af p&p 0+000 to 53+500-1-2
TRANSCRIPT
-
7/26/2019 AF P&P 0+000 TO 53+500-1-2
1/1
N
T
TBM
TBM
GPS
GPS
P-10
P-11
P-12
CEG-3
CEG-
4
TBM-P-11E=216253.315
N=3005201.207
Z=155.940
TBM-P-12E=216780.816
N=3004823.790
Z=155.811
ENGINEERS GROUPAnISO9001:2008Company
C O N S U L T I N G
CEG Tower, B-11(G), Malviya Industrial Area, Jaipur - 302017 Ind ia
Tel.+91 141 2751801,2751802,2751803,2751804 Fax: 0141-2751806
m i l r : h j r c i n i . c m L : .c i n i . c m
Detailed Design for Development of Agra to Firozabad(Village Gurha) (km -2.634 to 0.000 to 53.500) AccessControlled Expressway (Green Field) Project in the State of Uttar Pradesh on EPC mode
U.P. Expressways Industrial
Development Authority
PNC Infratech Limited
Co. PNC Tower, 3/22-D,Civil Lines,
Bypass Road, NH-2(Near Omax SRK Mall)Agra-282002 Tel.-91-562-4054400Fax-91-562-4070011,Email: [email protected]
LEGEND
OF HORIZONTAL PLAN
LEGEND
OF VERTICAL POFILE
Proposed Culvert
Proposed Minor Bridge
VUP / PUP
Proposed Minor Bridge
Proposed box Culvert
Proposed pipe Culvert
Proposed Right of Way
ROW Demarcated at Site
Proposed Paved Shoulder
Proposed Service Road
Proposed Center Line
Proposed FRL
GL at Proposed CL
GL Right @ 25m.
GL Left @ 25m.
Proposed VUP
Proposed PUP
Extra ROW Hatch
HoltecCenter, SushantLok,Gurgaon-122001,Harayana,India
C-13, 2ndFloor, Paryatan Bhawan,VipinKhand, Gomti Nagar Lucknow- 226010 (UP)
Holtec Consulting Pvt. Ltd.
InJoint
Venturewith