A&E and Innovative Contracting Forecast Report for the 2018-21 STIP
Presented by: Ray Mabey, Delivery Services Manager February 16, 2018
Outsourced PE/PE+CEI – Projected Number of Projects
2
Outsourced PE/PE+CEI – Estimated Total Contract Value
3
Full Service Contract Tier Distribution Estimate
4
CA/CEI Outsourced – Projected Number of Projects
5
CA/CEI Outsourced - Estimated Total Contract Value
6
Anticipated Outsourcing Rates: 2018-2021 STIP
% PE Outsourced % CE Outsourced Region 1 79% Pending Region 2 69% 27% Region 3 31% 28% Region 4 60% Pending Region 5 63% 28% Statewide 67% 20%
7
8
• A+B and Multi-Parameter (under development)
• Others to be evaluated
Delivery Method Selection Tool
Design-Bid-Build
Design-Build CM/GC A+B Multi-
Parameter
Indefinite Delivery/
Indefinite Quantities(ID/IQ)
Constructability Reviews
Bid Alternates
Incentive/Disincentive
Contractual Options Non-Delivery Methods
9
Projects Considering Innovative Delivery Evaluated as of 2/9/2018
10
Reg. Project Name Scope/ Description Est. Project Cost
Est. Let Date
HB2017 Trigger Project
1 I-205: Stafford Road to OR99E Corridor (Abernethy Bridge)
Road Widening & Seismic Retrofit
$496 M
12/2020 Yes
1 OR217: SB and NB Auxiliary Lanes Hall Blvd.
Modernization, Adding Auxiliary Lanes, Bridge Replacement
$99 M 12/2019 Yes
1 I-5 26th Ave Bridge (08238)
Bridge Replacement
$34 M 9/2020 Yes
1 I-5 Rose Quarter Improvement Project
Adding Auxiliary Lanes, Bridge Replacement
$521 M
2021 Yes
Projects Considering Innovative Delivery Interested
11
Reg. Project Name Scope/ Description Est. Project Cost
Est. Let Date
HB2017 Trigger Project (Y/N)
2 Van Buren Bridge Bridge Replacement $69 M 2021 N
3 Southern Oregon Seismic Triage
Bridge Structures Seismic Stability
$35 M 2021 Y
4 US 97 At Terrebonne
Structure Over Local Road, one-way couplet
$20 M 2021 Y
4 US97 Cooley Road Mid-Term
Intersection Improvements, Overpass, etc.
$50 M 2025 Y
Thank you. 12