advisory 8 april 2008 regional market development impediments for traders strictly private and...

20
Advisory 8 April 2008 Regional Market Development Impediments for Traders Strictly Private and Confidential

Upload: verity-hawkins

Post on 03-Jan-2016

215 views

Category:

Documents


1 download

TRANSCRIPT

Advisory

8 April 2008

Regional Market DevelopmentImpediments for Traders

Strictly Private and Confidential

Agenda

Page

1 Survey 2006 1

2 New Survey 2008 4

3 Some result from the Survey 2006 8

4 Contact Data 18

Advisory

Section 1Survey 2006

Regional Market Development • Impediments for Traders

Survey from 2006

2

• PwC analysed impediments for electricity traders

• Priorities of the survey:

– Network access administration and bureaucratic formalities

– Power exchanges and trade mechanisms

– Balance Energy

– Congestion Management

– Market structure and Timetable

– Divergent IT Platforms and Data Delivery

We have asked 39 traders, with a response of 48%

Section 1 - Survey 2006

Regional Market Development • Impediments for Traders

Survey from 2006

3

• PricewaterhouseCoopers analysed the impediments for traders for one region : ‘Central-East Region’

• This region covers the following seven countries: Austria, Czech Republic, Germany, Hungary, Poland, Slovakia and Slovenia

• Study was separated in two sections:

– Country comparison

– Result of survey

Section 1 - Survey 2006

Advisory

Section 2New Survey 2008

Regional Market Development • Impediments for Traders

NEW: Trader Survey 2008

5

• Now expansion for Gas Traders

• Region will be South-South-East (SSE)

• Priorities of the Survey:

– Regional Market Access

– Trading Platforms

– Balancing Energy

– Gas Storage

– Transportation

– IT-SystemsSource: ERGEG

Section 2 - New Survey 2008

Regional Market Development • Impediments for Traders

Report

6

• Trader Survey:

– We ask the trader, the person who is active in the market

– Trader answers only for the market, which is not ‘their home market’

– We will now contact 110 Gas traders and shippers

• Report will have three section:

– Country comparison for basic information

– Survey with Gas Traders active in this region

– Evaluation of Result

• Result available: May 2008

Section 2 - New Survey 2008

Advisory

Section 3Some result from the Survey 2006

Regional Market Development • Impediments for Traders

Network access administration and bureaucratic formalities

9

Section 3 - Some result from the Survey 2006

Regional Market Development • Impediments for Traders

Availability of information in English in some countries is poor

10

Section 3 - Some result from the Survey 2006

Regional Market Development • Impediments for Traders

Certain countries requires trader license – and it is difficult to obtain this license

11

Section 3 - Some result from the Survey 2006

Regional Market Development • Impediments for Traders

TSO and Power Exchanges should work together

12

Section 3 - Some result from the Survey 2006

Regional Market Development • Impediments for Traders

Are the balance energy prices market oriented?

13

Section 3 - Some result from the Survey 2006

Regional Market Development • Impediments for Traders

IT systems are in most cases adjusted

14

Section 3 - Some result from the Survey 2006

Regional Market Development • Impediments for Traders

Data access: Not satisfactory! A general problem

15

Section 3 - Some result from the Survey 2006

Regional Market Development • Impediments for Traders

Overall Rating

16

Section 3 - Some result from the Survey 2006

Regional Market Development • Impediments for Traders

Main Result of Survey 2006

• Result shows, that there are still significant impediments for traders in these countries.

• By harmonisation of laws and market rules a significant part of impediments could be reduced. Here are the Ministries, Regulators and in certain cases also the Transmission System Operators are the main address for a further improvement.

• In relation to congestions on the interconnection lines, increased investments in networks will be necessary

17

Section 3 - Some result from the Survey 2006

Advisory

Section 4Contact Data

Regional Market Development • Impediments for Traders

Trader Survey Contact

Erwin Smole

Senior ManagerEnergy, Utility and Mining

Phone: +43 1 50188 - 2928Mobile: +43 699 115 320 71E-mail: [email protected]

PwC Corporate Finance Beratung GmbH

Erdbergstraße 200

A-1030 Vienna

Phone: +43 1 50 188 -2901

Fax: +43 1 50 188 -621

PricewaterhouseCoopers

19

Section 4 - Contact Data