42A12NE8517 2.3790 MACDIARMID 010 o IH8I R E P O ,R T ON AN AIRBORNE ELECTROMAGNETIC (INPUT) SURVEY MACDIARMID TOWNSHIP TIMMINS, ONTARIO PORCUPINE MINING DIVISION for NORCEN ENERGY RESOURCES LIMITED Toronto, Ontario, Canada August, 1979 i. W. E. Brereton M P H CONSULTING LIMITED j).

Upload: others

Post on 05-Feb-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • 42A12NE8517 2.3790 MACDIARMID 010

    o IH8I

    R E P O ,R T

    ON

    AN AIRBORNE ELECTROMAGNETIC (INPUT) SURVEY

    MACDIARMID TOWNSHIP TIMMINS, ONTARIO

    PORCUPINE MINING DIVISION

    for

    NORCEN ENERGY RESOURCES LIMITED

    Toronto, Ontario, Canada August, 1979

    i.

    W. E. BreretonM P H CONSULTING LIMITED

    j).

  • INTRODUCTION

    i

    This report outlines the results of an INPUT survey flown

    in Macdiarmid Township, Ontario during the period May 11

    to 15, 1979.

    A brief description of the survey procedure together with

    recommendations for ground follow-up is included.

    A total of 47 linemiles of surveying was carried out over

    the 94 claims in Macdiarmid Township listed in the Technical

    Data Statement (Appendix 2). The survey was performed by

    Questor Surveys Limited employing a Britten Norman Tris-

    lander, registration C-GNKW, out of Timmins, Ontario.

    The survey results are presented in the map pocket at the

    rear.

  • MAP COMPILATION

    The base maps are uncontrolled mosaics constructed from

    l" - 4,300 feet (approximate) National Air Photo Library'

    photographs. The mosaics were reproduced at a scale of

    I" = 1 320 feet on stable transparent film from which

    white prints can be made.

    Flight path recovery was accomplished by comparison of

    the 35mm film with the mosaic to locate fiducial points.

    These points are approximately 4500 feet apart.

  • SURVEY AREA

    The survey area is located in northeast Macdiarmid township,

    approximately 15 miles northeast of Timmins/ Ontario. It is

    within a larger area which has seen a considerable amount of

    exploration work carried out in the form of prospecting,

    ground geophysical surveys, airborne geophysical surveys and

    diamond drilling.

    The past producing Kam Kotia and Jameland Mines Limited cop

    per-zinc deposits are located approximately 10 miles south-

    west of the survey area. Numerous other sulphide occuren-

    ces have been located by drilling within the area northwest

    of Timmins. These have proven uneconomic to date.

  • SURVEY PROCEDURE

    Terrain clearance was maintained as close to 400 feet as

    possible with the E.M. bird at approximately 150 feet above

    the ground. A normal S-pattern flight path using approxima

    tely one mile turns was used. The equipment operator log

    ged the flight details and monitored the instruments.

    A line spacing of 660 feet was used.

  • DATA PRESENTATION

    HII II li i i l l l l l l l

    The symbols used to designate the anomalies are shown in

    the legend on each map sheet, and the anomalies on each

    line are lettered in alphabetical order in the direction

    of flight. Their locations are plotted with reference to

    the fiducial numbers on the analog record.

    A sample record is included to indicate the method used

    for correcting the position of the E.M. bird and to iden

    tify the parameters that are recorded.

  • RESULTS

    There is one 3-channel INPUT anomaly in the east portion of

    the survey area representing, apparently, a north-northwest

    striking conductive zone. There is no direct magnetic cor

    relation.

    m m ii

  • CONCLUSIONS AND RECOMMENDATIONS

    i The anomaly should be investigated further as it does not

    appear to have been drill tested in the past.t

    MaxMin II and magnetic surveys should be carried out on

    100m lines off a northwest-southeast baseline as a prelude

    to possible diamond drilling.

    Respectfully submitted/

    WEB: g W. E. Brereton

  • ~"

    *

    i *

    **

    M.

    l..1

    ^4-- —

    — 7

    -—f—

    —4-

    •o l

    ^

    ' ~

    l

    •o la. ^

    lo.

    X—

    — —

    - ~

  • •if.'.;

    s;;:

    l

    Ministry of Natural Resources -

    GEOPHYSICAL - GEOLOGICAL - GEOCHEMICAL TECHNICAL DATA STATEMENT

    File.

    TO BE ATTACHED AS AN APPENDIX TO TECHNICAL REPORTFACTS SHOWN HERE NEED NOT BE REPEATED IN REPORT TECHNICAL REPORT MUST CONTAIN INTERPRETATION, CONCLUSIONS ETC.

    type of Survey^) Airborne E.M. (INPUT)township or Area Macdiarmid Township^.-Porgugir^g

    ||naim Ho3der(s) Norcen Energy Resources Limitedsion

    715-5th Ave. S.W., Calgary, Alta. T2P^Survey Company Qu e s tor Surveys Limited__________

    of Report W. E. Brereton/ R. de Carle-——-^

    2X7

    [LAddress of Author 706-141 Adelaide St. W., Toronto, Ontl vering Dates of Survey May 11-15, 1979 —(linccutting to office)

    ,,-TDtal Miles of Line Cut ̂ —^^—^^^^—^^^^

    SPECIAL PROVISIONS [CREDITS REQUESTED

    NTER 40 days (includescutting) for first

    survey.TER 20 days for each^ ' -

    dditional survey using same grid.

    Geophysical—Electromagnetic.—Magnetometer_—Radiometric———Other—————-.

    DAYS per claim

    Geological.Geochemical.

    OR-NE CREDITS (SpecifJ provision crediu do not apply to airborne surveyi)A. ft.

    !—— Radiometric ————i^gnetometer

    l.Electromagnetic

    il^*

    (enter days per claim)

    TE; August 21, 19-fefcNATURE:Author of Report or Agent

    •M- Geol.. .Quab'fi cations.

    TOTAL CLAIMS-il

    MINING CLAIMS TRAVERSED List numerically

    (prefix) (number)

    AS ATTACHED;

    all claims "P" prefix

    l

  • ll

    SELF POTENTIAL

    instrument___________________:———...—————————————— Range.survey Method -—-—.—-—.——.————--.-———.-—.--——-——-—————————-——.

    rrections made.

    DIOMETR1C

    Instrument.

    measuredEnergy windows (levels).leight of instrument ————.———————-—.———-——.—————.Background Count.lize of detector———-...-—.——.—..—.——..——..——.—.——-———————...——.^—

    sWverburden ________________________i———^^.—————.—.,..^—-—.—-.——.(type, depth include outcrop map)

    ESTHERS (SEISMIC, DRILL WELL LOGGING ETC.) P.•ype of survey_______________. ————istrument ̂ ^^——.—^^.—...—^—^—-.,..————.^.lccuracy.

    ameters measured.

    ir*,.^^Additional information (for understanding results).

    IRBORNE SURVEYSof jiiirvpy(s) Airborne Electromagnetic

    *Sstrument(s) Barringer/Questor Mark 6 INPUT system

    igmr. en racy 10(specify for each type of survey)

    (specify for each type of survey)Aircraft used Britten Norman Trislander———^———

    altitude,. 3.50 ft.Navigation and flight path recovery method In flight 35mm film strips relative to previously

    prepared l" to 1320ff photo mosains - visual navjga-hion.——.——-——-.^^^-^.—,.l•'Aircraft alfitnH^ 400 ft._________________________ Line Spacing .Jj^O.

    iles flown over total area 1699___________________Over claims

  • 1 i li li

    i l

    CLAIM NUMBER

    P - 452275

    452276

    452277

    452278

    452279

    452280

    452281

    452282

    452283

    452284

    452285

    452286

    452287

    452288

    452289

    452290

    452291

    452292

    452293

    452294

    DAYS

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

  • CLAIM NUMBER DAYS

    P - 495317

    495318

    495321

    495322

    20

    20

    20

    20

    ft

    * hh

    4 '" : ^i

    fc b

  • CLAIM NUMBER

    P - 521598

    521599

    521602

    521603

    521604

    521605

    521608

    521609

    521718

    521719

    521720

    521721

    521722

    521723

    521724

    521725

    521726

    521727

    521728

    521729

    DAYS

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

  • CLAIM NUMBER DAYS

    P - 517405

    517406

    517407

    517408

    517409

    522149

    522150

    522151

    522152

    522153

    522154

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

  • CLAIM NUMBER

    D - 516105

    P - 517370

    517371

    517372

    517373

    517374

    517375

    517376

    517377

    517378

    517379

    517380

    517381

    517382

    517383

    517384

    517385

    517386

    517387

    517388

    517389

    517390

    517391

    517392

    517393

    DAYS

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

    20

    517394 20517395 20

  • CLAIM NUMBER

    517396

    517397

    517398

    517399

    517400

    517401

    517402

    517404

    DAYS

    20

    20

    20

    20

    20

    20

    20

    20

  • CLAIM NUMBER__________________DAYS

    P - 516107 20

    P - 516108 20

    P - 516109 20

    P - 516110 20

    l l l l l l l l t l llll

    1 l i i i

  • CLAIM GROUP LOCATION MAP

    Mac North Group012

  • o c 70 m to Q m S r- m O

    l l l l l l l l l l l l l l l l l l l

  • i l "POPLAR -" f BLACK SPRUCE,

    NorcenEMirr RetourOM UnMted

    TIMMINS JOINT VENTURE

    ~ — - Vegelofion boundaries— == I r a i l s

    — Stream!,

    -m- C laim post

    -D- Witness post

    —— —— Traverse line

    T Previous dnll hole

    QUESTOR INPUT SURVEY DETAILED LINE LOCATION

    ANDGEOLOGICAL SURVEY

    MAC NORTH GROUPMacDiarmid Township

    Scale 1:5000NTS41-P-14&15

    March, 198)

    B. LAIRD

    42A12NE0517 2 .3790 MACDIARMID ao0

  • CARNEGIEMacDIARMID TWP

    MacDIARMIDKIDD

    JESSOPJAMIESON TWP

    42190E

    QUESTOR SURVEYS LIMITED

    TIMMINS AREA

    e 10