Page 1: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Aeronautical Survey Training Workshop

Corbin Training Facility

AC-5300-16 Geodetic Control

November 14-18, 2011

Page 2: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Agenda for AC-16 Geodetic Control

• Where to start• Overview (Plans and Data)• Survey Requirements• Survey monuments• Observations and data collection• Data processing• Required deliverables and submission

Page 3: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Where to start

• Statement of Work (SOW)– Geodetic Control Options

• NEW PACS/SACS (AC-16 2.2.1)• Verify Existing PACS/SACS (AC-18 2.6.10.1.1)• Temporary Survey Marks (TSM’s) (AC 2.2.2)

• AC-16– FAA AGIS Web Page

Page 4: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Where to start - AC 16 (continued)

– What are PACS/SACS?• Permanent Survey Marks tied to NSRS (AC 8.4.1-

8.6.1)• Horizontal and Vertical Datums (AC 3.1+3.2)

– NAD 1983– NAVD 1988 (Priority on BM’s)

Page 5: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Where to start (cont.)

• Introducing the NGS Web Page: FAA AC150 5300-16 Deliverables (Examples)

– Sample Geodetic Control Plan (New PACS/SACS)• Minimum Requirements (Big Picture)

– Airport Summary Report– Station Table– Airport Control Plot– Reconnaissance Photos

Page 6: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Minimum Requirements Big Picture (cont.)

– Station Location Sketch and Visibility Diagrams– GPS Observing Scheme– Project Vector Diagram– Proposed Instrumentation List– Listing of Data Processing Software– Quality Control Plan

Page 7: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Where to Start (cont.)

• NGS Example Geodetic Control Plan– The above is a link to the NGS example of a Geodetic

Control Plan

Page 8: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Where to Start (cont.)

– Sample AC-16 Data Submission (New PACS/SACS)• Minimum Requirements (Big Picture)

– Data (Raw Receiver and Rinex) – Field Logs– Photographs– Vector Processing Output– Project Vector Diagram

Page 9: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Where to Start (cont.)

• Minimum Requirements Data Big Picture (cont.)– Adjustment and Checking Program Output– Descriptions– Final Report

• NGS Example AC 16 Data

Page 10: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Where to Start (cont.)

• What is required regarding AC-16 Plans and associated Data for the Verify Existing PACS/SACS or Temporary Survey Marks (TSM’s) Geodetic Control options?

– AC-16 Geodetic Control Plans are not required• Do describe Geodetic Control within AC-18 Survey &

QC Plan– Submit any Data with the AC-18 Data (Survey Data)

submission

Page 11: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Overview (AC-16 Plans - New PACS/SACS)RECON

Page 12: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Overview (AC-16 Plans - New PACS/SACS)

Page 13: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Bench Mark Priority Table

Page 14: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Overview (AC-16 Plans - New PACS/SACS) (cont.)

• Survey Preparation and RECON– NGS Database search

• NGS Data Sheets • DSWORLD Software• WINDESC

Page 15: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Overview (AC-16 Plans - New PACS/SACS) (cont.)

• RECON– Importance of Airport Manager Interview

• Clearance to work on Airport• Any Existing NGS Marks on Airport (Published or

Unpublished)? • Candidate sites for New Marks

– Clear of future construction– Underground Utilities

• Airport Security and Safety

Page 16: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Overview (AC-16 Plans - New PACS/SACS) (cont.)

– Required Equipment for Vehicle– Unescorted access to AOA

• Control Tower or Unicom• Taxiway Designations/Map• FAA Terminal Procedures Publication• FAA Airport Facility Directory• Call Sign

– FAA Guide Airport Ground Vehicle Operations– Get a familiarization Tour of Airport

Page 17: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Overview (AC-16 Plans - New PACS/SACS) (cont.)

• Survey Requirements/New PACS/SACS– Survey Monuments

• Mark Settings/Stability Code A, B, or C• Stamping must be the LID followed by a sequential letter, followed by

the year the mark was set. (eg. SFQ A 2009, SFQ B 2009, SFQ C 2009)• Site Conditions

– Greater than 60 meters from runway edge– PACS/SACS should be 400 meters apart– Clear of ILS critical areas

Page 18: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Overview (AC-16 Plans - New PACS/SACS) (cont.)

– Intervisibility• PACS and both SACS are all intervisible with each

other • PACS is intervisible with both SACS but the SACS are

not intervisible with each other. • PACS is intervisible with one SACS and both SACS

intervisible with each other

Page 19: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Overview (AC-16 Plans - New PACS/SACS) (cont.)

– Use of existing monumentation (PACS)• Meets stability A or B• An existing concrete mark with a published stability of “C” can be used if it

meets the requirements of Section 8.4.3.1.:– The disk already exists– The monument is poured in place concrete– The monument is a triangulation station, azimuth mark, or bench mark

stamped “U.S. Coast and Geodetic Survey”, or any mark stamped “National Geodetic Survey.”

– The monument is set below the frost line.– The monument is set in non-expansive soils.– The monument shows no evidence of movement.– The monument meets all siting, construction, and intervisibility

requirements.

Page 20: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Overview (AC-16 Plans - New PACS/SACS) (cont.)

• Use of existing monumentation (SACS)• An existing mark may be used as a SACS if the mark meets A, B,

or C stability.

Page 21: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Overview (AC-16 Plans - New PACS/SACS) (cont.)

• Station Location Sketch and Visibility Diagram– Required for all marks (Proposed and Existing)– Show survey marks relation to

• Runway ends• Taxiways• Airport Lights, fence lines, buildings• Reference measurements

Page 22: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Overview (AC-16 Plans - New PACS/SACS) (cont.)

• Observations (minimum) and data collections– Observation Logs– CORS to PACS (TWO 4 hour sessions)– HARN Tie (ONE 4 hour session)– BM Ties(2 BM’s- ONE 4 hour session)– SACS – (TWO 1.5 hour sessions)– See AC 8.7.4-8.7.4.4– See AC 8.7.5-8.7.6

Page 23: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Overview (AC-16 Plans - New PACS/SACS) (cont.)

Page 24: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Overview (AC-16 Plans - New PACS/SACS) (cont.)

http://www.ngs.noaa.gov/ANTCAL/

Page 25: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Example Project Vector Diagram

Page 26: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Overview (AC-16 Plans - New PACS/SACS) (cont.)

– Required deliverables• Geodetic Control Plan• NGS Sample

– Submission• FAA AGIS Web Portal

Page 27: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Overview (AC-16 Data - New PACS/SACS)

• Survey Requirements – New PACS/SACS– Data Processing

• PAGE NT Software (See AC 8.8.1)– Be sure to update the files on your computer from this site on a

regular basis– Be sure to download the PRECISE ephemeris (CORS download

page)– NGS recommends also downloading the Global Navigation File

(CORS download page)

• Adjust Utilities Software

Page 28: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Overview (AC-16 Data - New PACS/SACS) (cont.)

• Vector Processing (AC 8.8)– Pay attention to sequential order of vector processing– Solution type based on vector distance– PACS processed first– Process BM Ties from PACS– Process HARN Tie from PACS– Create PACS Gfile– SACS processed relative to PACS– Create SACS Gfile– See Readme.txt file for PAGE NT sample data set

Page 29: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Overview (AC-16 Data - New PACS/SACS) (cont.)

– NGS example (Process and Compare with posted G file)– Special Consideration for AZ, OR, WA, NV, CA, and AK

• HTDP – Update positions and observations to a specified date.

Page 30: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Example Vector Processing Scheme

Averaged Coordinates

for PACS

1st CORS to PACS Session

2nd CORS to PACS Session

Page 31: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Solve Coordinates for PACS

Page 32: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Example Vector Processing Scheme (cont.)

Page 33: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Example Vector Processing Scheme (cont.)

Averaged PACS

coordinates

PACS to HARN and BMs (L3)

PACS to SACS (L1)

Page 34: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Example Vector Processing Scheme (cont.)

PACS to HARN and bench markAND

PACS to SACS sessions only

Page 35: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Overview (AC-16 Data - New PACS/SACS) (cont.)

• Create TWO separate Gfiles from running Sinex2g.exe– PACS.gfl – Contains CORS, PACS, HARN, BM vectors– SACS.gfl – Contains PACS and SACS vectors

Page 36: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Overview (AC-16 Data - New PACS/SACS) (cont.)

• Create TWO separate Bfiles– PACS.bfl – Contains CORS, PACS, HARN, and BM stations,

sessions, and GPS antenna/receiver information– SACS.bfl – Contains PACS and SACS stations, sessions, and

GPS antenna/receiver information

Page 37: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Overview (AC-16 Data - New PACS/SACS) (cont.)

• Create TWO sets of Afiles – Horizontal Free– Horizontal Constrained– Horizontal Free with Accuracies (QQRECORD)– Vertical Free– Vertical Constrained

Page 38: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Overview (AC-16 Data - New PACS/SACS) (cont.)

Bluebook• Adjustments (AC 8.9.2)

– Pay attention to sequence of adjustments– PACS adjusted first– SACS adjusted relative to PACS (do NOT run MODGEE)– Run all Adjust checking programs on final files– Criteria for NSRS HARN Tie 5cm hor, 10cm ellipsoid– Criteria for NSRS BM Tie 15cm orthometric– Criteria for PACS to SACS 3cm hor, 4cm ellipsoid, 5cm ortho

Page 39: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Overview (AC-16 Data - New PACS/SACS) (cont.)

• Import final Bfile into WINDESC and complete descriptions/recovery notes for all stations except CORS.

– Run spell check on all descriptions– Run DISCREP on all descriptions– Run NEIGHBOR on all descriptions– Export and check the Dfile

• Run OBSDES to compare final Bfile and Dfile

Page 40: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Overview (AC-16 Data - New PACS/SACS) (cont.)

• Required Deliverables– NGS Sample

• Submission– FAA AGIS Web Portal

Page 41: Aeronautical Survey Training Workshop Corbin Training Facility AC-5300-16 Geodetic Control November 14-18, 2011

Help and Training

• NGS Web Page: FAA AC150 5300-16 Deliverables• Training

– Corbin Training Center