to all supplies including planned orders. This is the default value.

Page 102: Advanced Planning and Scheduling Profile Options Setups

• No - The shortage tolerance and excess percentages are applied only to firm existing supplies (such as Onhand, WIP).

Introduced in ASCP Engine/UI rollup #33.

11-May-2010 - Not front ported to any R12.x release.

Default Value - YesNote Reference(s)

Bug Reference(s) 7461501Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Auto-Release Compression Days Tolerance

Profile Code MSCProfile Option Name MSC_AUTO_REL_COMP_TOLERANCEDescription Indicates the number of compression days allowed for the automatic release

of planned orders. Valid values are: • Integer >= 0

Example:We do not release planned orders that have Compression Day calculated in the ASCP plan. So if Item setup has Release time fence is 15 days, and leadtime is 10 days.Then any order inside Day 10 would not be released. If you set profile to 10, then we would release any order for this item. Auto-Release planned orders will run if you have the Production Flag checked in the Plan Names form.

Default Value - NULLNote Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 Profile

Page 103: Advanced Planning and Scheduling Profile Options Setups

Data Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types YesUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning YesCollaborative Planning NoInventory Optimization YesService Parts Planning Yes

All Plan Types NoEnforce Constraints – Not Optimized No

Enforce Constraints – Optimized No

Disable Constraints – Not Optimized No

Disable Constraints – Optimized NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Automatically Recalculate Operation Time

Profile Code MSCProfile Option Name MSC_RECALCULATE_OP_TIMEDescription Enables automatic re-calculation of "New Date" (due date) of make orders

when order is firmed and the "New Start Date" is updated by the user. This takes into account Fixed and Variable Lead Times and working days. This is done only in the case of unconstrained plans and has certain limitations.

Note Reference(s)

Bug Reference(s) 61426279359714

Document References(s) -1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 104: Advanced Planning and Scheduling Profile Options Setups

MSC: Avoid Re-Sourcing Sales Orders

Profile Code MSCProfile Option Name MSC_AVOID_RESOURCING_SALES_ORDERSDescription No information for this profile.Note Reference(s)

352277.1

Bug Reference(s) 6134419Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: BPEL Demantra Password

Profile Code MSCProfile Option Name MSC_SCN_DEMANTRA_PASSWORDDescription Required for launching Demantra nodes in BPEL, default value is soa.Note Reference(s) 759571.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center YesManufacturing Operations Center NoGlobal Order Promising No

Page 105: Advanced Planning and Scheduling Profile Options Setups

MSC: BPEL Demantra Username

Profile Code MSCProfile Option Name MSC_SCN_DEMANTRA_USERNAMEDescription Required for launching Demantra nodes in BPEL, default value is soa.Note Reference(s) 759571.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center YesManufacturing Operations Center NoGlobal Order Promising No

MSC: BPEL Domain Name

Profile Code MSCProfile Option Name MSC_SCN_BPEL_DOMAINDescription Required for launching BPEL. To deploy custom BPEL processes, you must

deploy the processes to the domain that is specified in the profile option MSC:BPEL

Note Reference(s) 759571.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center YesManufacturing Operations Center NoGlobal Order Promising No

Page 106: Advanced Planning and Scheduling Profile Options Setups

MSC: BPEL End Point URI

Profile Code MSCProfile Option Name MSC_SCN_SERVICE_ENDPOINTDescription Required for launching BPEL, typically:

http://[m/c name]:portNote Reference(s) 759571.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center YesManufacturing Operations Center NoGlobal Order Promising No

MSC: BPEL Process Version

Profile Code MSCProfile Option Name MSC_SCN_BPEL_VERSIONDescription Deployed BPEL process flows version number.Note Reference(s) 759571.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center YesManufacturing Operations Center NoGlobal Order Promising No

Page 107: Advanced Planning and Scheduling Profile Options Setups

MSC: Batch Size for Self Service Loads

Profile Code MSCProfile Option Name MSC_SELF_SERVICE_LOADS_BATCH_SIZEDescription For large data loads using Legacy Self Service Loads, set to a higher value

in combination with profile MSC: Number of Workers for Self Service Loads to achieve best fit for performance and data size being loaded. Valid values are:

• Integer

Default Value - 1000Note Reference(s) 352277.1

Bug Reference(s)Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Batchable Flag

Profile Code MSCProfile Option Name MSC_BATCHABLE_FLAGDescription No longer used in ASCPNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning No

Page 108: Advanced Planning and Scheduling Profile Options Setups

Rapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Batching Window

Profile Code MSCProfile Option Name MSC_BATCHING_WINDOWDescription Not used in Oracle Advanced Planning.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Buy Order Processing Lead Time Calendar

Profile Code MSCProfile Option Name MSC_BUY_ORDER_PROCESSING_LEAD_TIME_CALENDARDescription Use this profile option to instruct the planning engine what calendar to use

when it offsets processing lead-time for buy orders. Valid values are:

• Supplier Capacity Calendar - The planning engine offsets processing lead-time for buy orders using the Approved Supplier List Supplier Capacity Calendar. The Approved Supplier List Supplier Capacity Calendar is the successor to the Approved Supplier List supplier delivery calendar.

• Org Manufacturing Calendar - The planning engine offsets processing lead-time for buy orders using the organization manufacturing calendar.

This profile was introduced to offer backward compatibility to the way processing Lead-time was calculated in 11.5.9. The equivalent of the 11.5.9 functionalty is to use Org Manufacturing calendar.

Page 109: Advanced Planning and Scheduling Profile Options Setups

Notes: Ref Note 566206.1 for more information.ATP does not currently use thisprofile. an ASL must be assigned to the item with the Supplier Capacity Calendar same as the Org calendar to get ATP to offer the same functionality as ASCP planning

Default Value - Supplier Capacity CalendarNote Reference(s)

566206.1

Bug Reference(s)Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning YesCollaborative Planning NoInventory Optimization NoService Parts Planning Yes

All Plan Types NoEnforce Constraints – Not Optimized No

Enforce Constraints – Optimized No

Disable Constraints – Not Optimized No

Disable Constraints – Optimized NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center YesGlobal Order Promising No

MSC: CP Debug Level

Profile Code MSCProfile Option Name MSC_CP_DEBUGDescription Controls the level of detail in the concurrent program log messages for

Oracle Collaborative Planning. Valid values are:

• Off - No debug messages generated• On - Short debug messages generated• High - Detailed debug messages generated.

Note Reference(s) 295564.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance No

Page 110: Advanced Planning and Scheduling Profile Options Setups

Advanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning YesInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Calendar Reference for Bucketing

Profile Code MSCProfile Option Name MSC_BKT_REFERENCE_CALENDARDescription Calendar used for bucketing KPI's.

Also known to cause plan failures, Signal 11 errors when this not setup.

No formal documentation on the profileNote Reference(s) 452630.1

372199.1 603981.1

Bug Reference(s)Document References(s) -1

Oracle Advanced Supply Chain Planning Implementation and User's Guide-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning YesCollaborative Planning NoInventory Optimization YesService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Cancel Oustanding Sales Order Quantities

Profile Code MSCProfile Option Name MSC_FILL_OR_KILL_ENABLED

Page 111: Advanced Planning and Scheduling Profile Options Setups

Description Valid values are:

• No - then the DRP engine behavior is not affected and does not exhibit 'Fill or Kill'.

• Yes - then for any sales orders with openquantities after the Latest Acceptable Date, the quantities are canceled and the demands are not carried forward. The cancellation is effective as of the Latest Acceptable Date (which is considered by DRP as the end of the allocation bucket).

Note that the only order modifier that is considered when determining partial allocations to sales orders is the Round Order Quantities item attribute for the shipping organization.

Note Reference(s)

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning YesCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Category Set for Jobs without an Item Reference

Profile Code MSCProfile Option Name MSC_NO_ACTIVITY_ITEM_CATEGORY_SETDescription No information available for this profile in user guides.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning No

Page 112: Advanced Planning and Scheduling Profile Options Setups

Demantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Category Set for Liability Analysis

Profile Code MSCProfile Option Name MSC_CATEGORY_SET_NAMEDescription Not used in Oracle Advanced Planning.Note Reference(s)

Bug Reference(s) 5481643Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Category for Jobs without an Item Reference

Profile Code MSCProfile Option Name MSC_NO_ACTIVITY_ITEM_CATEGORYDescription No Information available in user guides.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning No

Page 113: Advanced Planning and Scheduling Profile Options Setups

Inventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Category set for CP Horizontal View

Profile Code MSCProfile Option Name MSCX_CP_HZ_CATEGORY_SETDescription Indicates a category set that you want to query in the Oracle Collaborative

Planning horizontal view. Using this profile option, you can restrict queries to specific categories based on your requirement.

Note Reference(s)

Bug Reference(s) 2422506Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning YesInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Category set for Strategic Planning

Profile Code MSCProfile Option Name MSC_STRATEGIC_PLANNING_CATEGORY_SETDescription Information about this profile is not available in user guides.Note Reference(s) 365112.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Page 114: Advanced Planning and Scheduling Profile Options Setups

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Choice of item for which to create supplies in substitute relationship

Profile Code MSCProfile Option Name MSC_ITEM_CHOICE_FOR_SUBSTITUTEDescription Determines the item for which Oracle Global Order Promising and Oracle

Advanced Supply Chain Planning creates planned supplies when item substitution relationships are specified.

When set to Follow Item Attribute and the item attribute Create Supply for all the substitute items in the substitution chain is No, no supplies are created.

When you have a substitution chain A --> B --> C, and this profile option is set to Highest Level Item, it is expected that Oracle Advanced Planning creates supply for item C. Item C must be enabled in the organization where you are trying to create supply. If item C is not enabled in the organization, Oracle Advanced Planning creates supply for item B (the next highest level item in the substitution chain) and does not create supply for item C.

Note Reference(s) 382638.1

Bug Reference(s) 6528915Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

Page 115: Advanced Planning and Scheduling Profile Options Setups

MSC: Circular sourcing surplus days

Profile Code MSCProfile Option Name MSC_CIRC_SRC_DAYSDescription This profile is no longer used.Note Reference(s)

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Class Hierarchy

Profile Code MSCProfile Option Name MSC_CLASS_HIERARCHYDescription Indicates which allocation hierarchy to use. Users can update at the site

level. Valid values are:• Demand Class - User-defined, single-level hierarchy.• Customer Class - Three levels: customer class, customer,

and site.

Note Reference(s)

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra No

Page 116: Advanced Planning and Scheduling Profile Options Setups

Strategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

MSC: Closest Quantity Pegging

Profile Code MSCProfile Option Name MSC_CLOSEST_QTY_PEGGINGDescription This profile was removed in 11.5.9Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Collaborative Planning Default Calendar

Profile Code MSCProfile Option Name MSC_X_DEFAULT_CALENDARDescription When multiple customer sites display together, Oracle Collaborative Planning

uses the default system calendar (profile option MSC: Collaborative PlanningDefault Calendar).

Note Reference(s)

Bug Reference(s) 4446794Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning YesInventory Optimization NoService Parts Planning NoRapid Planning No

Page 117: Advanced Planning and Scheduling Profile Options Setups

Demand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Collect Item, Material and Resource Costs

Profile Code MSCProfile Option Name MSC_COLLECT_COSTS_FOR_ITEMDescription This profile option indicates whether data collection should include cost

information. Specifying No may improve data collections performance.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning YesCollaborative Planning NoInventory Optimization YesService Parts Planning Yes

All Plan Types YesEnforce Constraints – Not Optimized No

Enforce Constraints – Optimized No

Disable Constraints – Not Optimized No

Disable Constraints – Optimized NoRapid Planning YesDemand Planning YesDemantra NoStrategic Network Optimization YesAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

MSC: Collect PS SNO Data

Profile Code MSCProfile Option Name MSC_COLLECT_PS_SNO_DATADescriptionNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance No

Page 118: Advanced Planning and Scheduling Profile Options Setups

Advanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Collection Window for Trading Partner Changes (Days)

Profile Code MSCProfile Option Name MSC_COLLECTION_WINDOW_FOR_TP_CHANGESDescription Used by Oracle Advanced Supply Chain Planning collections. Specifies the

number of days backwards that changes in customer names, customer sites,vendors, and vendor sites are collected.

If null, then all changes arecollected. Used when collections for the trading partners entity is run in complete mode.

Note Reference(s) 405295

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Collections Snapshot Threshold

Profile Code MSCProfile Option Name MSC_SNAPSHOT_THRESHOLDDescription In Refresh Snapshots request, we checks the number of rows in table and

number of rows in the MLOGIf ratio exceeds the threshold, then we will launch Complete Refresh of the SnapshotWe do not recommend setting this profile unless directed by DEVWe will perform a complete refresh when a large number of rows exist in the MLOG, since this would be faster than referencing the MLOG table for a fast refreshThis profile would usually be triggered when a large data load was performed

Page 119: Advanced Planning and Scheduling Profile Options Setups

to load data into setup tables. Valid values: Integer 0 - 100 NULL is default - seen as 40

Note Reference(s) 179522.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Compute Project Exception

Profile Code MSCProfile Option Name MSC_PROJECT_TASK_EXCEPTIONDescription This profile option determines whether to generate project specific

exceptions when running a project based plan. Valid values are:

• Yes: Enable the generation of project specific exceptions.• No: Disable the generation of project specific exceptions.

Default Value - YesNote Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center No

Page 120: Advanced Planning and Scheduling Profile Options Setups

Manufacturing Operations Center NoGlobal Order Promising No

MSC: Configuration

Profile Code MSCProfile Option Name MSC_X_CONFIGURATIONDescription Ensure that the value of the profile option MSC: Configuration is set to APS &

CP. This enables collaboration between Oracle Advanced Supply Chain Planning and Oracle Collaborative Planning used to enable ASCP - CP interaction

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning YesInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Consolidate Interplant Demands

Profile Code MSCProfile Option Name MSC_CONSOL_INTERPLANT_DEMDescription This profile option is not documented in the User Guide. (see Note 555016.1

)

Consolidates inter-plant demand into a single inter-plant supply, thus reducing the number of inter-plant orders. Valid values are:

• By End Pegged Demand - Retain current behavior of creating a demand for each end pegged demand.

• By Demand Schedule Supply -On a given day aggregate the dependent demands from one supply

Default Value - By End Pegged DemandNote Reference(s)

Bug Reference(s) 7457980Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections No

Page 121: Advanced Planning and Scheduling Profile Options Setups

Item Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning YesCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Consume Forecast Inside Demand Time Fence

Profile Code MSCProfile Option Name MSC_CONSUME_FORECAST_DTFDescription Valid values are:

• No - demand time fence control is implemented prior to forecast consumption. Forecast entries in the demand time fence are dropped as demand statements and not used for consumption.

• Yes - forecast consumption occurs prior to enforcing demandtime fence control. The forecast entries within the demand time fence are used for consumption but not as demand. After consumption, demand quantity for all the forecast entries within the demand time fence is zero.

If you are using forecast spreading:

• For a periodic forecast entry that falls in weekly planning buckets within the demand time fence, the forecast spreading process spreads the entries into daily entries.

• If the daily entry is within the demand time fence, the processignores the value that you set and uses the value Yes in processing.

• If the daily entry is outside the demand time fence, the process ignores this profile option and consumes against theentry.

Note Reference(s) 565926.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization No

Page 122: Advanced Planning and Scheduling Profile Options Setups

Service Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Consume forecast with no demand class

Profile Code MSCProfile Option Name MSC_CONSUME_NULL_DCDescription This profile option instructs the forecast consumption process in about the

order it should use to consume forecast entries when some of them have a demand class and others do not have a demand class. Valid values are:

• Within Each Bucket - The forecast consumption process starts by consuming forecast entries for the day on the sales order; it consumes entries with matching demand class first, then entries with no demand class. Then, it consumes forecast entries within the backward and forward consumption days; for each day, it uses matching demand class first, then no demand class.

• Within Each Bucket - After Consuming Demand Class Specific Forecast: The forecast consumption process starts by consuming forecast entries for the day on the sales order with matching demand class only. Then, it consumes forecast entries within the backward and forward consumption days with matching demand class only. If there is a remaining sales order quantity, it repeats the process against forecast entries with no demand class, first on the day on the sales order, then within the backward and forwardconsumption days.

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 123: Advanced Planning and Scheduling Profile Options Setups

MSC: Consume forecasts using Internal Sales Orders

Profile Code MSCProfile Option Name MSC_CONSUME_INT_SALES_ORDERSDescription Only used when INV: Inventory Capable to Promise - ATP/CTP based on

Planning Data

Valid values are:• Yes - Perform ATP check on Internal Sales Orders• No - Do Not perform ATP check on Internal Sales Orders• Only If Destination Organization on ISO is not part of Plan -

From Note 558908.11. The profile was added in bug 5440895. This profile works in

tandem with the profile option MSC: Consume forecasts using Internal Sales Orders. So, If profile MSC: Perform ATPCheck for Internal Sales Orders is set with a value, it is used.Otherwise, the value of the previous profile is used.

2. If you have a centralized instance, set the profile value as required. If you are a decentralized/distributed installation with both APS Destination and ERP Source, set this on the APS destination and ERP source.

Notes:1. Bug 6434413 Service Orgs do NOT use an External sales

order, so fixes had to be made so that scheduling would be correct for service orgs that generate Internal Reqs directly

2. For Bug 6434413 - fix is released on ATP RUP #22 and above (See Note 252108.1 for list of patches. Patch 6434413should not be applied instead of a rollup patch.

3. In R12.0.4, this fix for bug 6434413 is not yet released - 16-APR-2008

Note Reference(s) 558908.1

Bug Reference(s) 6434413Document References(s) -1

-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization No

Page 124: Advanced Planning and Scheduling Profile Options Setups

Advanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

MSC: Cost Type

Profile Code MSCProfile Option Name MSC_COST_TYPEDescription Use this profile option on the source instance (execution system) to specify

the cost type that collections should use when collecting the item costs. You should perform a cost rollup for the specified cost type before collecting data.If this profile option is null, collectionsuses the:

• Frozen cost type for standard costed organizations• Average cost type specified for average costed organizations

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Cost of Using a BOM/ Routing Flexfield Attribute

Profile Code MSCProfile Option Name MSC_ALT_BOM_COSTDescription Not used by Oracle Advanced Planning.Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning No

Page 125: Advanced Planning and Scheduling Profile Options Setups

Collaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Create Resource Requirements for all Operations

Profile Code MSCProfile Option Name MSC_CREATE_DUMMY_RES_REQSDescription If an operation has no resources with Schedule = Yes, when this profile

option is set to:

• Yes - The planning engine creates a dummy resource requirement for the operation

• No - The planning engine does not create a dummy resourcerequirement for the operation; the operation does not have any resource requirements

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Currency Conversion Type

Profile Code MSCProfile Option Name MSC_CURRENCY_CONVERSION_TYPEDescription Use this profile option on the destination instance to specify currency

conversion type. If you change the value, the next time you run collections, the collections process purges the data with the previous currency

Page 126: Advanced Planning and Scheduling Profile Options Setups

conversion type and replaces it with data with the new currency conversion type.

Note Reference(s)

Bug Reference(s)Document References(s) -1

-1-1

Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Custom allocation

Profile Code MSCProfile Option Name MSC_USE_CUSTOM_ALLOCATIONDescription To improve performance for customer allocated ATP used only in following

cases. • Only end item allocation. no component allocation. that is,

the item cannot be a component of other bom.• No ctp (so we don't deal with planned order demand

allocation and CTP suggested supply/demand allocation).

Note Reference(s) 555016.1

Bug Reference(s) 6456520Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning No

Page 127: Advanced Planning and Scheduling Profile Options Setups

Demantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

MSC: DPP Demand Priority Details viewing buckets

Profile Code MSCProfile Option Name MSC_DRP_DMD_PRIORITY_BKDescription No documentation found on this profile.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning YesCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: DPP Discrete Job Cutoff Window (Days)

Profile Code MSCProfile Option Name MSC_DRP_DISCRETE_JOB_CUTOFF_WINDOWDescription Use this profile option to control the number of days from plan start date that

discrete jobs are considered. Valid values are:• Null: -All discrete jobs are considered by the distribution plan.• 0 - No discrete jobs are considered by the distribution plan.• Integer >=0 - All discrete jobs with completion dates from

plan launch date + {integer value} are considered by the distribution plan. New planned orders for discrete jobs can be created both inside and outside the job cutoff window.

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization No

Page 128: Advanced Planning and Scheduling Profile Options Setups

Service Parts Planning NoRapid Planning NoDemand Planning YesDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: DPP Related Exception Additional Offset Days

Profile Code MSCProfile Option Name MSC_DRP_REL_EXP_OFFSET_DAYSDescription No DescriptionNote Reference(s)

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning YesCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: DRP Multitasking Group ID's per Process

Profile Code MSCProfile Option Name MSC_DRP_GROUPIDS_PER_PROCESSDescription Use this profile option to specify how many Group IDs an unconstrained

demand and supply netting and allocation child process should process. In this phase, a child process loads data based on internal group IDs and will load all the org-items belonging to those group ID's. This option specifies the length of the list of group ID's.

This profile option does not control the Load Consolidation processes.

This profile option does not apply with operating system Microsoft Windows.Note Reference(s)

Bug Reference(s) 8523019Document References(s) -1

Oracle Advanced Supply Chain Planning Implementation and User's Guide-1

Dependent Profiles

Page 129: Advanced Planning and Scheduling Profile Options Setups

11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning YesCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: DRP Multitasking Max Concurrent Processes

Profile Code MSCProfile Option Name MSC_DRP_MAX_CONCURRENT_PROCESSESDescription Use this profile option to specify the maximum number of DPP processes

that are allowed to run in parallel. For example, if your machine has 4 CPU's,you might choose to run a maximum of one concurrent process on each CPU; in this case, set the value to 4.

This profile option does not apply with operating system Microsoft Windows.Note Reference(s)

Bug Reference(s) 8523019Document References(s) -1

-1-1

Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning YesCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Daily Allocation to Maintain Safety Stock Level

Profile Code MSCProfile Option Name MSC_DAILY_ALLOCATION_SS

Page 130: Advanced Planning and Scheduling Profile Options Setups

Description Indicates whether or not the safety stock level that you specify needs to be maintained.

Note Reference(s)

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Day UOM

Profile Code MSCProfile Option Name MSC:DAY_UOM_CODEDescription Supports the unit of measure conversion required for Oracle Advanced

Supply Chain Planning resource batching calculations. Batching Window is considered in days, but users can specify the batching window in a unit of measure other than days. The profile option establishes a standard for the Day unit of measure.

• Users must specify a unit of measure that represents the value Day using this profile option.

• Users must also set up a unit of measure conversion between the unit of measure used for resources and the Dayunit of measure specified here.

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning No

Page 131: Advanced Planning and Scheduling Profile Options Setups

Demand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Days of Resource Availability before sysdate

Profile Code MSCProfile Option Name MSC_RES_AVAIL_BEFORE_SYSDATDescription Calculate Resource Availability for X days before sysdate. If a high number,

then resource availability calculation during ODS Load could take a longer time. This can be used to collect resource availability in the past. Then this can be used in Planning to calculate completion time of operations in progress. You should collect resource availability in the past that will cover the earliest operation start date currently running in the system. Valid values are:

• Integer / NULL = 1

Note Reference(s)

Bug Reference(s) 50449555043399

Document References(s) -1-1

Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Debug Level

Profile Code MSCProfile Option Name MSC_DEBUG_LEVELDescriptionNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections No

Page 132: Advanced Planning and Scheduling Profile Options Setups

Item Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Debug Module

Profile Code MSCProfile Option Name MSC_DEBUG_MODULEDescriptionNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Default Project for Supplies Pegged to Excess

Profile Code MSCProfile Option Name MSC_DEF_PROJ_SUP_EXCESSDescription This profile is no longer active in 11.5.10 and above.Note Reference(s)

Bug Reference(s) 5217328Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan No

Page 133: Advanced Planning and Scheduling Profile Options Setups

Constrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Default Workbench Height

Profile Code MSCProfile Option Name MSC_DEFAULT_WORKBENCH_HEIGHTDescription Specify the default workbench height. Can be defined at the site level.Note Reference(s)

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Default Workbench Width

Profile Code MSCProfile Option Name MSC_DEFAULT_WORKBENCH_WIDTHDescription Specify the default workbench width. Can be defined at the site level.Note Reference(s)

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 Profile

Page 134: Advanced Planning and Scheduling Profile Options Setups

Data Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Degree of Parallelism for Index Creation

Profile Code MSCProfile Option Name MSC_INDEX_PARALLEL_THREADSDescription Controls the use of parallel workers in data collections. Specifies how many

parallel workers to use when creating indexes.Note Reference(s)

Bug Reference(s) 4460213Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Demand Priority Flexfield Attribute

Profile Code MSCProfile Option Name MRP_DMD_PRIORITY_FLEX_NUM

Page 135: Advanced Planning and Scheduling Profile Options Setups

Description Stores the value of the attribute column that controls the demand priority. See 'Flexfield Attributes, page A-1 for more information. Set in EBS Source in a Distrubuted installation.

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

Oracle Advanced Supply Chain Planning Implementation and User's GuideOracle Advanced Supply Chain Planning Implementation and User's Guide

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Demand Satisfied Percent Threshold for Pegging

Profile Code MSCProfile Option Name MSC_DEMAND_SA_PER_THRESHHOLDDescription Set this profile option to instruct the planning engine to stop pegging supplies

to a demand which is over satisfaction percentage. Oracle recommends setting the value greater than 99.9.

Even if you set this profile option below 100.0, the planning engine still satisfies 100% of the demand.

Note Reference(s) 739561.1

Bug Reference(s)Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning No

Page 136: Advanced Planning and Scheduling Profile Options Setups

Demand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Display Order Rescheduling Supplies

Profile Code MSCProfile Option Name MSC_DISP_RESCH_SUPPLIESDescription Valid values are:

• Yes - Planner Workbench displays Order Rescheduling Supply and Order Rescheduling Demand inserted by available to promise when it unschedules a sales order for a configured item.

• No

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

MSC: Display Supplier Item in Collaborative Planning

Profile Code MSCProfile Option Name MSC_DIS_SUP_ITEM_CP_HZDescription This setting is to display the Supplier Item value in the Horizontal Plan in

Collaborative Planning. Valid values are: • Yes - display the Supplier Item value in the Horizontal Plan in

Collaborative Planning

• No - do not display the Supplier Item value in the Horizontal Plan in Collaborative Planning

After the profile change, allow 60-90 seconds for the profile change to take place.

Note Reference(s)

Page 137: Advanced Planning and Scheduling Profile Options Setups

Bug Reference(s) 3969852Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning YesInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Display Warning Message When Rescheduling Recommendation Not Suggested by the Plan

Profile Code MSCProfile Option Name MSC_REL_SHOW_WARNDescription This profile option specifies whether or not the Planner Workbench should

display a warning message when you release rescheduled orders that the planning engine has not recommended. Valid values are:

• Yes - Use this value if you want the Planner Workbench to prompt you for confirmation when you release rescheduled orders that the planning engine does not recommend.

• No - Use this value if you do not want the Planner Workbench to display the message prompting to prompt you for confirmation when you release the rescheduled orders that the planning engine does not recommend.

Note Reference(s)

Bug Reference(s) 3016969Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization No

Page 138: Advanced Planning and Scheduling Profile Options Setups

Advanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Distribution Planning Ship Date

Profile Code MSCProfile Option Name MSC_DIST_PLAN_SHIP_DATEDescription Use this profile option to schedule a trip for departure based on the earliest

and latest possible ship dates of the trip. Valid values are:• Ship full trips early or ship latest(Target) - Utilized trips ship

on the earliest possible ship date or in time to prevent inventory levels from dropping below target.

• Ship full trips early or ship latest (SS) -Utilized trips ship on the earliest possible ship date or in time to prevent inventory levels from dropping below safety stock.

• Latest possible ship date (Target) -Trips ship just in time to prevent inventory levels from dropping below target.

• Latest possible ship date (SS) - : Trips ship just in time to prevent inventory levels from dropping below safety stock

Note Reference(s)

Bug Reference(s)Document References(s) -1

-1-1-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning YesCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: EBS source instance for OTM

Profile Code MSCProfile Option Name MSC_EBS_INSTANCE_FOR_OTMDescription A string such as TST. Default to same instance as APS self instance. Now

APS-OTM integration only support single EBS source instance.Note Reference(s)

Page 139: Advanced Planning and Scheduling Profile Options Setups

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: ENFORCE CRITERIA REQUIREMENT BEFOREEXECUTING QUERY

Profile Code MSCProfile Option Name MSC_PQUERY_EXEC_WITH_CRITERIADescription Use this profile option to specify if a query requestor needs to specify criteria

before executing a query. Valid values are:

• Yes - This ensures that the query performs more efficiently.• No

Note Reference(s) 867822.1

Bug Reference(s)Document References(s) -1

Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization No

Page 140: Advanced Planning and Scheduling Profile Options Setups

Advanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Enable 64 bit snapshot

Profile Code MSCProfile Option Name MSC_ENABLE_64BIT_SNAPSHOTDescription When using 64 bit planning, you can also run the Memory Base Snapshot in

64 bit mode.This does not make the plan run faster. This is for extremely large data models the exceed the requirements of 32 bit snapshot. Most customers using 64 bit planning will not need 64 bit snapshot. Valid vaules are:

• Enabled• Disabled

Default Value - DisabledNote Reference(s) 254810.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types YesUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning YesCollaborative Planning NoInventory Optimization YesService Parts Planning Yes

All Plan Types NoEnforce Constraints – Not Optimized No

Enforce Constraints – Optimized No

Disable Constraints – Not Optimized No

Disable Constraints – Optimized NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Enable ATP Summary Mode

Profile Code MSCProfile Option Name MSC_ENABLE_ATP_SUMMARYDescription Enables the summarization of supply / demand data for performance

improvement. This is a site level profile. Valid values are:

Page 141: Advanced Planning and Scheduling Profile Options Setups

• Yes - Enable ATP Summary Mode• No - Disable ATP Summary Mode.

Note Reference(s) 457840.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

MSC: Enable ATP Workflow

Profile Code MSCProfile Option Name MSC_ALLOCATED_ATP_WORKFLOWDescription Controls the generation of workflow notifications to send to the planner. This

is a site level profile. Valid values are:• Yes: Generate ATP Workflow Notifications• No: Do not generate ATP Workflow Notifications

When one of the following actions occurs, workflow notifications are automaticallytriggered and sent to the item planner and sales representative or the customer contact:

• ATP fails on request date during scheduling• ATP succeeds only by taking allocation from a lower priority

demand class.

You must set profile MSC: Enable ATP Workflow to Yes if you want a notification to be sent to the appropriate people when an item substitution occurs during sales order scheduling.

Note Reference(s) 419271.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Page 142: Advanced Planning and Scheduling Profile Options Setups

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

MSC: Enable ATP for Phantom Components

Profile Code MSCProfile Option Name MSC_ENABLE_PHANT_COMPDescription Valid values are:

• Yes - Oracle Global Order Promising treats phantom items like standard items and net their supply and demand.

• No - Oracle Global Order Promising explodes phantom itemsto their components and performs availability check for the components only.

This is a site level profile option.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

MSC: Enable Advanced Constraints

Profile Code MSCProfile Option Name MSC_ENABLE_NEW_CONSTRAINTSDescription Use this profile option to control the values that display for plan option

Constraints Mode (on the Constraints tab). Valid values are:

Page 143: Advanced Planning and Scheduling Profile Options Setups

• Yes: All values for plan option Constraints Mode display • No: All values for plan option Constraints Mode display

except Constrained (Without Detailed Scheduling)

Note Reference(s)

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Enable Allocated ATP

Profile Code MSCProfile Option Name MSC_ALLOCATED_ATPDescription Use this profile options to indicate whether allocated order promising is used.

Users can update this profile at the site level. Valid Values are:• Yes• No

Default Value: NoNote Reference(s) 212788.1

218010.1 339599.1 154293.1 333936.1 251920.1

Bug Reference(s)Document References(s) -1

-1-1-1-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning No

Page 144: Advanced Planning and Scheduling Profile Options Setups

Distribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

MSC: Enable DRP Multitasking

Profile Code MSCProfile Option Name MSC_DRP_MULTITASKINGDescription Use this profile option to specify whether the planning engine should use

high volume distribution planning. You can set at the user and site levels. Valid values are:

• Yes - All DPP plans run by this user or at this site are run in high volume mode. This value does not apply with operating system Microsoft Windows.

• No - DPP plans run by this user or at this site are not run in high volume mode

Note Reference(s)

Bug Reference(s) 8523019Document References(s) -1

-1-1

Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning YesCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Enable Diagnostic ATP

Profile Code MSCProfile Option Name MSC_DIAGNOSTIC_ATPDescription Use this profile to enable diagnostics within the ATP Inquiry form.

Page 145: Advanced Planning and Scheduling Profile Options Setups

Open the ATP inquiry screen and then go to tools and check on enable diagnostics and then you can do an ATP inquiry for the item. It will give you what is the quantity that can be made till that date and the full pegging through which you can figure what the coinstraint actually is.

Note Reference(s) 303067.1

Bug Reference(s) 6001023Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

MSC: Enable Enhanced Sourcing

Profile Code MSCProfile Option Name MSC_ENHANCE_SOURCINGDescription Enables enhanced sourcing logic that considers historical allocations and

allows the splitting of planned orders to achieve target sourcing percentages.

Rank 2 buy sources are considered if supplier capacity is exhausted for rank 1 sources. This profile option duplicates the functionality of the decision rule Use Alternate Sources parameter for buy items but not for transfers from other organizations. When the decision rules are enabled, the planning engine does not consider this profile option.

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning No

Page 146: Advanced Planning and Scheduling Profile Options Setups

Demand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Enable Group Based Netting

Profile Code MSCProfile Option Name MSC_ENABLE_GROUP_BASED_NETTINGDescription Use this profile option to control whether the planning engine uses group

based netting features. Valid values are:

• Yes - provides the most recent netting logic

Oracle recommends that you set the value to Yes and use the latest netting features. This profile option is for backward compatibility. In R12 this profile has to be set to Yes.

Note Reference(s) 421097.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Enable Java Debug

Profile Code MSCProfile Option Name MSC_JAVA_DEBUGDescription When setting this profile to Yes, debug messages are written to the java

console.Note Reference(s) 396037.1

Bug Reference(s)Document References(s) -1Dependent Profiles

Page 147: Advanced Planning and Scheduling Profile Options Setups

11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center YesManufacturing Operations Center YesGlobal Order Promising No

MSC: Enable Priority Pegging

Profile Code MSCProfile Option Name MSC_ENABLE_PRIORITY_PEGGINGDescription This is not a visible profile.

This is actually a parameter on the options form for the plan options.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Enforce Hard Links

Profile Code MSCProfile Option Name MSO_ENFORCE_HARD_LINKS

Page 148: Advanced Planning and Scheduling Profile Options Setups

Description This profile option specifies whether time offsets are hard constraints or soft constraints. Valid values are:

• Yes - the planning engine can violate resource and material capacities to satisfy minimum and maximum time offsets. If capacity is exceeded, exception messages start the cause as "Hard Link Constraint".

• No - the planning engine cannot violate resource and material capacities to satisfy the minimum and maximum time offsets. In this case, the planning engine can violate hard links and generate a "Hard Link Violation" exception message.

Default Value - YesNote Reference(s)

Bug Reference(s) 7453287Document References(s) -1

Oracle Advanced Supply Chain Planning Implementation and User's GuideOracle Advanced Supply Chain Planning Implementation and User's Guide

Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Enhanced Project Netting

Profile Code MSCProfile Option Name MSC_ENHANCED_PROJECT_NETTINGDescription The new schedule date on on-hand and expired-lots is calculated incorrectly,

when flushing to MSLD_SUPPLIES.dat. The new shcedule date now is calculated using date from call to get_curr_date() instead of arguments->curr_date as done previously

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

Page 149: Advanced Planning and Scheduling Profile Options Setups

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Excess and Safety Stock by Demand Class

Profile Code MSCProfile Option Name MSC_EXCESS_SUPPLY_BY_DCDescription This profile option controls the allocation of supply or demand that pegs to

excess or safety stock in the case of allocated ATP using the demand-prioritybased method. Valid values are:

• Yes - If such supply or demand has a demand class, and if the demand class exists on the allocation rule, allocate the supply or demand to the demand class. However, if the supply or demand does not have a demand class or if the demand class does not exist on the allocation rule, allocate the supply or demand to OTHER.

• No: Allocate such supply or demand to OTHER.

Note Reference(s) 250289.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

Page 150: Advanced Planning and Scheduling Profile Options Setups

MSC: File Flush Limit

Profile Code MSCProfile Option Name MSC_FILE_FLUSH_LIMITDescription Use this profile option to control Planner concurrent process write to

database, if the number of records exceed this value, the process uses SQL*Loader or array insert.

Note Reference(s) 725858.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning YesCollaborative Planning YesInventory Optimization YesService Parts Planning Yes

All Plan Types NoEnforce Constraints – Not Optimized No

Enforce Constraints – Optimized No

Disable Constraints – Not Optimized No

Disable Constraints – Optimized NoRapid Planning YesDemand Planning YesDemantra NoStrategic Network Optimization YesAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Firm Internal Requisition Time Fence

Profile Code MSCProfile Option Name MSC_FIRM_PURCH_REQ_TFDescription This profile option creates a natural time fence for an item if a firm internal

requisition exists. The natural time fence is the date of the latest firm internal requisition. Valid values are:

• Yes: Use this to create a natural time fence for a firm internalrequisition.

• No: Use this if you do not want to create a natural time fence for a firm internal requisition.

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 Profile

Page 151: Advanced Planning and Scheduling Profile Options Setups

Data Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Firm Intransit and PO in Receiving Supplies

Profile Code MSCProfile Option Name MSC_FIRM_INTRANSIT_PO_IN_RECEIVINGDescription This profile option applies to unconstrained plans only and instructs the

planning engine whether it should consider intransit and purchase order in receiving supplies as firm or it should issue reschedule recommendations for them. Valid values are:

• Yes - the planning engine considers intransit and purchase order in receiving supplies as firm.

• No - the planning engine generates reschedule recommendations for these types of supplies. Use this setting if you expedite shipments that are en route from a supplier to a receiving organization or if you want to expeditethe movement of materials in receiving to the shop floor. For example, you might offload a package from a ship at a port and then fly the package to the receiving organization.

These recommendations are informational only and cannot be released from the Planner Workbench.

This is a user level profile option.Note Reference(s)

Bug Reference(s) 4593891Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization No

Page 152: Advanced Planning and Scheduling Profile Options Setups

Service Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Flush All Items for Simulation

Profile Code MSCProfile Option Name MSC_FLUSH_ALL_ITEMS_ONLINEDescription Profile option used to identify items to calculate safety stock as part of the

batch replan. Valid values are:• Yes - flush the item data during simulation/batch replan to

calculate the safety stocks and not miss any data.• No - only the items changed for simulation or batch replan

are taken into account and recalculated

Note Reference(s)

Bug Reference(s) 59205189361980

Document References(s) -1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Forecast Priority Flexfield Attribute

Profile Code MSCProfile Option Name MSC_FCST_PRIORITY_FLEX_NUMDescription Stores the value of the attribute column that will control the forecast priority.

See 'Flexfield Attributes, page A-1 for more information.Note Reference(s) 794086.1

Bug Reference(s)

Page 153: Advanced Planning and Scheduling Profile Options Setups

Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Forecast Spreading Calendar

Profile Code MSCProfile Option Name MSC_FCST_SPREADING_CALENDARDescription ObsoleteNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Forecast Spreading Calendar

Profile Code MSC

Page 154: Advanced Planning and Scheduling Profile Options Setups

Profile Option Name MSC_FORECAST_SPREAD_CALDescription ASCP currently supports forecast spreading based on manufacturing

calendar. When the profile is set to Organization Shipping Calendar, we will use the shipping calendar to spread the forecast.

Note Reference(s)

Bug Reference(s) 7420122Document References(s) -1

-1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Future Days for Currency Conversion

Profile Code MSCProfile Option Name MSC_FUTURE_DAYS_FOR_CURR_CONVDescription Use this profile option to instruct the collections process how many future

days of currency conversion rates to collect, starting from today.Note Reference(s)

Bug Reference(s)Document References(s) -1

-1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 155: Advanced Planning and Scheduling Profile Options Setups

MSC: Gateway URL to External Application

Profile Code MSCProfile Option Name MSC_GATEWAY_URL_EXTERNALDescription This profile is obsolete and needs to be removed from the applications. This

is documented in bug 2937850Note Reference(s)

Bug Reference(s) 2937850Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Generate Exceptions in CP

Profile Code MSCProfile Option Name MSC_WS_OTM_GEN_EXC_CPDescription Control whether the order later or earlier exceptions will be generated in

Collaborate Planning.Note Reference(s) 733189.1

761773.1

Bug Reference(s)Document References(s) -1

-1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning YesInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center No

Page 156: Advanced Planning and Scheduling Profile Options Setups

Manufacturing Operations Center NoGlobal Order Promising No

MSC: Generate Notifications for Transportation Updates

Profile Code MSCProfile Option Name MSC_GEN_NOTIFICATION_FOR_OTMDescription Use this profile option to specify whether the process that passes estimated

arrival time updates from Oracle Transportation Management should create workflow notifications.Valid values are:

• Yes - Create workflow notifications• No - Do not create workflow notifications

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: HP Maximum Displayed Item Count

Profile Code MSCProfile Option Name MSC_HP_ITEM_LIMITDescription Controls the number of items that can be viewed in the Horizontal Plan.Note Reference(s) 734926.1

Bug Reference(s)Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

Page 157: Advanced Planning and Scheduling Profile Options Setups

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: High Volume Items

Profile Code MSCProfile Option Name MSC_HIGH_VOL_ITEMSDescription This snapshot profile controls plan weed out logic. Since snapshot on 64-bit

machines could run out of memory if the number of planned items is high. Valid values:

• Yes: Snapshot bypasses the weed out logic and directly inserts items from operational data store to planning data store. If item planning type is All Planned Items, the snapshotinserts all items into the planing data store. If the items have demand schedules only, snapshot only inserts the items in demands schedules into the planning data store.

• No: The snapshot uses weed out logic.

Note Reference(s) 749602.1 404046.1 387368.1

Bug Reference(s) 76963205203445

Document References(s) -1-1-1-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra No

Page 158: Advanced Planning and Scheduling Profile Options Setups

Strategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: History Days for Currency Conversion

Profile Code MSCProfile Option Name MSC_HISTORY_DAYS_FOR_CURR_CONVDescription Use this profile option to instruct the collections process how many past days

of currency conversion rates to collect, starting from today.Note Reference(s)

Bug Reference(s)Document References(s) -1

-1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Horizontal Plan Demand Bucketing Preference

Profile Code MSCProfile Option Name MSC_HP_DMD_BKT_PRFDescription This profile controls how Oracle Global Order Promising treats demand due

date when calculating availability. Valid values are:• Plan Recommended Date - Oracle Global Order Promising

treats the demand due as the date recommended by Oracle Advanced Supply Chain Planning.

• Demand Due Date, Oracle Global Order Promising treats thedemand due as the Schedule Ship Date.

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning No

Page 159: Advanced Planning and Scheduling Profile Options Setups

Distribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

MSC: Horizontal Plan Extension Program

Profile Code MSCProfile Option Name MSC_HP_EXTENSION_PROGRAMDescription Use this profile option when you are using a custom row in the Planner

Workbench Horizontal Plan. Specify the name of the PL/SQL program unit with no parameters that specifies that information to display in the custom row.

Note Reference(s) 743420.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Hour UOM

Profile Code MSCProfile Option Name MSC:HOUR_UOM_CODEDescription Specifies unit of measure. Can be defined at the site level.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 Profile

Page 160: Advanced Planning and Scheduling Profile Options Setups

Data Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types YesUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization YesService Parts Planning Yes

All Plan Types YesEnforce Constraints – Not Optimized No

Enforce Constraints – Optimized No

Disable Constraints – Not Optimized No

Disable Constraints – Optimized NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: INTER PLANT DEM PRIORITY

Profile Code MSCProfile Option Name MSC_INTERPLANT_DEM_PRIDescription Hidden. Used for coding.Note Reference(s)

Bug Reference(s) 7457980Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 161: Advanced Planning and Scheduling Profile Options Setups

MSC: IO UI Performance tuning

Profile Code MSCProfile Option Name MSC_IO_UI_PERF_TUNEDescription Not available in user guide and no information on this profile.Note Reference(s)

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization YesService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Ignore ATP Check for Configured Item from Sales Order in ODS-ATP

Profile Code MSCProfile Option Name MSC_IGNORE_ATP_CHECKDescription Valid values are:

• Yes - and using "ATP Based on collected Data" then when there is a configuration existing for the Sales order, we treat the model as non atpable.

• No - no alterations on existing demand will be done

Default Value - NoNote Reference(s)

Bug Reference(s) 6355057Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra No

Page 162: Advanced Planning and Scheduling Profile Options Setups

Strategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

MSC: Ignore PTF during CTP

Profile Code MSCProfile Option Name MSC_CTP_IGNORE_PTFDescription Valid values are:

• Yes - set the Planning Time Fence to sysdate. So Planning Time Fence is not considered while doing ATP.

• No

Default Value - NoNote Reference(s) 464095.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

MSC: Include Firm Planned Orders In Firm Allocation Window

Profile Code MSCProfile Option Name MSC_INCLUDE_FPO_IN_FAWDescription For priority pegging, controls the point at which demands peg to firm planned

orders. Valid values are:

• Yes - Firm planned orders are included in the firm allocation window (along with scheduled receipts). They are eligible for pegging during the first phase of priority pegging.

• No - Firm planned orders are not included in the firm allocation window (along with scheduled receipts). They are eligible for pegging during the second phase priority pegging.

Note Reference(s)

Bug Reference(s) 6623090

Page 163: Advanced Planning and Scheduling Profile Options Setups

Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Include Manufacturing Calendar in ATP Sales Order Ship Date Calculations

Profile Code MSCProfile Option Name MSC_INCLUDE_MFG_CALDescription This profile was obsoleted in 11.5.10. The functionality of MSC: Use

Shipping/Receiving Calendars replaces this in 11.5.10 and above.

For 11.5.9 and lower, this determines whether ATP uses 24x7 calendar instead of Org Manufacturing calendar for shipping dates (No for 24x7, Yes for Org Calendar)

Note Reference(s) 555016.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 164: Advanced Planning and Scheduling Profile Options Setups

MSC: Include Safety Stocks in Priority Based Pegging

Profile Code MSCProfile Option Name MSC_INCLUDE_SS_IN_PRIORITYDescription Controls whether to exclude non-transient safety stock levels from the

priority-based pegging logic. Valid values are:

• Yes - The planning engine does not give preference to non-transient safety stock levels in priority-based pegging. It pegsthe demands and the safety stock levels, at the same time, to the supplies.

• No - The planning engine gives preference to non-transient safety stock levels in priority-based pegging. It first pegs them to non-firm planned orders. Then, it pegs the demands to the other supplies.

Note Reference(s)

Bug Reference(s) 4011546Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

-1Oracle Advanced Supply Chain Planning Implementation and User's Guide

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Inflate WIP Resource Requirements

Profile Code MSCProfile Option Name MSC_INFLATE_WIPDescription Determines whether or not the planning engine should inflate the Work in

Process resource requirements based on resource efficiency and utilization during collections from Oracle Work in Process. Valid values are:

• Yes - Planning engine inflates the resource requirements for the firm, unfirm, and non-standard discrete jobs considering the resource efficiency and utilization.

Page 165: Advanced Planning and Scheduling Profile Options Setups

• No - The planning engine does not consider resource efficiency and utilization to inflate the resource requirements for the collected discrete jobs.

Note that this profile option is used in conjunction with shop floor scheduling products such as Oracle Manufacturing Scheduling. It is assumed that the discrete jobs are not released from the planning engine. If the jobs are rescheduled and released by the planning engine, the resource requirementsare deflated. This could result in data inconsistency as the resource requirements are deflated on release whereas Oracle Manufacturing and Scheduling might have calculated resource requirements based on the inflated values. The planning engine always sends the original resource requirements upon release. If the resource requirements are already inflated in the source from Oracle Manufacturing Scheduling, set this profile option to No to avoid double inflation of the resource requirements. Otherwise, set it toYes so that the planning engine inflates the resource requirements.

Default Value - NoNote Reference(s)

373892.1 858515.1

Bug Reference(s) 2490553Document References(s) -1

-1-1Oracle Advanced Supply Chain Planning Implementation and User's Guide-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Inventory Rebalancing Surplus Inventory Basis

Profile Code MSCProfile Option Name MSC_CIRC_SRC_SURP_INV_BASISDescription This profile can be set at the Site, Responsibility, or User. This profile

relates to Distribution Planning. Use this option to specify whether inventory rebalancing considers target or safety stock inventory levels. Valid values are:

Page 166: Advanced Planning and Scheduling Profile Options Setups

• Target - Surplus inventory is defined as the quantity of projected available balance greater than target inventory level. Target inventory demands are considered by inventory rebalancing.

• Safety Stock - Surplus inventory is defined as the quantity of projected available balance greater than safety stock inventory level. Target inventory level demands are ignored by inventory rebalancing.

Note Reference(s) 397199.1

Bug Reference(s) 73669077426019

Document References(s) -1-1-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning YesDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: JInitiator Version

Profile Code MSCProfile Option Name MSC_JINI_VERSIONDescription No documentation or bugs found for this profile.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning No

Page 167: Advanced Planning and Scheduling Profile Options Setups

Demand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Launch Analyze Plan Partition

Profile Code MSCProfile Option Name MSC_LAUNCH_ANALYZE_PARTDescription Launches the concurrent request Analyze Plan Partition.Note Reference(s) 250161.1

298355.1

Bug Reference(s)Document References(s) -1

-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types YesUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning YesCollaborative Planning NoInventory Optimization YesService Parts Planning Yes

All Plan Types NoEnforce Constraints – Not Optimized No

Enforce Constraints – Optimized No

Disable Constraints – Not Optimized No

Disable Constraints – Optimized NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Launch System Sql Loader

Profile Code MSCProfile Option Name MSC_LAUNCH_SYSTEM_SQLLDRDescription Valid values are:

• Yes - will launch sqlldr by system call.

• No - will call fdpldr() function as earlier.

Page 168: Advanced Planning and Scheduling Profile Options Setups

This profile option is specifically used when MRP_DIRECT_LOAD is set to Yes.

Note Reference(s) 555016.1 307443.1

Bug Reference(s) 5722157Document References(s) -1

-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types YesUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning YesCollaborative Planning NoInventory Optimization YesService Parts Planning Yes

All Plan Types NoEnforce Constraints – Not Optimized No

Enforce Constraints – Optimized No

Disable Constraints – Not Optimized No

Disable Constraints – Optimized NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Launch Workflow-Enabled Exception Message Notifications

Profile Code MSCProfile Option Name MSC_LAUNCH_EXCEPTION_NOTIFICATIONDescription Determines if Oracle Collaborative Planning sends notification messages

when it generates exceptionsNote Reference(s)

564868.1

Bug Reference(s) 2474996Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning YesInventory Optimization NoService Parts Planning No

Page 169: Advanced Planning and Scheduling Profile Options Setups

Rapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Level for Calculating Liability

Profile Code MSCProfile Option Name MSC_LIABILITY_CALC_LEVELDescription This profile is not used.Note Reference(s)

Bug Reference(s) 5481643Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Limit Gantt Chart Orders View Hierarchy

Profile Code MSCProfile Option Name MSC_GANTT_ORDER_HIERARCHYDescription When you enter the ordersview of the ASCP Ganttchart from the context of

a supply, you should (optionally) see in the left hand pane tree only the supply and those supplies that end peg to that supply. You should not see any of the supplies between the context supply and the end pegged demand.

Note Reference(s)

Bug Reference(s) 3621869Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC No

Page 170: Advanced Planning and Scheduling Profile Options Setups

Distribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: MPS Auto-Firm Planned Orders

Profile Code MSCProfile Option Name MSC_MPS_AUTO_FIRM_PODescription This profile option specifies how the planning engine deals with master

production schedule firm planned orders. You can use this profile option to specify whether or not the planning engine should treat all planned orders in the master production schedule as firm:

Valid values are:• Yes - All planned orders in the master production schedule

are automatically firmed and not rescheduled during a batch replan.

• No - Use the same behavior as distribution requirements plans and material requirements plans. When a master production schedule is a demand schedule for another plan, the planning engine treats all planned orders in the demand schedule plan as firm. This is the same as treating planned orders in distribution requirements plans and material requirements plans that are demand schedules for other plans as firm.

This profile option applies only to master production schedule plans. You canset it at the site and user levels.

Note Reference(s) 259322.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center No

Page 171: Advanced Planning and Scheduling Profile Options Setups

Global Order Promising No

MSC: Map Server Host

Profile Code MSCProfile Option Name MSC_MAPSERVER_HOSTDescription Not Used.Note Reference(s)

Bug Reference(s) 4573393Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Map Server Port

Profile Code MSCProfile Option Name MSC_MAPSERVER_PORTDescription Not Used.Note Reference(s)

Bug Reference(s) 4573393Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 172: Advanced Planning and Scheduling Profile Options Setups

MSC: Maximum Capacity

Profile Code MSCProfile Option Name MSC_MAX_CAPACITYDescription Not UsedNote Reference(s)

Bug Reference(s) 4573393Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Maximum Percentage variation in safety stockvalues

Profile Code MSCProfile Option Name MSC_SS_MAX_VARIATIONDescription The safety stock is not allowed to deviate by more than this value between

two adjacent time intervals. Null allows any deviation.Note Reference(s) 759329.1

376451.1 276707.1 559867.1

Bug Reference(s)Document References(s) -1

Oracle Advanced Supply Chain Planning Implementation and User's Guide-1-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization No

Page 173: Advanced Planning and Scheduling Profile Options Setups

Service Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Maximum number of planned orders per demand

Profile Code MSCProfile Option Name MSC: MAXIMUM NUMBER OF PLANNED ORDERS PER DEMANDDescription The maximum number of planned orders that the planning engine can create

to satisfy one demand.Note Reference(s) 399364.1

434809.1

Bug Reference(s)Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Maximum number of planned orders per demand(1)

Profile Code MSCProfile Option Name MSC_MAX_PLANNED_ORDERS_PER_DEMANDDescription This profile is obsolete.

This profile was introduced in basically to plug abnormal demand supply situation in plans.

Suppose there is a demand line of 1000 and by mistake some one has setupan order modifier (FOQ/MOQ) of 1 then 1 demand would generate 1000 work orders. In actual business the order sizes may be 50 or 100, so 1000

Page 174: Advanced Planning and Scheduling Profile Options Setups

work order/demand is really not an ideal profile of supply /demand.

To check these kind of data maintenance issues this profile was introducedwhere one has a rough idea on the maximum number of work orders one demand might generate and can set this as an internal checkpoint.

I believe this profile has been removed later as in some business/Semiconductors work orders can really run into very huge number/demand and it is difficult to guess the value for this. Plans at our endwere tripping on this profile.

I do not see this profile any more in planners log 11.5.10-Rollup 4 onwards.

This is correct, just to add this logic is not applicable to DRP Plans and will get invoked only for Fixed Order Quantity order modifiers.

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Minimize Project Cross Peg within Window

Profile Code MSCProfile Option Name MSC_MINIMIZE_CROSS_PEGDescription Values: Yes/No

Default: Yes Used in conjunction with profile option MSC: Use attribute based netting in priority pegging. Valid values are:

• Yes - The planning engine tries to minimize cross pegging within the Supply/Demand window.

• No - The planning engine does not attend to the amount of cross pegging

Default Value - YesNote Reference(s)

417736.1

Bug Reference(s)Document References(s) -1

Oracle Advanced Supply Chain Planning Implementation and User's Guide-1-1-1

Page 175: Advanced Planning and Scheduling Profile Options Setups

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Minimize changes to chronological sequence of supplies while rescheduling

Profile Code MSCProfile Option Name MSC_MINIMIZE_WORKORDER_CROSSOVERDescription Valid values are:

• Yes - to minimize the rescheduling of work orders in progress during rescheduling operations during Memory Based Planner.

• No

Default Value - NoNote Reference(s) 376038.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center No

Page 176: Advanced Planning and Scheduling Profile Options Setups

Global Order Promising No

MSC: Minimum Capacity

Profile Code MSCProfile Option Name MSC_MIN_CAPACITYDescription Not Used.Note Reference(s)

Bug Reference(s) 4573393Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Minimum Percentage variation in safety stock values

Profile Code MSCProfile Option Name MSC_SS_MIN_VARIATIONDescription The safety stock is held constant across time intervals if the deviation is

withinthis percentage. Zero ignores all deviations.

Note Reference(s) 376451.1 276707.1 759329.1 559867.1

Bug Reference(s)Document References(s) -1

-1-1-1Oracle Advanced Supply Chain Planning Implementation and User's Guide

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Page 177: Advanced Planning and Scheduling Profile Options Setups

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Minimum Supply/Demand Percent for Pegging

Profile Code MSCProfile Option Name MSC_MIN_SUP_DEM_PER_PEGDescription Set this profile option to instruct the planning engine not to peg tiny supplies

and large demands. It skips a supply if (Supply size / Demand size) x 100 is less than the value ofthis profile option. Oracle recommends setting the value at 0.0001.

Default Value - 0.0

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Move Past Due To Sysdate

Profile Code MSCProfile Option Name MSC_MOVE_PAST_DUE_TO_SYSDATEDescription There is not any documentation or bugs found for this profile.Note Reference(s)

Page 178: Advanced Planning and Scheduling Profile Options Setups

Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Net Change Temp Dir

Profile Code MSCProfile Option Name MSC_OA_TEMP_DIRDescription Stores the location of image cache used in the Plan Comparison Report.

Indicate the location in the following format: [directory]@[subdir] where [directory]

This must match the absolute path of the OA_MEDIA environment variable and [subdir] is the name of a subdirectory under the OA_MEDIA directory.

The subdirectory must have write permissions for all. Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 179: Advanced Planning and Scheduling Profile Options Setups

MSC: New Forecast Auto Plan

Profile Code MSCProfile Option Name MSC_DEFAULT_UNCONST_PLANDescription The plan launched in Oracle Advanced Supply Chain Planning when Oracle

Collaborative Planning receives a supplier's forecast. Oracle recommends that this plan be an unconstrained plan.

Set the profile to an unconstrained supply chain plan. When the demand planscenario mentioned in the profile option MSD: Default DP Scenario is published, the unconstrained supply chain plan specified in the profile option MSC: New Forecast Auto Plan starts running.

Note Reference(s)

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning YesInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning YesDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: New Planner Backward Compatibility

Profile Code MSCProfile Option Name MSC_NEW_PLANNER_BACK_COMPATIBILITYDescription Based on latest information available in Bug

9848641

• Yes - uses the new algorithm for planning phantom items. When you also set MRP_NEW_PLANNER_BACKWARD_COMPATIBILITY = Yes, then Phantoms will be planned as regular items. When you also set MRP_NEW_PLANNER_BACKWARD_COMPATIBILITY = No or NULL, then Phantoms will NOT be planned as regular items.

• No - Uses the old algorithm for planning phantom items. When you also set MRP_NEW_PLANNER_BACKWARD_COMPATIBILITY = Yes, then Phantoms will be planned as regular items.

Page 180: Advanced Planning and Scheduling Profile Options Setups

When you also set MRP_NEW_PLANNER_BACKWARD_COMPATIBILITY = No or NULL, then Phantoms will NOT be planned as regular items.

Most all customers should use Yes.

If case of certain plan errors when working with by-products and profile = Yes, then you need to set profile = NoThe failure will occur when by-product is also a component of the BOM as shown belowEx: Assembly A / \ Phantom B Phantom C -> By-product C | comp C

This setup will result in a A->C->A loop.

This was seen in bug where plan failedwith the following message:### Error: found loop between FROM operation : with sequence number 10 supply id 1018430492 item id 1181059TO operation : with sequence number 1 supply id 1018430492 item id 1181059org Id = 86 This could occur in two conditions : A. There is a loop in network routing - if so, please check the set-up and fix the routing B. There are by/co-products of assembly which are also a component ofan item forming this assembly If so, try to change the profileoption MSO: Peg By-product Supplies to FALSE - APP-MRP-22064: An internal error hasoccurred (hls_failure, 1)

Note Reference(s) 433492.1

Bug Reference(s) 9848641Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

-1-1

Page 181: Advanced Planning and Scheduling Profile Options Setups

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types YesUnconstrained Plan YesConstrained – EDD Yes

Constrained – ECC YesDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning Yes

All Plan Types YesEnforce Constraints – Not Optimized Yes

Enforce Constraints – Optimized Yes

Disable Constraints – Not Optimized Yes

Disable Constraints – Optimized YesRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: New Supply Commit Auto Plan

Profile Code MSCProfile Option Name MSC_DEFAULT_CONST_PLANDescription The profile controls the plan that is launched in Oracle Advanced Supply

Chain Planning when Oracle Collaborative Planning receives a supplier's supply commits. Oracle recommends that this plan be a constrained plan. Valid values are:

• Specify the name of the plan that you want to launch automatically in the profile option MSC: New Supply Commit Auto Plan. It is recommended that you specify a constrained plan.

Set the profile option MSC: SCEM Engine Launch Events to All to automatically start Supply Chain Event Manager (SCEM) when a supplier loads an order forecast or when you publish an order forecast from the planning server. If you set the profile option to Publish, Supply Chain Event Manager starts only when plans are published from Oracle Advanced SupplyChain Planning. If you set the profile option to Load, Supply Chain Event Manager starts only when data is loaded using flat files.

Ensure that the value of the profile option MSC: Configuration is set to APS &CP.

Note Reference(s)

Bug Reference(s)Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 Profile

Page 182: Advanced Planning and Scheduling Profile Options Setups

Data Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning YesInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Number of Workers for Self Service Loads

Profile Code MSCProfile Option Name MSC_SELF_SERVICE_LOADS_WORKERS_NUMDescription Used in conjunction with profile MSC Batch Size for Self Service Loads to

help size loading for large data loads using Self Service Collections. Oracle does not suggest using a value larger than 10. You may need to increase Standard Manager workshifts (processes) to accommodate a larger number.Valid values: Integer Default value = 3

Note Reference(s) 352277.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: OTHER with zero allocation percent is valid demand class

Profile Code MSCProfile Option Name MSC_ZERO_ALLOC_PERCDescription When set to Yes, demand classes with 0% allocation are considered as valid

Page 183: Advanced Planning and Scheduling Profile Options Setups

demand classes for allocated ATP calculations.When set to No, demand classes with 0% allocations are not considered as valid demand classes for allocated ATP calculations.

Valid values: Yes / No Default = No

Note Reference(s)

Bug Reference(s) 6156478Document References(s) -1

Oracle Global Order Promising Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

MSC: OTM Punchout URI

Profile Code MSCProfile Option Name MSC_OTM_PUNCHOUT_URIDescription Used by punchout. URL to OTM such as:

http://otm-it1-55-oas.us.oracle.com/Note Reference(s) 733189.1

761773.1

Bug Reference(s)Document References(s) -1

-1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center No

Page 184: Advanced Planning and Scheduling Profile Options Setups

Manufacturing Operations Center NoGlobal Order Promising No

MSC: OTM Responsibility

Profile Code MSCProfile Option Name MSC_WS_OTM_RESPIDDescription Responsibility like supply chain plannerNote Reference(s) 761773.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: OTM User

Profile Code MSCProfile Option Name MSC_WS_OTM_USERIDDescription Userid, like MFG, this profile and next one will be used for notification

workflowNote Reference(s) 761773.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization No

Page 185: Advanced Planning and Scheduling Profile Options Setups

Service Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Operator Company Name

Profile Code MSCProfile Option Name MSC_X_COMPANY_NAMEDescription Used by Oracle Collaborative planning. This profile option will be defaulted

with value of "My Company". User can update the company name. This company name will get reflected in next collection run

Note Reference(s)

Bug Reference(s) 2297044Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning YesInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Order Number-CA Mandatory for CVMI

Profile Code MSCProfile Option Name MSC_X_CVMI_CA_MANDDescription Determines whether the order number is mandatory for a consumption

advice, while the customer enters the consumption advice record.

• If the profile option is set to Yes, the user must enter order number for the consumption advice.

• If set to No, the key date for sales orders and ASN is considered as part of deletion key.

Valid values: Yes/No Default = No

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Collaborative Planning Implementation and User's GuideDependent Profiles

Page 186: Advanced Planning and Scheduling Profile Options Setups

11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning YesInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Order Type for Consigned VMI

Profile Code MSCProfile Option Name MSC_X_VMI_OM_ORDER_TYPEDescription This indicates the order type that Oracle Collaborative Planning uses when

creating a sales order for consigned VMI. This order type should encompass billing and inventory reduction functions without any shipping being performed

Note Reference(s)

Bug Reference(s) 6518881Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning YesInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Organization containing generic BOM for forecast explosion

Profile Code MSCProfile Option Name MSC_ORG_FOR_BOM_EXPLOSIONDescription Used by collections to identify and populate the bill of material validation

organization. Note Reference(s)

Bug Reference(s)

Page 187: Advanced Planning and Scheduling Profile Options Setups

Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Overwrite all Order Forecast records

Profile Code MSCProfile Option Name MSC_X_OVERWRITE_OFDescription If the profile "MSC: Overwrite order forecast" is Yes, we delete all the Order

forecast for that item,cust/cust_site, supp/supp_site , order type combination;and then load the new Order forecast.

Note Reference(s) 461898.1

Bug Reference(s) 3754801Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning YesInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Overwrite all supplier capacity records

Profile Code MSC

Page 188: Advanced Planning and Scheduling Profile Options Setups

Profile Option Name MSC_X_OVERWRITE_SCDescription Indicates whether or not the previous records regarding supplier capacity

need to be maintained. You can set this profile option to replace all previous supplier capacity values with the latest supplier capacity to which the suppliercommits.

Note Reference(s)

Bug Reference(s) 3103879Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning YesInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: PS - Snapshot Base Package

Profile Code MSCProfile Option Name MSC_SCP_PS_BASE_PKGDescription Valid value are:

• Yes - Base Package is used for creating a model in Production Scheduling.

• No - Base Package is not used for creating a model in Production Scheduling.

Default Value - YesNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 189: Advanced Planning and Scheduling Profile Options Setups

MSC: PS - Snapshot Beginning Inventory Package

Profile Code MSCProfile Option Name MSC_SCP_PS_BGN_INVNTRY_PKGDescription Specifies whether the Beginning Inventory Package is used for creating a

model in Production Scheduling.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: PS - Snapshot Calendar Package

Profile Code MSCProfile Option Name MSC_SCP_PS_CALENDAR_PKGDescription Valid values are:

• Yes - Calendar Package is used for creating a model in Production Scheduling.

• No - Calendar Package is not used for creating a model in Production Scheduling.

Default Value - YesNote Reference(s) 415381.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center No

Page 190: Advanced Planning and Scheduling Profile Options Setups

Global Order Promising No

MSC: PS - Snapshot Customer Package

Profile Code MSCProfile Option Name MSC_SCP_PS_CUSTOMER_PKGDescription Specifies whether the Customer Package is used for creating a model in

Production Scheduling.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: PS - Snapshot Distribution Package

Profile Code MSCProfile Option Name MSC_SCP_PS_DSTRBTN_PKGDescription Specifies whether the Distribution Package is used for creating a model in

Production Scheduling.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 191: Advanced Planning and Scheduling Profile Options Setups

MSC: PS - Snapshot Enterprise Forecast Package

Profile Code MSCProfile Option Name MSC_SCP_PS_FORECAST_PKGDescription Valid values are:

• Yes -Specifies whether the Enterprise Forecast Package is used for creating a model in Production Scheduling.

• No

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: PS - Snapshot Inventory Safety Targets Package

Profile Code MSCProfile Option Name MSC_SCP_PS_IST_PKGDescription Valid values are:

• Yes - Specifies whether the Inventory Safety Targets Package is used for creating a model in Production Scheduling.

• No

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Planning Command Center User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning No

Page 192: Advanced Planning and Scheduling Profile Options Setups

Demantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: PS - Snapshot Manufacturing Package

Profile Code MSCProfile Option Name MSC_SCP_PS_MFG_PKGDescription Valid values are:

• Yes - Specifies whether the Manufacturing Package is used for creating a model in Production Scheduling.

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Planning Command Center User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: PS - Snapshot Purchase Orders Package

Profile Code MSCProfile Option Name MSC_SCP_PS_PO_PKGDescription Valid values are:

• Yes - Specifies whether the Purchase Order Package is used for creating a model in Production Scheduling.

• No

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning No

Page 193: Advanced Planning and Scheduling Profile Options Setups

Inventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: PS - Snapshot Sales Orders Package

Profile Code MSCProfile Option Name MSC_SCP_PS_SO_PKGDescription Valid values are:

• Yes - Specifies whether the Sales Orders Package is used for creating a model in Production Scheduling.

• No

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: PS - Snapshot Supplier Package

Profile Code MSCProfile Option Name MSC_SCP_PS_SUPPLIER_PKGDescription Valid values are:

• Yes - Specifies whether the Supplier Package is used for creating a model in Production Scheduling.

• No

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 Profile

Page 194: Advanced Planning and Scheduling Profile Options Setups

Data Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: PS - Snapshot Transfer Orders Package

Profile Code MSCProfile Option Name MSC_SCP_PS_TO_PKGDescription Valid values are:

• Yes - Specifies whether the Transfer Orders Package is used for creating a model in Production Scheduling.

• No

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: PS - Snapshot Work Orders Package

Profile Code MSCProfile Option Name MSC_SCP_PS_WO_PKGDescription Valid values are:

• Yes - Specifies whether the Work Orders Package is used for creating a model in Production Scheduling.

• No

Note Reference(s)

Page 195: Advanced Planning and Scheduling Profile Options Setups

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: PS Consistent Resource Assignment

Profile Code MSCProfile Option Name MSC_SCP_PS_CONSISTENT_RESOURCE_ASSIGNMENTDescription This means, with MSC: PS Consistent Resource Assignment set as Yes, that

the resource instance assignment coming in from ASCP remains the instance assignment post the PS solve (as it cannot be offloaded) and henceall the requirements for these products are against the same resource instance rather than being spread over the other available resource instances.

Note Reference(s) 883676.1

Bug Reference(s) 53329487316625

Document References(s) -1-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 196: Advanced Planning and Scheduling Profile Options Setups

MSC: PS Currency Symbol

Profile Code MSCProfile Option Name MSC_SCP_CURRENCY_SYMBOLDescription The currency symbol used by PS for measurement of costs and calculation

of key performance indicators.

Set this in the APS destination for a distributed installationNote Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: PS Enable CRO Scheduling

Profile Code MSCProfile Option Name MSC_SCP_PS_ENABLE_CRODescription If RMO (Oracle Repetitive Manufacturing Optimization) option is licensed

along with Production Scheduling application, the profile option "MSC: PS Enable CRO Scheduling" must be set to "Yes".

RMO and CRO are synonymous.Note Reference(s)

973027.1

Bug Reference(s) 7037527Document References(s) -1

-1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization No

Page 197: Advanced Planning and Scheduling Profile Options Setups

Advanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: PS Enable RMO Scheduling

Profile Code MSCProfile Option Name MSC_SCP_PS_ENABLE_RMODescription Believe this profile is a duplicate by different name with MSC: PS Enable

CRO Scheduling. As i believe CRO and RMO are same.Note Reference(s) 454651.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: PS Firm Past Due WO

Profile Code MSCProfile Option Name MSC_SCP_PS_FIRM_PAST_DUE_WODescription The Firming of Past Due Workorders and Planned Orders in PS is controlled

by this profile. Valid values are:• Yes - all pass due workorders will be firmed • No - workorder operations that are after horizon start and

within the fixed production fence will be firmed.

Default Value - YesNote Reference(s)

Bug Reference(s) 7489790Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization No

Page 198: Advanced Planning and Scheduling Profile Options Setups

Service Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: PS Run Application Script

Profile Code MSCProfile Option Name MSC_SCP_PS_APP_SCRIPTDescription Specifies the name of the batch script that starts Production Scheduling.

Default Value - runPS.batNote Reference(s)

Bug Reference(s) 5136451Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: PS Run Connector Script

Profile Code MSCProfile Option Name MSC_SCP_PS_CONNECTOR_SCRIPTDescription Specifies the batch script that starts the Production Scheduling Connector.

Default Value - runPSConnector.batNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization No

Page 199: Advanced Planning and Scheduling Profile Options Setups

Service Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: PS/SNO API Version

Profile Code MSCProfile Option Name MSC_SCP_API_VERSIONDescription The Supply Chain Planning XML format being used to generate SNO and PS

models.Note Reference(s) 552381.1

973027.1

Bug Reference(s)Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization YesAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: PS/SNO Alignment Date

Profile Code MSCProfile Option Name MSC_SCP_ALIGNMENT_DATEDescription The alignment date is the date and time that fixes the start of time periods in

a model. The alignment date fixes all time period starts, including the Fiscal Month 445 period type, where it sets the start of 13-week 445 patterns. The alignment date format is yyyy-MM-dd HH:mm:ss

Note Reference(s)

Bug Reference(s) 60128705646419

Document References(s) -1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections No

Page 200: Advanced Planning and Scheduling Profile Options Setups

Item Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization YesAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: PS/SNO App Server URL

Profile Code MSCProfile Option Name MSC_SCP_APP_SERVER_URLDescription Input the Application Server URL so that the PS application on the client

could release PS schedules to any server.

In 12.1, Architectural changes eliminate the need for this feature. User will beable to publish to any EBS server from PS without setting this profile option.

Note Reference(s) 760103.1

Bug Reference(s) 7037527Document References(s) -1

-1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization YesAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: PS/SNO Client Install Path

Profile Code MSCProfile Option Name MSC_SCP_CLIENT_PATHDescription The path where the Supply Chain Planning Production Scheduling (PS) or

Strategic Network Optimization (SNO) is installed. PS and SNO are installed automatically the first time they are accessed by the E-Business Suite.

Note Reference(s) Bug Reference(s)Document References(s)

Page 201: Advanced Planning and Scheduling Profile Options Setups

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization YesAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: PS/SNO Compress Xml Files

Profile Code MSCProfile Option Name MSC_SCP_ZIP_PACKAGESDescription Specifies whether data is transferred between the ASCP planning server, PS

and/or SNO using a compressed file format also known as .gzip. The compressed XML format reduces the size of data files transferred, thereby minimizing the time involved in the creation of models. Valid values are:

• Yes• No

Default Value - YesNote Reference(s) 415381.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization YesAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 202: Advanced Planning and Scheduling Profile Options Setups

MSC: PS/SNO Data Store Path

Profile Code MSCProfile Option Name MSC_SCP_DATA_STORE_PATHDescription The path to where the refreshed snapshot data from the E-Business Suite, or

the published plans from PS or SNO, are temporarily stored before being transferred to the ASCP planning server.

Note Reference(s) 602712.1 868904.1

Bug Reference(s)Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization YesAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: PS/SNO Debug Mode

Profile Code MSCProfile Option Name MSC_SCP_DEBUG_MODEDescription Writes extra messages to the log file for the Integration log for PS and SNO

applications. Valid values are:• Yes• No

Default Value - NoNote Reference(s) 868904.1

809199.1 405083.1

Bug Reference(s)Document References(s) -1

-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization No

Page 203: Advanced Planning and Scheduling Profile Options Setups

Service Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization YesAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: PS/SNO Download XML Files

Profile Code MSCProfile Option Name MSC_SCP_DOWNLOAD_XML_FILESDescription Valid values are:

• Yes - if users want to download the xml files to the client machine for debugging purpose.

• No

Default Value - No.Note Reference(s)

733189.1

Bug Reference(s) 729382387628628945618

Document References(s) -1-1-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization YesAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: PS/SNO Use DB for Integration Data

Profile Code MSCProfile Option Name MSC_SCP_USE_DB_FOR_DATADescription This profile must be set if Concurrent Tier and Web Tier are not on the same

server.Note Reference(s) 454651.1

Page 204: Advanced Planning and Scheduling Profile Options Setups

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization YesAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Pass List Price to OM in DRP Release

Profile Code MSCProfile Option Name MSC_DRP_PASS_LIST_PRICE_OMDescription This is discussed in Bug 7284253 MSC CREATES ISO WITH STATUS OF

'ENTERED' INSTEAD OF 'BOOKED':

If profile MSC: Pass List Price to OM in DRP Release is set to Y, DRP release will create the internal sales order in 'Booked' state.

Note Reference(s)

Bug Reference(s) 7497020Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning YesCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Peg Firm Supply First

Profile Code MSCProfile Option Name MSC_PEG_FIRM_SUPPLY_FIRSTDescription Does not appear in the documentation.Note Reference(s)

Page 205: Advanced Planning and Scheduling Profile Options Setups

Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Peg to maximize supply usage

Profile Code MSCProfile Option Name MSC_PEG_TO_MAX_SUPPLY_USAGEDescription Does not appear to exist in the documentationNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Perform ATP check for Internal Sales Orders

Profile Code MSCProfile Option Name MSC_ATP_CHECK_INT_SALES_ORDERSDescription Only used when INV: Inventory Capable to Promise - ATP/CTP based on

Planning Data From Note 558908.11. The profile was added in bug 5440895. This profile works in

tandem with the profile option MSC: Consume forecasts using Internal Sales Orders. So, If profile MSC: Perform ATPCheck for Internal Sales Orders is set with a value, it is used.

Page 206: Advanced Planning and Scheduling Profile Options Setups

Otherwise, the value of the previous profile is used.2. If you have a centralized instance, set the profile value as

required. If you are a decentralized/distributed installation with both APS Destination and ERP Source, set this on the APS destination and ERP source.

3. Profile option values and meanings:

• Yes - Perform ATP check on Internal Sales Orders

• No - Do Not perform ATP check on Internal Sales Orders

Notes:1. Bug 6434413 Service Orgs do NOT use an External sales

order, so fixes had to be made so that scheduling would be correct for service orgs that generate Internal Reqs directly

2. For Bug 6434413 - fix is released on ATP RUP #22 and above (See Note 252108.1 for list of patches. Patch 6434413should not be applied instead of a rollup patch.

3. In R12.0.4, this fix for bug 6434413 is not yet released - 16-APR-2008

Note Reference(s) 558908.1

Bug Reference(s)Document References(s) -1

-1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

MSC: Plan co-products

Profile Code MSCProfile Option Name MSC_PLAN_COPRODUCTSDescription Indicate whether co-products are planned and whether supplies are created

for the co-products. Valid values are:

• Yes• No

Can be defined at the site level.

If the plan planning mode is Constrained (Without Detailed Scheduling), the

Page 207: Advanced Planning and Scheduling Profile Options Setups

planning engine only uses this profile option if its value is Yes.Note Reference(s) 305575.1

Bug Reference(s)Document References(s) -1

Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Plan for order at risk calculation

Profile Code MSCProfile Option Name MSC_PLAN_FOR_ORDER_AT_RISKDescription Indicates a plan that Oracle Collaborative Planning uses to derive the

pegging information for each order that you upload.Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning YesInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 208: Advanced Planning and Scheduling Profile Options Setups

MSC: Planning Currency

Profile Code MSCProfile Option Name MSC_PLANNING_CURRENCYDescription In 11.5.10, this profile option is used to specify the planning currency.

This profile option can be defined at the site level.

In 12.1.x, this profile is not used.

Default Value - US DollarNote Reference(s)

147221.1

Bug Reference(s) 4573393Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Pre-Flush

Profile Code MSCProfile Option Name MSC_PRE_FLUSHDescription Not used per bug 4573393Note Reference(s)

Bug Reference(s) 4573393Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning No

Page 209: Advanced Planning and Scheduling Profile Options Setups

Demand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Prefer Consumption within Forecast Bucket

Profile Code MSCProfile Option Name MSC_PREF_FOR_BUCKETDescription Valid values are:

• Yes - this profile will take effect when the plan options are "Spread Forecast" and "Consumption by bucket" is unchecked. In that case, we would consume the forecasts in the following fashion: Spread the forecasts first. First round of consumption begins by walking backwards for the number of backward days mentioned from the date of the sales order, considering any forecast entry as eligible only if the sales order falls in the same bucket as the forecast. Once wefind no more entries backwards we walk forwards for the forward number of days mentioned checking for eligible forecasts as mentioned above. Now, if we still need forecast entries, we start walking backwards this time trying to consume all the forecast entries within the backward time fence. After this we go forward in the same fashion if required.

• No - old behavior

Default Value - NoNote Reference(s) 395804.1

804214.1

Bug Reference(s)Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 210: Advanced Planning and Scheduling Profile Options Setups

MSC: Priority for Substitute Items Flexfield Attribute

Profile Code MSCProfile Option Name MSC_BOM_SUBST_PRIORITYDescription This profile option stores the name of the flexfield column that contains the

value in the corresponding table. Set this profile option at the site level only See 'Flexfield Attributes, page A-1 for more information.

Set in EBS Source in a distributed installation. Created by Create Planning Flexfields process.

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

Oracle Advanced Supply Chain Planning Implementation and User's GuideOracle Advanced Supply Chain Planning Implementation and User's Guide

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Priority of Alternate Resources for an Operation Flexfield Attribute

Profile Code MSCProfile Option Name MSC_ALT_RES_PRIORITYDescription This profile option stores the name of the flexfield column that contains the

value in the corresponding table. See 'Flexfield Attributes, page A-1 for more information.

• Set in EBS Source in a distributed installation.

• Created by Create Planning Flexfields concurrent program

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance No

Page 211: Advanced Planning and Scheduling Profile Options Setups

Advanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Production Plan for Transportation updates

Profile Code MSCProfile Option Name MSC_PROD_PLAN_ID_FOR_OTM_UPDATESDescription Use this profile option to indicate the production plans that receive estimated

arrival time updates from Oracle Transportation Management. Valid values are:

• Null: Do not pass updates to any plan• All Production Plans: Pass updates to all plans with

Production flag selected• [specific plan name]: Pass updates only to the plan that is

specified

Default Value - NULLNote Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 212: Advanced Planning and Scheduling Profile Options Setups

MSC: Project Task Collection Window Days

Profile Code MSCProfile Option Name MSC_COLLECTION_WINDOW_FOR_PROJ_TASKSDescription Controls which projects/tasks are collected after the collection engine deletes

all of the previously collected records for the instance. Valid values are:• Null: Collects all of the records from the source.• Integer: Collects all of the records from the source from

projects whose end date is within the number of days in the past specified in the profile option value.

The collections process never collects tasks whose projects are completed.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning YesCollaborative Planning NoInventory Optimization YesService Parts Planning Yes

All Plan Types YesEnforce Constraints – Not Optimized No

Enforce Constraints – Optimized No

Disable Constraints – Not Optimized No

Disable Constraints – Optimized NoRapid Planning YesDemand Planning YesDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

MSC: Provide Warning For Dates Entered on Non-work Days

Profile Code MSCProfile Option Name MSC_VALIDATE_NON_WORK_DATEDescription Warning is displayed in the workbench if a non-working day is enteredNote Reference(s)

Bug Reference(s) 4639108Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections No

Page 213: Advanced Planning and Scheduling Profile Options Setups

Item Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Provide Warning when Sales Order Quantity is Changed

Profile Code MSCProfile Option Name MSC_SO_QTY_CHANGED_WARNDescription The New Quantity field on a sales order is user editable. The user can raise

or lower the sales order quantity by firming the sales order. Valid values are:

• Yes - As the user tabs out of the New Quantity field, if the quantity is changed then a warning is given as " Sales orderswith changed quantities cannot be released. The user must update the sales order directly in the source instance." In addition, the action for the sales order is set to None when the quantity is changed.

• No - supresses the warning

Note Reference(s)

Bug Reference(s) 4479258Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning YesCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 214: Advanced Planning and Scheduling Profile Options Setups

MSC: Purchase Order Dock Date Calculation Preference

Profile Code MSCProfile Option Name MSC_PO_DOCK_DATE_CALC_PREFDescription This profile option specifies the purchase order line date that the planning

engine uses as the material arrival (dock) date. Valid values are:

• Promise Date: If the Promise Date is not available, the planning engine uses Need by Date so that unacknowledgedpurchase orders consume supplier capacity.

• Need By Date: Existing purchase orders do not consume supplier capacity.

This is a site level profile option.

Use the same setting of this profile option for running both collections and plans.

Default Value - Promise DateNote Reference(s)

413816.1

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Purge Exception Days

Profile Code MSCProfile Option Name MSC_PURGE_EXCEPTION_DAYSDescription Information about this profile is not available in user guide.

All exceptions generated/updated by the number of days before (set by this profile value) will be deleted.

Page 215: Advanced Planning and Scheduling Profile Options Setups

Note Reference(s) 555016.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Purge Staging and Entity Key Translation Tables

Profile Code MSCProfile Option Name MSC_PURGE_ST_CONTROLDescription Controls both truncation of the staging table during data collection process

and deletion of the link ID tables. Valid values are:• Yes - conserve disk space when running data collections for

single instances, or as separate processes for multiple instances.

• No - When running data collections for multiple instances simultaneously, set to avoid data loss.

Note Reference(s) 405295.1

Bug Reference(s) 4717843Document References(s) -1

-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra No

Page 216: Advanced Planning and Scheduling Profile Options Setups

Strategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Read Profiles From DB

Profile Code MSCProfile Option Name MSC_READ_PROFILES_FROM_DBDescription No During planning flat files are created that hold profile values. At times, it is

better to have profiles read from the database instead of the flat files. This can espeically true for on-line or batch replan when profiles are changed. Valid values are:

• Yes• No

Default Value - NoNote Reference(s)

Bug Reference(s) 9406133Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types YesUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning YesCollaborative Planning NoInventory Optimization YesService Parts Planning Yes

All Plan Types NoEnforce Constraints – Not Optimized No

Enforce Constraints – Optimized No

Disable Constraints – Not Optimized No

Disable Constraints – Optimized NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Refresh Site to Region Mappings Event

Profile Code MSCProfile Option Name MSC_REFRESH_REGION_SITEDescription Valid values are:

• Yes - Collection of Sourcing Rules / Existing behavior -

Page 217: Advanced Planning and Scheduling Profile Options Setups

mapping during collection if sourcing rules parameter is set to Yes

• No - Running of Refresh Collection Snapshots Request / Mapping will be performed only during standalone refresh snapshot and not during a complete refresh of data collections.

With the alternate value selected, the collected data might not reflect the exact region site mapping based if the standalone Refresh Collection Snapshots is run.

Default Value - YesNote Reference(s) 427338.1

Bug Reference(s) 5717270Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Refresh Snapshots Pending Timeout

Profile Code MSCProfile Option Name MSC_REF_SNAP_PENDING_TIMEOUTDescription Sets the time that the Planning Data Pull concurrent process waits for

concurrent process Refresh Snapshots on the source before it times out. This time out only applies if concurrent process Refresh Snapshots is at status Pending/Inactive which occurs if another version of concurrent process Refresh Snapshots is running. Valid values are:

• Integer in minutes

Default Value - 10 Note Reference(s)

468903.1

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections No

Page 218: Advanced Planning and Scheduling Profile Options Setups

Item Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Region Instance

Profile Code MSCProfile Option Name MSC_HUB_REGION_INSTANCEDescription This profile needs to be set when data is being collected from multiple

sources. APCC only reports from the instance which is defined in this profile.Note Reference(s)

844667.1

Bug Reference(s) 68992536850493

Document References(s) -1-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center YesManufacturing Operations Center NoGlobal Order Promising No

MSC: Release WIP Dtls if Order Date different then BOM Revision Date

Profile Code MSCProfile Option Name MSC_RELEASE_DTLS_REVDATEDescription Oracle Work in Process uses the details effective on the job start date. Valid

values are:

• Yes - then planning engine releases the WIP details even if

Page 219: Advanced Planning and Scheduling Profile Options Setups

the Suggested Start Date is different than BOM Revision Date.

• No - the planning engine does not release the WIP details if the new WIP Start Date is different than BOM Revision Date.

Note Reference(s) 958034.1

Bug Reference(s) 2682123Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Released Only By User

Profile Code MSCProfile Option Name MSC_RELEASED_BY_USER_ONLYDescription Use this profile option to specify whether to restrict implementation of

planned orders and recommendations to the current user. Valid values are:• Yes - Only implement planned orders and recommendations

that this user marked• No - Implement planned orders and recommendations that

any user marked

Note Reference(s)

Bug Reference(s) 8326980Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning No

Page 220: Advanced Planning and Scheduling Profile Options Setups

Collaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Resource Group for a Line Flexfield Attribute

Profile Code MSCProfile Option Name MSC_LINE_RES_GROUPDescription This profile option stores the name of the flexfield column that contains the

value in the corresponding table.Note Reference(s) 147242.1

763878.1

Bug Reference(s)Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Resource Type for an Operation Flexfield Attribute

Profile Code MSCProfile Option Name MSC_RESOURCE_TYPEDescription This profile is no longer being used.Note Reference(s) 147242.1

Bug Reference(s) 2954572Document References(s) -1

-1

Page 221: Advanced Planning and Scheduling Profile Options Setups

Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Respect Minimum Remaining Shelf Life Days

Profile Code MSCProfile Option Name MSC_RESPECT_SHELF_LIFE_DAYSDescription This profile option enables ASCP to plan supplies with respect to the shelf

life enhancements described in this design including the minimum remaining shelf life days. Valid values are:

• Yes - ASCP plans supplies with respect to minimum remaining shelf life days. This is the recommended setting.

• No - ASCP plans supplies without enforcing minimum remaining shelf life days - This is the default value.

Note Reference(s)

Bug Reference(s) 7424037Document References(s) -1

-1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 222: Advanced Planning and Scheduling Profile Options Setups

MSC: Retain Time for Non-ATPable Items

Profile Code MSCProfile Option Name MSC_RETAIN_TIME_NON_ATP_ITEMDescription Valid values are:

• Yes - ATP returns same time stamp as passed to ATP from the Request Date and Time, for all single lines for non-atpable items or for all sets containing only non-atpable items. If a set contains mix of atpaple and non atpable items, then ATP continues to return 23:59:00 as the new timestamp.

• No

Note Reference(s) 259601.1 9237457 551293.1

Bug Reference(s) 9237457Document References(s) -1

-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

MSC: Return Best Source in Global ATP

Profile Code MSCProfile Option Name MSC_BEST_SOURCE_GLOBAL_ATPDescription No Information available in User guides (115.5.10 or R12.1.1)Note Reference(s) 960369.1

734925.1

Bug Reference(s)Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance No

Page 223: Advanced Planning and Scheduling Profile Options Setups

Advanced Supply Chain Planning YesAll Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

MSC: SCEM Engine Launch Events

Profile Code MSCProfile Option Name MSC_X_AUTO_SCEM_MODEDescription Launch the Supply Chain Event Manager when data is loaded,published, or

both.

Set the profile option MSC: SCEM Engine Launch Events to All to automaticallystart Supply Chain Event Manager (SCEM) when a supplier loads an order forecastor when you publish an order forecast from the planning server. If you set theprofile option to Publish, Supply Chain Event Manager starts only when plansarepublished from Oracle Advanced Supply Chain Planning. If you set the profileoption to Load, Supply Chain Event Manager starts only when data is loaded usingflat files.

Note Reference(s) 295564.1

Bug Reference(s) 29494372546115

Document References(s) -1-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning YesInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 224: Advanced Planning and Scheduling Profile Options Setups

MSC: SNO - Snapshot Base Package

Profile Code MSCProfile Option Name MSC_SCP_SNO_BASE_PKGDescription Specifies whether the Base Package is used for creating a model. Valid

values are:• Yes• No

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization YesAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: SNO - Snapshot Beginning Inventory Package

Profile Code MSCProfile Option Name MSC_SCP_SNO_BGN_INVNTRY_PKGDescription Specifies whether the Beginning Inventory Package is used for creating a

model in Strategic Network Optimization. Valid values are:• Yes• No

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization Yes

Page 225: Advanced Planning and Scheduling Profile Options Setups

Advanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: SNO - Snapshot Calendar Package

Profile Code MSCProfile Option Name MSC_SCP_SNO_CALENDAR_PKGDescription Specifies whether the Calendar Package is used for creating a model in

Strategic Network Optimization. Valid values are:• Yes• No

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization YesAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: SNO - Snapshot Customer Package

Profile Code MSCProfile Option Name MSC_SCP_SNO_CUSTOMER_PKGDescription Specifies whether the Customer Package is used for creating a model in

Strategic Network Optimization. Valid values are:

• Yes• No

Default Value - Yes

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections No

Page 226: Advanced Planning and Scheduling Profile Options Setups

Item Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization YesAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: SNO - Snapshot Demand Package

Profile Code MSCProfile Option Name MSC_SCP_SNO_DEMAND_PKGDescription Specifies whether the Demand Package is used for creating a model in

Strategic Network Optimization. Valid values are:

• Yes• No

Default Value - YesNote Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization YesAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: SNO - Snapshot Distribution Package

Profile Code MSCProfile Option Name MSC_SCP_SNO_DSTRBTN_PKGDescription Specifies whether the Distribution Package is used for creating a model in

Strategic Network Optimization. Valid values are:

Page 227: Advanced Planning and Scheduling Profile Options Setups

• Yes• No

Default Value - YesNote Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization YesAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: SNO - Snapshot Enterprise Forecast Package

Profile Code MSCProfile Option Name MSC_SCP_SNO_FORECAST_PKGDescription Specifies whether the Enterprise Forecast Package is used for creating a

model in Strategic Network Optimization. Valid values are:

• Yes• No

Default Value - YesNote Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization YesAdvanced Planning Command Center NoManufacturing Operations Center No

Page 228: Advanced Planning and Scheduling Profile Options Setups

Global Order Promising No

MSC: SNO - Snapshot Fixed Production Package

Profile Code MSCProfile Option Name MSC_SCP_SNO_FP_PKGDescription Specifies whether the Fixed Production Package is used for creating a model

in Strategic Network Optimization. Valid values are:

• Yes• No

Default Value - Yes

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization YesAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: SNO - Snapshot Inventory Safety Targets Package

Profile Code MSCProfile Option Name MSC_SCP_SNO_IST_PKGDescription Specifies whether the Inventory Safety Targets Package is used for creating

a model in Strategic Network Optimization. Valid values are:

• Yes• No

Default Value - YesNote Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

Page 229: Advanced Planning and Scheduling Profile Options Setups

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization YesAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: SNO - Snapshot Manufacturing Package

Profile Code MSCProfile Option Name MSC_SNO_SCP_MFG_PKGDescription

Specifies whether the Manufacturing Package is used for creating a model inStrategic Network Optimization. Note: We have two profiles:MSC: SNO - Snapshot Manufacturing PackageMSC: SNO - Snapshot Manufacturing Package (1)

Valid values: Yes/No Default value: Yes

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

-1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization YesAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: SNO - Snapshot Manufacturing Package(1)

Profile Code MSCProfile Option Name MSC_SCP_SNO_MFG_PKG

Page 230: Advanced Planning and Scheduling Profile Options Setups

Description Specifies whether the Manufacturing Package is used for creating a model inStrategic Network Optimization. Valid values are:

• Yes• No

Default Value - Yes

Note: We have two profiles:MSC: SNO - Snapshot Manufacturing PackageMSC: SNO - Snapshot Manufacturing Package (1)

Note Reference(s)

Bug Reference(s)Document References(s) -1

Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: SNO - Snapshot Purchase Orders Package

Profile Code MSCProfile Option Name MSC_SCP_SNO_PO_PKGDescription Specifies whether the Purchase Orders Package is used for creating a model

in Strategic Network Optimization. Valid values are:

• Yes• No

Default Value - YesNote Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning No

Page 231: Advanced Planning and Scheduling Profile Options Setups

Inventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization YesAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: SNO - Snapshot Sales Orders Package

Profile Code MSCProfile Option Name MSC_SCP_SNO_SO_PKGDescription Specifies whether the Sales Order Package is used for creating a model in

Strategic Network Optimization. Valid values are:

• Yes• No

Default Value - YesNote Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization YesAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: SNO - Snapshot Supplier Package

Profile Code MSCProfile Option Name MSC_SCP_SNO_SUPPLIER_PKGDescription Specifies whether the Supplier Package is used for creating a model in

Strategic Network Optimization. Valid values are:

• Yes• No

Default Value - Yes

Page 232: Advanced Planning and Scheduling Profile Options Setups

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization YesAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: SNO - Snapshot Transfer Orders Package

Profile Code MSCProfile Option Name MSC_SCP_SNO_TO_PKGDescription Specifies whether the Transfer Orders Package is used for creating a model

in Strategic Network Optimization. Valid values are:

• Yes• No

Default Value - YesNote Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization YesAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 233: Advanced Planning and Scheduling Profile Options Setups

MSC: SNO - Snapshot Work Orders Package

Profile Code MSCProfile Option Name MSC_SCP_SNO_WO_PKGDescription Specifies whether the Work Orders Package is used for creating a model in

Strategic Network Optimization. Valid values are:

• Yes• No

Default Value - YesNote Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization YesAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: SNO Connector Precision

Profile Code MSCProfile Option Name MSC_SCP_SNO_CONNECTOR_PRECISIONDescription 8 Specifies the precision value of the SNO connector. Valid values are:

• Integer

Change only on advise from Oracle Development.

Default Value - 8Note Reference(s)

Bug Reference(s) 5157640Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning No

Page 234: Advanced Planning and Scheduling Profile Options Setups

Distribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization YesAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: SNO Currency Precision

Profile Code MSCProfile Option Name MSC_SCP_SNO_CURRENCY_PRECISIONDescription Specifies the number of decimal places used to display currency information

in the SNO Currency Table. For the most accurate calculations, a precision of 9 is recommended. Valid values are:

• Numeric

Default Value - 2Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization YesAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: SNO Decimal Precision

Profile Code MSCProfile Option Name MSC_SCP_SNO_PRECISIONDescription Specifies the number of decimal places shown for data in properties

windows. Valid values are:

• Integer

Within SNO, the number of decimal places is called the display precision.

Page 235: Advanced Planning and Scheduling Profile Options Setups

Changing the display precision does not change the actual data values saved in a model. The display precision can affect results when you match data. For example, if the display precision is 2, a Machine node Utilization field with a value of 133.333333 displays 133.33. If you try to match Machinenodes with a Utilization field value of 133.33, the Machine node in this example is not matched because its actual value is 133.333333.

Default Value - 2Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization YesAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: SNO Optimization Type

Profile Code MSCProfile Option Name MSC_SCP_SNO_OPTIMIZATION_TYPEDescription Specifies the optimization type to be used when solving the model. Valid

values are:

• Cost: The item list price is not considered.• Profit: The item list price is considered.

Default Value - CostNote Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization YesAdvanced Planning Command Center No

Page 236: Advanced Planning and Scheduling Profile Options Setups

Manufacturing Operations Center NoGlobal Order Promising No

MSC: SNO Publish On Client

Profile Code MSCProfile Option Name MSC_SCP_SNO_PUBLISH_ON_CLIENTDescription Valid values are:

• Yes• No - prevents the local save of the files in CSV for

debugging, This can save space and improve performance on large models.

Default Value - Yes

Note Reference(s)

Bug Reference(s) 7233633Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: SNO Run Application Script

Profile Code MSCProfile Option Name MSC_SCP_SNO_APP_SCRIPTDescription Specifies the name of the batch script that starts SNO.

Default Value - runSNO.bat

OBSOLETE -- in R12.1.2Note Reference(s)

961419.1

Bug Reference(s) 70375276010199

Document References(s) -1-1-1

Dependent Profiles

Page 237: Advanced Planning and Scheduling Profile Options Setups

11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization YesAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: SNO Run Connector Script

Profile Code MSCProfile Option Name MSC_SCP_SNO_CONNECTOR_SCRIPTDescription Specifies the batch script that starts the SNO Connector.

Do not change without advise from Oracle Development.

Default Value - runSNOConnector.batNote Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization YesAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: SNO Transportation Capacity By

Profile Code MSCProfile Option Name MSC_SCP_SNO_TRANSPORT_CAPACITYDescription Specify the unit of measure that determines transportation capacity.

Default Value - WeightNote Reference(s)

Bug Reference(s)

Page 238: Advanced Planning and Scheduling Profile Options Setups

Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization YesAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Safety Stock Project

Profile Code MSCProfile Option Name MSC_SAFETY_STOCK_PROJECTDescription Specifies the default project charged for all safety stock demands.

Oracle Advanced Supply Chain Planning assigns the project specified for all safety stock demands which originate from non-MRP planned safety stock. When safety stock requirements are specified in Oracle Inventory for specificprojects, the profile option value is not honored.

The list of values for this profile option is restricted to projects specified in Oracle Projects. This profile option is enabled at project/seiban level, not at the task level.

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 239: Advanced Planning and Scheduling Profile Options Setups

MSC: Safety stock change interval (Days)

Profile Code MSCProfile Option Name MSC_SS_INTERVAL_DAYSDescription Use this profile option to specify the time interval used for smoothing within

the time interval functionality. You can instruct the planing engine to keep safety stock levels relatively constant within a time interval. You specify:

• The number of days in the time interval: Set profile option MSC: Safety stock change interval (Days)

• The method that the planning engine should use to calculate the constant value: Set profile option MSC: Smoothing method to calculate Safety stock within Change interval

Note Reference(s) 276707.1 559867.1 376451.1 759329.1

Bug Reference(s)Document References(s) -1

-1-1-1Oracle Advanced Supply Chain Planning Implementation and User's Guide-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Sales Orders Offset Days

Profile Code MSCProfile Option Name MSC_SO_OFFSET_DAYSDescription Completed sales orders are collected within the offset duration. For example,

if Sales Orders Offset Days is set to 90, all the sales orders completed in the past 90 days are also collected. Valid values are:

• Integer > 0

Page 240: Advanced Planning and Scheduling Profile Options Setups

Can be defined at the site level. A Null value means all closed sales orders are collected.

Does not apply to complex maintenance repair and overhaul where the material scheduled for a visit or task is collected as a sales order in Oracle Advanced Supply Chain Planning.

Default Value - nullNote Reference(s)

277863.1 217116.1 780735.1 365770.1

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

-1-1-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Scope of Analyze Plan Partition

Profile Code MSCProfile Option Name MSC_ANALYZE_PARTITION_SCOPEDescription This profile option specifies the partitions that concurrent process Analyze

Plan Partitions should analyze. Valid values are:

• All Partitions• Plan Partition Only

Normally, we recommend the default setting for this profile, unless you run several plans each cycle and the profile MSC: Launch Analyze Plan Partition is set to No. Then you should set All Partitions and launch this request after running all ASCP plans in your planning cycle. Using this strategy can have positive performance impact if all plans are run together and then users start working in the plans.

Default Value - Plan Partition Only

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

Page 241: Advanced Planning and Scheduling Profile Options Setups

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning YesCollaborative Planning NoInventory Optimization YesService Parts Planning Yes

All Plan Types NoEnforce Constraints – Not Optimized No

Enforce Constraints – Optimized No

Disable Constraints – Not Optimized No

Disable Constraints – Optimized NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Selection order for Firm Supplies in backwardallocation window

Profile Code MSCProfile Option Name MSC_SUPPLY_SELECTION_ORDER_BACKWARD_WINDOWDescription Closest Supply (1), Earliest Supply (2)

Site level default: Closest Supply (1) If profile is set to Earliest Supply, then we would walk forward instead of the existing backward way. If this profile is set to Closest Supply, then we will peg it to the closest firm supply. This would mean that the loop for backward phase present in mslflp.ppc, should be able to move in both the directions based on profile option.

Note Reference(s) 391548.1

Bug Reference(s) 5525679Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning No

Page 242: Advanced Planning and Scheduling Profile Options Setups

Demand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Self Service Loads Delimiter

Profile Code MSCProfile Option Name MSC_SELF_SERVICE_LOADS_DELIMITERDescription ~/, (tilde or Comma) - default = ~ (tilde)

Delimiter used to parse the data files loaded using self service loads, for example, the loading of spreadsheet forecast data to Oracle Demand Planning. Valid values are:

• ~• ,

Default Value - ~Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning YesCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Service Level Category Set

Profile Code MSCProfile Option Name MSC_SERVICE_LEVEL_CATEGORY_SETDescription Not much information is available about this profile in user guides.

As IO user guide:As part of the setup it is necessary to specify the value of the profile option MSC:Service Level Category Set. Only categories from this category set are availablewhen assigning target service levels and fulfillment lead times at a category levelduring the setup of specific item or category level service levels and

Page 243: Advanced Planning and Scheduling Profile Options Setups

fulfillment lead times.

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization YesService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Service Planning Enabled

Profile Code MSCProfile Option Name MSC_SRP_ENABLEDDescription If using Service Parts Planning, then set to Yes to collect data for SPP (aka

SRP). Valid values are:

• Yes• No

Default Value - No Note Reference(s) 760095.1

566096.1

Bug Reference(s)Document References(s) -1

-1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning Yes

All Plan Types NoEnforce Constraints – Not Optimized No

Enforce Constraints – Optimized No

Disable Constraints – Not Optimized No

Disable Constraints – Optimized No

Page 244: Advanced Planning and Scheduling Profile Options Setups

Rapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Service Planning Item Safety Stock Level Value

Profile Code MSCProfile Option Name MSO_SS_PLAN_LEVELDescription Not documented in any manual.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Share Plan Partitions

Profile Code MSCProfile Option Name MSC_SHARE_PARTITIONSDescription The profile option is a work-around for test/demo scenarios where you expect

the creation of many plans by different testers and demonstrators. This profile option is not meant for production use by customers. When enabled the number of plan partitions parameter to the concurrent program mentioned becomes irrelevant; only one partition is created for a plan (you can enter 1).This profile option should only be changed by the system administrator.If the MSC: Share Plan Partitions profile is turned on, you must run the Create APS Partitions program afterwards so that it can create the partition that every plan shares.

Note Reference(s) 137293.1

Bug Reference(s)Document References(s) -1

Oracle Advanced Supply Chain Planning Implementation and User's Guide-1

Dependent Profiles

Page 245: Advanced Planning and Scheduling Profile Options Setups

11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning YesCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

MSC: Shelf Life Override of Order Modifiers for Transfer Orders

Profile Code MSCProfile Option Name MSC_OVERRIDE_OM_FOR_TRANSFERDescription Instructs Oracle Advanced Supply Chain Planning whether to maximize the

number of demands satisfied with respect to minimum remaining shelf life.Note Reference(s) 760046.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 246: Advanced Planning and Scheduling Profile Options Setups

MSC: Simultaneous Resource Sequence Flexfield Attribute

Profile Code MSCProfile Option Name MSC_SIMUL_RES_SEQDescription This profile option stores the name of the flexfield column that contains the

value in the corresponding table. This setup is only performed during application install.

Note Reference(s) 153919.1 136734.1 130995.1

Bug Reference(s)Document References(s) -1

-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Smoothing method to calculate Safety stock within Change interval

Profile Code MSCProfile Option Name MSC_SS_SMOOTHING_METHODDescription Specifies the mathematical construct used to calculate safety stock for a time

interval using values within the time interval. Available values include:• Minimum• Average (Default)

• Maximum

Note Reference(s) 376451.1 276707.1

Bug Reference(s) 53703774520265

Document References(s) -1-1-1

Page 247: Advanced Planning and Scheduling Profile Options Setups

-1-1Oracle Advanced Supply Chain Planning Implementation and User's Guide-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning YesCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Source Instance ID

Profile Code MSCProfile Option Name MSC_SR_INSTANCE_IDDescription This profile option is no longer used as of August 2003.Note Reference(s)

Bug Reference(s) 2937850Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Source Setup Required

Profile Code MSCProfile Option Name MSC_SOURCE_SETUP

Page 248: Advanced Planning and Scheduling Profile Options Setups

Description Internal profile used by the software during collections configuration. Do not manually update.

When the Default Value of a profile option states that it is automatically calculated, this means that the Planning Engine determines the default value of that particular profile option. If you must change these profile option values, do so only after consulting Oracle Development and Oracle Support.

Valid values are:• 11i

• Y - for Yes

• N - for No

• 12+

• Yes• No

Note Reference(s) apsinfo_us 837670.1 211121.1 860349.1 580205.1

Bug Reference(s)Document References(s) -1

-1-1-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Sourcing History Start Date Offset(in months)

Profile Code MSCProfile Option Name MSC_START_SOURCING_HISTORYDescription Offsets the starting date of sourcing history calculations and is used in

conjunction with collections parameters Purge Sourcing History = Yes and Recalculate Sourcing History = Yes. These settings delete, then calculate Sourcing History from the Start date determined by the profile option value (in months). System performance can be degraded when there is a high value for this profile option and a high volume of source transaction data. Valid values are:

Page 249: Advanced Planning and Scheduling Profile Options Setups

• Integer >= 0

Defaul Value - Null ( No restriction, pulls all data)Note Reference(s) 399468.1

305327.1 780883.1

Bug Reference(s) 6959481Document References(s) -1

-1-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

MSC: Sourcing Rule Category Set

Profile Code MSCProfile Option Name MSC_SRA_CATEGORY_SETDescription Determines the category set used in Oracle Advanced Supply Chain

Planning in the assignment set form. If this not set, the user cannot assign sourcing rules and bills of distribution at the Category- Instance-Organization and Category-Instance level.

Note Reference(s) 205167.1 783204.1 306913.1

Bug Reference(s)Document References(s) -1

-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Page 250: Advanced Planning and Scheduling Profile Options Setups

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Sourcing Variance Tolerance

Profile Code MSCProfile Option Name MSC_SOURCING_TOLERANCEDescription Used when Enforce Sourcing Constraints is enabled for a plan. This

percentage value establishes a threshold for triggering exception messages if sourcing allocations are violated.

Exceptions are generated if the difference between the user-specified sourcing allocation percentages and the plan-derived allocation percentages is greater than the Sourcing Variance Tolerance. The profile option is enteredas a number and converted to a percentage.

If the user enters 0.5 it becomes 50%.

Valid values are: • Integer between 0 and 1

Default Value - 0.05 (5%)Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 251: Advanced Planning and Scheduling Profile Options Setups

MSC: Split Planned Order to perform safety stock pegging

Profile Code MSCProfile Option Name MSC_VIOLATE_ORDER_MODIFIER_SSDescription Use this profile option to instruct the planning engine how to split a planned

order that pegs to customer demand when pulling it in to meet transient safety stock.

Note Reference(s) 276707.1

Bug Reference(s) 3829477Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Split Planned Orders for Scheduling Flexibility

Profile Code MSCProfile Option Name MSC_SPLIT_SUPPLYDescription For constrained plan with decision rules and optimized plans, it determines

whether the planning engine consolidates planned orders that were split during optimization processing prior to scheduling them. For unconstrained plans, set it to No. Valid values are:

• Yes - Do not consolidate planned orders prior to scheduling. The planning engine splits them into multiple planned orders whose quantities generally satisfy one planning time bucket'sworth of capacity against the resources or suppliers used in the planned order. During scheduling, the planning engine has more flexibility to place smaller quantities into available time slots. You cannot specify the size of the durations and the planning engine does not guarantee that each planned order in the final plan output spans exactly one planning bucket.

• No - Consolidate orders when possible prior to scheduling. Use this value if you tend to have long production runs per routing that cross multiple planning buckets. The planning

Page 252: Advanced Planning and Scheduling Profile Options Setups

engine creates a single planned order. If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine only uses this profile option if its value is No.

Note Reference(s) 298806.1 787982.1 562872.1 787458.1 947399.1 958872.1

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

-1-1-1-1-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Supplier Capacity Accumulation(multiplier)

Profile Code MSCProfile Option Name MSC_SUPP_CAP_ACCUM_MLTPLRDescriptionNote Reference(s)

Bug Reference(s) 83443028847552

Document References(s) -1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning No

Page 253: Advanced Planning and Scheduling Profile Options Setups

Inventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Suppress Exception for Selection of Alternates

Profile Code MSCProfile Option Name MSC_SUPPRESS_ALT_EXCEPTIONDescription Controls whether the planning engine generates exceptions related to

alternate bills of material and routings. If the profile option is No, it does notgenerate those exceptions.Valid values: Yes/NoDefault value: No

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Temp Index Extent Size(Bytes)

Profile Code MSCProfile Option Name MSC_TEMP_IND_NXTEXTDescription Not UsedNote Reference(s) 343996.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 Profile

Page 254: Advanced Planning and Scheduling Profile Options Setups

Data Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Temp Table Extent Size(Bytes)

Profile Code MSCProfile Option Name MSC_TEMP_TAB_NXTEXTDescription Not usedNote Reference(s) 343996.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Unit of Measure

Profile Code MSCProfile Option Name MSC_UNIT_OF_MEASUREDescription Not UsedNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile No12.1.1 Profile

Page 255: Advanced Planning and Scheduling Profile Options Setups

Data Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Update Requested Completion Date when Releasing Reschedules

Profile Code MSCProfile Option Name MSC_UPD_REQ_DATE_RELDescription Marked as N/A in the Users Guide for all information. Exists in the code for

releasing from Planner Workbench in the Source side code MRP_AP_REL_PLAN_PUB and defaults to NoThe file is $MRP_TOP/patch/115/sql/MRPRELPB.pls Code review points to this not being used anywhere, even though the value is determined during the release process.Introduced in 11.5.9 and exists in 11.5.10Bug 8603036 logged to get this ported into R12

Note Reference(s)

Bug Reference(s) 39385658603036

Document References(s) -1-1Oracle Advanced Supply Chain Planning Implementation and User's Guide

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center No

Page 256: Advanced Planning and Scheduling Profile Options Setups

Global Order Promising No

MSC: Update Use Up Date

Profile Code MSCProfile Option Name MSC_UPDATE_USE_UP_DATEDescription This is an internal profileNote Reference(s) 747628.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Use Enhanced Forward ATP

Profile Code MSCProfile Option Name MSC_ENHANCED_FORWARD_ATPDescription MSC: Use Enhanced Forward ATP - Discussed in Bug 3939589

When a request cannot be fully met on the request date, GOP performs forward scheduling to find a day when the shortage can be met.

Today, forward scheduling logic does not combine schedule receipts with new attainable supply. This results in very conservative order promising date. Desired behavior is for GOP to come up with the best promising date considering all possible supply.

This is implemented in 11.5.10 ATP Rollup 12 (Ref Note 252108.1 for Rollup list)

When Profile MSC: Use Enhanced Forward ATP = Yes, then we do multiple iterations using backward logic which combines scheduled receipts and ctp. Please note the performance implication in setting this profile.

It appears that this was ment to be forward ported to 12.1 but was not.

Note Reference(s)

Page 257: Advanced Planning and Scheduling Profile Options Setups

Bug Reference(s) 8443590Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

MSC: Use FIFO Pegging

Profile Code MSCProfile Option Name MSC_USE_FIFO_PEGGINGDescription If this profile option is Yes, the planning engine uses FIFO pegging. Not used

in constrained plans without detailed schedulingNote Reference(s) 368676.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Use Optimization Phase Supply Due Dates forPegging

Profile Code MSCProfile Option Name MSC_USE_SCO_DATE

Page 258: Advanced Planning and Scheduling Profile Options Setups

Description When set to yes, Pegging uses the optimization recommended supply date for planned orders and scheduled receipts

Note Reference(s)

Bug Reference(s) 6009093Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Use Shipping/Receiving Calendar

Profile Code MSCProfile Option Name MSC_USE_SHIP_REC_CALDescription Controls the use of shipping, receiving, and carrier calendars. Values are:

• Yes: Use shipping, receiving, or, carrier calendar for planning/scheduling

• No: Use the organization manufacturing calendar while generating a plan.

This profile option specifies:• At the site level, whether the collection engine collects the

calendars.If the calendars are collected, the planning engine uses them.

• At the user level, whether Planner Workbench displays the collected calendars. Even if the planning engine used the calendars, if the user level value is No, the Planner Workbench displays calendars as 24x7. This should be avoided. If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine only uses this profile option if its value is Yes.

Note Reference(s) 845365.1 390531

Bug Reference(s) 845365.1Document References(s) -1

-1Oracle Advanced Supply Chain Planning Implementation and User's Guide

Dependent Profiles11.5.10 Profile Yes

Page 259: Advanced Planning and Scheduling Profile Options Setups

12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Use attribute based netting

Profile Code MSCProfile Option Name MSC_USE_ATTR_BASED_NETTINGDescription Use this profile option to control netting in a project manufacturing

environment. • Yes: Planning nets at the reservation level. It respects

pegging level and creates planned orders based on hard pegging level. It does not respect order modifiers if the reservation level and hard pegging level are not the same. With this approach, you can enable priority pegging can be enabled.

• No: The planning engine uses customary netting in a project manufacturing environment.

Note Reference(s) 420752.1

Bug Reference(s)Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center No

Page 260: Advanced Planning and Scheduling Profile Options Setups

Manufacturing Operations Center NoGlobal Order Promising No

MSC: VMI Default Query

Profile Code MSCProfile Option Name MSCX_SCE_DEFAULT_QUERYDescription Displays default results in the Oracle Collaborative Planning Horizontal ViewNote Reference(s)

Bug Reference(s) 5058121Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning YesInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Value of N for all top/bottom-N reports in Dashboards

Profile Code MSCProfile Option Name MSC_HUB_TOP_BOTTOM_N_VALUEDescription It holds the value of N for all top/bottom-N reports in Dashboards.Note Reference(s) 759571.1

844667.1

Bug Reference(s) 6755107Document References(s) -1

-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra No

Page 261: Advanced Planning and Scheduling Profile Options Setups

Strategic Network Optimization NoAdvanced Planning Command Center YesManufacturing Operations Center NoGlobal Order Promising No

MSC: Vertical view default query

Profile Code MSCProfile Option Name MSCX_VERTICAL_VIEW_DEFAULT_QUERYDescription Used by Oracle Collaborative Planning to determine whether default results

are displayed for the vertical viewNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning YesInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Wait Time to Obtain Lock on Table/Partition for Snapshot Delete Worker (in sec)

Profile Code MSCProfile Option Name MSC_LOCK_WAIT_TIMEDescription Time (in seconds) the Snapshot Delete Worker waits to obtain a lock on a

table/partition before aborting.

Releasing plan recommendations through Workbench and running Purge Plan can cause locks on the table/partition preventing the Snapshot Delete Worker from obtaining a lock.

If the timer expires, the program prints the following message in the log file: Unable to obtain a lock on table.

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan No

Page 262: Advanced Planning and Scheduling Profile Options Setups

Constrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC: Write MBP Flat Files

Profile Code MSCProfile Option Name MSC_WRITE_TO_FLAT_FILESDescription Profile provide controls whether to flush the Planner concurrent process data

files and setup data files during the plan run. If Yes, the process writes all thefiles to the $APPLCSF/out/data

directory.Note Reference(s)

336724.1

Bug Reference(s)Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC:ATP Assignment Set

Profile Code MSCProfile Option Name MSC_ATP_ASSIGN_SETDescription Indicates the name of the assignment set for Oracle Global Order Promising

to use to identify all the possible shipping organizations. Oracle Global Order

Page 263: Advanced Planning and Scheduling Profile Options Setups

Promising uses this assignment set if profile MRP: ATP Assignment Set is Null on the ERP instance. Users can update it the at site level in the Planninginstance.

Valid Value: TextDefault Value: Null

Note Reference(s) 812964.1 760117.1 290251.1 1059017.1 986625.1

Bug Reference(s)Document References(s) -1

-1-1-1-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

MSC:Coll Error Debug Mode

Profile Code MSCProfile Option Name MSC_COLL_ERR_DEBUGDescription Introduced in R12 to provide better messaging in Data Collections log files.

Set on APS Destination instance. Valid values are:• Off• Low• Medium• High (Verbose)• Dev

CAUTION: Using High and DEV may have performance impact.Note Reference(s)

Bug Reference(s) 5514401

Page 264: Advanced Planning and Scheduling Profile Options Setups

5578510Document References(s) -1

-1-1

Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC:Coll Performance Debug Mode

Profile Code MSCProfile Option Name MSC_COLL_PERF_DEBUGDescription Introduced in R12. Helps by adding messaging about performance in the log

files. Valid values are:• Off• Medium• High (Verbose)

CAUTION: Should not be used with MSC:Coll Error Debug Mode also set to Medium or higher unless directed by DEV.

Best to set this profile and have MSC: Coll Error Debug Mode = OFF when working a pure performance issue

Note Reference(s)

Bug Reference(s) 67220405514401

Document References(s) -1-1

Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center No

Page 265: Advanced Planning and Scheduling Profile Options Setups

Global Order Promising No

MSC:Collect Completed Jobs

Profile Code MSCProfile Option Name MSC_COLLECT_COMPLETED_JOBSDescription This profile is used to prevent the collection of remaining requirements for

jobs that are completed when set to No. Jobs may still have requirements forcomponents that were not issued to the job.

This profile was Introduced in 11.5.10 Collections Rollup #13 and is only used for Complete or Targeted Refresh of Data Collections

Note Reference(s) 404975.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC:Collect Routing

Profile Code MSCProfile Option Name MSC_COLLECT_ROUTINGDescription Use this profile to instruct the targeted collections process how to collect bill

of material and routing data. Valid values are:• Yes - Collect bill of material and routing data • No: Collect bill of material data but do not collect routing data

This profile option is overridden by profile option INV: Capable To Promise is ATP/CTP based on Planning Output.Do NOT set no if running any Plans in VCP Applications.Useful when ATP based collected data is being used and having very large BOM Routing tables and it can help performance.

Page 266: Advanced Planning and Scheduling Profile Options Setups

Currently only available in 11.5.10 starting in Data Collections Rollup #25.Bugs to Front port to R12 and R12.1 are pending

Note Reference(s)

Bug Reference(s) 6658721Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC:Criticality Category Set

Profile Code MSCProfile Option Name MSC_CRIT_CATEGORY_SETDescription You use this profile option to specify the category set that will be used for

defining criticality in the item mass maintenance window.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 267: Advanced Planning and Scheduling Profile Options Setups

MSC:Prevent Loops when pegging Non-Standard Jobs

Profile Code MSCProfile Option Name MSC_PREVENT_NSJOB_LOOPDescription Discrete job demands remain unpegged in case of job demands generated

due to Loops in BOM. Valid values are:• Yes - If there exists a non standard job demand for a top

level item in the supply chain bill and the non-standard job also exists as a valid supply in the plan, ASCP will make the pessimistic assumption that this could cause a fatal loop in the pegging and essentially ignore this demand for pegging purposes. This default setting is recommended strongly to prevent plan failures due to pegging loops.

• No - In the above case, ASCP makes the optimistic assumption that loops will not exist after pegging and proceeds to peg supply of the top level item to the non-standard job demand. This setting should not to be used unless the user is completely certain that loops will not be caused based on their pegging related plan and profile option settings

Default Value - NoNote Reference(s) 365112.1

Bug Reference(s) 4575602Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning YesCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC:Release only orders pegging fully to on han

Profile Code MSCProfile Option Name MSC_REL_ONLY_ONHAND_SUPPLYDescription No details on the profile available.Note Reference(s) Bug Reference(s)

Page 268: Advanced Planning and Scheduling Profile Options Setups

Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC:Select Sourcing Rules In ATP Based On

Profile Code MSCProfile Option Name MSC_SOURCING_DATEDescription Information about this profile is not available in user guides.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

MSC_ENFORCE_MODEL_LT

Profile Code MSCProfile Option Name MSC: ATP ENFORCES LEAD TIME FOR ATO MODELDescription Reconcile - this is setup backawards - Internal name and User name are

backwards - does this already exist or need to be switched???? Use this profile option to specify how ATP considers lead-time. Valid values are:

Page 269: Advanced Planning and Scheduling Profile Options Setups

• Yes: ATP always enforces lead-times for non-ATPable ATO models

• No: ATP does not enforce lead-times for non-ATPable ATO models

Default - YesNote Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

Oracle Global Order Promising Implementation and User's GuideOracle Global Order Promising Implementation and User's Guide

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSC_USE_HASH_KEY

Profile Code MSCProfile Option Name MSC_USE_HASH_KEYDescription This is an internal profile. Should be set to Yes always

Note Reference(s)

Bug Reference(s) 3575822Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra No

Page 270: Advanced Planning and Scheduling Profile Options Setups

Strategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSD: AW Tablespace

Profile Code MSDProfile Option Name MSD_TABLESPACEDescription This profile controls where analytic workspaces are created and stored. New

plans are created in the specified tablespace; existing plans remain in the tablespace specified at the time of their creation. Changing the tablespace profile has no effect on existing data.

Note Reference(s)

Bug Reference(s) 3900222Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning YesDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSD: Calculate Planning Percentages

Profile Code MSDProfile Option Name MSD_PLANNING_PERCENTAGEDescription This profile option controls the behavior of the planning percentage

calculations. For example, it controls whether the planning percentages can be calculated from the sales history of options. This profile can prevent expensive calculations when the user does not want to calculate planning percentages and just wants to use the existing planning percentages specified in the enterprise resource planning source to explode the forecast.

Note Reference(s) 556091.1

Bug Reference(s) 2930793Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning No

Page 271: Advanced Planning and Scheduling Profile Options Setups

Collaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning YesDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSD: Category Set Name

Profile Code MSDProfile Option Name MSD_CATEGORY_SET_NAMEDescription This profile option is used to select one category set during the data

collection process. If the user value is left blank, then all categories will be selected for data collection. Valid values are limited to valid category set names.

Note Reference(s) 344626.1

Bug Reference(s) 4058454Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning YesDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSD: Client Debugging

Profile Code MSDProfile Option Name MSD_CLIENT_DEBUGGINGDescription Used for debugging ODPNote Reference(s) 789091.1

301936.1

Bug Reference(s)Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections No

Page 272: Advanced Planning and Scheduling Profile Options Setups

Item Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning YesDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSD: Conversion Type

Profile Code MSDProfile Option Name MSD_CONVERSION_TYPEDescription This profile option determines what conversion rates are collected from the

General Ledger rates tableNote Reference(s) 419412.1

Bug Reference(s) 7530857Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning YesDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSD: Currency Code

Profile Code MSDProfile Option Name MSD_CURRENCY_CODEDescription This profile option designates the base currency used in Oracle Demand

Planning. All revenues are calculated and displayed in this base currencyNote Reference(s) 577726.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections No

Page 273: Advanced Planning and Scheduling Profile Options Setups

Item Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning YesDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSD: Customer Attribute

Profile Code MSDProfile Option Name MSD_CUSTOMER_ATTRIBUTEDescription This is a source profile option used to selectively bring the customer names

into Oracle Demand Planning to improve the system performanceNote Reference(s) 217042.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning YesDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSD: Default DP Scenario

Profile Code MSDProfile Option Name MSD_DEFAULT_DP_SCENARIODescription This profile option specifies a demand scenario, which appears as a demand

schedule in the Plan Options window. When you publish the demand scenario specified in this option, the planning engine launches the unconstrained plan specified in the profile option MSC: New Forecast Auto Plan

Note Reference(s)

Bug Reference(s) 2710122Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 Profile

Page 274: Advanced Planning and Scheduling Profile Options Setups

Data Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning YesDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSD: Enabled Organization for Item Collections

Profile Code MSDProfile Option Name MSD_ITEM_ORGDescription This profile option allows users to collect relationships for Items in Master

Organization only or All Organizations. This profile option specifies how Oracle Demand Planning collects Product Family and Product Category relationships

Note Reference(s)

Bug Reference(s) 4157588Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning YesDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSD: Excess and Obsolescence, Liability Category Set Name

Profile Code MSDProfile Option Name MSD_EOL_CATEGORY_SET_NAMEDescription This profile is not used.Note Reference(s)

Bug Reference(s) 5202797Document References(s) -1Dependent Profiles11.5.10 Profile No

Page 275: Advanced Planning and Scheduling Profile Options Setups

12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning YesDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSD: MAXVALUECOUNT for edges in XWDEVKIT

Profile Code MSDProfile Option Name MSD_EDGEMAXVALCOUNTDescription Used for setting the maximum number of values allowed on an edge for

XWDEVKIT. Used in the ODP WorksheetNote Reference(s) 359953.1

Bug Reference(s) 4725583Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning YesDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSD: Master Org

Profile Code MSDProfile Option Name MSD_MASTER_ORGDescription This profile option is used to select a master organization, if there are

multiple master organizations. The item attributes pertaining to the selected master organization are used by Oracle Demand Planning

Note Reference(s)

Bug Reference(s) 2779954Document References(s) -1Dependent Profiles

Page 276: Advanced Planning and Scheduling Profile Options Setups

11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning YesDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSD: OLAP Directory Alias

Profile Code MSDProfile Option Name MSD_DIR_ALIASDescription Use this profile to specify the database directory alias used to store the log

files created during the demand plan build process.Note Reference(s) 470483.1

Bug Reference(s) 3826884Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning YesDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSD: OLAP Initial Page Pool

Profile Code MSDProfile Option Name MSD_USER_INIT_PAGEPOOLDescription This profile specifies an initial minimum memory for planning and manager

sessions and can be optimized for individual users. A value of 4 to 6MB is generally adequate. The default value is olap_page_pool_size.

Note Reference(s) 363491.1

Bug Reference(s)Document References(s) -1

Page 277: Advanced Planning and Scheduling Profile Options Setups

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning YesDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSD: OLAP Maximum Page Pool

Profile Code MSDProfile Option Name MSD_USER_MAX_PAGEPOOLDescription Not used - obsoleteNote Reference(s) Note.416107.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra YesStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSD: OLAP Workflow Page Pool

Profile Code MSDProfile Option Name MAX_WF_MAX_PAGEPOOLDescription This profile specifies the memory footprint for workflow initiated Oracle

Demand Planning sessions. The default value is 64MB.Note Reference(s) 363491.1

285489.1 286729.1

Bug Reference(s)Document References(s) -1

-1

Page 278: Advanced Planning and Scheduling Profile Options Setups

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning YesDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSD: One Step Collection

Profile Code MSDProfile Option Name MSD_ONE_STEP_COLLECTIONDescription This profile option controls the number of steps in the data collection processNote Reference(s) 332545.1

Bug Reference(s) 2930793Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning YesDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSD: Two-Level Planning

Profile Code MSDProfile Option Name MSD_TWO_LEVEL_PLANNINGDescription This profile allows you to forecast demand at product family level on the

basis of sales histories of member items. You can collect all the product family members and their sales histories regardless of the forecast control aslong as the product family forecast control is 'Consume' or 'Consume & Derive' and the planning method for product family as well as members is notset to 'Not Planned'. This is achieved by setting the profile value to: Collect

Page 279: Advanced Planning and Scheduling Profile Options Setups

all family members and their sales histories. The default profile value, Exclude family members with forecast control 'None' enforces the existing behavior that is, only 'Consume' or 'Consume & Derive' product family members are collected.

Note Reference(s)

Bug Reference(s) 3009964Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning YesDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSD: Use Classic Even Allocation

Profile Code MSDProfile Option Name MSD_USE_EVEN_ALLOCDescription This profile allows you to determine the allocation method used when an

allocation basis does not exist. You can allocate evenly down the time dimension and use "first" allocation for other dimensions when an allocation basis is not available.Demand Planning uses the First Child allocation method by default, unless you enable the MSD: Use Classic Even Allocation profile.

Note Reference(s) 436673.1

Bug Reference(s) 4577092Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning YesDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 280: Advanced Planning and Scheduling Profile Options Setups

MSD: Use Classic Worksheet

Profile Code MSDProfile Option Name MSD_USE_CLASSIC_WORKSHEETDescription To force recalculations between worksheet edits, enable the MSD: Classic

Worksheet profile option. This option enforces consistency across hierarchy levels, but may decrease performance. in 11.5.10 default is classic, in R12 default is simple. Not applicable to planning percentages worksheet

Note Reference(s)

Bug Reference(s) 6137940Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning YesDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSD:View Scope measures are editable

Profile Code MSDProfile Option Name VIEW_SCOPE_MEAS_EDITABLEDescription The measures not included in the Assignment scope, but included in the

View scope, can be viewed but not edited. Valid values are:• Y - Yes, the default behaviour• N - No

Default Value - YNote Reference(s)

Bug Reference(s) 6367799Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning YesDemantra No

Page 281: Advanced Planning and Scheduling Profile Options Setups

Strategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSD_DEM: Category Set Name

Profile Code MSDProfile Option Name MSD_DEM_CATEGORY_SET_NAMEDescription This profile defines the Item to Category rollups in each instance.Note Reference(s) 549565.1

Bug Reference(s) 8235032Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra YesStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSD_DEM: Conversion Type

Profile Code MSDProfile Option Name MSD_DEM_CONVERSION_TYPEDescription This profile determines which currency conversion rates are collected from

the General Ledger tables Source side profileNote Reference(s)

Bug Reference(s) 5969081Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra Yes

Page 282: Advanced Planning and Scheduling Profile Options Setups

Strategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSD_DEM: Currency Code

Profile Code MSDProfile Option Name MSD_DEM_CURRENCY_CODEDescription This profile designates the Demand Management base currency. Destination

side profileNote Reference(s)

Bug Reference(s) 5959651Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra YesStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSD_DEM: Customer Attribute

Profile Code MSDProfile Option Name MSD_DEM_CUSTOMER_ATTRIBUTEDescription This is a source profile option used to selectively bring the customer names

into Demand Management to improve system performance. Source side profile

Note Reference(s) 726444.1

Bug Reference(s) 6926188Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning No

Page 283: Advanced Planning and Scheduling Profile Options Setups

Demantra YesStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSD_DEM: Data Profile for Price Lists

Profile Code MSDProfile Option Name MSD_DEM_PRICE_LIST_PROFILEDescription Set this profile to import integration data profile for price lists. Destination

side profileNote Reference(s)

Bug Reference(s) 6450646Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra YesStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSD_DEM: Debug Mode

Profile Code MSDProfile Option Name MSD_DEM_DEBUG_MODEDescription When set to 'Yes', this profile is used to print debug information to the output

file of the concurrent request. Destination side profileNote Reference(s) 741464.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra Yes

Page 284: Advanced Planning and Scheduling Profile Options Setups

Strategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSD_DEM: Fiscal Calendar

Profile Code MSDProfile Option Name MSD_DEM_FISCAL_CALENDARDescription All the fiscal calendars chosen in the calendar setup list will be available

in the List Of Values for this profile.Note Reference(s)

Bug Reference(s) 6278515Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra YesStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSD_DEM: Host URL

Profile Code MSDProfile Option Name MSD_DEM_HOST_URLDescription Set this profile to the Oracle Demantra Application Server Host Name, Port

Number and Application Name. This profile is used to invoke Oracle Demantra URLs from the E-Business Suite applications. Destination profile

Note Reference(s) 431301.1

Bug Reference(s) 6497910Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning No

Page 285: Advanced Planning and Scheduling Profile Options Setups

Demantra YesStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSD_DEM: Master Org

Profile Code MSDProfile Option Name MSD_DEM_MASTER_ORGDescription This profile defines the Product Family to which an Item rolls up. Source side

profileNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra YesStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSD_DEM: Maximum seeded units available for price lists

Profile Code MSDProfile Option Name MSD_DEM_MAX_PRLDescription This profile determines the number of slots available for price lists in Oracle

Demantra. Destination side profileNote Reference(s)

Bug Reference(s) 5879252Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra Yes

Page 286: Advanced Planning and Scheduling Profile Options Setups

Strategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSD_DEM: Schema

Profile Code MSDProfile Option Name MSD_DEM_SCHEMADescription Set this profile value to the database schema name where the Oracle

Demantra schema has been installed. Destination side profileNote Reference(s)

Bug Reference(s) 8361879Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra YesStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSD_DEM: Two-Level Planning

Profile Code MSDProfile Option Name MSD_DEM_TWO_LEVEL_PLANNINGDescription This profile enables demand forecasts at the Product Family level on the

basis of sales histories of member items. Destination side profile.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra YesStrategic Network Optimization NoAdvanced Planning Command Center No

Page 287: Advanced Planning and Scheduling Profile Options Setups

Manufacturing Operations Center NoGlobal Order Promising No

MSO: Activity Selection Window (in Days)

Profile Code MSOProfile Option Name MSO_SDS_SELECTOR_WINDOWDescription This profile option specifies the number of days over which the

planning engine groups activities that are candidates for scheduling.The larger the number, the greater the chance of finding an activitythat can be scheduled with another activity of the same setup type.Making this number too large might result in demand prioritiesnot being fully respected while scheduling.

Valid values are any number. The profile option is used in Days.Default value: 7

Note Reference(s) 415276.1

Bug Reference(s) 8538729Document References(s) -1

-1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning Yes

All Plan Types NoEnforce Constraints – Not Optimized No

Enforce Constraints – Optimized No

Disable Constraints – Not Optimized No

Disable Constraints – Optimized NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Additional Demand Slices for Shared Supply Rescheduling

Profile Code MSOProfile Option Name MSO_MAX_NUMBER_OF_RESCHEDULESDescription Controls the maximum number of slices to which supply can be rescheduled.

VAlid values are:

Page 288: Advanced Planning and Scheduling Profile Options Setups

• Between -1 and maximum number of slices.

Controls the maximum number of slices to which supply can be rescheduled.Supply is not rescheduled after this maximum even when demand will be delayed. Possible values include:

• -1 - Reschedule to last slice

• 0 - Does not reschedule.

For example, if a supply pegs to demand in slice 2, 3, 4, 5, and 6, and the parameter value is 2, supply will reschedule if needed in slice 3 and 4 (rescheduled 2 times, in slice 3 and 4) and will not reschedule in slice 5 and 6.

If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option.

Default Value - 0Note Reference(s) 739561.1

952924.1 726610.1 747739.1

Bug Reference(s)Document References(s) -1

-1-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Allow Partial Demand Completion

Profile Code MSOProfile Option Name MSO_PARTIAL_DEMAND_COMPLETIONDescription Enables supply orders to individually schedule for partial satisfaction of a

demand when demand is split across several supply orders. Valid values include:

• All End Demands - Enable Partial Demand Satisfaction for all

Page 289: Advanced Planning and Scheduling Profile Options Setups

independent demands (forecasts,sales orders, and MDS entries).

• Sales Orders: Enable Partial Demand Satisfaction for all Sales Order demand only.

• None: Schedules all supplies to coincide with completion date (latest supply date) to meet demand.

This functionality can be enabled for all independent demands or only for Sales Orders. If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine only uses this profile option if its value is All End Demands. Default Value - None

Note Reference(s) 458693.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Allow Schedule Gaps for Shared Supplies

Profile Code MSOProfile Option Name MSO_ENHANCED_RIGHT_JUSTIFYDescription This profile option controls the scheduling of shared supplies (scheduled

receipts, firm planned orders, and planned orders with multiple demands pegged to them). Valid values are:

• Yes - When scheduling shared supplies, the shared supply ismoved to the right (moving the schedule date later) during the final scheduling step (to coincide with the start time of downstream supplies) if it would make one of the pegged demands late or later. The shared supply schedule is always right justified if it does not make any pegged demands late orlater. When a lower-level shared supply is scheduled for the highest priority demand pegged to it, there may be a gap between the shared supply end date and the start date of thenext downstream supply. By not right justifying it, it is more likely to be on time for the lower priority demands in later demand slices which are also pegged to it. Before selecting Yes, consider the setting for MSO: Additional Demand Slicesfor Shared Supply Rescheduling. If this profile is not 0,

Page 290: Advanced Planning and Scheduling Profile Options Setups

shared supplies may be rescheduled and this profile option does not need to be Yes. For example, Demand A with priority 100 and Demand B with priority 500 are in different slices. If the shared supply is late for Demand B, it may still be rescheduled to be on time depending on available capacity and the number of additional demand slices in which it is scheduled. If MSO: Additional Demand Slices is 0 and this profile option is Yes, the planning engine does not right justify the shared supply due date; the shared supply might still be on time for demand B even though it is not rescheduled in a later slice.

• No - When scheduling shared supplies and moving them to the right (moving the schedule date later), the planning engine does not consider demands in other slices that are not yet unscheduled but pegged to this supply. This yields a schedule with fewer gaps but at the expense of potentially more late demands.

This is a user level profile option.Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Allow Simultaneous Resource To End At Different Time

Profile Code MSOProfile Option Name MSO_SIMULTANEOUS_RESOURCE_OVERLAP_MODEDescription Yes/No - Default = No

No documentation on this profile.We can infer from the name that when you have simultaneous resources, it would be best to have this profile set to Yes.

Note Reference(s) 837834.1

Bug Reference(s)Document References(s) -1Dependent Profiles

Page 291: Advanced Planning and Scheduling Profile Options Setups

11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Allow Simultaneous Resources to End at Different Times

Profile Code MSOProfile Option Name MSO_ALLOW_SIM_RES_TO_END_DIFF_TIMESDescription This profile is NOT USED. We have two profiles with same name

MSO_SIMULTANEOUS_RESOURCE_OVERLAP_MODE - MSO: Allow Simultaneous Resource To End At Different Time MSO_ALLOW_SIM_RES_TO_END_DIFF_TIMES - MSO: Allow Simultaneous Resources to End at Different Times-- this profile has 's' at end of name - Times vs Time-- this is description from application - Relaxes the constraint the the principaland simultaneous resources should start and end at the same time

Note Reference(s)

Bug Reference(s) 4566790Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 292: Advanced Planning and Scheduling Profile Options Setups

MSO: Alternate Process Penalty

Profile Code MSOProfile Option Name MSO_SCO_ALT_PROCESS_PENALTYDescription Specifies weight for alternate process objective in optimization. Valid values

are:• Integer > 0

This is an internal value.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Alternate Resource Penalty

Profile Code MSOProfile Option Name MSO_SCO_ALT_RESOURCE_PENALTYDescription Specifies weight for alternate resource objective in optimization. Valid values

are:• Integer > 0

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning No

Page 293: Advanced Planning and Scheduling Profile Options Setups

Inventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Alternate Resource Selection Method

Profile Code MSOProfile Option Name MSO_SDS_ALTRES_SELECTIONDescription Valid values: (1) Rank of Alternate (2) Setup Type Match

• If Rank of Alternate, ASCP will prefer to load the primary resource if it is available even if it means incurring a setup that could have been avoided by going to the alternate.

• If Setup Type Match, ASCP will prefer the alternate that is the best option from a setup minimization perspective. If all alternates are equal from a setup perspective, then ASCP chooses the alternate based on rank.

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Alternate Source Penalty

Profile Code MSOProfile Option Name MSO_SCO_ALT_SOURCE_PENALTYDescription Specifies weight for alternate source objective in optimization. Valid values

are:• Integer > 0

Note Reference(s) Bug Reference(s)Document References(s)

Page 294: Advanced Planning and Scheduling Profile Options Setups

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Apply Windows for Firm Scheduling

Profile Code MSOProfile Option Name MSO_APPLY_WINDOW_IN_FORWARD_SCHEDULEDescription No information on this profileNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Avoid non working days for Buy/Transfer order dates

Profile Code MSO

Page 295: Advanced Planning and Scheduling Profile Options Setups

Profile Option Name MSO_AVOID_NON_WRKNG_DAY_BUY_AND_TFRDescription This profile option applies only when profile option MSO: Use Shift definitions

when scheduling lead-times is No. Valid vales are:

• Yes - The planning engine avoids placing the ship, dock, duedates of buy and transfer orders on non-workdays according to the appropriate calendar.

• No: The planning engine does not schedule buy and transfer orders with regard to the appropriate calendar.

This profile option does not govern the placement of order dates. If profile option MSO: Use Shift definitions when scheduling lead-times is Yes, the planning engine assumes accurate shift timing.

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Barrier Optimizer Algorithm Choice

Profile Code MSOProfile Option Name MSO_CPX_PARAM_BARALGDescription This profile indicates which starting point algorithm the planning engine when

it uses the barrier algorithm to solve an optimization problem. It applies only when multiple threads are used in optimization. Values: 0, 1, 2, or 3

Default value: Null (interpreted as 0)Note Reference(s)

Bug Reference(s) 3511063Document References(s) -1

Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 Profile

Page 296: Advanced Planning and Scheduling Profile Options Setups

Data Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Batching Precision

Profile Code MSOProfile Option Name MSO_BATCHING_TYPEDescription Documentation bug 9669424 has been created to include this profile option

in the ASCP User Guide.Note Reference(s)

Bug Reference(s) 8899964Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Big M Value for SCO

Profile Code MSOProfile Option Name MSO_SCO_BIG_MDescription No longer used in ASCPNote Reference(s)

Page 297: Advanced Planning and Scheduling Profile Options Setups

Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: CPLEX Crash Parameter

Profile Code MSOProfile Option Name MSO_CPX_PARAM_CRAINDDescription Determines how objective coefficients are used to select basis.

Values: -1, 0, and 1Default value: See 'Automatic Calculations, page A-1 of the R12.1 ASCP User Guide.

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 298: Advanced Planning and Scheduling Profile Options Setups

MSO: CPLEX Refactor Rate

Profile Code MSOProfile Option Name MSO_CPX_PARAM_REINVDescription Specifies the value of the parameter to control the refactor rate.

Values: Integer > 0.Note Reference(s)

Bug Reference(s) 3964120Document References(s) -1

Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: CPLEX Scaling Factor

Profile Code MSOProfile Option Name MSO_CPX_PARAM_SCAINDDescription Contains the scaling factor in the Planning Engine.

Values are -1, 0, 1.Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning No

Page 299: Advanced Planning and Scheduling Profile Options Setups

Demand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: CPLEX messages to screen indicator

Profile Code MSOProfile Option Name MSO_CPX_PARAM_SCRINDDescription Used for Debugging issues for Supply Chain Optimized Plans

Which means plans that have Decision Rules OR Optimization set. Usually specified by Development when additional information in the log file is required for debugging purposes. Valid values: zero = Off and 1 = On

Note Reference(s)

Bug Reference(s) 7424573Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Calculate Constraint Exceptions

Profile Code MSOProfile Option Name MSO_CALCULATE_CONSTRAINT_EXCEPTIONSDescription Determines whether constraint exceptions are calculated for plans with

Enforce Capacity Constraints selected. The planning engine issues an "Order lead time constraint exception" when the lead-time of an order is the cause for a demand being satisfied late or a "Requirement lead time constraint exception" when the lead time of a resource requirement is the cause for a demand satisfied late or a "Material constraint exception" when a demand due date needs to be pushed out due to either a "Lead time violation" or a "Supplier capacity constraint" and if profile option MSO: Calculate Constraint Exceptions is Yes. Values are Yes or No.

Note Reference(s) 214041.1

Bug Reference(s)

Page 300: Advanced Planning and Scheduling Profile Options Setups

Document References(s) -1Oracle Advanced Supply Chain Planning Implementation and User's Guide

Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Capacity Units Recalculation Threshold

Profile Code MSOProfile Option Name MSO_RESOURCE_CONSUMPTION_PERCENTAGEDescription Valid values are:

• Any Value between 0 and 1

The planning engine schedules supplies in two phases:• Backward schedule - From demand due date to see if

demand can be met on time.• Forward schedule: If the backward schedule results in a late

demand, the forward schedule from the plan start date meet demands with minimum lateness.

At the end of the forward schedule phase, the planning engine adjusts the schedule to remove gaps between supplies (right justification). It may move a supply to occur at a time where there are more resource units available that there were in its previously scheduled time.

If this profile option is 1, the planning engine considers assigning more resource units to the supply. For example, this profile option is 0.5. The planning engine considers changing the number of resource units if the current capacity units value is less than 0.5 * Max assigned units on the routing for the item.

If this profile option is 0, the planning engine does not consider assigning more resource units.

This is a user level profile option.If the plan planning mode is Constrained (Without Detailed Scheduling),the planning engine does not use this profile option.

Default Value - 0Note Reference(s)

Page 301: Advanced Planning and Scheduling Profile Options Setups

Bug Reference(s) 8745009Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Check Redundant Constraints

Profile Code MSOProfile Option Name MSO_CPX_PARAM_DEPINDDescription Specifies location and removal of redundant constraints.

Values: 0 and 1Default value: See 'Automatic Calculations, page A-1 of the R12.1 ASCP User Guide.

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 302: Advanced Planning and Scheduling Profile Options Setups

MSO: Choice of supply for substitution

Profile Code MSOProfile Option Name MSO_SUPPLY_FOR_SUBSTITUTEDescription Determines which supplies are considered by the Planning Engine for

substitution.Note Reference(s)

Bug Reference(s)Document References(s) B31553-02Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Component offset logic for optimization

Profile Code MSOProfile Option Name MSO_SCO_COMP_OFFSET_LOGICDescription Introduced in 11.5.10 - ASCP Engine/UI rollup #12

Works in tandem with MSO: Postpone Use of Alternates to Latest Possible Time = Yes

• 1: Component requirement date is put one day before assembly start date.

• 2: Component requirement date is put on the same date as assembly start date

• 3: if assembly lead time =0, same result as 2. if assembly lead time >0, same result as 1

Note Reference(s)

Bug Reference(s) 5018283Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan No

Page 303: Advanced Planning and Scheduling Profile Options Setups

Constrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning Yes

All Plan Types NoEnforce Constraints – Not Optimized No

Enforce Constraints – Optimized No

Disable Constraints – Not Optimized No

Disable Constraints – Optimized NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Continuous transfer across organizations

Profile Code MSOProfile Option Name MSO_MTQ_ACROSS_ORGSDescription Allows you to model continuous or non-continuous transfers across

organizations. Valid values are: • Yes - Allows continuous transfers across organizations.• No: Allows discrete, incremental or non-continuous transfers

across organizations.

This feature can also be set at the item/organization level using the Continuous Inter-Org Transfers item attribute. The value specified for the item attribute overrides the profile option setting. If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine doesnot use this profile option.

Note Reference(s)

Bug Reference(s) 7436622Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 304: Advanced Planning and Scheduling Profile Options Setups

MSO: Convergent Supplies Consumption Pattern

Profile Code MSOProfile Option Name MSO_DEMAND_SPLITDescription Allows you to fulfill a demand in series or in parallel from multiple supplies

from suppliers and/or other organizations. Valid values are:• Series - Demand is satisfied in series from multiple supplies.• Parallel - Demand is satisfied in parallel from multiple

supplies.

Default Value - ParallelNote Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Convergent Supplies Consumption Pattern for Inter-Org and Supplier Sourced orders

Profile Code MSOProfile Option Name MSO_INTER_ORG_DEMAND_SPLITDescription Allows you to fulfill a demand in series or in parallel from multiple supplies

from suppliers and/or other organizations. Valid Values are:

• Series - Demand is satisfied in series from multiple supplies.

• Parallel - This is the default value.Demand is satisfied in parallel from multiple supplies.

Default Value: ParallelFor supplier sourced orders, use profile option MSO: Convergent Supplies Consumption Pattern for Inter-Org and Supplier Sourced Orders.If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option.

Page 305: Advanced Planning and Scheduling Profile Options Setups

Note Reference(s) 726610.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Convergent Supplies Consumption Pattern for Intra-Org Sourced orders

Profile Code MSOProfile Option Name MSO_INTRA_ORG_DEMAND_SPLITDescription Allows you to satisfy a demand in series or in parallel from multiple supplies

in the same organization.Values are:

• Series - Demand is satisfied in series from multiple supplies.

• Parallel - This is the default value. Demand is satisfied in parallel from multiple supplies.

If a component is fed by orders from multiple organizations, the value of profile option MSO:Convergent Supplies Consumption Pattern for Inter-Org and Supplier Sourced orders overrides the value of this profile option.If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option.

Note Reference(s) 726610.1

Bug Reference(s) 93100309147919

Document References(s) -1-1-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections No

Page 306: Advanced Planning and Scheduling Profile Options Setups

Item Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Cost Roll-up incremental factor

Profile Code MSOProfile Option Name MSO_SCO_COST_ROLLUP_INCR_FACTORDescription ASCP Userguide Profile Name: MSO: Incremental factor of internal cost

roll up

This profile option controls the cost increments used by the internal cost roll up in Oracle Advanced Supply Chain Planning. The cost calculation is:

SUM across all components for the assembly [K * Cost of a component * (Usage of the component for the assembly + 0.01)].

K is the value that you set in this profile option.

Oracle recommends a minimum value of 1.

Valid values are:• Number

Default Value - 1Note Reference(s) 555016.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra No

Page 307: Advanced Planning and Scheduling Profile Options Setups

Strategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Create Aggregate Supply for Unsatisfied Demands within Planning Time Fence

Profile Code MSOProfile Option Name MSO_AGG_SUP_FOR_DMD_IN_PTFDescription Introduced in ASCP Engine/UI rollup #33 for 11.5.10

Front ported to R12 in CU5 patch 7270650Waiting for 12.1 fix to be ported via Bug 7392541

This profile option specifies whether or not Oracle Advanced Supply Chain Planning should recommend reschedule messages for internal requisitions that have been linked to internal sales orders in Oracle Order Management. MBP used to create supplies for unsatisfied demands inside PTF on respective dates after considering the FDS. Later on those supplies were moved to PTF date, resulting in more than one supply on PTF date. This would be wrong for some set up. So, we made the code changes to create single supply for unsatisfied demands in PTF. This would be done only on the basis of the following profile: MSO: Create Aggregate Supply for Unsatisfied Demands within Planning Time FenceMSO_AGG_SUP_FOR_DMD_IN_PTF

• Yes, then one supply is created for unsatisfied demands on the PTF date if all of the following conditions are satisfied:

• 1. Plan is not constrained with GP• Plan is not optimized.

• No, more than one supply may be created for unsatisfied demands on the PTF date.

Note Reference(s)

Bug Reference(s) 7294117Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center No

Page 308: Advanced Planning and Scheduling Profile Options Setups

Global Order Promising No

MSO: DS Scheduling Window

Profile Code MSOProfile Option Name MSO_DETAILED_SCHEDULING_WINDOWDescription No information on this profile

Would be used for HLS - High Level SchedulerNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Default Forecast Priority

Profile Code MSOProfile Option Name MSO_DEFAULT_FORECAST_PRIORITYDescription Contains default priority value for forecasts and is used by the Scheduling

Engine to determine when to schedule the forecast. Can be defined at the site level. Valid values are:

• Integer > 0.

Default Value - 100000.Note Reference(s) 147220.1

296941.1

Bug Reference(s)Document References(s) -1

-1Oracle Advanced Supply Chain Planning Implementation and User's Guide-1

Dependent Profiles11.5.10 Profile Yes12.1.1 Profile

Page 309: Advanced Planning and Scheduling Profile Options Setups

Data Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Default Idle Time Tolerance (Hours)

Profile Code MSOProfile Option Name MSO_IDLE_TIME_TOLERANCEDescription No Documentation on this profile.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Default Resource Sequencing Window (in Days)

Profile Code MSOProfile Option Name MSO_SETUP_CYCLE_FOR_HLS_SDSDescription After the planning engine select an unscheduled activity from the activity

selection window specified by MSO: Activity Selection Window (Days), this profile option specifies the number of days from the pegged demand date over which the planning engine can look for another activity of the same setup type to schedule the activity with and achieve a good sequence on the resource. This profile optionnumber can be overridden by resource level settings made in the

Page 310: Advanced Planning and Scheduling Profile Options Setups

Departments: Resources screen in the source system. The large this number, the longerthe time spent by the resource on a setup type before changing over tothe next setup type.

Valid values: any number Default value: 7 (days)

Note Reference(s) 415276.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning Yes

All Plan Types NoEnforce Constraints – Not Optimized No

Enforce Constraints – Optimized No

Disable Constraints – Not Optimized No

Disable Constraints – Optimized NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Default Sales Order Priority

Profile Code MSOProfile Option Name MSO_DEFAULT_SO_PRIORITYDescription Contains default priority value for sales orders. Used by the Scheduling

Engine to determine when to schedule a sales order. Can be defined at the site level. Valid values are:

• Integer > 0.

Default Value - 10000.Note Reference(s)

296941.1 147220.1

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

-1-1-1

Dependent Profiles

Page 311: Advanced Planning and Scheduling Profile Options Setups

11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Default Timestamp Safety Stocks

Profile Code MSOProfile Option Name MSO_DEFAULT_TIMESTAMP_SFTSTCKDescription The planning engine uses this profile option value to determine when safety

stock supplies are due. The timestamp value applies to the safety stock requirements from Oracle Inventory, Oracle Inventory Optimization, Oracle Material Requirements Planning, and Oracle Advanced Supply Chain Planning. Valid values are:

• Beginning of Day - Supplies must be available at 00:00.Set this option if you want to use timestamps that match safety stock requirements from Oracle Inventory Optimization.

• End of Day: Supplies must be available at 23:59.Set this option if you want to use timestamps that match safety stock requirements from Oracle Inventory or Oracle Material Requirements Planning.

Default Value - Beginning of DayNote Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization YesService Parts Planning NoRapid Planning No

Page 312: Advanced Planning and Scheduling Profile Options Setups

Demand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Default Timestamp for Forecasts

Profile Code MSOProfile Option Name MSO_DEF_TIME_FCSTDescription This profile option determines the forecast timestamps that Oracle Advanced

Supply Chain Planning uses to plan.

It applies to forecast scenarios from Oracle Demand Planning, master demand schedule forecasts, and manual master demand schedule entries. The timestamp denotes the time by which supplies to meet the demand mustbe available to be considered on time: Values are:

• Beginning of Day: Supplies must be available at 00:00• End of Day: Supplies must be available at 23:59

This profile option does not apply to sales orders.Note Reference(s)

Bug Reference(s) 6273866319860674602293573179

Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide-1-1-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning YesDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 313: Advanced Planning and Scheduling Profile Options Setups

MSO: Default Timestamp for Sales Orders

Profile Code MSOProfile Option Name MSO_DEF_TIME_SODescription This profile option determines the sales order line timestamps that Oracle

Advanced Supply Chain Planning uses to plan.

The timestamp denotes the time by which supplies to meet the demand mustbe available to be considered on time: Values are:

• Beginning of Day: Supplies must be available at 00:00.• End of Day: Supplies must be available at 23:59.• Retain Sales Order Timestamps: Supplies must be available

at the timestamp on the sales order line.

The sales order demand due timestamp does not affect forecast consumption because forecast consumption is done in daily buckets.This profile option does not apply to forecasts.

Note Reference(s)

Bug Reference(s) 4120214Document References(s) -1

Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Default Value for Maximum Acceptable Days Early

Profile Code MSOProfile Option Name MSO_DEFAULT_MAX_EARLY_DAYSDescription No information on this profileNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile No12.1.1 Profile

Page 314: Advanced Planning and Scheduling Profile Options Setups

Data Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Delay Fulfillment of Small Demands

Profile Code MSOProfile Option Name MSO_RESPECT_SUPPLY_TOLERANCESDescription Use this profile option to enable the planning engine to delay fulfilling a small

demand until it has a later larger demand. Valid values are:• Yes - set the item attribute Unsatified Demand Factor on

each item whose small demands you want delayed.• No

Default Value - NoNote Reference(s) 1068297.1

749448.1

Bug Reference(s)Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 315: Advanced Planning and Scheduling Profile Options Setups

MSO: Demand Size Tolerance Before Splitting Planned Orders

Profile Code MSOProfile Option Name MSO_SPLIT_PO_THRESHOLDDescription Creates a threshold percentage that causes Planned Orders to split prior to

scheduling (if the remaining unallocated quantity of a planned order is greater than the remaining unallocated quantity of the pegged demand). Not used if order modifiers exist for an item and not used in a project planning environment. Valid values are:

• Positive decimal quantities (.5 is interpreted as 50%).

If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option.

Default Value - NULLNote Reference(s) 739561.1

1068297.1

Bug Reference(s)Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Demand Type Priority

Profile Code MSOProfile Option Name MSO_DEMAND_TYPE_PRIORITYDescription Appears to be unused according to the Oracle Advanced Supply Chain

Planning Implementation and Users GuideNote Reference(s)

Bug Reference(s) 4573393Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections No

Page 316: Advanced Planning and Scheduling Profile Options Setups

Item Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Demand Window Size

Profile Code MSOProfile Option Name MSO_DEMAND_WINDescription During priority pegging, demands are sorted based on the demand priority

within the demand window. After these demands are fully pegged, Oracle Advanced Supply Chain Planning sorts all demands in the next window by priority. This is stated as the number of calendar days including non-workdays. With a value of 10, the first demand window is between the start date of the plan or the first demand date +10 days. Valid values are:

• Integer >= 0

Default Value - NULL (1)Note Reference(s)

Bug Reference(s) 826432827648948264323

Document References(s) -1Oracle Advanced Supply Chain Planning Implementation and User's Guide-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning No

Page 317: Advanced Planning and Scheduling Profile Options Setups

Demantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Disable Inference of Item Substitution Relationship

Profile Code MSOProfile Option Name MSO_NO_INFER_IN_ITEMSUBSTDescription Use this profile option to instruct the planning engine whether to infer end

item substitution relationships. Valid values are:

• Yes - Do not infer item substitution relationships• No/Null - Do infer item substitution relationships

Default Value - NullNote Reference(s) 1068297.1

Bug Reference(s) 6901454Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Divergent Supply Feeding Pattern

Profile Code MSOProfile Option Name MSO_SUPPLY_SPLITDescription Not used.Note Reference(s)

Bug Reference(s) 4573393Document References(s) -1

Page 318: Advanced Planning and Scheduling Profile Options Setups

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Divergent Supply Feeding Pattern for Inter-Org and Supplier Sourced orders

Profile Code MSOProfile Option Name MSO_INTER_ORG_SUPPLY_SPLITDescription Allows you to fulfill multiple downstream demands in parallel or in series by a

supply from another internal organization. Values are:

• Series With MTQ Only - This is the default value. A supply always feeds multiple demands in series when a corresponding MTQ has been specified.

• Series - Supply feeds multiple demands in series.

If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option.

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 319: Advanced Planning and Scheduling Profile Options Setups

MSO: Divergent Supply Feeding Pattern for Intra-Org Sourced orders

Profile Code MSOProfile Option Name MSO_INTRA_ORG_SUPPLY_SPLITDescription Allows you to fulfill multiple downstream demands in parallel or in series by a

supply in the same organization. Values are:

• Series With MTQ Only - This is the default value. A supply always feeds Multiple demands in series when a corresponding MTQ has been specified.

• Series - Supply feeds multiple demands in series.

If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option.

Note Reference(s)

Bug Reference(s) 86753459147919

Document References(s) -1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Dual Simplex Parameter

Profile Code MSOProfile Option Name MSO_CPX_PARAM_DPRIINDDescription Gradient parameter for dual simplex.

Values: 0, 1, 2, 3, and 4Default value: See 'Automatic Calculations, page A-1 of the R12.1 ASCP User Guide.

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

Page 320: Advanced Planning and Scheduling Profile Options Setups

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: EDD Demand Cutoff Priority

Profile Code MSOProfile Option Name MSO_EDD_DEMAND_CUTOFF_PRIORITYDescription For an (ECC) plan, we can Enforce Due Dates (EDD) for some sales order

demand based on priority So if you have sales order priorities, and want all priority 1 and 2 to be planned as EDD, then set the profile value = 3This will override constraints, and plan these orders as EDD.This can cause overloads in resources and also for supplier capacity. This is a hidden profile in 11.5.10, but can be defined manually in Application DeveloperIn R12, this is seeded profile.

Note Reference(s)

Bug Reference(s) 4572101Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 321: Advanced Planning and Scheduling Profile Options Setups

MSO: EDD Scheduling Window Control

Profile Code MSOProfile Option Name MSO_EDD_SCHEDULING_WINDOW_CONTROLDescription This profile option is applicable to constrained plans with enforce demand

due dates. The planning engine calculates an actual scheduling window for each resource activity and supply. Valid values are:

• Number between 0 and 1

The actual window is defined by the dates: • Latest Possible completion time (LPCT) - Determined by the

start time of downstream activities that have already been scheduled.

• Earliest Allowable Completion Time (EACT) - Calculated by the planning engine which accounts for the unscheduled upstream activities and how much time those activities need.

If this profile option is the default value, the planning engine uses the calculated EACT. If this profile option is lower than the default value, the planning engine uses an earlier EACT than the calculated EACT which gives the activity a larger scheduling window. If this profile option is higher than thedefault value, the planning engine uses a later EACT than the calculated EACT which gives the activity a smaller scheduling window. This is a user level profile option.

Default Value - 0.5Note Reference(s)

259322.1

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

-1Oracle Advanced Supply Chain Planning Implementation and User's Guide

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 322: Advanced Planning and Scheduling Profile Options Setups

MSO: Enable Advanced Sequencing

Profile Code MSOProfile Option Name MSO_GLOBAL_SDS_FLAGDescription This profile has to do with Sequence Dependent Setups in HLS Need more

information on this profile. Valid values: Yes/No Default value: No

Note Reference(s)

Bug Reference(s) 5233140Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Enable Cost Rollup for Optimization

Profile Code MSOProfile Option Name MSO_SCO_COST_ROLLUPDescription This profile specifies where the optimization engine looks for costs during

cost-based optimization. Valid values are:

• No: Use user-provided costs from the source system• Yes: Use costs from the internal cost rollup

Default value = NULL (No)Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types No

Page 323: Advanced Planning and Scheduling Profile Options Setups

Unconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning Yes

All Plan Types NoEnforce Constraints – Not Optimized No

Enforce Constraints – Optimized No

Disable Constraints – Not Optimized No

Disable Constraints – Optimized NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Enable Decision Rules

Profile Code MSOProfile Option Name MSO_ENABLE_DECISION_RULESDescription The profile option enables User Defined Decision Rules. Valid values are:

• Yes - Use the user-defined decision rules.

• No - User defined decision rules are not allowed.

The Plan Options tab, Decision Rules, is disabled. If you select No, you can duplicate the functionality of the decision rule Use Alternate Sources parameter for buy items but not for transfers from other organizations; set profile option MSC: Enable Enhanced Sourcing to Yes.

Default Value - NoNote Reference(s)

214041.1 225876.1 267399.1

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

Oracle Advanced Supply Chain Planning Implementation and User's GuideOracle Advanced Supply Chain Planning Implementation and User's GuideOracle Advanced Supply Chain Planning Implementation and User's Guide-1-1Oracle Advanced Supply Chain Planning Implementation and User's GuideOracle Advanced Supply Chain Planning Implementation and User's GuideOracle Advanced Supply Chain Planning Implementation and User's Guide-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections No

Page 324: Advanced Planning and Scheduling Profile Options Setups

Item Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Enable Hard Links Globally

Profile Code MSOProfile Option Name MSO_GLOBAL_HARD_LINK_FLAGDescription Valid values are:

• Yes - hard links in the code are not disabled• No - disable the hard links in the code.

Default Value - YesNote Reference(s)

Bug Reference(s) 5067925Document References(s)Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Enable Rounding of Fractional Supplies For Service Planning

Profile Code MSOProfile Option Name MSO_ENABLE_ROUNDING_OF_FRACTIONAL_SUPPLIES_FOR_SRPDescription Controls the rounding process. Valid values are:

Page 325: Advanced Planning and Scheduling Profile Options Setups

• Y - By rounding the orders we are going to update the data from the pegging, supplies and demands table. Rounding is process that round up to the nearest integer the fractional order quantities.

• N

If the profile is not specified the order quantities are NOT rounded up (default behavior).

Rounding process is applicable only to the orders that are processed by the pegging partition functionality. By rounding up the orders quantities we are going to:

• generate negative inventories for defective items• break the yield factor.

Note Reference(s)

Bug Reference(s) 6834025Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning Yes

All Plan Types NoEnforce Constraints – Not Optimized No

Enforce Constraints – Optimized No

Disable Constraints – Not Optimized No

Disable Constraints – Optimized NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Enable sourcing split for end item substitution

Profile Code MSOProfile Option Name MSO_SRC_SPLIT_FOR_SUBSDescription When using End Item Substitution, for Rank 1 sourcing rules with split

sourcing %, this profile must be set to enforce the sourcing split. Valid values: Yes/No Default value: No

Note Reference(s)

Bug Reference(s) 64307669486069

Document References(s) -1-1

Page 326: Advanced Planning and Scheduling Profile Options Setups

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning Yes

All Plan Types NoEnforce Constraints – Not Optimized No

Enforce Constraints – Optimized No

Disable Constraints – Not Optimized No

Disable Constraints – Optimized NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Enforce Minimum Transfer Quantities

Profile Code MSOProfile Option Name MSO_GLOBAL_MTQ_FLAGDescription no documentation on this profile.Note Reference(s)

Bug Reference(s) 66506889409110

Document References(s) -1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 327: Advanced Planning and Scheduling Profile Options Setups

MSO: Enforce Resource Sequence Contiguity

Profile Code MSOProfile Option Name MSO_ENFORCE_RESOURCE_SEQUENCE_CONTIGUITYDescription Controls contiguity constraints between resource activities within an

operation. Valid values are:• Yes - Resource activities within the same operation are

scheduled contiguously in time. The end of the preceding activity exactly lines up with the start of the current activity and the end of the current activity exactly lines up with the start of the next (if there is MTQ specified, the activities may also overlap).

• No: The contiguity constraint is relaxed and in certain cases, the chances of obtaining feasible schedules improved.

Default Value - NoNote Reference(s)

562872.1 259322.1

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Firm Purchase Orders Within Time Fence

Profile Code MSOProfile Option Name MSO_FIRM_PURCHASE_ORDER_WITHIN_PTFDescription Indicates whether or not the planning engine should firm those purchase

orders that are within the time fence. Valid values are:

• Yes - Firms purchase orders that are within the time fence.• No - The planning engine does not reschedule the non-firm

Page 328: Advanced Planning and Scheduling Profile Options Setups

purchase orders that have dock dates within the Planning Time Fence. The planning engine does not reschedule or cancel recommendations even if there are conditions for reschedules and cancellations.

Note Reference(s) 370386.1 365112.1

Bug Reference(s)Document References(s) -1

Oracle Advanced Supply Chain Planning Implementation and User's Guide-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Firm Requisitions Within Time Fence

Profile Code MSOProfile Option Name MSO_FIRM_REQ_WITHIN_PTFDescription Indicates whether or not the planning engine should firm those requisitions

that are within the time fence. The valid values are:• Yes: Firms requisitions that are within the time fence.

• No: The planning engine does not reschedule the non-firm purchase requisitions that have dock dates within the Planning Time Fence.

The planning engine does not reschedule or cancel recommendations even ifthere are conditions for reschedules and cancellations.The planning engine uses the start date of the receiving organization as the reference for internal requisitions.Default : No

Note Reference(s) 555016.1 1079681.1 1068297.1 365112.1

Bug Reference(s) 8709703Document References(s) -1

-1

Page 329: Advanced Planning and Scheduling Profile Options Setups

-1-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Firm Supply Allocation Window (Backward days)

Profile Code MSOProfile Option Name MSO_FIRM_SUPPLY_ALLOC_WINDescription The allocation of firm supplies to demands is based on demand priorities

within the Firm Supply Allocation window. Set this window using system level profile options. This window is derived dynamically for each demand; it starts with the demand due date and goes backwards to the window size. This is stated as the number of calendar days including non-workdays. Validvalues are:

• Integer > 0

Default Value - 1Note Reference(s)

Bug Reference(s) 4688250Document References(s) -1

Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning No

Page 330: Advanced Planning and Scheduling Profile Options Setups

Demand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Firm Supply Allocation Window (Forward days)

Profile Code MSOProfile Option Name MSC_FIRM_SUPPLY_FWD_FENCEDescription The allocation of firm supplies to demands is based on demand priorities

within the Firm Supply Allocation window. Set this window using system levelprofile options.

This window is derived dynamically for each demand; it starts with the demand due dateand moves forwards to the window size. This pegs demands to firm supplies that are scheduled after the demand date. After searching backward, it searches forward bythe number of days set by this profile option, pegging the supply with the nearest (earliest) schedule to the unallocated demand quantity. This can cause supplies tobe late for the demand due date. This is stated as the number of calendar days including non-workdays.

To use this feature, set profile option MSO: Net All Firm Supplies Before Creating Planned Orders to Yes.

Note Reference(s)

Bug Reference(s)Document References(s) -1

-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 331: Advanced Planning and Scheduling Profile Options Setups

MSO: Firm Work Orders/Operations Within Time Fence

Profile Code MSOProfile Option Name MSO_SCHEDULE_FIRMED_BEFORE_PTFDescription Used for both constrained and unconstrained plans. Valid values are

• Yes - all operations of an order with start dates in the Planning Time Fence are treated as firm. Any operation with a start date outside of the Planning Time Fence is not considered firm and can be moved.

• No - operations with start dates in the Planning Time Fence can be rescheduled out.

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Floating Point Precision

Profile Code MSOProfile Option Name MSO_FLOATING_POINT_PRECISIONDescription

Not used. Replaced by profile option MSO: Floating Point Precision for OrderQuantities

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Page 332: Advanced Planning and Scheduling Profile Options Setups

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Floating Point Precision for Increments of Shift Start/End Times Within a Planning Bucket

Profile Code MSOProfile Option Name MSO_HLS_SHIFT_INC_PRECISIONDescription Could not find in the User guide.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Floating Point Precision for Order Q

Profile Code MSOProfile Option Name MSO_HLS_ORDER_QUANTITY_PRECISIONDescription Not used. Replaced by profile option MSO: Floating Point Precision for Order

QuantitiesNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning No

Page 333: Advanced Planning and Scheduling Profile Options Setups

Inventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Floating Point Precision for Planning Bucket Efficiency

Profile Code MSOProfile Option Name MSO_HLS_GRANULAR_PRECISIONDescription This has been changed to MSO:HLS Granularity Precision.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Floating Point Precision for Transportation Capacities (Volume)

Profile Code MSOProfile Option Name MSO_HLS_TRANS_VOLUME_PRECISIONDescription Internal multiplier for transportation lane capacities by volume, by day. Can

change the value depending on precision desired. Verify that the product of the floating point precision and the number does not exceed the maximum integer size handled bythe machine. See 'Floating Point Precision, page A-2 of ASCP User guide formore information.Valid Values: Number>0Default Value: 100

If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option.

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles

Page 334: Advanced Planning and Scheduling Profile Options Setups

11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Floating Point Precision for Transportation Capacities (Weight)

Profile Code MSOProfile Option Name MSO_HLS_TRANS_WEIGHT_PRECISIONDescription Internal multiplier for transportation lane capacities by volume, by day. Can

change the value depending on precision desired. Verify that the product of the floating point precision and the number does notexceed the maximum integer size handled bythe machine. See 'Floating Point Precision, page A-2 of ASCP User guide formore information.Valid Values: Number>0Default Value: 100

If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option.

Note Reference(s)

Bug Reference(s) 5173359Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center No

Page 335: Advanced Planning and Scheduling Profile Options Setups

Global Order Promising No

MSO: Floating Point Precision for Usage in Routings

Profile Code MSOProfile Option Name MSO_HLS_USAGE_PRECISIONDescription Internal multiplier for order quantities. Can change the value depending on

precision desired. Verify that the product of the floating point precision and the number does not exceed the maximum integer size handled by the machine. See 'Floating PointPrecision, page A-2 of ASCP User guide for more information.Valid Values: Number>0Default Value: 100

If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option.

Note Reference(s) 560505.1 579204.1 224112.1

Bug Reference(s)Document References(s) -1

-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Generate Compression Days Exception

Profile Code MSOProfile Option Name MSO_GENERATE_COMPRESSION_EXCEPTIONDescription Use this profile option to control issuance of exception message Orders with

compression days. Valid values are:

• Yes - Issue the exception message• No - Do not issue the exception message

Page 336: Advanced Planning and Scheduling Profile Options Setups

The planning engine issues exception message Orders with insufficient lead-time when it schedules orders for less time than their assembly's lead-time. If the reason for that scheduling is that the planning engine would schedule the order in the past, it also issues exception message Orders with compression days.

To avoid seeing both these exceptions for the same order, select No for this profile option.

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Generate Compression/Firming Exceptions for Orders in Progress

Profile Code MSOProfile Option Name MSO_GENERATE_COMPRESSION_FIRMING_EXCEPTIONSDescription When set to No, the planning engine does not issue the following exception

messages for firm orders whose start date is in the past (after applying the lead time offset to the due date). Valid values are:

• Order with Insufficient Lead Time• Order is Firmed Early

The planning engine assumes that these orders are in progress and on time:Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan No

Page 337: Advanced Planning and Scheduling Profile Options Setups

Constrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Generate Shared Supply Exceptions

Profile Code MSOProfile Option Name MSO_GENERATE_SHARED_SUPPLY_EXCEPTIONSDescription MSO: Generate Shared Supply Exceptions

Values: Yes/No • No: The planning engine schedules demands in slices; each

slice contains a set of demands in a time period. Sometimes, a supply is pegged to two demands (shared supply) that are each in different slices. If these two slices are separated by more slices than the value of profile option MSO: Additional Demand Slices for Shared Supply Rescheduling, the planning engine does not reschedule the shared supply in the earlier slice when it schedules the demand in the later slice. It is possible that the demand in the later slice is satisfied late because the planning engine did not reschedule in (earlier date) the supply in the earlier slice.

• Yes: The planning engine issues a Shared Supply Scheduled Late exception message when this occurs. If this profile option is No, the planning engine does not generate the exception message. This is a user level profile option.

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center No

Page 338: Advanced Planning and Scheduling Profile Options Setups

Manufacturing Operations Center NoGlobal Order Promising No

MSO: Global Batchable Flag

Profile Code MSOProfile Option Name MSO_BATCHABLE_FLAGDescription Enables resource batching functionality for order scheduling.Note Reference(s)

Bug Reference(s)Document References(s) B31553-02Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Global Chargeable Flag

Profile Code MSOProfile Option Name MSO_CHARGEABLE_FLAGDescription This profile option controls whether Oracle Advanced Supply Chain Planning

schedules resource charges.

• Yes: the planning engine schedules charges for chargeable resources.

• No, chargeable resources are considered as item basis an no individual charges are scheduled.

Material flows and resource loads are not influenced by charge quantities.Valid values: yes/noDefault value: no

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance No

Page 339: Advanced Planning and Scheduling Profile Options Setups

Advanced Supply Chain Planning YesAll Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Global Time Limit

Profile Code MSOProfile Option Name MSO_CPX_PARAM_TILIMDescription Parameter used to set global time limit for halting optimization.

Values: Number > 0.Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: HLS flat files path

Profile Code MSOProfile Option Name MSO_HLS_FLAT_FILES_PATHDescription Specifies the directory to store the Planning Engine debugging data files.

Valid Values: TextDefault Value: Null

Note Reference(s)

Page 340: Advanced Planning and Scheduling Profile Options Setups

Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Hard link scheduling window

Profile Code MSOProfile Option Name MSO_HARD_LINK_SCHEDULING_WINDOWDescription This profile option specifies the time window within which ASCP tries to

schedule a set of operations linked together through hard links.If scheduling is unsuccessful,overloads are created. This is a hidden profile option used by development. This defines the scheduling window within which the system schedules the hard-linked operation set. Increasing the window gives room to schedule operations with hard links without overloading. Based on the number of operations perhard linked operation set,increasing this value can have a performance impact.

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 341: Advanced Planning and Scheduling Profile Options Setups

MSO: Hard link scheduling window expansion factor

Profile Code MSOProfile Option Name MSO_HARD_LINK_SCHEDULE_WINDOW_FACTORDescription This hidden profile option used by development is used to limit the

propagation for the hard linked operation set. Normally, we limit the propagation by a factor of (This profile option value * Minimum duration of hard linked operation set).Valid Values: IntegerDefault Value: 10

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Heuristic type

Profile Code MSOProfile Option Name MSO_HEURISTIC_TYPEDescription Determines which heuristic to use.

The look-ahead heuristic reserves time for lower priorities so the schedule begins with the tasks of higher priorities.This is a site level profile option.Valid Value: Look AheadDefault Value Look Ahead

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Page 342: Advanced Planning and Scheduling Profile Options Setups

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Incremental Planned Orders

Profile Code MSOProfile Option Name MSO_SUPPLIER_DEMAND_SPLITDescription No documentation found.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Internal Demand Aggregation Within Optimization

Profile Code MSOProfile Option Name MSO_SCO_INT_DMD_AGGRDescription This profile specifies how the optimization engine should prioritize

independent demands. Valid values are:

• Yes: Prioritize by date. This value improves optimization engine performance.

• No: Prioritize by demand priority

Bug 9587814 shows that cusotmer had plan using 12gb of memory and by setting this profile = Yes,

Page 343: Advanced Planning and Scheduling Profile Options Setups

the plan only used 5gb of memory

Note Reference(s)

Bug Reference(s) 9587814Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types YesUnconstrained Plan NoConstrained – EDD Yes

Constrained – ECC YesDistribution Planning YesCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Inventory Carrying Costs Percentage

Profile Code MSOProfile Option Name MSO_CARRYING_COST_PCTDescription Specifies inventory carrying costs percentage for all items in the plan. Can be

defined at the site level. You can update this value. The inventory carrying cost is a percent(if the user enters 10, the value is 10%). A percentage between 0 and 100.

Note Reference(s)

Bug Reference(s) 6863019Document References(s) -1

Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning No

Page 344: Advanced Planning and Scheduling Profile Options Setups

Demantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: JIT Selector Window Size

Profile Code MSOProfile Option Name MSO_SELECTOR_JIT_WINDOW_SIZEDescription No information on this profileNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: LP Constraint Batch Size

Profile Code MSOProfile Option Name MSO_CONSTRAINT_BATCH_SIZEDescription Not used.Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center No

Page 345: Advanced Planning and Scheduling Profile Options Setups

Global Order Promising No

MSO: LP Markowitz Coefficient

Profile Code MSOProfile Option Name MSO_CPX_PARAM_EPMRKDescription Sets the Markowitz Coefficient.

Values: Number between 0.0001 and 0.99999Default value: See 'Automatic Calculations, page A-1 of the R12.1 ASCP User Guide.

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: LP Optimization Algorithm

Profile Code MSOProfile Option Name MSO_LP_ALGORITHMDescription Determines which optimization algorithm is used. Can be defined at the site

level. This is Automatic Calculations.When the Default Value of a profile option states that it is automatically calculated, this means that the Planning Engine determines the default value of that particular profile option.Valid Values:

• 0: Primal simplex• 1:Dual simplex• 2: Hybrid barrier primal• 3: Hybrid barrier dual

Default Value:0Note Reference(s) Bug Reference(s)Document References(s)

Page 346: Advanced Planning and Scheduling Profile Options Setups

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD Yes

Constrained – ECC YesDistribution Planning NoCollaborative Planning NoInventory Optimization YesService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Late Demands Exceptions Tolerance Minutes

Profile Code MSOProfile Option Name MSO_LATE_DMD_EXC_TOL_MINDescription This profile option is used by constrained plans. Sets the value in minutes for

a window during which the planning engine does not issue exception messages for late demands. Use it particularly in cases where demands are only a few minutes or a few hours late.The value that you enter is used based on a 24 hour, 7 day per week calendar. For example, enter 1440 minutes (24 hours) for this profile option. A demand due at 15:00 on Tuesday does not cause late demand exception or diagnosis information as long as the supplies are complete by l5:00 on Wednesday.

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 347: Advanced Planning and Scheduling Profile Options Setups

MSO: Lead Time Control

Profile Code MSOProfile Option Name MSO_LEAD_TIME_CONTROLDescription Violate Minimum Processing Times to Meet

Demand Due Date: The planning engine meets the demand due date even if it compresses operations and supplies beyond their minimum durations (from item lead-times and routing usages).

Do Not Violate Minimum Processing Times: Theplanning engine respects the minimum durations ofoperations and supplies (from item lead-times and routing usages) even if it satisfies demands late.

Default Value: Violate minimum Processing Times to Meet Demand Due Date

In 11.5.10, this profile is only for EDD - Enforce Demand Due Dates plan

In 12.0.4 and above, this profile works for BOTH EDD and ECC - Enforce Capacity Constraints plans.

Note Reference(s) 399888.1 850591.1 443357.1

Bug Reference(s)Document References(s) -1

-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center No

Page 348: Advanced Planning and Scheduling Profile Options Setups

Global Order Promising No

MSO: List Size for Pricing Candidates

Profile Code MSOProfile Option Name MSO_CPX_PARAM_PRICELIMDescription Parameter to set the list size for pricing candidates.

Values: Integer > 0.Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Lookahead days to net co-product/by-productsupplies before creating planned orders

Profile Code MSOProfile Option Name MSO_CO_LOOKAHEAD_WINDOWDescription No used.Note Reference(s)

Bug Reference(s) 5462273Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra No

Page 349: Advanced Planning and Scheduling Profile Options Setups

Strategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Max Gap Tolerence on SDS

Profile Code MSOProfile Option Name MSO_MAX_GAP_TOLERANCE_ON_SDSDescription Per bug 8538729 this profile is not currently used.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Maximium Number of Prepones

Profile Code MSOProfile Option Name MSO_MAXIMUM_PREPONESDescription Scalability factor for the Scheduling Engine. The Scheduling Engine attempts

to schedule the operations in different orders to find a solution. Limits the number of times the Scheduling Engine attempts to schedule an operation.If there are many components for some items or many small supplies answering a demand, the number of orders is larger; reduce this parameter.Valid values are:

• Integer > 0

Can be defined at the site level. This profile is automatically calculated,this means that the Planning Engine determines the default value of this profile option.

If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option.

Default Value - 8Note Reference(s) Bug Reference(s)

Page 350: Advanced Planning and Scheduling Profile Options Setups

Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Maximize Search of Availability Intervals

Profile Code MSOProfile Option Name MSO_MAXIMIZE_SEARCH_OF_AVAILABILITY_INTERVALSDescription Enhances the capability of the scheduling engine to accurately identify

pockets of available time where resource activities can be feasibly scheduled. Valid values are:

• Yes - Maintains a detailed picture of the Resource Profile while scheduling. Resource Profile refers to the time varying picture of requirements and availability. The maintenance of this detailed picture causes the planning engine to miss fewer valid slots for scheduling activities than otherwise.

• No - Detailed Resource Profile is not maintained.

If you need to change the default value of this profile in your installation, it is recommended that you consult with Oracle Development before doing so. You can set this option if you receive the Requirement causes resource overload exceptions in the Planner Workbench in Enforce Capacity Constraints Plans.

If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option.

Note Reference(s) 841308.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC No

Page 351: Advanced Planning and Scheduling Profile Options Setups

Distribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Maximize Use of Unfirm PurchOrd/WorkOrd inOptimization

Profile Code MSOProfile Option Name MSO_SCO_MAXIMIZE_POWODescription Optimization phase of the engine has the capability to evaluate the use of

new planned orders versus using partial supplies from scheduled receipts. • If you set it to 0 (Zero) engine may create new planned

orders while scheduled receipts exist. Ex: you have demand of 10 units and you have a W/O or PO of 100 units, engine will create new supply for 10 units versus using 10 units ut of100 units of scheduled receipts and carrying the 90 units. This decision might be taken as it is cheaper to produce thanto carry extra inventory.

• If you set it to 1, the engine will use existing supplies and decide to carry the un used portion of the supplies from W/O or a PO. Continuing the example, Engine will use 10 units of supply out of 100 and decide to carry the rest of the 90 units instead of creating new supplies. This might not be cost effective.

Note Reference(s) 567317.1

Bug Reference(s) 4006732Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning Yes

All Plan Types NoEnforce Constraints – Not Optimized No

Enforce Constraints – Optimized No

Disable Constraints – Not Optimized No

Disable Constraints – Optimized NoRapid Planning NoDemand Planning No

Page 352: Advanced Planning and Scheduling Profile Options Setups

Demantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Maximum Activity Duration

Profile Code MSOProfile Option Name MSO_HLS_ACTIVITY_DURATION_MAXDescription Defines the Planning Engine maximum activity duration in days.All

requirements should be less in duration than this. If null, the planning horizonduration is used.If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option.Valid Values: Number>0Default Value: by Automatic Calculations

Note Reference(s) 179406.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Maximum Allowable Days Late

Profile Code MSOProfile Option Name MSO_MAX_DAYS_LATEDescription Limits the number of days by which a demand or unfirmed scheduled receipt

can be moved out when optimization is turned on. This value is used only to improve performance and reduce the size of the plan for the optimization component of the Planning Engine. Scheduling moves demands and unfirmed scheduled receipts out as long as necessary. Valid values are:

• Integer > 0

Can be defined at the site level.

Note: Set this to a number as large as the typical planning horizon to avoid

Page 353: Advanced Planning and Scheduling Profile Options Setups

unusual results.

Default Value - 300Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Maximum Allowable Days Late before Forecast Expiration

Profile Code MSOProfile Option Name MSO_MAX_FCST_LATE_DAYSDescription Oracle Advanced Supply Chain Planning uses this profile option when

planning supplies for forecast scenarios from Oracle Demand Planning, master demand schedule forecasts, and manual master demand schedule entries. When a forecast or master demand schedule entry cannot be completely satisfied within the allowable days late, the planning engine does not plan supplies for the quantity that is late by this many days. The profile option does not apply to sales orders. Valid values are:

• Interger > 0

Default Value - NullNote Reference(s)

859179.1

Bug Reference(s) 8801111Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning No

Page 354: Advanced Planning and Scheduling Profile Options Setups

Collaborative Planning NoInventory Optimization NoService Parts Planning Yes

All Plan Types NoEnforce Constraints – Not Optimized No

Enforce Constraints – Optimized No

Disable Constraints – Not Optimized No

Disable Constraints – Optimized NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Maximum Alternate Combinations

Profile Code MSOProfile Option Name MSO_ALT_COMBINATIONSDescription Does not appear in any manual,Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Maximum Demands Per Group for Advanced Sequencing

Profile Code MSOProfile Option Name MSO_NUMBER_OF_DEMAND_PER_GROUP_FOR_SDSDescription The profile option specifies the number of demands that are grouped

together for scheduling. The larger this number, the greater the chances of obtaining good sequences on the resources. Making this number too large might result in demand priorities not being fully respected while scheduling. Valid values are:

• Any number

Default Value - 1

Page 355: Advanced Planning and Scheduling Profile Options Setups

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Maximum Demands per Group

Profile Code MSOProfile Option Name MSO_DEMANDS_PER_GROUPDescription Determines the maximum number of demands that can be grouped together

for scheduling. Within a group, the default heuristic can try different orders among the demands. Valid values are:

• Integer > 0, smaller than the size of a slice

Default Value - 5Note Reference(s)

Bug Reference(s) 2829066Document References(s) -1

Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra No

Page 356: Advanced Planning and Scheduling Profile Options Setups

Strategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Maximum Demands per Slice

Profile Code MSOProfile Option Name MSO_DEMANDS_PER_SLICEDescription Determines the number of demands in a slice. Enables the Scheduling

Engine to resolve interactions of demands within a slice. Supplies shared between demands are scheduled better when the demands are in the same slice. However, slices that are too large slow down the Scheduling Engine use more memory. Valid values are:

• Integer >= 0

Default Value - 100Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Maximum Inventory Level % of Safety Stock

Profile Code MSOProfile Option Name MSO_MAX_INV_LEVELDescription Use this option to specify maximum inventory levels. If no other method of

calculation is defined for an item-organization maximum inventory level, the levels are based on the specified percentage of the safety stock level. Valid values are:

• Percentage between 0 and 100

Note Reference(s)

Page 357: Advanced Planning and Scheduling Profile Options Setups

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

-1Dependent Profiles MSO: Target Inventory Level % of Safety Stock11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning YesCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Maximum Lead Time Factor

Profile Code MSOProfile Option Name MSO_MAX_LEAD_TIME_FACTORDescription As per Bug#2953151 not used any more.

This is used by the scheduling engine. This is the fraction of the overall horizon length, within which the backward pass restricts looking for resourcesto fit the schedule. If this cannot be scheduled within this fraction of the overall horizon length, it is forward scheduled. The value is specified as a number between 0 to 1. This profile option can bedefined at the site level. You can update this value. The default value is 1

Note Reference(s) 167239.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 358: Advanced Planning and Scheduling Profile Options Setups

MSO: Maximum Number of Demands in a Hard Linked Demand Set

Profile Code MSOProfile Option Name MSO_MAX_DEMANDS_PER_HLK_DEMAND_SETDescription Value specified in number of demands. Default value is 1, indicating no

upper limit. This is a hidden profile option.Note Reference(s)

Bug Reference(s) 6818322Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Maximum Number of Pull for Operation

Profile Code MSOProfile Option Name MSO_MAX_PULL_OPERATIONDescription When an operation cannot be scheduled on a certain day, the scheduling

engine attempts to schedule it on an earlier date (for backward scheduling). This profile option controls how many days are tried in this manner. Many days result in lower performance. Valid values are:

• Integer > 0

Can be defined at the site level.

This profile is automatically calculated, this means that the Planning Engine determines the default value of this profile option.

Default Value - 8Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

Page 359: Advanced Planning and Scheduling Profile Options Setups

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Maximum Number of Pushes for Operation

Profile Code MSOProfile Option Name MSO_MAX_PUSH_OPERATIONDescription When you are running constrained plans with the Enforce Capacity

Constraints plan option checked,this profile option controls the number of attempts made to schedule a resource activity feasibly. Valid values are:

• -1 - Continues the search for available capacity till the end of the planning horizon.

• Integer > 0 - The number that you specify here determines the number of attempts that the planning engine makes to schedule the activity. For example, if you set the profile option to 5, the planning engine makes 5 attempts to schedule the activity feasibly, and after that schedules the activity with an overload. The spot chosen to schedule the activity with overload is the initial spot that was tried.

If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option.

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 360: Advanced Planning and Scheduling Profile Options Setups

MSO: Maximum Operations Per Slice

Profile Code MSOProfile Option Name MSO_HLS_MAX_OPERATIONS_PER_SLICEDescription Determines the number of operations which can be scheduled in a slice.

Limits the problem size in a slice and can be a limiting factor in determining the number of demands that can be scheduled in a slice.Oracle recommends that you use a large value such as the default value.If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option.Valid Values: Integer>0Default Value: 3000 operations

Note Reference(s) 747739.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Maximum Resource Over-capacity

Profile Code MSOProfile Option Name MSO_MAX_EXCESS_RESOURCE_UNITSDescription Assigns resource slacks when it does not find the resource available and it is

forced to use slacks. The Scheduling Engine initiate the resource slack from 0 to maximum assigned units and will jump to this number if no solution is possible. This limits the number of tries to assign the resource slack. Valid values are:

• Number > 0

Can be defined at the site level.

This is automatic Calculated profile. When the Default Value of a profile option states that it is automatically calculated, this means that the Planning Engine determines the default value of that particular profile option.

Default Value - 5Note Reference(s) Bug Reference(s)Document References(s)

Page 361: Advanced Planning and Scheduling Profile Options Setups

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Maximum Simplex Iterations

Profile Code MSOProfile Option Name MSO_CPX_PARAM_ITLIMDescription Parameter to set the maximum number of simplex iterations.

Values: Integer > 0Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 362: Advanced Planning and Scheduling Profile Options Setups

MSO: Maximum number of pulls/push for hard linked operations

Profile Code MSOProfile Option Name MSO_MAX_PUSH_PULL_FOR_HARD_LINKSDescription This hidden profile option is not used.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Minimize Supply Duration

Profile Code MSOProfile Option Name MSO_MIN_SUPPLY_LEAD_TIME_BY_LEFT_JUSTIFYDescription No Documentation on this profile

Used in HLS

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 363: Advanced Planning and Scheduling Profile Options Setups

MSO: Minimum Processing Lead Time Adjustment Factor

Profile Code MSOProfile Option Name MSO_MIN_PROC_LEAD_TIME_ADJ_FACTORDescription Not available in user guide.Note Reference(s) 564241.1

Bug Reference(s)Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Multiplier To Derive Supply Allocation Window

Profile Code MSOProfile Option Name MSO_FIRM_SUPPLY_MULTIPLIERDescription You can set the Firm Supply Allocation window using the profile option MSC:

Firm Supply Allocation Window or you can use the manufacturing lead-time and the profile option MSC: Multiplier to Derive Firm Supply Allocation Window.

If you specify any value for the latter profile option, the information you enter for MSC: Firm Supply Allocation Window is ignored. If the product of this multiplier and cumulative manufacturing lead-time is a fractional quantity, the number is rounded up to the next integer. Formulas for the item-specific firm supply allocation window:

• Make item: Cumulative manufacturing lead-time * MSO: Multiplier to derive supply allocation window.

• Buy item: Processing lead-time * MSO: Multiplier to derive supply allocation window.

Valid Value: Number >= 0. Default Value: Null.

Page 364: Advanced Planning and Scheduling Profile Options Setups

Note Reference(s) 1068297.1

Bug Reference(s)Document References(s) -1

-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Net All Firm Supplies Before Creating Planned Order

Profile Code MSOProfile Option Name MSO_FIRM_B4_PODescription Nets all firmed supply available in any future period before creating new

planned orders. The profile option treats firmed planned orders the same as real supplies. The values are:

• 1 - No: Does not net firm supplies before creating planned orders.

• 2 - All Supply Types: Net all firm supplies before creating planned orders. This includes work orders, purchase orders, transfer supplies and firm planned orders for these supplies.

• 3 - Only for Work Orders: Net only firm discrete jobs before creating planned orders. - Only for Purchase and Transfer Supplies: Net all firm purchased and transfer supplies before creating planned orders.

• 4 - All Supply Types Including by-product/co-product supplies: Nets all firm supplies (including by-product and co-product supplies) before creating planned orders. The planning engine does not reschedule by-product and co-product supplies, they follow the scheduling of the supply that generates them. This choice allows these supplies to be netted for earlier demands. This may cause late demands, but may reduce overall inventory.

Page 365: Advanced Planning and Scheduling Profile Options Setups

Default: NoNote Reference(s) 370386.1

749448.1

Bug Reference(s)Document References(s) -1

-1Oracle Advanced Supply Chain Planning Implementation and User's Guide-1-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Network routing cycle time coefficient

Profile Code MSOProfile Option Name MSO_NFL_CYCLE_TIME_COEFFICIENTDescription Used by the Scheduling Engine to calculate the window of time allocated to

schedule a network flow. This is used in conjunction with NFL Fixed Time Window. The window of time is (Coefficient *Cycle time) + Fixed time window. Valid values are:

• Number > 0

Defined at the site level.

Profile is applicable when OSFM Network Scheduling Method is set to Optimized.

Default Value:0Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections No

Page 366: Advanced Planning and Scheduling Profile Options Setups

Item Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Network routing fixed time window

Profile Code MSOProfile Option Name MSO_NFL_FIXED_TIME_WINDOWDescription Used by the Scheduling Engine to calculate the window of time allocated to

schedule a network flow. This is used in conjunction with NFL Fixed Time Window. The window of time is (Coefficient *Cycle time) + Fixed time window.

Valid values are: • Number > 0

Profile is applicable when OSFM Network Scheduling Method is set to Optimized.

Defined at the site level.

Default Value - 0Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 367: Advanced Planning and Scheduling Profile Options Setups

MSO: Nfl Backward Compression Pct

Profile Code MSOProfile Option Name MSO_NFL_BACKWARD_COMPRESSION_PCTDescription Defines the percentage of the actual resources capacity that the network flow

takes into account. A value under 100 percent tends to offload more activities to alternate resources. Can be defined at the site level. Valid values are:

• Between 10 and 100%

Profile is applicable when OSFM Network Scheduling Method is set to Optimized.

Default Value - 100%Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Nfl Forward Compression Pct

Profile Code MSOProfile Option Name MSO_NFL_FORWARD_COMPRESSION_PCTDescription Defines the percentage of the actual resources capacity that the network flow

takes into account. Use in forward phase to force the system to use alternates and limit the tardiness of activities. Valid values are:

• Between 10 and 100%

Can be defined at the site level.

Profile is applicable when OSFM Network Scheduling Method is set to Optimized.

Default Value - 100%Note Reference(s) Bug Reference(s)Document References(s)

Page 368: Advanced Planning and Scheduling Profile Options Setups

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Number of Backtracks Allowed

Profile Code MSOProfile Option Name MSO_MAX_BACKTRACKSDescription As per Bug 2953151, this is not usedNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Number of Demand Groups for Optimization

Profile Code MSOProfile Option Name MSO_SCO_MAX_DEMAND_GROUPSDescription You can use this profile option only for constrained plans that have decision

rules enabled. In the case of cost-based optimization, the planning engine considers the demand lateness penalty cost instead of demand priorities.

Use this profile option to instruct the planning engine how to group demand

Page 369: Advanced Planning and Scheduling Profile Options Setups

into demand groups by priority ranges. For example, the demand priority values are from 1 to 100 and you set this profile option to 5. The planning engine assigns demands to five demand groups. Each group includes a range of 20 priorities - 1 to 20, 21 to 40, 41 to 60, 61 to 80, 81 to 100.

The planning engine searches for supplies that satisfy all demands having priorities in the same range. It satisfies demands in the higher priority range first. For multiple demands in the same priority range, the planning engine satisfies demands based on individual demand priorities.

Valid values: Integer > 0 Default value = 50

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning Yes

All Plan Types NoEnforce Constraints – Not Optimized No

Enforce Constraints – Optimized No

Disable Constraints – Not Optimized No

Disable Constraints – Optimized NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Number of Iterations for Local Search

Profile Code MSOProfile Option Name MSO_NUMBER_OF_LOCAL_SEARCH_ITERATIONSDescription No information on this profile.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning No

Page 370: Advanced Planning and Scheduling Profile Options Setups

Rapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Number of LP Phases for Safety Stock Calculation

Profile Code MSOProfile Option Name MSO_SCO_MRP_SS_LOGICDescription Set only with guidance from Oracle DevelopmentNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Number of Threads for Optimization

Profile Code MSOProfile Option Name MSO_SCO_NUM_THREADSDescription This profile option applies to 64-bit platforms only.

• Values greater than 1 invoke running optimized plans in a multi-threaded mode. This enables various optimization problems to be solved in parallel so that run time may be reduced.

However, multi-threading increases the CPU usage and memory consumption. You can control the load on CPU by specifying the number of threads that you want to run in parallel.

Valid value: Integer >0

Page 371: Advanced Planning and Scheduling Profile Options Setups

Default value: nullNote Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning Yes

All Plan Types NoEnforce Constraints – Not Optimized No

Enforce Constraints – Optimized No

Disable Constraints – Not Optimized No

Disable Constraints – Optimized NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Optimization Advanced Start

Profile Code MSOProfile Option Name MSO_CPX_PARAM_ADVINDDescription This profile option controls whether the planning engine should be set to use

advanced start (profile option value 1). This means that the optimization engine uses certain values from a previous run of the plan; it sees improved performance by reusing certain computations.This is an optimization engine profile option and should not be changed under ordinary circumstances. Values: 0 and 1Default value is: Null (internally defaulted as a value of 1)

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC No

Page 372: Advanced Planning and Scheduling Profile Options Setups

Distribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Optimization Daily Aggregation Buckets

Profile Code MSOProfile Option Name MSO_SCO_AGGREG_DAY_BUCKETSDescription Specifies the Daily Aggregation Time Bucket to be used by the Planning

Engine if the profileoption MSO: Use Optimization Internal Time Aggregation is set to True.

Note Reference(s)

Bug Reference(s)Document References(s) -1

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Optimization Weekly Aggregation Buckets

Profile Code MSOProfile Option Name MSO_SCO_AGGREG_WEEK_BUCKETSDescription Specifies the Weekly Aggregation Time Bucket to be used by the Planning

Engine if the profile option MSO: Use Optimization Internal Time Aggregationis set to True.

Note Reference(s)

Bug Reference(s)

Page 373: Advanced Planning and Scheduling Profile Options Setups

Document References(s) -1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Order Modifier Max Searching Depth

Profile Code MSOProfile Option Name MSO_OM_CTP_MAX_DEPTHDescription Use this profile option to specify the maximum number of lower levels in the

supply chain that the planning engine searches for alternate sources, bills of material, components, and resources to resolve a shortage. The shortages often occur when the planning engine rounds down planed orders with respect to capacity constraints and order modifiers. The planning engine searches this many levels down both in:

• The organization with the shortage• Organizations that supply the short organization with the

short item

Oracle suggests that:The solution quality improves with higher numbers while the processing time worsens with higher numbers. For each integer increase in the profile option,processing time worsens at a much higher rate than solution quality improves. You consider the tradeoffs and tend towards lower rather than higher numbers.

Note Reference(s)

Bug Reference(s) 6890145Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning No

Page 374: Advanced Planning and Scheduling Profile Options Setups

Collaborative Planning NoInventory Optimization NoService Parts Planning Yes

All Plan Types NoEnforce Constraints – Not Optimized No

Enforce Constraints – Optimized No

Disable Constraints – Not Optimized No

Disable Constraints – Optimized NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Overlap Activities by MTQ

Profile Code MSOProfile Option Name MSO_OVERLAP_ACTIVITIES_BY_MTQDescription Use this profile option to control overlapping activities inside one operation.

Valid values are:

• Yes - Allow overlapping activities inside one operation.• No - Prevent overlapping activities inside one operation.

Default Value - NoNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 375: Advanced Planning and Scheduling Profile Options Setups

MSO: Peg By-product Supplies

Profile Code MSOProfile Option Name MSO_PEG_BYPROD_SUPPDescription • Yes: Pegging is considered when scheduling operations with

by-product supply. Scheduling of these operations respects demand for the by-product and demand for the main product.After scheduling these operations, the by-product supply date is updated to reflect the operation scheduled date.

• No: By-Product Supplies are not pegged to demands For constraint-based plans. Set this profile option to No with items that are components on the supply chain bill of materials and that are by-product on a different level of the same supply chain bill of materials. Selecting No prevents the planning engine from continuous looping between the component demand and the by-product supply.

Default Value: YesNote Reference(s) 566497.1

984372.1 957490.1

Bug Reference(s)Document References(s) -1

-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Penalty Basis for Changeovers

Profile Code MSOProfile Option Name MSO_PENALTY_BASIS_FOR_CHANGEOVERSDescription Indicates whether the changeover time of the changeover penalty is to be

used as the criterion for calculation the ideal sequence.Valid Values are:

• Changeover time :If Changeover Time, ASCP uses the

Page 376: Advanced Planning and Scheduling Profile Options Setups

relative changeover times between setup types as the criteria for deciding on the ideal sequence of setup types.

• Changeover Penalty: If Changeover Penalty, ASCP uses therelative changeover penalties between setup types as the criteria for deciding on the ideal sequence of setup types.

Default Value: Changeover timeNote Reference(s) 415276.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Penalty Cost Factor for Exceeding Item Material Capacity Flexfield Attribute

Profile Code MSOProfile Option Name MSO_ITEM_CAP_PENALTYDescription Stores the flexfield column name that contains the value in the corresponding

table. Setup performed only during application install. See 'Flexfield Attributes, page A-1 of ASCP user guide for more information.Valid Values: Interger>=0Default Value: Null

Note Reference(s) 763878.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning No

Page 377: Advanced Planning and Scheduling Profile Options Setups

Collaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Penalty Cost Factor for Exceeding Material Capacity

Profile Code MSOProfile Option Name MSO_GLOBAL_ITEM_PENALTYDescription Defines a penalty cost factor for exceeding material capacity.

Valid Values: Number>=0Default Value: Null

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Penalty Cost Factor for Exceeding Material Capacity Flexfield Attribute

Profile Code MSOProfile Option Name MSO_SUP_CAP_PENALTYDescription Attribute Number Automatically generated to denote flexfield segment

holding the penalty factor. This profile option stores the item flexfield segment that holds the penalty cost factor for exceeding material capacity.

The collections process Generate Planning Flexfield concurrent program captures the segment when it first runs during installation.

Note Reference(s)

Page 378: Advanced Planning and Scheduling Profile Options Setups

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Penalty Cost Factor for Exceeding Org Material Capacity Flexfield Attribute

Profile Code MSOProfile Option Name MSO_ORG_ITEM_PENALTYDescription Stores the flexfield column name that contains the value in the corresponding

table. Setup performed only during application install. See 'Flexfield Attributes,page A-1 for more information. Valid values are:

• Interger >= 0

Default Value - NullNote Reference(s) 1069694.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center No

Page 379: Advanced Planning and Scheduling Profile Options Setups

Manufacturing Operations Center NoGlobal Order Promising No

MSO: Penalty Cost Factor for Exceeding Org Resource Capacity Flexfield Attribute

Profile Code MSOProfile Option Name MSO_ORG_RES_PENALTYDescription Stores the flexfield column name that contains the value in the corresponding

table. Setup performed only during application install. See 'Flexfield Attributes,page A-1 for more information. Valid values are:

• Interger >= 0

Default Value - NullNote Reference(s) 1069694.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Penalty Cost Factor for Exceeding Org Transportation Capacity Flexfield Attribute

Profile Code MSOProfile Option Name MSO_ORG_TRSP_PENALTYDescription Stores the flexfield column name that contains the value in the corresponding

table. Setup performed only during application install. See 'Flexfield Attributes,page A-1 for more information. Valid values are:

• Interger >= 0

Default Value - NullNote Reference(s) 1069694.1

Page 380: Advanced Planning and Scheduling Profile Options Setups

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Penalty Cost Factor for Exceeding Resource Capacity

Profile Code MSOProfile Option Name MSO_GLOBAL_RES_PENALTYDescription Denotes a factor for plan profit computations that is invoked only when the

plan profit parameter for optimization has a value greater than 0. The penalty cost factor is multiplied by the resource cost to give the cost of overloading a particular resource.Valid Values: 0 and 1Default Value: Null (internally defaulted as a value of 1)

Note Reference(s) 562872.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 381: Advanced Planning and Scheduling Profile Options Setups

MSO: Penalty Cost Factor for Exceeding Resource Capacity Flexfield Attribute

Profile Code MSOProfile Option Name MSO_RES_PENALTYDescription Stores the flexfield column name that contains the value in the corresponding

table. Setup performed only during application install. Valid values are: • Interger >=0

Default Value - NULLNote Reference(s) 147242.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Penalty Cost Factor for Exceeding Transportation Capacity Flexfield Attribute

Profile Code MSOProfile Option Name MSO_TRSP_PENALTYDescription Penalty Cost for Exceeding Transportation Capacity (Optimized Plan)Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning Yes

Page 382: Advanced Planning and Scheduling Profile Options Setups

Collaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Penalty Cost Factor for Late Demands

Profile Code MSOProfile Option Name MSO_GLOBAL_DMD_PENALTYDescription MSO: Penalty Cost Factor for Late Demands Defines a penalty cost factor

common to all demands. The demands include sales orders, forecasts and safety stock. Can be defined at the site level. Values Integer > 0 No default value

Note Reference(s)

Bug Reference(s) 4139766Document References(s) -1

Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Penalty Cost Factor for Late Forecasts Flexfield Attribute

Profile Code MSOProfile Option Name MSO_FCST_PENALTYDescription Stores the flexfield column name that contains the value in the corresponding

table. Setup performed only during application install. Valid values are• Integer >= 0

Page 383: Advanced Planning and Scheduling Profile Options Setups

Default Value - NULLNote Reference(s)

176030.1

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Penalty Cost Factor for Late Item Demands Flexfield Attribute

Profile Code MSOProfile Option Name MSO_ITEM_DMD_PENALTYDescription Stores the flexfield column name that contains the value in the corresponding

table. Setup performed only during application install.Valid Values: Integer>=0Default Value: Null

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center No

Page 384: Advanced Planning and Scheduling Profile Options Setups

Manufacturing Operations Center NoGlobal Order Promising No

MSO: Penalty Cost Factor for Late Org Demands Flexfield Attribute

Profile Code MSOProfile Option Name MSO_ORG_DMD_PENALTYDescription Stores the flexfield column name that contains the value in the corresponding

table. Setup performed only during application install. See 'Flexfield Attributes, page A-1 for more information. Valid values are:

• Interger >= 0

Default Value - NullNote Reference(s) 1069694.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Penalty Cost Factor for Late Sales Orders Flexfield Attribute

Profile Code MSOProfile Option Name MSO_SO_PENALTYDescription Stores the flexfield column name that contains the value in the corresponding

table. Setup performed only during application install. See 'Flexfield Attributes,page A-1 in the ASCP User Guide for more information.

Valid values: integer >= 0Default value: 0

Note Reference(s) 153919.1

Bug Reference(s)

Page 385: Advanced Planning and Scheduling Profile Options Setups

Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Penalty Increase Tolerance Percentage in Local Search

Profile Code MSOProfile Option Name MSO_TOLERANCE_PERCENT_FOR_LOCAL_SEARCHDescription No information on this profile.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 386: Advanced Planning and Scheduling Profile Options Setups

MSO: Penalty multiplier outside unconstrained

Profile Code MSOProfile Option Name MSO_LATE_PENALTY_MULTIPLIERDescription This profile option specifies an extra lateness penalty when scheduling later

than the unconstrained latest possible completion time for a given activity.Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Percent Complete Before Resequencing

Profile Code MSOProfile Option Name MSO_PERCENTAGE_OF_OPS_SCHED_BEFORE_RESEQUENCEDescription No information on this profileNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center No

Page 387: Advanced Planning and Scheduling Profile Options Setups

Manufacturing Operations Center NoGlobal Order Promising No

MSO: Postpone Use of Alternates to Latest PossibleTime

Profile Code MSOProfile Option Name MSO_USE_ALT_ALAPDescription This will cause the planning engine to postpone the use of Alternate Rank

sourcing until latest possible time in the plan. Used with sourcing rules wheremultiple ranks are used and trying to force use of Alternates.Best to set to Yes when using Multi-Rank sourcing rules.

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Preemption Slack Ratio

Profile Code MSOProfile Option Name MSO_PREEMPT_SLACK_RATIODescription No information on this profileNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning No

Page 388: Advanced Planning and Scheduling Profile Options Setups

Collaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Preprocessing Aggregator Fill

Profile Code MSOProfile Option Name MSO_CPX_PARAM_AGGFILLDescription Preprocessor aggregator fill

Valid values: Integer >= 0Default value: See 'Automatic Calculations, page A-1 of the R12.1 ASCP User Guide.

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Preprocessing Aggregator Limit

Profile Code MSOProfile Option Name MSO_CPX_PARAM_AGGINDDescription Parameter to control preprocessing aggregator limit.

Values: Integer > 0Default value: See 'Automatic Calculations, page A-1 of the R12.1 User Guide.

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

Page 389: Advanced Planning and Scheduling Profile Options Setups

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Preprocessing Flag for LP Matrix

Profile Code MSOProfile Option Name MSO_CPX_PARAM_PREINDDescription Contains the presolve indicator.

Values are 0 and 1.Note Reference(s)

Bug Reference(s) 2149275Document References(s) -1

Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 390: Advanced Planning and Scheduling Profile Options Setups

MSO: Preprocessor LP Compression

Profile Code MSOProfile Option Name MSO_SCO_PREPROCESS_COMPRESSDescription Not Used by ASCPNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Primal Simplex Parameter

Profile Code MSOProfile Option Name MSO_PARAM_PPRIINDDescription Gradient parameter for primal simplex algorithm. Valid values are:

• -1• 0• 1• 2• 3• 4

Default Value - Automatic Calulations

When the Default Value of a profile option states that it is automatically calculated, this means that the Planning Engine determines the default value of that particular profile option. These profile options are included in this appendix for information purposes only. If you must change these profile option values, do so only after consulting Oracle Development and Oracle Support.

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections No

Page 391: Advanced Planning and Scheduling Profile Options Setups

Item Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Primal/Dual Preprocessing Reduction

Profile Code MSOProfile Option Name MSO_SCO_PREPROC_REDUCTIONDescription Values 0, 1, 2, and 3

See 'Automatic Calculations,in ASCP User Guide page A-1.Used by optimization

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Pull push base

Profile Code MSOProfile Option Name MSO_PULL_PUSH_BASE

Page 392: Advanced Planning and Scheduling Profile Options Setups

Description Need to check. As per the bug#2953151 this profile is not used. But the R12 doc has this profle.

Each time the planning engine needs to search for a new spot to schedule it looks ahead by a certain time period that is dictated by the settings of the profile options MSO: Push Pull Base and MSO: Push Pull Offset. Valid values are:

• Positive Interger

Default Value - 1Note Reference(s)

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Pull push offset

Profile Code MSOProfile Option Name MSO_PULL_PUSH_OFFSETDescription Need to check. As per the bug#2953151 this profile is not used. But the

R12 doc has this profle.

Each time the planning engine needs to search for a new spot to schedule it looks ahead by a certain time period that is dictated by the settings of the profile options MSO: Push Pull Base and MSO: Push Pull Offset. Valid values are:

• Positive Interger

Default Value - 1440Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC No

Page 393: Advanced Planning and Scheduling Profile Options Setups

Distribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Queue Time Factor

Profile Code MSOProfile Option Name MSO_SCO_LEAD_TIME_FACTORDescription Increases item lead-time in optimization, so that lead-time values are close to

those used in the Scheduling Engine. Optimization lead-time is padded to include queue time. Valid values: Number >=0

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Re-computation percentage for sequence generation

Profile Code MSOProfile Option Name MSO_RECOMPUTATION_PERCENTAGE_FOR_SDSDescription No information on this profileNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile No

Page 394: Advanced Planning and Scheduling Profile Options Setups

12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Reschedule Jobs Out to Reduce Inventory Carrying Costs

Profile Code MSOProfile Option Name MSO_RESCHEDULE_JOBS_OUTDescription This profile option involves right justifying standard and lot-based discrete

jobs when rescheduling them out to line up with other supplies for the job. When there is a constraint, the planning engine always moves the jobs based on the constraint. When there are no constraints, you have the option to instruct the planning engine to right justify the jobs. Valid values are:

• Yes - The planning engine attempts to schedule the job as late as possible for one or more demands.

• No - The planning engine does not reschedule or right justify the job beyond its old due date. If there is existing capacity earlier than the old due date of the job, the planning engine may recommend a reschedule in.

This profile option does not apply to other order types, for example, purchaseorders and purchase requisitions.

Note Reference(s)

Bug Reference(s) 7280156Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning No

Page 395: Advanced Planning and Scheduling Profile Options Setups

Demantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Reschedule Shared Supply to Influence Batching

Profile Code MSOProfile Option Name MSO_BATCHING_BEST_EFFORTDescription Determines whether the Planning Engine schedules shared supplies early to

avoid item-based resource constraints prior to batch resources. Valid values are:

• Yes - considers whether scheduling shared supplies early will allow subsequent resource batching; this value improves the scheduled utilization of batch resources by considering earlier constraints

• No - schedules resource batching when supplies are available

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Resource Adjustment Factor For Improved Offloading to Alternates

Profile Code MSOProfile Option Name MSO_SCO_RES_ADJ_FACTORDescription The factor that the planning engine uses to reduce the resource availability

when making the sourcing decision. For example, if the factor is set to 0.8, the resourceavailability is reduced by 20% and the planning engine uses more of the

Page 396: Advanced Planning and Scheduling Profile Options Setups

alternate processes. Then, at the time of scheduling, planning has more flexibility.

Valid values: A number between and including 0 and 1Default value: Null (internally defaulted as a value of 1)

Note Reference(s) 562872.1 374093.1 317501.1 787458.1

Bug Reference(s)Document References(s) -1

-1-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Resource Batching Strategy

Profile Code MSOProfile Option Name MSO_BATCHING_STRATEGYDescription Selects order scheduling strategy used in resource batching. Valid values

are:• Nearest Date - schedules orders to load resources nearest

the due date of the order)• Level Utilization schedules orders to level utilization of the

resource

Note Reference(s) 244748.1

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning No

Page 397: Advanced Planning and Scheduling Profile Options Setups

Inventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Resource Group for the Line Flexfield Attribute

Profile Code MSOProfile Option Name MSO_LINE_RESOURCE_GROUPDescription Stores the name of the flexfield column that contains the value in the

corresponding table. This setup is only performed duringapplication install. Valid Values: Integer>=0Default Value: Null

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Respect Activity Contiguity Flag for Process Supplies

Profile Code MSOProfile Option Name MSO_MAKE_ACTIVITY_NON_BREAKABLE_AS_PER_FLAGDescription No Documentation on this profile.Note Reference(s)

Bug Reference(s) 4517139Document References(s) -1Dependent Profiles11.5.10 Profile No

Page 398: Advanced Planning and Scheduling Profile Options Setups

12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Respect EDD Scheduling windows for Lead Times

Profile Code MSOProfile Option Name MSO_PRESERVE_OPERATION_LEADTIMESDescription Do not compress post processing lead time for buy orders if enforce

purchasing lead time option is unchecked.• Yes - The scheduling windows used in enforce demand due

dates scheduling will be respected when scheduling lead time activities such as pre-processing, processing, post-processing and fixed+variable lead times.

• No - In Enforce demand due dates scheduling, these lead times will be scheduled backwards from due date and need not respect the scheduling windows assigned to the supply.

Valid values: Yes/NoDefault value: Yes

Note Reference(s) 365112.1

Bug Reference(s) 44139134432428

Document References(s) -1-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra No

Page 399: Advanced Planning and Scheduling Profile Options Setups

Strategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: SCO Dual Variables Tolerance

Profile Code MSOProfile Option Name MSO_SCO_DUALVAR_TOLDescription Parameter used internally for optimization. Consult Oracle Development and

Oracle Support before modifying this profile option.

Valid values: Numeric Default value: 0.000000001

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning Yes

All Plan Types NoEnforce Constraints – Not Optimized No

Enforce Constraints – Optimized No

Disable Constraints – Not Optimized No

Disable Constraints – Optimized NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: SCO Reduced Cost Tolerance

Profile Code MSOProfile Option Name MSO_SCO_REDCOST_TOLDescription Parameter used internally for optimization. Consult Oracle Development and

Oracle Support before modifying this profile option.

Default value: 0.000000001Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles

Page 400: Advanced Planning and Scheduling Profile Options Setups

11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: SCO TRIANGULATION

Profile Code MSOProfile Option Name MSO_SCO_TRIANGULATIONDescription Internal (hidden profile)Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: STL Buffer Size

Profile Code MSOProfile Option Name MSO_STL_BUFFER_SIZEDescription Not used.Note Reference(s)

Bug Reference(s) 2953151Document References(s) -1Dependent Profiles

Page 401: Advanced Planning and Scheduling Profile Options Setups

11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Schedule Across Breaks

Profile Code MSOProfile Option Name MSO_SCHEDULE_ACROSS_BREAKSDescription Determines whether the scheduling engine starts an activity before a break

and ends it after the break. Valid values are:• Yes• No - verify that every activity has enough resource in one

shift (otherwise the activities are moved to the end of the horizon). Can be defined at the site level.

Note Reference(s)

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Schedule All Firm Planned Orders First

Profile Code MSO

Page 402: Advanced Planning and Scheduling Profile Options Setups

Profile Option Name MSO_SCHEDULE_FIRM_PLANNED_ORDERS_FIRSTDescription No documentation on this profile option. It appears that this can work to

make sure Firm Planned Orders are scheduled first before any new planned orders are created. This should work in tandem with other Firm profiles and could create a Natural Time fence.

Valid values: Yes/No Default value: No

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Schedule Simultaneous Resources Across Breaks

Profile Code MSOProfile Option Name MSO_SCHEDULE_ACROSS_BREAKS_FOR_SIM_RESDescription Specifies whether the simultaneous resource activity is allowed to go across

calendar breaks or not. Need more information on this profile, documentation missing.

Note Reference(s)

Bug Reference(s) 5028133Document References(s) -1

-1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning No

Page 403: Advanced Planning and Scheduling Profile Options Setups

Rapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Schedule window width

Profile Code MSOProfile Option Name MSO_SCHEDULE_WINDOW_WIDTHDescription Defines time window (days) that the scheduling engine looks for its primary

resource. If the primary resource is not in this window, the scheduling engine moves to an alternate resource. Can be defined at the site level. Valid values are:

• Integer >=0

Default Value - 8 daysNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Scheduler Time Step

Profile Code MSOProfile Option Name MSO_SCHEDULER_TIME_STEPDescription According to bug 2920076 this profile should have been removed from the

application and the user guide in 2003.Note Reference(s)

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes

Page 404: Advanced Planning and Scheduling Profile Options Setups

12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Scheduling Activity Selection Window

Profile Code MSOProfile Option Name MSO_SELECTOR_FORWARD_WINDOW_SIZEDescription no documentation on this bugNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Scheduling Window UOM

Profile Code MSOProfile Option Name MSO_DETAILED_SCHEDULING_WINDOW_UOMDescription Not currently used in ASCP per Bug 4007906Note Reference(s)

Page 405: Advanced Planning and Scheduling Profile Options Setups

Bug Reference(s) 4007906Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Setup Pattern Calculation Window

Profile Code MSOProfile Option Name MSO_SUB_HORIZON_CYCLE_FOR_HLS_SDSDescription A window is calculated by multiplying the Resource's Sequencing window

value by the value in this profile. Valid values are:

• Integer

The relative mix of various setup types that fall into this window is calculatedand then applied to each resource sequencing window.

When MSO: Use Sequencing Template is set to Yes, ASCP uses this calculated mix of setup types to determine the desired spots.

Default Value - 1Note Reference(s)

Bug Reference(s) 4113649Document References(s) -1

Oracle Advanced Supply Chain Planning Implementation and User's GuideOracle Advanced Supply Chain Planning Implementation and User's Guide-1

Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC No

Page 406: Advanced Planning and Scheduling Profile Options Setups

Distribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Simplex Feasibility Tolerance

Profile Code MSOProfile Option Name MSO_CPX_PARAM_EPRHSDescription Parameter to set the simplex feasibility tolerance.

Values: Number between e-9 and e-4Note Reference(s)

Bug Reference(s) 5090041Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Simplex Optimality Tolerance

Profile Code MSOProfile Option Name MSO_CPX_PARAM_EPOPTDescription Parameter to set the optimality tolerance for the simplex algorithm.

Values: Number between e-9 and e-4 Default: e-6

Note Reference(s)

Page 407: Advanced Planning and Scheduling Profile Options Setups

Bug Reference(s) 416444344165045090041

Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide-1-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Simplex Perturbation Constant

Profile Code MSOProfile Option Name MSO_CPX_PARAM_EPPERDescription This profile option is a parameter to set the simplex perturbation constant.

The value is specified as any number greater than e-8. This value is defaulted by CPLEX. Use for SCO. This profile should not be changed unless directed by Oracle Development

Note Reference(s) 147222.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center No

Page 408: Advanced Planning and Scheduling Profile Options Setups

Global Order Promising No

MSO: Simplex Perturbation Limit

Profile Code MSOProfile Option Name MSO_CPX_PARAM_PERLIMDescription Parameter for the simplex perturbation limit.

Values: Integer > 0Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Simplex Perturbation Parameter

Profile Code MSOProfile Option Name MSO_CPX_PARAM_PERINDDescription Provides a perturbation constant for the Planning Engine.

Sets the amount by which the Planning Engine perturbs the upper and lower bounds on the variables when a problem is perturbed. Values are 0 and 1.

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning No

Page 409: Advanced Planning and Scheduling Profile Options Setups

Collaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Simplex Presolve Limit

Profile Code MSOProfile Option Name MSO_CPX_PARAM_PREPASSDescription Parameter to set the limit on the number of pre-solves.

Values are -1, 0, and integer > 0Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Simplex Singularity Repair Limit

Profile Code MSOProfile Option Name MSO_CPX_PARAM_SINGLIMDescription Parameter to set the simplex singularity repair limit.

Values: Integer > 0.Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections No

Page 410: Advanced Planning and Scheduling Profile Options Setups

Item Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Skip Firm SDS Activities During Justify

Profile Code MSOProfile Option Name MSO_SKIP_FIRM_IN_SEQUENCE_FOR_JUSTIFYDescription Bug 8538729 tells this profile is not currently used.Note Reference(s)

Bug Reference(s) 8538729Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Slack Hours For Batch Resource

Profile Code MSOProfile Option Name MSO_SLACK_HOURS_FOR_BATCH_RESOURCEDescription This profile value is used by Oracle Advanced Supply Chain Planning to right

justify the maximum end date for a scheduled batch resource.The value specified is the amount of slack time (in hours) to delay schedulingthe resource so that other supplies can be included in the same batch even

Page 411: Advanced Planning and Scheduling Profile Options Setups

though they cannot be scheduled as early as the original supply. This means that the batch must wait for the constrained supply.

Valid values: integerDefault value: null

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning Yes

All Plan Types NoEnforce Constraints – Not Optimized No

Enforce Constraints – Optimized No

Disable Constraints – Not Optimized No

Disable Constraints – Optimized NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Solve Dual Problem

Profile Code MSOProfile Option Name MSO_CPX_DUALDescription Controls whether the Planning Engine solves the dual problem or the primal

problem. Valid values: 0 and 1Default value: See 'Automatic Calculations, page A-1 of the R12.1 ASCP User Guide.

Note Reference(s) 147222.1

Bug Reference(s)Document References(s) -1

Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning No

Page 412: Advanced Planning and Scheduling Profile Options Setups

Collaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Sourcing Allocation Window

Profile Code MSOProfile Option Name MSO_SCO_ALLOCATION_WINDOWDescription Specifies the Allocation Percentages Satisfaction Period. The constraints are

enforced in a rolling horizon manner. Used with Enforce Sourcing Constraintsenabled in specific plan options.

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Split Planned Orders for Assigned Units

Profile Code MSOProfile Option Name MSO_SCO_ASSIGNED_UNITSDescription This profile option is used by Oracle Advanced Supply Chain Planning

optimized plans only. It specifies if the planning engine should attempt to splitplanned orders such that they can be scheduled within a specific day. Valid values are:

• Yes: Create more planned orders with quantities that can be scheduled by the resource units available within a given day.

• No: The planning engine generates larger planned orders that may require a resource duration spanning several days.

Page 413: Advanced Planning and Scheduling Profile Options Setups

Note that the maximum number of resource units at the routing level will always be respected.

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Spread Resource Consumption Within Optimization

Profile Code MSOProfile Option Name MSO_SCO_SPREAD_RESOURCEDescription This profile specifies how the optimization engine should model resource

consumption is modeled in optimization. Valid values are:• Yes: Consume resources at the first operation. This value

provides improved optimization engine performance.• No: Consume resources at the operation to which they

belong. This value provides improved optimization engine accuracy.

Default value: Null (interpreted as No)Note Reference(s)

Bug Reference(s) 9020829Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization No

Page 414: Advanced Planning and Scheduling Profile Options Setups

Service Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Substitute Item Penalty

Profile Code MSOProfile Option Name MSO_SCO_SUB_ITEM_PENALTYDescription Defines an internal penalty weight for substitute item objective in supply

chain optimization.Valid values: number > 0Default: none

Note Reference(s) 228459.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Supplies used for satisfying transient safety stock

Profile Code MSOProfile Option Name MSO_TRANS_SS_SUPPLY_CHOICEDescription Values

• Supplies pegging to lower priority demands

• Closest pegged supplies

Not more documentation available for this profileNote Reference(s)

Page 415: Advanced Planning and Scheduling Profile Options Setups

Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Supply Reschedule Window Size for Safety Stock Pegging

Profile Code MSOProfile Option Name MSO_SS_WINDOW_SIZEDescription This profile options provides an estimate of the number of days by which the

supply and its associated demand (dependent demand) moves due to constraints. Valid values are:

• Integer > 0

You can use this profile option to specify the number of days a specific supply can satisfy safety stock demand.

Default Value - NullNote Reference(s)

Bug Reference(s) 3500953Document References(s) -1

Oracle Advanced Supply Chain Planning Implementation and User's GuideOracle Advanced Supply Chain Planning Implementation and User's Guide

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization No

Page 416: Advanced Planning and Scheduling Profile Options Setups

Service Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Supply Window Size

Profile Code MSOProfile Option Name MSO_SUPPLY_WINDescription Used with priority pegging.Note Reference(s)

Bug Reference(s)Document References(s) B31553-02Dependent Profiles MSC: Use FIFO Pegging11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Synchronize Chargeable Resources to Respect Hard Links

Profile Code MSOProfile Option Name MSO_SYNCHRONIZE_CHARGESDescription Not enough information in bugs to define this profile

Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning No

Page 417: Advanced Planning and Scheduling Profile Options Setups

Collaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Target Inventory Level % of Safety Stock

Profile Code MSOProfile Option Name MSO_TGT_INV_LEVELDescription Use this option to specify target inventory levels. If no other method of

calculation is defined for an item-organization target inventory level, the levels are based on the specified percentage of the safety stock level.

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

-1Dependent Profiles MSO: Maximum Inventory Level % of Safety Stock11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning YesCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Transfer Quantity Threshold for Enforceing Hard Links

Profile Code MSOProfile Option Name MSO_HARD_LINK_TRANSFER_QUANTITY_THRESHOLDDescription Use this profile option to instruct the planning engine to ignore the hard link

constraints if a transfer quantity is less than or equal to this percent thresholdof the corresponding order quantity.Valid values are

• Number between 0 and 1: Ignores hard link constraints for

Page 418: Advanced Planning and Scheduling Profile Options Setups

transfer quantities less than or equal to this percent threshold• Null: Respects all hard link constraints regardless of the size

of the transfer quantities

Default Value: 0Note Reference(s)

Bug Reference(s) 8730427Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: UOM for converting Changeover Time to Penalty

Profile Code MSOProfile Option Name MSO_UOM_TO_CONVERT_CHANGEOVER_TIME_TO_PENALTYDescription no documentation for this profileNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization No

Page 419: Advanced Planning and Scheduling Profile Options Setups

Advanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Upper Limit for Maximum Time Offset for Hard Links

Profile Code MSOProfile Option Name MSO_HARD_LINK_MAX_OFFSET_UPPERBOUNDDescription Use this profile option to set an upper limit for the maximum time offset. If a

maximum time offset is higher than this number, theplanning engine uses this number instead of what you set. Valid values are:

Valid Values: Integer (including 0),nullDefault value: Null

Note Reference(s) 760046.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Use Breaks in Calculation of Unconstrained Scheduling Windows

Profile Code MSOProfile Option Name MSO_USE_BREAKS_IN_UNCONSTRAINEDDescription The planning engine calculates an unconstrained scheduling window for

each resource activity and supply in a plan. The scheduling window is defined by the dates:

• Unconstrained Earliest Possible Start Time (UEPST)• Unconstrained Earliest Possible Completion Time (UEPCT)• Unconstrained Latest Possible Start Time (ULPST)• Unconstrained Latest Possible Completion Time (ULPCT).

Valid values are:

Page 420: Advanced Planning and Scheduling Profile Options Setups

• Yes - the planning engine does not set any of these dates during a break even if the calculation places it there.

• No - the planning engine does set any of these dates during a break if the calculation places it there.

Default Value - YesNote Reference(s) 1080929.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Use Collections Start Time

Profile Code MSOProfile Option Name MSO_USE_COLLECTIONS_START_TIMEDescription Use this profile option to coordinate plan start date and collections start time.

This affects how the plan calculates resource availability. Valid values are:• No - Always use plan start time.• Yes - Use collections start time.• Use Input Demand Plan Start Time or Collections Start Time

- If there is an input demand plan, the planning engine uses the Input Demand Plan Start Time. Otherwise, it uses the Collections Start Time.

• Use Input Demand Plan Start Time or Plan Start Time - The planning engine uses the Input Demand Plan Start Time. Otherwise, it uses the Plan Start Time.

Default Value - YesNote Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance No

Page 421: Advanced Planning and Scheduling Profile Options Setups

Advanced Supply Chain Planning YesAll Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Use Customer Site in End Item Substitution Rule

Profile Code MSOProfile Option Name MSO_USE_CUSTSITE_IN_ITEMSUBSTDescription Could not find information about this profile in user guides.Note Reference(s)

Bug Reference(s) 5048642Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising Yes

MSO: Use Discrete Job Resource Usage to Consume Resource Capacity

Profile Code MSOProfile Option Name MSO_USE_RESOURCE_HOURS_PRECONSUMEDescription Use this profile to instruct the planning engine what data to use for resource

load when it determines resource availability. Valid values are:

Page 422: Advanced Planning and Scheduling Profile Options Setups

• Yes: The planning engine uses resource hours to determine the resource load. Use this value if you do not attend to workin process timestamps, your work in process times are not adjusted for efficiency, and you specify resource hours.

• No: The planning engine uses timestamps to determine the resource load. Use this value if your work in process times are adjusted for efficiency. If work in process is scheduled bythe planning engine scheduling process, choose this value.

Default Value - NoNote Reference(s) 745977.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Use Effectivity Date to Infer End Item Substitution Priority

Profile Code MSOProfile Option Name MSO_USE_EFCDATE_FOR_PRIO_IN_ITEMSUBSTDescription Could not find information about this profile in user guides.Note Reference(s) 564241.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning No

Page 423: Advanced Planning and Scheduling Profile Options Setups

Inventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Use Existing Supplies in Alternate BOM/Subs.Comp

Profile Code MSOProfile Option Name MSO_SCO_EXIST_SUPP_ABR_SUBSCOMPDescription This profile will enable the user to adjust the objective sequence so that

optimization will always go to primary BOM before going to alternate BOM. Controls how SCO will use the existing supply in alternate BOM or substitute component paths.

• NULL or 0 (zero) is the default and indicates all the existing supply will be used before creating new planned orders in primary path.

• 1 means SCO will consume supplies in subs comp path but will not consume supplies in alternate BOM path.

• 2 means SCO will consume supplies in alt bom path but will not consume supplies in substitute component path.

NOTE: This profile, when used with the profile "MSO: Postpone Use of Alternates to Latest Possible Time" may give you different results. From Note365112.1 - also see Note 567667.1 for clarification on the use of this profile in an Enforce Due Date (EDD) plan.

Note Reference(s) 365112.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 424: Advanced Planning and Scheduling Profile Options Setups

MSO: Use Item Shelf Life Days in Scheduling Buy/Transfer Orders

Profile Code MSOProfile Option Name MSO_USE_SHELF_LIFEDescription This profile option specifies whether to use item shelf life days as a maximum

time offset between operations that produce and consume the item. Valid values are:

• Yes - the planning engine uses item shelf life days as a maximum time offset if a maximum time offset value is not specified on the routing step that produces the item.

• No - the planning engine does not use item shelf life days as a maximum time offset between operations.

Default Value - NoNote Reference(s) 415101.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Use JIT dates from high level scheduling results

Profile Code MSOProfile Option Name MSO_USE_JIT_DATES_FROM_HLSDescription Not currently used in ASCP per Internal Bug 4007906Note Reference(s) Bug Reference(s)Document References(s)Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

Page 425: Advanced Planning and Scheduling Profile Options Setups

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Use Of Assigned Units In Scheduling

Profile Code MSOProfile Option Name MSO_USE_OF_ASSIGNED_UNITS_IN_SCHEDULINGDescription Controls the number of resource units to be used when scheduling a

resource activity. Valid values are:• Variable - Permits a choice ranging between a minimum of

one unit and a maximum value equivalent to the assigned units specified on the routing for the item.

• Fixed at Routing Value - Forces the scheduling engine to always choose the number of assigned units specified in the routing when scheduling a resource activity. It is recommended that you choose this option when you do not need to use the flexibility of the Variable option.

Note: The assumption that the activity duration is less when more units are chosen is only valid for the basis type of Item specified in the Operation >Resources form.

Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 426: Advanced Planning and Scheduling Profile Options Setups

MSO: Use Optimization and Decision Rules for Simulation

Profile Code MSOProfile Option Name MSO_ONLINE_SCODescription For online planner sessions against constrained plans with decision rules or

optimized plans. Valid values are: • Yes: To rerun the optimization and decision rules-based

decisions during the online planner session• No: To retain the optimization and decision rules-based

decisions from the initial planning run for the online planner session Valid Values: Yes/No

Default Value - No (Do not run Optimization / Decision Rules during Online Planning)

Note Reference(s) 365112.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Use SCO Time Aggregation

Profile Code MSOProfile Option Name MSO_USE_SCO_INT_TIMEAGGREGDescription Determines whether the Planning Engine should use different aggregate time

buckets than specified in the aggregation settings of the plan options. You can specify large values for daily and weekly buckets for Planning Engine output, but this increases Planning Engine calculation time. Valid values are:

• True - The Planning Engine uses aggregate time buckets specified in MSO: Optimization Daily Aggregation Buckets and MSO: Optimization Weekly Aggregation Buckets. The period time bucket is derived.

Page 427: Advanced Planning and Scheduling Profile Options Setups

• False - The Planning Engine uses the same aggregate time buckets as specified in the Aggregation tab of the Plan Options window.

Default Value - FalseNote Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

-1-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Use Safety Lead Time

Profile Code MSOProfile Option Name MSO_USE_SAFETY_LEAD_TIMEDescription Use this profile option to instruct the planning engine how to plan material to

be completed early as a safety buffer. Valid values are:

• Yes - Use safety lead-time planning. The value in item attribute Safety Stock Percent is the safety lead-time in days;for example, if safety lead-time is two days, enter 200.

• No - Use non-transient / transient safety stock planning. The value in item attribute Safety Stock Percent is a percent of demand.

Default Value - NoNote Reference(s)

872475.1

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

-1Dependent Profiles

Page 428: Advanced Planning and Scheduling Profile Options Setups

11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Use Sequencing Template

Profile Code MSOProfile Option Name MSO_NEED_USE_SOFT_PATTERNDescription This profile option specifies whether Oracle Advances Supply Chain Planning

tries to schedule activities in accordance with a determined preferred sequence of activities. Valid values are:

• Yes - the planning engine determines a preferred sequence of activities on resources and tries to schedule activities in accordancewith the sequence. This setting is recommended if the sequence dependent setup resource is the primary bottleneck.

• No - the sequence of activities is determined more dynamically when scheduling other activities.This setting is recommended if there are multiple bottleneck resources.

Default value: NoNote Reference(s)

415276.1

Bug Reference(s) 9500377Document References(s) -1

-1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning No

Page 429: Advanced Planning and Scheduling Profile Options Setups

Rapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Use Shift Definitions When Scheduling Lead Times

Profile Code MSOProfile Option Name MSO_USE_SHIFT_TIMES_IN_LEAD_TIME_SCHEDULINGDescription Determines whether the planning engine needs to take into account shift

times for calculating lead-times on shipping, receiving, and carrier calendars. Valid values are:

• Yes - Considers shift definitions for calculating lead-times on calendars in case of constrained plans.

• No - Shift definitions are not considered when offsetting lead-times on calendars.

If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option. (Default)

Note Reference(s) 950994.1 978623.1

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

-1-1-1

Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 430: Advanced Planning and Scheduling Profile Options Setups

MSO: Use Up Existing Supply of Primary Components Before Substitute

Profile Code MSOProfile Option Name MSO_SCO_SUBSCOMP_SEQDescription Use this profile option to specify whether to use the supply of substitute

components or the primary component first. Valid values are:• Yes: Use the supply of the primary component before using

the supply of the substitute components• No: Use the supply of the substitute components before

using the supply of the primary component

Note Reference(s) 834624.1

Bug Reference(s)Document References(s) -1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning Yes

All Plan Types NoEnforce Constraints – Not Optimized No

Enforce Constraints – Optimized No

Disable Constraints – Not Optimized No

Disable Constraints – Optimized NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSO: Write Inline forecasting flat files

Profile Code MSOProfile Option Name MSO_FORECASTER_WRITE_FLATFILEDescription Setting MSO: Write Inline forecasting flat files to be Yes will generate flat

filesNote Reference(s)

Bug Reference(s) 7621495Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance No

Page 431: Advanced Planning and Scheduling Profile Options Setups

Advanced Supply Chain Planning YesAll Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSR: Budget Category Set

Profile Code MSRProfile Option Name MSR_BUDGET_CATEGORY_SETDescription Use this profile option to specify the categories that you can use when

defining budgets in Oracle Inventory. Valid values are:

• NULL - Define budgets with any category.

• Any category set: Define budgets only with categories that are in the category set.

Default Value - NULLNote Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization YesService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

Page 432: Advanced Planning and Scheduling Profile Options Setups

MSR: Budget Enditem Favor Factor

Profile Code MSRProfile Option Name MSR_BUDGET_ENDITEM_FAVOR_FACTORDescription Could not find details of this profile in user guides.Note Reference(s)

Bug Reference(s) 5182644Document References(s) -1Dependent Profiles11.5.10 Profile No12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSR: Postponement Factor

Profile Code MSRProfile Option Name MSR_POSTPONEMENT_FACTORDescription Specifies maximum depth in the bill of materials and sourcing tree to which

uncertainty must be postponed. Valid values are:

• Integers >= 0

Default Value - 10Note Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning No

Page 433: Advanced Planning and Scheduling Profile Options Setups

Demantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSR: Probability Distribution Type

Profile Code MSRProfile Option Name MSR_PROB_DISTR_TYPEDescription Determines probability distribution type associated with forecast sets as

input to Oracle Inventory Optimization. Valid values are:

• Probabilities - Demand uncertainty is stated in terms of a (non-cumulative) probability distribution.

• Cumulative Probabilities - Demand uncertainty is stated in terms of a cumulative probability distribution.

Default Value - ProbabilitiesNote Reference(s)

Bug Reference(s)Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's GuideDependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization YesService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No

MSR: Safety Stock Holding Strategy

Profile Code MSRProfile Option Name MSR_SS_HOLDING_STRATEGYDescription Specifies where safety stock should be held when the carrying cost is the

same for an item in the destination organization and a source organization. Valid values are:

• 0 - causes the safety stock to be held at the destination organization.

Page 434: Advanced Planning and Scheduling Profile Options Setups

• 1 - causes the safety stock to be held at the source organization.

Default Value - Source Organization Note Reference(s)

Bug Reference(s) 2260006Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide

-1Dependent Profiles11.5.10 Profile Yes12.1.1 ProfileData Collections NoItem Mass Maintenance NoAdvanced Supply Chain Planning Yes

All Plan Types NoUnconstrained Plan NoConstrained – EDD No

Constrained – ECC NoDistribution Planning NoCollaborative Planning NoInventory Optimization NoService Parts Planning NoRapid Planning NoDemand Planning NoDemantra NoStrategic Network Optimization NoAdvanced Planning Command Center NoManufacturing Operations Center NoGlobal Order Promising No